4 Tanaman Rambat
Thunbergia grandiflora (tunbergia) 603 NOS Rp 37.030 Rp 22.329.090
Tanaman Aksen
- Pakis Monyet 32 pohon Rp 22.218 Rp 710.976
PEKERJAAN HARDSCAPE
1 Pagar Rambat Perimeter
- Pek. Beton Cor K175 0,90 m3 Rp 1.171.390 Rp 1.049.565
- Angkur M10 112 bh Rp 85.897 Rp 9.620.433
- Tiang Besi Hollow 100x100x5 mm 20,29 btg Rp 1.448.614 Rp 29.393.336
- Pek. Epoxy Primer Surfacer Belkote, + fin. Cat semprot duco matt 48,70 m2 Rp 120.750 Rp 5.880.235
- Kawat Galvanis 50x50mm ∅3mm , ex. Wilma 156,06 m2 Rp 169.050 Rp 26.381.689
Fin. Cat, Ex. Mowilex Hitam 250 156,06 m2 Rp 51.750 Rp 8.076.027
- Besi Siku 50x50x5mm 0,93 btg Rp 546.250 Rp 509.833
- Baut M.10-200 + u clip 112,00 bh Rp 9.258 Rp 1.036.840
2 Pek. Drainase
a Subsoil Drain
- Pek. Galian 10,14 m3 Rp 157.424 Rp 1.597.030
- Pek. Geotextile Layer 164,85 m2 Rp 30.590 Rp 5.042.853
- Pek. Pipa PVC dia. 3" (berlubang) 127,00 m Rp 164.743 Rp 20.922.382
- Pek. Gravel t=20-30mm 8,88 m3 Rp 287.500 Rp 2.552.051
b Pipa PVC dia. 4" 28,00 m Rp 258.721 Rp 7.244.181
c Drain Inlet
- Plastic Round Drainage Grates Uk. 3" Atriun Style Ex. Rainbird 11,00 bh Rp 134.550 Rp 1.480.050
- Pek. Geotextile Layer 0,66 m2 Rp 30.590 Rp 20.299
- Pek. Pipa PVC dia. 3" (berlubang) 3,00 m Rp 164.743 Rp 494.229
c Pek. Water Trap
- Quick Coupling Valve 44-RC 2,00 bh Rp 233.450 Rp 466.900
- Pipa PVC Dia. 1" (Riser) 1,00 m Rp 75.822 Rp 75.822
- Round Valve box: Rain bird VB-6RND 2,00 bh Rp 410.550 Rp 821.100
- Loose Pebbles dia. 30-50mm 0,03 m3 Rp 119.140 Rp 3.423
TOTAL BIAYA SELURUH PEKERJAAN Rp 324.829.867
Project Estimate
Rencana Anggaran Biaya MEP
Uraian Pekerjaan Volume Satuan Rincian Harga Satuan Harga Satuan Jumlah
No
Data List Qty Unit Bahan Tenaga Alat Bantu HSP Sub Total
PEKERJAAN POWER AREA CABIN
1 Pekerjaan Power Cabin NYFGby 4 x 4 mm2+ BC (dari cabin ke panel area cabin) 121,00 m' Rp 101.200 Rp 17.854 Rp 119.054 Rp 14.405.504
2 Pekerjaan power Cabin Fase 1 NYFGby 4 x 10 mm2+BC (dari panel lobby ke area cabin) 96,00 m' Rp 124.200 Rp 17.854 Rp 142.054 Rp 13.637.160
3 Pekerjaan Panel SDP Baru Area Cabin
- Pekerjaan Box Panel Outdoor 40x50x18 cm + pengunci (Lengkap dengan dudukan) 1,00 Unit Rp 1.940.625 Rp 624.881 Rp 2.565.506 Rp 2.565.506
- Pekerjaan MCCB 32 A 3 Phase 1,00 bh Rp 409.400 Rp 188.456 Rp 597.856 Rp 597.856
- Pekerjaan MCCB 10 A 3 Phase 1,00 bh Rp 85.388 Rp 13.225 Rp 98.613 Rp 98.613
- Pekerjaan MCB 16A 1 phase 7,00 bh Rp 131.963 Rp 20.499 Rp 152.461 Rp 1.067.229
- Pekerjaan MCB 10A 1 phase 1,00 bh Rp 85.388 Rp 13.225 Rp 98.613 Rp 98.613
- Pekerjaan MCB 6A 1 phase 7,00 bh Rp 85.388 Rp 13.225 Rp 98.613 Rp 690.288
- Pekerjaan Timer untuk Lampu 2,00 bh Rp 178.538 Rp 82.127 Rp 260.665 Rp 521.330
- Pekerjaan Grounding Kabel BC 1,00 Lot Rp 19.550 Rp 8.993 Rp 28.543 Rp 28.543
- Lengkap dengan Accessories dll 1,00 Lot Rp 465.750 Rp 72.076 Rp 537.826 Rp 537.826
4 Penambahan MCB SDP Eksisting Area Cabin
- Pekerjaan MCB 16A 1 phase 1,00 bh Rp 131.963 Rp 20.499 Rp 152.461 Rp 152.461
- Pekerjaan MCB 6A 1 phase 1,00 bh Rp 85.388 Rp 13.225 Rp 98.613 Rp 98.613
