Anda di halaman 1dari 90

Kepada Yth.

1. The Laguna Resort & Spa


2. Hotel Hyatt Regency
3. PT Pacific Resort Buana
4. Hotel Bali Sol
5. Proyek P.T.HII.
6. Nusa Indah Hotel
7. Nusa Dua Beach Hotel
8. N-5 Resort Project
9. Hotel The Ritz Carlton
10. Hilton Bali Resort
11. PT. Mulia Graha Tatalesta
12. PT. Baliprada Segara
13. PT. Pancaran K. Adiprima
14. Bali Hyatt Resort
15. PT. Para Bali Propertindo
16. PT. Oriental Indah Bali H
17. Hotel Pertamina Cott
18. PT Indonesia Paradise I
19. PT Tiara Raya Bali Inter
20. Bali Intercontinen-
21. PT. Karang M. Sejahtera
22, PT. Asia Pasifik Properti
23. PT. Graha Alam Lestari
24. PT. Garuda Adhimatra Ind.
25. PT. Bali Turtle Island Development
26. DRC PT. BRI
27. Hotel Mercure
28. Hotel Ulu Segara
29. Bali Nusa Dua Convention Centre
30. PT. Angkasa Pura I
31. PT ITDC
17. PT. Indonesian Paradise I
19. PT. Tiara Raya Bali Inter
PT. PLN (PERSERO) MINUTES OF MEETING
UNIT INDUK
DISTRIBUSI BALI WORKSHOP DAMPAK KEDIP TEGANGAN TERHADAP PELANGGAN TM

Lokasi Hotel Mercure (Hybrid)

Rabu, 14 Sept 2022


Tanggal
09:00 WIB s.d Selesai

1. Acara dibuka oleh EVP RJD Bapak IB Ari Wardana, dihadiri oleh 32 perwakilan Venue
G20
2. Pemaparan kesiapan PLN dalam mendukung KTT G20 disampaikan oleh GM UID
Bali dan SRM Dist UID Bali. Dengan point-point sebagai berikut :
a. Untuk mensukseskan KTT G20 2022, Program kerja PLN terdiri dari Program
Keandalan ( termasuk assessment IML ), Program Beautifkasi, Penyediaan
SPKLU, Showcase EBT.
b. Peralatan Pendukung yang disiapkan untuk meningkatkan keandalan adalah
UPS ( Uninterruptible Power Supply ): 123 Unit, UGB ( Unit Gardu Bergerak ) :
36 Unit, UKB ( Unit Kabel Bergerak ) : 29 Unit, Genset : 68 Unit
c. Jumlah Personil siaga sebanyak 1.079 personil siaga, dengan rincian
Pembangkitan : 25 orang, Transmisi & Operasi Sistem : 420 orang, Distribus :
612 orang, Icon+ : 22 orang
d. Rencana pengamanan pasokan kelistrikan terdiri dari 4 kriteria.
e. PLN melakukan assesment IML di venue G20 dengan melibatkan Pusertif dan
PPILN (Lembaga Inspeksi Teknik Tegangan Rendah). Sampai saat ini telah
dilakukan asesmen IML sebanyak 24 lokasi dari 30 lokasi venue G20. Hasil
assesment akan segera disampaikan ke masing-masing venue untuk dilakukan
tindak lanjut sesuai rekomendasi. Diharapkan tindaklanjut selesai paling lambat
15 Oktober 2022
f. PLN menyampaikan jadwal pemasangan UPS dimasing-masing venue dan
penempatan personil di masing-masing lokasi siaga.
g. Dukungan yang diperlukan dari pihak pelanggan sebagai berikut : Ijin
pemasangan UPS, Kesiapan Genset Pelanggan, Kesiapan Bahan Bakar minimal
24 jam Operasi, Penyesuaian setting peralatan, Kapasitas daya kontrak versus
prediksi beban saat KTT G20, Tindak lanjut rekomendasi hasil asesmen IML, Ijin
penempatan personil dan posko PLN, Penempatan personil dari internal Venue,
kesepakatan jadwal simulasi real peralihan beban dari Suplai utama ke suplai
PT. PLN (PERSERO) MINUTES OF MEETING
UNIT INDUK
DISTRIBUSI BALI WORKSHOP DAMPAK KEDIP TEGANGAN TERHADAP PELANGGAN TM

Lokasi Hotel Mercure (Hybrid)

Rabu, 14 Sept 2022


Tanggal
09:00 WIB s.d Selesai

cadangan dan dukungan update informasi apabila ada kegiatan Side Event
maupun Main Event di masing-masing venue.
3. Pelaksanaan sharing dampak kedip tegangan pada pelanggan TM, disampaikan oleh
Bapak DR. Ir. Nanang Hariyanto M.T dengan point-point sebagai berikut :
a. Pemaparan voltage Dip
b. Studi kasus rekaman PQM saat terjadi ganggauan 14 Juli 2022
c. Definisi SAG/DIP, dimana DIP merupakan sebuah kejadian probabilistic, adalah
fenomena yang pasti terjadi di system tenaga listrik terinterkoneksi dan kinerja kualitas
tegangan sebaiknya mengikuti standar yang berlaku (CBEMA / ITIK)
d. Analisis dampak sisi pembangkitan dan jaringan terhadap voltage recovery
e. Sosialisasi curva CBEMA dan kurva ITIK
f. Rekomendasi nilai seting proteksi sisi pelanggan sebagai berikut :
g. Jangka Pendek
Ke Pelanggan :
- Mengubah seting UVR 80% durasi 0,5 s.d 10 detik di rele utamapelangan
- Mengubah seting OVR 120% instant di rele main pelanggan
- Menonaktifkan seting UFR/OFR di rele main pelanggan
Ke PLN :
- Mengaktifkan AVR di Kit subsistem Bali dalam metode menjaga tegangan
(Voltage Constant)
- Kajian dan pengaktifkan switching automatisasi dari kompensator daya reaktif
(kapasitor bank dan reactor shunt) untuk mengendalikan recovery voltage dari
tegangan.
Jangka Panjang
Ke Pelanggan :
- Penggunaan peralatan untuk mengurangi dip di beban sensitive atau venue
penting (UPS, Dip, Compensator)
Ke PLN :
- Kajian dan penggunaaan STATCOM terdistribusi di jaringan 20 kV
PT. PLN (PERSERO) MINUTES OF MEETING
UNIT INDUK
DISTRIBUSI BALI WORKSHOP DAMPAK KEDIP TEGANGAN TERHADAP PELANGGAN TM

Lokasi Hotel Mercure (Hybrid)

Rabu, 14 Sept 2022


Tanggal
09:00 WIB s.d Selesai

4. Tanya jawab
a. BNDCC (Bapak Putu Suwendra) : sharing terkait kejadian Arching disisi instalasi
internal dengan lesson learn pemasangan ACB harus memenuhi jarak aman
antar phasa.
b. Bandara Ngurah Rai (Bapak Dewa Yoga) : Meminta dukungan perkuatan
pasokan ke VVIP bandara yang baru dan dalam waktu dekat akan disurvey oleh
tim PLN untuk dilakukan perkuatan
c. Hotel Hyatt Sanur (Bapak Ketut Sumentra): Pada saat kedip di sisi PLN terjadi
kerusakan pada PCB Lift dan telah dilakukan mitigasi dengan penambahan
Voltage Security device
5. Catatan penting :
a. Masing-masing Venue akan melakukan pengecekan nilai seting dan akan
menyesuaikan dengan rekomendasi yang disampaikan. jika diperlukan supervisi
dari ITB agar berkordinasi dengan PLN untuk dapat mengundang Bapak Dr. Ir.
Nanang Hariyanto M.T.
b. Para account Executive akan segera mengkordinasikan jadwal pemasangan
UPS dan simulasi dengan pihak engineering venue.

Dokumentasi :
PT. PLN (PERSERO) MINUTES OF MEETING
UNIT INDUK
DISTRIBUSI BALI WORKSHOP DAMPAK KEDIP TEGANGAN TERHADAP PELANGGAN TM

Lokasi Hotel Mercure (Hybrid)

Rabu, 14 Sept 2022


Tanggal
09:00 WIB s.d Selesai
PT. PLN (PERSERO) MINUTES OF MEETING
UNIT INDUK
DISTRIBUSI BALI WORKSHOP DAMPAK KEDIP TEGANGAN TERHADAP PELANGGAN TM

Lokasi Hotel Mercure (Hybrid)

Rabu, 14 Sept 2022


Tanggal
09:00 WIB s.d Selesai
PT. PLN (PERSERO) MINUTES OF MEETING
UNIT INDUK
DISTRIBUSI BALI WORKSHOP DAMPAK KEDIP TEGANGAN TERHADAP PELANGGAN TM

Lokasi Hotel Mercure (Hybrid)

Rabu, 14 Sept 2022


Tanggal
09:00 WIB s.d Selesai
KAJIAN SAGGING TEGANGAN SUBSISTEM
BALI

Dr. Ir. Nanang Hariyanto, M.T.


Rizky Rahmani, S.T., M.T.
Dr. Kevin Marojahan B N, S.T., M.T.

Bali – 14 September 2022


Voltage Dip
Melihat kejadian 14 Juli 2022
Monitoring Dip/Sag – PQ Meter
Pemasangan PQM:
1. Kualitas tegangan dimonitor menggunakan
Power Quality Meter (PQM) yang dipasang pada
titik sambungan atau GI pemasok pelanggan
2. Setiap kejadian kedip tegangan terekam dalam
bentuk grafik dan nilai yang masuk dalam
kategori kedip sesuai standar (IEC / Grid Code)
dan seting trashhold
3. PQM dapat memonitor besaran dan periode
kedip tegangan
Rekaman PQ meter – 14 Juli 2022

Terjadi dip dengan kedalaman 40-50% dan durasi 200-an milidetik di banyak lokasi di tanggal 14 Juli 2022.
Definisi Sag dan Dip
• Berdasarkan IEEE Standard 1159-1995, voltage sag merupakan variasi
tegangan rms dengan besar antara 10% sampai 90% dari tegangan
nominal dan berlangsung selama 0,5 siklus sampai satu menit.
Sag dan Dip
Penyebab Dampak

• Gangguan pada jaringan • Memory loss pada komputer


distribusi & transmisi • Redupnya pencahayaan
• Gangguan dan starting motor • Motor stalling
pada jaringan pelanggan
• Bekerjanya sistem proteksi
• Shutdown peralatan
Jaringan distribusi
Performa Dip/Sag
Jml Ggn
Sistem Trans
Kali Kedip
Jml Ggn
Distribusi

Topologi
Kedip Kedalaman Sistem
Tegangan Kedip
Tipe
gangguan

Clearing Ggn
(Proteksi + PMT)
Durasi
Kedip
Respons
beban + Kit
Dip – sebuah kejadian
probabilistik
Ilustrasi pada saluran transmisi
SLD Simulasi - saluran transmisi dan distribusi

JENIS KUBIKEL AREA UNIT TIPE JARINGAN SKTM (m) SKUTM (m) SUTM (m)

penyulang BATAN ULP KUTA SKTM 2782 0 0

penyulang BATAN ULP KUTA SKTM, SKUTM, SUTM 2446 5304 9221

penyulang BATAN ULP KUTA SKTM, SKUTM, SUTM 102 5827 18255

penyulang BATAN ULP KUTA SKTM, SKUTM, SUTM 1347 7746 28676

penyulang BATAN ULP KUTA SKTM, SKUTM, SUTM 4963 20401 16802

penyulang BATAN ULP KUTA SKTM 13783 0 0

penyulang BATAN ULP KUTA SKTM 800

penyulang BATAN ULP KUTA SKTM 1334 0 0

penyulang BATAN ULP KUTA SKTM 3516 0 0

penyulang BATAN ULP KUTA SKTM, SKUTM 29679 1192 0


Model Jaringan tegangan tinggi (150 kV)
Pengamatan Dip/sag Tegangan
1. Pembuatan plot voltage dip dilakukan dengan menggunakan asumsi model gangguan sebagai berikut.

