Anda di halaman 1dari 18

DATA LAHAN

TPS

RTH

500
RTH
1050
1096 No PERUNTUKAN KAVLING UNIT LUAS PROSENTASE (%)

702

700
B-20
1105 75m²
1 KAVLING SIAP BANGUN 38 2.580 m² 68,8 %
A-18
B-19
68m²
77m² 1102 2 JALAN DAN SALURAN - 1.166 m² 31,2 %
A-17

602

600
66m²
1153
1108

602
B-18

600
70m²
ROW 6,5 A-16
B-17 67m² 1114
72m²
A-15

600

600
67m²
1200
1119

600
B-16

600
1200 72m²
A-14
B-15 67m² 1125
72m²
A-12A
600

600
68m²
1200
Bendar

1130
600

B-14

600
1200 72m² A-12
B-12A 68m² 1136
72m²
A-11
600

600
68m²
1200
1142
600

B-12

600
1200 72m²
A-10
B-11 69m² 1147
72m²
A-09
600

600
69m²
1200
1150
600

B-10
600

1200 72m²
A-08
B-09 69m² 1150
72m²
A-07
600

600

69m²
1200
1150
KETENTUAN LAINYA
Surat Tanah
600

B-08 No Nomor Surat Tanah Luas (m²)


Bendar

1. PJU
600

1200 72m² PHGR No. 290 atas SHM 3.750


A-06 · PJU di lingkungan perumahan dengan jarak antar tiang
B-07 1150 1 No. 172
69m²
72m²
A-05 minimal 50 m.
600

· Tiap 10 tiang PJU terpasang KWH meter.


600

69m²
1200
1150
2. Hidran
· Menyediakan hidran umum yang dilengkapi dengan
600

B-06
reservoir atau bak.
600

1200 72m²
A-04 3. Menanam pohon perindang di lingkungan perumahan.
B-05 69m² 1150
72m²
A-03 4. Berm difungsikan sebagaRuang Terbuka Hijau (RTH).
600

5. Membuat Sumur Resapan.


600

69m² Total 3.750


1200
1150
6. Menyediakan Tempat Pembuangan Sementara (TPS) /
Depo Sampah serta manajemen pengelolaanya.
600

B-04
7. menyediakan lahan makam bagi penghuni perumahan
600

1200 72m²
ROW 6,5 A-02
sesuai Surat Keterangan Lurah/Kepala Desa..... Kecamatan....
B-03 69m² 1150
72m²
A-01 No.. SITEPLAN
600

80m² 8. Jalan di dalam lokasi menggunakan bahan yang mudah


700

1 : 500
1200
menyerap air.
9. Bila pengembang dan pembangunan kawasan
600

B-02 Pos Jaga


72m²
perumahan sudah selesai serta tidak ada pengembangan lebih
1200
B-01 lanjut, pengembang diwajibkan melakukan serah terima
84m² Prasarana, Sarana dan Utilitas (PSU) kepada Pemerintah Kota
795

Batu.

LEGENDA
JALAN MASUK

KEY PLAN
Batas Lahan
ROW 6

Garis Sempadan Bangunan (GSB, 21 Rumah)

