Input Sampah 450 tpd

DU BSF
No Komponen % tpd %/Komp. tpd %/Komp. tpd
1 SOD 36.7 165.2 0 - 3% 5.0
2 Plastik, kulit, karet 32.0 144.1 25% 36.0 0 -
3 Logam 1.5 6.8 100% 6.8 0 -
4 Kaca 1.6 7.1 100% 7.1 0 -
5 Kertas, Kardus 20.8 93.6 25% 23.4 0 -
6 Kayu 2.0 8.9 0 - 5 -
7 Tekstil 3.5 15.8 0 - 0 -
8 Lain-lain 1.9 8.6 0 - 0 -
Total 100 450 16.29 73.28 1.11 5.00

input DU Kompos
% 0.16 0.01
tpd 73.28 5.00
Output 51.30 1.50
0.11
INPUT PILAH OLAH

MDU MDU
73.28 73.28

Bahan Kompos Komposting


5.00 5.00
450 tpd
Bahan RDF Pengeringan
363.08 363.08

Residu Landfill
8.64 8.64

450.00 450.00
RDF Residu Jumlah
%/Komp. tpd %/Komp. tpd %/Total tpd
97% 160.2 0 - - 165.2
75% 108.1 0 - - 144.1
0% - 0 - - 6.75
0% - 0 - - 7.11
75% 70.2 0 - - 93.60
100% 8.9 0 - - 8.87
100% 15.8 0 - - 15.80
0% - 1 8.6 1.9 8.64
80.68 363.08 1.92 8.64 1.92 450.00 100.00

RDF Residu Uap Air


0.81 0.07 0.00
363.08 8.64 0.00
108.92 21.98
24%
PRODUK OFFTAKER

MDU Industri DU
51.30 51.30

Kompos Uap air Pasar Kompos


1.50 3.50 1.50

RDF Uap air Pasar RDF


108.92 254.15 108.92

Landfill Landfill
30.62 30.62

450.00 192.35
Alat Remarks Harga Unit
Kompor tungku rinnai 350,000
Kompor gas biasa 495,000
Wajan 130,000
Panci uk 35 195,000
Panci masak nasi 10 liter 280,000
Termos nasi maspion 160,000
Termos es 65,000
Pisau daging tramontina 35,000
Telenan daging 160,000
Spatula 10,000
Baskom besar stainless 79,000
Penjepit makanan 25,000
Blender miyako 270,000
Penjepit pendek 21,000
Telenan fiber lion star 60,000
Gelas ukur 16,000
Pukulan daging ; 95.000 95,000
Cetakan nasi 4,000
Erok erok besar 75,000
Cobek besar online
Bangunan
A POS JAGA
B JEMBATAN TIMBANG
C KANTOR Manajemen dan adm
D UNIT KONTROL SISTEM Komputer, Panel sistem, CCTV
E AREA DROPING SAMPAH Wheel loader
Hoper
Chane Plate Feeder

F TERMINATOR Bag Breaker


G PEMILAHAN DENGAN CONVEYOR Conveyor
Magnetik separator
Splitser
Sorting Platform
Sorting conveyor
bin penampung sortiran
Baler Machine
H GUDANG PENAMPUNGAN PRODUK Display produk TPST
I PENAMPUNGAN DAUR ULANG Plastik, kertas,kardus
Logam, kaca
J MESIN RDF Big Shrader
Wood Chipper Machine
RDF Machine
K PENAMPUNGAN HASIL RDF
Forklif
L MESIN PENCACAH ORGANIK Cruiser Machine
M AREA KOMPOSTING Mesin Komposter
N WASTE TREATMENT Residu
O IPL
Mekanik/elektrik

1 Zona Unloading

Pemilahan Manual
Pembuatan RDF

Pembuatan Kompos

Mesin
Chain Hopper With Bag Breaker 24
Tromel = 50 Ton/Jam 50
Shredder 15
Horiszontal Screen 20
Baller Machine 8
Rdf Machine 5

Catu daya listrik 250


Vol.beban Jumlah unit Operator

4
450 tpd 1
14 Kepala 1
3 sekretaris 1
450 tpd 4 4 manajer 3
450 tpd 4 4 seksi 6
450 tpd 4 staf adm kantor 3

450 tpd 4 Pencatat gudang 7


450 tpd 4 Operator mesin 29
4 1 Operator Wheel loader 4
4 4 Operator forklif 1
450 tpd 8 Mekanik/elektrik 2
450 tpd 8 96 Pemilah 96
59.4225 tpd 96 4 Penjaga 4
59.4225 tpd 4 157

59.4225 tpd 1
13.86 tpd
354.2125 4 4
8.865 1 1
363.0775 4 4
1
1
5 1
5 1
1.92 1
1
2

Jumlah 157
tph
tph
tph
tph
tph
tph

kva
14
Referensi Asumsi Dasar Nilai
Reference Basic Assumptions Amount

Tingkat Inflasi Biaya Operasi - Referensi Konsorsium % 6.0%


Operational Cost Inflation Rate - Consortium Reference
Tingkat Inflasi Biaya Modal - Referensi Konsorsium % 3.0%
Capital Cost Inflation Rate - Consortium Reference

