Halaman 1
NO URAIAN PEKERJAAN HARGA SATUAN
Halaman 2
DAFTAR UPAH PEKERJA BANGUNAN
PEKERJAAN RENOVASI LAPANGAN FUTSAL MAHASISWA
INSTITUT AGAMA ISLAM NEGERI SYEKH NURJATI CIREBON
LOKASI JALAN PERJUANGAN, SUNYARAGI, KECAMATAN KESAMBI KOTA CIREBON, JAWA BARAT 4513
TAHUN ANGGARAN 2022
B. BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
1 Plamir Tembok Kg
2 Cat Tembok Ltr
3 Cat Tembok Plapond Ltr
4 Rool Cat Tembok Bh
5 Kwas 3" Bh
6 Terpentin Ltr
7 Tiner A Ltr
8 Ampelas Lbr
9 Dempul Kayu Kg
10 Dempul Besi Kg
11 Meni Kayu / Besi Kg
12 Zincromat Kg
13 Cat Dasar Kayu Kg
14 Cat Kayu Kg
15 Cat Besi Kg
16 Cat Nipe Kg
17 Cat Duco Kg
18 Surpricer Kg
19 Dempul plastic Kg
20 Nippon Sportskote Cat Lapangan Kg
HALAMAN 4
NO. JENIS BAHAN BANGUNAN SAT
HALAMAN 5
NO. JENIS BAHAN BANGUNAN SAT
J. BAHAN KACA
1 Kaca Polos 5 mm M2
2 Kaca es 5 mm M2
HALAMAN 6
NO. JENIS BAHAN BANGUNAN SAT
L. BAHAN PERPIPAAN
Pipa PVC,Kelas AW,10Kg/cm2
1 Pipa PVC type AW Ø 1/2" (15 mm2) Btng
2 Pipa PVC type AW Ø 3/4" (20 mm2) Btng
3 Pipa PVC type AW Ø 1" (25 mm2) Btng
4 Pipa PVC type AW Ø 1 1/4" (32 mm2) Btng
5 Pipa PVC type AW Ø 1 1/2" (40 mm2) Btng
6 Pipa PVC type AW Ø 2" (50 mm2) Btng
7 Pipa PVC type AW Ø 2 1/2" (65 mm2) Btng
8 Pipa PVC type AW Ø 3" (80 mm2) Btng
9 Pipa PVC type AW Ø 4" (100 mm2) Btng
10 Lem Paralon Tb
11 Solatip Leideng Glng
M. BAHAN SANITAIR
1 Floor Drain TX1AN Bh
2 Kran Tembok T23 B13 V7NB dia. 1/2 " Bh
3 Jet Washer THX20NBPIV Bh
4 Closet jomgkok CE 9 Unit
N. PELUMAS BEKISTING
1 Minyak Bekisting Ltr
HALAMAN 7
AWA BARAT 4513
HARGA SATUAN
Rp.
HALAMAN 8
HARGA SATUAN
Rp.
HALAMAN 9
HARGA SATUAN
Rp.
HALAMAN 10
HARGA SATUAN
Rp.
