SUPLESI DARI APARANG III

Bendung Aparang I
B.Sp.1 Bb.1.Ki
Ha lt/dt

SALURAN INDUK A P A R A NG I SALURAN SEKUNDER


B.Ap.I.1 B.Ap.I.2 B.Ap.I.3 B.Ap.I.4 B.Bb.1

BABARA
A = 1,040.72 Ha
Q = 1.31 m3/dt
A = 1,033.97 Ha
Q = 1.30 m3/dt
A = 1,028.92 Ha
Q = 1.29 m3/dt
A = 1,017.01 Ha
Q = 1.27 m3/dt
A = 1,017.01 Ha
Q = 1.27 m3/dt
A = 1,017.01 Ha
Q = 1.14 m3/dt
A = 966.95 Ha
Q = 1.08 m3/dt
Bk.1.Ki.1
L = 166.72 m L = 2094.06 m L = 1094.222 m L = 425.148 m L = 160.05 m L = 1248.17 m L = 551.88 m
Ha lt/dt
B.Ap.1.5/B.Sp.2
Box T
Ap.I.1.Ka Ap.I.2.Ka Ap.I.3.Ka Ap.I.4.Ka Bb.1.Ka B.Bb.2 Bb.2.Ka
Bk.1.Ki.2
Ha lt/dt Ha lt/dt Ha lt/dt Ha lt/dt Ha lt/dt Ha lt/dt
Bk.3.Ki.2

B.Bb.3A
Ha lt/dt

Q = 1.02 m3/dt
A = 913.46 Ha
Ha lt/dt

L = 152.06 m
Bk.3.Ki.1
Bb.3A.Ki Bb.3A.Ka Ha lt/dt Bk.3.Ki.3.a

Q = 1.02 m3/dt
Ha lt/dt Ha lt/dt Ha lt/dt

A = 913.46 Ha

L = 176.86 m
SALURAN SEKUNDER B I K E R U
Bb.3.Ka B.Bk.1 B.Bk.2
Ha lt/dt B.Bb.3 A = 456.07 Ha A = 355.72 Ha A = 330.58 Ha
B.Bk.3

PEDDA
Q = 0.51 m3/dt Q = 0.40 m3/dt Q = 0.370 m3/dt
L = 1627.33 m L = 245.48 m L = 677.78 m

Q = 0.43 m3/dt
Bk.3.Ki.3.b

A = 380.31 Ha
L = 703.31 m
Bb.3.Ki Bk.2.Ka Ha lt/dt
Ha lt/dt Ha lt/dt

BONTO
Bk.3.Ka.1 Bk.3.Ka.2
Bp.1.Ka Ha lt/dt Ha lt/dt
B.BP.1
Ha lt/dt Box T

SEKUNDER
Bendung Aparang 2

Q = 0.40 m3/dt
A = 357.20 Ha
L = 1168.34 m
SUPLESI
Q = 0.22 m3/dt
A = 29.35 Ha
L = 1866.35 m

S A LU R A N
B.Su.Ap.2.1
B.BP.2
A = 302.63 Ha
Q = 1.07 m3/dt
L = 1509.10 m

B.Su.Ap.2.1 Bp.2.Ki.1 Bp.2.Ki.2


Ha lt/dt Ha lt/dt Ha lt/dt
KETERANGAN

B.BP.3
Bp.3.Ka.1.a Bp.3.Ki BENDUNG
Ha lt/dt Ha lt/dt

BANGUNAN BAGI SADAP


Bp.3.Ka.1.b
Ha lt/dt BANGUNAN BAGI

BANGUNAN SADAP

BANGUNAN TALANG
Bp.3.Ka.2a Bp.3.Ka.2b
Ha lt/dt Ha lt/dt GORONG-GORONG
Box T
BANGUNAN TERJUN

JEMBATAN

SUNGAI

BANGUNAN PEMBUANG

SALURAN INDUK

SALURAN SEKUNDER

NAMA PETAK
NAMA PETAK TERSIER
LUAS DEBIT

Provinsi :
SULAWESI SELATAN
Pekerjaan :
SID PENINGKATAN
DIAPARANG
-
KABUPATEN SINJAI

Kabupaten :
SINJAI
SKEMA JARINGAN DESAIN
No. Gambar : 43
D.I. APARANG
No. Lembar : 01/01

Direncana : Arinto Murti Legawa, ST. Tanggal No. Kontrak


Diperiksa : Riman, ST. MT.

