Anda di halaman 1dari 24

BILL OF QUANTITY (BOQ)

PEKERJAAN SIPIL
PEKERJAAN PEMBANGUNAN PRASARANA, PONDASI SWITC
EXTENSION 150 kV GI PLTU II KALBAR, KALIMAN

NO URAIAN KEGIATAN SATUAN

1 2 3

I PEKERJAAN PRASARANA

A. PEKERJAAN PERSIAPAN Unit


B. PEKERJAAN PEMATANGAN TANAH Unit

II PEKERJAAN SWITCH YARD

A. PEKERJAAN PONDASI SWITCHYARD


1 PEKERJAAN PONDASI C-11 ( 1 UNIT ) Unit
2 PEKERJAAN PONDASI C-12 ( 1 UNIT ) Unit
3 PEKERJAAN PONDASI C-23 ( 1 UNIT ) Unit
4 PEKERJAAN PONDASI LA ( 1 UNIT = 3 PONDASI ) Unit
5 PEKERJAAN PONDASI CPD (1 UNIT = 3 PONDASI ) Unit
6 PEKERJAAN PONDASI CT /CVT ( 1 UNIT = 3 PONDASI ) Unit
7 PEKERJAAN PONDASI CB ( 1 UNIT = 3 PONDASI ) Unit
8 PEKERJAAN PONDASI DS / DSE ( 1 UNIT = 3 PONDASI ) Unit
9 PEKERJAAN PONDASI MK ( 1 UNIT ) Unit
10 PEKERJAAN PONDASI CPD BUS (1 UNIT) Unit

B. PEKERJAAN CABLE DUCT DAN TUTUP CABLE DUCT


1 PEKERJAAN CABLE DUCT TYPE. I ( 1 m' ) M'
2 PEKERJAAN CABLE DUCT TYPE. II ( 1 m' ) M'
3 PEKERJAAN CABLE DUCT TYPE. III ( 1 m' ) M'
4 PEKERJAAN CABLE DUCT TYPE. IV ( 1 m' ) M'
5 PEKERJAAN CABLE DUCT TYPE. V ( 1 m' ) M'
6 PEKERJAAN PIPA CONDUIT TYPE I ( K1 / DS) Set
7 PEKERJAAN PIPA CONDUIT TYPE II ( K2 / CB ) Set
8 PEKERJAAN PIPA CONDUIT TYPE III( K3/ CT, CPD) Set

C. PEKERJAAN PENYANGGA KABEL/ CABLE TRAY Ls


NO URAIAN KEGIATAN SATUAN

1 2 3

D. PEKERJAAN DRAINASE (BAK KONTROL) set

E. PEKERJAAN HAMPARAN KORAL & KANSTEEN Ls

F. PENGADAAN DAN PEMASANGAN KONSTRUKSI BAJA U/ GANTRY


1 STEEL STRUCTURE U/KOLOM C-11 + MURBOUT LENGKAP Set
2 STEEL STRUCTURE U/KOLOM C-12 + MURBOUT LENGKAP Set
3 STEEL STRUCTURE U/KOLOM C-23 + MURBOUT LENGKAP Set
4 STEEL STRUCTURE U/ BEAM P-12 + MURBOUT LENGKAP Set
5 STEEL STRUCTURE U/ BEAM P-23 + MURBOUT LENGKAP Set

G. PEKERJAAN PAGAR SWITCHYARD Ls

H. PEKERJAAN SALURAN SWITCHYARD Ls


F QUANTITY (BOQ)
KERJAAN SIPIL
ASARANA, PONDASI SWITCHYARD 2 LINE BAY
LTU II KALBAR, KALIMANTAN BARAT

HARGA JUMLAH
VOLUME SATUAN HARGA
(Rp) (Rp)
4 5 6

1.00 - -
1.00 - -
JUMLAH I -

2.00 -
2.00 -
1.00 -
2.00 21,881,810.00 43,763,620.00
- - -
4.00 21,881,810.00 87,527,240.00
2.00 28,291,210.00 56,582,420.00
6.00 34,066,980.00 204,401,880.00
2.00 6,848,900.00 13,697,800.00
- - -
JUMLAH A 405,972,960.00