APBN 2016 Pertumbuhan Pendapatan Nasional Bruto 5.3%


State Budget 2016 Gross Domestic Product Bruto
APBN 2016 Inflasi 5.0%
State Budget 2016 Inflation
PP No. 78/2015 Tingkat Kenaikan Upah Minimum 10.3%
Minimum Wages Increase Rate
Asumsi Komposisi Upah terhadap Keseluruhan Gaji dan Upah 2.0%
Wages Composition Assumption to Overall Salaries and Wages
Tingkat Kenaikan Gaji dan Upah Referensi Konsorsium 6.1%
Salaries and Wages Increase Rate - Consortium Reference

Asumsi Nilai Tukar Internal Konsorsium USD/IDR 13,500


Internal Consortium Exchange Rate Assumption EUR/IDR 15,300
EUR/USD 1.13

BI Rate 15-10-2015 Tingkat Investasi Tanpa Resiko % 7.50%


Risk Free Investment Rate
Premium Resiko Pasar % 7.50%
Market Risk Premium

9/61
Referensi Asumsi Dasar Nilai
Reference Basic Assumptions Amount
Sensitivitas Resiko Pasar times 100.00%
Risk Sensitivity
Biaya Modal % 15.00%
Cost of Equity

Bunga Pinjaman % 14.00%


Interest Rate
Dirjen Pajak Pajak Penghasilan Perusahaan % 25.00%
Tax Office Corporate Income Tax
Biaya Pinjaman % 10.50%
Cost of Debt
Porsi Pinjaman atas investasi Awal % 70.00%
Loan Portion on Initial Investment
Tingkat Pengembalian Modal Rata-Rata % 11.85%
Weighted Average Cost of Capital

Masa Tenggang Tahun 1.00


Grace Period Year
Jangka Waktu Pembayaran Tahun 8.00
Payment Period Year

Dirjen Pajak Pajak Pertambahan Nilai % 10.0%


Tax Office Value Added Tax
Dirjen Pajak Pajak Penghasilan Art 23 - Tidak Final % 2.0%
Tax Office Withholding Tax Art 23 - Non Final

10/61
Referensi Asumsi Dasar Nilai
Reference Basic Assumptions Amount
Metode Penyusutan Pajak Garis Lurus
Tax Depreciation Method Straight Line

Maksimum Saldo Kas di tangan dari Penjualan % 25.0%


Maximum Cash Balance on Hand of Gross Sales Amount
Tingkat suku Bunga untuk Saldo Kas di Bank (sebelum pajak final 20%) % 1.7%
Interest rate for Cash Balance in Bank (before final tax 20%)

Kenaikan Harga Biaya Jasa Pengolahan Sampah % 6.0%


Tipping Fee Price Increase
Interval Kenaikan Harga Biaya Jasa Pengolahan Sampah Years 2.00
Tipping Fee Price Increase Interval
Kenaikan Harga RDF % 6.0%
RDF Price Increase
Interval Kenaikan Harga RDF Years 2.00
RDF Price Increase Interval
Kenaikan Harga Sampah Daur Ulang % 6.0%
Recyclable Price Increase
Interval Kenaikan Harga Sampah Daur Ulang Years 2.00
Recyclable Price Increase Interval

11/61
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Tahun ke- 0 1 2 3 4 5 6 7 8
Year #
Asumsi Teknis
Technical Assumptions
Jumlah Hari per Tahun 365 366 365 365 365 366 365
Days per year
Kapasitas Pengolahan ton/hari 450 450 450 450 450 450 450
Treatment Capacity tons/day
Utilitas Kapasitas % 80.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
Capacity Utilization
Utilitas Tambahan (maksimum 10%) %
Additional Utility (10% maximum)
Municipal Solid Waste (MSW) ton/hari 360 450 450 450 450 450 450
tons/day
ton/tahun 131,400 164,700 164,250 164,250 164,250 164,700 164,250
tons/year
Refuse Derived Fuel (RDF) % dari MSW 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2%
% of MSW
ton/hari 87 109 109 109 109 109 109
tons/day
ton/tahun 31,806 39,866 39,757 39,757 39,757 39,866 39,757
tons/year
Hi Caloric Content 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2%
Lo Caloric Content 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Sampah Daur Ulang % dari MSW 11.4% 11.4% 11.4% 11.4% 11.4% 11.4% 11.4% 11.4% 11.4%
Recyclable % of MSW
ton/hari 41 51 51 51 51 51 51
tons/day
ton/tahun 14,979 18,775 18,724 18,724 18,724 18,775 18,724
tons/year
Residu to Landfill % dari MSW 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8%
% of MSW

12/61
2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Tahun ke- 0 1 2 3 4 5 6 7 8
Year #
Asumsi Harga Jual/Pendapatan
Price Assumptions/Revenues
Biaya Jasa Pengolahan Sampah Rupiah/Ton 89,000 89,000 94,340 94,340 100,000 100,000 106,000
Tipping Fee % Kenaikan 0.0% 6.0% 0.0% 6.0% 0.0% 6.0%
% Increase

Biaya Jasa Pengolahan Sampah di atas 1500


tpd sampai dengan Kapasitas Maksimum yang
dapat ditoleransi Rupiah/Ton
Tipping Fee Above 1500 tpd up to Tolerable
Maximum Capacity factor

