Anda di halaman 1dari 7

A Pek.

Persiapan
1 Pek. Bongkaran

B Pek. Plafond
1 Plafon Metal 147.84 m2 477,967
Loket 121.32
R. Msuk Racik 26.52

2 Plafon Gypsum 1 Ls 106,974,117


Plafon Gypsum 663.34 m2 137,415
Sec 5.04
Koridor 67.79
Hall 81.49
R. Pertemuan Kliring 104.09
Ruang 1 ( R. Toilet) 57.13
Ruang 2 ( R. Warkat) 11.81
Ruang 3 ( Guest Bank ) 11.51
Ruang 4 13.36
Ruang 5 12.63
Bas 9.18
Gudang Sovenir 29.27
Gudang 26.6
Loker 6.51
Satpam 29.8
Control CCTV 43.74
Arsip 153.39

Shadow line pada Plafond Gypsumboard 529.61 m' 29,873


Sec 9.45
Koridor 69.54
Hall 38.82
R. Pertemuan Kliring 44.20
Ruang 1 ( R. Toilet) 30.60
Ruang 2 ( R. Warkat) 14.40
Ruang 3 ( Guest Bank ) 14.05
Ruang 4 15.54
Ruang 5 15.25
Bas 12.35
Gudang Sovenir 22.90
Gudang 10.68
Loker 10.40
Satpam 24.30
Control CCTV 43.74
Arsip 153.39

3 Plafon Expose 138.66 m2 47,500


SetBay 66.75
R. Ahu 55.71
R. Limbah Cadangan 16.2

4 Plafon Kalsiboard 1 Ls 5,653,627


Plafon Kalsiboard 26.63 179,237
Toilet 24.81
Janitor 1.82

Shadow line pada Plafond Kalsi Board 29 29,873


Toilet 23.99 29,873
Janitor 5.49 29,873

5 Pek. Cat Plafond 828.63 m2 29,873


Setbay 66.75
AHU 55.71
Sec 5.04
Koridor 67.79
Hall 81.49
R. Pertemuan Kliring 104.09
Ruang 1 ( R. Toilet) 57.13
Ruang 2 ( R. Warkat) 11.81
Ruang 3 ( Guest Bank ) 11.51
Ruang 4 13.36
Ruang 5 12.63
Bas 9.18
Gudang Sovenir 29.27
Gudang 26.6
Loker 6.51
Satpam 29.8
R. Limbah Cadangan 16.2
Control CCTV 43.74
Arsip 153.39
Janitor 1.82
Toilet 24.81

C Pek. Dinding
1 Pek. Pasangan Dinding Bata Ringan 435.7035 m2 179,237
Sec 14.2625
AHU 32.6
Setbay 59.224
R. Fire Supression 43.9
Gudang Souvenir 24.86
Lift 36.68
Ruang 4 20.9
Ruang 2 ( R. Warkat) 28.384
Ruang 3 ( Guest Bank ) 4.7
R. Pertemuan Kliring 35.296
Loker 12.528
Ruang 1 ( R. Toilet) 26.8
Gudang 70.324
Limbah Cadangan 25.245

2 Pek. Plester & Aci 850.51 m2 83,644


R. Limbah Cadangan 68.28
Loket 114.17
Sec 26.46
Gudang Souvenir 60.82
Ruang 1 ( R. Toilet) 82.38
Ruang 4 41.58
Ruang 2 ( R. Warkat) 38.39
Ruang 3 ( Guest Bank ) 30.12
Koridor tangga 194.72
R. Pertemuan Kliring 120.19
Ruang 5 40.76
BASS 32.64

3 Pek.Dinding Finish Cat 423.68 m2 29,873


Sec 26.46
Gudang Sovenir 60.82
Koridor tangga 194.72
Ruang 5 40.76
BASS 32.64
R. Limbah Cadangan 68.28

