ITEM PEKERJAAN
A. PEKERJAAN PERSIAPAN
B. PEKERJAAN TANAH
C. PEKERJAAN STRUKTUR BAWAH
D. PEKERJAAN STRUKTUR LANTAI 1 -8
E. PEKERJAAN BAJA
F. PEKERJAAN ARSITEK LT 1 -2
G. PEKERJAAN FAÇADE LT 1-8
H. PEKERJAAN LANDSCAPE
I. PEKERJAAN INSTALASI PEMIPAAN
J. PEKERJAAN ELEKRIKAL
K. PEKERJAAN GAS MEDIS
L. PEKERJAAN PNEUMATIC TUBE
SYSTEM
PEMBANGUNAN RSUD
1. MUTU(SEUAI
2. MUTU (SESUAI SPEKTEK)
SPEKTEK)
PEMBANGUNAN RSUD
2. WAKTU
WAKTU ( 194 HARI )
JUNI JULI
1 2 3 4 5 6
0.52 0.71 0.71 1.44 3.87 3.35
0.52 1.23 1.94 3.38 7.25 10.61
AGUSTUS SEPTEMBER
7 8 9 10 11 12 13 14 15
4.00 3.89 3.45 3.46 4.64 2.15 3.24 3.13 4.49
14.61 18.50 21.95 25.41 30.05 32.19 35.43 38.56 43.05
OKTOBER NOVEMBER
16 17 18 19 20 21 22 23
4.43 4.61 4.57 4.99 5.46 6.37 4.78 4.15
47.48 52.09 56.65 61.65 67.11 73.48 78.26 82.40
DESEMBER
24 25 26 27 28
3.26 3.62 3.75 3.66 3.31
85.67 89.29 93.03 96.69 100.00
PEMBANGUNAN RSUD
1. BAHAN
I STRUKTUR
1 Sewa SSP uk. 400x125x13 mm, panjang 12 m + Bracing 385.00 btg
2 Sewa Skur dari SSP 65.00 btg
3 Pekerjaan urugan tanah kembali 897.11 m3
4 Beton fc' 35 mpa Ready Mix 8,053.21 m3
5 Pembesian Ulir 1,339,723.12 kg
6 Beton fc' 35 mpa Ready Mix 8,053.21 m3
7 Begesting Pondasi 2x pakai 1,411.94 m3
8 Begesting Kolom 2x pakai 5,338.12 m3
9 Begesting Plat 2x pakai 15,538.16 m3
10 Begesting Balok 2x pakai 11,019.52 m3
11 Begesting Balok 2x pakai 11,019.52 m3
12 Begesting Balok 2x pakai 11,019.52 m3
PEMBANGUNAN RSUD
1. BAHAN
II ARSITEK
1 Pekerjaan pas bata ringan tebal 10cm + Perekat 8,738.91 m²
2 Pekerjaan plester instan tebal 10mm 17,319.39 m²
3 Pekerjaan acian dinding 17,319.39 m²
4 Pekerjaan Granite Tile 60x60cm (polished) 2,539.72 m²
5 Pekerjaan Floor Hardener 1,416.52 m²
6 Pekerjaan step nosing (Tangga) 173.00 m²
7 Pekerjaan Granite 60x60cm (unpolished) tangga 13.48 m²
8 Pekerjaan Granite dinding 30x60cm (KM) 77.85 m²
9 Pekerjaan Keramik Lantai 40x40 (unpolished) (KM) 114.30 m²
10 Pekerjaan Keramik Dinding 25x40 (KM) 459.40 m²
11 Pekerjaan vinyl Antibakteri 152.55 m²
12 Pekerjaan granite 30x60cm dengan step nosing (Tangga) 110.40 m²
13 Pekerjaan waterproofing 144.90 m²
14 Pekerjaan Plafond Gypsumboard 9 mm + Rangka 1,724.03 m²
PEMBANGUNAN RSUD
1. BAHAN
II ARSITEK
15 Pemasangan Kloset Duduk monoblock 38.00 bh
16 Pemasangan Kloset Duduk monoblock (disabilitas) 2.00 bh
17 Pemasangan Urinoir 3.00 bh
18 Pemasangan Jet Shower 40.00 bh
19 Pemasangan Kran Stainless Steel 12.00 bh
20 Pemasangan Floor Drain 40.00 bh
21 Pemasangan Washtafel 15.00 bh
22 Pemasangan Penyekat Kubical 9.00 bh
23 Pemasangan Penyekat Urinoir 4.00 bh
24 Pemasangan Spoel Hoek 2.00 bh
25 Pemasangan Grab Bar 26.00 bh
26 Pemasangan Kitchen sink set Stainless Steel 2.00 bh