50.00 2,416,710.00 120,835,500.00


30.00 2,050,010.00 61,500,300.00
60.00 1,636,120.00 98,167,200.00
- - -
- - -
6.00 342,050.00 2,052,300.00
2.00 1,290,000.00 2,580,000.00
4.00 2,096,250.00 8,385,000.00
JUMLAH B 293,520,300.00

1.00 42,000,000 42,000,000.00


JUMLAH C 42,000,000.00
HARGA JUMLAH
VOLUME SATUAN HARGA
(Rp) (Rp)
4 5 6

2.00 7,865,329 15,730,658.78


JUMLAH D 15,730,658.78

1.00 129,031,597 129,031,597.47


JUMLAH E 129,031,597.47

2.00 -
2.00 -
1.00 -
4.00 -
2.00 -
JUMLAH F

1.00 64,110,480.00 64,110,480.00


JUMLAH G 64,110,480.00

1.00 45,328,197.74 45,328,197.74


JUMLAH H 45,328,197.74
JUMLAH II 995,694,193.99
HARGA PERKIRAAN ENJINIRING (HPE)
PEKERJAAN SIPIL
PEKERJAAN PEMBANGUNAN PRASARANA, PONDASI SWITCHYAR
EXTENSION 150 kV GI PLTU II KALBAR, KALIMANTAN BA

NO URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4

I. PEKERJAAN PRASARANA :

A. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi Unit 1.00
2 Penyediaan Direksi Keet, Gudang dan Barak Kerja Unit -
3 Mobilisasi dan Demobilisasi Unit 1.00
4 Mobilisasi dan Demobilisasi alat borepile Unit -
5 Membuat papan nama ( Nama proyek, jadwal pelaksanaan dan lay out ) Unit -
6 Pengukuran dan Pemasangan Bouwplank Unit 1.00
7 Sondir ttk 3.00

B. PEKERJAAN PEMATANGAN TANAH


1 Pekerjaan Stripping Tanah m2 2,500.00
2 Pekerjaan Urugan Tanah dari luar m3 2,500.00

II. PEKERJAAN SWITCH YARD

A. PEKERJAAN PONDASI SWITCHYARD

1. PEKERJAAN PONDASI GANTRY C-11 ( 1 UNIT )


1 Galian tanah untuk podasi m3 10.75
2 Urugan pasir m3 1.02
3 Urugan tanah kembali m3 3.50
4 Buangan tanah sisa galian m3 7.25
5 Borepile beton K-225 dia. 40 cm, L = 4 meter, (8 titik) m' 32.00
6 Beton Beton Lantai kerja B-0 m3 0.51
7 Beton K - 225 m3 7.25
8 Beton Grouting camp. 1PC : 1.5 Psr : 2.5 Krl m3 0.51
9 Besi Beton U-24 kg 498.75
10 Anchor lengkap set 16.00
11 Bekisting m2 7.68
NO URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4

2. PEKERJAAN PONDASI GANTRY C-12 ( 1 UNIT )


1 Galian tanah untuk podasi m3 12.60
2 Urugan pasir m3 1.20
3 Urugan tanah kembali m3 5.00
4 Buangan tanah sisa galian m3 7.60
5 Borepile beton K-225 dia. 40 cm, L = 4 meter, (8 titik) m' 32.00
6 Beton Beton Lantai kerja B-0 m3 0.60
7 Beton K - 225 m3 7.60
8 Beton Grouting camp. 1PC : 1.5 Psr : 2.5 Krl m3 0.85
9 Besi Beton U-24 kg 602.61
10 Anchor lengkap set 16.00
11 Bekisting m2 9.20