4 Pek. Wallpaper 312.66 m2 119,492


Ruang 4 41.58
Ruang 1 82.38
Ruang 2 38.39
Ruang 3 30.12
R. Pertemuan Kliring 120.19

5 Pek. Dinding HT 1.00 Ls 86,734,863


Pek. Dinding HT 219.02 m2 86,734,863
Toilet 70.499 334,935
Loket 114.17 425,000
R.MSUK Racik 34.353 425,000

D Pek. Lantai
1 Pek. Screeding Lantai Tebal 30 mm 121.32 m2 275,000
Loket 121.32

2 Pek. Finishing Lantai Pu 121.32 m2 614,157


Loket 121.32

3 Pek. Floor Hardener 113.464 m2 52,278


SetBay 66.75
R. Ahu 46.714

4 Pek. Lantai Homogenus & Keramik 1 ls 171,714,868


Pek. Lantai Homogenus Tile 657.121 m2 247,348
R.Arsip 155.68
Ruang 5 12.13
Loker 5.992
BAS 9.175
Satpam 29.536
CCTV 43.74
R. Gudang Souvenir 41.899
Hall 103.102
Ruang 4 11.347
Gudang 56.87
Ruang 2 11.642
Ruang 3 11.485
R. Pertemuan Kliring 103.836
Lorong Toilet 34.687
Toilet 26

Pas. Lantai Keramik Tile ukuran 300/300 mm, KR-P1 9,177,500


Fire Supression 30.62 125,000
Gudang 26.6 125,000
R. Limbah Cadangan 16.2 125,000

5 Pek. Plint HT & Keramik 1.00 Ls 22,920,271


Pek. Plint HT 469.23 m' 45,000
Sec 9.45
Gudang Sovenir 22.90
Hall 38.82
Ruang 4 15.54
Ruang 1 30.60
Ruang 2 14.40
Ruang 3 14.05
R. Pertem Kliring 44.20
Koridor 69.54
Janitor 5.49
Toilet 60.74
Satpam 24.30
Control CCTV 26.60
Ruang 5 15.25
Loker 10.40
Bas 12.35
Arsip 54.60

Pas. Plint Lantai Keramik Tile ukuran 100/300 mm, KR-P1 1,804,921
Fire Supression 22.27 m' 35,847
Gudang 10.68 m' 35,847
Limbah Cadangan 17.40 m' 35,847

E Pek. Pintu & Jendela


1 Pintu Solid Kayu Kusen Alumunium 1 Ls 121,826,066
40,423,026
P1 7 5,774,718
Sec 1
Control CCTV 1
Ruang 4 1
Ruang 2 1
Ruang 3 1
Loker 1
BAS 1

P2 1 Ls 81,403,040
R. Gudang Souvenir 1 17,883,662
R. Arsip 1 17,883,662
Koridor Arah Tangga 1 17,883,662

PT1 ( Toilet) 4 5,774,718


PT2 ( Toilet) 1 4,653,182

2 Pintu Kaca Frame Besi 1 Ls 865,885,480.79


PZ6 (Loket) 6 unit 118,716,756
PB ( Limbah Cadangan, Fire Supression, AHU II) 3 unit 38,196,819
P5 ( AHU I, AHU III) 2 unit 11,326,319
PZ2 ( R. MSUK Racik) 1 unit 16,341,847