HALAMAN 11
ANALISA HARGA SATUAN PEKERJAAN SESUAI PERMEN PUPR NO. 1 TAHUN 2022
PEKERJAAN RENOVASI LAPANGAN FUTSAL MAHASISWA
INSTITUT AGAMA ISLAM NEGERI SYEKH NURJATI CIREBON
LOKASI JALAN PERJUANGAN, SUNYARAGI, KECAMATAN KESAMBI KOTA CIREBON, JAWA BARAT 4513
TAHUN ANGGARAN 2022
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 12
3 Penggalian 1 m3 Tanah Biasa sedalam > 1 m s.d. 2 m
No untuk volume 200 s.d Uraian
2000 m3 Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6750
Mandor L.04 OH 0.0675
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
5 1 m3 Pemadatan tanah
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0446
Mandor L.04 OH 0.0045
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 13
6 Pemadatan Tanah1 m3 per 20 cm dengan alat timbris
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000
Mandor L.04 OH 0.0500
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
8 1 m3 Timbunan pasir
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3180
Mandor L.04 OH 0.0318
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug M3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 14
9 1 m3 Timbunan sirtu
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3180
Mandor L.04 OH 0.0318
JUMLAH TENAGA KERJA
B BAHAN
Sirtu M3 1.200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
10 1 m3 Pemadatan pasir
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5000
Mandor L.04 OH 0.0500
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 15
12 Pemasangan 1 m3 Pondasi Batu Belah Mortar Tipe N (5,2MPa)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.5000
Tukang L.02 OH 0.7500
Kepala Tukang L.03 OH 0.0750
Mandor L.04 OH 0.0750
JUMLAH TENAGA KERJA
B BAHAN
Batu belah M3 1.2000
Semen Portlan Kg 163.0000
Pasir Pasang M3 0.5200
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 16
14 Pemasangan 1 m3 Batu Kosong (Aanstamping) untuk Pondasi Gedung
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7800
Tukang L.02 OH 0.3900
Kepala Tukang L.03 OH 0.0390
Mandor L.04 OH 0.0390
JUMLAH TENAGA KERJA
B BAHAN
Batu belah M3 1.2000
Pasir urug M3 0.4320
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 17
16 Pembuatan 1 m3 Beton Mutu f’c = 14,5 Mpa (K175)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500
Tukang L.02 OH 0.2750
Kepala Tukang L.03 OH 0.0280
Mandor L.04 OH 0.0830
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 326.0000
Pasir Beton M3 0.5429
Kerikil M3 0.7622
(Maks
Air 30mm) Liter 215.0000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 18
18 1 m3 Pemadatan beton pada saat pengecoran
No Vibrator Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0800
Mandor L.03 OH 0.0080
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
19 Penulangan pelat untuk besi beton > 12 mm, cara Semi mekanis
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0800
Tukang L.02 OH 0.0400
Kepala Tukang L.03 OH 0.0040
Mandor L.04 OH 0.0080
JUMLAH TENAGA KERJA
B BAHAN
Besi beton Kg 105.0000
(polos/ulir)
Kawat beton Kg 1.5000
JUMLAH HARGA BAHAN
C PERALATAN
Cutter besi beton Hari 0.0200
Bender besi beton Hari 0.0200
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan per - 100kg (D+E)
Halaman 19
20 Semi Mekanis: Pembesian pelat
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0400
Tukang L.02 OH 0.0400
Kepala Tukang L.03 OH 0.0020
Mandor L.04 OH 0.0040
JUMLAH TENAGA KERJA
B BAHAN
Wiremesh M6 Kg 102.0000
Kawat beton Kg 0.5000
JUMLAH HARGA BAHAN
C PERALATAN
Cutter besi beton Hari 0.0100
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan (D+E) Per 1 Kg
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 20
22 Pemasangan 1 m2 Bekisting untuk Sloof Beton Bangunan Gedung
