Halaman 01
Harga Satuan
No. Uraian Satuan Keterangan
Rp.
1 2 3 4 5
1 Pekerja Hr 75,000.00
2 Pekerja Setengah Terampil Hr 87,000.00
3 Pekerja Terampil Hr 85,000.00
4 Tukang Gali Hr 95,000.00
5 Mandor Hr 111,000.00
6 Tukang Batu Setengah Terampil Hr 87,000.00
7 Tukang Batu Terampil Hr 95,000.00
8 Kepala Tukang Batu Hr 100,000.00
9 Tukang Kayu Setengah Terampil Hr 87,000.00
10 Tukang Kayu Terampil Hr 95,000.00
11 Kepala Tukang Kayu Hr 100,000.00
12 Tukang Cat Setengah Terampil Hr 87,000.00
13 Tukang Cat Terampil Hr 95,000.00
14 Kepala Tukang Cat Hr 100,000.00
15 Tukang Besi Beton Setengah Terampil Hr 87,000.00
16 Tukang Besi Beton Terampil Hr 95,000.00
17 Kepala Tukang Besi Beton Hr 100,000.00
18 Tukang Besi Profil Setengah Terampil Hr 87,000.00
19 Tukang Besi Profil Terampil Hr 95,000.00
20 Kepala Tukang Besi Profil Hr 100,000.00
21 Tukang Las Setengah Terampil Hr 87,000.00
22 Tukang Las Terampil Hr 95,000.00
23 Kepala Tukang Las Hr 100,000.00
24 Operator Alat Berat Hr 250,000.00
25 Pembantu Operator/ Mekanik Hr 87,000.00
26 Supir Truk Hr 95,000.00
27 Kenek Truk Hr 87,000.00
28 Penjaga Malam Hr 79,000.00
Mengetahui ; Diperiksa ;
Kepala Dinas Perumahan, Tata Ruang dan Cipta Karya Kepala Bidang Penataan Prasarana Permukiman
Kabupaten Garut
file:///conversion/tmp/scratch/505164563.xlsx
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan
Halaman 02
Harga Satuan
No. Uraian Satuan Keterangan
Rp.
1 2 3 4 5
file:///conversion/tmp/scratch/505164563.xlsx
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan
Halaman 03
1 2 3 4 5
52 Flat Besi 2 s/d 5 mm Kg 15,000.00
53 Kawat Beton Kg 19,600.00
54 Wire Mesh/Kawat Baja dilas Kg 13,200.00
55 Besi Profil DN SII Kg 12,750.00
56 Besi IWF Ex. DN SII Kg 12,750.00
57 Besi Kabel/Sling 1 1/4" M' 178,750.00
58 Besi Kabel/Sling 1" M' 151,250.00
59 Besi Kabel/Sling 7/8" M' 107,520.00
60 Besi Kabel/Sling 5/8" M' 71,500.00
61 Besi Kabel/Sling 3/4" M' 35,750.00
62 Besi Kabel/Sling 1/2" M' 22,880.00
63 Besi Kabel/Sling 3/8" M' 19,250.00
64 Klem Besi 3 mm bh 277,475.00
65 Waltermur 1 1/2" bh 4,070,000.00
66 Waltermur 1 1/4" bh 2,062,500.00
67 Waltermur 1" bh 1,705,000.00
68 Waltermur 7/8" bh 907,500.00
69 Waltermur 5/8" bh 495,000.00
70 Waltermur 3/4" bh 70,675.00
71 Waltermur 1/2" bh 57,750.00
72 Waltermur 3/8" bh 49,500.00
73 Causen 1 1/4" bh 431,200.00
74 Causen 1" bh 290,400.00
75 Causen 7/8" bh 203,500.00
76 Causen 5/8" bh 121,000.00
77 Causen 3/4" bh 38,500.00
78 Causen 1/2" bh 24,750.00
79 Causen 3/8" bh 16,500.00
80 Klem Kabel 1 1/4" bh 277,475.00
81 Klem Kabel 1" bh 215,875.00
82 Klem Kabel 7/8" bh 115,500.00
83 Klem Kabel 5/8" bh 88,165.00
84 Klem Kabel 3/4" bh 60,775.00
85 Klem Kabel 1/2" bh 19,250.00
86 Klem Kabel 3/8" bh 17,050.00
87 Besi Siku L Kg 11,500.00
88 Besi Plat 0,5 mm Kg 10,500.00
89 Kawat Las Listrik Kg 37,500.00
90 Bronjong Kawat 4 mm Kg 38,500.00
91 Kayu Albasia M3 1,440,000.00
92 Kayu Stoot 5 s/d 7 Btg 14,000.00
93 Kayu Stoot 7 s/d 10 Btg 21,500.00
94 Kayu Papan Terentang (Kls.III) M3 1,776,000.00
95 Kayu Awet Kls. I M3 4,200,000.00
96 Kayu Awet Kls. II M3 3,960,000.00
97 Kayu Kaso 5/7 kayu Awet Kls. I M3 3,450,000.00
98 Kayu Kaso 5/7 kayu Awet Kls. II M3 3,120,000.00
99 Kayu 5/10 kayu Kls. I M3 3,250,000.00
100 Kayu 5/10 kayu Kls. II M3 2,550,000.00
101 Multiplek tebal 9 mm Lbr 172,800.00
102 Dolken kayu galam, ø(8-10)cm, panjang 4 m Batang 58,800.00
103 Bambu Ø 6 - 8 / 600 cm Batang 28,000.00
104 Ijuk Kg 7,500.00
105 Paku 1 - 3 cm Kg 25,900.00
106 Paku 4 - 7 cm Kg 15,300.00
107 Paku 8 - 12 cm Kg 12,500.00
108 Cat Untuk Kanstin/Keb Beton , Cat sekualitas ICI Eksterior Kg 57,500.00
109 Cat Tembok sekualitas SANLEX Kg 21,100.00
110 Cat Tembok sekualitas Vinilex Kg 25,200.00
111 Cat Kayu Avian Kg 49,900.00
112 Minyak Cat Terpentin Ltr 7,000.00
113 Minyak tanah Ltr 20,000.00
114 Solar Ltr 5,650.00
115 Pelumas Mesin Ltr 25,500.00
file:///conversion/tmp/scratch/505164563.xlsx
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan
file:///conversion/tmp/scratch/505164563.xlsx
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan
Halaman 04
1 2 3 4 5
127 Lempengan besi baja profil desain galvanis (Beam) Btg 932,000.00
128 Tiang penyangga besi st.32 galvanis (post) 1800x320x6 Btg 574,500.00
129 Besi pengikat baja profil desain (blocking) Bh 90,000.00
130 Mur baut beam 12 x 25 mm Bh 7,150.00
131 Mur baut blocking 16 x 30 mm Bh 9,000.00
132 Mur baut post 16 x 48 mm Bh 8,700.00
133 Besi angkur 30 x 30 x 3 mm m 33,000.00
134 Terminal end (sleeve Beam) Bh 368,500.00
Mengetahui ; Diperiksa ;
Kepala Dinas Perumahan, Tata Ruang dan Cipta Karya Kepala Bidang Penataan Prasarana Permukiman
Kabupaten Garut
file:///conversion/tmp/scratch/505164563.xlsx
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan
Halaman 04
Harga Satuan
No. Uraian Satuan Keterangan
Rp.
1 2 3 4 5
Mengetahui ; Diperiksa ;
Kepala Dinas Perumahan, Tata Ruang dan Cipta Karya Kepala Bidang Penataan Prasarana Permukiman
Kabupaten Garut
file:///conversion/tmp/scratch/505164563.xlsx
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
PEKERJAAN PERSIAPAN
505164563.xlsx 7
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
5 1M3 Pekerjaan Buangan Sisa Galian
Pekerja 0.4000 Org 75,000.00 30,000.00
Mandor 0.0400 Org 111,000.00 4,440.00
Alat Angkut 1.0000 Ls 1,000.00 1,000.00
Jumlah 35,440.00
Keuntungan dan Overhead 15 % 5,316.00
Total 40,756.00
Dibulatkan 40,750.00
6 1M1 Pekerjaan Pasangan Bouplank
Kayu Papan Terentang 0.0100 M3 1,776,000.00 17,760.00
Paku 5 - 7 0.0380 kg 15,300.00 581.40
Ongkos Pasang 1.0000 ls 500.00 500.00
Jumlah 18,841.40
Keuntungan dan Overhead 15 % 2,826.21
Total 21,667.61
Dibulatkan 21,660.00
7 1M1 Pekerjaan Pengukuran & Pemasangan Bowplank (SNI Rev. 2002)
Kayu Kaso 5 / 7 (kayu kls. III) 0.0120 M3 1,776,000.00 21,312.00
Paku Biasa 2" - 5" 0.0200 kg 15,300.00 306.00
Kayu Papan 3 / 20 (Kayu kls. III) 0.0070 M3 1,776,000.00 12,432.00
Pekerja 0.0170 Org 75,000.00 1,275.00
Tukang Kayu 0.0020 Org 95,000.00 190.00
Kepala Tukang Kayu 0.2500 Org 100,000.00 25,000.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 61,958.00
Keuntungan dan Overhead 15 % 9,293.70
Total 71,251.70
Dibulatkan 71,250.00
505164563.xlsx 8
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
2 1M3 Pekerjaan Urugan Tanah Dipadatkan
Tanah Urug 1.0100 M3 60,000.00 60,600.00
Pekerja 0.5000 Org 75,000.00 37,500.00
Mandor 0.0500 Org 111,000.00 5,550.00
Peralatan (sewa stemper) 1.0000 Ls 1,000.00 1,000.00
Jumlah 104,650.00
Keuntungan dan Overhead 15 % 15,697.50
Total 120,347.50
Dibulatkan 120,340.00
3 1M3 Pekerjaan Urugan Tanah Kembali
Pekerja 0.1920 Org 75,000.00 14,400.00
Mandor 0.0190 Org 111,000.00 2,109.00
Peralatan 1.0000 Ls 500.00 500.00
Jumlah 17,009.00
Keuntungan dan Overhead 15 % 2,551.35
Total 19,560.35
Dibulatkan 19,560.00
4 1M3 Pekerjaan Urugan Pasir Urug
Pasir Urug 1.2000 M3 178,500.00 214,200.00
Pekerja 0.1500 Org 75,000.00 11,250.00
Mandor 0.0100 Org 111,000.00 1,110.00
Jumlah 226,560.00
Keuntungan dan Overhead 15 % 33,984.00
Total 260,544.00
Dibulatkan 260,540.00
5 1M3 Pekerjaan Urugan Sirtu
Sirtu 1.2000 M3 144,000.00 172,800.00
Pekerja 0.1500 Org 75,000.00 11,250.00
Mandor 0.0100 Org 111,000.00 1,110.00
Jumlah 185,160.00
Keuntungan dan Overhead 15 % 27,774.00
Total 212,934.00
Dibulatkan 212,930.00
6 1M3 Pekerjaan Urugan Kerikil
Kerikil 1.2000 M3 207,500.00 249,000.00
Pekerja 0.1500 Org 75,000.00 11,250.00
Mandor 0.0100 Org 111,000.00 1,110.00
Jumlah 261,360.00
Keuntungan dan Overhead 15 % 39,204.00
Total 300,564.00
Dibulatkan 300,560.00
PEKERJAAN BETON
1 1M3 Pekerjaan Beton Mutu fc 9,8 MPa K-125, Slump 12±2 cm, w/c=0,78 (SNI 7394-2008)
Semen PC (50 Kg) 5.5200 Zak 80,000.00 441,600.00
Pasir Beton 0.5914 M3 350,000.00 206,990.00
Batu Pecah 2/3 0.7496 M3 400,000.00 299,840.00
Air 215.0000 Liter 150.00 32,250.00
Pekerja 1.6500 Org 75,000.00 123,750.00