3 Pintu Kaca Rangka Alumunium 1 Ls 15,474,624


P6 ( Ruang 5) 1 Unit
PK1 (Satpam, Pertemuan Kliring) 2 Unit 7,737,312

3 Pintu Kaca Frameless 1 Ls 14,284,385


PK0 ( Pertemuan Kliring) 1 Ls 14,284,385

4 Pintu Automatic Rolling Door + Rolling Grill 1 Ls 206,481,559


PR1 1
Setbay 1 57,355,989
PR2 1
Setbay 1 86,750,933
PR4 1
Kanopi 1 62,374,638

5 Pintu Besi 1 Ls 23,166,801


PZ3 ( Setbay ke Koridor) 1 Ls 23,166,801

6 Jendela Kaca Frame Besi 1 Ls 786,206,090.21


Z3 1 40,935,935
R.MSUK Racik
Z6 3 57,251,882
Loket
Z7 5 114,702,902
Loket

F Pek. MEP
1 Pek. PP + Instalasi Kabel Feeder 1 Ls 509,446,845.32
Pek. Panel 165,830,501.89
SDP B.L1 1 Unit 23,647,396
PP-AHU.1.1-L.1 ( R.AHU) 1 Unit 46,721,232
PP-AHU.1.2-L.1 ( R. AHU) 1 Unit 46,721,232
LP/B1-L.1 ( SHAFT Tangga 1) 1 Unit 23,121,633
LP/B3-L.1 ( Shaft dekat Toilet T5) 1 Unit 25,619,008

Instalasi kabel feeder dari LVMDP : 323,141,314.52


SDP-B. L1 175 m 1,588,932
PP-AHU.1.1-L.1 ( R.AHU) 6.00 m 213,123
PP-AHU.1.2-L.1 ( R. AHU) 110.00 m 213,123
LP/B1-L.1 ( SHAFT Tangga 1) 6.00 m 76,115
LP/B3-L.1 ( Shaft dekat Toilet T5) 110.00 m 99,943
PP-SUMPIT.1 7.00 m 76,115
PP-SUMPIT.2 110.00 m 76,115
Instalasi kabel feeder dari PP-AHU.1.1-L.1 6,507,862.35
AHU-1.1 (R.AHU) 24 m 76,115
IF-1.1 (Setbay) 41 m 38,058
IU-1.1 & 2 ( R. Limbah Cadangan) 19 m 38,058
IU-1.5 (R.Security) 34 m 38,058
EF-1.10 (R.Setbay) 29 m 38,058
Instalasi kabel feeder dari PP-AHU.1.2-L.1 13,967,166.56
AHU-1.1 (R.AHU III) 15 m 76,115
AHU-1.2 (Khazanah) 39 m 76,115
EF-1.3 ( Toilet Satpam) 18 m 38,058
EF-1.4 (Toilet T5) 17 m 38,058
EF-1.5 (Toilet T5) 17 m 38,058
EF-1.6 (Toilet T5) 13 m 38,058
EF-1.7 (Toilet T5) 15 m 38,058
EF-1.8 (Toilet T5) 12 m 38,058
EF-1.9 (Toilet T5) 14 m 38,058
EF-1.10 (Janitor) 8 m 38,058
IU-1.8 ( Ruang 3) 26.00 m 38,058
IU-1.9 ( Ruang 2) 22.00 m 38,058
IU-1.10 ( R. BAS) 19.00 m 38,058
IU-1.11 ( R. Control CCTV) 17.00 m 38,058
IU-1.12 ( Ruang 5) 26.00 m 38,058
IU-1.13 ( R.Satpam) 21.00 m 38,058
IU-1.14 ( R. Control CCTV) 14.00 m 38,058

