Kampung Kipaku,
89657 Tambunan,
Sabah.
Tarikh: 18 Oktober 2022
Kepada,
Yang Berhormat,
02. Adalah dimaklumkan bahawa pihak Surau Al-Hidayah Kg. Kipaku ingin memohon
sumbangan kewangan untuk menaik taraf bangunan surau yang telah uzur agar dapat
menyediakan ruang yang selesa bagi para jemaah islam untuk menunaikan ibadah solat.
03. Surau ini telah didirikan sekitar tahun 80-an dan amat memerlukan penyelenggaraan
bumbung, lantai, dinding serta pembesaran ruang solat bagi jemaah lelaki. Kos keseluruhan
kerja naik taraf ini dianggarkan bernilai RM 73,478.00. Berserta surat ini kami lampirkan
bersama kertas kerja cadangan menaik taraf bangunan surau. Sumbangan boleh disalurkan
ke akaun berikut:
04. Segala usaha dan keprihatinan dari pihak Yang Berhormat berkenaan perkara ini
amatlah dihargai dan didahului dengan ucapan terima kasih.
Yang Benar,
…………………………….
(Hardi Bin Juman)
Pengerusi Surau Al-Hidayah
Kampung Kipaku, Tambunan
CADANGAN KERTAS KERJA
NAIKTARAF BANGUNAN
SURAU AL-HIDAYAH
KAMPUNG KIPAKU, TAMBUNAN
1.0 Pendahuluan
Surau Al-Hidayah merupakan surau uzur yang telah dibina sekitar tahun 80-an dan
terletak di Kampung Kipaku, Tambunan Sabah. Sebanyak 10 buah rumah keluarga
islam di kampung ini dan jumlah ahli keluarga ini lebih kurang 120 orang
menyebabkan ruang solat di dalam surau tidak lagi dapat menampung kapasiti
jemaah yang hadir ke surau. Atas alasan mendesak ini, pihak AJK Surau telah
berbincang dan bersetuju untuk menaiktaraf bangunan surau ini dengan cara
memperbesarkan ruang solat bagi jemaah lelaki dan perempuan.
2.0 Objektif
Objektif utama kertas kerja cadangan naiktaraf bangunan Surau Al-Hidayah ini dibuat
adalah untuk:
2.1 Mencari dan mengumpul dana untuk tujuan menampung kos kerja
naiktaraf bangunan surau.
2.2 Mewujudkan satu tempat ibadah yang selesa untuk keperluan jemaah
penduduk Kampung Kipaku serta memudahkan sebarang aktiviti
keagamaan dapat dijalankan dengan selesa selaras dengan tuntutan
islam.
Pihak AJK Surau dalam beberapa kali mesyuarat yang lalu telah mengenalpasti
beberapa isu yang perlu diambil perhatian yang sewajarnya demi kebaikan bersama
dan telah membuat rangka pelan naiktaraf bangunan surau. Antara isu yang
ditimbulkan dalam mesyuarat ialah:
4.1 Keadaan surau yang telah uzur serta ketiadaan ruang solat yang selesa
bagi kegunaan para jemaah.
4.2 Keperluan penduduk yang mendesak dan memerlukan tempat beribadat
yang sesuai, baik dan selesa.
4.3 Program aktiviti keagamaan yang dirancang akan dapat dijalankan
dengan lebih teratur.
4.4 Memiliki kawasan tapak yang sesuai untuk dibangunkan dan dinaiktaraf
serta telah mendapat kelulusan daripada ketua kampung.
4.5 Penduduk islam di Kampung Kipaku dan kampung sekitarnya berkongsi
menggunakan Surau Al Hidayah ini.
Ahli Jawatankuasa
Terdapat empat (4) fasa yang telah diatur untuk kerja naiktaraf bangunan surau Al-
Hidayah Kampung Kipaku
6.1 Fasa 1
6.1.1 Pengurusan gazet tanah dan tapak surau dari ketua kampung.
6.1.2 Pengurusan kelulusan permohonan sumbangan melalui
JHEAINS Tambunan
6.1.3 Penyediaan dokumentasi kertas kerja naiktaraf bangunan surau
Al-Hidayah Kg. Kipaku
6.1.4 Pengurusan pemilihan dan perlantikan kontraktor pembinaan
6.2 Fasa 2
6.2.1 Pengurusan permohonan sumbangan dari orang awam
6.2.2 Pengurusan permohonan sumbangan dari badan-badan politik.
6.2.3 Pengurusan permohonan sumbangan dari tokoh-tokoh korporat
6.2.4 Pengurusan permohonan sumbangan dari syarikat dan majikan
6.2.5 Pengurusan resit dan senarai penyumbang
6.2.6 Pengurusan rekod dan pengauditan
6.3 Fasa 3
6.3.1 Kerja naiktaraf surau Al-Hidayah Kampung Kipaku
6.3.2 Pemantauan dari ahli jawatankuasa pembinaan dan AJK terlibat.
6.4 Fasa 4
6.4.1 Pengurusan kelengkapan prasarana dan peralatan Surau Al-
Hidayah Kg. Kipaku
6.4.2 Pengurusan perasmian Surau Al-Hidayah Kampung Kipaku
7.0 Cadangan Pelan Naiktaraf Surau Al-Hidayah Kampung Kipaku
1 Preliminaries 5,000.00
4 Frame 3,060.00
1 PRELIMINARIES
2 DEMOLITION WORKS
Preambles
a The Contractor deemed to have visited the site and shall ascertain for himself and in consultation
with the Employer and carefully studies the Drawings as to the extent of the demolition works
involved for this area of works and including new works, appraise carefully all difficulties likely to
be encountered due to the nature and character of the site. No claim made on the ground of lack
of knowledge on this matter will be entertained.
