Hari/Tanggal
SEPTEMBER 2018
Upah/Hari 7 8 9 10 11 12 13 14 15 16 17 18
No. Nama Jabatan (Rp)
Minggu
Minggu
Selasa
Selasa
Jumat
Jumat
Kamis
Sabtu
Sabtu
Senin
Senin
Rabu
1 Mandor 150,000
2 Kepala Tukang 135,000
3 Tukang 125,000
4 Tukang 125,000
5 Tukang 125,000
6 Pekerja 85,000
7 Pekerja 85,000
8 Pekerja 85,000
9 Pekerja 85,000
10 Pekerja 85,000
11 Pekerja 85,000
12 Pekerja 85,000
13 Pekerja 85,000
14 Pekerja 85,000
15 Pekerja 85,000
16 Pekerja 85,000
17 Pekerja 85,000
18 Pekerja 85,000
TOTAL UPAH
PEMBULATAN
Terbilang : Tiga Puluh Lima Juta Rupiah
Serdan
Disetujui Oleh : Diperiksa Oleh :
Kuasa Pengguna Anggaran Pejabat Pelaksana Teknis Kegiatan
Bidang Kawasan Permukiman
12 1,800,000
12 1,620,000
12 1,500,000
12 1,500,000
12 1,500,000
12 1,020,000
12 1,020,000
12 1,020,000
12 1,020,000
12 1,020,000
12 1,020,000
12 1,020,000
12 1,020,000
12 1,020,000
12 1,020,000
12 1,020,000
12 1,020,000
12 1,020,000
21,180,000
21,180,000
ima Juta Rupiah
Rusdi, ST.
DAFTAR HADIR / TANDA TERIMA UPAH PEKERJA
KEGIATAN PILOT PROYEK PEMBANGUNAN INFRASTRUKTUR PERMUKIMAN PERDESAAN
DI DESA BINAAN PKK PROVINSI SUMATERA UTARA TAHUN ANGGARAN 2018
Lokasi : Dusun Batu Limapuluh Desa Bingkat Kecamatan Pegajahan Kabupaten Serdang Bedagai
Total Dana : Rp 16,080,000
Hari/Tanggal
SEPTEMBER 2018
Upah/Hari 7 8 9 10 11 12 13 14 15 16 17 18
No. Nama Jabatan Jumlah Total diterima Tanda Tangan
(Rp)
Minggu
Minggu
Selasa
Selasa
Jumat
Jumat
Kamis
Sabtu
Sabtu
Senin
Senin
Rabu
1 Mandor 150,000 12 1,800,000
2 Kepala Tukang 135,000 12 1,620,000
3 Tukang 125,000 12 1,500,000
4 Tukang 125,000 12 1,500,000
5 Tukang 125,000 12 1,500,000
6 Pekerja 85,000 12 1,020,000
7 Pekerja 85,000 12 1,020,000
8 Pekerja 85,000 12 1,020,000
9 Pekerja 85,000 12 1,020,000
10 Pekerja 85,000 12 1,020,000
11 Pekerja 85,000 12 1,020,000
12 Pekerja 85,000 12 1,020,000
13 Pekerja 85,000 12 1,020,000
TOTAL UPAH 16,080,000
PEMBULATAN 16,080,000
Terbilang : Tiga Puluh Lima Juta Rupiah
Ir. Herizal Ananda Pulungan, M.Si. Yuni Kurniasih, ST. Rusdi, ST.
NIP. 19631002 199009 1 001 NIP. 19770611 201001 2 010
DAFTAR HADIR / TANDA TERIMA UPAH PEKERJA
KEGIATAN PILOT PROYEK PEMBANGUNAN INFRASTRUKTUR PERMUKIMAN PERDESAAN
DI DESA BINAAN PKK PROVINSI SUMATERA UTARA TAHUN ANGGARAN 2018
Lokasi : Dusun 8 Desa Pematang Ganjang Kecamatan Sei Rampah Kabupaten Serdang Bedagai
Total Dana : Rp 10,530,000
Hari/Tanggal
SEPT 2018 OKTOBER 2018
Upah/Hari 28 29 30 1 2 3 4 5 6 7 8
No. Nama Jabatan Jumlah Total diterima Tanda Tangan
(Rp)
Minggu
Minggu
Selasa
Selasa
Jumat
Kamis
Sabtu
Sabtu
Senin
Senin
Rabu
1 Mandor 150,000 9 1,350,000
2 Kepala Tukang 135,000 9 1,215,000
3 Tukang 125,000 9 1,125,000
4 Tukang 125,000 9 1,125,000
5 Tukang 125,000 9 1,125,000
6 Pekerja 85,000 9 765,000
7 Pekerja 85,000 9 765,000
8 Pekerja 85,000 9 765,000
9 Pekerja 85,000 9 765,000
10 Pekerja 85,000 9 765,000
11 Pekerja 85,000 9 765,000
Ir. Herizal Ananda Pulungan, M.Si. Yuni Kurniasih, ST. Rusdi, ST.