2 Pek. AHU 1 Ls 267,672,637.21


AHU-1.1 1 Unit 85,213,633
R. AHU I 1 Unit 85,213,633

AHU-1.2 1 Unit 85,683,644


R. AHU II 1 Unit 85,683,644

AHU-1.3 1 Unit 96,775,361


R. AHU III 1 Unit 96,775,361

3 Pek. Ac Split 1 Ls 88,458,468.25


IU/OU.1.5 1 Unit 5,132,166
R. Security 1 Unit 5,132,166

IU/OU.1.7 1 Unit 5,526,488


Ruang 4 1 Unit 5,526,488

IU/OU.1.8 1 Unit 5,316,183


Ruang 3 1 Unit 5,316,183

IU/OU.1.9 1 Unit 5,316,183


Ruang 2 1 Unit 5,316,183

IU/OU.10 & 11 2 Unit 5,316,183


R. BAS & Control CCTV 2 Unit 5,316,183

IU/OU.12 1 Unit 5,526,488


R. Satpam 1 Unit 5,526,488

IU/OU.13 1 Unit 19,734,045


R. Satpam 1 Unit 19,734,045

IU/OU.14 1 Unit 31,274,548


Control CCTV 1 Unit 31,274,548

4 Pek. Tata Udara 1 Ls 150,586,679.96


pipa refrigrant ukuran 1/4 inch/ 1/2 inch + Kabel kontrol NYM 3 x 2,5 mm2 67.3 266,765
Pipa Drain + Isolasi 66.2 43,949
- dia. 20 mm
Isolasi ruang AHU 363.11 228,611

Ducting lengkap dgn gantungan/hanger/support dan aksesories lainnya - Polyurethane (PU) 185.33 266,466

SUPPLY AIR DIFFUSER


Square Diffuser 1 Ls 5,006,699.83
Uk. 200 x 200 0 191,187
Uk. 250 x 250 18 244,958
R. Msuk Racik 2
R. Setor Bayar 5
Hall 11

Gudang Souvenir 2
Arsip 8
R. Pertemuan Kliring 5
Uk. 350 x 350 2 298,729
Gudang 2

RETURN AIR GRILLE


Rectangular 1 Ls 8,221,025.03
Uk. 300 x 150 11 176,250
Setor bayar 5
Gudang 6
Uk. 300 x 200 9 244,958
R. Msuk Racik 2
Hall 7
Uk. 400 x 200 15 271,843
Gudang Souvenir 2
R. Arsip 8
R. Pertemuan Kliring 5

BJLS 60 15.4376 m2 4,113,601.13


Setbay 7.2486 266,466
8.189 266,466

Drain Pipa Ducting 1 Ls 15,430,021.56


Pipa dia.100 mm 24.30 371,599
Pipa dia.150 mm 4.50 706,972
Pipa dia.200 mm 4.30 748,555

Testing & Commissioning Pekerjaan HVAC 1.00 Ls 13,940,692

5 Pek. Sprinkler 1 Ls 63,070,046.41


Instalasi sprinkler dengan Pipa Black Sch. 40 46,192,258.39
- dia. 80 mm 24.92 m 387,352
- dia. 65 mm 19.09 m 280,706
- dia. 50 mm 12.71 m 142,554
- dia. 40 mm 15.27 m 125,466
- dia. 32 mm 30.29 m 114,712
- dia. 25 mm 236.08 m 101,568

1,219,531.71
Fitting dia. 80 mm 6 109,932
Fitting dia. 65 mm 6 83,644

3,157,269.07
BCV Dia 80 mm 1 Bh 3,157,269

6,667,633.67
Head Sprinkler 62 Bh 107,542
Setbay 23
Gudang Souvenir 6
Hall 14
Ruang 4 1
Gudang 6
Ruang 2 1
Ruang 3 1
R. Pertemuan Kliring 6
Ruang 5 1
Loker 1
Satpam 2
Instalasi Drain Sprinkler dengan Pipa Black Sch 40 1,551,569.71
- dia. 50 mm 2.80 m 142,554
- dia. 25 mm 11.35 m 101,568

Inspector Test Valve Set dia. 25 mm 1 Set 1,493,646

Testing & Commissioning 1 Ls 2,788,138

6 Pek. Fire Supression 1 Ls 6,016,184,356


MSUK Racik (Volume : 126.45 m3, Height : 3.3m)
Arsip Room (Volume : 581.86 m3, Height 7 3.8m)
Locker Room (Volume : 34.86 m3, Height : 3.8m)
Control CCTV Room (Volume : 166.21 m3, Height : 3.8m)