3. PEKERJAAN PONDASI GANTRY C-23 ( 1 UNIT )


1 Galian tanah untuk podasi m3 9.45
2 Urugan pasir m3 0.90
3 Urugan tanah kembali m3 2.45
4 Buangan tanah sisa galian m3 7.00
5 Borepile beton K-225 dia. 40 cm, L = 4 meter, (8 titik) m' 32.00
6 Beton Beton Lantai kerja B-0 m3 0.45
7 Beton K - 225 m3 7.00
8 Beton Grouting camp. 1PC : 1.5 Psr : 2.5 Krl m3 0.85
9 Besi Beton U-24 kg 451.82
10 Anchor lengkap set 16.00
11 Bekisting m2 6.60
NO URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4

4. PEKERJAAN PONDASI LA ( 1 UNIT = 3 PONDASI )


1 Galian tanah untuk podasi m3 3.41
2 Urugan pasir m3 0.57
3 Urugan tanah kembali m3 1.66
4 Buangan tanah sisa galian m3 1.76
5 Borepile beton K-225 dia. 40 cm, L = 4 meter, (1x3 titik) m' 12.00
6 Beton Beton Lantai kerja B-0 m3 0.29
7 Beton K - 225 m3 2.60
8 Beton Grouting camp. 1PC : 1.5 Psr : 2.5 Krl m3 0.16
9 Besi Beton U-24 kg 206.22
10 Anchor lengkap set 12.00
11 Bekisting m2 21.68

5. PEKERJAAN PONDASI CPD (1 UNIT = 3 PONDASI )


1 Galian tanah untuk podasi m3 3.41
2 Urugan pasir m3 0.57
3 Urugan tanah kembali m3 1.66
4 Buangan tanah sisa galian m3 1.76
5 Borepile beton K-225 dia. 40 cm, L = 4 meter, (1x3 titik) m' 12.00
6 Beton Beton Lantai kerja B-0 m3 0.29
7 Beton K - 225 m3 2.60
8 Beton Grouting camp. 1PC : 1.5 Psr : 2.5 Krl m3 0.16
9 Besi Beton U-24 kg 206.22
10 Anchor lengkap set 12.00
11 Bekisting m2 21.68

6. PEKERJAAN PONDASI CT ( 1 UNIT = 3 PONDASI )


1 Galian tanah untuk podasi m3 3.41
2 Urugan pasir m3 0.57
3 Urugan tanah kembali m3 1.66
4 Buangan tanah sisa galian m3 1.76
5 Borepile beton K-225 dia. 40 cm, L = 4 meter, (1x3 titik) m' 12.00
6 Beton Beton Lantai kerja B-0 m3 0.29
7 Beton K - 225 m3 2.60
8 Beton Grouting camp. 1PC : 1.5 Psr : 2.5 Krl m3 0.16
9 Besi Beton U-24 kg 206.22
10 Anchor lengkap set 12.00
NO URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4
11 Bekisting m2 21.68

7. PEKERJAAN PONDASI CB ( 1 UNIT = 3 PONDASI )


1 Galian tanah untuk podasi m3 7.07
2 Urugan pasir m3 0.78
3 Urugan tanah kembali m3 3.79
4 Buangan tanah sisa galian m3 3.28
5 Borepile beton K-225 dia. 40 cm, L = 4 meter, (1x3 titik) m' 12.00
6 Beton Beton Lantai kerja B-0 m3 0.39
7 Beton K - 225 m3 4.36
8 Beton Grouting camp. 1PC : 1.5 Psr : 2.5 Krl m3 0.16
9 Besi Beton U-24 kg 314.12
10 Anchor lengkap set 12.00
11 Bekisting m2 30.30
NO URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4
8. PEKERJAAN PONDASI DS/ DSE ( 1 UNIT = 3 PONDASI )
1 Galian tanah untuk podasi m3 6.08
2 Urugan pasir m3 1.05
3 Urugan tanah kembali m3 2.88
4 Buangan tanah sisa galian m3 3.21
5 Borepile beton K-225 dia. 40 cm, L = 4 meter, (2x3 titik) m' 24.00
6 Beton Beton Lantai kerja B-0 m3 0.53
7 Beton K - 225 m3 4.97
8 Beton Grouting camp. 1PC : 1.5 Psr : 2.5 Krl m3 0.31
9 Besi Beton U-24 kg 408.26
10 Anchor lengkap set 12.00
11 Bekisting m2 15.85

