DAFTAR ISIAN 1 : DAFTAR KUANTITAS DAN HARGA ( BOQ )
PENGADAAN DAN PEMASANGAN PANEL KONTROL, PANEL PROTEKSI DAN MK LENGKAP KABEL KONTROL BAY 150 KV CIKARANG 1 & 2 GI FAJAR SURYA WISESA

HARGA SATUAN JUMLAH HARGA


TOTAL
No. URAIAN PEKERJAAN VOLUME SATUAN
MATERIAL JASA MATERIAL JASA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 3x5 = 7 3x6 = 8 7+8 = 9

I DESAIN ENJINIRING
1.1 Proteksi & Kontrol, SCADA 2 bay N/A 106,452,000 N/A 212,904,000 212,904,000
SUB TOTAL I 212,904,000

II PEKERJAAN DISMANTLING
2.1 Dismantling eks panel kontrol/proteksi berikut mobilisasi ke gudang 3 set N/A 9,678,000 N/A 29,034,000 29,034,000
2.2 Dismantling eks Marshalling Kiosk berikut mobilisasi ke gudang 2 set N/A 8,603,000 N/A 17,206,000 17,206,000
2.3 Dismantling eks kabel kontrol Bay Cikarang 1-2 berikut mobilisasi ke gudang 1 lot N/A 6,452,000 N/A 6,452,000 6,452,000
SUB TOTAL II 52,692,000

III PEMASANGAN PANEL KONTROL, PROTEKSI DAN MK


Pengadaan dan Pemasangan Bay Level SOGI terkait Penggantian panel Bay Cikarang 1-2 GI
3,1
Fajar SW (SOGI eksisting : NARI), meliputi :
Panel bay level-1 (untuk penempatan BCU, BCM) 1 set terdiri dari :
Panel berikut accessories, Meter Digital, Local/Remote/Supervisory switch, Master relay
reset switch, Discrepancy switch, Discrepancy indicator, Current&Voltage Test Block, Aux.
relay, dan material lain sebagai kelengkapan panel kontrol) dan Set wiring Control
a. termasuk connection untuk interface marshalling cable(s) terminal block dengan 2 set 207,450,000 6,237,000 414,900,000 12,474,000 427,374,000
switches, links, fuses, test facilities dan lainnya sampai peralatan dapat dioperasikan
(local/remote), Kabel optik untuk indoor dan kabel power, Material penunjang (Terminal,
MCB, ELCB, Overvoltage Arrester) untuk melengkapi lingkup pekerjaan
IED BCU, dilengkapi Bay Control Mimic (BCM dengan menggunakan discrepancy switch) :
b. 2 set 88,236,000 include 176,472,000 include 176,472,000
1 set
c. Ethernet switch 1 set 2 set 37,648,000 include 75,296,000 include 75,296,000

Tanggal : 5 Agustus 2019

Nama Kontraktor : KSO PT Gridtech Indonesia - PT Daya Usaha Mandiri

Tanda Tangan Kontraktor : Page 1 of 3


KSO PT GRIDTECH INDONESIA - PT DAYA USAHA MANDIRI
Millenium Industrial Estate 4-A.24/5, Peusar, Panongan, Tangerang, 15710 Indonesia
DAFTAR ISIAN 1 : DAFTAR KUANTITAS DAN HARGA ( BOQ )
PENGADAAN DAN PEMASANGAN PANEL KONTROL, PANEL PROTEKSI DAN MK LENGKAP KABEL KONTROL BAY 150 KV CIKARANG 1 & 2 GI FAJAR SURYA WISESA

HARGA SATUAN JUMLAH HARGA


TOTAL
No. URAIAN PEKERJAAN VOLUME SATUAN
MATERIAL JASA MATERIAL JASA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 3x5 = 7 3x6 = 8 7+8 = 9

Pengadaan dan Pemasangan Bay Level SOGI terkait Penggantian panel Bay Cikarang 1-2 GI
3,2
Fajar SW (SOGI eksisting : NARI), meliputi :
Panel bay level-2 (untuk penempatan MPU, BPU) 1 set, terdiri dari :
Panel berikut 2 Trip circuit Supervision Relay/Aux Relay for line protection with indication
flag,manual and electric reset, 3 Tripping relays/Lockout relays untuk masing-masing
tripping circuit, 1 Tripping relays/Lockout relays for Busbar Protection, 1 set-Current &
Voltage Test Block, Aux. relay, dan material lain sebagai kelengkapan panel, 1 set wiring
a. 2 set 191,447,000 6,237,000 382,894,000 12,474,000 395,368,000
Protection termasuk connection untuk interface marshalling cable(s) terminal block
dengan switches, links, fuses, test facilities lainnya sampai peralatan dapat dioperasikan
(local/remote), Kabel optik untuk indoor dan kabel power, Material penunjang (Terminal,
MCB, ELCB, Overvoltage Arrester) untuk melengkapi lingkup pekerjaan.

