No.

Keterangan Volume Satuan


A. Biaya Pendirian Kolam (ukuran 4 x 2 x 1,3 m)
1. Bambu 1 10 40 set.batang.kolam
2. Bambu kulit anyaman ( 4 x 1,3 m) 1 2 40 set.lembar.kolam
3. Bambu kulit anyaman ( 2 x 1,3 m) 1 2 40 set.lembar.kolam
4. Terpal ( 7 x 5 m ) 1 1 40 set.lembar.kolam
5. Sekam padi 1 4 40 set.karung.kolam
6. Pompa kolam (60 watt) 1 1 40 set.buah.kolam
7. Kabel dan alat listrik (steker, jack) 1 3 40 set.buah.kolam
8. Tali tambang 1 2 40 set.kilogram.kolam
9. Tali rafia 1 1 40 set.roll.kolam
10. Paku 1 2 40 set.kilogram.kolam
11. Palu 1 2 5 set.buah.kelompok
12. Gergaji 1 2 5 set.buah.kelompok
13. Komsumsi tenaga kerja pasang kolam 10 2 5 hari.orang.kelompok

B. Biaya Bibit Ikan Lele


1. Bibit lele pembesaran (ukuran 5-7 cm) 1 3000 40 set.ekor.kolam

C. Biaya Perlengkapan Treatment Kolam


1. Probiotik (X-Tro) 1 1 40 set.buah.kolam
2. Pupuk urea (non subsidi) 1 0.25 40 set.kilogram.kolam
3. Dolomit (kapur pertanian) 1 1 40 set.kilogram.kolam

D. Biaya Peralatan Kolam


1. Ember 1 1 40 set.buah.kolam
2. Jaring ikan kecil 1 2 5 set.buah.kelompok
3. Jaring ikan besar 1 2 5 set.buah.kelompok
4. Timbangan gram 1 1 5 set.buah.kelompok
5. Senter 1 2 5 set.buah.kelompok
6. Selang 1 0.5 40 set.roll.kolam
7. Alat tulis (notes, bolpen) 1 2 5 set.buah.kelompok

E. Biaya Bahan Pakan Lele


1. Pakan bulan pertama (Hi-pro-vite FF-999) 1 2 40 bulan.karung 10 kg.kolam
2. Pakan bulan kedua (Hi-pro-vite 781-2) 1 3 40 bulan.karung 30 kg.kolam
3. Pakan bulan ketiga (Hi-pro-vite 781-3) 1 4 40 bulan.karung 30 kg.kolam

F. Biaya Tetap
1. Biaya listrik 1 3 40 set.bulan.kolam
2. Biaya PDAM 1 3 40 set.bulan.kolam

G. Biaya Lain-lain
1. Biaya tak terduga (10%)

GRAND TOTAL (A+B+C+D+E+F+G)


Harga Satuan Harga Total

20,000 8,000,000
90,000 7,200,000
45,000 3,600,000
250,000 10,000,000
7,500 1,200,000
120,000 4,800,000
20,000 2,400,000
42,500 3,400,000
5,000 200,000
14,000 1,120,000
20,000 200,000
40,000 400,000
25,000 2,500,000
Total A 45,020,000

125 15,000,000
15,000,000

45,000 1,800,000
4,000 40,000
2,000 80,000
Total C 1,920,000

25,000 1,000,000
15,000 150,000
30,000 300,000
200,000 1,000,000
20,000 200,000
165,000 3,300,000
10,000 100,000
Total D 6,050,000

112,000 8,960,000
209,000 25,080,000
201,000 32,160,000
Total E 66,200,000

15,000 1,800,000
7,500 900,000
Total F 2,700,000

13,689,000
Total G 13,689,000
A+B+C+D+E+F+G) 150,579,000
No. Keterangan Volume Satuan Harga Satuan
A. Total Pendapatan (1 periode panen)
1. Panen ikan lele (1 kg = 10 ekor) 300 x 40 kilogram.kolam 10,000
Total A
B. Beban Biaya (1 periode panen)
1. Biaya Bibit Ikan Lele 3000 x 40 ekor.kolam 125
2. Biaya Perlengkapan Treatment Kolam 1 x 40 set.kolam 48,000
3. Biaya Bahan Pakan Lele 1 x 40 set.kolam 1,655,000
4. Biaya Tetap (Listrik & PDAM) 1 x 40 set.kolam 67,500
Total B

PERKIRAAN PENDAPATAN BERSIH (A-B)

Pendapatan Pendapatan
Prosentase 1 Periode Panen Per Bulan
No. Keterangan
(A-B) x C (D/3)
C D E
1. Pendapatan Kelompok 70% 23,926,000 7,975,333
2. Kas 5% 1,709,000 569,667
3. Break Event Point 25% 8,545,000 2,848,333

1.89%
22.7%
Harga Total

120,000,000
120,000,000

15,000,000
1,920,000
66,200,000
2,700,000
85,820,000

34,180,000

Pendapatan BEP BEP


Per Orang (Bulan) (Tahun)
(E1¸10) ((RAB-B)/E3) (G3¸12)
F G H
797,533 - -
- - -
- 22.7 1.9
Schedule
No.
Pekerjaan Rincian
1. Pemesanan bibit lele 3.000 ekor per kolam
2. Pembelian bahan kolam & peralatan kolam
3. Pembuatan kolam 50 kolam dengan tenaga kerja 5 kelompok (10 orang)
4. Pengisian air kolam
5. Treatment air kolam menggunakan urea, dolomit dan probiotik
6. Pembelian dan pengisian bibit lele
7. Pemeliharaan ikan lele
8. Pemisahan ikan lele pemisahan ikan lele besar dan kecil
9. Pemeliharaan ikan lele
10. Pemisahan ikan lele pemisahan ikan lele besar dan kecil
11. Pemeliharaan ikan lele
12. Panen dan penjualan ikan lele
Time Schedule
Bulan I Bulan II Bulan III Bulan IV
I II III IV I II III IV I II III IV I II III IV