9. PEKERJAAN PONDASI MK ( 1 UNIT )


1 Galian tanah untuk podasi m3 1.02
2 Urugan pasir m3 0.23
3 Urugan tanah kembali m3 0.52
4 Buangan tanah sisa galian m3 0.50
5 Borepile beton K-225 dia. 40 cm, L = 4 meter, (1 titik) m' 4.00
6 Beton Beton Lantai kerja B-0 m3 0.11
7 Beton K - 225 m3 0.50
8 Besi Beton U-24 kg 67.70
9 Bolt fatener M-12 unit 4.00
10 Bekisting m2 8.52

10. PEKERJAAN PONDASI CPD BUS (1 UNIT)


1 Galian tanah untuk podasi m3 3.41
2 Urugan pasir m3 0.57
3 Urugan tanah kembali m3 1.66
4 Buangan tanah sisa galian m3 1.76
5 Borepile beton K-225 dia. 40 cm, L = 4 meter, (1 titik) m' 4.00
6 Beton Beton Lantai kerja B-0 m3 0.29
7 Beton K - 225 m3 2.60
8 Beton Grouting camp. 1PC : 1.5 Psr : 2.5 Krl m3 0.16
9 Besi Beton U-24 kg 206.22
10 Anchor lengkap set 12.00
11 Bekisting m2 21.68
NO URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4

B. PEKERJAAN CABLE DUCT DAN TUTUP CABLE DUCT

1. PEKERJAAN CABLE DUCT TYPE. I ( 1 m' )


1 Galian tanah m3 1.30
2 Urugan pasir m3 0.14
3 Urugan tanah kembali m3 0.27
4 Buangan tanah sisa galian m3 1.03
5 Beton Lantai kerja B-0 m3 0.07
6 Beton K.175 m3 0.40
7 Besi Beton U-24 kg 42.72
8 Bekisting m2 5.26
NO URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4

2. PEKERJAAN CABLE DUCT TYPE. II ( 1 m' )


1 Galian tanah m3 0.70
2 Urugan pasir m3 0.10
3 Urugan tanah kembali m3 0.08
4 Buangan tanah sisa galian m3 0.52
5 Beton Lantai kerja B-0 m3 0.05
6 Beton K.175 m3 0.32
7 Besi Beton U-24 kg 36.02
8 Bekisting m2 4.80

3. PEKERJAAN CABLE DUCT TYPE. III ( 1 m' )


1 Galian tanah m3 0.38
2 Urugan pasir m3 0.06
3 Urugan tanah kembali m3 0.05
4 Buangan tanah sisa galian m3 0.36
5 Beton Lantai kerja B-0 m3 0.03
6 Beton K.175 m3 0.27
7 Besi Beton U-24 kg 30.04
8 Bekisting m2 3.80

4. PEKERJAAN CABLE DUCT TYPE. IV ( 1 m' )


1 Galian tanah m3 0.12
2 Urugan pasir m3 0.03
3 Urugan tanah kembali m3 0.05
4 Buangan tanah sisa galian m3 0.14
5 Beton Lantai kerja B-0 m3 0.02
6 Beton K.175 m3 0.18
7 Besi Beton U-24 kg 23.16
8 Bekisting m2 2.80

5. PEKERJAAN CABLE DUCT TYPE. V ( 1 m' )


1 Galian tanah m3 0.90
2 Urugan pasir m3 0.10
3 Urugan tanah kembali m3 0.21
4 Buangan tanah sisa galian m3 0.70
5 Beton Lantai kerja B-0 m3 0.05
NO URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4
6 Beton K.175 m3 0.35
7 Besi Beton U-24 kg 45.24
8 Bekisting m2 4.26