27 Pengecatan tembok exterior 5,149.45 m²
28 Pengecatan tembok interior cat anti bakteri 458.90 m²
29 Pengecatan coating batu alam 280.40 m²
30 Pengecatan tembok exterior 5,149.45 m²
31 Pengecatan tembok interior 4,150.41 m²
32 Pengecatan Epoxy Dinding Lab sampling 16.80 m²
33 Pengecatan Plafond 153.95 m²
PEMBANGUNAN RSUD
1. BAHAN
II ARSITEK
15 Pemasangan Kloset Duduk monoblock 38.00 bh
16 Pemasangan Kloset Duduk monoblock (disabilitas) 2.00 bh
17 Pemasangan Urinoir 3.00 bh
18 Pemasangan Jet Shower 40.00 bh
19 Pemasangan Kran Stainless Steel 12.00 bh
20 Pemasangan Floor Drain 40.00 bh
21 Pemasangan Washtafel 15.00 bh
22 Pemasangan Penyekat Kubical 9.00 bh
23 Pemasangan Penyekat Urinoir 4.00 bh
24 Pemasangan Spoel Hoek 2.00 bh
25 Pemasangan Grab Bar 26.00 bh
26 Pemasangan Kitchen sink set Stainless Steel 2.00 bh
27 Pengecatan tembok exterior 5,149.45 m²
28 Pengecatan tembok interior cat anti bakteri 458.90 m²
29 Pengecatan coating batu alam 280.40 m²
30 Pengecatan tembok exterior 5,149.45 m²
31 Pengecatan tembok interior 4,150.41 m²
32 Pengecatan Epoxy Dinding Lab sampling 16.80 m²
33 Pengecatan Plafond 153.95 m²
PEMBANGUNAN RSUD
1. BAHAN
II ARSITEK
34 Pekerjaan hospital plint 236.63 m²
35 Pekerjaan handril 236.63 m²
36 Pekerjaan Railing Railing Pipa Galvanish Diameter 2” 101.80 m²
37 ACP 1 (Warna Orange Tua) 2,311.85 m²
38 ACP 2 (Warna Orange Muda) 1,200.77 m²
39 ACP 3 (Warna Abu-abu) 4,541.30 m²
40 ACP 4 (Warna Cream/Putih) 4,363.89 m²
41 Pekerjaan Railing Tangga Pipa besi lingkaran 2 inci 116.31 m²
42 Pekerjaan Hollow Fasade 100x100x4,5 mm + Finish 197.60 m²
43 Pekerjaan Kaca Kanopi Laminated t=6mm+6mm (double) 82.10 m²
44 Pekerjaaan Spider kaca 4 kaki 69.00 m²
45 Letter Acrylic + Neon t= 1,80 m "GEDUNG PAVILIUN " 14.00 m²
46 Letter Acrylic + Neon t= 1,30 m "PAVILIUN " 8.00 m²
47 Logo Acrylic "RSSA MALANG" uk. 228x227 cm 1.00 m²
48 Letter Acrylic + Neon t= 40cm "BASEMENT" 8.00 m²
49 Logo Acrylic "RSSA MALANG" uk. 131x151 cm 1.00 m²
50 Letter Acrylic + Neon t= 1,50 m "PAVILIUN RSSA" 12.00 m²
51 Pekerjaan waterproofing Membran Tempel 1,660.96 m²
52 Pekerjaan Saluran U Ditch 40x40x120 + Cover 151.00 bh
53 Pekerjaan Saluran U Ditch 40x60x120 + Cover 266.00 bh
PEMBANGUNAN RSUD
2. ALAT
PEMBANGUNAN RSUD
PEKERJAAN PERSIAPAN
SITE MANAGEMENT
: TOWER CRANE
: PRODUKSI BESI
: PRODUKSI BEKISTING
: BARACK PEKERJA
: DIREKSI KEET
: POS SECURITY
: GERBANG PROYEK
R
A
D
60
M
PEMBANGUNAN RSUD
MANAGEMENT K3
SAFETY PROGRAM
SAFETY SAFETY
ACCIDENT INDUCTION INSPECTION
Every New
Zero Employe Every Day
ACCIDENT
Target untuk kecelakaan yang ingin di capai oleh PT. PERMATA ANUGERAH
YALAPERSADA adalah tidak ada fatality dalam setiap kegiatan proyek.