b Unless otherwise stated, all reusable or salvageable materials, finishes and fixtures arising from the
alterations and demolitions shall become the property of the Employer. The Contractor is
responsible to remove and stored these materials, finishes and fixtures to a place as directed by
the Employer. However, all debris arises from the demolition and un-wanted salvageable
materials shall be removed offsite from time to time to Contractor's own dumping ground. The
place of storage for all these unusable materials, finishes and fixtures shall be within the vicinity of
the site and the Contractor shall allow in his price cost of transportation and removal as described
c The rate/ price for the Demolition Works shall deemed to include COMPLETE demolition including
hacking, cutting and removing of all sub-structure works, pile cap, column stump, floor slab and
beam, extracting of driven piles, excavation etc, and left the demolished are free of all debris,
backfill all hole/voids, levelled and ready for new construction works
d Care must by taken to ensure that no vibrations or other disturbances shall affect the adjoining
buildings and structures during the constructions of the work.
e The work shall be carried out in such a manner as to cause as little inconvenience as possible to
occupants of adjoining properties and the public, and the contractor will be held responsible for
any claim claims which may arise from the disregard of this clause. Rubbish, etc. arising from the
works are to be sprinkled with water to prevent dust arising and all proper screen, etc shall be
provided to the satisfaction of the Employer.
f Contractor is solely responsible for the complete adequacy of the protective measure that are
necessary for the safety of all workmen and the public at all times of Construction.
g
Hack existing wall as indicated in the Architectural's drawing,
etc making good all works disturbed and remove debris offsite
- Approx. 136m2 LS 7,000.00
SUBSTRUCTURE
SUPERSTRUCTURE
4 Frame
Column
a Concrete (G30) - Stiffener M3 1 600.00 600.00
b Formwork M2 20 75.00 1,500.00
c Reinforcement KG 160 6.00 960.00
Brickwall
a 115mm thick brickwall - (Roang Solat Utama, Bilik AV, Ruang
Simpanan File, Tandas Perempuan) M2 85 70.00 5,950.00
b 115mm wide horizontal damp-proof course laid on brickwall
M 27 5.00 135.00
Windows
a Pre-cast concrete lintol M 4 60.00 240.00
Casement Window
b Powder coated clear glass, 1200mm x 1600mm (W1) NO 1 950.00 950.00
Top hung
c Powder coated tinted top hung, 600mm x 600mm (W3) NO 2 350.00 700.00
Doors
d Pre-cast concrete lintol M 5 60.00 300.00
Solid Laminated Timber Door complete with soundproof
propeties and stainless steel frame
e Single leaf door, 900mm x 2100mm NO 2 1,000.00 2,000.00
Waterproof Laminated Timber Door complete with and
stainless steel frame
f Single leaf door, 900mm x 2100mm NO 2 1,450.00 2,900.00
Painting
g General surfaces of doors M2 15 25.00 375.00
h Door frames; 200 - 300mm girth M 22 15.00 330.00
Ironmongery
i Stainless steel hinges NO 12 25.00 300.00
j Stainless Steel Lever Handle NO 4 180.00 720.00
Notes:
All the materials and patterns subjected to the approval of the Employer.
Notes:
All the materials and patterns subjected to the approval of the Employer.
Plastering
a 20mm Thick to side of wall and attached column -brickwall
M2 75 30.00 2,250.00
b 13mm Thick to wall to receive tiles finishes (measured
separately) M2 42 28.00 1,176.00
Wall Tiles
c Ceramic tiles (to approved pattern) M2 42 150.00 6,300.00
Painting
d To wall and attached column M2 75 13.00 975.00
Notes:
All the materials and patterns subjected to the approval of the Employer.
UAC ceiling
a To suspended ceiling (Tandas Perempuan) M2 10 60.00 600.00
b 100mm high cornice to ceiling M 22 25.00 550.00
Painting
c To soffit of suspended UAC ceiling M2 10 13.00 130.00
d To cornice M 22 6.00 132.00
Notes:
All the materials and patterns subjected to the approval of the Employer.
Plastering
a 20mm Thick to side of wall and attached column -brickwall
M2 54 30.00 1,620.00
Painting (Weatherproof)
b To wall and attached column M2 54 15.00 810.00
11 SANITARY FITTINGS
Notes:
All the materials and patterns subjected to the approval of the Employer.
12 EXTERNAL WORKS
Sumbangan dari pihak penderma amatlah dialu-alukan demi mencapai impian para
penduduk. Pihak jawatankuasa yang dilantik akan sedaya upaya dan sepenuh hati
berusaha agar kerja naiktaraf surau ini dapat disegerakan demi kesejahteraan
penduduk.
……………………………….. ………………………………..
(Anjumilah Tingki) (Hardi bin Juman)
Setiausaha Pengerusi
Surau Al-Hidayah Surau Al-Hidayah
Kg. Kipaku Tambunan Kg. Kipaku Tambunan