Anda di halaman 1dari 8

RIWAYAT HPS RAMBU RPPJ

1 Unit Pengadaan dan Pemasangan Pondasi Rambu Lalu Lintas RPPJ


Komponen Penyusun Uku : 60 X 60 X 120 cm
0.432 0.36
Harga Satuan KONTRAK HARGA PASAR
Kode Nama Satuan Volume Total Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 2018 PSR 1 PSR 2 PSR 3 RATA-RATA
I. Pengadaan E- Budgeting Analisa E- Budgeting Analisa E- Budgeting Analisa
3.02.03.02.005.080 Angkur Unit 30,000.00 4.00 4.00 120,000.00 120,000.00 30,000.00 120,000.00 120,000.00 E-Budgeting
3.02.03.02.005.081 Mur Baut Unit 7,150.00 4.00 4.00 28,600.00 28,600.00 7,150.00 28,600.00 28,600.00 E-Budgeting
II. Konstruksi Pemasangan - - -

3.02.03.02.005.084 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 1 Meter Unit 81,137.53 0.56 0.432 45,437.02 35,051.41 81,137.53 45,437.02 35,051.41 Analisa
3.02.03.02.005.085 Pekerjaan Pengecoran Unit 994,456.06 0.43 0.430 427,616.11 427,616.11 994,456.06 427,616.11 427,616.11 E-Budgeting
3.02.03.02.005.086 1 Kg Pekerjaan Pembesian Dengan Besi Polos Unit 15,621.29 36.00 36.00 562,366.44 562,366.44 15,621.29 562,366.44 562,366.44 E-Budgeting
3.02.03.02.005.087 Urugan Sirtu di bawah Pondasi Unit 378,246.33 0.05 0.05 18,912.32 18,912.32 378,246.33 18,912.32 18,912.32 E-Budgeting
3.02.03.02.005.088 1 M2 Pekerjaan Pasang Bekisting Untuk Pondasi Unit 340,857.75 1.92 0.36 654,446.88 122,708.79 340,857.75 654,446.88 122,708.79 Analisa
3.02.03.02.005.089 1 Unit Ongkos Angkut ke Lokasi (Rambu, Delineator, RPPJ) Unit 14,030.41 1.00 1.00 14,030.41 14,030.41 14,030.41 14,030.41 14,030.41 E-Budgeting

1,871,409.17 1,329,285.48
Sub Total 1,871,409.17 1,329,285.48

Tiang Arm Rambu Lalu Lintas Tipe Cremona (RPPJ) Ukuran Besar 6",2.5", 1" Panjang 7 M

Harga Satuan HARGA PASAR


Kode Nama Satuan Volume Total coretan Profit 10% HPS 2018 Jumlah ket
Ebudgeting 2019 PSR 1 PSR 2 PSR 3 RATA-RATA
I. Pengadaan bahan E- Budgeting Analisa E- Budgeting Analisa E- Budgeting Analisa
Tiang Arm Rambu Lalu Lintas
1.1.7.02.01.06.001.00005 Spesifikasi : Tipe Cremona Ukuran Besar 6",2.5", 1" Panjang 7 Buah 8,584,390.00 1.00 8,584,390.00
M

I. Pengadaan bahan
700 cm (600 + 100) Pipa Galvanis Dia. 6" m 7.00 3,000,000.00 6 " 2,350,000.00 2,325,000.000 2,337,500.00 2,571,250.00 2,571,250.00 3,000,000.00 Analisa
550 cm (275+275) Pipa Galvanis Dia 2,5" m 5.50 796,583.33 2,5" 805,000.00 775,000.000 790,000.00 869,000.00 869,000.00 796,583.33 Analisa
180 cm (90+90) Pipa Galvanis Spesifikasi : Dia 1" m 1.80 98,835.00 1" 305,000.00 294,000.000 299,500.00 329,450.00 329,450.00 98,835.00 Analisa
Base Plate (400x400x12 mm) kg 15,550.00 15.56 15.56 15,550.00 241,888.89 241,888.89 E-Budgeting 2018
Rib Base Plate t=10mm kg 15,550.00 6.08 6.08 15,550.00 94,555.34 94,555.34 E-Budgeting 2018
Rib flange t=5 mm kg 15,550.00 2.84 2.84 15,550.00 44,220.31 44,220.31 E-Budgeting 2018
Plat Galvanis Penutup Pipa 6" t .1,2 mm kg 15,550.00 0.18 0.18 15,550.00 2,756.36 2,756.36 E-Budgeting 2018
Plat Galvanis Penutup Pipa 2" t.1,2 mm kg 15,550.00 0.02 0.02 15,550.00 306.26 306.26 E-Budgeting 2018
Besi Siku 30x30x3 untuk frame panel m 20,740.00 9.50 9.50 75,000.00 20,740.00 197,030.00 197,030.00 E-Budgeting 2018
Klem 3x40x450 mm bh 13,270.00 8.00 8.00 13,270.00 106,160.00 106,160.00 E-Budgeting 2018
Mur Baut untuk klem bh 7,150.00 8.00 8.00 7,150.00 57,200.00 57,200.00 E-Budgeting 2018
Rivet / Panel bh 1,500.00 22.00 22.00 1,500.00 33,000.00 33,000.00 E-Budgeting 2018
pengelasan cm 4,059.50 703.97 703.97 4,059.50 2,857,767.84 2,857,767.84 E-Budgeting 2018