Tukang Batu Terampil 0.2750 Org 95,000.00 26,125.00
Kepala Tukang Batu 0.0280 Org 100,000.00 2,800.00
Mandor 0.0830 Org 111,000.00 9,213.00
Jumlah 1,142,568.00
Keuntungan dan Overhead 15 % 171,385.20
Total 1,313,953.20
Dibulatkan 1,313,950.00
505164563.xlsx 9
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
2 1M3 Pekerjaan Beton Mutu fc 14,5 MPa K-175, Slump 12±2 cm, w/c=0,66 (SNI 7394-2008)
Semen PC (50 Kg) 6.5200 Zak 80,000.00 521,600.00
Pasir Beton 0.5429 M3 350,000.00 190,015.00
Batu Pecah 2/3 0.7622 M3 400,000.00 304,880.00
Air 215.0000 Liter 150.00 32,250.00
Pekerja 1.6500 Org 75,000.00 123,750.00
Tukang Batu Terampil 0.2750 Org 95,000.00 26,125.00
Kepala Tukang Batu 0.0280 Org 100,000.00 2,800.00
Mandor 0.0830 Org 111,000.00 9,213.00
Jumlah 1,210,633.00
Keuntungan dan Overhead 15 % 181,594.95
Total 1,392,227.95
Dibulatkan 1,392,220.00
3 1M3 Pekerjaan Beton Mutu fc 19,3 MPa K-225, Slump 12±2 cm, w/c=0,58 (SNI 7394-2008)
Semen PC (50 Kg) 7.4200 Zak 80,000.00 593,600.00
Pasir Beton 0.4986 M3 350,000.00 174,510.00
Batu Pecah 2/3 0.7756 M3 400,000.00 310,240.00
Air 215.0000 Liter 150.00 32,250.00
Pekerja 1.6500 Org 75,000.00 123,750.00
Tukang Batu Terampil 0.2750 Org 95,000.00 26,125.00
Kepala Tukang Batu 0.0280 Org 100,000.00 2,800.00
Mandor 0.0830 Org 111,000.00 9,213.00
Jumlah 1,272,488.00
Keuntungan dan Overhead 15 % 190,873.20
Total 1,463,361.20
Dibulatkan 1,463,360.00
4 1M3 Pekerjaan Pondasi Siklop, 60% Beton Campuran 1 PC:2PB:3KR dan 40% Batu Belah (SNI 2836-2008)
Batu Belah 15 cm/20 cm 0.4800 M3 174,000.00 83,520.00
Semen PC (50 Kg) 3.8800 Zak 80,000.00 310,400.00
Pasir Beton 0.3120 M3 350,000.00 109,200.00
Batu Pecah 2/3 0.4680 M3 400,000.00 187,200.00
Besi Beton 126.0000 Kg 10,000.00 1,260,000.00
Kawat Beton 1.8000 Kg 19,600.00 35,280.00
Pekerja 3.4000 OH 75,000.00 255,000.00
Tukang Batu 0.8500 OH 95,000.00 80,750.00
Kepala Tukang Batu 0.0850 OH 100,000.00 8,500.00
Mandor 0.1700 OH 111,000.00 18,870.00
Jumlah 2,348,720.00
Keuntungan dan Overhead 15 % 352,308.00
Total 2,701,028.00
Dibulatkan 2,701,020.00
5 1 Kg Pekerjaan Besi Polos atau Ulir (SNI 7394-2008)
Besi Beton (polos/ulir) 1.0500 Kg 10,000.00 10,500.00
Kawat Beton 0.0150 Kg 19,600.00 294.00
Pekerja 0.0070 Org 75,000.00 525.00
Tukang Besi Terampil 0.0070 Org 95,000.00 665.00
Kepala Tukang Besi 0.0007 Org 100,000.00 70.00
Mandor 0.0004 Org 111,000.00 44.40
Jumlah 12,098.40
Keuntungan dan Overhead 15 % 1,814.76
Total 13,913.16
Dibulatkan 13,910.00
505164563.xlsx 10
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
6 1 Kg Pekerjaan Kabel Presstressed Besi Polos atau Strands (SNI 7394-2008)
Besi Beton (polos/ulir) 1.0500 Kg 10,000.00 10,500.00
Kawat Beton 0.0100 Kg 19,600.00 196.00
Pekerja 0.0050 OH 75,000.00 375.00
Tukang Besi Terampil 0.0050 OH 95,000.00 475.00
Kepala Tukang Besi 0.0005 OH 100,000.00 50.00
Mandor 0.0003 OH 111,000.00 33.30
Jumlah 11,629.30
Keuntungan dan Overhead 15 % 1,744.40
Total 13,373.70
Dibulatkan 13,370.00
7 1 Kg Pekerjaan Jaring Kawat Baja/Wire Mesh (SNI 7394-2008)
Jaring Kawat Baja di las 1.0200 Kg 13,200.00 13,464.00
Kawat Beton 0.0500 Kg 19,600.00 980.00
Pekerja 0.0250 OH 75,000.00 1,875.00
Tukang Besi Terampil 0.0250 OH 95,000.00 2,375.00
Kepala Tukang Besi 0.0020 OH 100,000.00 200.00
Mandor 0.0010 OH 111,000.00 111.00
Jumlah 19,005.00
Keuntungan dan Overhead 15 % 2,850.75
Total 21,855.75
Dibulatkan 21,850.00
8 1 Kg Pekerjaan Memasang Besi Profil (SNI 7393-2008)
Besi Profil 1.1500 Kg 12,750.00 14,662.50
Pekerja 0.0600 OH 75,000.00 4,500.00
Tukang Las Konstruksi 0.0600 OH 95,000.00 5,700.00
Kepala Tukang 0.0060 OH 100,000.00 600.00
Mandor 0.0030 OH 111,000.00 333.00
Jumlah 25,795.50
Keuntungan dan Overhead 15 % 3,869.33
Total 29,664.83
Dibulatkan 29,660.00
9 1 Kg Pekerjaan Memasang Rangka Baja IWF (SNI 7393-2008)
Besi IWF 1.1500 Kg 12,750.00 14,662.50
Pekerja 0.0600 OH 75,000.00 4,500.00
Tukang Las Konstruksi 0.0600 OH 95,000.00 5,700.00
Kepala Tukang 0.0060 OH 100,000.00 600.00
Mandor 0.0030 OH 111,000.00 333.00
Jumlah 25,795.50
Keuntungan dan Overhead 15 % 3,869.33
Total 29,664.83
Dibulatkan 29,660.00
10 1 Kg Pekerjaan Perakitan (SNI 7393-2008)
Solar 0.0100 Ltr 5,650.00 56.50
Minyak Pelumas 0.0010 Ltr 25,500.00 25.50
Pekerja 0.0010 OH 75,000.00 75.00
Tukang Besi Konstruksi 0.0010 OH 95,000.00 95.00
Kepala Tukang 0.0000 OH 100,000.00 1.00
Mandor 0.0001 OH 111,000.00 5.55
Sewa Alat (Genset, Weldingset, Takel, Bor tangan, Bor duduk, Grinder) 0.0080 Jam 138,721.00 1,109.77
Jumlah 1,368.32
Keuntungan dan Overhead 15 % 205.25
Total 1,573.57
Dibulatkan 1,570.00
11 1 M Pekerjaan Besi Kabel/Sling Utama 1 1/4"
Besi Kabel/Sling 1 1/4" 1.0000 M 178,750.00 178,750.00
Tukang 0.2500 Org 95,000.00 23,750.00
Kepala Tukang 0.0700 Org 100,000.00 7,000.00
Pekerja 0.5000 Org 75,000.00 37,500.00
Mandor 0.0700 Org 111,000.00 7,770.00
Jumlah 254,770.00
Keuntungan dan Overhead 15 % 38,215.50
Total 292,985.50
Dibulatkan 292,980.00
505164563.xlsx 11
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
12 1 M Pekerjaan Besi Kabel/Sling Utama 1"
Besi Kabel/Sling 1" 1.0000 M 151,250.00 151,250.00
Tukang 0.2500 Org 95,000.00 23,750.00
Kepala Tukang 0.0700 Org 100,000.00 7,000.00
Pekerja 0.5000 Org 75,000.00 37,500.00
Mandor 0.0700 Org 111,000.00 7,770.00
Jumlah 227,270.00
Keuntungan dan Overhead 15 % 34,090.50
Total 261,360.50
Dibulatkan 261,360.00
13 1 M Pekerjaan Besi Kabel/Sling Utama 7/8"
Besi Kabel/Sling 7/8" 1.0000 M 107,520.00 107,520.00
Tukang 0.2500 Org 95,000.00 23,750.00
Kepala Tukang 0.0700 Org 100,000.00 7,000.00
Pekerja 0.5000 Org 75,000.00 37,500.00
Mandor 0.0700 Org 111,000.00 7,770.00
Jumlah 183,540.00
Keuntungan dan Overhead 15 % 27,531.00
Total 211,071.00
Dibulatkan 211,070.00
14 1 M Pekerjaan Besi Kabel/Sling Utama 5/8"
Besi Kabel/Sling 5/8" 1.0000 M 71,500.00 71,500.00
Tukang 0.2500 Org 95,000.00 23,750.00
Kepala Tukang 0.0700 Org 100,000.00 7,000.00
Pekerja 0.5000 Org 75,000.00 37,500.00
Mandor 0.0700 Org 111,000.00 7,770.00
Jumlah 147,520.00
Keuntungan dan Overhead 15 % 22,128.00
Total 169,648.00
Dibulatkan 169,640.00
15 1 M Pekerjaan Besi Kabel/Sling Utama 3/4"
Besi Kabel/Sling 3/4" 1.0000 M 35,750.00 35,750.00
Tukang 0.2500 Org 95,000.00 23,750.00
Kepala Tukang 0.0700 Org 100,000.00 7,000.00
Pekerja 0.5000 Org 75,000.00 37,500.00
Mandor 0.0700 Org 111,000.00 7,770.00
Jumlah 111,770.00
Keuntungan dan Overhead 15 % 16,765.50
Total 128,535.50
Dibulatkan 128,530.00
16 1 M Pekerjaan Besi Kabel/Sling Utama 1/2"
Besi Kabel/Sling 1/2" 1.0000 M 22,880.00 22,880.00
Tukang 0.2500 Org 95,000.00 23,750.00
Kepala Tukang 0.0700 Org 100,000.00 7,000.00
Pekerja 0.5000 Org 75,000.00 37,500.00
Mandor 0.0700 Org 111,000.00 7,770.00
Jumlah 98,900.00
Keuntungan dan Overhead 15 % 14,835.00
Total 113,735.00
Dibulatkan 113,730.00
17 1 M Pekerjaan Besi Kabel/Sling Utama 3/8"
Besi Kabel/Sling 3/8" 1.0000 M 19,250.00 19,250.00
Tukang 0.2500 Org 95,000.00 23,750.00
Kepala Tukang 0.0700 Org 100,000.00 7,000.00
Pekerja 0.5000 Org 75,000.00 37,500.00
Mandor 0.0700 Org 111,000.00 7,770.00
Jumlah 95,270.00
Keuntungan dan Overhead 15 % 14,290.50
Total 109,560.50
Dibulatkan 109,560.00
18 1 Buah Pasang Klem Kabel 1 1/4"
Klem Kabel 1 1/4" 1.0000 Bh 277,475.00 277,475.00
Tukang 0.1500 Org 95,000.00 14,250.00
Kepala Tukang 0.0150 Org 100,000.00 1,500.00
505164563.xlsx 12
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
Pekerja 0.0150 Org 75,000.00 1,125.00
Mandor 0.0050 Org 111,000.00 555.00
Jumlah 294,905.00
Keuntungan dan Overhead 15 % 44,235.75
Total 339,140.75
Dibulatkan 339,140.00
19 1 Buah Pasang Klem Kabel 1"
Klem Kabel 1" 1.0000 Bh 215,875.00 215,875.00
Tukang 0.1500 Org 95,000.00 14,250.00
Kepala Tukang 0.0150 Org 100,000.00 1,500.00
Pekerja 0.0150 Org 75,000.00 1,125.00
Mandor 0.0050 Org 111,000.00 555.00
Jumlah 233,305.00
Keuntungan dan Overhead 15 % 34,995.75