6. PEKERJAAN PIPA CONDUIT TYPE I ( K1 / DS)


1 Galian tanah m3 0.20
2 Urugan tanah kembali m3 0.17
3 Buangan tanah sisa galian m3 0.03
4 Beton B-0 m3 0.03
5 Bekisting m2 0.72
6 Pipa conduit PVC dia 4" AW m' 1.80

7. PEKERJAAN PIPA CONDUIT TYPE II ( K2 / CB )


1 Galian tanah m3 0.84
2 Urugan tanah kembali m3 0.70
3 Buangan tanah sisa galian m3 0.14
4 Beton B-0 m3 0.14
5 Bekisting m2 3.06
6 Pipa conduit PVC dia 4 " AW m' 5.36
NO URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4

8. PEKERJAAN PIPA CONDUIT TYPE III( K3/ CT, CPD)


1 Galian tanah m3 1.32
2 Urugan tanah kembali m3 1.10
3 Buangan tanah sisa galian m3 0.22
4 Beton B-0 m3 0.22
5 Bekisting m2 4.79
6 Pipa conduit PVC dia 4 " AW m' 9.40

C. PEKERJAAN PENYANGGA KABEL/CABLE TRAY


1 TYPE I (6 shaf) Set 100.00
2 TYPE II (4 shaf) Set 60.00
3 TYPE III (4 shaf) Set 120.00
4 TYPE IV (2 shaf) Set -
5 TYPE V (3 shaf) Set -

D. PEKERJAAN DRAINASE ( BAK KONTROL )


1 Galian tanah m3 1.06
2 Urugan pasir m3 0.07
3 Urugan tanah kembali m3 0.77
4 Buangan tanah sisa galian m3 0.29
5 Beton Beton Lantai kerja B-0 m3 0.04
6 Beton K.175 m3 0.52
7 Besi Beton U-24 kg 46.52
8 Bekisting m2 7.13
9 Pipa PVC dia. 4" m' 30.00

E. PEKERJAAN HAMPARAN KORAL & KANSTEEN M' 100.00


1 Galian tanah m3 12.00
2 Urugan pasir m3 3.00
3 Buangan tanah sisa galian m3 6.00
4 Beton camp. K - 175 u/ kansteen m3 11.00
5 Hamparan koral m3 180.00

F. PENGADAAN DAN PEMASANGAN KONSTRUKSI BAJA U/ GANTRY


1 Steel structure U/ kolom C-11 + murbout lengkap (1 unit ) set 1.00
NO URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4
2 Steel structure U/ kolom C-12 + murbout lengkap (1 unit ) Set 1.00
3 Steel structure U/ kolom C-23 + murbout lengkap (1 unit ) Set 1.00
4 Steel structure U/ beam P-12 + murbout lengkap (1 unit ) Set 1.00
5 Steel structure U/ beam P-23 + murbout lengkap (1 unit ) Set 1.00

G. PEKERJAAN PAGAR SWITCHYARD M' 70.00


1 Galian tanah untuk pondasi m3 4.38
2 Urugan pasir padat m3 0.73
3 Urugan tanah kembali m3 2.19
4 Beton K - 175 m3 6.66
5 Besi Beton U-24 kg 1,331.46
6 Bekisting m2 42.00
7 Pancang Cerucuk Dia. 10 cm L = 4 M btg 59.00
8 Tiang dia.2"tinggi 190 cm galvanize lengkap dg. tutup btg 31.00
9 Panel BRC tinggi 190cm dia.7mm galvanize lengkap clamp dan baut panel 30.00
10 Pintu pagar galvanized type T 190, lebar = 2.5 m lengkap unit -

H. PEKERJAAN SALURAN SWITCHYARD M' 50.00


1 Galian tanah m3 24.50
2 Pasangan batu batu belah campuran 1pc :4ps m3 22.50
3 Plesteran camp. 1 Pc : 4 Ps m2 90.00
IRAAN ENJINIRING (HPE)
KERJAAN SIPIL
ASARANA, PONDASI SWITCHYARD 2 LINE BAY
TU II KALBAR, KALIMANTAN BARAT

