Bendung Aparang I
B.Sp.1 Bb.1.Ki
Ha lt/dt
BABARA
A = 1,040.72 Ha
Q = 1.31 m3/dt
A = 1,033.97 Ha
Q = 1.30 m3/dt
A = 1,028.92 Ha
Q = 1.29 m3/dt
A = 1,017.01 Ha
Q = 1.27 m3/dt
A = 1,017.01 Ha
Q = 1.27 m3/dt
A = 1,017.01 Ha
Q = 1.14 m3/dt
A = 966.95 Ha
Q = 1.08 m3/dt
Bk.1.Ki.1
L = 166.72 m L = 2094.06 m L = 1094.222 m L = 425.148 m L = 160.05 m L = 1248.17 m L = 551.88 m
Ha lt/dt
B.Ap.1.5/B.Sp.2
Box T
Ap.I.1.Ka Ap.I.2.Ka Ap.I.3.Ka Ap.I.4.Ka Bb.1.Ka B.Bb.2 Bb.2.Ka
Bk.1.Ki.2
Ha lt/dt Ha lt/dt Ha lt/dt Ha lt/dt Ha lt/dt Ha lt/dt
Bk.3.Ki.2
B.Bb.3A
Ha lt/dt
Q = 1.02 m3/dt
A = 913.46 Ha
Ha lt/dt
L = 152.06 m
Bk.3.Ki.1
Bb.3A.Ki Bb.3A.Ka Ha lt/dt Bk.3.Ki.3.a
Q = 1.02 m3/dt
Ha lt/dt Ha lt/dt Ha lt/dt
A = 913.46 Ha
L = 176.86 m
SALURAN SEKUNDER B I K E R U
Bb.3.Ka B.Bk.1 B.Bk.2
Ha lt/dt B.Bb.3 A = 456.07 Ha A = 355.72 Ha A = 330.58 Ha
B.Bk.3
PEDDA
Q = 0.51 m3/dt Q = 0.40 m3/dt Q = 0.370 m3/dt
L = 1627.33 m L = 245.48 m L = 677.78 m
Q = 0.43 m3/dt
Bk.3.Ki.3.b
A = 380.31 Ha
L = 703.31 m
Bb.3.Ki Bk.2.Ka Ha lt/dt
Ha lt/dt Ha lt/dt
BONTO
Bk.3.Ka.1 Bk.3.Ka.2
Bp.1.Ka Ha lt/dt Ha lt/dt
B.BP.1
Ha lt/dt Box T
SEKUNDER
Bendung Aparang 2
Q = 0.40 m3/dt
A = 357.20 Ha
L = 1168.34 m
SUPLESI
Q = 0.22 m3/dt
A = 29.35 Ha
L = 1866.35 m
S A LU R A N
B.Su.Ap.2.1
B.BP.2
A = 302.63 Ha
Q = 1.07 m3/dt
L = 1509.10 m
B.BP.3
Bp.3.Ka.1.a Bp.3.Ki BENDUNG
Ha lt/dt Ha lt/dt
BANGUNAN SADAP
BANGUNAN TALANG
Bp.3.Ka.2a Bp.3.Ka.2b
Ha lt/dt Ha lt/dt GORONG-GORONG
Box T
BANGUNAN TERJUN
JEMBATAN
SUNGAI
BANGUNAN PEMBUANG
SALURAN INDUK
SALURAN SEKUNDER
NAMA PETAK
NAMA PETAK TERSIER
LUAS DEBIT
Provinsi :
SULAWESI SELATAN
Pekerjaan :
SID PENINGKATAN
DIAPARANG
-
KABUPATEN SINJAI
Kabupaten :
SINJAI
SKEMA JARINGAN DESAIN
No. Gambar : 43
D.I. APARANG
No. Lembar : 01/01
Bendung Jembatan
Talang
Penahan Longsor
S.APARANG
B.Ap.2 (0.923,61) (E)
B.Ap.3 (1.177,48) (E)
B.Ap.4.a (1.433,67) (E)
B.Ap.4.b (1.979,76) (N)
B.Ap.4.c (2.146,52) (N)
B.Ap.4.d (3.044,76) (N)
B.Ap.4.e (3.509,77) (N)
B.Ap.4.e (3.805,75) (N)
Provinsi :
SULAWESI SELATAN
Pekerjaan :
SID PENINGKATAN DI. APARANG
KABUPATEN SINJAI
Kabupaten :
SINJAI