SAFETY INDUCTION
Pemberian pengenalan peraturan safety proyek kepada setiap karyawan dan sub
kontraktor serta mandor yang terlibat dalam peroyek ini untuk partisipasi dan tanggung
jawab terhadap keselamatan kerja oleh semua pihak.
SAFETY INSPECTION
Melakukan inspeksi pada setiap hari, setiap kegiatan, lingkungan dan peralatan yang
memungkinkan untuk terjadinya kecelakaan dan melakukan tindakan pencegahannya
secara langsung serta membuat sistem pelaporan.
PEMBANGUNAN RSUD
MANAGEMENT K3
MASKER
PEMADAM
SEPATU PROYEK PERSEDIAAN P3K
KEBAKARAN
OUT
F2
JALAN DIALIHKAN SEMENTARA KARENA ADA
PEMBANGUNAN GEDUNG
IN
MANAGEMENT K3
PEMBANGUNAN RSUD
PEKERJAAN PEMBESIAN
STAR
T Pekerjaan Personil Material Peralatan
Fabrikasi
Inspeksi Perbaiki
FINIS
H
PEMBANGUNAN RSUD
PEKERJAAN BEKISTING
A
START
START
Perakitan panel - Pengukuran Persiapan
Full/Semi Table Beam - Shop drawing besi Persiapan Cor
tulangan
NO Pembersihan
Check Perbaikan
Inspeksi 3 Ulang
Pemasangan bekisting
Fabrikasi
Full/Semi Table Beam
Pengecoran
NO
Inspeksi 1 Perbaikan
Pemadatan
Pemasangan Perataan
besi tulangan
pelat
NO Perbaikan Curing
Inspeksi 2
Pembongkaran bekisting
FINISH
A
PEMBANGUNAN
PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR
LANTAI 2
PEKERJAAN STRUKTUR
LANTAI 3
PEMBANGUNAN RSUD
PEKERJAAN STRUKTUR
Mulai
Mulai
Pengajuan gambar shopdrawing
Pengajuan gambar shopdrawing
Penentuan kepala plesteran
Inspeksi
NO YES
Ampelas, dan bersihkan permukaan
Inspeksi
NO YES
Cat Finish
Inspeksi
NO YES
Selesai
PEMBANGUNAN RSUD
Mulai
Mulai
Pengajuan gambar shopdrawing
Pengajuan gambar shopdrawing
Marking penentuan elevasi penggantung di dinding
Marking penentuan start point
Pasang penggantung
Buat kepala pas granit
Pasang rangka tepi di dinding
Inspeksi
NO YES Inspeksi
Granit di rendam NO YES
Lanjutkan pemasangan
Lanjutkan pemasangan
Pas rangka sesuai jarak di gambar
Cek elevasi kerataan
Inspeksi
Inspeksi NO YES
NO YES Ratakan sambungan gypsum Selesai
Selesai
PEMBANGUNAN RSUD
PEKERJAAN SANITARY
Mulai
Inspeksi
PEMBANGUNAN RSUD
PEKERJAAN ARSITEK
START PEKERJAAN PLESTERAN DENGAN JANGAN LUPA MENYIRAM BATA SEBELUM LAKUKAN FINISHING ACIAN STELAH PLESTE
BUAT KEPALA PLESTERAN
KEPALA PLESTER SEBAGAI ACUAN SEBELUM MENERUSKAN PLESTERAN RAN DENGAN MEMPERHATIKAN KERATAAN
PERMUKAAN DINDING
MARKING AS DINDING PAS. KEPALA DINDING CEK ELEVASI TIAP 1 METER PAS DINDING SAMPAI ELEVASI SESUAI GAMBAR
TENTUKAN START POIN BUAT KEPALA KERAMIK PASANG KERAMIK DENGAN MENGIKUTI LAKUKAN PEMBERSIHAN ANATR KERAMIK
DENGAN TARIAN BENANG TERLEBIH DAHULU KEPALA KERAMIK SEBELUM PENGENATAN
PEMBANGUNAN RSUD
PEKERJAAN FACADE
Mulai
Pekerjaan Persiapan
Aproval Material
Inspeksi
NO YES
Pemasangan Rangka / Struktur suport Fasade
Pemasangan
Finishing
Selesai
PEMBANGUNAN RSUD
PEKERJAAN FACADE
LETTER
ACP
PEMBANGUNAN RSUD
START
APPROVAL MATERIAL
PEKERJAAN INSTALASI
CONNECTING INSTALASI
PROCESSING
YES NO
FINISH
PEMBANGUNAN RSUD