RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE
PRODUKSI TANGGAL : ###
LOKASI : 0+025
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1194.5 664.6 1209.3 534.7 2.234 63 992 3.2 309.96 0.96


2. 1193.5 664.6 1209.4 533.5 2.237 67 1055 3.4 310.25 0.96
2.236 1023 3.30 310.10

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE
PRODUKSI TANGGAL : ###
LOKASI :
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1197.3 667.4 1207.8 536.7 2.231 61 930 3.3 281.93 0.93


2. 1193.0 663.5 1209.3 533.1 2.238 63 992 3.5 283.39 0.96
2.235 961 3.40 282.66

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE
PRODUKSI TANGGAL : ###
LOKASI :
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1193.4 663.7 1206.9 534.0 2.235 60 945 3.2 295.20 0.96


2. 1192.6 668.3 1204.6 533.4 2.236 59 929 3.3 281.48 0.96
2.236 937 3.25 288.34

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE
PRODUKSI TANGGAL : ###
LOKASI :
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1197.6 665.5 1208.3 536.8 2.231 61 930 3.2 290.74 0.93


2. 1195.3 667.2 1209.3 535.0 2.234 60 945 3.5 269.90 0.96
2.233 938 3.35 280.32

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE
PRODUKSI TANGGAL : ###
LOKASI :
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1197.2 663.7 1204.3 535.2 2.237 59 929 3.1 299.64 0.96


2. 1196.3 665.9 1206.4 535.3 2.235 58.9 927 3.4 272.74 0.96
2.236 928 3.25 286.19

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE
PRODUKSI TANGGAL : ###
LOKASI :
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1196.5 664.3 1209.5 535.8 2.233 62 976 3.2 305.04 0.96


2. 1194.5 663.5 1209.3 533.7 2.238 62 976 3.3 295.80 0.96
2.236 976 3.25 300.42

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE
PRODUKSI TANGGAL : ###
LOKASI :
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1198.2 663.4 1204.5 536.3 2.234 63 961 3.1 309.96 0.93


2. 1195.3 668.2 1207.3 535.0 2.234 60 945 3.3 286.25 0.96
2.234 953 3.20 298.11

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE
PRODUKSI TANGGAL : ###
LOKASI :
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1194.3 665.3 1204.2 533.6 2.238 58 913 3.2 285.36 0.96


2. 1195.3 667.4 1203.2 534.3 2.237 63 992 3.2 309.96 0.96
2.238 953 3.20 297.66

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE
PRODUKSI TANGGAL : ###
LOKASI :
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1196.2 663.4 1206.2 535.2 2.235 63 992 3.1 319.96 0.96


2. 1198.2 665.7 1207.3 537.1 2.231 62 946 3.2 295.51 0.93
2.233 969 3.15 307.73

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE

LOKASI : 0+985
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1193.4 664.2 1205.3 534.9 2.231 60 945 3.2 295.20 0.96


2. 1195.3 664.7 1207.3 534.6 2.236 61 960 3.4 282.47 0.96
2.234 953 3.30 288.83

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE

LOKASI : 4+825
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1197.2 663.8 1204.3 535.9 2.234 65 1023 3.4 300.99 0.96


2. 1196.3 662.6 1206.7 536.2 2.231 62 946 3.3 286.55 0.93
2.233 984 3.35 293.77

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE

LOKASI : 4+345
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1193.2 665.2 1207.7 533.9 2.235 61 960 3.2 300.12 0.96


2. 1197.2 665.9 1205.2 534.7 2.239 64 1008 3.1 325.04 0.96
2.237 984 3.15 312.58

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE

LOKASI : 3+865
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1197.0 663.4 1208.7 535.6 2.235 63 992 3.1 319.96 0.96


2. 1195.8 662.9 1207.9 535.3 2.234 67 1055 3.1 340.27 0.96
2.235 1023 3.10 330.12

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE

LOKASI : 3+385
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1198.0 663.9 1207.5 535.5 2.237 58 913 3.2 285.36 0.96


2. 1198.3 667.9 1206.2 536.4 2.234 60 915 3.4 269.15 0.93
2.236 914 3.30 277.26

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE

LOKASI : 2+905
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1197.3 663.7 1206.9 533.3 2.245 61 960 3.3 291.03 0.96


2. 1196.2 665.5 1210 535.7 2.233 63 992 3.3 300.57 0.96
2.239 976 3.30 295.80

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE

LOKASI : 2+425
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1192.2 669.5 1208.0 531.0 2.245 60 945 3.4 277.84 0.96


2. 1193.4 665.8 1205.5 534.4 2.233 61 960 3.1 309.80 0.96
2.239 953 3.25 293.82

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE

LOKASI : 1+945
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1190.6 662.9 1208.0 533.9 2.230 64 1008 3.2 314.88 0.96


2. 1195.3 667.8 1205.5 534.1 2.238 67 1055 3.3 319.65 0.96
2.234 1031 3.25 317.27

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE

LOKASI : 1+465
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1195.0 662.3 1204.7 535.2 2.233 59 929 3.2 290.28 0.96


2. 1193.3 662.1 1205.3 534.2 2.234 63 992 3.3 300.57 0.96
2.234 960 3.25 295.42

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE

LOKASI : 0+985
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1198.2 667.4 1206.2 535.9 2.236 60 945 3.4 277.84 0.96


2. 1197.8 668.1 1205 535.9 2.235 64 1008 3.5 287.89 0.96
2.236 976 3.45 282.86

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE

LOKASI : 0+505
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1197.2 667.1 1204.0 535.2 2.237 63 992 3.4 291.73 0.96


2. 1196.7 668.9 1203.8 535.4 2.235 62 976 3.5 278.89 0.96
2.236 984 3.45 285.31

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76
RUTIN TEST MARSHAL

SKNVT : PRESERVASI JALAN DAN JEMBATAN KALBAR


PEKERJAAN : PEMELIHARAAN BERKALA JALAN TEBELIAN - SINTANG 1
KONSULTAN : PT. KARTIA TARINA BUMI Ass.
KONTRAKTOR : PT. MITRA KONSTRUKSI KALBAR
MATERIAL : HRS-BASE

LOKASI : 0+025
K. PROPING RING (Kg) = 16.4
TEST BERAT SAMPLE ( Gr ) VOLUME STABILITAS Kg HASIL BAGI KORELASI
DENSYTY KELELEHAN
NO DI UDARA DLM AIR SSD ( CC ) DIBACA DISESUAIKAN MARSHAL STABILITAS

1. 1195.2 666.3 1203.3 536.9 2.226 65 991 3.6 275.38 0.93


2. 1198.1 669.7 1204.8 535.1 2.239 60 945 3.4 277.84 0.96
2.233 968 3.50 276.61

SPESIFIKASI MIN. 800 MIN 3 MIN. 250

KONTRAKTOR KONSULTAN PROYEK


444 - 456 1.25
457 - 470 1.19
471 - 482 1.14
483 - 495 1.09
496 - 508 1.04
509 - 522 1.00
523 - 535 0.96
536 - 546 0.93
547 - 559 0.89
560 - 573 0.86
574 - 585 0.83
586 - 598 0.81
599 - 610 0.78
611 - 625 0.76

Anda mungkin juga menyukai