Rupiah/Ton 89,000 89,000 94,340 94,340 100,000 100,000 106,000

Harga Jual Refuse Derived Fuel Hi Cal - Rupiah/Ton 300,000 300,000 318,000 318,000 337,100 337,100 357,400
Refuse Derived Fuel Sales Price Lo Cal - Rupiah/Ton 100,000 100,000 106,000 106,000 112,400 112,400 119,200
Rupiah/Ton 300,000 300,000 318,000 318,000 337,100 337,100 357,400
% Kenaikan 0.0% 6.0% 0.0% 6.0% 0.0% 6.0%
% Increase
Harga Rata-Rata Sampah Daur Ulang Rupiah/Ton 500,000 500,000 530,000 530,000 561,800 561,800 595,508
Recyclable Average Sales Price % Kenaikan 0.0% 6.0% 0.0% 6.0% 0.0% 6.0%
% Increase

13/61
2030 2031 2032 2033 2034 2035 2036 2037
Tahun ke- 9 10 11 12 13 14 15 16
Year #
Asumsi Teknis
Technical Assumptions
Jumlah Hari per Tahun 365 365 366 365 365 365 366 365
Days per year
Kapasitas Pengolahan ton/hari 450 450 450 450 450 450 450 450
Treatment Capacity tons/day
Utilitas Kapasitas % 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
Capacity Utilization
Utilitas Tambahan (maksimum 10%) %
Additional Utility (10% maximum)
Municipal Solid Waste (MSW) ton/hari 450 450 450 450 450 450 450 450
tons/day
ton/tahun 164,250 164,250 164,700 164,250 164,250 164,250 164,700 164,250
tons/year
Refuse Derived Fuel (RDF) % dari MSW 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2%
% of MSW
ton/hari 109 109 109 109 109 109 109 109
tons/day
ton/tahun 39,757 39,757 39,866 39,757 39,757 39,757 39,866 39,757
tons/year
Hi Caloric Content 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2%
Lo Caloric Content 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Sampah Daur Ulang % dari MSW 11.4% 11.4% 11.4% 11.4% 11.4% 11.4% 11.4% 11.4%
Recyclable % of MSW
ton/hari 51 51 51 51 51 51 51 51
tons/day
ton/tahun 18,724 18,724 18,775 18,724 18,724 18,724 18,775 18,724
tons/year
Residu to Landfill % dari MSW 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8%
% of MSW

14/61
2030 2031 2032 2033 2034 2035 2036 2037
Tahun ke- 9 10 11 12 13 14 15 16
Year #
Asumsi Harga Jual/Pendapatan
Price Assumptions/Revenues
Biaya Jasa Pengolahan Sampah Rupiah/Ton 106,000 112,360 112,360 119,102 119,102 126,248 126,248 133,823
Tipping Fee % Kenaikan 0.0% 6.0% 0.0% 6.0% 0.0% 6.0% 0.0% 6.0%
% Increase

Biaya Jasa Pengolahan Sampah di atas 1500


tpd sampai dengan Kapasitas Maksimum yang
dapat ditoleransi Rupiah/Ton
Tipping Fee Above 1500 tpd up to Tolerable
Maximum Capacity factor

Rupiah/Ton 106,000 112,360 112,360 119,102 119,102 126,248 126,248 133,823

Harga Jual Refuse Derived Fuel Hi Cal - Rupiah/Ton 357,400 378,900 378,900 401,700 401,700 425,900 425,900 451,500
Refuse Derived Fuel Sales Price Lo Cal - Rupiah/Ton 119,200 126,400 126,400 134,000 134,000 142,100 142,100 150,700
Rupiah/Ton 357,400 378,900 378,900 401,700 401,700 425,900 425,900 451,500
% Kenaikan 0.0% 6.0% 0.0% 6.0% 0.0% 6.0% 0.0% 6.0%
% Increase
Harga Rata-Rata Sampah Daur Ulang Rupiah/Ton 595,508 631,238 631,238 669,113 669,113 709,260 709,260 751,815
Recyclable Average Sales Price % Kenaikan 0.0% 6.0% 0.0% 6.0% 0.0% 6.0% 0.0% 6.0%
% Increase

15/61
2038 2039 2040 2041 2042 2043 2044 2045 2046 2047
Tahun ke- 17 18 19 20 21 22 23 24 25 26
Year #
Asumsi Teknis
Technical Assumptions
Jumlah Hari per Tahun 365 365 366 365 365 365 366 365 365 365
Days per year
Kapasitas Pengolahan ton/hari 450 450 450 450 450 450 450 450 450 450
Treatment Capacity tons/day
Utilitas Kapasitas % 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
Capacity Utilization
Utilitas Tambahan (maksimum 10%) %
Additional Utility (10% maximum)
Municipal Solid Waste (MSW) ton/hari 450 450 450 450 450 450 450 450 450 450
tons/day
ton/tahun 164,250 164,250 164,700 164,250 164,250 164,250 164,700 164,250 164,250 164,250
tons/year
Refuse Derived Fuel (RDF) % dari MSW 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2%
% of MSW
ton/hari 109 109 109 109 109 109 109 109 109 109
tons/day
ton/tahun 39,757 39,757 39,866 39,757 39,757 39,757 39,866 39,757 39,757 39,757
tons/year
Hi Caloric Content 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2% 24.2%
Lo Caloric Content 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Sampah Daur Ulang % dari MSW 11.4% 11.4% 11.4% 11.4% 11.4% 11.4% 11.4% 11.4% 11.4% 11.4%
Recyclable % of MSW
ton/hari 51 51 51 51 51 51 51 51 51 51
tons/day
ton/tahun 18,724 18,724 18,775 18,724 18,724 18,724 18,775 18,724 18,724 18,724
tons/year
Residu to Landfill % dari MSW 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8% 6.8%
% of MSW