Total 268,300.75
Dibulatkan 268,300.00
20 1 Buah Pasang Klem Kabel 7/8"
Klem Kabel 7/8" 1.0000 Bh 115,500.00 115,500.00
Tukang 0.1500 Org 95,000.00 14,250.00
Kepala Tukang 0.0150 Org 100,000.00 1,500.00
Pekerja 0.0150 Org 75,000.00 1,125.00
Mandor 0.0050 Org 111,000.00 555.00
Jumlah 132,930.00
Keuntungan dan Overhead 15 % 19,939.50
Total 152,869.50
Dibulatkan 152,860.00
21 1 Buah Pasang Klem Kabel 5/8"
Klem Kabel 5/8" 1.0000 Bh 88,165.00 88,165.00
Tukang 0.1500 Org 95,000.00 14,250.00
Kepala Tukang 0.0150 Org 100,000.00 1,500.00
Pekerja 0.0150 Org 75,000.00 1,125.00
Mandor 0.0050 Org 111,000.00 555.00
Jumlah 105,595.00
Keuntungan dan Overhead 15 % 15,839.25
Total 121,434.25
Dibulatkan 121,430.00
505164563.xlsx 13
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
24 1 Buah Pasang Klem Kabel 3/8"
Klem Kabel 3/8" 1.0000 Bh 17,050.00 17,050.00
Tukang 0.1500 Org 95,000.00 14,250.00
Kepala Tukang 0.0150 Org 100,000.00 1,500.00
Pekerja 0.0150 Org 75,000.00 1,125.00
Mandor 0.0050 Org 111,000.00 555.00
Jumlah 34,480.00
Keuntungan dan Overhead 15 % 5,172.00
Total 39,652.00
Dibulatkan 39,650.00
25 1 Buah Pasang Waltermur 1 1/2"
Waltermur 1 1/2" 1.0000 Bh 4,070,000.00 4,070,000.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 4,086,193.00
Keuntungan dan Overhead 15 % 612,928.95
Total 4,699,121.95
Dibulatkan 4,699,120.00
25 1 Buah Pasang Waltermur 1 1/4"
Waltermur 1 1/4" 1.0000 Bh 2,062,500.00 2,062,500.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 2,078,693.00
Keuntungan dan Overhead 15 % 311,803.95
Total 2,390,496.95
Dibulatkan 2,390,490.00
26 1 Buah Pasang Waltermur 1"
Waltermur 1" 1.0000 Bh 1,705,000.00 1,705,000.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 1,721,193.00
Keuntungan dan Overhead 15 % 258,178.95
Total 1,979,371.95
Dibulatkan 1,979,370.00
27 1 Buah Pasang Waltermur 7/8"
Waltermur 7/8" 1.0000 Bh 907,500.00 907,500.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 923,693.00
Keuntungan dan Overhead 15 % 138,553.95
Total 1,062,246.95
Dibulatkan 1,062,240.00
28 1 Buah Pasang Waltermur 5/8"
Waltermur 5/8" 1.0000 Bh 495,000.00 495,000.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 511,193.00
Keuntungan dan Overhead 15 % 76,678.95
Total 587,871.95
Dibulatkan 587,870.00
29 1 Buah Pasang Waltermur 3/4"
Waltermur 3/4" 1.0000 Bh 70,675.00 70,675.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
505164563.xlsx 14
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 86,868.00
Keuntungan dan Overhead 15 % 13,030.20
Total 99,898.20
Dibulatkan 99,890.00
30 1 Buah Pasang Waltermur 1/2"
Waltermur 1/2" 1.0000 Bh 57,750.00 57,750.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 73,943.00
Keuntungan dan Overhead 15 % 11,091.45
Total 85,034.45
Dibulatkan 85,030.00
31 1 Buah Pasang Waltermur 3/8"
Waltermur 3/8" 1.0000 Bh 49,500.00 49,500.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 65,693.00
Keuntungan dan Overhead 15 % 9,853.95
Total 75,546.95
Dibulatkan 75,540.00
32 1 Buah Pasang Causen 1 1/4"
Causen 1 1/4" 1.0000 Bh 431,200.00 431,200.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 447,393.00
Keuntungan dan Overhead 15 % 67,108.95
505164563.xlsx 15
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
Total 514,501.95
Dibulatkan 514,500.00
33 1 Buah Pasang Causen 1"
Causen 1" 1.0000 Bh 290,400.00 290,400.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 306,593.00
Keuntungan dan Overhead 15 % 45,988.95
Total 352,581.95
Dibulatkan 352,580.00
34 1 Buah Pasang Causen 7/8"
Causen 7/8" 1.0000 Bh 203,500.00 203,500.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 219,693.00
Keuntungan dan Overhead 15 % 32,953.95
Total 252,646.95
Dibulatkan 252,640.00
35 1 Buah Pasang Causen 5/8"
Causen 5/8" 1.0000 Bh 121,000.00 121,000.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 137,193.00
Keuntungan dan Overhead 15 % 20,578.95
Total 157,771.95
Dibulatkan 157,770.00
36 1 Buah Pasang Causen 3/4"
Causen 3/4" 1.0000 Bh 38,500.00 38,500.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 54,693.00
Keuntungan dan Overhead 15 % 8,203.95
Total 62,896.95
Dibulatkan 62,890.00
37 1 Buah Pasang Causen 1/2"
Causen 1/2" 1.0000 Bh 24,750.00 24,750.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 40,943.00
Keuntungan dan Overhead 15 % 6,141.45
Total 47,084.45
Dibulatkan 47,080.00
38 1 Buah Pasang Causen 3/8"
Causen 3/8" 1.0000 Bh 16,500.00 16,500.00
Tukang 0.0500 Bh 95,000.00 4,750.00
Kepala Tukang 0.0250 Org 100,000.00 2,500.00
Pekerja 0.1000 Org 75,000.00 7,500.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 32,693.00
Keuntungan dan Overhead 15 % 4,903.95
Total 37,596.95
Dibulatkan 37,590.00
505164563.xlsx 16
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
39 1 Cm Pekerjaan Pengelasan dengan las listrik (SNI 7393-2008)
Kawat Las Listrik 0.0400 Kg 37,500.00 1,500.00
Solar 0.0300 Ltr 5,650.00 169.50
Minyak Pelumas 0.0040 Ltr 3,000.00 12.00
Pekerja 0.0040 OH 75,000.00 300.00
Tukang Besi Konstruksi 0.0020 OH 95,000.00 190.00
Kepala Tukang 0.0002 OH 100,000.00 20.00
Mandor 0.0002 OH 111,000.00 22.20
Sewa Alat 0.0170 Jam 28,721.00 488.26
Jumlah 2,701.96
Keuntungan dan Overhead 15 % 405.29
Total 3,107.25
Dibulatkan 3,100.00
40 1M2 Pekerjaan Bekisting untuk Pondasi (SNI 7394-2008)
Kayu kelas III 0.0400 M3 1,776,000.00 35,520.00
Paku 5 - 10 cm 0.3000 Kg 12,500.00 3,750.00
Minyak bekisting 0.1000 Liter 3,000.00 300.00
Pekerja 0.5200 OH 75,000.00 39,000.00
Tukang Kayu Terampil 0.2600 OH 95,000.00 24,700.00
Kepala Tukang Kayu 0.0260 OH 100,000.00 2,600.00
Mandor 0.0260 OH 111,000.00 2,886.00
Jumlah 108,756.00
Keuntungan dan Overhead 15 % 16,313.40
Total 125,069.40
Dibulatkan 125,060.00
41 1M2 Pekerjaan Bekisting untuk Sloof (SNI 7394-2008)
Kayu kelas III 0.0450 M3 1,776,000.00 39,960.00
Paku 5 - 10 cm 0.3000 Kg 12,500.00 3,750.00
Minyak bekisting 0.1000 Liter 3,000.00 300.00
Pekerja 0.5200 OH 75,000.00 39,000.00
Tukang Kayu Terampil - OH 95,000.00 -
Kepala Tukang Kayu 0.0260 OH 100,000.00 2,600.00
Mandor 0.0260 OH 111,000.00 2,886.00
Jumlah 88,496.00
Keuntungan dan Overhead 15 %
Total 88,496.00
Dibulatkan 88,490.00
42 1M2 Pekerjaan Bekisting untuk Kolom (SNI 7394-2008)
Kayu kelas III 0.0400 M3 1,776,000.00 35,520.00
Paku 5 - 12 cm 0.4000 Kg 12,500.00 5,000.00
Minyak bekisting 0.2000 Liter 3,000.00 600.00
Balok kayu kelas II 0.0150 M3 3,960,000.00 59,400.00
Plywood tebal 9 mm 0.3500 Lbr 172,800.00 60,480.00
Dolken kayu galam, ø(8-10)cm, panjang 4 m 2.0000 Batang 58,800.00 117,600.00
Pekerja 0.6600 OH 75,000.00 49,500.00
Tukang Kayu Terampil 0.3300 OH 95,000.00 31,350.00
Kepala Tukang Kayu 0.0330 OH 100,000.00 3,300.00
Mandor 0.0330 OH 111,000.00 3,663.00
Jumlah 366,413.00
Keuntungan dan Overhead 15 % 54,961.95
Total 421,374.95
Dibulatkan 421,370.00
505164563.xlsx 17
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
43 1M2 Pekerjaan Bekisting untuk Balok (SNI 7394-2008)
Kayu kelas III 0.0400 M3 1,776,000.00 35,520.00
Paku 5 - 12 cm 0.4000 Kg 12,500.00 5,000.00
Minyak bekisting 0.2000 Liter 3,000.00 600.00
Balok kayu kelas II 0.0180 M3 3,960,000.00 71,280.00
Plywood tebal 9 mm 0.3500 Lbr 172,800.00 60,480.00
Dolken kayu galam, ø(8-10)cm, panjang 4 m 2.0000 Batang 58,800.00 117,600.00
Pekerja 0.6600 OH 75,000.00 49,500.00
Tukang Kayu Terampil 0.3300 OH 95,000.00 31,350.00
Kepala Tukang Kayu 0.0330 OH 100,000.00 3,300.00
Mandor 0.0330 OH 111,000.00 3,663.00
Jumlah 378,293.00
Keuntungan dan Overhead 15 % 56,743.95
Total 435,036.95
Dibulatkan 435,030.00
44 1M2 Pekerjaan Bekisting untuk Plat Lantai (SNI 7394-2008)
Kayu kelas III 0.0400 M3 1,776,000.00 35,520.00
Paku 5 - 12 cm 0.4000 Kg 12,500.00 5,000.00
Minyak bekisting 0.2000 Liter 3,000.00 600.00
Balok kayu kelas II 0.0150 M3 3,960,000.00 59,400.00
Plywood tebal 9 mm 0.3500 Lbr 172,800.00 60,480.00
Dolken kayu galam, ø(8-10)cm, panjang 4 m 6.0000 Batang 58,800.00 352,800.00
