Anda di halaman 1dari 4

PO NO : 5700000173 KERJASAMA SUPPLY BATU BARA

PEMBIAYAAN SUPPLY BATUBARA GAR 5400 DARI PT TRIPA BARA ke PT SEMEN PADANG

PENJELASAN M
1 2 3 4
KAS MASUK
Setoran Modal 469,000,000 469,000,000 469,000,000 469,000,000
Pembayaran dari PT Semen Padang - - - -
Lain-lain - - - -
TOTAL KAS MASUK 469,000,000 469,000,000 469,000,000 469,000,000
Pembayaran Lot ke … dari PT WHW

KAS KELUAR
Biaya penyediaan batubara :
- Pembayaran batu bara (Rp/ton) 350,000 350,000,000 350,000,000 350,000,000 350,000,000
- Pembayaran ongkos angkut (Rp/ton) 112,000 112,000,000 112,000,000 112,000,000 112,000,000
- Lain-lain (Rp/ton) 5,000 5,000,000 5,000,000 5,000,000 5,000,000
Biaya tak terduka dan biaya lain-lain 2,000,000 2,000,000 2,000,000 2,000,000
TOTAL KAS KELUAR 469,000,000 469,000,000 469,000,000 469,000,000

Assumsi schedule penyelesaian dokumen tagihan MINGGU KE


1 2 3 4
- Rekap dari Gudang
- Analisa labor
- GR
- Invoice
- Persetujuan bayar SCF
- Pembayaran diterima dari Semen Padang

ARUS KAS (Casf Flow) - - - -


SALDO KAS AWAL MINGGU 469,000,000 469,000,000 469,000,000 469,000,000
SALDO KAS AKHIR MINGGU - - - -

RENCANA PENGIRIMAN BATUBARA


Minggu ke : I II III IV
Jumlah (ton) 1,000 1,000 1,000 1,000

ANALISA LABA RUGI DAN PROFIT SHARING HARGA JUAL BATUBARA Rp./ton

SALDO KAS AKHIR 4,050,000,000


PENGEMBALIAN MODAL USAHA 2,345,000,000
LABA BERSIH 1,705,000,000
PROFIT SHARING : FUNDER (40%) 682,000,000
PROFIT SHARING : MINER (60%) 1,023,000,000
BARA
N PADANG

TAHUN 2019
MINGGU KE ……
5 5 6 7 8 9

469,000,000 - - - -
- 810,000,000 810,000,000 810,000,000 810,000,000 810,000,000
- - - - -
469,000,000 810,000,000 810,000,000 810,000,000 810,000,000 810,000,000
1 2 3 4

350,000,000
112,000,000
5,000,000
2,000,000
469,000,000 - - - -

5 6

- 810,000,000 810,000,000 810,000,000 810,000,000 810,000,000


469,000,000 810,000,000 1,620,000,000 2,430,000,000 3,240,000,000 4,050,000,000
- 810,000,000 1,620,000,000 2,430,000,000 3,240,000,000 4,050,000,000

V
1,000

810,000 DASAR PERHITUNGAN PRODUKSI


In mine cost $ 12.00 168,000
Coal $ 1.00 14,000
Hauling $ 1.50 21,000
crushing, stock pil $ 3.50 49,000
Transport $ 8.00 112,000
Royalti tax $ 2.50 35,000
Surveyor $ 1.50 21,000
Op. cost $ 1.50 21,000
Overhead $ 1.50 21,000
$ 33.00 462,000

$ 1.00 14,000.00