16/61
2038 2039 2040 2041 2042 2043 2044 2045 2046 2047
Tahun ke- 17 18 19 20 21 22 23 24 25 26
Year #
Asumsi Harga Jual/Pendapatan
Price Assumptions/Revenues
Biaya Jasa Pengolahan Sampah Rupiah/Ton 133,823 141,852 141,852 150,364 150,364 159,385 159,385 168,949 168,949 179,085
Tipping Fee % Kenaikan 0.0% 6.0% 0.0% 6.0% 0.0% 6.0% 0.0% 6.0% 0.0% 6.0%
% Increase

Biaya Jasa Pengolahan Sampah di atas 1500


tpd sampai dengan Kapasitas Maksimum yang
dapat ditoleransi Rupiah/Ton
Tipping Fee Above 1500 tpd up to Tolerable
Maximum Capacity factor

Rupiah/Ton 133,823 141,852 141,852 150,364 150,364 159,385 159,385 168,949 168,949 179,085

Harga Jual Refuse Derived Fuel Hi Cal - Rupiah/Ton 451,500 478,600 478,600 507,400 507,400 537,900 537,900 570,200 570,200 604,500
Refuse Derived Fuel Sales Price Lo Cal - Rupiah/Ton 150,700 159,800 159,800 169,400 169,400 179,600 179,600 190,400 190,400 201,900
Rupiah/Ton 451,500 478,600 478,600 507,400 507,400 537,900 537,900 570,200 570,200 604,500
% Kenaikan 0.0% 6.0% 0.0% 6.0% 0.0% 6.0% 0.0% 6.0% 0.0% 6.0%
% Increase
Harga Rata-Rata Sampah Daur Ulang Rupiah/Ton 751,815 796,924 796,924 844,739 844,739 895,424 895,424 949,149 949,149 1,006,098
Recyclable Average Sales Price % Kenaikan 0.0% 6.0% 0.0% 6.0% 0.0% 6.0% 0.0% 6.0% 0.0% 6.0%
% Increase

17/61
Rincian Biaya Investasi dan Permodalan
No Keterangan Jumlah Rupiah Jumlah Rupiah Umur Pakai Kelompok Aset
(150 tpd) (450 tpd) Usage Year Asset Group
Peralatan Mekanik dan Elektrik
Mechanical and Electrical Equipments

1 Chain plate feeder 215,445,000 861,780,000 10 Mesin dan Peralatan


2 Bag opener 161,584,000 646,336,000 Machineries and Heavy Equipments
3 Belt conveyor 80,792,000 323,168,000 10 Mesin dan Peralatan
4 Tromel rotary screen 430,890,000 1,723,560,000 Machineries and Heavy Equipments
5 Sorting Platform 48 person 700,197,000 2,800,788,000 25 Tanah dan Bangunan
6 Vibrating screen feeding conveyor 80,792,000 323,168,000 Land and Building
7 Horizontal screen 78,997,000 315,988,000 25 Tanah dan Bangunan
8 Hydralic Baler machine (2 unit) 132,140,000 528,560,000 Land and Building
9 Control Cabinet 34,472,000 137,888,000 5 Perkakas dan Peralatan Kecil
10 Chain plate conveyor 139,322,000 557,288,000 Tools and Small Equipment
11 Double shaft shredde BIG 380,620,000 1,522,480,000 10 Mesin dan Peralatan
12 Belt conveyor M (2 Unit) 86,178,000 344,712,000
13 magnetic separation (2 Unit) 112,032,000 448,128,000
14 Belt conveyor S 43,089,000 172,356,000
15 magnetic separation 56,016,000 224,064,000
16 RDF Fuel Forming Machine 511,323,000 2,045,292,000
17 Belt conveyor SM 35,908,000 143,632,000
18 Cruiser Organik (2 unit) 50,000,000 200,000,000
19 Wood Choper 98,000,000 392,000,000
20 Whell Loader 198,000,000 792,000,000
21 Forklift Batere 100,000,000 400,000,000
22 Master Control Cabine 103,414,000 413,656,000
23 Pengandaan Daya PLN dan Panel pembagi 250,000,000 500,000,000
24 Kontrol room dan Alat bantu (sensor,CCTV,dll) 100,000,000 400,000,000
25 Instalasi Pemasangan semua Alat 180,000,000 720,000,000
26 Biaya Lain 190,000,000 190,000,000
Fire Extinguisher Set Machineries and Heavy Equipments
A Sub Jumlah 4,549,211,000 17,126,844,000
Sub Total
B Kendaraan Operasional 1,500,000,000 10 Kendaraan
Operational Vehicles Vehicles

18/61
No Keterangan Jumlah Rupiah Jumlah Rupiah Umur Pakai Kelompok Aset
(150 tpd) (450 tpd) Usage Year Asset Group