Garis Sempadan Sungai/ Aliran Air/ Curah

Taman / RTH

TPS / Depo Sampah

JALAN Dr. SOETOMO


Plengseng Sumur Resapan

SITEPLAN Kontur Penerangan Jalan


SKALA 1 : 600 Umum (PJU)
Hidrant Arah Aliran
Drainase
TPS

RTH

500
RTH
1050
1096

702

700
B-20
1105 75m² A-18
U
B-19 77m² 1102
68m²
A-17

602

600
66m²
1153
1108 B T

602
B-18

600
70m²
ROW 6,5 A-16
B-17 67m² 1114
72m²
A-15 S

600

600
67m²
1200
1119

600
B-16

600
1200 72m²
A-14
B-15 67m² 1125
72m²
A-12A

600

600
68m²
1200

Bendar
1130

600
B-14

600
1200 72m² A-12
B-12A 68m² 1136
72m²
A-11

600

600
68m²
1200
1142

600
B-12

600
1200 72m²
A-10
B-11 69m² 1147
72m²
A-09

600

600
69m²
1200
1150

600
B-10

600
1200 72m²
A-08
B-09 69m² 1150
72m²
A-07

600

600
69m²
1200
1150

600
Bendar B-08

600
1200 72m²
A-06
B-07 69m² 1150
72m²
A-05
600

600
69m²
1200
1150
600

B-06

600
1200 72m²
A-04
B-05 69m² 1150
72m²
A-03
600

600
69m²
1200
1150
600

B-04

600
1200 72m²
ROW 6,5 A-02
B-03 69m² 1150
72m²
A-01
600

80m²
1200 700
600

B-02 Pos Jaga


1200 72m²
B-01
84m²
795

JALAN MASUK
ROW 6

JARINGAN AIR BERSIH


SKALA 1 : 600

JALAN Dr. SOETOMO


Hydrant
TPS

RTH

500
RTH
1050
1096

702

700
B-20
1105 75m² A-18
U
B-19 77m² 1102
68m²
A-17

602

600
66m²
1153
1108 B T

602
B-18

600
70m²
ROW 6,5 A-16
B-17 67m² 1114
72m²
A-15 S

600

600
67m²
1200
1119

600
B-16

600
1200 72m²
A-14
B-15 67m² 1125
72m²
A-12A

600

600
68m²
1200

Bendar
1130

600
B-14

600
1200 72m² A-12
B-12A 68m² 1136
72m²
A-11

600

600
68m²
1200
1142

600
B-12

600
1200 72m²
A-10
B-11 69m² 1147
72m²
A-09

600

600
69m²
1200
1150

600
B-10

600
1200 72m²
A-08
B-09 69m² 1150
72m²
A-07

600

600
69m²
1200
600 1150

B-08
Bendar

600
1200 72m²
A-06
B-07 69m² 1150
72m²
A-05
600

600
69m²
1200
1150
600

B-06

600
1200 72m²
A-04
B-05 69m² 1150
72m²
A-03
600

600
69m²
1200
1150
600

B-04
600
1200 72m²
ROW 6,5 A-02
B-03 69m² 1150
72m²
A-01
600

80m²
700

1200
600

B-02 Pos Jaga


1200 72m²
B-01
Hydrant
84m²
795

JALAN MASUK
ROW 6

HYDRANT
SKALA 1 : 600

JALAN Dr. SOETOMO


Penerangan
TPS Jalan

Penerangan

500
RTH Jalan
1050
1096

702

700
B-20
1105 75m² A-18
U
B-19 77m² 1102
68m²
A-17

602

600
66m²
1153
1108 B T

602
B-18

600
70m²
ROW 6,5 A-16
B-17 67m² 1114
72m²
A-15 S

600

600
67m²
1200
1119

600
B-16

600
1200 72m²
A-14
B-15 67m² 1125
72m²
A-12A

600
Penerangan

600
68m²
1200 Jalan

Bendar
1130

600
B-14

600
1200 72m² A-12
B-12A 68m² 1136
72m²
A-11

600

600
68m²
1200
1142

600
B-12

600
1200 72m²
A-10
B-11 69m² 1147
72m²
A-09

600

600
69m²
1200
1150

600
B-10

600
1200 72m²
A-08
B-09 69m² 1150
72m²
A-07
600
Penerangan

600
69m²
1200 Jalan
1150
600

B-08
Bendar

600
1200 72m²
A-06
B-07 69m² 1150
72m²
A-05
600

600
69m²
1200
1150
600

B-06

600
1200 72m²
A-04
B-05 69m² 1150
72m²
A-03
600

600
69m²
1200
1150
600

B-04 600
1200 72m²
ROW 6,5 A-02
B-03 69m² 1150
72m²
A-01
600

Penerangan 80m²
700

1200 Jalan
600

B-02 Pos Jaga


1200 72m²
B-01
84m²
795

JALAN MASUK
ROW 6

Penerangan PENERANGAN JALAN UMUM


Jalan
SKALA 1 : 600

JALAN Dr. SOETOMO


TPS

500
RTH
1050
1096

702

700
B-20
1105 75m² A-18
U
B-19 77m² 1102
68m²
A-17

602

600
66m²