HARGA JUMLAH
SATUAN HARGA
Rp. Rp.
5 6

-
-
-
-
-
-
-
JUMLAH A -
###
###
-
-
JUMLAH B -
###
###
###
###
###
###
75,000.00 806,250.00
175,000.00 178,500.00
40,000.00 140,000.00
25,000.00 181,250.00
550,000.00 17,600,000.00
750,000.00 382,500.00
1,300,000.00 9,425,000.00
900,000.00 459,000.00
15,500.00 7,730,625.00
250,000.00 4,000,000.00
225,000.00 1,728,000.00
JUMLAH 1 42,631,125.00
HARGA JUMLAH
SATUAN HARGA
Rp. Rp.
5 6
###
###
75,000.00 945,000.00
175,000.00 210,000.00
40,000.00 200,000.00
25,000.00 190,000.00
550,000.00 17,600,000.00
750,000.00 450,000.00
1,300,000.00 9,880,000.00
900,000.00 765,000.00
15,500.00 9,340,455.00
250,000.00 4,000,000.00
225,000.00 2,070,000.00
JUMLAH 2 69,311,149.18
###
###
75,000.00 708,750.00
175,000.00 157,500.00
40,000.00 98,000.00
25,000.00 175,000.00
550,000.00 17,600,000.00
750,000.00 337,500.00
1,300,000.00 9,100,000.00
900,000.00 765,000.00
15,500.00 7,003,210.00
250,000.00 4,000,000.00
225,000.00 1,485,000.00
JUMLAH 3 41,429,960.00
HARGA JUMLAH
SATUAN HARGA
Rp. Rp.
5 6
###
###
75,000.00 255,750.00
175,000.00 99,750.00
40,000.00 66,400.00
25,000.00 44,000.00
550,000.00 6,600,000.00
750,000.00 217,500.00
1,300,000.00 3,380,000.00
900,000.00 144,000.00
15,500.00 3,196,410.00
250,000.00 3,000,000.00
225,000.00 4,878,000.00
JUMLAH 4 21,881,810.00
###
###
-
-
-
-
-
-
-
-
-
-
-
JUMLAH 5 -
###
###
75,000.00 255,750.00
175,000.00 99,750.00
40,000.00 66,400.00
25,000.00 44,000.00
550,000.00 6,600,000.00
750,000.00 217,500.00
1,300,000.00 3,380,000.00
900,000.00 144,000.00
15,500.00 3,196,410.00
250,000.00 3,000,000.00
HARGA JUMLAH
SATUAN HARGA
Rp. Rp.
5 6
225,000.00 4,878,000.00
JUMLAH 6 21,881,810.00
###
###
75,000.00 530,250.00
175,000.00 136,500.00
40,000.00 151,600.00
25,000.00 82,000.00
550,000.00 6,600,000.00
750,000.00 292,500.00
1,300,000.00 5,668,000.00
900,000.00 144,000.00
15,500.00 4,868,860.00
250,000.00 3,000,000.00
225,000.00 6,817,500.00
JUMLAH 7 28,291,210.00
###
HARGA JUMLAH
SATUAN HARGA
Rp. Rp.
5 6
###
75,000.00 456,000.00
175,000.00 183,750.00
40,000.00 115,200.00
25,000.00 80,250.00
550,000.00 13,200,000.00
750,000.00 397,500.00
1,300,000.00 6,461,000.00
900,000.00 279,000.00
15,500.00 6,328,030.00
250,000.00 3,000,000.00
225,000.00 3,566,250.00
JUMLAH 8 34,066,980.00
###
###
75,000.00 76,500.00
175,000.00 40,250.00
40,000.00 20,800.00
25,000.00 12,500.00
550,000.00 2,200,000.00
750,000.00 82,500.00
1,300,000.00 650,000.00
15,500.00 1,049,350.00
200,000.00 800,000.00
225,000.00 1,917,000.00
JUMLAH 9 6,848,900.00
###
###
-
-
-
-
-
-
-
-
-
-
-
JUMLAH 10 -
