PROYEK : BENGKEL PAK SANDY

LOKASI : TULUNGAGUNG

L t n VOLUME Weight PEMBESIAN TUL. UTAMA PEMBESIAN TUL. SENGKA


NO STRUKTUR
(m) (m) (buah) (m3) kg/m1 kg (Total) Tul. Utama lonjor Tul. Sengkang
1 Sloof 1 20x30 16.2 0.97 9 Ø12 13 Ø8-150
2 Sloof 2 20x30 10.5 0.63 4 Ø12 4 Ø8-150
3 Sloof 3 15x30 62.0 2.79 4 Ø12 21 Ø8-150
4 Balok Beton 1 15x30 45.7 2.06 7 Ø12 27 Ø8-100
5 Balok Beton 2 15x25 53.7 2.01 4 Ø12 18 Ø8-150
6 Balok WF1 300.150.6,5.9 18.0 36.7 660.6 3
7 Balok WF2 250.125.6.9 12.6 29.6 372.96 3
8 Balok WF3 150.75.5.7 53.9 14 754.6 9
9 Balok UNP 150.75.6,5.10 49.5 18.6 920.7 9
10 Kolom Beton 1 20x30 3.9 3 0.702 10 D13 10 Ø8-150
6.4 3 0.864 6 Ø12 10 Ø8-150
11 Kolom Beton 2 15x30
2.8 3 0.378 6 Ø12 5 Ø8-150
12 Kolom Beton 3 15x25 3.7 2 0.2775 6 Ø12 4 Ø8-150
13 Kolom WF1 300.150.6,5.9 3.6 4 36.7 528.48 14.4 3
14 Kolom WF2 250.125.6.9 3.6 2 29.6 213.12 7.2 2
15 Kolom WF3 150.75.5.7 4.15 8 14 464.8 33.2 6
16 Kolom Pedestal 35x30 1.5 6 0.945 12 Ø12 9 Ø8-150
Pondasi Pilecape 50x50x30 0.075 9 0.675 10 Ø12 12
17
Strouss Ø30 0.07 6 12 5.04 5 D13 36 Ø8-100
18 Pondasi Telapak 50x50x30 0.075 5 0.375 10 Ø12 7
19 Plat Lantai Baja tebal=1,6mm 59 2,88lbr 21lbr
20 Struktur Tangga 150.75.6,5.10 22.54 14 315.56 4
Total 4230.82
Sambungan 84.6164
4315.44
N TUL. SENGKANG
lonjor
9
6
28
31
21

6
9
4
3

54
REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN PEMBANGUNAN JEMBATAN KENDARAAN DAN PEDESTRIAN
:
PENGHUBUNG RSCM KENCANA - RSCM KIRANA
LOKASI : RSUPN Dr. CIPTO MANGUNKUSUMO
TAHUN ANGGARAN : 2022

NO URAIAN PEKERJAAN HARGA (Rp)

I PEKERJAAN PERSIAPAN 446,598,750.00


II PEKERJAAN TANAH 185,997,900.00
III PEKERJAAN STRUKTUR 13,983,043,218.58
IV PEKERJAAN ELEKTRIKAL 179,034,000.00
V PEKERJAAN PLUMBING 50,364,200.00
VI PEKERJAAN SECONDARY SKIN 571,300,000.00
VII PEKERJAAN PENUTUP ATAP 544,575,000.00

JUMLAH 15,960,913,068.58
PPN 10% 1,596,091,306.86
TOTAL JUMLAH 17,557,004,375.43
PEMBULATAN 17,557,004,000.00

Terbilang : Tujuh Belas Milyar Lima Ratus Lima Puluh Tujuh Juta Empat Ribu Rupiah

Jakarta, 23 Maret 2022


PT. ADIK ABANG QANITA PRATAMA

PAIDI
Direktur Cabang
RINCIAN RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN JEMBATAN KENDARAAN DAN PEDESTRIAN PENGHUBUNG RSCM KENCANA - RSCM KIRANA
LOKASI : RSUPN Dr. CIPTO MANGUNKUSUMO
TAHUN : 2022