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5200
Tukang L.02 OH 0.2600
Kepala Tukang L.03 OH 0.0260
Mandor L.04 OH 0.0260
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III M3 0.0450
Paku 5 cm – 10 cm Kg 0.3000
Minyak bekisting Liter 0.1000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 21
27 1 M3 Kolom Pedestal K.2 25/30 Tul. 330 kg/m3
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Mutu f’c = 19,3 Mpa (K225) M3 1.0000
Besi Beton BJTD 320 (U 32) dan BJTD 240 (U24) Kg 330.0000
Bekisting untuk Kolom M2 16.0000
Vibrator M3 1.0000
Harga Satuan Pekerjaan
31 1 M3 Pelat Lantai Beton T.7 cm (Area Toilet) Tul. Wire Mesh M.5 (1 rangkap)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Mutu f’c = 19,3 Mpa (K225) M3 1.0000
Besi Beton Tulangan Wire mesh Kg 30.4143
Bekisting untuk Sloof M2 1.000
Harga Satuan Pekerjaan
32 1 M3 Pelat Lantai Beton T.5 cm (Area Atas Lapang Existing) Tul. Wire Mesh M.5 (1 rangkap)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Mutu f’c = 19,3 Mpa (K225) M3 1.0000
Besi Beton Tulangan Wire mesh Kg 42.5800
Bekisting untuk Sloof M2 1.000
Harga Satuan Pekerjaan
Halaman 22
34 1 M3 Ring balok 12/12
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
Beton Mutu f’c = 14,5 Mpa (K175) M3 1.0000
Besi Beton Kg 159.0000
Bekisting M2 16.667
Harga Satuan Pekerjaan
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 23
37 Pemasangan 1 m2 Rangka Besi Hollow Galvanis 40.40 mm, Modul 60 x
No 60 cm, untuk Plafon Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3500
Tukang L.02 OH 0.3500
Kepala Tukang L.03 OH 0.0350
Mandor L.04 OH 0.0180
JUMLAH TENAGA KERJA
B BAHAN
Rangka metal M1 4.0000
hollow 40.40.0,5
Assesoris mm las dll)
(perkuatan, Ls 0.1000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 24
39 Pemasangan 1 m2 Daun Jendela Alumunium Casement
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085
Tukang L.03 OH 0.085
Kepala tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Daun Jendela Casement M 4.400
Skoneng Casement M 4.400
Spit Casement Tube 4.400
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 25
41 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal ½ Batu dengan
No Mortar tipe S, fc’ 12, 5 Mpa ( Setara Campuran 1SP : 3PP).
Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000
Tukang L.02 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0150
JUMLAH TENAGA KERJA
B BAHAN
Bata merah M3 70.0000
Semen Portlan Kg 14.3700
Pasir Pasang M3 0.0400
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 26
43 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu dengan
No Mortar tipe O, fc’ 2,4 Mpa ( Setara Campuran 1SP : 5PP)Kode Satuan
Uraian Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.6000
Tukang L.02 OH 0.2000
Kepala Tukang L.03 OH 0.0200
Mandor L.04 OH 0.0300
JUMLAH TENAGA KERJA
B BAHAN
Bata merah M3 140.0000
Semen Portlan Kg 22.2000
Pasir Pasang M3 0.1020
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 27
45 Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000
Tukang L.03 OH 0.1500
Kepala Tukang L.03 OH 0.0150
Mandor L.04 OH 0.0150
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 5.1840
Pasir pasang M3 0.0260
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
46 Pemasangan 1 m2 acian
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000
Tukang L.03 OH 0.1000
Kepala Tukang L.03 OH 0.0100
Mandor L.04 OH 0.0100
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 3.2500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 28
47 Pemasangan 1 m2 lantai granit tile ukuran 60cm x 60cm polish
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2400
Tukang L.02 OH 0.1200
Kepala tukang L.03 OH 0.0120
Mandor L.04 OH 0.0120