5 Penambahan MCCB di Panel MDP Eksisting Area Lobby
- Pekerjaan MCCB 40 A 3 Phase 1,00 Unit Rp 479.550 Rp 220.527 Rp 700.077 Rp 700.077
TOTAL PEKERJAAN POWER AREA CABIN Rp 35.199.617
PEKERJAAN PIPA AIR BERSIH
1 Pekerjaan Instalasi pipa HDPE 1" air bersih rucika (dari area torrent bobobox ke area cabin) 221,00 m' Rp 27.169 Rp 17.854 Rp 45.023 Rp 9.949.973
2 Stop Kran 1" 8,00 Unit Rp 171.925 Rp 79.086 Rp 251.011 Rp 2.008.084
3 Pressure Gauge 0-2 kg 8,00 Unit Rp 759.000 Rp 349.140 Rp 1.108.140 Rp 8.865.120
4 T HDPE 1" 8,00 Unit Rp 14.548 Rp 6.613 Rp 21.160 Rp 169.280
5 Shock HDPE 1" 16,00 Unit Rp 9.200 Rp 4.629 Rp 13.829 Rp 221.260
6 Lengkap dengan Accessories dll 1,00 lot Rp 628.763 Rp 194.408 Rp 823.170 Rp 823.170
TOTAL PEKERJAAN PIPA AIR BERSIH Rp 22.036.887
PEKERJAAN PIPA AIR KOTOR DAN BEKAS
1 Pekerjaan Instalasi Air Kotor PVC 4" (Main Pipe) 191,00 m' Rp 143.520 Rp 17.854 Rp 161.374 Rp 30.822.386
2 Pekerjaan Instalasi Air Bekas PVC 2" (Main Pipe) 32,00 m' Rp 42.780 Rp 17.854 Rp 60.634 Rp 1.940.280
3 Lengkap dengan Accessories dll (untuk mempermudah maintenance) 1,00 lot Rp 714.150 Rp 714.150 Rp 714.150
TOTAL PIPA AIR KOTOR DAN BEKAS Rp 33.476.816
PEKERJAAN POMPA AREA RUANG POMPA
1 Gate Valve 1 " 1,00 Unit Rp 256.450 Rp 117.703 Rp 374.153 Rp 374.153
TOTAL PEKERJAAN POMPA AREA RUANG POMPA Rp 374.153
PEKERJAAN LAMPU LANDSCAPE
1 Lampu Sorot Led Outdoor 20 Watt 3000k Warm White - Krisbow 8,00 bh Rp 238.050 Rp 109.503 Rp 347.553 Rp 2.780.424
2 Spotlight LED 520 BGP150 8 Watt, Warm White, PHILIPS 34,00 bh Rp 383.525 Rp 176.422 Rp 559.947 Rp 19.038.181
3 Pekerjaan Kabel Power Lampu Landscape NYY 3x1,5 mm2 dalam konduit 202,00 m Rp 101.200 Rp 46.288 Rp 147.488 Rp 29.792.475
4 T Dus 42,00 bh Rp 690 Rp 1.500 Rp 2.190 Rp 91.980
TOTALPEKERJAAN LAMPU LANDSCAPE Rp 51.611.080
PEKERJAAN LAMPU EGD
1 Spotlight LED 520 BGP150 8 Watt, Warm White, PHILIPS 16,00 bh Rp 383.525 Rp 176.422 Rp 559.947 Rp 8.959.144
2 Pekerjaan Kabel Power Lampu Landscape NYY 3x1,5 mm2 dalam konduit 32,00 m Rp 60.605 Rp 46.288 Rp 106.893 Rp 3.420.560
3 T Dus 16,00 bh Rp 690 Rp 1.500 Rp 2.190 Rp 35.040
TOTALPEKERJAAN LAMPU LANDSCAPE Rp 12.379.704
PEKERJAAN LAMPU PAGAR
1 Spotlight LED 520 BGP150 8 Watt, Warm White, PHILIPS 27,00 bh Rp 383.525 Rp 176.554 Rp 560.079 Rp 15.122.126
2 Pekerjaan Kabel Power Lampu Landscape NYY 3x1,5 mm2 dalam konduit 136,00 m Rp 101.200 Rp 46.288 Rp 147.488 Rp 20.058.300
3 T Dus 27,00 bh Rp 690 Rp 1.500 Rp 2.190 Rp 59.130
TOTALPEKERJAAN LAMPU LANDSCAPE Rp 35.180.426
PEKERJAAN TEST COMISIONING
1 Test Magger 1,00 ls Rp 5.750.000 Rp 5.750.000 Rp 5.750.000
2 Test Gelontor & Rendam air kotor dan bekas 1,00 ls Rp 5.750.000 Rp 5.750.000 Rp 5.750.000
3 Test Tekan Pipa air bersih dan panas 1,00 ls Rp 5.750.000 Rp 5.750.000 Rp 5.750.000
TOTALPEKERJAAN TES COMISIONING Rp 17.250.000
SUB TOTAL BIAYA SELURUH PEKERJAAN Rp 207.601.757
Project Estimate
Rencana Anggaran Biaya MEP
3
PEKERJAAN ACCESSORIES DAN TEST COMMISIONING 1,00 lot Rp 3.306.250 Rp 3.306.250
TOTAL BIAYA SELURUH PEKERJAAN Rp 41.053.247
Nb. kabel di tanam dengan pipa 2"