Dengan menggunakan persamaan lintasan inti kabel, didapat koordinat posisi kabel
untuk setiap nilai absis (satuan jarak) dari panjang bentang, seperti diperlihatkan pada
Tabel .
Tabel. Perhitungan lintasan inti tendon (cable)
X Y X Y X Y X Y X Y
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
-0.25 -0.022 8.00 0.560 17.00 0.855 26.00 0.796 35.00 0.383
0.00 0.000 9.00 0.610 18.00 0.866 27.00 0.767 36.00 0.315
1.00 0.085 10.00 0.656 19.00 0.872 28.00 0.735 37.00 0.243
2.00 0.166 11.00 0.697 20.00 0.874 29.00 0.697 38.00 0.166
3.00 0.243 12.00 0.735 21.00 0.872 30.00 0.656 39.00 0.085
4.00 0.315 13.00 0.767 22.00 0.866 31.00 0.610 40.00 0.000
5.00 0.383 14.00 0.796 23.00 0.855 32.00 0.560 0.25 0.022
6.00 0.446 15.00 0.820 24.00 0.839 33.00 0.505
7.00 0.505 16.00 0.839 25.00 0.820 34.00 0.446
1. Sudut Angkur
Persamaan lintasan tendon, Y = 4 x fi x X / L2 x (L - X)
dY/dX = 4 x fi x ( L 2X) / L2
Untuk X = 0 (posisi angkur di tumpuan), maka dY/dX = 4 x fi / L
Persamaan sudut angkur, = ATAN (dY/dX)
Nomor Jumlah Diameter fi
Eksentrisitas dy/dx Sudut Angkur
Tendon Strand Selubung (m)
1 12 76 f1 = 1.302 0.13020 1 =0.12947 rad = 7.418
2 19 84 f2 = 1.051 0.10513 2 =0.10475 rad = 6.002
3 19 84 f3 = 0.651 0.06507 3 =0.06497 rad = 3.723
4 19 84 f4 = 0.250 0.02500 4 =0.02499 rad = 1.432
2. Tata Letak dan Trace Kabel
L = 40.00 m f1 = 1.302 m
fo= es = 0.87445 m f2 = 1.051 m
yb = 1.012 m f3 = 0.651 m
f4 = 0.250 m
Posisi masing-masing cable : zi = zi' - 4 x fi x X / L2 x (L - X)
Jarak Trace Posisi masing-masing kabel
X Z0 Z1 Z2 Z3 Z4
(m) (m) (m) (m) (m) (m)
0.00 1.012 1.552 1.151 0.751 0.350
1.00 0.927 1.425 1.049 0.688 0.326
2.00 0.846
3.00 0.769
4.00 0.697
5.00 0.629
6.00 0.566
7.00 0.507
8.00 0.452
9.00 0.402
10.00 0.356
11.00 0.315
12.00 0.277
13.00 0.245
14.00 0.216
15.00 0.192
16.00 0.173
17.00 0.157
18.00 0.146
19.00 0.140
20.00 0.138
Z2 = Z2 - 4 x f2x X / L2 x (L - X)
= 1.151 4 x 1.051 x (0/402) x (40 0)
= 1.151 m
Z3 = Z3 4 x f3x X / L2 x (L - X)
= 0.751 4 x 0.651 x (0/402) x (40 0)
= 0.751 m
Z4 = Z4 4 x f4x X / L2 x (L - X)
= 0.350 4 x 0.250 x (0/402) x (40 0)
= 0.350 m
Z1 = Z1 - 4 x f1x X / L2 x (L - X)
= 1.552 4 x 1.302 x (1/402) x (40 1)
= 1.425 m
Z2 = Z2 - 4 x f2x X / L2 x (L - X)
= 1.151 4 x 1.051 x (1/402) x (40 1)
= 1.049 m
Z3 = Z3 4 x f3x X / L2 x (L - X)
= 0.751 4 x 0.651 x (1/402) x (40 1)
= 0.688 m
Z4 = Z4 4 x f4x X / L2 x (L - X)
= 0.350 4 x 0.250 x (1/402) x (40 1)
= 0.326 m