HARGA JUMLAH
No. URAIAN KEGIATAN VOLUME SATUAN
(Rp) (Rp)
A. PENGADAAN MEBELAIR
1. Meja dan Kursi Siswa 112 set 455,000 50,960,000
2. Meja Kursi Guru 4 set 1,950,000 7,800,000
JUMLAH (A) 58,760,000
Ongkos Tenaga
1. Tukang 2 orang @ 110.000 30 hari 220,000 6,600,000
2. Pembantu Tukang 3 orang @ 90.000 30 hari 270,000 8,100,000
JUMLAH (B) 78,895,000
D. AC/PENDINGIN
1. Unit AC/Pendingin 1 unit 6,500,000 6,500,000
2. Pemasangan Instalasi 1 1,500,000 1,500,000
JUMLAH (D) 8,000,000