Testing and Commissioning

7 Pek. Penerangan 1 Ls 41,220,672.11


Dust Proof 1 x 14,5 W 22 876,125
Kanopi 5
AHU 1
Loket 16

Dust Proof 1 x 14,5 W + Battery 3 1,207,356


AHU 1
Kanopi 1
Loket 1

Dust Proof 2 x 14,5 W 4 1,254,543


Loket 3
R.MSUK 1

Dust Proof 2 x 14,5 W + Battery 2 1,917,004


R.MSUK 1
Loket 1

RM TLED 2 x 14,5 W 49 1,041,417


R.Arsip 19
R. Lift 1
Ruang 4 1
Gudang 5
Ruang 2 1
Ruang 3 1
R. Pertemuan Kliring 11
Loker 1
BAS 1
Control Room 3
Ruang 5 1
Satpam 2
AHU 3 2

RM TLED 2 x 14,5 W + Battery 4 1,703,878


R.Arsip 1
Gudang 1
R. Pertemuan Kliring 1
Control Room 1

TLED 1 x 14,5 W 17 459,326


AHU 2
Fire Supression 3
AHU 2 6
Gudang Souvenir 6

Downlight 7 W 24
Sec 1
Hall 12
Toilet Control Room 2
Selasar Tangga 3
Toilet 6

Downlight 7 W + Battery 5
Hall 4
Lorong Toilet 1

Instalasi Lampu 1 25,452,795.34


Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit PVC HI 20 mm 101 252,008

Testing & Commissioning 1 ls 2,788,138

8 Pek. Stop Kontak 1 Ls 13,074,793


R. Security 1 99,281
AHU I 1 99,281
R.MSUK 2 99,281
R. Setbay 4 99,281
AHU II 3 99,281
R. Arsip 2 99,281
R. Gudang Souvenir 3 99,281
Hall 2 99,281
Gudang 2 99,281
Ruang 5 1 99,281
Loker 1 99,281
BAS 1 99,281
Control CCTV 1 99,281
R. Toilet 2 99,281
Ruang 2 1 99,281
Ruang 3 1 99,281
Ruang Pertemuan Kliring 1 99,281

Instalasi Stop Kontak 1 Ls 7,308,228.37


Titik nyala Stop kontak dinding NYM 3 x 2,5 mm² didalam conduit PVC HI 20 mm 29 Titik 252,008

Testing & Commissioning 1 LS 2,788,138

9 Pek. Speaker 1 Ls 21,608,929.43


Ceiling Speaker 30 316,055
Instalasi Ceiling Speaker 30 232,232
Coloumn Speaker 1 745,867
Instalasi Coloumn Speaker 1 232,232
Testing & Commissioning peralatan dan instalasi sound system 1 4,182,207

Ceiling Speaker
AHU 1 Unit
R. MSUK 1 Unit
Ceiling Speaker 1 Unit
Setbay 2 Unit
Security 1 Unit
AHU II 2 Unit
Gudang Souvenir 2 Unit
Hall 4 Unit
R. Arsip 2 Unit
Ruang 4 1 Unit
Gudang 1 Unit
Ruang 2 1 Unit
Ruang 3 1 Unit
Ruang Pertemuan Kliring 2 Unit
BAS 1 Unit
Ruang 5 1 Unit
Satpam 1 Unit
Control CCTV 1 Unit
AHU III 1 Unit
Koridor Toilet 1 Unit
Toilet T5 2 Unit

Tangga Darurat
Column Speaker 1 Unit

Ruang Pertemuan Kliring


Ceiling Speaker 2
BAS
Ceiling Speaker 1

Ruang 5
Ceiling Speaker 1

Satpam
Ceiling Speaker 1

Control CCTV
Ceiling Speaker 1

AHU III
Ceiling Speaker 1

Koridor Toilet
Ceiling Speaker 1

Toilet
Ceiling Speaker 2

10 Pek. Data 1 Ls 47,728,148.58


Switch Hub 2 21,276,682
Outlet Data/Telepon, RJ45 7 164,898
Instalasi Outlet Data/Telepon, UTP Cat. 6 Dalam Conduit PVC 20 mm 7 375,204
Testing and Commissioning 1 1,394,069