PPTK Bidang Bina Teknik : Sugeng, S.ST. 20 Mei 2016 602.44/BT/DPSDA/V/2016


Disetujui
Rev.No. Date Revised By Design App. KPA. Bidang Bina Teknik : Ir. H. Patiwiri Ar, SP1.
LEGENDA :

Bendung Jembatan

Saluran Primer Jembatan Orang

Saluran Sekunder Gorong-Gorong Menerus

Bangunan Bagi Gorong-gorong Silang

Bangunan Bagi Sadap Bangunan Pelimpah

Bangunan Sadap Pelimpah Masuk

Bangunan Terjun Nama Petak Tersier

Talang

Penahan Longsor

S.APARANG
B.Ap.2 (0.923,61) (E)
B.Ap.3 (1.177,48) (E)
B.Ap.4.a (1.433,67) (E)
B.Ap.4.b (1.979,76) (N)
B.Ap.4.c (2.146,52) (N)
B.Ap.4.d (3.044,76) (N)
B.Ap.4.e (3.509,77) (N)
B.Ap.4.e (3.805,75) (N)

B.Ap.1.a (0.094,08) (N)


B.Ap.1 (0.153,27) (E)
B.Ap.5/B.Sp.2 (3.895,37) (E)
B.Bb.1.a (0.805,16) (E)
B.Bb.1 (1.060,16) (E)
SALURAN INDUK APARANG I SAL . SEKUNDER BABARA

B.Bb.3.a (1.440,08) (E)

B.Bb.2 (1.259,52) (E)

B.Ap.4 (3.732,54) (E)


B.Bk.1.c (1.048,00) (N)
B.Bk.1.a (1.284,30) (E)

B.Bk.1.b (0.945,64) (N)


B.Bk.1.d (1.136,45) (N)

B.Bk.1.a' (0.738,18) (N)


B.Bk.1.a'' (0.945,64) (N)

B.Bb.3 (2.113,84) (E)

SALURAN SEKUNDER BIKERU

B.Bp.1 (0.716,98) (E)


B.Bk.1 (1.632,96) (E)
B.Bk.2 (1.927,75) (E)
B.Bk.3 2.553,38) (N)

SAL . SEK . BONTO PEDDA

B.Bp.3 B.Bp.2 (1.885,95) (E)

Provinsi :
SULAWESI SELATAN
Pekerjaan :
SID PENINGKATAN DI. APARANG
KABUPATEN SINJAI

Kabupaten :
SINJAI
SKEMA BANGUNAN DESAIN APARANG I No. Gambar : 44
No. Lembar : 01/01

Direncana : Arinto Murti Legawa, ST. Tanggal No. Kontrak


Diperiksa : Riman, ST. MT.
PPTK Bidang Bina Teknik : Sugeng, S.ST. 20 Mei 2016 602.44/BT/DPSDA/V/2016
Disetujui
No.Rev Tgl Yang Direvisi Oleh Direnc Diset KPA. Bidang Bina Teknik : Ir. H. Patiwiri Ar, SP1.
Tebing

A
Tebing
47
4.1
43
Tebing
42

42

Tebing
6.2

41
5.0

3.1
60

43
08

76
6.6
42 2.16

073
6.1 2
44225.0 8
0
5.0
42 60
6.2
42
00
+430.055 4.1
U 42

k
+427.541 Saluran Indu
Tebing

+430.055
+425.76
+425.13
+426.217
+430.36

+430.36

D D
424
.50

BH-1

C C
ng
Sungai Apara
lokasi titik bor
38
5.9 BH-2
42
39.50
B endung Existing

B B

+ 428.6
BH-3
43
4.2
42

5.00

+430.36 +430.36 +430.36

435.829

DENAH A
Skala 1 : 300

Provinsi :
SULAWESI SELATAN
Pekerjaan :
SID PENINGKATAN
DIAPARANG
Skala 1 : 300 -
KABUPATEN SINJAI