SKEMA BANGUNAN DESAIN APARANG I No. Gambar : 44
No. Lembar : 01/01
A
Tebing
47
4.1
43
Tebing
42
42
Tebing
6.2
41
5.0
3.1
60
43
08
76
6.6
42 2.16
073
6.1 2
44225.0 8
0
5.0
42 60
6.2
42
00
+430.055 4.1
U 42
k
+427.541 Saluran Indu
Tebing
+430.055
+425.76
+425.13
+426.217
+430.36
+430.36
D D
424
.50
BH-1
C C
ng
Sungai Apara
lokasi titik bor
38
5.9 BH-2
42
39.50
B endung Existing
B B
+ 428.6
BH-3
43
4.2
42
5.00
435.829
DENAH A
Skala 1 : 300
Provinsi :
SULAWESI SELATAN
Pekerjaan :
SID PENINGKATAN
DIAPARANG
Skala 1 : 300 -
KABUPATEN SINJAI
Kabupaten :
0 5.00 10.00 15.00 20.00 m SINJAI
No. Gambar : 45
No. Lembar : 01/01
D
B B
A A
+312.84
+313.84
+311.84
21.00
5.00
9.25
Deck Shear +316.640
D
DENAH BENDUNG
Skala 1 : 200
Provinsi :
SULAWESI SELATAN
Pekerjaan :
0 5 10 15 20.0 m SID PENINGKATAN DI. APARANG
SCALE KABUPATEN SINJAI
Scale 1:200 Kabupaten :
SINJAI
DENAH BENDUNG APARANG 2 No. Gambar : 48
No. Lembar : 01/01
Direncana : Arinto Murti Legawa, ST. Tanggal No. Kontrak
Diperiksa : Riman, ST. MT.
PPTK Bidang Bina Teknik : Sugeng, S.ST. 20 Mei 2016 602.44/BT/DPSDA/V/2016
Disetujui
Rev.No. Date Revised By Design App. KPA. Bidang Bina Teknik : Ir. H. Patiwiri Ar, SP1.
Tangga 0.40
Deck Shear +316.640
MAB +316.140
0.40
Mercu +313.84
2
+313.34 1
+312.84 +312.84
1.00
1.50
+311.84
1.81
0.80
+313.34
+312.84 +312.84
1.00
1.50
+311.84
1.81
0.80
1.00 3.03 1.50 1.50 1.50 8.76
0.50 0.60
POTONGAN B - B
Skala 1 : 200
+316.640 +316.640
MAB +316.140
3.30
3.55
Mercu +313.84
+313.34
0.50
Mercu +312.84
1.50
2.00 21.00 2.00
POTONGAN C - C
Skala 1 : 200
0.50
+316.640
MAB +316.140
1.79
+313.84
3.01
+311.84
1.30
1.50 21.00 1.50
POTONGAN D - D Provinsi :
Skala 1 : 200 SULAWESI SELATAN
Pekerjaan :
0 5 10 15 20.0 m SID PENINGKATAN DI. APARANG
SCALE KABUPATEN SINJAI
Scale 1:200
Kabupaten :
SINJAI
POTONGAN BENDUNG APARANG 2 No. Gambar : 49
No. Lembar : 01/01
Direncana : Arinto Murti Legawa, ST. Tanggal No. Kontrak
Diperiksa : Riman, ST. MT.
PPTK Bidang Bina Teknik : Sugeng, S.ST. 20 Mei 2016 602.44/BT/DPSDA/V/2016
Disetujui
Rev.No. Date Revised By Design App. KPA. Bidang Bina Teknik : Ir. H. Patiwiri Ar, SP1.