Anda di halaman 1dari 7

REKAP PENAWARAN HARGA

PROYEK : COMPACT HOUSE TEBET


OWNER :
LOKASI : TEBET - JAKRTA SELATAN
TAHUN : AGUSTUS 2019

REKAP PEKERJAAN
II. PEK. LANTAI SATU Rp. 252,917,385
III. PEK. LANTAI DUA Rp. 90,224,149

SUB TOTAL Rp. 343,141,535

PPN 10 % Rp. 34,314,153

TOTAL Rp. 377,455,688

HARGA PER M2 Rp. 2,042,509


REKAP PENAWARAN HARGA
PROYEK : COMPACT HOUSE TEBET
OWNER :
LOKASI : TEBET - JAKRTA SELATAN
TAHUN : AGUSTUS 2019

REKAP PEK. LANTAI 1


I. PEK. BETON BERTULANG Rp. 141,591,800
II. PEK. DINDING Rp. 58,880,000
III. PEK. LANTAI Rp. 24,790,585
IV. PEK. KUSEN PINTU & JENDELA Rp. -

V. PEK. PLAFOND Rp. 8,505,000


VI. PEK. CAT Rp. 19,150,000
VII. PEK. TANGGA Rp. -
VIII. PEK. MEKANIKAL & ELETRIKAL Rp. -
IX. PEK. LAIN - LAIN Rp. -

Rp. 252,917,385
RAB COMPACT HOUSE
TEBET - JAKARTA SELATAN
OWNER :
LOKASI : TEBET - JAKRTA SELATAN
TAHUN : AGUSTUS 2019
LANTAI : LANTAI SATU

Harga Jumlah
No Uraian Pekerjaan Sat Volume Satuan Harga
A. PEK. BETON BERTULANG
A.I PEK. TANAH
1 Galian pondasi m3 8 88,000 704,000
2 Urug kembali bekas galian m3 1.44 13,731 19,773
3 Buang tanah bekas galian m3 6.56 27,522 180,544
4 Pasir urug t = 100 mm m3 0.80 215,523 172,418
5 Lantai kerja t = 50 mm m3 0.40 808,401 323,360
-
A.II PONDASI BOER PILE -
1 Boer Dia. 40 mm kedalaman 4 meter m1 160.00 170,914 27,346,176
2 Beton K 250 m3 22.61 1,123,756 25,405,865
-
A.III PONDASI FOOT PLAT -
1 Pile Cap Uk. 1000x1000x500 -
2 Beton K 250 m3 4.00 3,200,000 12,800,000
4 Bekisting batako m2 16.00 95,015 1,520,248
-
A.IV KOLOM -
1 Kolom Uk. 250 x 250 -
2 Beton K 250 m3 11.52 3,000,000 34,560,000
-
A.V PONDASI TIE BEAM -
1 Pondasi Tie Beam Uk. 200 x 400 -
2 Beton K 250 m3 2.56 3,000,000 7,680,000
5 Bekisting batako m2 25.60 95,015 2,432,396
-
A.VI PLAT LANTAI -
1 Beton Rabat (B0 ) t = 80 mm m3 12.60 2,250,000 28,350,000
2 Plastik Cor m2 12.60 7,700 97,020
-
SUB TOTAL PEK. PONDASI - 141,591,800
B. PEK. DINDING -
1 Pas. Dinding bata ringan uk. 100x200x600 m2 128.00 120,000 15,360,000
2 Plesteran 1 : 5 m2 256.00 120,000 30,720,000
3 Acian m2 256.00 50,000 12,800,000
-
SUB TOTAL PEK. DINDING - 58,880,000
C. PEK. LANTAI -
1 Pas. Homogeneous Tile 60 X 60 ( Unpholised ), Garasi m2 63.00 303,000 19,089,000
2 Plint Lantai uk. 15 x 60 ( Unpolished ) m1 32.00 80,721 2,583,085
3 Pek. Anti Rayap m2 63.00 49,500 3,118,500
-
SUB TOTAL PEK. LANTAI - 24,790,585
D. PEK. KUSEN PINTU & JENDELA -
1 Pintu Garasi ( Pintu Panel ) 2240 x 2200 unit 2.00 - -
TEBET - JAKARTA SELATAN
OWNER :
LOKASI : TEBET - JAKRTA SELATAN
TAHUN : AGUSTUS 2019
LANTAI : LANTAI SATU

