Anda di halaman 1dari 5

Disain Strunture Balok Anak Ltg Lt-1 Disain Pergudangan

ANALISA BALOK ANAK KOMPOSIT MELINTANG WF-300X150


MOMEN POSITIF (LAPANGAN) Lt-1 SEGMEN KANTOR

Pembebanan :

Bentang balok : Lbj = 6m

Momen ultimate lapangan: M LU = 73.8kN m tebal slab : tp = 120mm

Propertif Penampang :

Mutu baja : fy = 240  MPa fu = 520MPa Mutu beton : fc' = 20.75 MPa

Es = 200000 MPa Ec = 4700 fc' MPa Ec = 21409.51891  MPa

Pakai baja WF 300x150x6.5x9:


2 4 4 4 4
Awf = 4678 mm Ixo = 7210 10  mm Iyo = 508  10  mm

3 3
Hwf = 300  mm Bwf = 150  mm tf = 9  mm tw = 6.5 mm Sx = 481  10  mm

 Lbj 
Lebar efektif slab beton : beff = min Bwf + 16 tp , 2.5m ,  = 1.5 m
 4 
Es
ratio modulus : nm = nm = 9.34164
Ec

Asumsi 1 nilai PNA (Plastic Neutral Axis) di dalam slab beton:

Awf fy
ax = ax = 42.43685 mm
0.85fc' b eff

ket1 = "PNA di dalam slab (Asumsi 1), langsung cek momen, abaikan asumsi 2 dan 3"

Asumsi 2 nilai PNA (Plastic Neutral Axis) di dalam flens profil WF:

Cek pemenuhan asumsi 2 :

Awf  fy - 0.85 fc' b eff  tp


Cs = Cs = -1026.015  kN
2

dalam daerah tekan di flens :


Cs
df = df = -28.50042 mm
Bwf  fy

ket2 = "PNA di dalam flens (Asumsi2 ) terpenuhi, abaikan asumsi 3, lanjutkan perhitungan titik berat tarik baja "

jika PNA dalam flens maka titik berat tarik dari baja kondisi plastis :

Hwf
Awf  - df  B wf ( Hwf - 0.5 d f )
2
yc1 = yc1 = 228.42902  mm
Awf - d f  Bwf

PT Peputra Maha Raya Kap Kmpst Lapangan - 1


Disain Strunture Balok Anak Ltg Lt-1 Disain Pergudangan

tp
d21 = ( tp + Hwf ) - yc1 - d21 = 131.57098  mm
2

d22 = Hwf - yc1 - 0.5 d f d22 = 85.82119 mm

Asumsi 3 nilai PNA (Plastic Neutral Axis) di dalam web profil WF:

cek kapasitas gaya maksimum di dalam flens :

Cf = tf  Bwf  fy Cf = 324  kN

Awf  fy - 2Cf - 0.85 fc' tp b eff


Cw = Cw = -1350.015 kN
2

kedalaman PNA dari sisi terbawah flens :

Cw
dw = dw = -865.39423  mm
fy tw

PNA dihitung dari puncak slab :

yPNA = tp + tf + d w yPNA = -736.39423  mm

jika PNA dalam web maka titik berat tarik dari baja kondisi plastis :

Hwf
Awf  - tf  Bwf  ( Hwf - 0.5 tf ) - dw tw ( Hwf - tf - 0.5 dw)
2
yc2 = yc2 = 488.50508  mm
Awf - tf  Bwf - dw tw

lengan lengan momen internal :

tp
Lc = + Hwf - yc2 Lc = -128.50508  mm
2
tf
Lf = Hwf - - yc2 Lf = -193.00508  mm
2
dw
Lw = Hwf - tf - - yc2 Lw = 235.19204  mm
2

 Hwf ax 
M nc = Awf fy  + tp -  if ax  tp = 279.31205  kN m
 2 2
( 0.85 fc' tp beff ) Lc + (tf  Bwf fy) Lf + Cw Lw if df > tf
( 0.85 fc' tp beff ) d21 + Cs d22 otherwise

M LU
Rasio Momen Terhadap Kapasitas : = 0.26422
M nc

Ket3 = "Kapasitas Penampang Ok, Lanjutkan !"

PT Peputra Maha Raya Kap Kmpst Lapangan - 2


Disain Strunture Balok Anak Ltg Lt-1 Disain Pergudangan

Cek Shear Connector :


2 2
Diameter stud : Φstud = 12mm Astud = 0.25 π Φstud = 113.09734  mm Rg = 1 Rp = 1

Qnstd = 0.5 Astud fc' Ec if 0.5 Astud fc' Ec  Rg Rp Astud fu = 37.69076 kN
R g Rp Astud fu otherwise

gaya geser disain untuk connector :

Cmax = 0.85 fc' ax b eff if ax  tp = 1122.72  kN Tsmax = Awf  fy if ax  tp = 1122.72  kN


0.85 fc' tp b eff otherwise Awf  fy - Cf - Cw if d f > tf
Awf  fy - Cs otherwise

Vsh = min( Cmax , Tsmax) = 1122.72  kN

 Vsh 
Jumlah Shear Connector : Nstud = ceil  = 30
 1Qnstd 
Lbj
Jarak Shear connector : Ssc = = 200  mm
Nstud

Pakai Minimal Stud 1x Φ12mm- 200mm

PT Peputra Maha Raya Kap Kmpst Lapangan - 3


Disain Strunture Balok Anak Ltg Lt-1 Disain Pergudangan

ket1 = "PNA di dalam slab (Asumsi 1), langsung cek momen, abaikan asumsi 2 dan 3" if ax < tp
"PNA di dalam baja, cek di flens (Asumsi2 ) atau di web (Asumsi 3), abaikan asumsi 1 " otherwise

ket2 = "PNA di dalam web (Asumsi 3), abaikan asumsi 1 dan 2" if d f > tf
"PNA di dalam flens (Asumsi2 ) terpenuhi, abaikan asumsi 3, lanjutkan perhitungan titik berat tarik baja " otherwise

PT Peputra Maha Raya Kap Kmpst Lapangan - 4


Disain Strunture Balok Anak Ltg Lt-1 Disain Pergudangan

M LU
Ket3 = "Kapasitas Penampang Ok, Lanjutkan !" if 1
M nc
"Kapasitas Penampang Tidak Ok, Perbesar Penampang !" otherwise

PT Peputra Maha Raya Kap Kmpst Lapangan - 5

Anda mungkin juga menyukai