Fault Type Probability


LLL 2.5%
Fault Frequency:
Asumsi: LLG 7.5%
Saluran Transmisi = 0.02 year/km
LL 10%
Saluran Distribusi = 0.1 year/km
LG 80%

2. Plot sumbu X menyatakan remaining voltage value (p.u.) dan sumbu Y adalah peluang kejadian selama 1 tahun
Voltage Sag Plot
Voltage Dip akibat gangguan di jaringan interkoneksi (trans & distribusi)  Niscaya terjadi!

Berpotensi
terjadi 15-16
Probabilitas
(kali/tahun)

kali/tahun

Sisa tegangan
(per unit)
Terkait voltage recovery
Durasi voltage Dip
Durasi Dip – Kontribusi Kit dan Beban

90%
80%

Respons Kit +
beban

90%
80%

Rele
proteksi
+PMT
Respons Beban terhadap Dip – Motor Induksi
• Dip 150 ms, sisa tegangan 10%

Saat dip, motor kehilangan kecepatan Saat suplai sudah recover, motor “menarik”
dan kembali “restart” saat tegangan arus tinggi yang berakibat dropnya tegangan
pulih dan memperlambat voltage recovery
Analisis Dampak sisi
Pembangkitan dan Jaringan
terhadap voltage recovery
Hasil Simulasi – Dampak Jarak dari GI

• Sisi 150 kV pulih dengan cepat saat


gangguan telah berhasil diisolir
• Sisi 20 kV memiliki respon yang lebih
lambat bergantung kepada lokasi dari
beban
• Semakin jauh beban dari gardu induk,
semakin lambat pulihnya tegangan
Alternatif Solusi -
STATCOM

2.33 MW
0.99

15 km

Alternatif solusi d-statcom dapat menurunkan


durasi recovery tegangan di ujung saluran sebesar 50% (dari 400
ms ke 200 ms)
Pembangkit: dampak AVR – Subsistem Bali
• Fault 3 fasa solid Gianyar – Sanur
• Clear 120 ms (trip)
• Reclose 1000 ms
• AVR Kit Celukan bawang dan Kit Pesanggaran MVAR constant
Dip 196 ms
Pembangkit: dampak AVR – Subsistem Bali
• Fault 3 fasa solid Gianyar – Sanur
• Clear 120 ms (trip)
• Reclose 1000 ms
• AVR Kit Celukan bawang dan Kit Pesanggaran V constant
Dip 128 ms
Dampak Kapasitor
75 MVAR, Nusa Dua

AVR Kit Pesanggaran dan Kit Celukan Bawang Q const


Dip 139 ms
Rekapitulasi mengenai lambatnya recovery
tegangan
• Diakibatkan respons pembangkit dan sifat/respons beban
• Beban motor cenderung menarik arus tinggi saat tegangan recover,
mengakibatkan normalisasi tegangan lebih lama
• Beban diharapkan mampu ride-through terhadap voltage dip
• Pembangkit sebaiknya mampu menjaga tegangan terminal (bukan hanya MVAR)
secara responsive untuk mempercepat durasi voltage recovery
• Jaringan sebaiknya lebih responsive menjaga tegangan sistem dengan kompensasi
daya reaktif yang lebih responsive
Standar Pelayanan Tegangan
• Universal standard voltage tolerance curves include ITIC (Information Technology
Industry Council) curve that formerly known as CBMEB (Computer & Business
Equipment Manufacturers Association) for information and technology industry
• SEMI (Semiconductor Equipment Materials International) F47 curve for the
semiconductor industry,
• Five types of voltage sags proposed by the CIGRE/CIRED/UIE joint working group
C4.110 [10].

• Any of the curves mentioned can describe the voltage tolerance capability of
arbitrary sensitive equipment including VFDs
Kurva CBEMA dan ITIC
Komparasi Kurva Performa Tegangan

ITIC merupakan
salah satu
Syarat yang
paling strict

ITIC mengatur
standar untuk
alat IT, sehingga
motor dan
peralatan lain
semestinya juga
mampu immune
Rekomendasi setting proteksi utama
Rele Rekomendasi Setting Alasan
OVR 120%, instan Untuk menghindari kerusakan peralatan, sesuai dengan
standar kualitas tegangan ITIC
UVR 80%, 0,5 detik – 10 detik Untuk menghindari padam total sisi pelanggan akibat dip
selama beberapa ratus milidetik.

Sebagai pembanding, jika setting terlalu cepat, ada risiko


changeover ke genset bisa memakan waktu puluhan detik
sampai genset memikul beban, padahal suplai dari PLN
sudah kembali dalam orde ratusan milidetik.
OFR Nonaktif Frekuensi sistem sudah dijaga oleh pasokan interkoneksi
Jawa-Bali antara 49-51 hz
UFR Nonaktif Frekuensi sistem sudah dijaga oleh pasokan interkoneksi
Jawa-Bali antara 49-51 hz
Ilustrasi Risiko Setting Proteksi Utama Terhadap
Dip
Proteksi Pelanggan A Pelanggan B Pelanggan C
Setting OVR 105%, delay 0 ms (instan) 120%, 1 detik 120%, instan
Setting UVR 90%, delay 0 ms (instan) 80 %, 20 ms 95%, 5 detik
Setting OFR Nonaktif Nonaktif 51 Hz, 1 detik
Setting UFR Nonaktif Nonaktif 48 Hz, 1 detik

Pelanggan A
OVR terlalu rendah dan cepat, berisiko trip saat voltage recovery, UVR terlalu rendah cepat, berisiko trip saat gangguan/starting motor
OFR dan UFR sudah tepat, karena frekuensi sudah dikendalikan oleh PLN (rentang normal 49 s.d. 51 Hz)

Pelanggan B
OVR setpoin baik, namun terlalu lama, berisiko alat rusak akibat overvoltage, UVR setpoin baik namun terlalu cepat, berisiko trip saat
gangguan/starting motor, OFR dan UFR sudah tepat.

Pelanggan C
OVR sudah tepat, melindungi alat dari overvoltage, UVR setpoin terlalu tinggi, berisiko trip pada operasi normal (tegangan PLN 90%-
105%), OFR dan UFR sebaiknya dinonaktifkan.
Mitigasi Dip Lain (non main feeder)
• Back up UPS untuk venue dan peralatan sensitif
• Pengaturan spesifikasi chiller dan AC untuk mengaktifkan dip ride through,
ataupun pemasangan alat voltage dip-ride through
• Coil Hold-in Devices untuk kontaktor
• Voltage dip compensator (untuk sistem kontrol mesin)
• Auto-restart untuk peralatan-peralatan sensitif seperti lift.

Referensi: Power Quality Handbook, CLP Hongkong


Kesimpulan
• Voltage dip adalah fenomena yang pasti terjadi di sistem tenaga listrik
terinterkoneksi
• Kinerja kualitas tegangan sebaiknya mengikuti standar yang berlaku (CBEMA/ITIC)
Rekomendasi
• Jangka Pendek
• Mengubah setting UVR 80%, durasi 0.5 s.d. 10 detik di rele main pelanggan
• Mengubah setting OVR 120%, instant di rele main pelanggan
• Menonaktifkan setting UFR/OFR di rele main pelanggan
• Mengaktifkan AVR di Kit Subsistem Bali dalam mode menjaga tegangan (voltage constant)
• Kajian dan pengaktifan switching automatis dari kompensator daya reaktif (kapasitor bank dan
reaktor shunt) untuk mengendalikan recovery voltage dan tegangan jaringan

• Jangka Menengah - Panjang


• Penggunaan peralatan untuk mengurangi dip di beban sensitif atau venue penting (UPS, dip
compensator)
• Kajian dan penggunaan STATCOM terdistribusi di jaringan 20 kV

Note:
Pelanggan
PLN
Terima Kasih
KOLABORASI PLN DAN
PELANGGANNYA DALAM
MENSUKSESKAN KTT G20 - 2022
POWERED BY

Denpasar, 14 September 2022


POWERED BY

OUTLINE :
1. EXECUTIVE SUMMARY
2. KELISTRIKAN SUBSISTEM BALI
3. POLA PENGAMANAN LOKASI VENUE
4. PETA RISIKO
5. MITIGASI RISIKO
6. ASSEMENT INSTALASI MILIK PELANGGAN
7. POSKO SIAGA DAN PERALATAN PENDUKUNG KTT
G20
8. RENCANA PENEMPATAN PERSONIL
9. DAFTAR ALOKASI UPS
10. JADWAL PEMASANGAN UPS
11. DUKUNGAN
EXECUTIVE SUMMARY
POWERED BY

1 Sekilas KTT G20 2 Program Kerja PLN


KTT G20 adalah kelompok internasional yang terdiri dari Untuk mensukseskan KTT G20 2022, Program kerja PLN
Argentina, Australia, Brazil, Kanada, China, Uni Eropa, terdiri dari :
Francis, Jerman, India, Indonesia, Italia, Jepang, Meksiko, • Program Keandalan ( termasuk assessment IML )
Rusia, Arab Saudi, Afrika Selatan, Korea Selatan, Turki, • Program Beautifkasi
Inggris, dan Amerika Serikat. Peserta yang hadir baik • Penyediaan SPKLU
secara fisik juga dihadiri secara virtual. • Showcase EBT

Sesuai Keputusan Presiden Republik Indonesia Nomor 12


Tahun 2021 Tentang Panitia Nasional Penyelenggara
Presidensi G20 Indonesia Tahun 2022, Keppres No 18 3 Kesiapan Peralatan Pendukung & Personil
tahun 2021 Tentang Perubahan Atas Keputusan Presiden a. Peralatan Pendukung :
Nomor 12 Tahun 2021 Tentang Panitia Nasional • UPS ( Uninterruptible Power Supply ): 123 Unit
Penyelenggara Presidensi G20 Indonesia Tahun 2022 , dan • UGB ( Unit Gardu Bergerak ) : 36 Unit
Keppres No 3 Tahun 2022 tentang Perubahan Kedua Atas • UKB ( Unit Kabel Bergerak ) : 29 Unit
Keputusan Presiden Nomor 12 Tahun 2021 Tentang Panitia • Genset : 68 Unit
Nasional Penyelenggara Presidensi G20 Indonesia Tahun b. Personil : 1079 personil siaga
2022 pada Pasal 3 Ayat (2) Penyelenggaraan KTT G20 • Pembangkitan : 25 orang
Tahun 2022 dilaksanakan pada kuartal keempat tahun 2022 • Transmisi & Operasi Sistem : 420 orang
di Provinsi Bali. • Distribus : 612 orang
• Icon+ : 22 orang

#PLNSukseskanKTTG20
EXECUTIVE SUMMARY
POWERED BY

4 Informasi sementara yang berkembang, terdapat 34 5 Rencana pengamanan pasokan kelistrikan :


Lokasi Venue yang akan menjadi tempat penyelenggaran 1. Kriteria 1 ( N-4 )
acara : Supply utama penyulang PLN, Back up 1 : Penyulang
1. Venue Utama : PLN dari GI Berbeda via Automatic Change Over TM,
• Hotel Apurva Kempinski Back up 2 : UPS PLN, Back up 3 : Genset PLN, Back
• Garuda Wisnu Kencana up 4 : Genset Pelanggan dengan Personel Siaga &
• Bali Turtle Island Development ( BTID ) Teknisi On Site
• Mangrove Tahura 2. Kriteria 2 ( N-3 )
Supply utama penyulang PLN, Back up 1 : Penyulang
2. Venue Menginap : PLN dari GI Berbeda atau sama via Automatic Change
• Hotel dikawasan ITDC Over TM / Remote Control , Back up 2 : UPS PLN (
• Hotel dikawasan Nusa Dua genset PLN Optional ), Back up 3 : Genset Pelanggan
• Hotel dikawasan Jimbaran dengan Personel Siaga & Teknisi On Site
• Hotel dikawasan Kuta 3. Kriteria 3 ( N-2 )
• Hotel dikawasan Sanur Supply utama penyulang PLN, Back up 1 : Penyulang
PLN dari GI Berbeda atau sama via remote control /
3. Rumah Sakit Rujukan : manual, Back up 2 : Genset Pelanggan dengan
• 6 Rumah sakit lokasi tersebar Personel Siaga & Teknisi mobile.
4. Kriteria 1 ( N-1 )
Supply utama penyulang PLN, Back up 1 : Penyulang
PLN dari GI Berbeda atau sama via remote control /
manual dengan Personel Siaga & Teknisi mobile.
#PLNSukseskanKTTG20
SMNEP

