Anda di halaman 1dari 4

SOAL PRAKTIKUM

MATA KULIAH EPIDEMIOLOGI DAN EKONOMI VETERINER (IPH 413)


POKOK BAHASAN : EKONOMI VETERINER 2
TAHUN 2018
OLEH KELOMPOK 4

Suatu proyek pengendalian penyakit antraks di Kabupaten Ndeso direncanakan selama 10 tahun dengan rancangan anggaran dana sebagai
berikut.

Total
Fixed Variable Total
Tahun Investasi DR (12%) PVC Pendapata DR (12%) PVB NPV BCR
Cost Cost Biaya
n
1 5000 0 0 5000 0.893 4465 0 0.893 0 -4465  
2 5000 750 600 6350 0.797 5060.9 2000 0.797 1594 -3466.95  
3 0 1500 1200 2700 0.712 1922.4 2500 0.712 1780 -142.4  
4 0 1500 1200 2700 0.636 1717.2 5000 0.636 3180 1462.8  
5 3000 1500 1200 5700 0.567 3231.9 8000 0.567 4536 1304.1  
6 0 1500 1200 2700 0.507 1368.9 8000 0.507 4056 2687.1  
7 0 1500 1200 2700 0.452 1220.4 8000 0.452 3616 2395.6  
8 3000 1500 1200 5700 0.404 2302.8 8000 0.404 3232 929.2    
9 3000 1500 1200 5700 0.361 2057.7 10500 0.361 3790.5 1732.8    
10 0 1500 1200 2700 0.322 869.4 11000 0.322 3542 2672.6    
TOTA 24216.6 29326. 1.21100
L 19000 12750 10200 41950   5 63000   5 5109.85 6  

 
Dengan menggunakan Discount Rate 12%

a. NVP = 5109,85 (Proyek tersebut dapat diterima karena nilai PVB > PVC atau nilai NPV positif)
b. BCR = 1,21101 (Proyek tersebut dapat diterima karena nilai BCR > 1)
c. IRR = 22.44 (Jika DR lebih tinggi akan menghasilkan NPV negatif, jika kurang akan menghasilkan NPV positif)

1
d. Kesimpulan kami mengenai proyek tersebut adalah proyek tersebut memiliki tingkat pengembalian minimal 22,44% pada
penggunaan Discount Rate 20-24%. Dengan DR tersebut, apabila suku bunga bank lebih kecil maka proyek ini layak dijalani.

Fixed Variable Total Total DR


Tahun Investasi DR (14%) PVC PVB NPV
Cost Cost Biaya Pendapatan (14%)
1 5000 0 0 5000 0.877 4385.965 0 0.877 0 -4385.96
2 5000 750 600 6350 0.769 4886.119 2000 0.769 1538.935 -3347.18
3 0 1500 1200 2700 0.675 1822.423 2500 0.675 1687.429 -134.994
4 0 1500 1200 2700 0.592 1598.617 5000 0.592 2960.401 1361.785
5 3000 1500 1200 5700 0.519 2960.401 8000 0.519 4154.949 1194.548
6 0 1500 1200 2700 0.456 1230.084 8000 0.456 3644.692 2414.609
7 0 1500 1200 2700 0.400 1079.021 8000 0.400 3197.099 2118.078
8 3000 1500 1200 5700 0.351 1998.187 8000 0.351 2804.472 806.2858
9 3000 1500 1200 5700 0.308 1752.795 10500 0.308 3228.833 1476.038
10 0 1500 1200 2700 0.270 728.3083 11000 0.270 2967.182 2238.874
TOTAL 19000 12750 10200 41950   22441.92 63000   26183.99 3742.074

Fixed Variable Total Total DR


Tahun Investasi DR (16%) PVC PVB NPV
Cost Cost Biaya Pendapatan (16%)
1 5000 0 0 5000 0.862 4310.345 0 0.862 0 -4310.34
2 5000 750 600 6350 0.743 4719.084 2000 0.743 1486.326 -3232.76
3 0 1500 1200 2700 0.641 1729.776 2500 0.641 1601.644 -128.132
4 0 1500 1200 2700 0.552 1491.186 5000 0.552 2761.455 1270.27
5 3000 1500 1200 5700 0.476 2713.844 8000 0.476 3808.904 1095.06
6 0 1500 1200 2700 0.410 1108.194 8000 0.410 3283.538 2175.344
7 0 1500 1200 2700 0.354 955.3397 8000 0.354 2830.636 1875.297
8 3000 1500 1200 5700 0.305 1738.645 8000 0.305 2440.204 701.5586
9 3000 1500 1200 5700 0.263 1498.832 10500 0.263 2761.006 1262.174
10 0 1500 1200 2700 0.227 612.0457 11000 0.227 2493.52 1881.474

2
TOTAL 19000 12750 10200 41950   20877.29 63000   23467.23 2589.942

Fixed Variable Total Total DR


Tahun Investasi DR (20%) PVC PVB NPV
Cost Cost Biaya Pendapatan (20%)
1 5000 0 0 5000 0.833 4166.667 0 0.833 0 -4166.67
2 5000 750 600 6350 0.694 4409.722 2000 0.694 1388.889 -3020.83
3 0 1500 1200 2700 0.579 1562.5 2500 0.579 1446.759 -115.741
4 0 1500 1200 2700 0.482 1302.083 5000 0.482 2411.265 1109.182
5 3000 1500 1200 5700 0.402 2290.702 8000 0.402 3215.021 924.3184
6 0 1500 1200 2700 0.335 904.2245 8000 0.335 2679.184 1774.959
7 0 1500 1200 2700 0.279 753.5204 8000 0.279 2232.653 1479.133
8 3000 1500 1200 5700 0.233 1325.638 8000 0.233 1860.544 534.9065
9 3000 1500 1200 5700 0.194 1104.698 10500 0.194 2034.97 930.2722
10 0 1500 1200 2700 0.162 436.0651 11000 0.162 1776.561 1340.496
TOTAL 19000 12750 10200 41950   18255.82 63000   19045.85 790.0268

Fixed Variable Total Total DR


Tahun Investasi DR (24%) PVC PVB NPV
Cost Cost Biaya Pendapatan (24%)
1 5000 0 0 5000 0.806 4032.258 0 0.806 0 -4032.26
2 5000 750 600 6350 0.650 4129.813 2000 0.650 1300.728 -2829.08
3 0 1500 1200 2700 0.524 1416.116 2500 0.524 1311.218 -104.897
4 0 1500 1200 2700 0.423 1142.029 5000 0.423 2114.868 972.8393
5 3000 1500 1200 5700 0.341 1944.314 8000 0.341 2728.862 784.5478
6 0 1500 1200 2700 0.275 742.7346 8000 0.275 2200.695 1457.961
7 0 1500 1200 2700 0.222 598.9795 8000 0.222 1774.754 1175.775
8 3000 1500 1200 5700 0.179 1019.768 8000 0.179 1431.253 411.4853
9 3000 1500 1200 5700 0.144 822.3935 10500 0.144 1514.935 692.5419
10 0 1500 1200 2700 0.116 314.1571 11000 0.116 1279.899 965.7423

3
TOTAL 19000 12750 10200 41950   16162.56 63000   15657.21 -505.348

IRR = Lower DR + [(perbedaan DR) x (NPV dari DR terendah) / (NPV dari DR tertinggi + NPV DR terendah)]

IRR = 20 + (24-20) × 790


  790 + 505
= 20 + 2.44  
= 22.44  

Anda mungkin juga menyukai