JUMLAH TENAGA KERJA
B BAHAN
Granite tile Bh 3.1000
Semen Portlan Kg 9.6000
Semen warna Kg 1.5000
Pasir pasang M3 0.0450
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 29
49 Pemasangan 1 m2 lantai ubin keramik ukuran 40cm x 40cm (rock tile)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.7000
Tukang Batu L.02 OH 0.3500
Kepala tukang L.03 OH 0.0350
Mandor L.04 OH 0.0350
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik Bh 6.6300
Semen Portlan Kg 10.0000
Pasir pasang M3 0.0450
Semen warna Kg 0.5000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit D
F Harga Satuan Pekerjaan (D+E)
Halaman 30
51 Pemasangan 1 m2 dinding keramik 20cm x 40cm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.9000
Tukang Batu L.02 OH 0.4500
Kepala tukang L.03 OH 0.0450
Mandor L.04 OH 0.0450
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik Bh 13.7500
Semen Portlan Kg 9.3000
Pasir Pasang M3 0.0180
Semen warna Kg 1.9400
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 31
53 Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm, tebal 9 mm Anti Lembab
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000
Tukang L.02 OH 0.0500
Kepala tukang L.03 OH 0.0050
Mandor L.04 OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Gypsum board Lembar 0.3640
Finishing (plaster board,dempul) Ls 1.0000
Paku skrup Kg 0.1100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 32
55 Pemasangan 1 m2 penutup Atap LYSAGHT® TRIMDEK OPTIMA® 0.45 MM BMT G550 COLORBOND®
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1200
Tukang L.03 OH 0.0600
Kepala tukang L.11 OH 0.0060
Mandor L.15 OH 0.0060
JUMLAH TENAGA KERJA
B BAHAN
LYSAGHT® TRIMDEK OPTIMA® 0.45 MM BMT G550 C M2 1.1000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
56 Pemasangan 1 m2 penutup Atap LYSAGHT® TRIMDEK OPTIMA® 0.35 MM BMT AZ 150 COLORBOND®
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1200
Tukang L.03 OH 0.0600
Kepala tukang L.11 OH 0.0060
Mandor L.15 OH 0.0060
JUMLAH TENAGA KERJA
B BAHAN
LYSAGHT® TRIMDEK OPTIMA® 0.35 MM BMT AZ 150 M2 1.1000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 33
57 Pemasangan 1 buah Body Kunci + Cylinder
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.005
Tukang L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
BD/ONS 8816-30 SS Bh 1.000
CY/ONS 65mm DO Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 34
59 Pemasangan satu pasang Lever Hendle
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.015
Tukang L.02 OH 0.150
Kepala tukang L.03 OH 0.015
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
LHTR 0016 22mm SSS Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 35
61 Pemasangan 1 buah door closer
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.050
Tukang L.02 OH 0.500
Kepala tukang L.03 OH 0.050
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
DC/ONS 068 RL SY-HO Set 1.000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 36
64 Pemasangan 1 m2 kaca tebal 5 mm
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0150
Tukang L.02 OH 0.1500
Kepala tukang L.03 OH 0.0150
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm M2 1.1000
Sealant Kg 0.0500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
65 Pengecetan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700
Tukang L.02 OH 0.0090
Kepala tukang L.03 OH 0.0060
Mandor L.04 OH 0.0030
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.2000
Plamuur Kg 0.1500
Cat dasar Kg 0.1700
Cat penutup Kg 0.2600
Kuas Bh 0.0100
Pengencer Kg 0.0300
Ampelas Lbr 0.2000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 37
66 Pengecetan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup )
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200
Tukang L.02 OH 0.0630
Kepala tukang L.03 OH 0.0063
Mandor L.04 OH 0.0030
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.1000
Cat dasar Kg 0.1000
Cat Tembok sek. Catylac Kg 0.2600
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 38
68 Pengecatan 1 m2 Permukaan Baja Galvanis secara Semprot sistem 3
No lapis Cat Terakhir Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.4000
Tukang L.02 OH 0.7000
Kepala tukang L.03 OH 0.0700
Mandor L.04 OH 0.0200
JUMLAH TENAGA KERJA
B BAHAN
Cat Dasar Kg 0.3000
Pengencer Ltr 0.0100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 39
70 Pemasangan 1 buah Closet jomgkok
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.000
Tukang L.02 OH 1.500
Kepala tukang L.03 OH 0.150
Mandor L.04 OH 0.160
JUMLAH TENAGA KERJA
B BAHAN
Closet jomgkok Unit 1.000
Pasangan bata M2 0.036
1PC:3PS JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 40
72 Pemasangan 1 buah kran diameter 1/2" atau 3/4"
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0100
Tukang L.02 OH 0.4000
Kepala tukang L.03 OH 0.0400
Mandor L.04 OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Kran air M 1.000
Sealtape Buah 0.025
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 41
74 Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0360
Tukang L.02 OH 0.0600
Kepala tukang L.03 OH 0.0060
Mandor L.04 OH 0.0020
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1/2” M 1.2000
Perlengkapan % 0.3500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 42
76 Pemasangan 1 m' pipa PVC tipe AW diameter 1"
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0360
Tukang L.02 OH 0.0600
Kepala tukang L.03 OH 0.0060
Mandor L.04 OH 0.0020
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1” M 1.2000
Perlengkapan % 0.3500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 43
78 Pemasangan 1 m' pipa PVC tipe AW diameter 1,5"
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0540
Tukang L.02 OH 0.0900
Kepala tukang L.03 OH 0.0090
Mandor L.04 OH 0.0030
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 1,5” M 1.2000
Perlengkapan % 0.3500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 44
80 Pemasangan 1 m' pipa PVC tipe AW diameter 2,5"
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810
Tukang L.02 OH 0.1350
Kepala tukang L.03 OH 0.0135
Mandor L.04 OH 0.0040
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 2,5” M 1.2000
Perlengkapan % 0.3500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 45
82 Pemasangan 1 m' pipa PVC tipe AW diameter 4"
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0810
Tukang L.02 OH 0.1350
Kepala tukang L.03 OH 0.0135
Mandor L.04 OH 0.0040
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC 4” M 1.2000
Perlengkapan % 0.3500
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 10% D
F Harga Satuan Pekerjaan (D+E)
Halaman 46
BILL OF QUANTITY (BOQ)
PEKERJAAN RENOVASI LAPANGAN FUTSAL MAHASISWA
INSTITUT AGAMA ISLAM NEGERI SYEKH NURJATI CIREBON
LOKASI JALAN PERJUANGAN, SUNYARAGI, KECAMATAN KESAMBI KOTA CIREBON, JAWA BARAT 4513
TAHUN ANGGARAN 2022
I Kegiatan Protokol Pencegahan Penyebaran Corona VIRUS DISEASE 2019 (COVID - 19) : JUMLAH
a Masker dus 5.00
b APD set 5.00
c Hand sanitizer liter 5.00
d Desinfektan liter 5.00
e Rapid Test (Antigen) unit 5.00
Halaman 47
NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)
B. PEKERJAAN RENOVASI LAPANGAN FUTSAL MAHASISWA
IV PEKERJAAN STRUKTUR PORTAL KUDA KUDA BAJA & PENUTUP ATAP JUMLAH
1 Kolom Struktur K.1 (WF,200,100,4.5,7) KG 1,965.600
2 Kolom Struktur K.2 (WF.200,100.4,5.7) KG 436.80
3 Balok Regel RB,1 (WF.200.100.4,5.7) KG 1456.00
4 Balok Regel RB,2 (WF.150.75.5.7) KG 588.00