Kabupaten :
0 5.00 10.00 15.00 20.00 m SINJAI
No. Gambar : 45
No. Lembar : 01/01

Direncana : Arinto Murti Legawa, ST. Tanggal No. Kontrak


Diperiksa : Riman, ST. MT.
20 Mei 2016 602.44/BT/DPSDA/V/2016
PPTK Bidang Bina Teknik : Sugeng, S.ST.
Disetujui
Rev.No. Date Revised By Design App. KPA. Bidang Bina Teknik : Ir. H. Patiwiri Ar, SP1.
B.1
B.2
U
LEGENDA / KETERANGAN :
B.3
HU.1
Kampung / Desa
Sawah
B.0 Rawa-Rawa
Kebun Coklat
Kebun Sagu
Sungai
Aliran
Jalan Provinsi
Jalan Desa
Jalan Petani
Batas Kecamatan
Batas Petak Tersier
10.0
Kontur
Masjid
Sekolah
HU2 Pasar
Makam
BM.07
X = 183,145.678
Y = 9,414,732.602
Z = +316.332
Provinsi :
SULAWESI SELATAN
Pekerjaan :
SID PENINGKATAN DI. APARANG
KABUPATEN SINJAI
Kabupaten :
SITUASI BENDUNG SINJAI
APARANG 2 No. Gambar : 47
No. Lembar : 01/01
Direncana : Arinto Murti Legawa, ST. Tanggal No. Kontrak
Diperiksa : Riman, ST. MT.
PPTK Bidang Bina Teknik : Sugeng, S.ST. 20 Mei 2016 602.44/BT/DPSDA/V/2016
Disetujui
Rev.No. Date Revised By Design App. KPA. Bidang Bina Teknik : Ir. H. Patiwiri Ar, SP1.
Deck Shear +316.640
C

D
B B
A A
+312.84

+313.84

+311.84
21.00
5.00
9.25
Deck Shear +316.640

D
DENAH BENDUNG
Skala 1 : 200
Provinsi :
SULAWESI SELATAN
Pekerjaan :
0 5 10 15 20.0 m SID PENINGKATAN DI. APARANG
SCALE KABUPATEN SINJAI
Scale 1:200 Kabupaten :
SINJAI
DENAH BENDUNG APARANG 2 No. Gambar : 48
No. Lembar : 01/01
Direncana : Arinto Murti Legawa, ST. Tanggal No. Kontrak
Diperiksa : Riman, ST. MT.
PPTK Bidang Bina Teknik : Sugeng, S.ST. 20 Mei 2016 602.44/BT/DPSDA/V/2016
Disetujui
Rev.No. Date Revised By Design App. KPA. Bidang Bina Teknik : Ir. H. Patiwiri Ar, SP1.
Tangga 0.40
Deck Shear +316.640
MAB +316.140
0.40

Deck Shear +314.850


3.80

Mercu +313.84
2
+313.34 1
+312.84 +312.84
1.00
1.50

+311.84
1.81
0.80

1.00 3.03 1.50 1.50 1.50 8.76


0.50 0.60
POTONGAN A - A
Skala 1 : 200
Tangga
Deck Shear +316.640
MAB +316.140
Deck Shear +314.850
3.80

+313.34
+312.84 +312.84
1.00
1.50

+311.84

1.81
0.80
1.00 3.03 1.50 1.50 1.50 8.76
0.50 0.60
POTONGAN B - B
Skala 1 : 200
+316.640 +316.640
MAB +316.140
3.30

3.55
Mercu +313.84
+313.34
0.50

Mercu +312.84

1.50
2.00 21.00 2.00
POTONGAN C - C
Skala 1 : 200
0.50
+316.640
MAB +316.140

1.79
+313.84

3.01
+311.84

1.30
1.50 21.00 1.50
POTONGAN D - D Provinsi :
Skala 1 : 200 SULAWESI SELATAN
Pekerjaan :
0 5 10 15 20.0 m SID PENINGKATAN DI. APARANG
SCALE KABUPATEN SINJAI
Scale 1:200
Kabupaten :
SINJAI
POTONGAN BENDUNG APARANG 2 No. Gambar : 49
No. Lembar : 01/01
Direncana : Arinto Murti Legawa, ST. Tanggal No. Kontrak
Diperiksa : Riman, ST. MT.
PPTK Bidang Bina Teknik : Sugeng, S.ST. 20 Mei 2016 602.44/BT/DPSDA/V/2016
Disetujui
Rev.No. Date Revised By Design App. KPA. Bidang Bina Teknik : Ir. H. Patiwiri Ar, SP1.