Pekerja 0.6600 OH 75,000.00 49,500.00
Tukang Kayu Terampil 0.3300 OH 95,000.00 31,350.00
Kepala Tukang Kayu 0.0330 OH 100,000.00 3,300.00
Mandor 0.0330 OH 111,000.00 3,663.00
Jumlah 601,613.00
Keuntungan dan Overhead 15 % 90,241.95
Total 691,854.95
Dibulatkan 691,850.00
45 1M2 Pekerjaan Bekisting untuk Dinding (SNI 7394-2008)
Kayu kelas III 0.0300 M3 1,776,000.00 26,640.00
Paku 5 - 12 cm 0.4000 Kg 12,500.00 5,000.00
Minyak bekisting 0.2000 Liter 3,000.00 600.00
Balok kayu kelas II 0.0200 M3 3,960,000.00 79,200.00
Plywood tebal 9 mm 0.3500 Lbr 172,800.00 60,480.00
Dolken kayu galam, ø(8-10)cm, panjang 4 m 3.0000 Batang 58,800.00 176,400.00
Formite/penjaga jarak bekisting/spacer 4.0000 Bh 355.20 1,420.80
Pekerja 0.6600 OH 75,000.00 49,500.00
Tukang Kayu Terampil 0.3300 OH 95,000.00 31,350.00
Kepala Tukang Kayu 0.0330 OH 100,000.00 3,300.00
Mandor 0.0330 OH 111,000.00 3,663.00
Jumlah 437,553.80
Keuntungan dan Overhead 15 % 65,633.07
Total 503,186.87
Dibulatkan 503,180.00
505164563.xlsx 18
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
46 1M3 Pekerjaan Pondasi Beton Bertulang, 150 Kg Besi + Bekisting (SNI 7394-2008)
Kayu kelas III 0.2000 M3 1,776,000.00 177,600.00
Paku 5 - 12 cm 1.5000 Kg 12,500.00 18,750.00
Minyak bekisting 0.4000 Liter 3,000.00 1,200.00
Besi beton polos 157.5000 Kg 10,000.00 1,575,000.00
Kawat beton 2.2500 Kg 19,600.00 44,100.00
Semen PC (50 Kg) 6.7200 Zak 80,000.00 537,600.00
Pasir Beton 0.5400 M3 350,000.00 189,000.00
Batu Pecah 2/3 0.8100 M3 400,000.00 324,000.00
Pekerja 5.3000 OH 75,000.00 397,500.00
Tukang Batu Terampil 0.2750 Org 95,000.00 26,125.00
Tukang Kayu Terampil 1.3000 OH 95,000.00 123,500.00
Tukang Besi Terampil 1.0500 OH 95,000.00 99,750.00
Kepala Tukang 0.2620 OH 100,000.00 26,200.00
Mandor 0.2650 OH 111,000.00 29,415.00
Jumlah 3,569,740.00
Keuntungan dan Overhead 15 % 535,461.00
Total 4,105,201.00
Dibulatkan 4,105,200.00
47 1M3 Pekerjaan Sloof Beton Bertulang, 200 Kg Besi + Bekisting (SNI 7394-2008)
Kayu kelas III 0.2700 M3 1,776,000.00 239,760.00
Paku 5 - 12 cm 2.0000 Kg 12,500.00 25,000.00
Minyak bekisting 0.6000 Liter 3,000.00 1,800.00
Besi beton polos 210.0000 Kg 10,000.00 2,100,000.00
Kawat beton 3.0000 Kg 19,600.00 58,800.00
Semen PC (50 Kg) 6.7200 Zak 80,000.00 537,600.00
Pasir Beton 0.5400 M3 350,000.00 189,000.00
Batu Pecah /3 2
0.8100 M3 400,000.00 324,000.00
Pekerja 5.6500 OH 75,000.00 423,750.00
Tukang Batu Terampil 0.2750 Org 95,000.00 26,125.00
Tukang Kayu Terampil 1.5600 OH 95,000.00 148,200.00
Tukang Besi Terampil 1.4000 OH 95,000.00 133,000.00
Kepala Tukang 0.3230 OH 100,000.00 32,300.00
Mandor 0.2830 OH 111,000.00 31,413.00
Jumlah 4,270,748.00
Keuntungan dan Overhead 15 % 640,612.20
Total 4,911,360.20
Dibulatkan 4,911,360.00
505164563.xlsx 19
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
48 1M3 Pekerjaan Kolom Beton Bertulang, 300 Kg Besi + Bekisting (SNI 7394-2008)
Kayu kelas III 0.4000 M3 1,776,000.00 355,200.00
Paku 5 - 12 cm 4.0000 Kg 12,500.00 50,000.00
Minyak bekisting 2.0000 Liter 3,000.00 6,000.00
Besi beton polos 315.0000 Kg 10,000.00 3,150,000.00
Kawat beton 4.5000 Kg 19,600.00 88,200.00
Semen PC (50 Kg) 6.7200 Zak 80,000.00 537,600.00
Pasir Beton 0.5400 M3 350,000.00 189,000.00
Batu Pecah 2/3 0.8100 M3 400,000.00 324,000.00
Balok kayu kelas II 0.1500 M3 3,960,000.00 594,000.00
Plywood tebal 9 mm 3.5000 Lbr 172,800.00 604,800.00
Dolken kayu galam, ø(8-10)cm, panjang 4 m 20.0000 Batang 58,800.00 1,176,000.00
Pekerja 7.0500 OH 75,000.00 528,750.00
Tukang Batu Terampil 0.2750 Org 95,000.00 26,125.00
Tukang Kayu Terampil 1.5600 OH 95,000.00 148,200.00
Tukang Besi Terampil 2.1000 OH 95,000.00 199,500.00
Kepala Tukang 0.4030 OH 100,000.00 40,300.00
Mandor 0.3530 OH 111,000.00 39,183.00
Jumlah 8,056,858.00
Keuntungan dan Overhead 15 % 1,208,528.70
Total 9,265,386.70
Dibulatkan 9,265,380.00
49 1M3 Pekerjaan Balok Beton Bertulang, 200 Kg Besi + Bekisting (SNI 7394-2008)
Kayu kelas III 0.3200 M3 1,776,000.00 284,160.00
Paku 5 - 12 cm 3.2000 Kg 12,500.00 40,000.00
Minyak bekisting 1.6000 Liter 3,000.00 4,800.00
Besi beton polos 210.0000 Kg 10,000.00 2,100,000.00
Kawat beton 3.0000 Kg 19,600.00 58,800.00
Semen PC (50 Kg) 6.7200 Zak 80,000.00 537,600.00
Pasir Beton 0.5400 M3 350,000.00 189,000.00
Batu Pecah 2/3 0.8100 M3 400,000.00 324,000.00
Balok kayu kelas II 0.1400 M3 3,960,000.00 554,400.00
Plywood tebal 9 mm 2.8000 Lbr 172,800.00 483,840.00
Dolken kayu galam, ø(8-10)cm, panjang 4 m 16.0000 Batang 58,800.00 940,800.00
Pekerja 6.3500 OH 75,000.00 476,250.00
Tukang Batu Terampil 0.2750 Org 95,000.00 26,125.00
Tukang Kayu Terampil 1.5600 OH 95,000.00 148,200.00
Tukang Besi Terampil 1.4000 OH 95,000.00 133,000.00
Kepala Tukang 0.3330 OH 100,000.00 33,300.00
Mandor 0.3180 OH 111,000.00 35,298.00
Jumlah 6,369,573.00
Keuntungan dan Overhead 15 % 955,435.95
Total 7,325,008.95
Dibulatkan 7,325,000.00
505164563.xlsx 20
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
50 1M3 Pekerjaan Plat Beton Bertulang, 150 Kg Besi + Bekisting (SNI 7394-2008)
Kayu kelas III 0.3200 M3 1,776,000.00 284,160.00
Paku 5 - 12 cm 3.2000 Kg 12,500.00 40,000.00
Minyak bekisting 1.6000 Liter 3,000.00 4,800.00
Besi beton polos 157.5000 Kg 10,000.00 1,575,000.00
Kawat beton 2.2500 Kg 19,600.00 44,100.00
Semen PC (50 Kg) 6.7200 Zak 80,000.00 537,600.00
Pasir Beton 0.5400 M3 350,000.00 189,000.00
Batu Pecah 2/3 0.8100 M3 400,000.00 324,000.00
Balok kayu kelas II 0.1200 M3 3,960,000.00 475,200.00
Plywood tebal 9 mm 2.8000 Lbr 172,800.00 483,840.00
Dolken kayu galam, ø(8-10)cm, panjang 4 m 32.0000 Batang 58,800.00 1,881,600.00
Pekerja 5.3000 OH 75,000.00 397,500.00
Tukang Batu Terampil 0.2750 Org 95,000.00 26,125.00
Tukang Kayu Terampil 1.3000 OH 95,000.00 123,500.00
Tukang Besi Terampil 1.0500 OH 95,000.00 99,750.00
Kepala Tukang 0.2650 OH 100,000.00 26,500.00
Mandor 0.2650 OH 111,000.00 29,415.00
Jumlah 6,542,090.00
Keuntungan dan Overhead 15 % 981,313.50
Total 7,523,403.50
Dibulatkan 7,523,400.00
51 1M3 Pekerjaan Dinding Beton Bertulang, 150 Kg Besi + Bekisting (SNI 7394-2008)
Kayu kelas III 0.2400 M3 1,776,000.00 213,120.00
Paku 5 - 12 cm 3.2000 Kg 12,500.00 40,000.00
Minyak bekisting 1.6000 Liter 3,000.00 4,800.00
Besi beton polos 157.5000 Kg 10,000.00 1,575,000.00
Kawat beton 2.2500 Kg 19,600.00 44,100.00
Semen PC (50 Kg) 6.7200 Zak 80,000.00 537,600.00
Pasir Beton 0.5400 M3 350,000.00 189,000.00
Batu Pecah 2/3 0.8100 M3 400,000.00 324,000.00
Balok kayu kelas II 0.1600 M3 3,960,000.00 633,600.00
Plywood tebal 9 mm 2.8000 Lbr 172,800.00 483,840.00
Dolken kayu galam, ø(8-10)cm, panjang 4 m 24.0000 Batang 58,800.00 1,411,200.00
Pekerja 5.3000 OH 75,000.00 397,500.00
Tukang Batu Terampil 0.2750 Org 95,000.00 26,125.00
Tukang Kayu Terampil 1.3000 OH 95,000.00 123,500.00
Tukang Besi Terampil 1.0500 OH 95,000.00 99,750.00
Kepala Tukang 0.2650 OH 100,000.00 26,500.00
Mandor 0.2650 OH 111,000.00 29,415.00
Jumlah 6,159,050.00
Keuntungan dan Overhead 15 % 923,857.50
Total 7,082,907.50
Dibulatkan 7,082,900.00
505164563.xlsx 21
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
52 1M3 Pekerjaan Dinding Beton Bertulang, 200 Kg Besi + Bekisting (SNI 7394-2008)
Kayu kelas III 0.2500 M3 1,776,000.00 222,000.00
Paku 5 - 12 cm 3.0000 Kg 12,500.00 37,500.00
Minyak bekisting 1.2000 Liter 3,000.00 3,600.00
Besi beton polos 210.0000 Kg 10,000.00 2,100,000.00
Kawat beton 3.0000 Kg 19,600.00 58,800.00
Semen PC (50 Kg) 6.7200 Zak 80,000.00 537,600.00
Pasir Beton 0.5400 M3 350,000.00 189,000.00
Batu Pecah 2/3 0.8100 M3 400,000.00 324,000.00
Balok kayu kelas II 0.1050 M3 3,960,000.00 415,800.00
Plywood tebal 9 mm 2.5000 Lbr 172,800.00 432,000.00
Dolken kayu galam, ø(8-10)cm, panjang 4 m 14.0000 Batang 58,800.00 823,200.00
Pekerja 5.6500 OH 75,000.00 423,750.00
Tukang Batu Terampil 0.2750 Org 95,000.00 26,125.00