II. Konstruksi Pemasangan

1 Unit Pekerjaan Pemotongan dan Pengeboran untuk Rambu-


Unit 12,864.34 1.00 1.00 12,864.34 12,864.34 12,864.34
Rambu Lalu Lintas E-Budgeting 2018
1 Unit Pekerjaan Perakitan dan Penyetelan untuk Rambu-
Unit 63,943.10 1.00 1.00 63,943.10 63,943.10 63,943.10
Rambu Lalu Lintas E-Budgeting 2018
1 Unit Ongkos Angkut ke Lokasi (Rambu, Delineator, RPPJ) Unit 15,877.29 1.00 1.00 15,877.29 15,877.29 15,877.29
E-Budgeting 2018

Sub Total 7,622,988.06


Panel Rambu Petunjuk uk. 150 x 200 Cm
Komponen Penyusun

Harga Satuan KONTRAK HARGA PASAR


Kode Nama Satuan Volume Total Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 2018 PSR 1 PSR 2 PSR 3 RATA-RATA
E- Budgeting Analisa E- Budgeting Analisa E- Budgeting Analisa
1 M2 Daun Rambu Allumunium Composite Panel
Bahan :
9.1.2.18.04.08.007.00116 1 M2 Daun Rambu Allumunium Composite Panel M2 1,400,691.80 1.00 3.00 1,400,691.80 2,302,721.40
Sub Total 2,109,764.40

Analisa 1 M2 Daun Rambu Allumunium Composite Panel

Harga Satuan KONTRAK


Kode Nama Satuan Volume Total HARGA PASAR Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 2018
PSR 1 PSR 2 PSR 3 RATA-RATA
E- Budgeting Analisa E- Budgeting Analisa E- Budgeting Analisa
1 M2 Daun Rambu Allumunium Composite Panel
Bahan :
1.1.7.01.01.05.003.00005 Plat Alumunium Composite Panel M2 362,920.00 1.15 1.00 417,358.00 362,920.00 285,000.00 260,000.00 272,500.00 299,750.00 331,335.00 417,358.00 331,335.00 Analisa
1.08.24.01.04.003.003 Scothlite Engineering Grade Prismatic (Panel) M2 329,468.00 2.30 1.00 757,776.40 329,468.00 235,000.00 245,000.00 240,000.00 264,000.00 296,734.00 757,776.40 296,734.00 Analisa
Peralatan : - -
1.5.2.01.01.01.002.00092 Alat Bantu Pembuatan Daun Rambu Lalu Lintas M2 8,500.00 1.00 1.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 E-Budgeting
Tenaga: - - - - -
9.1.2.26.02.01.001.00023 Mandor (1 Orang) M2 185,023.00 0.2000 0.2000 37,004.60 37,004.60 37,004.60 37,004.60 37,004.60 E-Budgeting
9.1.2.26.02.01.001.00027 Tukang (1 Orang) M3 173,978.00 0.4000 0.4000 69,591.20 69,591.20 69,591.20 69,591.20 69,591.20 E-Budgeting
9.1.2.26.02.01.001.00040 Pekerja/buruh tidak terampil (2 Orang) M4 138,077.00 0.8000 0.8000 110,461.60 110,461.60 110,461.60 110,461.60 110,461.60 E-Budgeting
1,400,691.80 917,945.40 1,400,691.80 853,626.40