R. MSUK 1
Loket 1
Gudang 1
Pertemuan Kliring 1
BAS 1
Satpam 1
Control CCTV 1

11 Pek. Fire Alarm 1 Ls 44,696,219


TBFA 1 1,675,870
Heat Detector 2 1,334,011
R. MSUK Racik 1
R. Limbah Cadangan 1

Smoke Detector 22 1,834,197


R. Loket 2
R. AHU I 1
R. Fire Supression 1
AHU II 2
Gudang Souvenir 1
Hall 4
Ruang 4 1
Gudang 1
Ruang 2 1
Ruang 3 1
R. Pertemuan Kliring 2
BAS 1
Loker 1
Satpam 1
Control CCTV 1
AHU 3 1

12 Pek. Hydrant 1 Ls 23,472,310.20


Indoor Hydrant Box Type B Uk. 750 x 1250 x 180 mm 1 Unit 1,726,654
Landing valve dia. 65 mm 1 Unit 1,726,654
Instalasi 1 Ls 16,157,032
Fire Extinguisher 1 Ls 3,861,969.90

IHB
Koridor Tangga Kliring 1

Landing Valve
Koridor Tangga Kliring 1

Instalasi Pipa Cabang


Dia 80 mm 5.82 387,352
Dia 65 mm 49.52 280,706

Fire Extinguisher 3 kg
Loket 1 519,789
Hall 1
Pertemuan Kliring 1
Koridor Toilet 1
R. Arsip 1
R. Satpam 1

Fire Extinguisher 5 kg
R. Control CCTV 1 743,238

13 Pek. Air Bersih, Air Kotor, dan Kotoran 1 Ls 76,837,321.73


Pipa PPR PN 10 16,665,139.13
- dia. 50 mm 2.13 164,848
- dia. 40 mm 33.56 140,234
- dia. 32 mm 64.25 125,756
- dia. 25 mm 1.70 120,688
- dia. 20 mm 5.43 115,621
- dia. 15 mm 24.23 111,277

Gate Valve 2,391,014.77


Gate Valve dia. 40 mm 2.00 467,448
Gate Valve dia. 32 mm 3.00 401,260
Gate Valve dia. 15 mm 1.00 252,339

Instalasi Air Kotor Pipa PVC AW 45,218,825.85


- dia. 100 mm 278.6 141,165
- dia. 80mm 3 103,004
- dia. 50 mm 4 70,572
- Fitting dia. 100 mm 47.00 105,900
- Fitting dia. 80 mm 4.00 80,418

Instalasi Air Buangan Pipa PVC AW 8,782,222.08


- dia. 80 mm 59 97,792
- dia. 50 mm 10 70,572
- dia. 40 mm 18 56,673
- Fitting dia. 80 mm 16 80,418

Instalasi Vent Cabang Pipa PVC AW 3,358,176


- dia. 32 mm 66.00 m 50,881

U trap dia. 50 mm 421,944


U trap dia. 50 mm 6.00 Bh 70,324

14 Pek. Sumpit dan Pompa 1 Ls 222,792,168.01


Pompa Sumpit Air Kotoran 1 (SWP.1) 1 38,775,038
Pompa Sumpit Air Kotoran 2 & 7 (SWP.2 & SWP.7) 2 40,746,650
Pompa Sumpit Air Kotoran 4 (SWP.4) 1 34,174,610
Pompa Sumpit Air Kotoran 5 & 6 (SWP.5 & SWP.6) 2 34,174,610