Tukang Kayu Terampil 1.5600 OH 95,000.00 148,200.00
Tukang Besi Terampil 1.4000 OH 95,000.00 133,000.00
Kepala Tukang 0.3230 OH 100,000.00 32,300.00
Mandor 0.2830 OH 111,000.00 31,413.00
Jumlah 5,938,288.00
Keuntungan dan Overhead 15 % 890,743.20
Total 6,829,031.20
Dibulatkan 6,829,030.00
53 1M1 Pekerjaan Kolom Praktis Beton Bertulang 11x11 cm (SNI 7394-2008)
Kayu kelas III 0.0020 M3 1,776,000.00 1,776.00
Paku 5 - 12 cm 0.0100 Kg 12,500.00 125.00
Besi beton polos 3.0000 Kg 10,000.00 30,000.00
Kawat beton 0.0450 Kg 19,600.00 882.00
Semen PC (50 Kg) 0.0600 Zak 80,000.00 4,800.00
Pasir Beton 0.0060 M3 350,000.00 2,100.00
Batu Pecah 2/3 0.0090 M3 400,000.00 3,600.00
Pekerja 0.1800 OH 75,000.00 13,500.00
Tukang Batu Terampil 0.0200 Org 95,000.00 1,900.00
Tukang Kayu Terampil 0.0200 OH 95,000.00 1,900.00
Tukang Besi Terampil 0.0200 OH 95,000.00 1,900.00
Kepala Tukang 0.0060 OH 100,000.00 600.00
Mandor 0.0090 OH 111,000.00 999.00
Jumlah 64,082.00
Keuntungan dan Overhead 15 % 9,612.30
Total 73,694.30
Dibulatkan 73,690.00
54 1M2 Pekerjaan Pasangan Stoot Werk 5 s/d 7
Kayu Stoot (2 x Pakai) 50% 9.0000 Btg 14,000.00 63,000.00
Papan Terentang (2 x Pakai) 50% 0.0160 M3 1,776,000.00 14,208.00
Paku 4 - 7 cm 0.5000 Kg 15,300.00 7,650.00
Pekerja 0.1500 Org 75,000.00 11,250.00
Tukang Kayu Terampil 0.2000 Org 95,000.00 19,000.00
Kepala Tukang Kayu 0.2000 Org 100,000.00 20,000.00
Mandor 0.0170 Org 111,000.00 1,887.00
Jumlah 136,995.00
Keuntungan dan Overhead 15 % 20,549.25
Total 157,544.25
Dibulatkan 157,540.00
505164563.xlsx 22
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
55 1M2 Pekerjaan Pasangan Stoot Werk 7 s/d 10
Kayu Stoot (2 x Pakai) 50% 9.0000 Btg 21,500.00 96,750.00
Papan Terentang (2 x Pakai) 50% 0.0160 M3 1,776,000.00 14,208.00
Paku 4 - 7 cm 0.5000 Kg 15,300.00 7,650.00
Pekerja 0.1500 Org 75,000.00 11,250.00
Tukang Kayu Terampil 0.2000 Org 95,000.00 19,000.00
Kepala Tukang Kayu 0.2000 Org 100,000.00 20,000.00
Mandor 0.0170 Org 111,000.00 1,887.00
Jumlah 170,745.00
Keuntungan dan Overhead 15 % 25,611.75
Total 196,356.75
Dibulatkan 196,350.00
56 1 M1 Pekerjaan Pemasangan Buis Beton Dia 20 cm
Pekerja Setengah Terampil 0.2980 Org 87,000.00 25,926.00
Mandor 0.0070 Org 111,000.00 777.00
Buis Beton Dia 20 cm 1.0000 M' 45,000.00 45,000.00
Pasir Urug 0.0010 M3 178,500.00 178.50
Semen PC (50 Kg) 0.0128 Zak 80,000.00 1,024.00
Peralatan 1.0000 Ls 500.00 500.00
Jumlah 73,405.50
Keuntungan dan Overhead 15 % 11,010.83
Total 84,416.33
Dibulatkan 84,410.00
57 1 M1 Pekerjaan Pemasangan Buis Beton Dia 30 cm
Pekerja Setengah Terampil 0.2980 Org 87,000.00 25,926.00
Mandor 0.0070 Org 111,000.00 777.00
Buis Beton Dia 30 cm 1.0000 M' 57,500.00 57,500.00
Pasir Urug 0.0010 M3 178,500.00 178.50
Semen PC (50 Kg) 0.0128 Zak 80,000.00 1,024.00
Peralatan 1.0000 Ls 500.00 500.00
Jumlah 85,905.50
Keuntungan dan Overhead 15 % 12,885.83
Total 98,791.33
Dibulatkan 98,790.00
58 1 M1 Pekerjaan Pemasangan Buis Beton Dia 40 cm
Pekerja Setengah Terampil 0.5960 Org 87,000.00 51,852.00
Mandor 0.0140 Org 111,000.00 1,554.00
Buis Beton Dia 40 cm 1.0000 M' 72,500.00 72,500.00
Pasir Urug 0.0020 M3 178,500.00 357.00
Semen PC (50 Kg) 0.0256 Zak 80,000.00 2,048.00
Peralatan 1.0000 Ls 500.00 500.00
Jumlah 128,811.00
Keuntungan dan Overhead 15 % 19,321.65
Total 148,132.65
Dibulatkan 148,130.00
59 1 M1 Pekerjaan Pemasangan Buis Beton Dia 50 cm
Pekerja Setengah Terampil 0.5960 Org 87,000.00 51,852.00
Mandor 0.0140 Org 111,000.00 1,554.00
Buis Beton Dia 50 cm 1.0000 M' 97,500.00 97,500.00
Pasir Urug 0.0020 M3 178,500.00 357.00
Semen PC (50 Kg) 0.0256 Zak 80,000.00 2,048.00
Peralatan 1.0000 Ls 500.00 500.00
Jumlah 153,811.00
Keuntungan dan Overhead 15 % 23,071.65
Total 176,882.65
Dibulatkan 176,880.00
505164563.xlsx 23
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
60 1 M1 Pekerjaan Pemasangan Gravel 1/2 Dia 20 cm
Pekerja Setengah Terampil 0.1490 Org 87,000.00 12,963.00
Mandor 0.0070 Org 111,000.00 777.00
Gravel 1/2 Dia 20 cm 1.0000 M' 40,000.00 40,000.00
Pasir Urug 0.0005 M3 178,500.00 89.25
Semen PC (50 Kg) 0.0064 Zak 80,000.00 512.00
Peralatan 1.0000 Ls 250.00 250.00
Jumlah 54,591.25
Keuntungan dan Overhead 15 % 8,188.69
Total 62,779.94
Dibulatkan 62,770.00
61 1 M1 Pekerjaan Pemasangan Gravel 1/2 Dia 30 cm
Pekerja Setengah Terampil 0.1490 Org 87,000.00 12,963.00
Mandor 0.0070 Org 111,000.00 777.00
Gravel 1/2 Dia 30 cm 1.0000 M' 44,000.00 44,000.00
Pasir Urug 0.0005 M3 178,500.00 89.25
Semen PC (50 Kg) 0.0064 Zak 80,000.00 512.00
Peralatan 1.0000 Ls 250.00 250.00
Jumlah 58,591.25
Keuntungan dan Overhead 15 % 8,788.69
Total 67,379.94
Dibulatkan 67,370.00
62 1 M1 Pekerjaan Pemasangan Gravel 1/2 Dia 40 cm
Pekerja Setengah Terampil 0.1490 Org 87,000.00 12,963.00
Mandor 0.0070 Org 111,000.00 777.00
Gravel 1/2 Dia 40 cm 1.0000 M' 47,500.00 47,500.00
Pasir Urug 0.0005 M3 178,500.00 89.25
Semen PC (50 Kg) 0.0064 Zak 80,000.00 512.00
Peralatan 1.0000 Ls 250.00 250.00
Jumlah 62,091.25
Keuntungan dan Overhead 15 % 9,313.69
Total 71,404.94
Dibulatkan 71,400.00
63 1M3 Pekekerjaan Sloof Beton 15/20 K 175
Beton K. 175 1.0100 M3 1,392,220.00 1,406,142.20
Besi Beton Rata-rata 160.000 Kg 13,910.00 2,225,600.00
Bekisting 13.3333 M2 125,060.00 1,667,466.67
Jumlah 5,299,208.87
Dibulatkan 5,299,200.00
64 1M3 Pekerjaan Kolom Beton 12/12 K 175
Beton K. 175 1.0100 M3 1,392,220.00 1,406,142.20
Besi Beton Rata-rata 120.000 Kg 13,910.00 1,669,200.00
Bekisting 33.3333 M2 88,490.00 2,949,666.67
Jumlah 6,025,008.87
Dibulatkan 6,025,000.00
65 1M3 Pekerjaan Ring Balok 15/20 K 175
Beton K. 175 1.0000 M3 1,392,220.00 1,392,220.00
Besi Beton Rata-rata 160.000 Kg 13,910.00 2,225,600.00
Bekisting 13.3333 M2 435,030.00 5,800,400.00
Jumlah 9,418,220.00
Dibulatkan 9,418,220.00
505164563.xlsx 24
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
PEKERJAAN PASANGAN
505164563.xlsx 25
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
Kepala Tukang Batu 0.0100 Org 100,000.00 1,000.00
Mandor 0.0015 Org 111,000.00 166.50
Jumlah 105,429.50
Keuntungan dan Overhead 15 % 15,814.43
Total 121,243.93
Dibulatkan 121,240.00
7 1M2 Pekerjaan Pasangan Bata Merah ukuran 5x11x22, tebal 1 bata, camp spesi 1 : 3 (SNI 6897-2008)
Bata Merah 140.0000 Buah 800.00 112,000.00
Semen PC (50 Kg) 0.6590 Zak 80,000.00 52,720.00
Pasir Pasang 0.0091 M3 350,000.00 3,185.00
Pekerja 0.6000 Org 75,000.00 45,000.00
Tukang Batu Setengah Terampil 0.2000 Org 87,000.00 17,400.00
Kepala Tukang Batu 0.0200 Org 100,000.00 2,000.00
Mandor 0.0030 Org 111,000.00 333.00
Jumlah 232,638.00
Keuntungan dan Overhead 15 % 34,895.70
Total 267,533.70
Dibulatkan 267,530.00
8 1M2 Pekerjaan Pasangan Bata Merah ukuran 5x11x22, tebal 1 bata, camp spesi 1 : 5 (SNI 6897-2008)
Bata Merah 140.0000 Buah 800.00 112,000.00
Semen PC (50 Kg) 0.4440 Zak 80,000.00 35,520.00
Pasir Pasang 0.1020 M3 350,000.00 35,700.00
Pekerja 0.6000 Org 75,000.00 45,000.00
Tukang Batu Setengah Terampil 0.2000 Org 87,000.00 17,400.00
Kepala Tukang Batu 0.0200 Org 100,000.00 2,000.00
Mandor 0.0030 Org 111,000.00 333.00
Jumlah 247,953.00
Keuntungan dan Overhead 15 % 37,192.95
Total 285,145.95
Dibulatkan 285,140.00
9 1M2 Pekerjaan Pasangan Batu Tempel Hitam (SNI 7395-2008)
Batu Tempel Hitam 1.1000 M2 144,000.00 158,400.00
Semen PC (50 Kg) 0.2350 Zak 80,000.00 18,800.00
Pasir Pasang 0.0350 M3 350,000.00 12,250.00
Pekerja 0.7000 Org 75,000.00 52,500.00
Tukang Batu Terampil 0.3500 Org 87,000.00 30,450.00
Kepala Tukang Batu 0.0350 Org 100,000.00 3,500.00
Mandor 0.0350 Org 111,000.00 3,885.00
Jumlah 279,785.00
Keuntungan dan Overhead 15 % 41,967.75
Total 321,752.75
Dibulatkan 321,750.00
505164563.xlsx 26
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
10 1M3 Pekerjaan Pasangan Batu Kosong (SNI 2836-2008)
Batu Belah 1.2000 M3 174,000.00 208,800.00
Pasir Urug 0.4320 M3 178,500.00 77,112.00