Pekerjaan Sipil
Civil Works

1 Bangunan Kantor 0 25 Tanah dan Bangunan


Office Building Land and Building
2 Balai Pemrosesan Awal 0 25 Tanah dan Bangunan
Initial Process Hall Land and Building
3 Balai Pemrosesan RDF 0 25 Tanah dan Bangunan
RDF Process Hall Land and Building
4 Gudang kompos dan material daur ulang 0 25 Tanah dan Bangunan
Fertilizer and Recyclable Storage Land and Building
5 Gudang Perkakas, Garasi dan Bengkel 0 25 Tanah dan Bangunan
Warehouse, Garage and Workshop Land and Building
6 Bangunan Mekanik dan Elektrik (Rumah Genset, dll) 0 25 Tanah dan Bangunan
Mechanical and Electrical Building (Power Generator House, etc.) Land and Building
7 Fasilitas Pencucian Truk 0 25 Tanah dan Bangunan
Truck Washing Facility Land and Building
8 Pekerjaan lahan dan infrastruktur 0 25 Tanah dan Bangunan
Area and Infrastructure work Land and Building
9 Fasilitas Air bersih 0 25 Tanah dan Bangunan
Clean Water Facility Land and Building
10 Pemagaran 0 25 Tanah dan Bangunan
Fencing Land and Building
11 Area Bio-drying 0 25 Tanah dan Bangunan
Bio-drying Area Land and Building
12 Gudang Penyimpanan RDF 0 25 Tanah dan Bangunan
RDF Storage Land and Building
13 Fasilitas Area Penerimaan 0 25 Tanah dan Bangunan
Receiving Area Facility Land and Building
14 Pengolahan Air Limbah 0 25 Tanah dan Bangunan
Waste Water Treatment Plant Land and Building
15 Struktur untuk mesin 0 25 Tanah dan Bangunan
Machinery Structure Land and Building
16 Jalan Akses (Area Plant) 0 25 Tanah dan Bangunan

19/61
No Keterangan Jumlah Rupiah Jumlah Rupiah Umur Pakai Kelompok Aset
(150 tpd) (450 tpd) Usage Year Asset Group
Access Road (Plant Area) Land and Building
17 Landfill Sementara 0 25 Tanah dan Bangunan
Temporary landfill Land and Building
C Total Pekerjaan Sipil 50,000,000,000
Civil Works Total

20/61
No Keterangan Jumlah Rupiah Jumlah Rupiah Umur Pakai Kelompok Aset
(150 tpd) (450 tpd) Usage Year Asset Group

D Pemasangan untuk pekerjaan mekanikal dan elektrikal 26,135,994,276 25 Tanah dan Bangunan
Installation for mechanical and electrical work Land and Building
Jumlah Biaya Konstruksi (A+B+C+D+E) 44,762,838,276 Jumlah Biaya Konstruksi
Construction Cost Total (A+B+C+D+E)
Biaya manajemen proyek 2.0% 895,256,766 25 Tanah dan Bangunan
Project Management Cost Land and Building
Pajak Pertambahan Nilai 10.0% 4,476,283,828 25 Tanah dan Bangunan
Value Added Tax Land and Building
PPh import 2.5% 4,856,525 10 Mesin dan Peralatan
Import With-holding Tax Machineries and Heavy Equipments
Modal Kerja 16,055,625,337
Working Capital
Jumlah Kebutuhan Pendanaan Awal 66,194,860,731
Initial Funding Requirement
Selisih 139,269 25 Tanah dan Bangunan
Difference Land and Building
Pembulatan - Pokok Pendanaan 66,195,000,000
Rounding - Financing Principle
Bunga yang dikapitalisasi 3,243,555,000 25 Tanah dan Bangunan
Capitalized Interest Land and Building
Investasi Awal 69,438,555,000
Initial Investment

21/61
No Keterangan Jumlah Rupiah Jumlah Rupiah Umur Pakai Kelompok Aset
(150 tpd) (450 tpd) Usage Year Asset Group

% Total
% Kepemilikan Pembiayaan
Sumber Pendanaan % of Ownership % Financing
Source of Fund Konsorsium BUP
Total Modal Sendiri 20,831,566,500 30.0%
Own Capital
Pinjaman Bank (Pokok) 46,336,500,000 70.0%
Bank Loan (Principle)
Pinjaman Bank (Pokok + Bunga yang dikapitalisasi) 49,580,055,000
Bank Loan (Principle + Capitalized Interest)

22/61
Rincian Biaya Gaji dan Upah Berdasarkan Kondisi di Tahun 2015
Salary and Wages Detail Based on Year 2015 Conditions

No Keterangan Jumlah Tahunan


No Descriptions Yearly Total

1 Manajemen 720,000,000
2 Sekretaris 90,000,000
3 Manajer 540,000,000
4 Kepala Seksi 720,000,000
5 Operator pemilahan 3,168,000,000
6 Staff Administrasi 108,000,000
7 Sopir Wheel Loader 168,000,000
8 Petugas Keamanan 144,000,000
9 Pencatat gudang 252,000,000
10 Operator mesin 1,044,000,000
11 Operator Wheel loader 144,000,000
12 Operator forklif 36,000,000
13 Mekanik/elektrik 72,000,000
14 Sopir Truk 108,000,000
Sub Jumlah 7,314,000,000