HARGA SATUAN JUMLAH HARGA


NO JENIS PEKERJAAN VOL SAT
( Rp. ) ( Rp. )
a b c d e f=cxe

I PEKERJAAN PERSIAPAN
1. Mobilisasi/Demobilisasi peralatan, material dan tenaga kerja 1.00 Ls 120,000,000.00 120,000,000.00
2. Site Management, Safety & Security 1.00 Ls 170,000,000.00 170,000,000.00
3. Site Office 1.00 Ls 30,000,000.00 30,000,000.00
4. Material Test 1.00 Ls 30,000,000.00 30,000,000.00
5. Pembersihan Lapangan Dan Perataan 344.50 m2 75,000.00 25,837,500.00
6. Pembongkaran bangunan eksisting 1.00 Ls 6,000,000.00 6,000,000.00
7. Pek. Pemasangan Bowplank 116.00 m' 135,000.00 15,660,000.00
8. Pembuangan Bongkaran Material 92.41 m3 125,000.00 11,551,250.00
9. Swab Antigen 30.00 Person 85,000.00 2,550,000.00
10. Total Station 1.00 Ls 35,000,000.00 35,000,000.00
JUMLAH I. PEKERJAAN PERSIAPAN 446,598,750.00

II PEKERJAAN TANAH
1. Pek. Galian Tanah untuk pondasi & pilecap 740.85 m3 71,500.00 52,970,775.00
2. Pek. Urugan (granular material) termasuk pemadatan 558.94 m3 238,000.00 133,027,125.00
pilecap & ramp
JUMLAH II. PEKERJAAN TANAH 185,997,900.00

III PEKERJAAN STRUKTUR


A. PEKERJAAN DASARAN
1. Pekerjaan Sand Bendding 100mm Pilecap 14.96 m3 185,000.00 2,767,600.00
2. Pekerjaan Lean Concrete 100mm Pilecap 14.96 m3 750,000.00 11,220,000.00
3. Pekerjaan Sand Bendding 100mm Approach slab 6.05 m3 185,000.00 1,119,250.00
4. Pekerjaan Lean Concrete 100mm Approach slab 6.05 m3 750,000.00 4,537,500.00
5. Pekerjaan Sand Bendding 100mm Ramp 120.51 m3 185,000.00 22,293,425.00
6. Pekerjaan Lean Concrete 100mm Ramp 120.51 m3 750,000.00 90,378,750.00

SUB JUMLAH III.A. PEKERJAAN DASARAN 132,316,525.00


B. PEKERJAAN STRUKTUR BETON
1. Pekerjaan Abutment & Wingwall
a. Pembesian 9,273.60 kg 13,500.00 125,193,600.00
b. Bekisting 152.90 m2 283,000.00 43,270,700.00
c. Membuat Beton Mutu f'c = 25 Mpa (K300) 77.28 m3 1,200,000.00 92,736,000.00
2. Pekerjaan Pondasi Borepile Ø 100cm
a. Pek. Pengeboran Ø100cm termasuk temporary steel cashing 600.00 m1 1,100,000.00 660,000,000.00
b. Pembesian 70,685.83 kg 13,500.00 954,258,768.53
c. Membuat Beton Mutu f'c = 30 Mpa (K350) 471.24 m3 1,250,000.00 589,048,622.55
d. Pemotongan kepala tiang, untuk persiapan pile cap 20.00 bh 355,000.00 7,100,000.00
e. Pile Test (Sonic Logging Test) 4.00 bh 18,000,000.00 72,000,000.00
f. Pile Integrity Test 6.00 bh 10,000,000.00 60,000,000.00
g. PDA Test 4.00 bh 40,000,000.00 160,000,000.00
h. Static Load Test 2.00 bh 190,000,000.00 380,000,000.00
3. Pekerjaan Pilecap
a. Pembesian 38,313.00 kg 13,500.00 517,225,500.00
b. Bekisting 119.04 m2 283,000.00 33,688,320.00
c. Membuat Beton Mutu f'c = 25 Mpa (K300) 255.42 m3 1,200,000.00 306,504,000.00
4. Pekerjaan Plat
Lantai 1
a. Pembesian 19,612.50 kg 13,500.00 264,768,750.00
b. Plat Bondex 1.2mm 523.00 m2 283,000.00 148,009,000.00
c. Membuat Beton Mutu f'c = 25 Mpa (K300) T=250mm 130.75 m3 1,200,000.00 156,900,000.00
5. Pekerjaan Ramp termasuk dinding dan pondasi
a. Pembesian 43,456.88 kg 13,500.00 586,667,812.50
b. Membuat Beton Mutu f'c = 25 Mpa (K300) T=250mm 289.71 m3 1,200,000.00 347,655,000.00