1153
1108 B T

602
B-18

600
70m²
ROW 6,5 A-16
B-17 67m² 1114
72m²
A-15 S

600

600
67m²
1200
1119

600
B-16

600
1200 72m²
A-14
B-15 67m² 1125
72m²
A-12A

600

600
68m²
1200

Bendar
1130

600
B-14

600
1200 72m² A-12
B-12A 68m² 1136
72m²
A-11

600

600
68m²
1200
1142

600
B-12

600
1200 72m²
A-10
B-11 69m² 1147
72m²
A-09

600

600
69m²
1200
1150

600
B-10

600
1200 72m²
A-08
B-09 69m² 1150
72m²
A-07

600

600
69m²
1200
1150

600
B-08
Bendar

600
1200 72m²
A-06
B-07 69m² 1150
72m²
A-05
600

600
69m²
1200
1150
600

B-06

600
1200 72m²
A-04
B-05 69m² 1150
72m²
A-03
600

600
69m²
1200
1150
600

B-04

600
1200 72m²
ROW 6,5 A-02
B-03 69m² 1150
72m²
A-01
600

80m²
1200 700
600

B-02 Pos Jaga


1200 72m²
B-01
84m²
795

JALAN MASUK
ROW 6

IPAL
SKALA 1 : 600

JALAN Dr. SOETOMO


TPS

RTH

500
RTH
1050
1096

702

700
B-20
1105 75m² A-18
U
B-19 77m² 1102
68m²
A-17

602
F

600
66m²
1153
1108 B T

602
B-18

600
70m²
ROW 6,5 A-16
B-17 67m² 1114
72m²
A-15 S

600

600
67m²
1200
1119

600
B-16 E

600
1200 72m²
A-14
B-15 67m² 1125
72m²
A-12A

600

600
68m²
1200

Bendar
1130

600
B-14

600
1200 72m² A-12
B-12A 68m² 1136
72m²
A-11

600

600
68m²
1200
1142

600
B-12

600
1200 72m²
A-10
B-11 D 69m² 1147
72m²
A-09

600

600
69m²
1200
1150

600
B-10

600
1200 72m²
A-08
B-09 69m² 1150
72m²
A-07

600

600
69m²
1200
C 1150
600

B-08
Bendar

600
1200 72m²
A-06
B-07 69m² 1150
72m²
A-05
600

600
69m²
1200
1150
600

B-06 B

600
1200 72m²
A-04
B-05 69m² 1150
72m²
A-03
600

600
69m²
1200
1150
600

B-04
1200 72m²
ROW 6,5 A-02 600
B-03 69m² 1150
72m²
A-01
600

80m²
700

1200
A
600

B-02 Pos Jaga


1200 72m²
B-01
84m²
795

A
JALAN MASUK
ROW 6

ELEVASI TANAH
SKALA 1 : 600

JALAN Dr. SOETOMO


TPS

RTH

500
RTH
1050
1096

702

700
B-20
1105 75m² A-18
U
B-19 77m² 1102
68m²
A-17

602

600
66m²
1153
1108 B T

602
B-18

600
70m²
ROW 6,5 A-16
B-17 67m² 1114
72m²
A-15 S

600

600
67m²
1200
1119

600
B-16

600
1200 72m²
A-14
B-15 67m² 1125
72m²
A-12A

600

600
68m²
1200

Bendar
1130

600
B-14

600
1200 72m² A-12
B-12A 68m² 1136
72m²
A-11

600

600
68m²
1200
1142

600
B-12

600
1200 72m²
A-10
B-11 69m² 1147
72m²
A-09

600

600
69m²
1200
1150

600
B-10

600
1200 72m²
A-08
B-09 69m² 1150
72m²
A-07
600

600
69m²
1200
1150
600

B-08
Bendar

600
1200 72m²
A-06
B-07 69m² 1150
72m²
A-05
600

600
69m²
1200
1150
600

B-06

600
1200 72m²
A-04
B-05 69m² 1150
72m²
A-03
600

600
69m²
1200
1150
600

B-04
600

1200 72m²
ROW 6,5 A-02
B-03 69m² 1150
72m²
A-01
600

80m²
700

1200
600

B-02 Pos Jaga


1200 72m²
B-01
84m²
795

JALAN MASUK
ROW 6

AREA PEMATANGAN
SKALA 1 : 600

JALAN Dr. SOETOMO


TPS

500
RTH
1050 Bak
Kontrol 1096

702

700
B-20
1105 75m² A-18
U
B-19 77m² 1102
68m²
A-17

602

600
66m²
1153
1108 B T

602
B-18

600
70m²
ROW 6,5 A-16
B-17 67m² 1114
72m²
A-15 S

600

600
67m²
1200
1119
Bak

600
B-16 Kontrol

600
1200 72m²
A-14
B-15 67m² 1125
72m²
A-12A

600

600
68m²
1200

Bendar
1130

600
B-14

600
1200 72m² A-12
B-12A 68m² 1136
72m²
A-11

600

600
68m²
1200
1142

600
B-12

600
1200 72m²
A-10
B-11 69m² 1147
72m² Bak A-09

600
Kontrol

600
69m²
1200
1150

600
B-10

600
1200 72m²
A-08