Pekerja 0.7800 Org 75,000.00 58,500.00
Tukang Batu Terampil 0.3900 Org 95,000.00 37,050.00
Kepala Tukang Batu 0.0039 Org 100,000.00 390.00
Mandor 0.0390 Org 111,000.00 4,329.00
Jumlah 386,181.00
Keuntungan dan Overhead 15 % 57,927.15
Total 444,108.15
Dibulatkan 444,100.00
11 1M2 Pekerjaan Plesteran 1 : 3, tebal 20 mm (SNI 2837-2008)
Semen PC (50 Kg) 0.2074 Zak 80,000.00 16,592.00
Pasir Pasang 0.0310 M3 350,000.00 10,850.00
Pekerja 0.4000 Org 75,000.00 30,000.00
Tukang Batu Terampil 0.2000 Org 95,000.00 19,000.00
Kepala Tukang Batu 0.0200 Org 100,000.00 2,000.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 79,885.00
Keuntungan dan Overhead 15 % 11,982.75
Total 91,867.75
Dibulatkan 91,860.00
12 1M2 Pekerjaan Plesteran 1 : 4, tebal 20 mm (SNI 2837-2008)
Semen PC (50 Kg) 0.1664 Zak 80,000.00 13,312.00
Pasir Pasang 0.0320 M3 350,000.00 11,200.00
Pekerja 0.4000 Org 75,000.00 30,000.00
Tukang Batu Terampil 0.2000 Org 95,000.00 19,000.00
Kepala Tukang Batu 0.0200 Org 100,000.00 2,000.00
Mandor 0.0220 Org 111,000.00 2,442.00
Jumlah 77,954.00
Keuntungan dan Overhead 15 % 11,693.10
Total 89,647.10
Dibulatkan 89,640.00
13 1M2 Pekerjaan Acian (SNI 2837-2008)
Semen PC (50 Kg) 0.0650 Zak 80,000.00 5,200.00
Pekerja 0.2000 Org 75,000.00 15,000.00
Tukang Batu Terampil 0.1000 Org 95,000.00 9,500.00
Kepala Tukang Batu 0.0100 Org 100,000.00 1,000.00
Mandor 0.0100 Org 111,000.00 1,110.00
Jumlah 31,810.00
Keuntungan dan Overhead 15 % 4,771.50
Total 36,581.50
Dibulatkan 36,580.00
14 1M2 Pekerjaan Finishing Siaran Batu Kali 1:2 (SNI 2837-2008)
Semen PC (50 Kg) 0.1268 Zak 80,000.00 10,144.00
Pasir Pasang 0.0120 M3 350,000.00 4,200.00
Pekerja 0.3000 Org 75,000.00 22,500.00
Tukang Batu Terampil 0.1500 Org 95,000.00 14,250.00
Kepala Tukang Batu 0.0150 Org 100,000.00 1,500.00
Mandor 0.0150 Org 111,000.00 1,665.00
Jumlah 54,259.00
Keuntungan dan Overhead 15 % 8,138.85
Total 62,397.85
Dibulatkan 62,390.00
505164563.xlsx 27
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
505164563.xlsx 28
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
5 1M2 Pekerjaan Pasangan Lantai Keramik (20/20) Warna/Polos Sekualitas " MULIA " (SNI 7395-2008)
Keramik KW 1 Warna/Polos (20/20) 1.0100 M2 54,000.00 54,540.00
Semen PC (50 Kg) 0.2080 Zak 80,000.00 16,640.00
Pasir Pasang 0.0450 M3 350,000.00 15,750.00
Semen Warna 1.6200 Kg 6,000.00 9,720.00
Pekerja 0.7000 Org 75,000.00 52,500.00
Tukang Batu Terampil 0.3500 Org 95,000.00 33,250.00
Kepala Tukang Batu 0.0350 Org 100,000.00 3,500.00
Mandor 0.0350 Org 111,000.00 3,885.00
Jumlah 189,785.00
Keuntungan dan Overhead 15 % 28,467.75
Total 218,252.75
Dibulatkan 218,250.00
6 1M2 Pekerjaan Pasangan Lantai Keramik (20/20) Warna/Corak Sekualitas " MULIA " (SNI 7395-2008)
Keramik KW 1 Warna/Corak (20/20) 1.0100 M2 57,600.00 58,176.00
Semen PC (50 Kg) 0.2080 Zak 80,000.00 16,640.00
Pasir Pasang 0.0450 M3 350,000.00 15,750.00
Semen Warna 1.6200 Kg 6,000.00 9,720.00
Pekerja 0.7000 Org 75,000.00 52,500.00
Tukang Batu Terampil 0.3500 Org 95,000.00 33,250.00
Kepala Tukang Batu 0.0350 Org 100,000.00 3,500.00
Mandor 0.0350 Org 111,000.00 3,885.00
Jumlah 193,421.00
Keuntungan dan Overhead 15 % 29,013.15
Total 222,434.15
Dibulatkan 222,430.00
7 1M2 Pekerjaan Pasangan Lantai Keramik (30/30) Putih/Polos Sekualitas " MULIA " (SNI 7395-2008)
Keramik KW 1 (30/30) Polos 1.0100 M2 50,000.00 50,500.00
Semen PC (50 Kg) 0.2000 Zak 80,000.00 16,000.00
Pasir Pasang 0.0450 M3 350,000.00 15,750.00
Semen Warna 1.5000 Kg 6,000.00 9,000.00
Pekerja 0.7000 Org 75,000.00 52,500.00
Tukang Batu Terampil 0.3500 Org 95,000.00 33,250.00
Kepala Tukang Batu 0.0350 Org 100,000.00 3,500.00
Mandor 0.0350 Org 111,000.00 3,885.00
Jumlah 184,385.00
Keuntungan dan Overhead 15 % 27,657.75
Total 212,042.75
Dibulatkan 212,040.00
8 1M2 Pekerjaan Pasangan Lantai Keramik (33/33) Warna/Corak Sekualitas " ROMAN GRESS " (SNI 7395-2008)
Keramik KW 1 (33/33) Warna/Corak, Grace Roman 1.0100 M2 70,000.00 70,700.00
Semen PC (50 Kg) 0.1638 Zak 80,000.00 13,104.00
Pasir Pasang 0.0450 M3 350,000.00 15,750.00
Semen Warna 1.6200 Kg 6,000.00 9,720.00
Pekerja 0.7000 Org 75,000.00 52,500.00
Tukang Batu Terampil 0.3500 Org 95,000.00 33,250.00
Kepala Tukang Batu 0.0350 Org 100,000.00 3,500.00
Mandor 0.0350 Org 111,000.00 3,885.00
Jumlah 202,409.00
Keuntungan dan Overhead 15 % 30,361.35
Total 232,770.35
Dibulatkan 232,770.00
505164563.xlsx 29
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
9 1M2 Pekerjaan Pasangan Lantai Keramik (40/40) Warna/Corak Sekualitas " MULIA " (SNI 7395-2008)
Keramik KW 1 (40/40) Warna/Corak, Sekualitas " MULIA " 1.0100 M2 60,000.00 60,600.00
Semen PC (50 Kg) 0.1960 Zak 80,000.00 15,680.00
Pasir Pasang 0.0450 M3 350,000.00 15,750.00
Semen Warna 1.6200 Kg 6,000.00 9,720.00
Pekerja 0.2500 Org 75,000.00 18,750.00
Tukang Batu Terampil 0.1250 Org 95,000.00 11,875.00
Kepala Tukang Batu 0.0130 Org 100,000.00 1,300.00
Mandor 0.0130 Org 111,000.00 1,443.00
Jumlah 135,118.00
Keuntungan dan Overhead 15 % 20,267.70
Total 155,385.70
Dibulatkan 155,380.00
10 1M2 Pekerjaan Pasangan Dinding Keramik (20/20) Warna/ Polos Sekualitas " MULIA " (SNI 7395-2008)
Keramik KW 1 Warna/Polos (20/20) 1.0100 M2 54,000.00 54,540.00
Semen PC (50 Kg) 0.1860 Zak 80,000.00 14,880.00
Pasir Pasang 0.0180 M3 350,000.00 6,300.00
Semen Warna 1.9400 Kg 6,000.00 11,640.00
Pekerja 0.9000 Org 75,000.00 67,500.00
Tukang Batu Terampil 0.4500 Org 95,000.00 42,750.00
Kepala Tukang Batu 0.0450 Org 100,000.00 4,500.00
Mandor 0.0450 Org 111,000.00 4,995.00
Jumlah 207,105.00
Keuntungan dan Overhead 15 % 31,065.75
Total 238,170.75
Dibulatkan 238,170.00
11 1M2 Pekerjaan Pasangan Dinding Keramik (20/20) Warna/Corak Sekualitas " MULIA " (SNI 7395-2008)
Keramik KW 1 Warna/Corak (20/20) 1.0100 M2 57,600.00 58,176.00
Semen PC (50 Kg) 0.1860 Zak 80,000.00 14,880.00
Pasir Pasang 0.0180 M3 350,000.00 6,300.00
Semen Warna 1.9400 Kg 6,000.00 11,640.00
Pekerja 0.9000 Org 75,000.00 67,500.00
Tukang Batu Terampil 0.4500 Org 95,000.00 42,750.00
Kepala Tukang Batu 0.0450 Org 100,000.00 4,500.00
Mandor 0.0450 Org 111,000.00 4,995.00
Jumlah 210,741.00
Keuntungan dan Overhead 15 % 31,611.15
Total 242,352.15
Dibulatkan 242,350.00
12 1M3 Pekerjaan Rabat Beton Tumbuk 1 : 3 : 5
Semen PC (50 Kg) 3.7330 Zak 80,000.00 298,640.00
Pasir Beton 0.5500 M3 350,000.00 192,500.00
Batu Pecah 2/3 0.9300 M3 400,000.00 372,000.00
Peralatan 1.0000 Ls 2,500.00 2,500.00
Pekerja 1.1570 Org 75,000.00 86,775.00
Tukang Batu Setengah Terampil 0.6000 Org 87,000.00 52,200.00
Kepala Tukang Batu 0.0500 Org 100,000.00 5,000.00
Mandor 0.0100 Org 111,000.00 1,110.00
Jumlah 1,010,725.00
Keuntungan dan Overhead 15 % 151,608.75
Total 1,162,333.75
Dibulatkan 1,162,330.00
505164563.xlsx 30
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
13 1M2 Pekerjaan Rabat Batu Sikat (Ditabur)
Batu Sikat 0.0500 M3 110,000.00 5,500.00
Peralatan 1.0000 Ls 1,750.00 1,750.00
upah Kerja 1.0000 Ls 2,750.00 2,750.00
Jumlah 10,000.00
Keuntungan dan Overhead 15 % 1,500.00
Total 11,500.00
Dibulatkan 11,500.00
14 1 m3 Pekerjaan Pasangan Batu Candi
Batu Candi 1.1000 m2 165,000.00 181,500.00
PC (50 Kg) 0.1200 zak 80,000.00 9,600.00
Pasir Pasang 0.0310 m3 350,000.00 10,850.00
Pekerja 0.1875 org 75,000.00 14,062.50
Tukang Batu Terampil 0.2250 org 100,000.00 22,500.00
Kepala Tukang Batu 0.0375 org 100,000.00 3,750.00
Mandor 0.0338 org 111,000.00 3,751.80
Peralatan 0.7500 ls 2,500.00 1,875.00
Jumlah 247,889.30
Keuntungan dan Overhead 15 % 37,183.40
Jumlah 285,072.70
Dibulatkan 285,070.00
15 1 m2 Pekerjaan Pasangan Batu Sikat Natural
Batu Sikat Natural 1.0100 m2 110,000.00 111,100.00
PC (50 Kg) 0.1600 zak 80,000.00 12,800.00
Pasir Pasang 0.0300 m3 350,000.00 10,500.00
Pekerja 0.1875 org 75,000.00 14,062.50
Tukang Batu Terampil 0.3000 org 95,000.00 28,500.00
Kepala Tukang Batu 0.0375 org 100,000.00 3,750.00