SUB JUMLAH III.B. PEKERJAAN STRUKTUR BETON 5,505,026,073.58


HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN VOL SAT
( Rp. ) ( Rp. )
a b c d e f=cxe
C. PEKERJAAN STRUKTUR BAJA
Supply,Install & fabrikasi pekerjaan struktur baja termasuk pengerollan,
sambungan, pengelasan, splice joint,stiffener, shear stud,
pengetesan pengelasan & paint untuk struktur baja
1. Lantai 1
a. H-Beam 428x407x20x35 (ASTM A992) 31,413.00 kg 25,600.00 804,172,800.00
Kebutuhan = 18,5 Lonjor (Panjang 6 m)
b. H-Beam 400x400x13x21 (ASTM A992) 41,796.00 kg 25,600.00 1,069,977,600.00
Kebutuhan = 40,5 Lonjor (Panjang 6 m)
c. H-Beam 200x200x8x12 (ASTM A36) 8,982.00 kg 25,600.00 229,939,200.00
Kebutuhan = 30 Lonjor (Panjang 6 m)
d. Plat Tebal 22 mm (ASTM A992) 38,000.00 kg 25,600.00 972,800,000.00
e. Plat Tebal 12 mm (ASTM A992) 1,800.00 kg 25,600.00 46,080,000.00
f. Plat Badan 15 mm (ASTM A992) 6,400.00 kg 25,600.00 163,840,000.00
g. Bolt M30 (Mutu A325 Grup A) termasuk ring 17,000.00 pcs 84,500.00 1,436,500,000.00
h. Paint struktur baja 128,391.00 kg 2,000.00 256,782,000.00
- SSPC SP 14
- Prime Coating : Inorganic Zinc 50 μm
- Intermediate Coating : Polyamide Epoxy Primer 75 μm
- Finish Coating : Apliphatic Polyurethane coat 25 μm

2. Rangka Atap
a. Pipa Baja Ø 355.6 (Tebal 12mm) (ASTM A992) 57,944.78 kg 25,600.00 1,483,386,240.00
Kebutuhan = 95 Lonjor (Panjang 6 m)
b. Pipa Baja Ø 355.6 (Tebal 12mm) (ASTM A992) 9,149.18 kg 25,600.00 234,218,880.00
Kebutuhan = 15 Lonjor (Panjang 6 m)
c. Plat Tebal 15 mm (ASTM A992) 5,200.00 kg 25,600.00 133,120,000.00
d. Sambungan Pin Plat 30 mm (ASTM A992) 3,000.00 kg 25,600.00 76,800,000.00
e. Pin M100 48.00 pcs 1,800,000.00 86,400,000.00
f. Bolt M30 (Mutu A325 Grup A) termasuk ring 768.00 pcs 84,500.00 64,896,000.00
g. Painting struktur baja 75,293.95 kg 2,000.00 150,587,900.00
- SSPC SP 14
- Prime Coating : Inorganic Zinc 50 μm
- Intermediate Coating : Polyamide Epoxy Primer 75 μm
- Finish Coating : Apliphatic Polyurethane coat 25 μm
SUB JUMLAH III.C. PEKERJAAN STRUKTUR BAJA 7,209,500,620.00

D. PEKERJAAN LAINNYA
1. Expansion Joint 18.00 m 5,500,000.00 99,000,000.00
2. Mechanical Pot Bearing (1 Fix, 2 Guided Sliding, 1 Free Sliding) 4.00 buah 55,000,000.00 220,000,000.00
termasuk supply & install serta pekerjaan grouting
3. Pot Bearing Test 1.00 buah 35,000,000.00 35,000,000.00
4. Pagar Pengaman Jembatan Railing Lantai 1 termasuk cat 220.00 m 1,000,000.00 220,000,000.00
5. Pekerjaan Trotoar beton pada jembatan 50.40 m3 3,000,000.00 151,200,000.00
6. Pekerjaan Temporary Stage Pada saat Pemasangan Jembatan 1.00 LS 300,000,000.00 300,000,000.00
termasuk perijinan dsb
7. Perbaikan kerusakan akibat pelaksanaan 1.00 LS 75,000,000.00 75,000,000.00
8. Rambu 1.00 LS 18,000,000.00 18,000,000.00
9. Road Marking 1.00 LS 18,000,000.00 18,000,000.00
SUB JUMLAH III.D. PEKERJAAN LAINNYA 1,136,200,000.00
JUMLAH III. PEKERJAAN STRUKTUR 13,983,043,218.58