NIP. 19631002 199009 1 001 NIP. 19770611 201001 2 010
DAFTAR HADIR / TANDA TERIMA UPAH PEKERJA
KEGIATAN PILOT PROYEK PEMBANGUNAN INFRASTRUKTUR PERMUKIMAN PERDESAAN
DI DESA BINAAN PKK PROVINSI SUMATERA UTARA TAHUN ANGGARAN 2018
Lokasi : Dusun 3 Desa Sei Naga Lawan Kecamatan Perbaungan Kabupaten Serdang Bedagai
Total Dana : Rp 20,160,000
Hari/Tanggal
SEPTEMBER 2018
Upah/Hari 7 8 9 10 11 12 13 14 15 16 17 18 19
No. Nama Jabatan Jumlah Total diterima
(Rp)
Minggu
Minggu
Selasa
Selasa
Jumat
Jumat
Kamis
Sabtu
Sabtu
Sabtu
Senin
Senin
Rabu
1 Mandor 150,000 12 1,800,000
2 Kepala Tukang 135,000 12 1,620,000
3 Tukang 125,000 12 1,500,000
4 Tukang 125,000 12 1,500,000
5 Tukang 125,000 12 1,500,000
6 Pekerja 85,000 12 1,020,000
7 Pekerja 85,000 12 1,020,000
8 Pekerja 85,000 12 1,020,000
9 Pekerja 85,000 12 1,020,000
10 Pekerja 85,000 12 1,020,000
11 Pekerja 85,000 12 1,020,000
12 Pekerja 85,000 12 1,020,000
13 Pekerja 85,000 12 1,020,000
14 Pekerja 85,000 12 1,020,000
15 Pekerja 85,000 12 1,020,000
16 Pekerja 85,000 12 1,020,000
17 Pekerja 85,000 12 1,020,000
TOTAL UPAH 20,160,000
PEMBULATAN 20,160,000
Terbilang : Tiga Puluh Lima Juta Rupiah
Ir. Herizal Ananda Pulungan, M.Si. Yuni Kurniasih, ST. Rusdi, ST.
NIP. 19631002 199009 1 001 NIP. 19770611 201001 2 010
N
Tanda Tangan
September 2018
ei Naga Lawan
DAFTAR HADIR / TANDA TERIMA UPAH PEKERJA
KEGIATAN PILOT PROYEK PENINGKATAN JALAN LINGKUNGAN
DESA BINAAN TAHUN ANGGARAN 2017
Hari/ Tanggal
JULI AGUSTUS
Upah/ hari 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11
No Nama Jabatan (Rp)
Minggu
Minggu
Minggu
Selasa
Selasa
Selasa
Jumat
Jumat
Jumat
Jumat
Kamis
Kamis
Kamis
Sabtu
Sabtu
Sabtu
Senin
Senin
Senin
Rabu
Rabu
Rabu
1 Mandor 140,000
2 Kepala Tukang 135,500
3 Tukang 120,000
4 Tukang 120,000
5 Pekerja 80,000
6 Pekerja 80,000
7 Pekerja 80,000
8 Pekerja 80,000
Tapanuli Tengah,
Disetujui Oleh Diperiksa Oleh
Kepala Bidang Perumahan Swadaya Pejabat Pelaksana Teknis Kegiatan
Selasa
Sabtu
Senin
22 3,080,000
22 2,981,000
22 2,640,000
22 2,640,000
22 1,760,000
22 1,760,000
22 1,760,000
22 1,760,000
22 2,981,000
22 3,080,000
22 2,640,000
22 2,640,000
22 1,760,000
22 1,760,000
22 1,760,000
35,002,000
Pembulatan 35,000,000