23/61
Rincian Biaya Operasi dan Pemeliharaan Berdasarkan Kondisi di Tahun 2015
Operational and Maintenance Cost Detail Based on Year 2015 Conditions

dalam Rupiah
Jumlah per Tahun
No Keterangan (355 Hari Kerja)
Total per Year
No Descriptions (355 Working Days)

Bahan Bakar
Fuels

1 Kendaraan 742,500,000
2 Loader 1,485,000,000
3 Listrik 2,001,416,664
A Sub Jumlah 4,228,916,664
Subtotal

Penunjang
Support

1 Administrasi Kantor 120,000,000


2 Tenaga Ahli (Hukum/Audit) 150,000,000
3 Biaya Utilitas (termasuk pengolahan air limbah) 500,000,000
4 Lain-Lain 100,000,000
B Sub Jumlah 870,000,000
Subtotal
Jumlah Biaya Operasi (A+B) 5,098,916,664
Operational Cost (A+B)

Biaya Pemeliharaan
Maintenance Costs

1 Mekanik dan Elektrik 5.00% 856,342,200


Mechanical and Electrical
2 Kendaraan 5.00% 75,000,000
Vehicles
4 Bangunan 1.00% 500,000,000
Building
Jumlah Biaya Pemeliharaan 1,145,073,760
Maintenace Costs

24/61
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Tahun ke- 0 1 2 3 4 5 6 7 8 9
Proyeksi Arus Kas Proyek - Laporan Arus Kas
Laba Operasi Sebelum Penyusutan Juta Rupiah 0 7,189 11,730 12,340 10,788 11,425 9,766 10,252 8,289
Pajak Penghasilan Juta Rupiah 0 -22 -1,358 -1,716 -1,536 -1,911 -1,704 -2,039 -1,763
Pajak Tangguhan Juta Rupiah 0 -7 -7 -7 -7 -4 -7 -7 -7
Modal Kerja
Piutang/Hutang Pajak Pendapatan Nilai Juta Rupiah 81 33 7 -4 7 -5 7 -5
Piutang Usaha Juta Rupiah -4,855 -1,214 -364 0 -386 0 -410 0
Hutang Usaha Juta Rupiah 1,637 352 121 127 134 140 153 160
Investasi
Tanah dan Bangunan Juta Rupiah -19,859 22,323 0 0 0 0 0 0 0 0
Mesin dan Peralatan Juta Rupiah -677 0 0 0 0 0 0 0 0
Kendaraan Juta Rupiah 0 0 0 0 0 0 0 0 0
Perkakas dan Peralatan Kecil Juta Rupiah -34 0 0 0 0 -41 0 0 0
Arus Kas Operasi dan Investasi Juta Rupiah -19,859 21,612 4,024 9,536 10,382 9,368 9,224 8,190 7,956 6,673
Bunga Kapitalisasi Juta Rupiah -3,244
Pendapatan Bunga Juta Rupiah 0 0 1,002 944 900 874 854 837 826
Biaya Bunga Juta Rupiah 0 -6,941 -6,941 -6,074 -5,206 -4,338 -3,471 -2,603 -1,735
Pinjaman Bank Juta Rupiah 49,580 0 -6,198 -6,198 -6,198 -6,198 -6,198 -6,198 -6,198
Arus Kas Bersih setelah Pembiayaan Pihak Luar Juta Rupiah -19,859 67,948 -2,917 -2,601 -945 -1,136 -438 -624 -8 -434
Pinjaman Modal Kerja Juta Rupiah 0 0 0 0 0 0 0 0 0
Setoran Modal Juta Rupiah 19,859 0 0 0 0 0 0 0 0 0
Dividen Juta Rupiah 0 0 0 0 0 0 0 0 0
Arus Kas Bersih Juta Rupiah 0 67,948 -2,917 -2,601 -945 -1,136 -438 -624 -8 -434
Saldo Kas Juta Rupiah 0 67,948 65,031 62,430 61,484 60,348 59,910 59,286 59,278 58,844

25/61
2026 2027 2028 2029 2030 2031 2032
Tahun ke- 10 11 12 13 14 15 16
Proyeksi Arus Kas Proyek - Laporan Arus Kas
Laba Operasi Sebelum Penyusutan Juta Rupiah 8,775 6,661 6,949 4,468 4,723 2,033 2,031
Pajak Penghasilan Juta Rupiah -2,142 -1,834 -1,847 -1,243 -1,323 -665 -682
Pajak Tangguhan Juta Rupiah 14 17 -8 -8 -8 -8 -5
Modal Kerja
Piutang/Hutang Pajak Pendapatan Nilai Juta Rupiah 7 -6 7 -7 7 -7 7
Piutang Usaha Juta Rupiah -434 0 -460 0 -488 0 -517
Hutang Usaha Juta Rupiah 169 176 193 202 214 223 244
Investasi
Tanah dan Bangunan Juta Rupiah 0 0 0 0 0 0 0
Mesin dan Peralatan Juta Rupiah 0 -937 0 0 0 0 0
Kendaraan Juta Rupiah 0 0 0 0 0 0 0
Perkakas dan Peralatan Kecil Juta Rupiah 0 -48 0 0 0 0 -55
Arus Kas Operasi dan Investasi Juta Rupiah 6,390 4,030 4,835 3,411 3,125 1,575 1,022
Bunga Kapitalisasi Juta Rupiah
Pendapatan Bunga Juta Rupiah 815 807 798 881 964 1,037 1,094
Biaya Bunga Juta Rupiah -868 0 0 0 0 0 0
Pinjaman Bank Juta Rupiah -6,198 0 0 0 0 0 0
Arus Kas Bersih setelah Pembiayaan Pihak Luar Juta Rupiah 140 4,837 5,633 4,292 4,089 2,611 2,116
Pinjaman Modal Kerja Juta Rupiah 0 0 0 0 0 0 0
Setoran Modal Juta Rupiah 0 0 0 0 0 0 0
Dividen Juta Rupiah 0 0 0 0 0 0 0
Arus Kas Bersih Juta Rupiah 140 4,837 5,633 4,292 4,089 2,611 2,116
Saldo Kas Juta Rupiah 58,984 63,821 69,455 73,747 77,835 80,447 82,563