B-09 69m² 1150
72m²
A-07
600

600
69m²
1200
1150
600

B-08
Bendar

600
1200 72m²
A-06
B-07 69m² 1150
72m²
A-05
600

600
69m²
1200
1150
Bak
600

B-06 Kontrol

600
1200 72m²
A-04
B-05 69m² 1150
72m²
A-03
600

600
69m²
1200
1150
600

B-04 600
1200 72m²
ROW 6,5 A-02
B-03 69m² 1150
72m²
A-01
600

80m²
700

1200
600

B-02 Pos Jaga


1200 72m²
B-01
84m²
795

JALAN MASUK
ROW 6

BAK KONTROL
SKALA 1 : 600

JALAN Dr. SOETOMO


TPS

500
RTH
1050
1096

702

700
B-20
1105 75m² A-18
U
B-19 77m² 1102
68m²
A-17

602

600
66m²
1153
1108 B T

602
B-18

600
70m²
ROW 6,5 A-16
B-17 67m² 1114
72m²
A-15 S

600

600
67m²
1200
1119

600
B-16

600
1200 72m²
A-14
B-15 67m² 1125
72m²
A-12A

600

600
68m²
1200

Bendar
1130

600
B-14

600
1200 72m² A-12
B-12A 68m² 1136
72m²
A-11

600

600
68m²
1200
1142

600
B-12

600
1200 72m²
A-10
B-11 69m² 1147
72m²
A-09

600

600
69m²
1200
1150

600
B-10

600
1200 72m²
A-08
B-09 69m² 1150
72m²
A-07
600

600
69m²
1200
1150
600

B-08
Bendar

600
1200 72m²
A-06
B-07 69m² 1150
72m²
A-05
600

600
69m²
1200
1150
600

B-06

600
1200 72m²
A-04
B-05 69m² 1150
72m²
A-03
600

600
69m²
1200
1150
600

B-04
600

1200 72m²
ROW 6,5 A-02
B-03 69m² 1150
72m²
A-01
600

80m²
700

1200
600

B-02 Pos Jaga


1200 72m²
B-01
84m²
795

JALAN MASUK
ROW 6

SUMUR RESAPAN
SKALA 1 : 600

JALAN Dr. SOETOMO


TPS

RTH

500
RTH
1050
1096

702

700
B-20
1105 75m² A-18
U
B-19 77m² 1102
68m²
A-17

602
F

600
66m²
1153
1108 B T

602
B-18

600
70m²
ROW 6,5 A-16
B-17 67m² 1114
72m²
A-15 S

600

600
67m²
1200
1119

600
B-16 E

600
1200 72m²
A-14
B-15 67m² 1125
72m²
A-12A

600

600
68m²
1200

Bendar
1130

600
B-14

600
1200 72m² A-12
B-12A 68m² 1136
72m²
A-11

600

600
68m²
1200
1142

600
B-12

600
1200 72m²
A-10
B-11 D 69m² 1147
72m²
A-09

600

600
69m²
1200
1150

600
B-10

600
1200 72m²
A-08
B-09 69m² 1150
72m²
A-07

600

600
69m²
1200
C 1150
600

B-08
Bendar

600
1200 72m²
A-06
B-07 69m² 1150
72m²
A-05
600

600
69m²
1200
1150
600

B-06 B

600
1200 72m²
A-04
B-05 69m² 1150
72m²
A-03
600

600
69m²
1200
1150
600

B-04
72m² 600
1200 ROW 6,5 A-02
B-03 69m² 1150
72m²
A-01
600

80m²
700

1200
A
600

B-02 Pos Jaga


1200 72m²
B-01
84m²
795

A
JALAN MASUK
ROW 6

GRADING PLAN
SKALA 1 : 600

JALAN Dr. SOETOMO


Galian

3,5 m
Urugan Tanah Asli

1875 1751 2725 1856 1490 1978 853

3,5 m
F E D C B A

ELEVASI TANAH RENC/GALIAN URUGAN


SKALA 1 : 400
50

180

A 215

20

15

20 23 120 23 20

SUMUR RESAPAN
206 1 : 20

Sumur Resapan
Skala 1 : 20
145
145

10
15
70

125 95 10
A 180
10

15
10

10 125 10

10 125 10

BAK KONTROL
1 : 20

Detail Bak Kontrol


Skala 1 : 20
7m
1875 1751 2725 1856 1490 1978 853

F E D C B A

ELEVASI TANAH ASLI/TOPOGRAFI EKSISTING


SKALA 1 : 400
9 9
7 7 58
26
15
5
30 30
70
10 10 55
5
7 12

20 15 15
5 Lantai
10 10 10 15
Kerja

Pasir Urug
45
15 15

Saluran Primer B
Skala 1 : 20

7.5

60
53

15 15
5 Lantai 15 DETAIL DRAINASE
10 Kerja 1 : 20

Pasir Urug
40
15 15

Detail
ISI BOX HYDRANT
- HOSE NOZZLE(1) Ø65mm
- CANVAS HOSE Ø65mm 30M

66 23

HYDRANT
95 95

30 30

10 10
20

Pondasi Pondasi

86 43

DETAIL HYDRANT
1 : 15

Detail Box Hydrant


Skala 1 : 15

Anda mungkin juga menyukai