UPT GRESIK

KELISTRIKAN SUB SISTEM BALI TAHUN 2021-


BKLAN GLUK

G
G
N
2022
SAMPG PMKSN
Daya Mampu vs Beban Puncak
POWERED BY
UPT SURABAYA
442 MW
485 MW (31%)
GRATI 1 (41%)

G 1322 1422
GDTAN
PIER
PBLGO
GDING
PAITON STBDO
837
980

AAN RJOSO
KRSAN
PWSRI TH 2021 TH 2022 (RELOKASI TH 2022 TH 2022 (PREDIKSI
GRATI 1 X 100 MW) MODERAT)
BDWSO
DAYA MAMPU (MW) BEBAN PUNCAK (MW)
AN PMRON
LJANG GLNUK CLBWG

TNGUL JMBER
1. Reserve Margin Tahun 2022 BP sd September
NGARA

GTENG
BWNGI BRITI
Sebesar 485 MW (37%)
PNGAN 2. Reserve Margin Tahun 2022 KTT G20 Sebesar 442
PUGER
UPT PROBOLINGGO
GNYAR
MW (31%)
ASARI
AMPRA

TNLOT
PBIAN
NO KIT/TRANSFER DM 2021 DM 2022
PKLOD
SANUR
1 KIT BALI 952 MW 952 MW
PSGRN
BNDRA

TRANSMISI GARDU INDUK 2 TRANSFER JAWA 370 MW 370 MW


PCATU NSDUA

500 kV 500 kV 3 RELOKASI GRATI 100 MW


SKLT JAWA BALI – 4 SIRKIT
150 kV 150 kV TOTAL 1.322 MW 1.422 MW
Transfer dari Jawa 370 MW
70 KV 70 KV
Demand Tertinggi Bali Th 2022
837 MW (13 Mei 22)

#PLNSukseskanKTTG20
POLA PENGAMANAN LOKASI VENUE KTT G20
(1/2)Terdapat 34 lokasi yang menjadi focus pengamanan tediri dari 4 Venue Utama, 1 Bandar Udara, 23 Hotel
POWERED BY
tempat menginap delegasi dan 6 RS rujukan, dengan 4 kriteria pengamanan SPKLU Ultra Fast CHarging

4 Lokasi Venue Utama 7 Hotel ITDC 3 Hotel Kuta 1. Kempinski


2. ITDC
1. The Apurva 1. Sofitel 1. Trans Hotel
Kempinski 2. Nusa Dua Hotel 2. Patra Bali 11 Lokasi Home Charging
2. GWK 3. Sheraton Laguna 6 Hotel 3. Sheraton Kuta
3. Mangrove Tahura 4. Merusaka Hotel 1. BICC 7. Westin
Menginap
4. BTID 5. Melia Bali Menginap 2. BNDCC 8. Laguna
Kepala
6. Grand Hyatt Delegasi 3. Samabe 9. Merusaka
Negara
7. Westin Hotel (Jimbaran) 4. Hilton
1 Bandar Udara 6 Lokasi (ITDC) 10. Grand Hyatt
Menginap Amphi 5. Ritz Carlton
Ballroom/ 11. St Regis
1. Bandara Ngurah Rai Delegasi Theatre 6. Mulia
Hall 2 Hotel
GWK, (Kuta)
Menginap Hotel 6 RS Rujukan Covid 19
Mangrove Menginap Tempat
6 Lokasi Ballroom/Hall Kepala 1. RS Sanglah
Tahura Delegasi Wisata
7 Hotel Negara Hotel 2. RS Bali Mandara
1. BNDCC dan BTID (Sanur)
The Menginap (Sanur) Menginap
2. BICC 3. RS Wangaya
Apurva Kepala Delegasi Bali
3. Sofitel 4. RS Siloam
Kempinski Negara (Nusa Colection
4. Ritz Carlton 5. RS BIMC
Bandara (Nusa Dua) SPKLU Dua) 6. RS Udayana
5. The Mulia Command
Ngurah Ultra Fast Center Tempat
6. Hilton Bali
Rai 4 Hotel Charging ITDC Wisata
Menginap SPKLU Kriteria Pengamanan Lapis 4 ( 2 Sumber
4 Hotel Jimbaran Kepala Home Peninsula PLN dari GI Berbeda, UPS PLN, Genset
Negara 3 Hotel Charging PLN, Genset Pelanggan dan personil on
1. Jumaierah (Jimbaran) Menginap 6 RS site )
2. Ayana
Kepala Rujukan Kriteria Pengamanan Lapis 3 ( 2 Sumber
3. Le Meredien
Negara Covid 19 Keterangan : PLN, UPS PLN, Genset PLN ( Optional )
4. Intercontinental Jimbaran
(Kuta) Genset Pelanggan dan personil on site )
7 Hotel Nusa Dua Kriteria Pengamanan Lapis 2 ( 2 Sumber
2 Hotel Sanur PLN, Genset Pelanggan dan personil
1. Kempinski 5. St Regis
2. Samabe mobile )
6. Conrad 1. Andaz
3. Ritz Carlton 7. Mulia 2. Intercontinental Sanur Kriteria Pengamanan Lapis 1 ( 2 Sumber
4. Hilton #PLNSukseskanKTTG20 PLN dan personil mobile )
POLA PENGAMANAN LOKASI VENUE KTT G20
POWERED BY
(2/2) Feeder 1 (Suplai No. 1) Gardu Induk 1
KRITERIA 1 UPS N-1 UPS
1. Gardu Induk Berbeda
1. Apurva Kempinski
ACO TR 2. Suplai Cadangan 4 Lapis
2. GWK ACO TM + RC 3. Automatic Change Over TM
3. Mangrove Tahura 4. UPS dan Genset PLN
4. BTID 5. Genset Pelanggan
5. Bandara Ngurah Rai Feeder 2 (Suplai No. 2) Gardu Induk 2 6. Personel Siaga & Teknisi On Site
6. 6 Lokasi Ballroom : BICC, BNDCC, Sofitel,
Ritz Carlton, Mulia dan Hilton. GENSET PLN GENSET PLG/EO 1. Gardu Induk Berbeda Atau Sama
(Back Suplai No. 4) (Back Suplai No. 3) 2. Suplai Cadangan 3 Lapis
KRITERIA 2 3. Automatic Change Over TM Atau
22 Hotel Menginap Kepala Negara : Feeder 1 (Suplai No. 1) Gardu Induk 1 Remote Control
Kempinski, Mulia, Hilton, Ritz Carlton, ACO TR 4. UPS dan Genset PLN ( Optional )
UPS
Samabe, St Regis, Merusaka, Grand Hyatt, 5. Genset Pelanggan
Nusa Dua Hotel, Sheraton Laguna Conrad, ACO TM / RC 6. Personel Siaga on Site & Teknisi
Andaz, Sofitel, Intercontinental Jimbaran, Mobiling
Trans Hotel, Patra Bali, Sheraton Kuta
Intercontinental Sanur, Jumairah, Ayana, Le Feeder 2 (Suplai No. 2) Gardu Induk 2
GENSET PLN GENSET PLG/EO
Meredien, SPKLU UFC. (Back Suplai No. 4) (Back Suplai No. 3)

Feeder 1 (Suplai No. 1) 1. Gardu Induk Berbeda Atau Sama


KRITERIA 3
2. Suplai Cadangan Minimal 2 Lapis
1. Lokasi Menginap 3. Lokasi Menginap 3. Remote Control Atau Manual
Delegasi Delegasi
ACO TR 4. Personel Siaga & Teknisi Mobiling
Kawasan Nusa Kawasan Kuta
Dua (Grand dan Sanur (Four RC/ Manual
Mirage, Sakala, Season, Sanur Gardu Induk 1
Movenpick, Hyatt, Bulgari, Feeder 2 (Suplai No. 2)
Marriot, dll) The Edge, Alila GENSET PLG/EO/PLN
2. SPKLU Home dll (Back Suplai No. 3) Feeder 1 (Suplai No. 1)
Charging 4. RS Rujukan 1. Gardu Induk Sama
2. Suplai Cadangan 1 Lapis
KRITERIA 4
3. Remote Control Atau Manual
1. Tempat Wisata GENSET PLG/EO/PLN Gardu Induk 1 4. Personil Siaga Mobiling
Feeder 2 (Suplai No. 2)
(Back Suplai No. 3)

#PLNSukseskanKTTG20
PETA RISIKO ( 1/2 )
Ruang Panel
Transmisi 150 kV Gardu Induk PLN Gardu Distribusi PLN Trafo Pelanggan Beban
Pelanggan

Diskripsi Risiko : Diskripsi Risiko : Diskripsi Risiko : Diskripsi Risiko : Diskripsi Risiko : Diskripsi Risiko :
1. Gangguan Pada 2. Gangguan Pada 4. Gangguan Supply 7. Setting Time Delay 8. Gangguan Pada IML 9. Beban Lebih
Transmisi 150 KV Gardu Induk / Utama SACO Terlalu singkat Pelanggan (Trafo /Pemakaian lebih
Gardu Induk /Gangguan Rusak, Kubikel
Kehilangan Jaringan Pelanggan Rusak,
Supply 150 KV Tegangan Genset Tidak Siap,
3. Gangguan Trafo Menengah Kerusakan Instalasi
Daya Gardu 5. Gangguan Pada Tegangan Rendah)
Induk Gardu DIstribusi
6. Waktu Pemulihan
Gangguan > 5
Menit

Genset Pelanggan #PLNSukseskanKTTG20


PETA RISIKO ( 2/2 )
Tingkat Tingkat Tingkat
No/ ID Risk Deskripsi Risiko Risiko Risiko Risiko
Sangat
E Inheren Residu Target
Besar

4 5 13 19 32
E.1 E.2 E.3 E.4 E.5

4 DJBI.21.S.3.5 .001 Padam karena pemakaian Sangat Rendah Rendah


lebih Tinggi (C5) (B2) (B2)
Besar D
DJBI.21.S.3.5 .002 Gangguan Pada Instalasi Milik Sangat Rendah Rendah
TINGKAT KEMUNGKINAN

Pelanggan Tinggi (B5) (B2) (B2)


D.1 D.2 D.3 D.4 D.5

3 5 1 DJBI.21.S.3.5 .003 Gangguan Pada Gardu Tinggi (C3) Rendah Rendah


Distribusi PLN (B2) (B2)
C
Sedang DJBI.21.S.3.5 .004 Gangguan Pada Supply Tinggi (D3) Rendah Rendah
6 Utama (TM PLN) (B2) (B2)
C.1 C.2 C.3 C.4 C.5
DJBI.21.S.3.5 .005 Waktu Pemulihan Gangguan Tinggi (C4) Rendah Rendah
4 3 5 2 TM melebihi 5 menit (B2) (B2)

Kecil B DJBI.21.S.3.5 .006 Gangguan Pada Gardu Induk Tinggi (C4) Rendah Rendah
1 2 6 150 KV (B2) (B2)

B.1 B.2 B.3 B.4 B.5

Sangat
A
Kecil

A.1 A.2 A.3 A.4 A.5


1 2 3 4 5
Tidak Signifikan Minor Medium Signifikan Sangat Signifikan
TINGKAT DAMPAK