IV PEKERJAAN ELEKTRIKAL
Lantai 1
1. Pek. Pemasangan Panel Listrik 1.00 Bh 1,500,000.00 1,500,000.00
2. Pek. Instalasi Titik Lampu 39.00 Bh 850,000.00 33,150,000.00
3. Pek. Instalasi Titik Saklar 6.00 Bh 1,300,000.00 7,800,000.00
4. Pek. Instalasi Lampu LED Strip 3.00 Bh 3,800,000.00 11,400,000.00
5. Pek. Pemasangan Lampu Spotlight 10 Watt 24.00 Bh 440,000.00 10,560,000.00
6. Pek. Pemasangan Lampu LED 70 Watt 12.00 Bh 2,300,000.00 27,600,000.00
7. Pek. Pemasangan Lampu LED Strip (White) 222.00 m1 120,000.00 26,640,000.00
8. Pek. Pemasangan Lampu LED Strip (Magenta) 127.20 m1 120,000.00 15,264,000.00
9. Pek. Pemasangan Lampu LED Strip (Biru) 376.00 m1 120,000.00 45,120,000.00
179,034,000.00
HARGA SATUAN JUMLAH HARGA
NO JENIS PEKERJAAN VOL SAT
( Rp. ) ( Rp. )
a b c d e f=cxe

V PEKERJAAN PLUMBING
1. Pek. Pemasangan pipa ∅3" (Buangan air hujan) 221.00 m1 185,000.00 40,885,000.00
2. Pek. Floor Drain (Stainless Steel) 42.00 Bh 110,000.00 4,620,000.00
3. Pek. Pemasangan Klem pipa ∅3" 224.00 Bh 8,300.00 1,859,200.00
4. Lain-lain… 1.00 Ls 3,000,000.00 3,000,000.00
JUMLAH V. PEKERJAAN PLUMBING 50,364,200.00

VI PEKERJAAN SECONDARY SKIN


1. Pekerjaan Secondary Skin 580.00 m2 985,000.00 571,300,000.00
Spesifikasi :
- Neon Box
- Elektrikal
- Alat
- Tenaga
- Rangka Hollow
- Rumput Sintetis
- Finishing
JUMLAH VI. PEKERJAAN SECONDARY SKIN 571,300,000.00

VII PEKERJAAN PENUTUP ATAP


1. Pekerjaan Penutup Atap Solartuff 795.00 m2 685,000.00 544,575,000.00
Spesifikasi :
- Solartuff 3mm
- Rangka Atap Solartuff
- Alat
- Tenaga
- Baut Skrup
- Sealer/Perekat
- Finishing
JUMLAH VII. PEKERJAAN PENUTUP ATAP 544,575,000.00
JUMLAH KESELURUHAN 15,960,913,068.58
JADWAL WAKTU PELAKSANAAN
PEKERJAAN PEMBANGUNAN JEMBATAN KENDARAAN DAN PEDESTRIAN PENGHUBUNG RSCM KENCANA - RSCM KIRANA
RSUPN Dr. CIPTO MANGUNKUSUMO
2022

April 2022 Mei 2022 Juni 2022 Juli 2022 Agustus 2022 September 2022 Oktober 2022 Nov-22
Bobot M1 M2 M3 M4 M5 M6 M7 M8 M9 M 10 M 11 M 12 M 13 M 14 M 15 M 16 M 17 M 18 M 19 M 20 M 21 M 22 M 23 M 24 M 25 M 26 M 27 M 28 M 29 M 30
No Uraian Sat. Volume Keterangan
(%) 13-Apr 20-Apr 27-Apr 4-May 11-May 18-May 25-May 1-Jun 8-Jun 15-Jun 22-Jun 29-Jun 6-Jul 13-Jul 20-Jul 27-Jul 3-Aug 10-Aug 17-Aug 24-Aug 31-Aug 7-Sep 14-Sep 21-Sep 28-Sep 5-Oct 12-Oct 19-Oct 26-Oct 2-Nov
19-Apr 26-Apr 3-May 10-May 17-May 24-May 31-May 7-Jun 14-Jun 21-Jun 28-Jun 5-Jul 12-Jul 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov

I PEKERJAAN PERSIAPAN
1. Mobilisasi/Demobilisasi peralatan, material dan tenaga kerja Ls 1.00 0.75% 0.188% 0.188% 0.188% 0.188% 100.00%
2. Site Management, Safety & Security Ls 1.00 1.07% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036% 0.036%
3. Site Office Ls 1.00 0.19% 0.094% 0.094%
4. Material Test Ls 1.00 0.19% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008% 0.008%
5. Pembersihan Lapangan Dan Perataan m2 344.50 0.16% 0.040% 0.040% 0.040% 0.040%
6. Pembongkaran bangunan eksisting Ls 1.00 0.04% 0.009% 0.009% 0.009% 0.009%
7. Pek. Pemasangan Bowplank m' 116.00 0.10% 0.049% 0.049%
8. Pembuangan Bongkaran Material m3 92.41 0.07% 0.036% 0.036%
9. Swab Antigen Person 30.00 0.02% 0.008% 0.008%
10. Total Station Ls 1.00 0.22% 0.110% 0.110%

II PEKERJAAN TANAH
1. Pek. Galian Tanah untuk pondasi & pilecap m3 740.85 0.33% 0.111% 0.111% 0.111%
2. Pek. Urugan (granular material) termasuk pemadatan m3 558.94 0.83% 0.417% 0.417%

III PEKERJAAN STRUKTUR


A. PEKERJAAN DASARAN
1. Pekerjaan Sand Bendding 100mm Pilecap m3 14.96 0.02% 0.006% 0.006% 0.006%
2. Pekerjaan Lean Concrete 100mm Pilecap m3 14.96 0.07% 0.023% 0.023% 0.023%
3. Pekerjaan Sand Bendding 100mm Approach slab m3 6.05 0.01% 0.004% 0.004%
4. Pekerjaan Lean Concrete 100mm Approach slab m3 6.05 0.03% 0.014% 0.014%
5. Pekerjaan Sand Bendding 100mm Ramp m3 120.51 0.14% 0.070% 0.070%
6. Pekerjaan Lean Concrete 100mm Ramp m3 120.51 0.57% 0.283% 0.283%

B. PEKERJAAN STRUKTUR BETON


1. Pekerjaan Abutment & Wingwall
a. Pembesian kg 9,273.60 0.78% 0.392% 0.392%
b. Bekisting m2 152.90 0.27% 0.136% 0.136%
c. Membuat Beton Mutu f'c = 25 Mpa (K300) m3 77.28 0.58% 0.291% 0.291%
2. Pekerjaan Pondasi Borepile Ø 100cm
Libur Hari Raya Idul
a. Pek. Pengeboran Ø100cm termasuk temporary steel cashing m1 600.00 4.14% 1.378% 1.378% 1.378%
b. Pembesian kg 70,685.83 5.98% 1.993% 1.993% 1.993%
c. Membuat Beton Mutu f'c = 30 Mpa (K350) m3 471.24 3.69% 1.230% 1.230% 1.230%
d. Pemotongan kepala tiang, untuk persiapan pile cap bh 20.00 0.04% 0.044%
e. Pile Test (Sonic Logging Test) bh 4.00 0.45% 0.451%
f. Pile Integrity Test bh 6.00 0.38% 0.376%
g. PDA Test bh 4.00 1.00% 1.002%
h. Static Load Test bh 2.00 2.38% 1.190% 1.190%
3. Pekerjaan Pilecap
a. Pembesian kg 38,313.00 3.24% 1.080% 1.080% 1.080%
b. Bekisting m2 119.04 0.21% 0.070% 0.070% 0.070%
Fitri

c. Membuat Beton Mutu f'c = 25 Mpa (K300) m3 255.42 1.92% 0.640% 0.640% 0.640%
4. Pekerjaan Plat
Lantai 1
a. Pembesian kg 19,612.50 1.66% 0.829% 0.829%
b. Plat Bondex 1.2mm m2 523.00 0.93% 0.464% 0.464%
c. Membuat Beton Mutu f'c = 25 Mpa (K300) T=250mm m3 130.75 0.98% 0.492% 0.492%
5. Pekerjaan Ramp termasuk dinding dan pondasi
a. Pembesian kg 43,456.88 3.68% 1.838% 1.838%
b. Membuat Beton Mutu f'c = 25 Mpa (K300) T=250mm m3 289.71 2.18% 1.089% 1.089%