Mandor 0.0188 org 111,000.00 2,086.80
Jumlah 182,799.30
Keuntungan dan Overhead 15 % 27,419.90
Jumlah 210,219.20
Dibulatkan 210,210.00
16 1 m2 Pekerjaan Pasangan Batu Sikat Warna
Batu Sikat Warna 1.0100 m2 165,000.00 166,650.00
PC (50 Kg) 0.1600 zak 80,000.00 12,800.00
Pasir Pasang 0.0300 m3 350,000.00 10,500.00
Pekerja 0.1875 org 75,000.00 14,062.50
Tukang Batu Setengah Terampil 0.3000 org 95,000.00 28,500.00
Kepala Tukang Batu 0.0375 org 100,000.00 3,750.00
Mandor 0.0188 org 111,000.00 2,086.80
Jumlah 238,349.30
Keuntungan dan Overhead 15 % 35,752.40
Jumlah 274,101.70
Dibulatkan 274,100.00
505164563.xlsx 31
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
PEKERJAAN PENGECATAN
505164563.xlsx 32
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
2 1 M Pekerjaan Lapis Pondasi Bawah ( Telford )
3
505164563.xlsx 33
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
6 1 M Pekerjaan LAPEN
2
505164563.xlsx 34
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
10 1 M Pekerjaan Agregat Penutup BURAS
2
505164563.xlsx 35
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3 4 5 6
14 1 Unit/4 M Pekerjaan Guard Rail
Lempengan besi baja profil desain galvanis (Beam) 1.0000 btg 932,000.00 932,000.00
Tiang penyangga besi st.32 galvanis (post) 1800x320x6 3.0000 btg 574,500.00 1,723,500.00
Besi pengikat baja profil desain (blocking) 3.0000 bh 90,000.00 270,000.00
Mur baut beam 12 x 25 mm 10.0000 bh 7,150.00 71,500.00
Mur baut blocking 16 x 30 mm 3.0000 bh 9,000.00 27,000.00
Mur baut post 16 x 48 mm 3.0000 bh 8,700.00 26,100.00
Besi angkur 30 x 30 x 3 mm 2.2500 m 33,000.00 74,250.00
Terminal end (sleeve Beam) 2.0000 bh 368,500.00 737,000.00
Galian tanah dan urugan kembali 1.6800 m3 76,034.00 127,737.12
Urugan pasir bawah pondasi 0.2000 m3 226,560.00 45,312.00
Bekisting pondasi 5.8400 m2 108,756.00 635,135.04
Cor pondasi beton K-175 0.5100 m3 1,210,633.00 617,422.83
Ongkos angkut bahan guard rail ke lokasi 1.0000 unit 1,081,543.00 1,081,543.00
Jumlah 6,368,499.99
Keuntungan dan Overhead 15 % 955,275.00
Total 7,323,774.99
Dibulatkan 7,323,770.00
Mengetahui ; Diperiksa ;
Kepala Dinas Tata Ruang dan Permukiman Kepala Bidang Penataan Prasarana Permukiman
Kabupaten Garut
505164563.xlsx 36
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan
HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN
PEKERJAAN
(Rp)
1 2 3 4
PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Semak m2 7,000.00
2 Pekerjaan Membersihkan Lapangan dan Perataan (SNI Rev.2002) m2 15,000.00
3 Pekerjaan Pembuatan Stegger dari Bambu m2 66,450.00
4 Pekerjaan Pengerukan Lumpur m3 139,040.00
5 Pekerjaan Buangan Sisa Galian m3 40,750.00
6 Pekerjaan Pembuatan Bouplank m1 21,660.00
7 Pekerjaan Pengukuran dan Pemasangan Bowplank (SNI Rev. 2002) m1 71,250.00
PEKERJAAN BETON
1 Pekerjaan Beton Mutu fc 9,8 MPa K-125, Slump 12±2 cm, w/c=0,78 (SNI 7394-2008) m3 1,313,950.00
2 Pekerjaan Beton Mutu fc 14,5 MPa K-175, Slump 12±2 cm, w/c=0,66 (SNI 7394-2008) m3 1,392,220.00
3 Pekerjaan Beton Mutu fc 19,3 MPa K-225, Slump 12±2 cm, w/c=0,58 (SNI 7394-2008) m3 1,463,360.00
4 Pekerjaan Pondasi Siklop, 60% Beton Campuran 1PC:2PB:3KR dan 40% Batu Belah (SNI 2836- m3 2,701,020.00
2008)
5 Pekerjaan Pondasi Siklop, 60% Beton Campuran 1PC:2PB:3KR dan 40% Batu Belah (SNI 2836- m3 1,179,850.00
2008), tanpa tulangan
file:///conversion/tmp/scratch/505164563.xlsx 37
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan
1 2 3 4
24 Pek. Pengadaan & Pemasangan Klem Kabel 1/2" bh 42,180.00
25 Pek. Pengadaan & Pemasangan Klem Kabel 3/8" bh 39,650.00
26 Pek. Pengadaan & Pemasangan Waltermur 1 1/2" bh 4,699,120.00
27 Pek. Pengadaan & Pemasangan Waltermur 1 1/4" bh 2,390,490.00
28 Pek. Pengadaan & Pemasangan Waltermur 1" bh 1,979,370.00
29 Pek. Pengadaan & Pemasangan Waltermur 7/8" bh 1,062,240.00
30 Pek. Pengadaan & Pemasangan Waltermur 5/8" bh 587,870.00
31 Pek. Pengadaan & Pemasangan Waltermur 3/4" bh 99,890.00
32 Pek. Pengadaan & Pemasangan Waltermur 1/2" bh 85,030.00
33 Pek. Pengadaan & Pemasangan Waltermur 3/8" bh 75,540.00
34 Pek. Pengadaan & Pemasangan Causen 1 1/4" bh 514,500.00
35 Pek. Pengadaan & Pemasangan Causen 1" bh 352,580.00
36 Pek. Pengadaan & Pemasangan Causen 7/8" bh 252,640.00
37 Pek. Pengadaan & Pemasangan Causen 5/8" bh 157,770.00
38 Pek. Pengadaan & Pemasangan Causen 3/4" bh 62,890.00
39 Pek. Pengadaan & Pemasangan Causen 1/2" bh 47,080.00
40 Pek. Pengadaan & Pemasangan Causen 3/8" bh 37,590.00
41 Pekerjaan Pengelasan dengan Las Listrik (SNI 7393-2008) cm 3,100.00
42 Pekerjaan Bekisting untuk Pondasi (SNI 7394-2008) m2 125,060.00
43 Pekerjaan Bekisting untuk Sloof (SNI 7394-2008) m2 88,490.00
44 Pekerjaan Bekisting untuk Kolom (SNI 7394-2008) m2 421,370.00
45 Pekerjaan Bekisting untuk Balok (SNI 7394-2008) m2 435,030.00
46 Pekerjaan Bekisting untuk Plat Beton (SNI 7394-2008) m2 691,850.00
47 Pekerjaan Bekisting untuk Dinding (SNI 7394-2008) m2 503,180.00
48 Pekerjaan Pondasi Beton Bertulang, 150 Kg Besi + Bekisting (SNI 7394-2008) m3 4,105,200.00
49 Pekerjaan Sloof Beton Bertulang, 200 Kg Besi + Bekisting (SNI 7394-2008) m3 4,911,360.00
50 Pekerjaan Kolom Beton Bertulang, 300 Kg Besi + Bekisting (SNI 7394-2008) m3 9,265,380.00
file:///conversion/tmp/scratch/505164563.xlsx 38
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan
1 2 3 4
51 Pekerjaan Balok Beton Bertulang, 200 Kg Besi + Bekisting (SNI 7394-2008) m3 7,325,000.00
52 Pekerjaan Plat Beton Bertulang, 150 Kg Besi + Bekisting (SNI 7394-2008) m3 7,523,400.00
53 Pekerjaan Dinding Beton Bertulang, 150 Kg Besi + Bekisting (SNI 7394-2008) m3 7,082,900.00
54 Pekerjaan Dinding Beton Bertulang, 200 Kg Besi + Bekisting (SNI 7394-2008) m3 6,829,030.00
55 Pekerjaan Kolom Praktis Beton Bertulang, 11 x 11 cm (SNI 7394-2008) m1 73,690.00
56 Pekerjaan Pasangan Stoot Werk 5 s/d 7 m2 157,540.00
57 Pekerjaan Pasangan Stoot Werk 7 s/d 10 m2 196,350.00
58 Pekerjaan Pemasangan Buis Beton Dia. 20 cm m1 84,410.00
59 Pekerjaan Pemasangan Buis Beton Dia. 30 cm m1 98,790.00
60 Pekerjaan Pemasangan Buis Beton Dia. 40 cm m1 148,130.00
61 Pekerjaan Pemasangan Buis Beton Dia. 50 cm m1 176,880.00
62 Pekerjaan Pemasangan Gravel 1/2 Dia. 20 cm m1 62,770.00
63 Pekerjaan Pemasangan Gravel 1/2 Dia.30 cm m1 67,370.00
64 Pekerjaan Pemasangan Gravel 1/2 Dia. 40 cm m 1
71,400.00
65 Pekerjaan Sloof Beton 15/20 K-175 m3 5,299,200.00
66 Pekerjaan Kolom Beton Praktis 12/12 K-175 m3 6,025,000.00
67 Pekerjaan Ring Balk 15/20 K-175 m3 9,418,220.00
PEKERJAAN PASANGAN
1 Pekerjaan Pasangan Kanstin ( Kerb ) Beton m1 112,040.00
2 Pekerjaan Pasangan Batu Kali 1 : 3 (SNI 2836-2008) m3 1,027,900.00
3 Pekerjaan Pasangan Batu Kali 1 : 4 (SNI 2836-2008) m3 988,510.00
4 Pekerjaan Pasangan Bronjong Kawat 4 mm (SNI 2002) m3 723,660.00
5 Pek. Pas. Bata Merah uk. 5x11x22, tebal 1/2 bt, camp.spesi 1:3 (SNI 6897-2008) m2 145,880.00
6 Pek. Pas. Bata Merah uk. 5x11x22, tebal 1/2 bt, camp.spesi 1:5 (SNI 6897-2008) m2 121,240.00
7 Pek. Pas. Bata Merah uk. 5x11x22, tebal 1 bt, camp.spesi 1:3 (SNI 6897-2008) m2 267,530.00
8 Pek. Pas. Bata Merah uk. 5x11x22, tebal 1 bt, camp.spesi 1:5 (SNI 6897-2008) m2 285,140.00
9 Pekerjaan Pasangan Batu Tempel Hitam (SNI 7395-2008) m2 321,750.00
10 Pekerjaan Pasangan Batu Kosong (SNI 2836-2008) m3 444,100.00
11 Pekerjaan Plesteran 1 : 3, tebal 20 mm (SNI 2837-2008) m2 91,860.00
12 Pekerjaan Plesteran 1 : 4, tebal 20 mm (SNI 2837-2008) m2 89,640.00
13 Pekerjaan Acian (SNI 2837-2008) m2 36,580.00
14 Pekerjaan Finishing Siaran Batu Kali 1:2 (SNI 2837-2008) m2 62,390.00
PEKERJAAN PENGECATAN
1 Pekerjaan Pengecatan Kanstin ( Kerb ) Beton m2 50,550.00
2 Pekerjaan Pengecatan Dinding Baru (3x) m2 44,640.00
3 Pekerjaan Pengecatan Dinding Lama (2x) m2 29,760.00
4 Pekerjaan Pengecatan Besi m2 30,240.00
file:///conversion/tmp/scratch/505164563.xlsx 39
Standar Harga di Bidang Praskim untuk Wilayah Garut Selatan