#PLNSukseskanKTTG20
MITIGASI RISIKO (1/4)
PEMETAAN SUMBER RISIKO IDENTIFIKASI ANALISIS
Sasaran/ Usulan Sub Deskripsi Kontrol Eksisting
Penyebab Risiko Dampak Risiko
Kegiatan/ Keputusan Sasaran Risiko Program / Alat Kendali Saat Ini
1 2 5 9 10 15
Keandalan Pasokan Peningkatan Padam Internal : Produk & layanan Kontrol penyebab:
Listrik Pada Lokasi Keandalan karena D1. Keandalan 1. Assesment IML (P1)
Venue Pasokan pemakaian Eksternal : Pasokan Menurun 2. Tindaklanjut Temuan Assesment IML (P1)
Listrik lebih P1. MCB lemah D2. Keluhan 3. Monitoring beban Kontinyu (P2)
P2. Beban Pelanggan tidak tercontrol pelanggan disorot oleh 4. Simulasi Beban (P2)
media nasional/
tuntutan hukum oleh Kontrol dampak:
pelanggan secara 4. Personil Siaga on Site (D1, D2)
individu

Keandalan Pasokan Peningkatan Gangguan Internal : Produk & layanan Kontrol penyebab:
Listrik Pada Lokasi Keandalan Pada D1. Keluhan 1. Assesment IML (P1,P3)
Venue Pasokan Instalasi Eksternal : pelanggan disorot oleh 2. Tindaklanjut Temuan Assesment IML (P1,P3)
Listrik Milik P1. Kerusakan Peralatan sisi Pelanggan media nasional/ 3. Pemasangan Penghalang binatang (P2)
Pelanggan (trafo, Panel, Kubikel TM TR dan Kabel tuntutan hukum oleh 4. Pemeliharaan Peralatan sisi pelanggan (P1)
TM TR. pelanggan secara 5. Simulasi Genset beban penuh (P1)
P2. akibat binatang individu
P3. Pemakaian melebihi KHA Kontrol dampak:
/Kemampuan peralatan 6. Personil Siaga on Site (D1)
P5. Material terpasang tidak standar 7. Pemasangan UPS (D1)
8. Pemasangan Genset PLN (D1)

Sudah Selesai
Sedang Berlangsung
#PLNSukseskanKTTG20
MITIGASI RISIKO (2/4)
PEMETAAN SUMBER RISIKO IDENTIFIKASI ANALISIS
Sasaran/ Usulan Sub Deskripsi Kontrol Eksisting
Penyebab Risiko Dampak Risiko
Kegiatan/ Keputusan Sasaran Risiko Program / Alat Kendali Saat Ini
1 2 5 9 10 15
Keandalan Pasokan Peningkatan Gangguan Internal : Produk & layanan Kontrol penyebab:
Listrik Pada Lokasi Keandalan Pada Gardu P1. Kerusakan Pada D1. Keluhan pelanggan disorot oleh 1. Pelaksanaan Assesement dan SLO Gardu (P1)
Venue Pasokan Distribusi Peralatan Gardu (kubikel media nasional/ tuntutan hukum oleh 2. Pelaksanaan Tindaklanjut temuan Assesment Gardu
Listrik PLN LBS, CB dll) pelanggan secara individu (P2)
3. Pemeliharaan Gardu (P1,P2)
Eksternal :
P2. Bencana Alam Kontrol dampak:
P3. Shortcircuit karena 4. Kesiapan dan Simulasi Genset Pelanggan (D1)
Binatang 5. Personil Siaga On Site (D1)
6. Pemasangan UPS (D1,)
7. Pemasangan Genset PLN (D1)
Keandalan Pasokan Peningkatan Gangguan Internal : Produk & layanan Kontrol penyebab:
Listrik Pada Lokasi Keandalan Pada Supply P1. Kerusakan peralatan D1. Keluhan pelanggan disorot oleh 1. Pelaksanaan Assesment Penyulang (P1)
Venue Pasokan Utama (TM supply (kabel, Terminating media nasional/ tuntutan hukum oleh 2. Tindaklanjut pelaksanaan Assesment Penyulang (P1)
Listrik PLN) dan atau Jointing ) pelanggan secara individu 3. Pelaksanaan Ground Patrol Rutin (P3,P4)
P2. SACO Pelanggan D2. Pasokan beralih ke Genset 4. Mengevaluasi time delay SACO milik pelanggan (P2)
bekerja saat kedip < 1000 Pelanggan
ms*) Kontrol dampak:
5. Kesiapan dan Simulasi Genset Pelanggan (D1)
Eksternal : 6. Personil Siaga On Site (D1,D2)
P3. Bencana Alam 7. Pemasangan UPS (D1, D2)
P4. Penggalian/Missdig 8. Pemasangan Genset PLN (D1, D2)
Pihak ke III 9. Melakukan penyesuaian setting time delay SACO (D2 )

Sudah Selesai *) Permen ESDM No. 20 Thn 2020 Tentang Grid Code
Sedang Berlangsung Permen ESDM No. 04 Thn 2009 Tentang Distribution Code #PLNSukseskanKTTG20
MITIGASI RISIKO (3/4)
PEMETAAN SUMBER RISIKO IDENTIFIKASI ANALISIS
Sasaran/ Usulan Sub Deskripsi Kontrol Eksisting
Penyebab Risiko Dampak Risiko
Kegiatan/ Keputusan Sasaran Risiko Program / Alat Kendali Saat Ini
1 2 5 9 10 15
Keandalan Pasokan Peningkatan Waktu Internal : Produk & layanan Kontrol penyebab:
Listrik Pada Lokasi Keandalan Pemulihan P1. Kegagalan Fungsi ACO TM D1. Keluhan pelanggan 1. Pemasangan ACO TM (P4)
Venue Pasokan Gangguan P2. Kegagalan Fungsi RC disorot oleh media nasional/ 2. Simulasi ACO TM (P1)
Listrik TM melebihi P3. Komunikasi Blank Spot tuntutan hukum oleh 3. Assesment dan Simulasi RC (P2)
5 menit P4. Belum Terpasang ACO TM pelanggan secara individu 4. Upgrade Repeater Radio Komunikasi (P3)
5. Implementasi Radio GSM (P3)
Eksternal : Kontrol dampak:
P5. Bencana Alam 6. Personil siaga on site (D1)
7. Penyusunan SOP Operasi Pemulihan Gangguan (D1)
8. Pemasangan UPS (D1)

Peningkatan layanan Peningkatan Gangguan Internal : Produk & layanan Kontrol penyebab:
pelanggan Keandalan Pada Gardu P1. Kerusakan Pada Peralatan D1. Keluhan pelanggan 1. Pelaksanaan Assesement Peralatan Pada Gardu Induk
Pasokan Induk 150 Gardu Induk disorot oleh media nasional/ (P1,P2)
Listrik KV P2. Gangguan pada gardu induktuntutan hukum oleh 2. Peremajaan Peralatan Assesment (P1,P2)
penyuplai pelanggan secara individu 3. Pemasangan Sensor Early Warning (P1,P2)
Eksternal : 4. Patroli Layang-layang (P3)
P3. Gangguan akibat pihak III 5. Sosialisasi Himabuan Keselamatan Ketenagalistrikan (P3)
(Binatang) dan Layang-layang Kontrol dampak:
P4. Bencana Alam 6. Pembangunan Supply dari GI Berbeda (D1)
7. Kesiapan dan Simulasi Genset Pelanggan (D1)
7. Pemasangan UPS (D1)
8. Pemasangan Genset PLN (D1)

Sedang Berlangsung Sudah Selesai #PLNSukseskanKTTG20


MITIGASI RISIKO (4/4)
PEMETAAN SUMBER RISIKO IDENTIFIKASI ANALISIS
Sasaran/ Usulan Sub Deskripsi Kontrol Eksisting
Penyebab Risiko Dampak Risiko
Kegiatan/ Keputusan Sasaran Risiko Program / Alat Kendali Saat Ini
1 2 5 9 10 15
Peningkatan layanan Peningkatan Gangguan Internal : Produk & layanan Kontrol penyebab:
pelanggan Keandalan Pada P1. Kerusakan Pada Peralatan D1. Keluhan pelanggan 1. Pelaksanaan Assesement Peralatan Pada Peralatan
Pasokan Transmisi Gardu Induk disorot oleh media nasional/ Transmisi (P1)
Listrik P2. SACO Pelanggan bekerja tuntutan hukum oleh 2. Patroli Layang-layang (P3)
saat kedip < 140 ms*) pelanggan secara individu 3. Sosialisasi Himbauan Keselamatan Ketenagalistrikan (P3)
D2. Pasokan beralih ke 4. Mengevaluasi time delay SACO milik pelanggan (P2)
Eksternal : Genset Pelanggan
P3. Gangguan akibat pihak III Kontrol dampak:
(Binatang) dan Layang-layang 4. Pembangunan Supply dari GI Berbeda (D1)
P4. Bencana Alam 5. Kesiapan dan Simulasi Genset Pelanggan (D1)
6. Pemasangan UPS (D1)
7. Pemasangan Genset PLN (D1)
8. Melakukan penyesuaian setting time delay SACO (D2)
Sudah Selesai
Sedang Berlangsung

*) Permen ESDM No. 20 Thn 2020 Tentang Grid Code


Permen ESDM No. 04 Thn 2009 Tentang Distribution Code

#PLNSukseskanKTTG20
ASSESMENT INSTALASI MILIK
POWERED BY
PELANGGAN (1/3)
Assessment Kelistrikan Lokasi Venue (IML) yang melibatkan PLN Progres sd 14 Sept 2022
Pusertif dimaksud untuk Memastikan keandalan pasokan listrik Sebesar 83,33%
sampai ke lokasi venue KTT G20 Terjamin. ( Leading 3,33% dari Target
80,00% )
1. Progres 83%
80%
TARGET REALISASI 70%
73%
Target Selesai :
60% 30 Sept 2022
50% 53% 3. Lokasi Assesment IML
40% 43%
Telah di Assessment (24 / 30)
30%
25%
30% 2. Tahap Pengujian o Venue Utama : Apurva Kempinski, GWK
20% 20%
15% o Tempat Menginap : Samabe, Nusa dua Beach, Grandhyatt,
Pemeriksaan Visual
15%
10% St. Regis, Merusaka, Conrad, Trans, Intercon, Melia, Sofitel,
Patra , Ayana, BNDCC, Mulia, Ritz Carlton, Sheraton Kuta,
Intercontinental Sanur, Laguna, Jumeirah, Hilton, Le
Pemeriksaan Thermovision
Jan Feb Mar Apr Mei Jun Jul Agu Sep MII Meredian

Pengujian Fungsi Trip


Sedang di Assessment (2)
Pengujian Tahanan Isolasi
o Tempat Menginap : BICC (30%), Andaz

Pengujian Grounding
Belum di Assessment (4/30)
o Venue Utama : Bandara.
o Tempat Outdoor : Bali Collection, BTID, Mangrove tahura.