C. PEKERJAAN STRUKTUR BAJA


Supply,Install & fabrikasi pekerjaan struktur baja termasuk pengerollan,
sambungan, pengelasan, splice joint,stiffener, shear stud,
pengetesan pengelasan & paint untuk struktur baja
1. Lantai 1
a. H-Beam 428x407x20x35 (ASTM A992) kg 31,413.00 5.04% 1.260% 1.260% 1.260% 1.260%
Kebutuhan = 18,5 Lonjor (Panjang 6 m)
b. H-Beam 400x400x13x21 (ASTM A992) kg 41,796.00 6.70% 1.676% 1.676% 1.676% 1.676%
Kebutuhan = 40,5 Lonjor (Panjang 6 m)
c. H-Beam 200x200x8x12 (ASTM A36) kg 8,982.00 1.44% 0.360% 0.360% 0.360% 0.360%
Kebutuhan = 30 Lonjor (Panjang 6 m)
d. Plat Tebal 22 mm (ASTM A992) kg 38,000.00 6.09% 1.524% 1.524% 1.524% 1.524%
e. Plat Tebal 12 mm (ASTM A992) kg 1,800.00 0.29% 0.072% 0.072% 0.072% 0.072%
f. Plat Badan 15 mm (ASTM A992) kg 6,400.00 1.03% 0.257% 0.257% 0.257% 0.257%
g. Bolt M30 (Mutu A325 Grup A) termasuk ring pcs 17,000.00 9.00% 2.250% 2.250% 2.250% 2.250%
h. Paint struktur baja kg 128,391.00 1.61% 0.402% 0.402% 0.402% 0.402%
- SSPC SP 14
- Prime Coating : Inorganic Zinc 50 μm
- Intermediate Coating : Polyamide Epoxy Primer 75 μm 50.00%
- Finish Coating : Apliphatic Polyurethane coat 25 μm

2. Rangka Atap
a. Pipa Baja Ø 355.6 (Tebal 12mm) (ASTM A992) kg 57,944.78 9.29% 2.323% 2.323% 2.323% 2.323%
Kebutuhan = 95 Lonjor (Panjang 6 m)
b. Pipa Baja Ø 355.6 (Tebal 12mm) (ASTM A992) kg 9,149.18 1.47% 0.367% 0.367% 0.367% 0.367%
Kebutuhan = 15 Lonjor (Panjang 6 m)
c. Plat Tebal 15 mm (ASTM A992) kg 5,200.00 0.83% 0.209% 0.209% 0.209% 0.209%
d. Sambungan Pin Plat 30 mm (ASTM A992) kg 3,000.00 0.48% 0.120% 0.120% 0.120% 0.120%
e. Pin M100 pcs 48.00 0.54% 0.135% 0.135% 0.135% 0.135%
f. Bolt M30 (Mutu A325 Grup A) termasuk ring pcs 768.00 0.41% 0.102% 0.102% 0.102% 0.102%
g. Painting struktur baja kg 75,293.95 0.94% 0.236% 0.236% 0.236% 0.236%
- SSPC SP 14
- Prime Coating : Inorganic Zinc 50 μm
- Intermediate Coating : Polyamide Epoxy Primer 75 μm
- Finish Coating : Apliphatic Polyurethane coat 25 μm

D. PEKERJAAN LAINNYA
1. Expansion Joint m 18.00 0.62% 0.310% 0.310%
2. Mechanical Pot Bearing (1 Fix, 2 Guided Sliding, 1 Free Sliding) buah 4.00 1.38% 0.689% 0.689%
termasuk supply & install serta pekerjaan grouting
3. Pot Bearing Test buah 1.00 0.22% 0.219%
4. Pagar Pengaman Jembatan Railing Lantai 1 termasuk cat m 220.00 1.38% 0.689% 0.689%
5. Pekerjaan Trotoar beton pada jembatan m3 50.40 0.95% 0.474% 0.474%
6. Pekerjaan Temporary Stage Pada saat Pemasangan Jembatan LS 1.00 1.88% 0.940% 0.940%
termasuk perijinan dsb
7. Perbaikan kerusakan akibat pelaksanaan LS 1.00 0.47% 0.157% 0.157% 0.157%
8. Rambu LS 1.00 0.11% 0.056% 0.056%
9. Road Marking LS 1.00 0.11% 0.056% 0.056%