REKAPITULASI 1 UNIT RAMBU RPPJ E- Budgeting Analisa

1 Unit Pengadaan dan Pemasangan Pondasi Rambu Lalu Lintas RPPJ 1,871,409.17 1,329,285.48
Tiang Arm Rambu Lalu Lintas Tipe Cremona Ukuran Besar 6",2.5", 1" Panjang 7 M 8,584,390.00 7,622,988.06
Panel Rambu Petunjuk uk. 150 x 200 Cm 1,400,691.80 853,626.40
Jumlah 11,856,490.97 9,805,899.94
RIWAYAT HPS RAMBU F

1 Unit Pengadaan dan Pemasangan Pondasi Rambu Lalu Lintas Tiang F (6 M)


Komponen Penyusun Uku : 60 X 60 X 120 cm
Harga Satuan KONTRAK HARGA PASAR
Kode Nama Satuan Volume Total Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 2018 PSR 1 PSR 2 PSR 3 RATA-RATA
I. Pengadaan E- Budgeting Analisa E- Budgeting Analisa E- Budgeting Analisa
3.02.03.02.005.080 Angkur Unit 30,000.00 4.00 4.00 120,000.00 120,000.00 30,000.00 120,000.00 120,000.00 E-Budgeting
3.02.03.02.005.081 Mur Baut Unit 7,150.00 4.00 4.00 28,600.00 28,600.00 7,150.00 28,600.00 28,600.00 E-Budgeting
II. Konstruksi Pemasangan - - -

3.02.03.02.005.084 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 1 Meter Unit 81,137.53 0.56 0.432 45,437.02 35,051.41 81,137.53 45,437.02 35,051.41 Analisa
3.02.03.02.005.085 Pekerjaan Pengecoran Unit 994,456.06 0.43 0.430 427,616.11 427,616.11 994,456.06 427,616.11 427,616.11 E-Budgeting
3.02.03.02.005.086 1 Kg Pekerjaan Pembesian Dengan Besi Polos Unit 15,621.29 36.00 36.00 562,366.44 562,366.44 15,621.29 562,366.44 562,366.44 E-Budgeting
3.02.03.02.005.087 Urugan Sirtu di bawah Pondasi Unit 378,246.33 0.05 0.05 18,912.32 18,912.32 378,246.33 18,912.32 18,912.32 E-Budgeting
3.02.03.02.005.088 1 M2 Pekerjaan Pasang Bekisting Untuk Pondasi Unit 340,857.75 1.92 0.36 654,446.88 122,708.79 340,857.75 654,446.88 122,708.79 Analisa
3.02.03.02.005.089 1 Unit Ongkos Angkut ke Lokasi (Rambu, Delineator, RPPJ) Unit 14,030.41 1.00 1.00 14,030.41 14,030.41 14,030.41 14,030.41 14,030.41 E-Budgeting

1,871,409.17 1,329,285.48
Sub Total 1,871,409.17 1,329,285.48

Tiang Arm Rambu Lalu Lintas


Spesifikasi : Tipe Cremona Ukuran Sedang 4", 2", 1" Panjang 6 M

Harga Satuan KONTRAK HARGA PASAR


Kode Nama Satuan Volume Total Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 2018 PSR 1 PSR 2 PSR 3 RATA-RATA
I. Pengadaan bahan E- Budgeting Analisa E- Budgeting Analisa E- Budgeting Analisa
Tiang Arm Rambu Lalu Lintas
1.1.7.02.01.06.001.00005 Spesifikasi : Tipe Cremona Ukuran Sedang 4", 2", 1" Panjang Buah 6,445,270.00 1.00 6,445,270.00
6M