15 Pek. Exaust Fan 1 Ls 94,082,770.20

EF-1.3 S/D 1.11 9 1,068,829


Toilet Satpam 1
Toilet Laki-laki 2
Toilet Perempuan 4
Janitor 1
Security 1

EF-1.14
IF-1.14 / 1.15

EF-1.16 (Ruang Fire Supression) 2 14,848,032


Fire Supression 2

IF-1.1 1 27,383,624
Setbay 1

HE.1 1 27,383,624
AHU 1

16 Pengadaan Lift 1 Ls 571,767,511

17 Pembongkaran MEP

G Pek. Toilet 1 Ls
1 Pek. Sanitary 1 Ls 95,187,711.85
Tissue Holder type Ego Series TX 703 AE 4.00 951,321
Closet Type CW 824 NPJ 4.00 9,858,539
Floor Drain Type TX 1 DA 7.00 388,611
Faucet Type TX 133 L 1.00 647,286
Jet Shower Type TX 403 SMCRB 4.00 624,416
Hand Shower Type TX 423 S 2.00 911,482
Urinoir Type UW 447 HJNM W/F 3.00 7,898,876
Westafel Type LW 641 NCJ 4.00 5,140,865
Cubicle Toilet 1.00 28,556,314

2 Pek. Cermin 4 Unit 5,687,802.20


Toilet Area T5 4 Unit 1,421,951

3 Pas. Waterproofing Coating, WpC 1 2,972,026


Lantai Toilet Area T5 26 m2 59,746
Dinding Toilet T5 23.74 m2 59,746

H Pek. Struktur
1 Pek. Galian ,Pondasi dan Pile Cap 1 Ls 39,538,770
Pengeboran + Pek. Beton Bertulang Bor Pile 25,700,007
Galian, Urugan, Buang Tanah 838,794
Pile Cap 12,999,969

2 Pek. Pedestal, Angkur & Grouting 1 Ls 14,280,543


Pedestal 6,062,047
Angkur 4,446,366
Baseplate 3,463,968
Grouting 308,163

3 Pek. Pembesian & Pengecoran Ram 1 Ls 165,303,215.43


Galian Tanah 69.54 100,168
Batu Kapur Padat 500 mm 56.07 262,882
Pasir Urug 100 mm 10.40 278,655
Lantai Kerja 50 mm 104.02 99,895
Plat Lantai T = 300 mm 33.64 3,873,381

4 Pek. Baja 1 Ls 177,480,457.87


Kolom Baja 1,728.22 Kg 28,852
Balok Baja 3,616.03 Kg 28,852
B1 1616.1375 Kg 28,852
B2 1999.8925 Kg 28,852
Gording 807.161833 Kg 28,852
Sambungan Kg

5 Pek. Atap & Flushing 1 Ls 56,796,162.48


Atap 113.495 m2 451,059
Flushing 14.92 m 360,650
1 Unit 222,318

6 Pek. Louvre GRC 1 Ls 17,662,806.48


Struktur rangka dinding GRC L.50.50.5 323.07 Kg 28,852
ANGKUR BAUT 4∅19,L=500mm,A307 40 Bh 123,510
Plat t=10 17.61 Kg 28,852
Kalsiplank tebal 10mm 29.73 m2 97,326

7 Pek. Uditch & Grill 1 Ls 10,434,215.47


Pas. U-ditch uk. 300x400 mm Termasuk Cover 15.192 m' 686,823

8 Pek. Paving Baru Area Kanopi 1 Ls 14,741,678.14


Jalan Paving baru, termasuk base layer 56.3 m2 261,842

9 Pek. Struktur Lift 1 Ls 324,015,706


Pekerjaan Pondasi; (Provisional) 51,557,487
Pekerjaan Pile Cap; Beton bertulang mutu beton K-350 2,279,088
Pekerjaan kolom dan balok separator lift 122,315,039
Pekerjaan Bongkaran 88,652,271
Pekerjaan Atap Baru 59,211,820

10 Perkuatan Struktur 1 Ls 863,230,346


2.1 Pekerjaan Pengecekan Struktur 1 65,031,264.64
Pekerjaan Rebar Scanner (Full Scan) 44 347,739
Pekerjaan Pengupasan Beton 461.32 57,364
Pekerjaan Boring 63.01 79,962
Pekerjaan Pembersihan Puing 524.33 34,766