#PLNSukseskanKTTG20
ASSESMENT INSTALASI MILIK PELANGGAN
POWERED BY
(2/3)

#PLNSukseskanKTTG20
ASSESMENT INSTALASI MILIK PELANGGAN
POWERED BY
(3/3)

#PLNSukseskanKTTG20
POSKO SIAGA DAN PERALATAN PENDUKUNG
KTT G20
POWERED BY APEL SIAGA KTT
TRANSMISI &
PEMBANGKIT SISTEM DISTRIBUSI ICON+ G20
27 Oktober 2022

25 420 612 22
PERSONIL PERSONIL PERSONIL PERSONIL

1.079 PERSONIL ( BKO 107 )


Posko Mirroring
1 Hotel Mercure Nusa
(Operasi 27 Oktober 2022)
UP-
Dua 123
06 juni , 05 Agustus. 16 Agustus 2022 Unit UPS
30 kVA s/d 500 kVA
Posko Siaga Knowledge Sharing Event Internasional
62 Tersebar di PLN Bali SKILLING
Asia Game, Pon Papua dan GP Mandalika.
(Operasi 27 Oktober 2022)
UPS dan UGB 36
Unit UGB
MONITORING 250 kVA & 630 kVA

SLD GI (Monitoring Single Line GI G-20)


SLD Venue (Monitoring Single Line Venue G-20)
29
Grafana UP2D Bali (Monitoring EWS, Beban Unit UKB
Penyulang, PQM) 95 mm² & 150 mm²
Grafana UP2B Bali (Monitoring Kesiapan
Pembangkit, Kondisi Transmisi)
CCTV (Monitoring ruang kubikel GI, GH dan GD 68
Venue) Unit Genset
100 kVA s/d 250 kVA

#PLNSukseskanKTTG20
RENCANA PENEMPATAN PERSONIL (1/11)
POWERED BY
Apurva Kempinski (60 Personil)
NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
1 I Nyoman Martin Kurniawan P P P P P P P P 33 Andrefta Adi Nugroho P P P P P P P P
Koordinator
2 I Gede Nyoman Cidhi Anom S S S S S S S S 34 I Made Darmika Airsaniya P P P P P P P P
3 I Gusti Agung Ngurah Wintara P P P P P P P P Lobby + Pendopo Lighting
35 Ridlwan Zein Wahyuardi S S S S S S S S
4 I Wayan Arsana Giri P P P P P P P P
SUPLAI PLN 36 I Gusti Made Putra Arsana S S S S S S S S
5 I Ketut Sujana S S S S S S S S
Gardu Kempinski 37 I Nyoman Juniawan P P P P P P P P
6 Adit Medah Ferdianto S S S S S S S S
7 Tumiran P P P P P P P P 38 Anak Agung Gede Putra P P P P P P P P
Lantai 17 Lighting
8 Sugeng Sudarlianto. ST S S S S S S S S 39 A.A Yuda Saptajaya S S S S S S S S
9 Agus Sudarso P P P P P P P P 40 Kadek Sukma Sutrisna S S S S S S S S
10 I Ketut Geria Wardana P P P P P P P P 41 I Made Agung Adi Wiartawan P P P P P P P P
Site plan 1 Lighting
11 AA. Made Putra Wiarsa S S S S S S S S P P P P P P P P
42 I Putu Sutrisno
12 I Ketut Subrata S S S S S S S S Converted Room 1 Lighting
43 I Wayan Tangkas Putrawan S S S S S S S S
13 I Nyoman Ardika P P P P P P P P
14 Pradika Sakti P P P P P P P P 44 Agus Ariyadi S S S S S S S S
Site plan 2 Videotron 45 I Gede Pasek Gunawan P P P P P P P P
15 Ida Bagus Dwi Apriana S S S S S S S S
16 Ketut Ery Kesuma S S S S S S S S 46 I Gede Alit Sutawan P P P P P P P P
Nusantara Villa Lighting
17 Aristo Adi Kusuma P P P P P P P P 47 Putu Agra Ricna Sukarmawan S S S S S S S S
18 Ari Hidayanto P P P P P P P P 48 Chandra Adi Wicaksono S S S S S S S S
Candi Sound
19 I Dewa Made Wira Arsana S S S S S S S S P P P P P P P P
49 I Putu Sandi Harta
20 Ngurah Alit Putra Supangkat S S S S S S S S
50 I Kadek Evi Surbakti P P P P P P P P
21 I Made Jimi Arta P P P P P P P P Social Lounge Lighting
22 Kawung, Ikat, I Putu Agus Wira Citta P P P P P P P P 51 I Gde Herry Pramana Putra S S S S S S S S
Lighting 52 I Putu Wian Suaryadi S S S S S S S S
23 Parang I Putu Agus Dharmika S S S S S S S S
24 I Made Aris Prasetya S S S S S S S S 53 I Putu Gede Eka Suantara P P P P P P P P
25 I Gd Basudeva Gunartha P P P P P P P P 54 I Putu Agus Paramartha P P P P P P P P
26 I Wayan Edgard Bayusuta P P P P P P P P Ref Restaurant Lighting
Amaya + Kimaya Lighting 55 Muhammad Yusrul Falah S S S S S S S S
27 Gede Eka Putra Junaedy S S S S S S S S S S S S S S S S
56 Ketut Merdana
28 I Kadek Nata Surya Agastya S S S S S S S S
57 Ahmad Basyir Purnama P P P P P P P P
29 DIMAS ARSY RAHMANANDA P P P P P P P P
30 I Gede Eka Putra Hamanda P P P P P P P P 58 I MADE RAI WIDIANTARA P P P P P P P P
Kasi + Kiran Lighting Koral Restaurant Lighting
31 I Nyoman Yoga Aryanata S S S S S S S S 59 Agus Arwany S S S S S S S S
32 Putu Edy Dahliawan S S S S S S S S 60 Kadek Parta Yadnya S S S S S S S S

#PLNSukseskanKTTG20
RENCANA PENEMPATAN PERSONIL (2/11)
POWERED BY Garuda Wisnu Kencana (22 Personil) BTID (8 Personil)
NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
1 Andri Prabawanto P P P P P P P P 1 I Gst Putu Agus Wiadi P P P P P P P P
Koordinator Gardu SS 2
2 I Gd Aditya Sadnuartika S S S S S S S S 2 Nugroho Andri Anto S S S S S S S S
SUPLAI PLN
3 I Wayan Gede Astawa P P P P P P P P 3 I Wayan Novidi Putra P P P P P P P P
Gardu GWK I SUPALI PLN Gardu BTID
4 I Wayan Andika Putra S S S S S S S S 4 Muhammad Abdullah S S S S S S S S
5 I Made Surata P P P P P P P P 5 Lighting, Sound Dw Gd Agus Wisnu E P P P P P P P P
GH Jimbaran
6 I Wyn Andika Saputra S S S S S S S S 6 Videotron Andri Prabawanto P P P P P P P P
UPS BTID
7 I Kadek Wiratama P P P P P P P P 7 Lighting, Sound I Putu Ari Kristiana S S S S S S S S
SDP I Lotus Pond Lighting
8 Gede Suparsa S S S S S S S S 8 Videotron I Md Adhi Pradnyana S S S S S S S S
9 I Putu Gede Eka Putra P P P P P P P P
SDP II Toilet Festival Lighting
10 Dedy Nuriawan S S S S S S S S
P P P P P P P P
Mangrove Tahura (6 Personil)
11 I Putu Adi Gustama P
12 AC DAN LAMPU I Made Puryanto P P P P P P P P
Festival + Lotus Park
13 PANITIA Putu Adi Maha Putra S S S S S S S S NOVEMBER
14 Ketut Alit Adi Saputra S S S S S S S S NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17
15 I Made Adhi Pradnyana P P P P P P P P
Jendela Bali Lighting P P P P P P P P
16 Nugroho Andri Anto S S S S S S S S 1 Ni Nyoman Sucianiki
Koordinator SUPLAI PLN
17 I Dewa Gede Suganda H P P P P P P P P 2 Dennys Hadi Sanjaya S S S S S S S S
18 Muhammad Abdullah S S S S S S S S P P P P P P P P
Pedestal ALL 3 Lighting, Sound I Dewa Gd. Gina S
19 I Putu Gede Dian S P P P P P P P P Gardu Mangrove
4 Lighting, Sound I Wyn Pari Purnawan S S S S S S S S
20 I Putu Yudha Wiradarma S S S S S S S S
5 Videotron I Nyn Merta Baskara P P P P P P P P
21 I Nym Suadnyana P P P P P P P P Panel Mangrove
3Way Pedestal SUPLAI PLN
22 Kadek Sudiana Putra S S S S S S S S 6 Videotron I Putu Gede Eka Putra S S S S S S S S

#PLNSukseskanKTTG20
RENCANA PENEMPATAN PERSONIL (3/11)
POWERED BY BNDCC (30 Personil)
NOVEMBER
NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17
1 Afriansyah P P P P P P P P
Kordinator
2 Kadek Satriya Adi Setiawan S S S S S S S S
3 I Made Semarajana Putra P P P P P P P P
SUPLAI PLN
4 I Putu Yana Juliantika P P P P P P P P
Gardu BNDCC
5 I Gede Artawan S S S S S S S S
6 I Nyoman Gunawan S S S S S S S S
7 Dedy Zakaria P P P P P P P P
Nusa Dua Hall 1,2,3, Uluwatu, VIP, Taman Sari
8 Edy Ridhwan P P P P P P P P
LIGHTING
9 Yanuar Teddy Permadi S S S S S S S S
Nusa Dua Hall 4,5
10 Ida Bagus Rahadi Gangga Putra S S S S S S S S
11 Muh. Reza Putra Utama Suwandy P P P P P P P P
LED Nusa Dua Hall 1,2,3 VIDEO TRONE
12 I Ketut Edy Sultrawan S S S S S S S S
13 I Gede Toni Arta Wijaya P P P P P P P P
Sound Nusa Dua Hall 1,2,3 SOUND
14 Unggul Dzackiy Kurniawan S S S S S S S S
15 I Made Dwipayana P P P P P P P P
LED Nusa Dua Hall 4,5 VIDEO TRONE
16 I Made Suartayana S S S S S S S S
17 I Putu Agus Budi Kusuma P P P P P P P P
Sound Nusa Dua Hall 4,5 SOUND
18 I Putu Wawan Selamet Mulyana S S S S S S S S
19 Mohamad Ridwan Islami P P P P P P P P
Pecatu Hall LIGHTING
18 Hananta Wiraputra S S S S S S S S
19 Made Sudi Antara P P P P P P P P
LED Pecatu Hall VIDEO TRONE
20 Hasta Nur Anwar S S S S S S S S
21 Teguh Dwi Saputro P P P P P P P P
Sound Pecatu Hall SOUND
22 Andi Zulfakar S S S S S S S S
23 I Gede Dharma Saputra P P P P P P P P
Mengwi Hall LIGHTING
24 I Nyoman Diatmika Perkasa A S S S S S S S S
25 I Kadek Wantara P P P P P P P P
Singaraja Hall LIGHTING
26 Dwi Ardianto S S S S S S S S
27 Muttaqin P P P P P P P P
Tanjung Benoa Hall LIGHTING
28 Ahmad Zurkoni S S S S S S S S
29 Very Bagus Saputra P P P P P P P P
Legian Hall LIGHTING
30 Muhammad Alwi Rizqillah S S S S S S S S

#PLNSukseskanKTTG20
RENCANA PENEMPATAN PERSONIL (4/11)

BICC (16 Personil) Sofitel (18 Personil)


POWERED BY

NOVEMBER November
NO POSKO PENGAMANAN NAMA Posko Pengamanan Nama
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17