I. Pengadaan bahan
600 cm ( 600 x 1 piece) Pipa Galvanis Dia. 4" m 1,525,000.00 1,450,000.000 1,487,500.00 1,636,250.00 1,636,250.00 1,636,250 Analisa
400 cm (200 x 2 piece) Pipa Galvanis Dia 2" m 595,000.00 608,000.000 601,500.00 661,650.00 661,650.00 441,100.00 Analisa
300 cm (5 piece) Pipa Galvanis Spesifikasi : Dia 1" m 305,000.00 294,000.000 299,500.00 329,450.00 329,450.00 164,725.00 Analisa
- 75 x 2 = 150 Base Plate (400x400x12 mm) kg 15,550.00 15.56 15.56 15,550.00 241,888.89 241,888.89 E-Budgeting 2018
- 50 x 3 = 150 Rib Base Plate t=10mm kg 15,550.00 6.08 6.08 15,550.00 94,555.34 94,555.34 E-Budgeting 2018
Rib flange t=5 mm kg 15,550.00 2.84 2.84 15,550.00 44,220.31 44,220.31 E-Budgeting 2018
Plat Galvanis Penutup Pipa 6" t .1,2 mm kg 15,550.00 0.18 0.18 15,550.00 2,756.36 2,756.36 E-Budgeting 2018
Plat Galvanis Penutup Pipa 2" t.1,2 mm kg 15,550.00 0.02 0.02 15,550.00 306.26 306.26 E-Budgeting 2018
Besi Siku 30x30x3 untuk frame panel m 20,740.00 9.50 9.50 20,740.00 197,030.00 197,030.00 E-Budgeting 2018
Klem 3x40x450 mm bh 13,270.00 8.00 8.00 13,270.00 106,160.00 106,160.00 E-Budgeting 2018
Mur Baut untuk klem bh 7,150.00 8.00 8.00 7,150.00 57,200.00 57,200.00 E-Budgeting 2018
Rivet / Panel bh 1,500.00 22.00 22.00 1,500.00 33,000.00 33,000.00 E-Budgeting 2018
pengelasan cm 4,059.50 703.97 703.97 4,059.50 2,857,767.84 2,857,767.84 E-Budgeting 2018

II. Konstruksi Pemasangan

1 Unit Pekerjaan Pemotongan dan Pengeboran untuk Rambu-


Unit 12,864.34 1.00 1.00 12,864.34 12,864.34 12,864.34
Rambu Lalu Lintas E-Budgeting 2018
1 Unit Pekerjaan Perakitan dan Penyetelan untuk Rambu-
Unit 63,943.10 1.00 1.00 63,943.10 63,943.10 63,943.10
Rambu Lalu Lintas E-Budgeting 2018
1 Unit Ongkos Angkut ke Lokasi (Rambu, Delineator, RPPJ) Unit 15,877.29 1.00 1.00 15,877.29 15,877.29 15,877.29
E-Budgeting 2018

Sub Total 5,969,644.73


1 M2 Daun Rambu Allumunium Composite Panel Uk. Dia. 90 Cm dan Dia. 75
Komponen Penyusun

Harga Satuan KONTRAK HARGA PASAR


Kode Nama Satuan Volume Total Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 2018 PSR 1 PSR 2 PSR 3 RATA-RATA
E- Budgeting Analisa E- Budgeting Analisa E- Budgeting Analisa
1 M2 Daun Rambu Allumunium Composite Panel Uk. Dia. 90 Cm dan Dia. 75
Bahan :
9.1.2.18.04.08.007.00116 1 M2 Daun Rambu Allumunium Composite Panel M2 1,400,691.80 1.00 1,400,691.80
Sub Total -

Analisa 1 M2 Daun Rambu Allumunium Composite Panel Dia. 75 cm


Harga Satuan KONTRAK HARGA PASAR
Kode Nama Satuan Volume Total Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 2018 PSR 1 PSR 2 PSR 3 RATA-RATA
E- Budgeting Analisa E- Budgeting Analisa E- Budgeting Analisa
1 M2 Daun Rambu Allumunium Composite Panel
Bahan :
1.1.7.01.01.05.003.00005 Plat Alumunium Composite Panel M2 362920 1.15 1.00 417,358.00 285,000.00 260,000.00 272,500.00 299,750.00 331,335.00 417,358.00 331,335.00 Analisa
1.08.24.01.04.003.003 Scothlite Engineering Grade Prismatic (Panel) M2 329468 2.30 1.00 757,776.40 235,000.00 245,000.00 240,000.00 264,000.00 296,734.00 757,776.40 296,734.00 Analisa
Peralatan : -
1.5.2.01.01.01.002.00092 Alat Bantu Pembuatan Daun Rambu Lalu Lintas M2 8500 1.00 1.00 8,500.00 8500 8,500.00 8,500.00 E- Budgeting
Tenaga: -
9.1.2.26.02.01.001.00023 Mandor (1 Orang) M2 185023 0.2000 0.2000 37,004.60 185023 37,004.60 37,004.60 E- Budgeting
9.1.2.26.02.01.001.00027 Tukang (1 Orang) M3 173978 0.4000 0.4000 69,591.20 173978 69,591.20 69,591.20 E- Budgeting
9.1.2.26.02.01.001.00040 Pekerja/buruh tidak terampil (2 Orang) M4 138077 0.8000 0.8000 110,461.60 138077 110,461.60 110,461.60 E- Budgeting
Sub Total 1,400,691.80 853,626.40