26/61
2033 2034 2035 2036 2037 2038 2039 2040 2041 2042
Tahun ke- 17 18 19 20 21 22 23 24 25 26
Proyeksi Arus Kas Proyek - Laporan Arus Kas
Laba Operasi Sebelum Penyusutan Juta Rupiah -1,107 -1,194 -4,615 -5,027 -8,994 -9,558 -13,905 -14,890 -19,906 -21,131
Pajak Penghasilan Juta Rupiah 100 117 973 1,022 2,018 1,917 3,013 2,438 3,662 3,025
Pajak Tangguhan Juta Rupiah -328 -350 -1,205 -1,249 -2,234 -2,115 -3,180 -2,570 -3,751 -3,061
Modal Kerja
Piutang/Hutang Pajak Pendapatan Nilai Juta Rupiah -9 7 -9 7 -11 7 -12 6 -14 6
Piutang Usaha Juta Rupiah 0 -548 0 -581 0 -616 0 -652 0 -692
Hutang Usaha Juta Rupiah 255 270 281 308 321 341 355 389 406 430
Investasi
Tanah dan Bangunan Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Mesin dan Peralatan Juta Rupiah 0 0 0 0 -1,259 0 0 0 0 0
Kendaraan Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Perkakas dan Peralatan Kecil Juta Rupiah 0 0 0 0 -64 0 0 0 0 0
Arus Kas Operasi dan Investasi Juta Rupiah -1,089 -1,697 -4,575 -5,520 -10,222 -10,024 -13,729 -15,280 -19,603 -21,422
Bunga Kapitalisasi Juta Rupiah
Pendapatan Bunga Juta Rupiah 1,138 1,160 1,160 1,137 1,079 989 833 664 445 179
Biaya Bunga Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Pinjaman Bank Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Arus Kas Bersih setelah Pembiayaan Pihak Luar Juta Rupiah 50 -537 -3,415 -4,383 -9,143 -9,035 -12,896 -14,616 -19,158 -21,243
Pinjaman Modal Kerja Juta Rupiah 0 0 0 0 0 0 0 0 0 13,000
Setoran Modal Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Dividen Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Arus Kas Bersih Juta Rupiah 50 -537 -3,415 -4,383 -9,143 -9,035 -12,896 -14,616 -19,158 -8,243
Saldo Kas Juta Rupiah 82,612 82,076 78,661 74,278 65,135 56,100 43,205 28,589 9,431 1,188

27/61
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Tahun ke- 0 1 2 3 4 5 6 7 8 9
Proyeksi Neraca Keuangan - Laporan Neraca
Aset
Aset Tetap
Tanah dan Bangunan Juta Rupiah 19,859 779 779 779 779 779 779 779 779 779
Mesin dan Peralatan Juta Rupiah 0 677 677 677 677 677 677 677 677 677
Kendaraan Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Perkakas dan Peralatan Kecil Juta Rupiah 0 34 34 34 34 34 76 76 76 76
Biaya Perolehan Juta Rupiah 1,491 1,491 1,491 1,491 1,491 1,532 1,532 1,532 1,532
Tanah dan Bangunan Juta Rupiah 0 0 31 62 94 125 156 187 218 249
Mesin dan Peralatan Juta Rupiah 0 0 68 135 203 271 338 406 474 541
Kendaraan Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Perkakas dan Peralatan Kecil Juta Rupiah 0 0 7 14 21 28 34 43 51 59

28/61
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Tahun ke- 0 1 2 3 4 5 6 7 8 9
Akumulasi Penyusutan Juta Rupiah 0 106 211 317 423 529 636 743 850
Nilai Buku Juta Rupiah 0 1,491 1,385 1,279 1,173 1,068 1,003 896 789 682