1 I Made Supriadi P P P P P P P P I Nengah Jana A P P P P P P P P


Kordinator Kordinator
2 I Kadek Adi Antara S S S S S S S S A Subhakti S S S S S S S S
3 Oka Sanjaya P P P P P P P P Suplai Pln Wyn Suandikayasa P P P P P P P P
SUPLAI PLN
4 Trinata Dewata P P P P P P P P Gd Oka Wijaya S S S S S S S S
Gardu BICC Gardu Sofitel
5 Indra Seputra S S S S S S S S I Pt Sugiana S P P P P P P P P
S S S S S S S S I Wayan Sutama S S S S S S S S
6 Gede Sutamajaya
7 Zaenur Rokhman P P P P P P P P Firhan Ulinuha F P P P P P P P P
Mangapura Hall, Nusantara, Jakarta, Gamelan Lighting
Medan, Manado, Exhibition Hall, LIGHTING Arif Nugroho S S S S S S S S
Exhibition Gallery, Auditorium S S S S S S S S Ade Ngr Aryadana P P P P P P P P
8 M Danu Widjana LED Gamelan Video Trone
Imam Suhadi S S S S S S S S
9 P P P P P P P P
LED Mangupura VIDEO TRONE IWedhayana Adi P Ketut Widia Atmaja P P P P P P P P
S S S S S S S S Sound Gamelan Sound
10 Suraspati Yasa Md Barry Prasta W S S S S S S S S
11 Kt Budi Darsana P P P P P P P P P
Sound Mangupura SOUND Kecak Lighting Rian R Hidayat P P P P P P P P
12 Ketut Mudita S S S S S S S S
Arif Rohman Hakim S S S S S S S S
13 Vembri Adi Surya P P P P P P P P Andika Tri Wibowo P P P P P P P P
Hibiscus + Frangipane LIGHTING
14 Andi M Mahesa P S S S S S S S S Putu Setiawan S S S S S S S S
VIP Room Lighting
15 I Gede Ari Andika P P P P P P P P Adek Ramadhana P P P P P P P P
Bali Room, Orchid + Bougenville LIGHTING
16 Ardhean Hastomy G S S S S S S S S Fendi Hermawanta S S S S S S S S

#PLNSukseskanKTTG20
RENCANA PENEMPATAN PERSONIL (5/11)
POWERED BY

Ritz Carlton (14 Personil) The Mulia (18 Personil)


NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17

P P P P P P P P 1 I Nyoman Joni Santika P P P P P P P P


1 I Wayan Ary Suyanto Koordinator
Koordinator Krishna D Pratiwindhya
S S S S S S S S 2 S S S S S S S S
2 Anugrah Hidayat
3 I Made Sudarsana P P P P P P P P
I Putu Agus Aditya P P P P P P P P SUPLAI PLN
3 SUPLAI PLN Pramana 4 Made Apta Wijaya P P P P P P P P
Gardu Mulia
4 Made Puja Astawa S S S S S S S S 5 I Ketut Mulyawan S S S S S S S S
Gardu Ritz Carlton
5 I Made Suardiana P P P P P P P P 6 I Made Nuada S S S S S S S S
S S S S S S S S 7 Muhammad Ridhwan P P P P P P P P
6 I Made Adi Gunawan
8 Lighting I Gede Eka Abdi N P P P P P P P P
Lighting I Gusti Ngurah Ari P P P P P P P P
7 Kartika Putra (Dimmer) Md Ari Praditha S
9 S S S S S S S S
Grand Ballroom
8 Videotron Fernando Suwiknyo P P P P P P P P I Gst Harry Sutrisna
10 S S S S S S S S
Grand Ballroom
Lighting I Komang Hera Agus S S S S S S S S 11 I Gd Eka Sukma A P P P P P P P P
9 Budi Sanjaya Videotron
12 I Gst N Mahendra S S S S S S S S
Videotron Putu Gede Yudi S S S S S S S S
10 Adnyana 13 Lighting I Wayan Witantra P P P P P P P P
Junior Ballroom
(Dimmer) I Made Adi Widana
11 M Gati Jayeng P P P P P P P P 14 S S S S S S S S
15 I Nengah Yudiara P P P P P P P P
S S S S S S S S
12 VIP Room Lighting Nanda Ramadhannur 16 Lighting Choirul Sholeh P P P P P P P P
VIP Room
13 I Gede Sumartawan P P P P P P P P (Dimmer) I Bagus Raka Dirgayusa
17 S S S S S S S S
14 Marco Van Nover S S S S S S S S 18 Benendra B andika P S S S S S S S S

#PLNSukseskanKTTG20
RENCANA PENEMPATAN PERSONIL (6/11)
POWERED BY Bandara (8 Personil) Hilton (22 Personil)
NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17
10 11 12 13 14 15 16 17
1 Kadek Surachmanto P P P P P P P P
1 Sura Dhipaatmaja P P P P P P P P Koordinator
2 Fajar Dwi Susanto S S S S S S S S
2 Gardu Bandara/ Hady Swadarma P P P P P P P P
SUPLAI PLN 3 I Made Panca Karyawan P P P P P P P P
Metering S S S S S S S S SUPLAI PLN
3 R Adi Nugroho 4 I Gusti Made Yoga Wijaya P P P P P P P P
S S S S S S S S Gardu Hilton
4 Deni Hartadi 5 I Wayan Rudita S S S S S S S S
5 I GN Arya Santika P P P P P P P P 6 I Wayan Subaga S S S S S S S S
6 Panel Reza Ramadhan P P P P P P P P 7 I Nyoman Artawa P P P P P P P P
RUANG VIP Paruman Ballroom
Bandara/VVIP S S S S S S S S 8 Made Agus Budiartha S S S S S S S S
7 Putra Wiraatmaja Lighting
S S S S S S S S 9 Sawangan Agus Agung Yunaedi P P P P P P P P
8 Kadek Purnawan
10 Ballroom I Nyoman Astawa S S S S S S S S
P P P P P P P P
ST Regis (8 Personil) 11
12
LED Paruman Videotron
Heryx Kerta Nugraha
Made Ardi Suparnawa S S S S S S S S

NOVEMBER 13 I Dw. Gd. Jimi Sanjaya P P P P P P P P


NO POSKO PENGAMANAN NAMA Sound Paruman Sound
10 11 12 13 14 15 16 17 14 I Ketut Sumerta S S S S S S S S

P P P P P P P P 15 Viriya S Pasek Sucarita P P P P P P P P


1 Septiyana Nugraha LED Sawangan Videotron
2 I Made Suantara P P P P P P P P 16 Suvendi Tjojodihardjo S S S S S S S S
Gardu St Regis SUPLAI PLN
3 Putu Sena Manuaba S S S S S S S S 17 Made Wirya Santhosa P P P P P P P P
Sound Sawangan Sound
4 I Wayan Suardana S S S S S S S S 18 Kade Mas Yuda Arta S S S S S S S S

5 I.B. Dwi Suryanatha S P P P P P P P P 19 David Kurniyawan P P P P P P P P

6 Totok Yudhianto P P P P P P P P 20 Huda Kurniawan P P P P P P P P


VIP Room LIGHTING VIP Room Lighting
7 Pradnya Putra Pratama S S S S S S S S 21 Windhu Sugiartana S S S S S S S S
8 Priyo Utomo S S S S S S S S 22 Benny Prabawa Wiguna S S S S S S S S

#PLNSukseskanKTTG20
RENCANA PENEMPATAN PERSONIL (7/11)
POWERED BY

Samabe (8 Personil) Ayana (8 Personil)


NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
1 Adi Kuswadi P P P P P P P P 1 Mauludo Satria Wicaksana P P P P P P P P
2 Wayan Bujana Erawan Sandi P P P P P P P P 2 I Ketut Widiastawan P P P P P P P P
Gardu Samabe SUPLAI PLN Gardu SUPLAI PLN
3 I Wayan Juliarta S S S S S S S S 3 I Wayan Sujana S S S S S S S S
4 I Dewa Gede Anom Rai S S S S S S S S 4 Kornelius Samara S S S S S S S S
5 I Made Mertha P P P P P P P P 5 I Gede Putu Adi Nosaputra P P P P P P P P
6 Vigor Zius Muarayadi P P P P P P P P 6 DANY WAHYU H P P P P P P P P
VIP Room LIGHTING Panel dan UPS LIGHTING
7 I Komang Jepri Elsa Putra S S S S S S S S 7 I Made Adi Dewantara S S S S S S S S
8 Banjo Tri Suryanata S S S S S S S S 8 BAMBANG BS S S S S S S S S

Conrad (8 Personil) Jumeirah (8 Personil)


NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
1 I Komang Sutarjana P P P P P P P P 1 I Komang Wirawan P P P P P P P P
2 I Gede Adi Suryandika P P P P P P P P 2 I Made Rai Dwi Antara Putra P P P P P P P P
Gardu SUPLAI PLN Gardu SUPLAI PLN
3 Lanang Agung Anom U S S S S S S S S 3 Eka Pristiwa Ramendra S S S S S S S S
4 I Wayan Kamiana S S S S S S S S 4 Kadek Agus Yudha Negara S S S S S S S S
5 I Kadek Suarda P P P P P P P P 5 I Made Wahyu Supriyatna P P P P P P P P
6 Miftahur Rizqi P P P P P P P P 6 Rendi Bian Prasetiyono P P P P P P P P
Panel dan UPS LIGHTING Panel dan UPS LIGHTING
7 Kadek Rudianta S S S S S S S S 7 Kadek Bayu Wedana S S S S S S S S
8 Ivan Kristian S S S S S S S S 8 Moch Jodhy Alfareza S S S S S S S S

#PLNSukseskanKTTG20
RENCANA PENEMPATAN PERSONIL (8/11)
POWERED BY
Le Meredian (8 Personil) Patra Bali (8 Personil)
NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
1 Hadi Santoso P P P P P P P P 1 Adittya Putera Pradana P P P P P P P P
2 I Made Arsana P P P P P P P P 2 Bisri P P P P P P P P
Gardu Suplai Pln Gardu Suplai Pln
I Kadek Raditya S. 3 I Nyoman Teka Arnawa S S S S S S S S
S S S S S S S S
3 Wicaksana S S S S S S S S
4 Made Aditya Sanjaya
4 Samuel Ekarifano Diwa S S S S S S S S
5 I Gede Dharma Kusuma P P P P P P P P
5 Adit Agus Prastyo P P P P P P P P
6 Afid Ridho Aji P P P P P P P P
6 Jaya Kurniawan P P P P P P P P Panel Dan UPS Lighting
Panel Dan UPS Lighting 7 I Made Dwi Kurnia Jaya S S S S S S S S
7 I Pande Gede Ardika S S S S S S S S
8 Anton Noloproyo S S S S S S S S
8 Mustopa Rizal S S S S S S S S

Intercontinental Jimbaran (8 Personil) Sheraton Kuta (8 Personil)


NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
Nyoman Gede Restu 1 Putu Sujana P P P P P P P P
P P P P P P P P
1 Mahadiva
2 I Made Dwi Saputra P P P P P P P P
2 Gardu Suplai Pln Andrik Hadi Istamar W P P P P P P P P Gardu Suplai Pln
3 Putu Pramana S S S S S S S S
3 I Made Gampil Astawiguna S S S S S S S S
S S S S S S S S 4 I Made Murbawan S S S S S S S S
4 Umar Farouq
5 Made Harry Sukmawan P P P P P P P P 5 I Kadek Arya Adi Stiawan P P P P P P P P
6 Yudi Dharyadi P P P P P P P P 6 Agam Fauzi Gumelar P P P P P P P P
Panel Dan UPS Lighting Panel Dan UPS Lighting
7 I Nyoman Rai Putra S S S S S S S S S 7 I Ketut Wiharta S S S S S S S S
8 Nur Yasin S S S S S S S S 8 Rahmatul Fadhli S S S S S S S S

#PLNSukseskanKTTG20
RENCANA PENEMPATAN PERSONIL (9/11)
POWERED BY
Trans Resort (8 Personil) Andaz (8 Personil)
NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
1 Komang Lovi Try Ariana P P P P P P P P 1 I Gusti Putu Alit Santika P P P P P P P P
2 I Ketut Budiada P P P P P P P P 2 I Kadek Dody Arthadi P P P P P P P P
Gardu Suplai Pln Gardu Suplai Pln
3 I Made Hari Pradhana S S S S S S S S S S S S S S S S
3 Nyoman Priya Santiagi
4 Komang Bisma Prajadenta S S S S S S S S
4 Agus Raka Juni Purnama S S S S S S S S
5 I Putu Dony Hermawan P P P P P P P P
5 Alit Yoga Waisnawa P P P P P P P P
6 Richardo Pratama P P P P P P P P
6 Wisnu Darmadi P P P P P P P P
Panel Dan UPS Lighting I Bagus Bhujangga Agung Panel Dan UPS Lighting
S S S S S S S S 7 Yuni Prastiyo S S S S S S S S
7 Krisna Dwiyana
8 Krisna Bayu Aji S S S S S S S S 8 Bambang Jaya Saputra S S S S S S S S