2.2 Pekerjaan Perbaikan Jacketing 1.00 798,199,081


Pekerjaan Penulangan 2,245.77 11,252
Pekerjaan Bekisting 483.12 118,648
Pekerjaan Cor Beton 53.91 858,787
Pekerjaan Injeksi Grouting 3,472.00 62,579
Pekerjaan Carbon Wrap 483.12 821,353
Pekerjaan Plester 483.12 56,811
Pekerjaan Aci 483.12 32,356
Pekerjaan Cat 483.12 25,141

11 Pekerjaan Parkir 1 Ls 520,532,140


Pekerjaan Pondasi Mini pile; 343,088,907
Pekerjaan pembuatan lubang bor pada tanah dengan diameter borpile 400mm kedalaman 8m,
sebanyak 4 titik, termasuk pembuangan material sisa pengeboran keluar area proyek dan 430.00 m' 184,367
penimbunan kembali
Pekerjaan beton bertulang dengan mutu fc' 30MPa, dengan tulangan utama 8D16 sengkang
54.01 m3 4,779,309
spiral D10-100
Pemotongan kepala tiang (1-1,5m) 43.00 titik 132,112

Pekerjaan Pile Cap; Beton bertulang mutu beton K-350 92,605,067


Galian tanah biasa sedalam 1 m 8.40 m3 89,171
Buang tanah sejauh ± 15 m 8.40 m3 156,091
Urugan pasir urug tebal 10cm 1.05 m3 248,060
Lantai kerja beton tumbuk 1:3:5; t. 50 mm 10.50 m2 88,927
Pile Cap PC1 uk. 400/500/650 0.65 m3 14,533,190
Pile Cap PC2 uk. 1000/500/650 5.53 m3 13,330,309
Pile Cap PC4 uk. 2000/500/650 0.65 m3 9,519,215

Tie-Beam; Beton bertulang mutu beton K-350 84,838,167


Galian tanah biasa sedalam 1 m 15.73 m3 89,171
Buang tanah sejauh ± 15 m 15.73 m3 156,091
Urugan pasir urug tebal 10cm 2.97 m3 248,060
Lantai kerja beton tumbuk 1:3:5; t. 50 mm 29.68 m2 88,927
Tie-Beam T1 uk. 250/500 9.29 m3 8,353,509

I Pekerjaan Batu Candi 1.00 Ls 17,840,007


Pekerjaan Batu Candi 37.32 477,967

J TANGGA DARURAT #1 1.00 Ls 65,759,174


Pas. Lantai Homogenous Tile ukuran 600x600 mm, HT-K1; 4.68 m2 316,450
Pas. Lantai Homogenous Tile ukuran 600x600 mm, HT-E1; 16.85 m2 316,450
Pas. Lantai Homogenous Tile ukuran 600x600 mm, HT-N1; Bordes 19.10 m2 316,450
Pas. Lantai Homogenous Tile ukuran 600x600 mm, HT-N2; 15.85 m2 316,450
Pas. Plint Lantai Homogenous Tile ukuran 100x600 mm, HT-K1 39.64 m' 79,495
Pas. Step Nosing HT-K1 96.90 m' 29,873
Pas. Acian beton exposed 43.93 m2 76,437
Cat Acrylic Emulsion Plafond Interior 43.93 m2 38,219
Pas. Railing Stainless steel hollow ukuran 50x50 mm, setinggi 1000 mm 20.89 m' 1,194,916
Pas. Handrailing Stainless steel hollow ukuran 50x50 mm 39.64 m' 298,729

K PEKERJAAN ARSITEKTUR GEDUNG PENUNJANG FAÇADE 1.00 Ls 90,412,759


Expanded metal termasuk rangka besi hollow uk.20x20 mm finishing cat duco 97.94 m2 923,144

L PEKERJAAN ARSITEKTUR PAGAR 1.00 Ls 1,047,080,727