Analisa 1 M2 Daun Rambu Allumunium Composite Panel Dia. 90 cm

Harga Satuan KONTRAK


Kode Nama Satuan Volume Total HARGA PASAR Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 2018
PSR 1 PSR 2 PSR 3 RATA-RATA
E- Budgeting Analisa E- Budgeting Analisa E- Budgeting Analisa

1 M2 Daun Rambu Allumunium Composite Panel


Bahan :
1.1.7.01.01.05.003.00005 Plat Alumunium Composite Panel M2 362920 1.15 1.00 417,358.00 285,000.00 260,000.00 272,500.00 299,750.00 331,335.00 417,358.00 331,335.00 Analisa
1.08.24.01.04.003.003 Scothlite Engineering Grade Prismatic (Panel) M2 329468 2.30 1.00 757,776.40 235,000.00 245,000.00 240,000.00 264,000.00 296,734.00 757,776.40 296,734.00 Analisa
Peralatan : -
1.5.2.01.01.01.002.00092 Alat Bantu Pembuatan Daun Rambu Lalu Lintas M2 8500 1.00 1.00 8,500.00 8500 8,500.00 8,500.00 E- Budgeting
Tenaga: -
9.1.2.26.02.01.001.00023 Mandor (1 Orang) M2 185023 0.2000 0.2000 37,004.60 185023 37,004.60 37,004.60 E- Budgeting
9.1.2.26.02.01.001.00027 Tukang (1 Orang) M3 173978 0.4000 0.4000 69,591.20 173978 69,591.20 69,591.20 E- Budgeting
9.1.2.26.02.01.001.00040 Pekerja/buruh tidak terampil (2 Orang) M4 138077 0.8000 0.8000 110,461.60 138077 110,461.60 110,461.60 E- Budgeting
Sub Total 1,400,691.80 853,626.40

REKAPITULASI E- Budgeting Analisa

1 Unit Pengadaan dan Pemasangan Pondasi Rambu Lalu Lintas Tiang F (6 M) 1,871,409.17 1,329,285.48
Tiang Arm Rambu Lalu Lintas Spesifikasi : Tipe Cremona Ukuran Sedang 4", 2", 1" Panjang 6 M 6,445,270.00 5,969,644.73
1 M2 Daun Rambu Allumunium Composite Panel Uk. Dia. 90 Cm dan Dia. 75 1,400,691.80 853,626.40

Jumlah 9,717,370.97 8,152,556.60


RIWAYAT HPS RAMBU STANDAR
Tiang Rambu Pipa Bulat Galvanised 2,5"

Harga Satuan HARGA PASAR


Kode Nama Satuan Volume Total Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 PSR 1 PSR 2 PSR 3 RATA-RATA
I. Komponen Penyusun E-Budgeting Analisa E-Budgeting Analisa E-Budgeting Analisa
48,564.63
1.3.3.01.01.32.005.00057.025 Besi Siku L40;L50;L60;L70 Unit 19,135.00 2.54 48,564.63 48,564.63 48,564.63

15,400.00
Mur Baut Spesifikasi : Bahan / material untuk pengikat besi
1.3.3.01.01.32.005.00057.026 Unit 3,850.00 4.00 15,400.00 15,400.00 15,400.00
atau kayu, Material besi, ukuran 17 mm , Standar SNI
579,700.00
1.3.3.01.01.32.005.00057.027 Pipa Galvanis Dia. 2.5" t = 3,6 Unit 26,230.00 34.69 909,824.27 537,000.00 517,000.00 527,000.00 579,700.00 579,700.00 909,824.27

307,232.79
1.3.3.01.01.32.005.00057.028 Tutup pipa Galvanis Dia. 2.5" Unit 19,634.93 15.65 307,232.79 307,232.79 307,232.79