HARGA JUMLAH
SATUAN HARGA
Rp. Rp.
5 6
###
###
###
###
75,000.00 97,500.00
175,000.00 24,500.00
40,000.00 10,800.00
25,000.00 25,750.00
750,000.00 52,500.00
900,000.00 360,000.00
15,500.00 662,160.00
225,000.00 1,183,500.00
JUMLAH 1 2,416,710.00
HARGA JUMLAH
SATUAN HARGA
Rp. Rp.
5 6
###
###
75,000.00 52,500.00
175,000.00 17,500.00
40,000.00 3,200.00
25,000.00 13,000.00
750,000.00 37,500.00
900,000.00 288,000.00
15,500.00 558,310.00
225,000.00 1,080,000.00
JUMLAH 2 2,050,010.00
###
###
75,000.00 28,500.00
175,000.00 10,500.00
40,000.00 2,000.00
25,000.00 9,000.00
750,000.00 22,500.00
900,000.00 243,000.00
15,500.00 465,620.00
225,000.00 855,000.00
JUMLAH 3 1,636,120.00
###
###
75,000.00 9,000.00
175,000.00 5,250.00
40,000.00 2,000.00
25,000.00 3,500.00
750,000.00 15,000.00
900,000.00 162,000.00
15,500.00 358,980.00
225,000.00 630,000.00
JUMLAH 4 1,185,730.00
###
###
75,000.00 67,500.00
175,000.00 17,500.00
40,000.00 8,400.00
25,000.00 17,500.00
750,000.00 37,500.00
HARGA JUMLAH
SATUAN HARGA
Rp. Rp.
5 6
900,000.00 315,000.00
15,500.00 701,220.00
225,000.00 958,500.00
JUMLAH 5 2,123,120.00
###
###
75,000.00 15,000.00
40,000.00 6,800.00
25,000.00 750.00
750,000.00 22,500.00
225,000.00 162,000.00
75,000.00 135,000.00
JUMLAH 6 342,050.00
###
###
75,000.00 63,000.00
40,000.00 28,000.00
25,000.00 3,500.00
750,000.00 105,000.00
225,000.00 688,500.00
75,000.00 402,000.00
JUMLAH 7 1,290,000.00
HARGA JUMLAH
SATUAN HARGA
Rp. Rp.
5 6
###
###
75,000.00 99,000.00
40,000.00 44,000.00
25,000.00 5,500.00
750,000.00 165,000.00
225,000.00 1,077,750.00
75,000.00 705,000.00
JUMLAH 8 2,096,250.00
###
###
150,000.00 15,000,000.00
150,000.00 9,000,000.00
150,000.00 18,000,000.00
- -
- -
JUMLAH C 42,000,000.00
###
###
75,000.00 125,323.80
175,000.00 16,921.80
40,000.00 47,539.80
25,000.00 51,156.00
750,000.00 48,609.43
900,000.00 702,178.65
15,500.00 1,144,252.44
225,000.00 2,134,117.47
75,000.00 3,595,230.00
JUMLAH D 7,865,329.39
###
###
75,000.00 1,418,760.00
175,000.00 725,220.00
25,000.00 1,058,400.00
900,000.00 14,853,779.22
350,000.00 110,975,438.26
JUMLAH E. 129,031,597.47
###
###
87,620,000.00
HARGA JUMLAH
SATUAN HARGA
Rp. Rp.
5 6
77,847,000.00
50,550,000.00
100,763,000.00
100,763,000.00
JUMLAH F. 417,543,000.00
###
###
75,000.00 328,500
175,000.00 127,750
40,000.00 87,600
900,000.00 5,994,000
15,500.00 20,637,630
225,000.00 9,450,000
40,000.00 2,360,000
375,000.00 11,625,000
450,000.00 13,500,000
- -
JUMLAH G 64,110,480
###
###
75,000.00 2,896,635.00
750,000.00 33,445,039.78
60,000.00 8,986,522.96
JUMLAH H 45,328,197.74