1 2 3 4
PEKERJAAN JALAN LINGKUNGAN
1 Pekerjaan Lapis Pondasi Bawah Kelas C m3 218,000.00
2 Pekerjaan Lapis Pondasi Bawah ( Telford ) m3 321,410.00
3 Pekerjaan Lapis Pondasi Agregat Kelas B m3 213,900.00
4 Pekerjaan Lapis Resap Pengikat ( Prime Coat ) liter 20,190.00
5 Pekerjaan Lapis Perekat ( Teack Coat ) liter 12,220.00
6 Pekerjaan LAPEN m2 99,950.00
7 Pekerjaan Laston Lapis Pondasi ( AC-BASE ) Leveling, tebal 6 cm ton 1,478,070.00
8 Pekerjaan Agregat Penutup BURTU m2 25,420.00
9 Pekerjaan Agregat Penutup BURDA m2 60,330.00
10 Pekerjaan Laburan Aspal (Buras) m2 23,190.00
11 Pekerjaan Lataston Lapis Aus (HRS-WC) Leveling, tebal 3 cm ton 1,477,170.00
12 Pekerjaan Lataston Lapis Antara (AC-BC) Leveling, tebal 5 cm ton 1,336,520.00
13 Pekerjaan Lataston Lapis Antara (AC-WC) Leveling, tebal 4 cm ton 1,398,190.00
14 Pekerjaan Guard Rail unit/4 m 7,323,770.00
Mengetahui ; Diperiksa ;
Kepala Dinas Tata Ruang dan Permukiman Kepala Bidang Penataan Prasarana Permukiman
Kabupaten Garut
file:///conversion/tmp/scratch/505164563.xlsx 40
PERHITUNGAN HARGA BARANG/MATERIAL
DPP
NO BAHAN HARGA BAHAN PPN 10% PPH 1.5%
100/110
1 2 5 7 8 9
BAHAN / MATERIAL UTAMA
1 Pasir Urug 250,000 227,273 22,727 3,409
2 Semen Portland 58,000 52,727 5,273 791
3 Batu Belah 235,000 213,636 21,364 3,205
4 Pasir Pasang 200,000 181,818 18,182 2,727
5 Pasir Beton 300,000 272,727 27,273 4,091
6 Batu Pecah 2/3 300,000 272,727 27,273 4,091
7 Papan Begisting 1,500,000 1,363,636 136,364 20,455
7 Paku 5-10 15,000 13,636 1,364 205
8 Paku 12 15,000 13,636 1,364 205
9 Paku 7-10 15,000 13,636 1,364 205
10 Paku Tripleks 20,000 18,182 1,818 273
11 Papan Lisplank 2,200,000 2,000,000 200,000 30,000
12 Besi Ø 6 mm 29,000 26,364 2,636 395
13 Besi Ø 10 mm 59,000 53,636 5,364 805
14 Kawat Beton 25,000 22,727 2,273 341
15 Bata Merah 750 682 68 10
16 Keramik 30/30 38,000 34,545 3,455 518
17 Kayu Kelas II 6/12 2,000,000 1,818,182 181,818 27,273
18 Kayu Kelas II 8/12 2,000,000 1,818,182 181,818 27,273
19 Kayu Kaso 5/7 2,000,000 1,818,182 181,818 27,273
20 Reng 2/3 2,000,000 1,818,182 181,818 27,273
21 Genteng 1,800 1,636 164 25
22 Bubungan 3,000 2,727 273 41
23 Triplek 45,000 40,909 4,091 614
24 Cat Tembok 17,500 15,909 1,591 239
25 Cat Kayu 55,000 50,000 5,000 750
26 Plamir Tembok 15,000 13,636 1,364 205
27 Meni Kayu 17,000 15,455 1,545 232
28 Kusen Pintu 250,000 227,273 22,727 3,409
29 Kusen Jendela 200,000 181,818 18,182 2,727
30 Kusen BV 1 150,000 136,364 13,636 2,045
31 Kusen BV 2 150,000 136,364 13,636 2,045
32 Daun Pintu 400,000 363,636 36,364 5,455
33 Daun Jendela 130,000 118,182 11,818 1,773
34 GRC 50,000 45,455 4,545 682
35 Kaca Polos 3 mm 33,000 30,000 3,000 450
36 Kunci Tanam Biasa 200,000 181,818 18,182 2,727
37 Engsel Pintu 25,000 22,727 2,273 341
38 Engsel Jendela 10,000 9,091 909 136
39 Slot Jendela 7,000 6,364 636 95
40 Hak Kait Angin 7,000 6,364 636 95
41 Lampu Pijar 20 Watt 15,000 13,636 1,364 205
42 Stop Kontak 15,000 13,636 1,364 205
43 Sakelar Tunggal 15,000 13,636 1,364 205
44 Sakelar Double 20,000 18,182 1,818 273
45 Kabel Listrik 200,000 181,818 18,182 2,727
46 Spandek Pasir 100,000 90,909 9,091 1,364
47 Mangkok Listrik 8,000 7,273 727 109
PERALATAN KERJA
1 Sendok Tembok 25,000 22,727 2,273 341
2 Cangkul 60,000 54,545 5,455 818
3 Sekop 100,000 90,909 9,091 1,364
4 Roda Dorong 550,000 500,000 50,000 7,500
5 Ember 10,000 9,091 909 136
6 Papan Proyek 60x80 cm 250,000 227,273 22,727 3,409
7 Prasasti 40x60 cm 500,000 454,545 45,455 6,818
8 Kwas 15,000 13,636 1,364 205
9 Ampelas 12,000 10,909 1,091 164
10 Roll Cat 25,000 22,727 2,273 341
11 Benang Kecil 5,000 4,545 455 68
12 Lem Kayu 18,000 16,364 1,636 245
Upah
1 Pekerja
2 Tukang
3 Mandor
TERIAL
DIBLATKAN
HARGA
HARGA RAB
10 11
276,136 276,100
64,064 64,100
259,568 259,600
220,909 220,900
331,364 331,400
331,364 331,400
1,656,818 1,656,800
16,568 16,600
16,568 16,600
16,568 16,600
22,091 22,100
2,430,000 2,430,000
32,032 32,000
65,168 65,200
27,614 27,600
828 800
41,973 42,000
2,209,091 2,209,100
2,209,091 2,209,100
2,209,091 2,209,100
2,209,091 2,209,100
1,988 2,000
3,314 3,300
49,705 49,700
19,330 19,300
60,750 60,800
16,568 16,600
18,777 18,800
276,136 276,100
220,909 220,900
165,682 165,700
165,682 165,700
441,818 441,800
143,591 143,600
55,227 55,200
36,450 36,500
220,909 220,900
27,614 27,600
11,045 11,000
7,732 7,700
7,732 7,700
16,568 16,600
16,568 16,600
16,568 16,600
22,091 22,100
220,909 220,900
110,455 110,500
8,836 8,800
27,614 27,600
66,273 66,300
110,455 110,500
607,500 607,500
11,045 11,000
276,136 276,100
552,273 552,300
16,568 16,600
13,255 13,300
27,614 27,600
5,523 5,500
19,882 19,900
80,000
110,000
110,000
PERHITUNGAN VOLUME/KUANTITAS PEKERJAAN
Propinsi : Jawa Barat
Kota/Kab : Garut Jenis Kegiatan : Pekerjaan TPT
Kecamatan Kadungora Volume : 5.60 M³
Desa : Harumansari Lokasi : Kp.Sayuran RW 08
TOTAL 5.60
IV Acian m2
5.60
PERHITUNGAN KEBUTUHAN DAN BIAYA
TENAGA KERJA/BAHAN/ALAT DAN ADMINISTRASI
VOLUME 14.49 m3
2 1M3 Pekerjaan Pasangan Batu Kali 1 : 4 (SNI 2837-2008)
Batu Belah M3 1.2
Semen PC (50 Kg) Zak 3.26
Pasir Pasang M3 0.544
Pekerja Org 1.5
Tukang Batu Terampil Org 0.75
Kepala Tukang Batu Org 0.075
Mandor
3 VOLUME 5.60 m2
1M2 Pekerjaan Plesteran 1 : 4, tebal 20 mm (SNI 2837-
2008)
Semen PC (50 Kg) Zak 0.1664
Pasir Pasang M3 0.032
Pekerja Org 0.4
Tukang Batu Terampil Org 0.2
Kepala Tukang Batu Org 0.02
Mandor Org 0.022
4 VOLUME 5.60 m3
1M2 Pekerjaan Acian (SNI 2837-2008)
Semen PC (50 Kg) Zak 0.065
Pekerja Org 0.2
Tukang Batu Terampil Org 0.1
Kepala Tukang Batu Org 0.01
Mandor Org 0.01
4 VOLUME 24.00 m3
1 m2 Pengelasan
Cat kg 0.1
Kwas bh 0.015
Upah
Pekerja Oh 0.1
Kepala Tukang Besi Oh 0.12
4 VOLUME 40.50 m3
Cat tembok sekualitas "Sanlex" Kg 0.1750
Plamir Tembok Kg 0.1600
Rol Cat Buah 0.0100
Ampelas Lembar 0.5000
Pekerja Org 0.1040
Tukang Cat Terampil Org 0.1820
Kepala Tukang Cat Org 0.0195
Mandor Org 0.0100
I
ASI
: Pekerjaan TPT
Kp.Sayuran RW 08
Volume
Pekerja Mandor sirtu kramik corak Batu belah
8 8
0 0
5 5
1 1
0 0
17 17
47
8
22 22
10.9
1.1 1.1
0.9
0.2
2.2 2.2
1.1
0.1
0.1 0.1
0.4
1.1 1.1
0.6
0.1
0.1 0.1
-
2.4
0.4
-
2.4 2.4
2.9
7.1 7.1
6.5
0.4
20.3
4.2 4.2
7.4
0.8
0.4 0.4
pembulatan 48 2 5 0 17
Pekerja Mandor Batu belah
RAB - 3
47
8
10.9
0.9
0.2
1.1
0.4
0.6
-
-
2.9
-
-
-
6.5
0.4
7.4
0.8
49 8 0 30 0
semen pasir pasantukang tukang batu terampil
RENCANA ANGGARAN BIAYA ( RAB )
DESA HARUMANSARI KECAMATAN KADUNGORA
TAHUN ANGGARAN 2020
A. BAHAN
1 Batu Belah 14.00 M³ 259,600 3,634,400.00
2 Semen 47.00 sak 64,100 3,012,700.00
3 Pasir Pasang 8.00 M³ 220,900 1,767,200.00
4 Spandek Pasir 24.00 m2 110,500 2,652,000.00
5 Cat Besi 5.00 kg 60,800 304,000.00
6 Cat Tembok 25.00 kg 19,300 482,500.00
Sub Total 1) 11,852,800.00
B. A L A T
1 Papan Nama Proyek 1.0 buah 276,100 276,100.00
2 Prasasti 1.0 Buah 552,300 552,300.00
3 Kuas 4.0 Buah 16,600 66,400.00
Disetujui/mengesahkan:
Kepala Desa Mekarsari Pelaksana Kegiatan
_________________
Cara Pengisian :
1. Bidang diisi dengan dengan kode rekening berdasarkan klasifikasi kelompok belanja desa
2. Kegiatan diisi dengan kode rekening sesuai dengan urutan kegiatan dalam APBDesa
3. Kolom 1 diisi dengan nomor urut
4. Kolom 2 diisi dengan uraian berupa rincian kebutuhan dalam kegiatan
5. kolom 3 diisi dengan volume berupa jumlah orang/barang
6. kolom 4 diisi dengan harga satuan yang merupakan besaran untuk membayar orang/barang
7. kolom 5 diisi dengan jumlah perkalian antara kolom 3 dengan kolom 4
PERHITUNGAN UPAH ANGKUT BAHAN/MATERIAL
DESA KARYAMUKTI KECAMATAN CIBALONG KABUPATEN GARUT
TAHUN ANGGARAN 2018
Desa : Karyamukti
Kecamatan : Cibalong Jenis Kegiatan :
Kabupaten : GARUT Volume :
Provinsi : JAWA BARAT 1 Hok Lansir :
( ………………………... )
L
RUT
80,000
HOK Lansir
4.11
5.00
8.75
- 87500
-
-
-
-
-
-
17.86
18.00
........................ 2016
usun RKPDesa
etua
……………... )