1 M2 Pekerjaan Pengecatan Rambu Dan Besi Sarana 33,603.92


1.3.3.01.01.32.005.00057.029 Unit 129,245.83 0.26 33,603.92 33,603.92 33,603.92
Prasarana Jalan
1 Unit Pekerjaan Pemotongan Dan Pengeboran Untuk Rambu- 12,864.34
1.3.3.01.01.32.005.00057.030 Unit 12,864.34 1.00 12,864.34 12,864.34 12,864.34
Rambu Lalu Lintas

1.3.3.01.01.32.005.00057.031 1 cm Pengelasan Unit 4,063.54 40.26 40.26 163,594.06 163594.06 2,868.86 2,868.86 3,155.75 4,063.54 163,594.06 163,594.06

1 Unit Pekerjaan Perakitan dan Penyetelan untuk Rambu- 63,943.10


1.3.3.01.01.32.005.00057.032 Unit 63,943.10 1.00 63,943.10 63,943.10 63,943.10
Rambu Lalu Lintas

163,594.06 Sub Total 1,555,027.11 1,224,902.83

1 Unit Pengadaan dan Pemasangan Pondasi Rambu Lalu Lintas Standar


Komponen Penyusun Uk : 40 X 40 X 60 cm

HARGA PASAR
Harga Satuan
Kode Nama Satuan Volume Total Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 PSR 1 PSR 2 PSR 3 RATA-RATA
E-Budgeting Analisa E-Budgeting Analisa E-Budgeting Analisa

II. Konstruksi Pemasangan


1 M3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm,
9.1.2.18.03.03.002.00001 M3 1,155,878.03 1.00 1.000 1,155,878.03 1,155,878.03 1,155,878.03 1,155,878.03
Campuran (1 Pc : 3 Pp)
9.1.2.18.03.02.005.00004 1 M3 Pekerjaan Galian Tanah Keras Sedalam 1 Meter M3 143,997.74 1.00 1.000 143,997.74 143,997.74 143,997.74 143,997.74

Sub Total 1,299,875.77 1,299,875.77

Analisa 1 M3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 3 Pp)
Harga Satuan HARGA PASAR
Kode Nama Satuan Volume Total Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 PSR 1 PSR 2 PSR 3 RATA-RATA
I. Bahan E-Budgeting Analisa E-Budgeting Analisa E-Budgeting Analisa
1.1.7.01.01.01.002.00002 Semen M3 63,534.00 5.05 320,846.700
1.1.7.01.01.01.004.00002 Pasir M3 293,400.00 0.49 142,299.000
1.1.7.01.01.01.005.00006 Batu Kali M3 283,000.00 1.20 339,600.000
II. Tenaga -
9.1.2.26.02.01.001.00023 Mandor M3 185,023.00 0.08 13,876.725
9.1.2.26.02.01.001.00026 Kepala Tukang Batu M3 173,978.00 0.08 13,048.350
9.1.2.26.02.01.001.00032 Tukang Batu M3 158,789.00 0.75 119,091.750
9.1.2.26.02.01.001.00040 Pekerja (buruh tidak terampil) M3 138,077.00 1.50 207,115.500
0.00
Sub Total 0.00
Panel Rambu Lalu Lintas
1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 75 x 75 cm dan 60 x 75 cm
0.5625 0.45

Harga Satuan HARGA PASAR


Kode Nama Satuan Volume Total Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 PSR 1 PSR 2 PSR 3 RATA-RATA
E-Budgeting Analisa E-Budgeting Analisa E-Budgeting Analisa
1 M2 Daun Rambu Allumunium Composite Panel
Bahan :
1.1.7.01.01.05.003.00005 Plat Alumunium Composite Panel M2 362,920.00 1.15 1.000 417,358.00 285,000.00 260,000.00 272,500.00 299,750.00 331,335.00 417,358.00 331,335.00
1.08.24.01.04.003.003 Scothlite Engineering Grade Prismatic (Panel) M2 329,468.00 2.30 1.000 757,776.40 235,000.00 245,000.00 240,000.00 264,000.00 296,734.00 757,776.40 296,734.00
Peralatan :
1.5.2.01.01.01.002.00092 Alat Bantu Pembuatan Daun Rambu Lalu Lintas M2 8,500.00 1.00 1.00 8,500.00 8,500.00 8,500.00 8,500.00
Tenaga:
9.1.2.26.02.01.001.00023 Mandor (1 Orang) M2 185,023.00 0.2000 0.2000 37,004.60 185,023.00 37,004.60 37,004.60
9.1.2.26.02.01.001.00027 Tukang (1 Orang) M3 173,978.00 0.4000 0.4000 69,591.20 173,978.00 69,591.20 69,591.20
9.1.2.26.02.01.001.00040 Pekerja/buruh tidak terampil (2 Orang) M4 138,077.00 0.8000 0.8000 110,461.60 138,077.00 110,461.60 110,461.60
- Sub Total 1,400,691.80 853,626.40