IV PEKERJAAN ELEKTRIKAL
Lantai 1
1. Pek. Pemasangan Panel Listrik Bh 1.00 0.01% 0.002% 0.002% 0.002% 0.002%
2. Pek. Instalasi Titik Lampu Bh 39.00 0.21% 0.052% 0.052% 0.052% 0.052%
3. Pek. Instalasi Titik Saklar Bh 6.00 0.05% 0.012% 0.012% 0.012% 0.012%
4. Pek. Instalasi Lampu LED Strip Bh 3.00 0.07% 0.018% 0.018% 0.018% 0.018%
5. Pek. Pemasangan Lampu Spotlight 10 Watt Bh 24.00 0.07% 0.017% 0.017% 0.017% 0.017%
6. Pek. Pemasangan Lampu LED 70 Watt Bh 12.00 0.17% 0.043% 0.043% 0.043% 0.043%
7. Pek. Pemasangan Lampu LED Strip (White) m1 222.00 0.17% 0.042% 0.042% 0.042% 0.042%
8. Pek. Pemasangan Lampu LED Strip (Magenta) m1 127.20 0.10% 0.024% 0.024% 0.024% 0.024%
9. Pek. Pemasangan Lampu LED Strip (Biru) m1 376.00 0.28% 0.071% 0.071% 0.071% 0.071%

V PEKERJAAN PLUMBING
1. Pek. Pemasangan pipa ∅3" (Buangan air hujan) m1 221.00 0.26% 0.128% 0.128%
2. Pek. Floor Drain (Stainless Steel) Bh 42.00 0.03% 0.014% 0.014%
3. Pek. Pemasangan Klem pipa ∅3" Bh 224.00 0.01% 0.006% 0.006%
4. Lain-lain… Ls 1.00 0.02% 0.009% 0.009%

VI PEKERJAAN SECONDARY SKIN


Pekerjaan Secondary Skin m2 580.00 3.58% 1.790% 1.790%
Spesifikasi :
- Neon Box
- Elektrikal
- Alat
- Tenaga
- Rangka Hollow
- Rumput Sintetis
- Finishing

VII PEKERJAAN PENUTUP ATAP


1. Pekerjaan Penutup Atap Solartuff m2 795.00 3.41% 1.706% 1.706%
Spesifikasi :
- Solartuff 3mm
- Rangka Atap Solartuff
- Alat
- Tenaga
- Baut Skrup
- Sealer/Perekat
- Finishing 0.00%

Total 100.00%

Rencana Progress 0.366% 0.366% 0.036% 0.036% 0.440% 5.041% 4.690% 4.735% 3.174% 3.164% 1.974% 2.681% 4.159% 12.498% 9.200% 7.843% 7.843% 3.535% 3.535% 5.320% 5.320% 1.749% 1.749% 2.832% 3.051% 0.797% 1.644% 1.440% 0.593% 0.192%
Komulatif Rencana Progress 0.366% 0.732% 0.767% 0.803% 1.242% 6.283% 10.973% 15.708% 18.882% 22.045% 24.019% 26.700% 30.859% 43.357% 52.557% 60.400% 68.244% 71.779% 75.314% 80.633% 85.953% 87.702% 89.451% 92.283% 95.334% 96.131% 97.775% 99.215% 99.808% 100.000%
Pelaksanaan
Kumulatif Pelaksanaan
Deviasi

Jakarta , April 2022


Menyetujui, Diperiksa Oleh, Dibuat Oleh,
XXXXXXXXXXXXXXX Konsultan Pengawas PT. Adik Abang Qanita Pratama

XXXXXXXXXXXX XXXXXXXXXXXX XXXXXXXXXXXX


XXXXXXXXX Konsultan Pengawas Project Manager
BAGIAN PEKERJAAN YANG DISUBKONTRAKKAN

PEKERJAAN : PEMBANGUNAN JEMBATAN KENDARAAN DAN PEDESTRIAN PENGHUBUNG RSCM KENCANA - RSCM KIRANA
LOKASI : RSUPN Dr. CIPTO MANGUNKUSUMO
TAHUN : 2022

Harga Jumlah
% Dari Nilai
No. Jenis Pekerjaan Satuan Volume Satuan Harga Ket.
Penawaran
(Rp.) (Rp.)

Nihil

Jumlah Rp - 0.000