5 Base Plat Uk,(200x300) T,12mm KG 101.41
6 Base Plat Uk,(200x250) T,12mm KG 28.17
7 Boud Angker M,20 (HTB) BH 96.00
8 Plat Stifneer Kolom T,8mm KG 241.32
9 Plat Dudukan Balok Regel T,8mm KG 90.14
10 Boud Dudukan Balok Regel M,16 (HTB) BH 160.00
11 Base Plat T,8mm (Batang Kuda Kuda ke Kolom Baja) KG 169.02
12 Boud M,16(HTB)/ (Batang Kuda Kuda ke Kolom Baja) BH 216.00
13 Kuda Kuda Pipa Galvanized (Type K,1)
- Batang Atas / Pipa Galvanized ф 3" Tebal 4,00 mm KG 3537.07
- Batang Bawah / Pipa Galvanized ф 3" Tebal 4,00 mm KG 3659.04
- Batang Vertikal / Pipa Galvanized ф 2" Tebal 3,60 mm KG 854.36
- Batang Diagonal / Pipa Galvanized ф 2" Tebal 3,60 mm KG 1548.38
14 Rafter Pipa Galvanized (Type 1)
- Batang Atas / Pipa Galvanized ф 2" Tebal 3,60 mm KG 407.20
- Batang Bawah / Pipa Galvanized ф 2" Tebal 3,60 mm KG 407.20
- Batang Vertikal / Pipa Galvanized ф 1 1/2" Tebal 3,20 mm KG 52.13
- Batang Diagonal / Pipa Galvanized ф 1 1/2 " Tebal 3,20 mm KG 159.86
15 Rafter Pipa Galvanized (Type 2)
- Batang Atas / Pipa Galvanized ф 2" Tebal 3,60 mm KG 814.40
- Batang Bawah / Pipa Galvanized ф 2" Tebal 3,60 mm KG 814.40
- Batang Vertikal / Pipa Galvanized ф 1 1/2" Tebal 3,20 mm KG 121.63
- Batang Diagonal / Pipa Galvanized ф 1 1/2 " Tebal 3,20 mm KG 331.30
16 Skoor Kuda Kuda Pipa Galvanized & Baja Siku
- Batang Atas / Pipa Galvanized ф 3" Tebal 4,00 mm KG 274.43
- Batang Besi Siku L.50.50.5 KG 461.45
- Plat Buhul T,5mm KG 21.13
17 Pek.Gordeng Baja C 125.50.20.2,3 KG 5493.18
18 Pek.Besi Pelat T,5mm Dudukan Gordeng KG 245.08
19 Pek.Trekstang O 12 mm BH 448.00
20 Rangka Hollow 40x80 T,2,60mm Dinding Ampig Spandek KG 1128.00
Halaman 48
NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)
V PEKERJAAN PENGECATAN STRUKTUR BAJA JUMLAH
1 Pengecatan (Zinc Cromat dan Cat Finish) Kolom Baja K.1 & K,2 M2 66.00
2 Pengecatan (Zinc Cromat dan Cat Finish) Balok Regel Type 1 & Type 2 M2 98.88
3 Pengecatan (Zinc Cromat dan Cat Finish) Kuda Kuda Pipa K,1 M2 279.28
4 Pengecatan (Zinc Cromat dan Cat Finish) Skoopr Kuda Kuda Pipa +Besi Siku M2 31.78
5 Pengecatan (Zinc Cromat dan Cat Finish) Gordeng M2 426.30
6 Pengecatan (Zinc Cromat dan Cat Finish) Rangka Besi Hollow 40X80 (Ampig) M2 57.60
Halaman 49
NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)
IX PEKERJAAN KUSEN PINTU DAN JENDELA JUMLAH
Pintu Type P.1 ( 3 Unit )
1 Kusen Aluminium ukuran 4" t = 1,35 mm, YBIC Lengkap Accessories M¹ 15.48
2 Daun pintu Wood Plastic Composit (WPC) Panel uk. 80x210 cm Bh 3.00
3 Engsel pintu 4" Set 4.50
4 Mortise & Cylinder Bh 3.00
5 Lever Handle Bh 3.00
Halaman 50
NO URAIAN PEKERJAAN SAT VOLUME HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)
XIV PEKERJAAN INSTALASI AIR BERSIH DAN AIR KOTOR JUMLAH
Instalasi air Bersih
1 Pengeboran air sumur dangkal , 50 mtr, pompa submersible 1PK,lkp casing Unit 1.00
2 Instalasi listrik pompa Unit 1.00
3 Control level air Unit 1.00
4 Pipa PVC dia 25mm Mtr 8.00
5 Pipa PVC dia 20mm Mtr 12.00
6 Pipa PVC dia 15mm Mtr 20.00
7 Tangki air 500 ltr Unit 1.00
8 Ball valve dia 25mm Bh 1.00
Halaman 51
REKAPITULASI BILL OF QUANTITY
PEKERJAAN RENOVASI LAPANGAN FUTSAL MAHASISWA
INSTITUT AGAMA ISLAM NEGERI SYEKH NURJATI CIREBON
LOKASI JALAN PERJUANGAN, SUNYARAGI, KECAMATAN KESAMBI KOTA CIREBON, JAWA BARAT 4513
TAHUN ANGGARAN 2022
JUMLAH
PPN 11 %
JUMLAH + PPN 11 %
DIBULATKAN
Terbilang :
DOMISILI : TANGGAL …
PENAWAR :
CV/PT.
NAMAJELAS
JABATAN
KEMENTERIAN AGAMA REPUBLIK INDONESIA
INSTITUT AGAMA ISLAM NEGERI (IAIN) SYEKH NURJATI CIREBON
Jl. Perjuangan By Pass Sunyragai Cirebon Telp. 0231481264 Faks. 0231 489926
Website : www.syekhnurjati.ac.id, E-mail : E-mail: info@syekhnurjati.ac.id
KONSULTAN PERENCANA