REKAPITULASI E-Budgeting Analisa


Tiang Rambu Pipa Bulat Galvanised 2,5" 1,555,027.11 1,224,902.83
1 Unit Pengadaan dan Pemasangan Pondasi Rambu Lalu Lintas Standar 1,299,875.77 1,299,875.77
1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 75 x 75 cm dan 60 x 75 cm (PANEL) 1,400,691.80 853,626.40
Jumlah 1 Unit Rambu Standar Tiang Bulat 4,255,594.68 3,378,405.00
RIWAYAT HPS RAMBU STANDAR
ANALISA
1 unit Pemasangan dan Pengadaan Tiang Rambu Pipa Bulat Galvanised 2,5" (JAK LINKO)
Komponen Penyusun

Harga Satuan HARGA PASAR


Kode Nama Satuan Volume Total Kontrak 2018 Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 PSR 1 PSR 2 PSR 3 RATA-RATA
I. Komponen Penyusun E-Budgeting Analisa E-Budgeting Analisa E-Budgeting Analisa
1.3.3.01.01.32.005.00057.025 Besi Siku L40;L50;L60;L70 Unit 19,135.00 2.54 48,564.63 - 48,564.63 48,564.63 48,564.63 E-budgeting

Mur Baut Spesifikasi : Bahan / material untuk pengikat besi


1.3.3.01.01.32.005.00057.026 Unit 3,850.00 4.00 15,400.00 15,400.00 15,400.00 15,400.00 E-budgeting
atau kayu, Material besi, ukuran 17 mm , Standar SNI

1.3.3.01.01.32.005.00057.027 Pipa Galvanis Dia. 2.5" t = 3,6 Unit 26,230.00 34.69 909,824.27 537,000.00 517,000.00 527,000.00 579,700.00 579,700.00 909,824.27 579,700.00 Analisa

1.3.3.01.01.32.005.00057.028 Tutup pipa Galvanis Dia. 2.5" Unit 19,634.93 15.65 307,232.79 307,232.79 307,232.79 307,232.79 E-budgeting

1 M2 Pekerjaan Pengecatan Rambu Dan Besi Sarana


1.3.3.01.01.32.005.00057.029 Unit 129,245.83 0.26 33,603.92 33,603.92 33,603.92 33,603.92 E-budgeting
Prasarana Jalan
1 Unit Pekerjaan Pemotongan Dan Pengeboran Untuk
1.3.3.01.01.32.005.00057.030 Unit 12,864.34 1.00 12,864.34 12,864.34 12,864.34 12,864.34 E-budgeting
Rambu-Rambu Lalu Lintas

1.3.3.01.01.32.005.00057.031 1 cm Pengelasan Unit 4,063.54 40.26 49.94 163,594.06 202,929.12 2,868.86 2,868.86 3,155.75 4,063.54 163,594.06 163,594.06 E-budgeting

1 Unit Pekerjaan Perakitan dan Penyetelan untuk Rambu-


1.3.3.01.01.32.005.00057.032 Unit 63,943.10 1.00 63,943.10 63,943.10 63,943.10 63,943.10 E-budgeting
Rambu Lalu Lintas

202,929.12 Sub Total 1,555,027.11 1,224,902.83

PONDASI Pemasangan dan Pengadaan Tiang Rambu Pipa Bulat Galvanised 2,5" (JAK LINKO)

Harga Satuan HARGA PASAR


Kode Nama Satuan Volume Total Kontrak 2018 Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 PSR 1 PSR 2 PSR 3 RATA-RATA
E-Budgeting Analisa E-Budgeting Analisa E-Budgeting Analisa