Intercontinental Sanur (8 Personil) Nusa Dua Beach (8 Personil)


NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
1 I Wayan Sujana P P P P P P P P 1 Eko Kurniawan Ridwanna P P P P P P P P
2 I Nyoman Sudiarsa P P P P P P P P 2 Denny Nurcahyana S S S S S S S S
Gardu Suplai Pln Gardu Nusa Dua Suplai Pln
3 I Ketut Barastawa S S S S S S S S 3 Putu Myada P P P P P P P P
4 I Gede Juniarta S S S S S S S S 4 Nyoman Sudarsana S S S S S S S S
5 Ngr Bagus Abdi Negara P. P P P P P P P P Mukhammad Nadzir
P P P P P P P P
5 Baskoro
6 Indra Yoga P P P P P P P P
Panel Dan UPS Lighting 6 VIP Room Lighting Lilik Dian Rofika S S S S S S S S
7 Dodi Wilka Penas S S S S S S S S
7 Komang Ardy Gunadi Yasa P P P P P P P P
8 Badrujaman S S S S S S S S
8 Stephanus Tofan Wijaya S S S S S S S S

#PLNSukseskanKTTG20
RENCANA PENEMPATAN PERSONIL (10/11)
POWERED BY
Sheraton Laguna (8 Personil) Merusaka (8 Personil)
NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
1 Tegar Eka Saputra P P P P P P P P 1 I Made Arya Supartana P P P P P P P P
Pande Ketut Gede S S S S S S S S
S S S S S S S S 2 I Dewa Putu Oka Cahyana
2 Gardu Laguna Suplai Pln Arismawan Gardu Merusaka Suplai Pln
3 I Nyoman Petran P P P P P P P P
3 Ngakan Nyoman Suardika P P P P P P P P
S S S S S S S S 4 I Made Markastika S S S S S S S S
4 I Gst Ngr Putra Yadnya
5 Ricky Setiawan Hidayat P P P P P P P P 5 Putu Pratama Angga Wiguna P P P P P P P P
6 Mohammad Arif Khudloti S S S S S S S S 6 Dany Hermawan S S S S S S S S
VIP Room Lighting VIP Room Lighting
7 Putu Ari Wisnu Saputra P P P P P P P P 7 Agus Novan Prasatya P P P P P P P P
8 Rengga Ade Wisudha S S S S S S S S 8 Dedi Nur Dila Wijayanto S S S S S S S S

Melia Bali (8 Personil) Grand Hyatt (8 Personil)


NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA NO POSKO PENGAMANAN NAMA
10 11 12 13 14 15 16 17 10 11 12 13 14 15 16 17
1 Gede Ari Candra D P P P P P P P P 1 Ilham Ramadhan P P P P P P P P
2 Fauzi Nurul Huda S S S S S S S S 2 Gardu Grand Endardi Agus Priyanto S S S S S S S S
Gardu Melia Suplai Pln Suplai Pln
3 I Ketut Loka P P P P P P P P 3 Hyatt I Ketut Suarnata P P P P P P P P
4 I Made Adnyana S S S S S S S S 4 Erwin Dwi Sulistyo S S S S S S S S
5 I Made Gede Suastawa P P P P P P P P 5 Made Briannala P P P P P P P P
6 Panggih Yasa Supraja S S S S S S S S 6 Danny Saputro S S S S S S S S
VIP Room Lighting VIP Room Lighting
7 I Putu Sudarmawan P P P P P P P P 7 I Putu Ari Purnawan P P P P P P P P
8 AA Ngurah Krisna Wisesa S S S S S S S S 8 W. Affan Febryasta S S S S S S S S

#PLNSukseskanKTTG20
RENCANA PENEMPATAN PERSONIL (11/11)
POWERED BY
Command Center (8 Personil) Grand Hyatt (4 Personil)
NOVEMBER NOVEMBER
NO POSKO PENGAMANAN NAMA
NO POSKO PENGAMANAN NAMA 10 11 12 13 14 15 16 17
10 11 12 13 14 15 16 17
1 I Putu Maha Yuniartha P P P P P P P P
P P P P P P P P 2 Putu Gede Resa Cahya S S S S S S S S S
1 I Ketut Sutasena Gardu Suplai Pln
3 Made Darsana P P P P P P P P
S S S S S S S S
2 Kadek Hendra Dwi Jayanto 4 I Made Tirtayana S S S S S S S S
Gardu Suplai Pln
P P P P P P P P
3 I Gusti Putu Suadnyana
S S S S S S S S
4 I Wayan Budiartana
P P P P P P P P
5 Putu Agus Dian Jaya
S S S S S S S S
6 Pramiantoro Sumaryono
UPS Lighting
P P P P P P P P
7 I Gde Arie Widyantara P
S S S S S S S S
8 I Kt Denis Purnama Yadnya

#PLNSukseskanKTTG20
DAFTAR ALOKASI UPS (1/5)
POWERED BY
Apurva Kempinski (29 Unit) Garuda Wisnu Kencana (8 Unit)
Backup Suplai PLN Backup Suplai PLN
UPS
No. Tempat UPS No. Tempat
500
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA 250 KVA 200 KVA 100 KVA 30 KVA
KVA
Lighting 1 1 Building Lighting 2
Jendela Lighting 1
1 Candi Ballroom Videotron 1
Lighting 1
1 Festival Park
Sound 2 Videotron 1
2 Parang Lighting 1 Lighting 1
Lotus Pond
Sound 1
3 Kawung dan Ikat Lighting 1
Pedestal All 1
4 Kashi dan Kiran Lighting 1
5 Amala dan Kimaya Lighting 1 Mangrove Tahura (2 Unit)
6 Converted Room (11 room) Lighting 6
Backup Suplai PLN
7 Lobby dan Pendopo Lighting 1 No. Tempat UPS
8 Lantai 17 (1706 dstnya) Lighting 6 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
1 Lighting + Sound 1
9 Area Beach Club Lighting 3 Wantilan
Videotron 1
10 North Villa Lighting 1
11 South Villa Lighting 1 BTID (2 Unit)
12 Nusantara Villa Lighting 1
Backup Suplai PLN
13 Spa Voyer Lighting 1 No. Tempat UPS
14 Reef Restaurant Lighting 1 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
1 Tsenghua Lighting + Sound 1
15 Koral Restaurant Lighting
4 Academy Videotron 1
16 Apurva Bamboo Lighting 1

#PLNSukseskanKTTG20
DAFTAR ALOKASI UPS (2/5)
The Mulia (7 Unit)
POWERED BY
Backup Suplai PLN

BNDCC (9 Unit) Tempat UPS


500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Backup Suplai PLN Lighting 1
Grand Ballroom
Tempat UPS Videotron 1
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA Marques and Duke Ballroom Lighting 1
Lighting 1 1
Junior 1 Ballroom Lighting
Nusa Dua Hall 4 & 5 Videotron 1
Junior 2 Ballroom Lighting 1
Sound 1
Nusa Dua Hall 1,2, 3 Lighting 1 Presiden Suite Room Lighting 1
Lighting 1 Presiden Suite Room Lighting 1
Pecatu Hall
Videotron 1
Singaraja Hall Lighting 1 Ritz Carlton (3 Unit)
Tanjung Benoa Hall Lighting 1
Uluwatu Hall Lighting 1
Backup Suplai PLN
Tempat UPS
BICC (7 Unit) 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Lighting 1
Grand Ballroom
Backup Suplai PLN Videotron 1
Tempat UPS Presiden Suite Room Lighting 1
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Mangupura Hall Lighting 1 Hilton (5 Unit)
Videotron 1
Manado Lighting 1 Backup Suplai PLN
Nusantara Lighting 1 Tempat UPS
Medan Lighting 1 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Bali Room Lighting 1 Lighting 1
Presiden Suite Room Lighting 1 Sawangan Ballroom
Videotron 1
Lighting 1
Paruman Ballroom
Videotron 1
Presiden Suite Room Lighting 1
#PLNSukseskanKTTG20
DAFTAR ALOKASI UPS (3/5)
Melia Bali (1 Unit)
POWERED BY
Backup Suplai PLN
Tempat UPS
Sofitel (5 Unit) 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Presiden Suite Room Lighting 1
Backup Suplai PLN
Tempat UPS Sheraton Laguna (1 Unit)
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Lighting 1 Backup Suplai PLN
Gambelan Meeting
Videotron 1 Tempat UPS
Lighting 1 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Kecak Meeting
Videotron 1 Presiden Suite Room Lighting 1
Presiden Suite Room Lighting 1

Samabe (1 Unit) Nusa Dua Beach (2 Unit)


Backup Suplai PLN
Backup Suplai PLN Tempat UPS
Tempat UPS 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA Presiden Suite Room Lighting 2
Presiden Suite Room Lighting 1

Grand Hyatt (2 Unit)


ST Regis (2 Unit)
Backup Suplai PLN
Backup Suplai PLN Tempat UPS
Tempat UPS 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA Presiden Suite Room Lighting 2
Presiden Suite Room Lighting 2
Merusaka (2 Unit)
Backup Suplai PLN
Tempat UPS
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Presiden Suite Room Lighting 2
#PLNSukseskanKTTG20
DAFTAR ALOKASI UPS (4/5)
POWERED BY

Bali Collection (1 Unit) Patra Bali (1 Unit)


Backup Suplai PLN Backup Suplai PLN
Tempat UPS Tempat UPS
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Bali Colection Lighting 1 Presiden Suite Room Lighting 1

Trans Resort (1 Unit) Sheraton Kuta (1 Unit)


Backup Suplai PLN Backup Suplai PLN
Tempat UPS Tempat UPS
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Presiden Suite Room Lighting 1 Presiden Suite Room Lighting 1

Intercontinental Jimbaran (1 Unit) Ayana (1 Unit)


Backup Suplai PLN Backup Suplai PLN
Tempat UPS Tempat UPS
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Presiden Suite Room Lighting 1 Presiden Suite Room Lighting 1

Intercontinental Sanur (1 Unit) Le Meredian (1 Unit)


Backup Suplai PLN Backup Suplai PLN
Tempat UPS Tempat UPS
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Presiden Suite Room Lighting 1 Presiden Suite Room Lighting 1

#PLNSukseskanKTTG20
DAFTAR ALOKASI UPS (5/5)
POWERED BY

Andaz (1 Unit) Command Center (1 Unit)


Backup Suplai PLN Backup Suplai PLN
Tempat UPS Tempat UPS
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
Presiden Suite Room Lighting 1 Command Center ITDC Lighting 1

Conrad (1 Unit)
Jumeirah (1 Unit)
Backup Suplai PLN
Backup Suplai PLN Tempat UPS
Tempat UPS 500 KVA 250 KVA 200 KVA 100 KVA 30 KVA
500 KVA 250 KVA 200 KVA 100 KVA 30 KVA Presiden Suite Room Lighting 1
Presiden Suite Room Lighting 1

#PLNSukseskanKTTG20
JADWAL PEMASANGAN UPS (1/6)
POWERED BY

TIME LINE
REN/REALIS
No. Lokasi Venue Tempat SEPTEMBER OKTOBER
ASI
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
REN
Nusa Dua Hall 4 & 5
REAL
REN
Nusa Dua Hall 1,2, 3
REAL
REN
Uluwatu Hall
REAL
REN
1 BNDCC VIP
REAL
REN
Pecatu Hall
REAL
REN
Singaraja Hall
REAL
REN
Tanjung Benoa Hall
REAL
Building (Lotus, Festival REN
Lighting Existing) REAL
REN
Jendela
REAL
REN
2 GWK Festival Park
REAL
REN
Lotus Pond
REAL
REN
Pedestal
REAL