No Uraian Pekerjaan Sat Volume Harga Jumlah


Satuan Harga
2 Pintu Tangga Uk. 700 x 2200 ( SOLID ) unit 2.00 - -
3 Pintu Sledding Uk. 700 x 2200 unit 2.00 - -
-
SUB TOTAL PEK. KUSEN PINTU & JENDELA - -
E. PEK. PLAFOND -
1 Gypsumboard 9 mm m2 63.00 135,000 8,505,000
-
SUB TOTAL PEK. PLAFOND - 8,505,000
F. PEK. CAT -
1 Cat dinding interior Ex Vinilex m2 128.00 50,000 6,400,000
2 Cat dinding exterior Ex Vinilex m2 128.00 75,000 9,600,000
3 Cat Gypsumboard m2 63.00 50,000 3,150,000
-
SUB TOTAL PEK. CAT - 19,150,000
G. PEK. TANGGA -
1 Beton K 250 m3 1,123,756 -
2 Besi Ø 12 kg 14,223 -
3 Besi Ø 8 kg 11,770 -
4 Besi Decking Ø 10 kg 12,650 -
5 Bekisting Multiplek 9 mm m2 221,882 -
-
7 Pas. Homogeneous Tile 60 X 60 ( Pholised ) Untred m2 297,060 -
8 Pas. Homogeneous Tile 60 X 60 ( Pholised ) Optred m2 297,060 -
9 Reilling Tangga, Rangka Hollow, Hand Reilling kayu m1 2,755,360 -
-
SUB TOTAL PEK. TANGGA - -
H. PEK. MEKANIKAL & ELETRIKAL -
1 Instalasi pipa air bersih 3/4 " + Fitting m1 44,891 -
2 Instalasi pipa air bersih 1/2 " + Fitting m1 29,711 -
3 Instalasi pipa ke TORN 1 1/2 " + Fitting m1 97,471 -
4 Instalasi pipa air hujan 3" + Fitting m1 110,715 -
5 Instalasi pipa air kotor 4" ke septick tank m1 137,016 -
6 Instalasi pipa air bekas 3" ke saluran m1 110,715 -
7 Fitting dan material bantu ls 1,100,000 -
-
8 Instalasi lampu penerangan ttk 260,403 -
9 Instalasi stop kontak ttk 281,853 -
10 Instalasi saklar ttk 69,355 -
11 Armatur lampu Down light 3 " bh 505,505 -
12 Lampu LED 3 " bh 69,355 -
13 Saklar Tunggal bh 40,755 -
14 Saklar Seri bh 69,355 -
15 Stop kontak bh 55,055 -
16 Material bantu ls 1,100,000 -
-
TEBET - JAKARTA SELATAN
OWNER :
LOKASI : TEBET - JAKRTA SELATAN
TAHUN : AGUSTUS 2019
LANTAI : LANTAI SATU

No Uraian Pekerjaan Sat Volume Harga Jumlah


Satuan Harga

SUB TOTAL PEK. MEKANIKAL & ELEKTRIKAL - -


I. PEK. LAIN - LAIN -
1 Bor air kedalam ± 20 meter + pipa & accessories ls -
2 Pompa air ex. Sanyo ( Otomatis ) unit 715,000 -
3 Bak kontrol rumah pompa unit 550,000 -
4 Septik Tank Biotech unit 12,000,000 -
5 Kran Luar bh 82,500 -

SUB TOTAL PEK. LAIN - LAIN -


REKAP PENAWARAN HARGA
PROYEK : COMPACT HOUSE TEBET
OWNER :
LOKASI : TEBET - JAKRTA SELATAN
TAHUN : AGUSTUS 2019

REKAP PEK. LANTAI 2


I. PEK. BETON BERTULANG Rp. 90,224,149

Rp. 90,224,149
RAB COMPACT HOUSE
TEBET - JAKARTA SELATAN
OWNER :
LOKASI : TEBET - JAKRTA SELATAN
TAHUN : AGUSTUS 2019
LANTAI : LANTAI DUA

Harga Jumlah
No Uraian Pekerjaan Sat Volume Satuan Harga

A. PEK. BETON BERTULANG


-
A.II BALOK BETON -
1 Balok Beton Uk. 200 x 400 -
2 Beton K 250 m3 3.00 1,123,756 3,371,267
3 Besi Ø 12 kg 286.12 14,223 4,069,497
4 Besi Ø 8 kg 143.00 11,770 1,683,110
5 Bekisting Multiplek 9 mm m2 59.83 247,987 14,837,054
-
6 Balok Beton Uk. 200 x 300 -
7 Beton K 250 m3 2.56 1,123,756 2,876,814
8 Besi Ø 12 kg 167.21 14,223 2,378,235
9 Besi Ø 8 kg 112.68 11,770 1,326,244
10 Bekisting Multiplek 9 mm m2 34.16 247,987 8,471,231
-
A.III PLAT LANTAI -
1 Beton K 250 t = 120 m3 25.20 1,123,756 28,318,639
2 Besi Wiremesh M 7 2 lapis m2 51.34 138,798 7,125,889
3 Besi Ø 12 ( DOWEL ) kg 57.14 16,500 942,810
4 Bekisting Multiplek 9 mm m2 51.34 281,432 14,448,720
5 Besi Ø 8 DECKING kg 31.83 11,770 374,639
-
SUB TOTAL PEK. PONDASI - 90,224,149

SUB TOTAL PEK. MEKANIKAL & ELEKTRIKAL -