II. Konstruksi Pemasangan


9.1.2.18.03.03.002.00001 1 M3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran
M3 (1 Pc : 3 Pp)
1,155,878.03 1.00 1.000 1,155,878.030 1,155,878.03 1,155,878.03 1,155,878.03 1,155,878.03 E- Budgeting
9.1.2.18.03.02.005.00004 1 M3 Pekerjaan Galian Tanah Keras Sedalam 1 Meter M3 143,997.74 1.00 1.000 143,997.740 143,997.74 143,997.74 143,997.74 143,997.74 E- Budgeting

Sub Total 1,299,875.77 1,299,875.77

Analisa 1 M3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Cm, Campuran (1 Pc : 3 Pp)
Harga Satuan HARGA PASAR
Kode Nama Satuan Volume Total Kontrak 2018 Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 PSR 1 PSR 2 PSR 3 RATA-RATA
I. Bahan E-Budgeting Analisa E-Budgeting Analisa E-Budgeting Analisa
1.1.7.01.01.01.002.00002 Semen M3 63,534.00 5.050 320,846.70
1.1.7.01.01.01.004.00002 Pasir M3 293,400.00 0.485 142,299.00
1.1.7.01.01.01.005.00006 Batu Kali M3 283,000.00 1.200 339,600.00
II. Tenaga -
9.1.2.26.02.01.001.00023 Mandor M3 185,023.00 0.075 13,876.73
9.1.2.26.02.01.001.00026 Kepala Tukang Batu M3 173,978.00 0.075 13,048.35
9.1.2.26.02.01.001.00032 Tukang Batu M3 158,789.00 0.750 119,091.75
9.1.2.26.02.01.001.00040 Pekerja (buruh tidak terampil) M3 138,077.00 1.500 207,115.50
1,155,878.03
Sub Total 0.00
Panel Rambu Lalu Lintas
1 Unit Pengadaan & Pemasangan Rambu Lalu Lintas uk. 40 x 50 cm dan 60 x 75 cm

Harga Satuan HARGA PASAR


Kode Nama Satuan Volume Total Kontrak 2018 Profit 10% HPS 2019 Jumlah ket
Ebudgeting 2019 PSR 1 PSR 2 PSR 3 RATA-RATA
E-Budgeting Analisa E-Budgeting Analisa E-Budgeting Analisa
1 M2 Daun Rambu Allumunium Composite Panel
Bahan : Erajaya Bangun Persada
Pasundan
1.1.7.01.01.05.003.00005 Plat Alumunium Composite Panel M2 362,920.00 1.15 1.00 417,358.00 362,920.00 285,000.00 260,000.00 272,500.00 299,750.00 331,335.00 417,358.00 331,335.00 Analisa
1.08.24.01.04.003.003 Scothlite Engineering Grade Prismatic (Panel) M2 329,468.00 2.30 1.00 757,776.40 329,468.00 235,000.00 245,000.00 240,000.00 264,000.00 296,734.00 757,776.40 296,734.00 Analisa
Peralatan : - - -
1.5.2.01.01.01.002.00092 Alat Bantu Pembuatan Daun Rambu Lalu Lintas M2 8,500.00 1.00 1.00 8,500.00 8,500.00 8,500.00 8,500.00 8,500.00 E- Budgeting
Tenaga: - - -
9.1.2.26.02.01.001.00023 Mandor (1 Orang) M2 185,023.00 0.2000 37,004.60 37,004.60 185,023.00 37,004.60 37,004.60 E- Budgeting
9.1.2.26.02.01.001.00027 Tukang (1 Orang) M2 173,978.00 0.4000 69,591.20 69,591.20 173,978.00 69,591.20 69,591.20 E- Budgeting
9.1.2.26.02.01.001.00040 Pekerja/buruh tidak terampil (2 Orang) M2 138,077.00 0.8000 110,461.60 110,461.60 138,077.00 110,461.60 110,461.60 E- Budgeting
217,057.40 Sub Total 1,400,691.80 853,626.40

REKAPITULASI E- Budgeting Analisa


1,555,027.11 1,224,902.83
1 unit Pemasangan dan Pengadaan Tiang Rambu Pipa Bulat Galvanised 2,5" (JAK LINKO)
1 Unit Pondasi Rambu 1,299,875.77 1,299,875.77
Panel Rambu Lalu Lintas uk. 40 x 50 cm dan 60 x 75 cm 1,400,691.80 853,626.40
Total 4,255,594.68 3,378,405.00

Anda mungkin juga menyukai