#PLNSukseskanKTTG20
JADWAL PEMASANGAN UPS (2/6)
POWERED BY

TIME LINE
REN/REALI
No. Lokasi Venue Tempat SEPTEMBER OKTOBER NOVEMBER
SASI
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
REN
3 Command Center ITDC Command Center ITDC
REAL

REN
4 Conrad Presiden Suite Room
REAL

REN
5 Bali Colection Bali Colection
REAL

REN
6 Grand Hyatt Presiden Suite Room
REAL

REN
7 Nusa Dua Beach Presiden Suite Room
REAL

REN
8 Sheraton Laguna Presiden Suite Room
REAL

REN
9 Melia Bali Presiden Suite Room
REAL

REN
10 Merusaka Presiden Suite Room
REAL

#PLNSukseskanKTTG20
JADWAL PEMASANGAN UPS (3/6)
POWERED BY

TIME LINE
REN/REALI
No. Lokasi Venue Tempat SEPTEMBER OKTOBER NOVEMBER
SASI
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
REN
Grand Ballroom
REAL
REN
Junior 1 Ballroom
REAL
REN
Junior 2 Ballroom
REAL
12 The Mulia
Marques and Duke REN
Ballroom REAL
REN
Presiden Suite Room
REAL
REN
Presiden Suite Room
REAL
REN
Gambelan Meeting
REAL
REN
13 Sofitel Kecak Meeting
REAL
REN
Presiden Suite Room
REAL
REN
Mangupura Hall
REAL
REN
Manado
REAL
REN
Nusantara
REAL
14 BICC
REN
Medan
REAL
REN
Bali Room
REAL
REN
Presiden Suite Room
REAL

#PLNSukseskanKTTG20
JADWAL PEMASANGAN UPS (4/6)
POWERED BY

TIME LINE
REN/REALI
No. Lokasi Venue Tempat SEPTEMBER OKTOBER NOVEMBER
SASI
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
REN
Candi Ballroom
REAL
REN
Parang
REAL
REN
Kawung dan Ikat
REAL
REN
Kashi dan Kiran
REAL
REN
Amala dan Kimaya
REAL
Converted Room (11 REN
room) REAL
REN
Lobby dan Pendopo
REAL
REN
Lantai 17 (1706 dstnya)
REAL
15 The Apurva Kempinski
REN
Area Beach Club
REAL
REN
North Villa
REAL
REN
South Villa
REAL
REN
Nusantara Villa
REAL
REN
Spa Voyer
REAL
REN
Reef Restaurant
REAL
REN
Koral Restaurant
REAL
REN
Apurva Bamboo
REAL

#PLNSukseskanKTTG20
JADWAL PEMASANGAN UPS (5/6)
POWERED BY

TIME LINE
REN/REALI
No. Lokasi Venue Tempat
SASI
SEPTEMBER OKTOBER NOVEMBER
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
REN
Grand Ballroom
REAL
16 Ritz Carlton
REN
Presiden Suite Room
REAL
REN
17 Samabe Presiden Suite Room
REAL
REN
Sawangan Ballroom
REAL
REN
18 Hilton Paruman Ballroom
REAL
REN
Presiden Suite Room
REAL
REN
19 St Regis Presiden Suite Room
REAL
REN
20 Mangrove Tahura Wantilan
REAL
REN
21 BTID Tsenghua Academy
REAL
REN
22 Trans Resort Presiden Suite Room
REAL

#PLNSukseskanKTTG20
JADWAL PEMASANGAN UPS (6/6)
POWERED BY

TIME LINE
REN/REALI
No. Lokasi Venue Tempat
SASI
SEPTEMBER OKTOBER
NOVEMBER
26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4
REN
23 Intercontinental Jimbaran Presiden Suite Room
REAL
REN
24 Patra Bali Presiden Suite Room
REAL
REN
25 Sheraton Kuta Presiden Suite Room
REAL
REN
26 Le Meredian Presiden Suite Room
REAL
REN
27 Jumeirah Presiden Suite Room
REAL
REN
28 Ayana Presiden Suite Room
REAL
REN
29 Andaz Presiden Suite Room
REAL
REN
30 Intercontinental Sanur Presiden Suite Room
REAL

#PLNSukseskanKTTG20
DUKUNGAN YANG DIBUTUHKAN
POWERED BY

1. Ijin pemasangan UPS


2. Kesiapan Genset Pelanggan
3. Kesiapan Bahan Bakar minimal 24 jam Operasi
4. Penyesuaian setting peralatan
5. Kapasitas daya kontrak versus prediksi beban saat KTT G20.
6. Tindak lanjut rekomendasi hasil Assesment IML
7. Ijin penempatan personil dan posko PLN
8. Penempatan personil dari internal Venue

#PLNSukseskanKTTG20
POWERED BY

TERIMA KASIH
Berakhlak... Andal... Terbaik
KALEIDOSKOP KEGIATAN PLN AGUSTUS 2021 –
SAAT INI
POWERED BY
1 1 1 1

2 2 2 2

3 3 3 3

4 4 4 4

1) Pemetaan Vegetasi RoW Transmisi | UPT Bali 1) Pemasangan Recloser Penyulang | Nusa Dua 1) Kunker Tim PLN Bali | Bandara Ngurah Rai 1) Rakor Kesiapan G20 - Stakeholder | UID Bali
2) Penyempurnaan Konstruksi Penyulang | Pecatu 2) Pest Control Seluruh GI | UPT dan UP2D 2) Rehabilitasi Sipil Gardu Bangunan| Nusa Dua 2) Rehabilitasi Jaringan Distribusi | Nusa Dua
3) Pemeliharaan Rutin | Transmisi dan GI di Bali 3) Penggantian MTU P0 | Transmisi dan GI 3) Penggantian Kubikel SF6 Low | Nusa Dua 3) Kunker Tim PLN Pusat | Lokasi Venue G20
4) Pengamanan Pondasi Tower Kritis | UPT Bali 4) Peremajaan Rambu Suar | SKLT Gilimanuk 4) Rakor Assesment dan SLO dengan Pusertif | UID 4) Pengadaan Unit Assesment Kabel | UP3 Batan

AGU - 21 SEP - 21 OKT - 21 NOV - 21

#PLNSukseskanKTTG20
KALEIDOSKOP KEGIATAN PLN AGUSTUS 2021 –
SAAT INI
POWERED BY
1 1

2 2

3 3

4 4

1) Checkpoint Menteri BUMN | IP Pesanggaran 1) Pemasangan Proteksi Pada Key Point | Nusa 1) Ground breaking PLTG Pesanggaran | PLN IP 1) Checkpoint Kemenko Marinvest | ITDC
2) Assesment GH, GD dan GI | Nusa Dua Dua 2) Checkpoint Setneg | SPKLU ITDC dan Kempinski
2) Rakor Beutifikasi dengan PUPR | Nusa Dua
3) Beutifikasi Jaringan | Depan Hotel Kempinski 2) Rakor dengan Pengadan Server | UPP JBTB 4 3) Penggantian Catu Daya Master Station | UP2B
3) Pengadaan Alat Uji Kubikel | UP2D Bali
4) Peresmian SPKLU Fast Charging | Denpasar 3) Beutifikasi Jalur Siligita-Peminge| Kempinski 4) Implementasi Skema OLS | SUTT Kapal - Pkalod
4) Checkpoint Kemenko Marinvest | Mangrove
4) Pemasangan Sensor Early Warning | GI Nusa
Dua
DES - 21 JAN - 22 FEB - 22 MAR - 22

#PLNSukseskanKTTG20
KALEIDOSKOP KEGIATAN PLN AGUSTUS 2021 –
SAAT INI
POWERED BY

1) Peresmian SPKLU UFC oleh RI 1 | ITDC 1) Pengujian UPS 60 KVA | Gudang Tohpati 1) Chekpoint Kesiapan oleh Wamen BUMN | Bali 1) Reconductor Untuk Beutifikasi | Nusa Dua
2) Pekerjaan Sipil Pondasi PLTG | IP Pesanggaran 2) Assesment Instalasi Pelanggan | GWK 2) Perkuatan Radio Komunikasi | Bali Selatan 2) Pembangunan Suplai Express | Nusa Dua
3) Simulasi Charging KLBB dengan UFC | ITDC 3) Proses Konstruksi PLTG | IP Pesanggaran 3) Pengoperasian Fast ATS | Kempinski 3) Pematangan Lahan SPKLU | ITDC &
4) Persembahyangan di Pura Gunung Salak, Bogor 4) Reconductoring untuk Beutifikasi| Mangrove 4) Pelatihan Kompetensi Siaga | UPDL Pandaan Kempinski
4) Pembangunan Shelter SPKLU | Kempinski
APR - 22 MEI - 22 JUN - 22 JUL - 22

#PLNSukseskanKTTG20
KALEIDOSKOP KEGIATAN PLN AGUSTUS 2021 –
SAAT INI
POWERED BY
1 3 4

1) Apel Pengarahan persiapan G20


2) Workshop Teknik pengoperasian UPS dan UGB
3) Tanggap darurat SKLT Jawa Bali (Simulasi basah) dan perbaikan CCTV GI
4) Persembahyangan bersama di Pura Luhur Uluwatu Bali

AUG - 22

#PLNSukseskanKTTG20
KALEIDOSKOP KEGIATAN PLN SEPTEMBER 2021 – SAAT
INI
POWERED BY
1 3 5

2
4 6

1) Sosialisasi pembuatan SOP per lokasi venue


2) Penanaman kabel tanam menuju Lapangan Lagoon pada section SSII
3) Perakitan GRC lokasi SP Siligita – Peminge
4) Assesmen fasilitas SCADA : GD Hilton, GD Ritz Carlton, GD Samabe, GD
Kempinski
5) Pengoperasian penyulang express kempinski 1 dari GI Nusa Dua
6) Rencana Persembahyangan bersama pada tanggal 25 September 2022 di Pura
Kerthabumi Taman Mini
SEP - 22

#PLNSukseskanKTTG20
PROGRES INFRASTRUKTUR SPKLU

POWERED BY

01 SPKLU Ultra Fast Charging 03 CATU DAYA BUS


APURVA KEMPINSKI & ITDC LISTRIK
64 Unit 66 Unit 100,0%

M4 Sept M4 Sept

Progres pembangunan SPKLU untuk Catu daya Bus


Progres pembangunan SPKLU Ultra Fast Charging di charging di lokasi terminal Ho Ho dengan target
2 lokasi telah mencapai 42 unit dengan target operasi operasi di M4 September 2022
di M4 September 2022
Total Progres
Total Progres

KENDARAAN DELEGASI
02 HOME CHARGING
636 Unit
Kendaraan
140 Unit 200 Unit Delegasi & Pengamanan
M4 Sept

Progres pembangunan SPKLU Home


Charging di 11 lokasi telah mencapai 140
KENDARAAN
unit dengan target operasi di M4 September OPERASIONAL LAINNYA
2022
Total Progres

#PLNSukseskanKTTG20
PROGRES BEAUTIFIKASI
POWERED BY

02 | JALUR SILIGITA - KEMPINSKI

Penurunan Kabel Udara menjadi


92%
1 Kabel Tanam sepanjang 6,50
01 | KAWASAN MANGROVE kms dari Perempatan Jalan
Siligita Bypass Ngurah Rai sd
Depan Hotel Apurva Kempinski
Penurunan Kabel Udara menjadi
100% Kabel Tanam sepanjang 2,24
kms dari Jalan By Pass Ngurah
Rai sampai di Bali Keramik
2

Pembangunan Kabel Tanam 0,58


100%
kms dan GRC 1 Unit di Balai
Keramik

Pemindahan Jaringan SKUTM


100%
0,8 kms di Barat Muara Tukad
Badung

#PLNSukseskanKTTG20

Anda mungkin juga menyukai