b. 1 IED Main Protection Distance 150 kV 2 set 176,471,000 include 352,942,000 include 352,942,000
c. 1 IED Back-up Protection/Over Current Relay 150 kV 2 set 35,295,000 include 70,590,000 include 70,590,000
d. Ethernet switch 1 set 2 set 37,648,000 include 75,296,000 include 75,296,000
Integrasi IED bay baru dengan SOGI Eksisting (IED bay baru / bay level baru harus dapat
3,3 dimonitor dan dikendalikan dari lokal HMI eksisting & RCC/JCC) termasuk Testing - Komisioning 2 bay include 88,710,000 include 177,420,000 177,420,000
SCADA bay line (Point to Point dan SAT di sisi GI dan sisi master station)
3,4 Pengadaan dan Pemasangan outdoor Marshalling Kiosk (include accessoris) 2 set 59,140,000 5,377,000 118,280,000 10,754,000 129,034,000
3,5 Bongkar dan pasang wiring MTU (CB, DS, CT dan CVT ) 2 bay Include 21,506,000 Include 43,012,000 43,012,000
Pengadaan dan Pemasangan LV cable, control cable and accessories dan peralatan pendukung
3,6 1 lot 322,581,000 69,893,000 322,581,000 69,893,000 392,474,000
lainnya (cable ladder, clamp, cable lug, terminal,dll) untuk bay line Cikarang 1-2
3,7 Pengadaan dan pemasangan Panel ACDB & DCDB beserta instalasinya, meliputi :
a. Set panel ACDB 400/230 V Lengkap asesoris 1 set 118,280,000 5,377,000 118,280,000 5,377,000 123,657,000
b. Set panel DCDB 110 V Lengkap asesoris 1 set 80,646,000 5,377,000 80,646,000 5,377,000 86,023,000
SUB TOTAL III 2,524,958,000

Tanggal : 5 Agustus 2019

Nama Kontraktor : KSO PT Gridtech Indonesia - PT Daya Usaha Mandiri

Tanda Tangan Kontraktor : Page 2 of 3


KSO PT GRIDTECH INDONESIA - PT DAYA USAHA MANDIRI
Millenium Industrial Estate 4-A.24/5, Peusar, Panongan, Tangerang, 15710 Indonesia
DAFTAR ISIAN 1 : DAFTAR KUANTITAS DAN HARGA ( BOQ )
PENGADAAN DAN PEMASANGAN PANEL KONTROL, PANEL PROTEKSI DAN MK LENGKAP KABEL KONTROL BAY 150 KV CIKARANG 1 & 2 GI FAJAR SURYA WISESA

HARGA SATUAN JUMLAH HARGA


TOTAL
No. URAIAN PEKERJAAN VOLUME SATUAN
MATERIAL JASA MATERIAL JASA
( Rp ) ( Rp ) ( Rp ) ( Rp ) ( Rp )
1 2 3 4 5 6 3x5 = 7 3x6 = 8 7+8 = 9

IV PEKERJAAN SIPIL
4,1 Bongkaran dan bobokan berikut perapihan 1 ls Include 15,054,000 Include 15,054,000 15,054,000
4,2 Pondasi MK 2 bh Include 17,205,000 Include 34,410,000 34,410,000
SUB TOTAL IV 49,464,000

V TESTING & KOMISIONING


5.1 Testing & komisioning kontrol & proteksi 2 bay N/A 177,420,000 N/A 354,840,000 354,840,000
SUB TOTAL V 354,840,000

JUMLAH I s/d V 3,194,858,000


Dibulatkan 3,194,858,000

PPN 10% 319,485,800


TOTAL 3,514,343,800
Terbilang : Tiga Milyar Lima Ratus Empat Belas Juta Tiga Ratus Empat Puluh Tiga Ribu Delapan Ratus Rupiah

Tanggal : 5 Agustus 2019

Nama Kontraktor : KSO PT Gridtech Indonesia - PT Daya Usaha Mandiri