Aset dalam Pengerjaan Juta Rupiah 19,859

Hak Pajak Yang Ditangguhkan Juta Rupiah 0 7 13 20 26 31 38 44 51

Piutang Pajak (PPN Masukan) Juta Rupiah 0 63 67 71 75 80 84 90 95


Piutang Usaha
Tipping Fee Juta Rupiah 0 0 2,884 3,605 3,821 3,821 4,050 4,050 4,293 4,293
Million Rupiah
Hari Perputaran Piutang 90 90 90 90 90 90 90 90
Refuse Derived Fuel Juta Rupiah 0 0 1,294 1,618 1,715 1,715 1,818 1,818 1,927 1,927
Hari Perputaran Piutang 45 45 45 45 45 45 45 45
Recyclabe Juta Rupiah 0 0 677 846 897 897 951 951 1,008 1,008
Hari Perputaran Piutang 30 30 30 30 30 30 30 30
Kas Juta Rupiah 0 67,948 65,031 62,430 61,484 60,348 59,910 59,286 59,278 58,844
Cash Million Rupiah
Total Aset Juta Rupiah 19,859 69,439 71,340 69,857 69,181 67,950 67,842 67,122 67,429 66,900

29/61
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Tahun ke- 0 1 2 3 4 5 6 7 8 9

Ekuitas
Modal Juta Rupiah 19,859 19,859 19,859 19,859 19,859 19,859 19,859 19,859 19,859 19,859
Laba ditahan Juta Rupiah 0 0 120 4,447 9,836 14,676 20,620 25,958 32,296 37,805

Kewajiban

Hutang Pajak (PPN Keluaran) Juta Rupiah 0 0 145 181 192 192 203 203 215 215
Hutang Usaha Juta Rupiah 0 0 1,637 1,988 2,110 2,236 2,371 2,510 2,663 2,823
Hari Perputaran Hutang 30 30 30 30 30 30 30 30
Pinjaman Modal Kerja Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Hutang Bunga Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Pinjaman Bank Juta Rupiah 0 49,580 49,580 43,383 37,185 30,988 24,790 18,593 12,395 6,198
Total Ekuitas dan Kewajiban Juta Rupiah 19,859 69,439 71,340 69,857 69,181 67,950 67,842 67,122 67,429 66,900

30/61
2026 2027 2028 2029 2030 2031 2032
Tahun ke- 10 11 12 13 14 15 16
Proyeksi Neraca Keuangan - Laporan Neraca
Aset
Aset Tetap
Tanah dan Bangunan Juta Rupiah 779 779 779 779 779 779 779
Mesin dan Peralatan Juta Rupiah 677 1,614 1,614 1,614 1,614 1,614 1,614
Kendaraan Juta Rupiah 0 0 0 0 0 0 0
Perkakas dan Peralatan Kecil Juta Rupiah 76 123 123 123 123 123 179
Biaya Perolehan Juta Rupiah 1,532 2,516 2,516 2,516 2,516 2,516 2,572
Tanah dan Bangunan Juta Rupiah 281 312 343 374 405 436 468
Mesin dan Peralatan Juta Rupiah 609 677 771 864 958 1,052 1,145
Kendaraan Juta Rupiah 0 0 0 0 0 0 0
Perkakas dan Peralatan Kecil Juta Rupiah 67 76 85 95 104 114 123

31/61
2026 2027 2028 2029 2030 2031 2032
Tahun ke- 10 11 12 13 14 15 16
Akumulasi Penyusutan Juta Rupiah 957 1,064 1,199 1,333 1,467 1,602 1,736
Nilai Buku Juta Rupiah 575 1,452 1,318 1,183 1,049 915 835

Aset dalam Pengerjaan Juta Rupiah

Hak Pajak Yang Ditangguhkan Juta Rupiah 37 19 28 36 45 53 58

Piutang Pajak (PPN Masukan) Juta Rupiah 101 106 113 120 127 134 143
Piutang Usaha
Tipping Fee Juta Rupiah 4,551 4,551 4,824 4,824 5,113 5,113 5,420
Million Rupiah
Hari Perputaran Piutang 90 90 90 90 90 90 90
Refuse Derived Fuel Juta Rupiah 2,043 2,043 2,166 2,166 2,296 2,296 2,434
Hari Perputaran Piutang 45 45 45 45 45 45 45
Recyclabe Juta Rupiah 1,069 1,069 1,133 1,133 1,201 1,201 1,273
Hari Perputaran Piutang 30 30 30 30 30 30 30
Kas Juta Rupiah 58,984 63,821 69,455 73,747 77,835 80,447 82,563
Cash Million Rupiah
Total Aset Juta Rupiah 67,358 73,061 79,036 83,208 87,666 90,159 92,726

32/61
2026 2027 2028 2029 2030 2031 2032
Tahun ke- 10 11 12 13 14 15 16

Ekuitas
Modal Juta Rupiah 19,859 19,859 19,859 19,859 19,859 19,859 19,859
Laba ditahan Juta Rupiah 44,279 49,806 55,572 59,544 63,773 66,043 68,351

Kewajiban

Hutang Pajak (PPN Keluaran) Juta Rupiah 228 228 242 242 257 257 272
Hutang Usaha Juta Rupiah 2,993 3,169 3,362 3,564 3,778 4,001 4,245
Hari Perputaran Hutang 30 30 30 30 30 30 30
Pinjaman Modal Kerja Juta Rupiah 0 0 0 0 0 0 0
Hutang Bunga Juta Rupiah 0 0 0 0 0 0 0
Pinjaman Bank Juta Rupiah 0 0 0 0 0 0 0
Total Ekuitas dan Kewajiban Juta Rupiah 67,358 73,061 79,036 83,208 87,666 90,159 92,726

33/61
2033 2034 2035 2036 2037 2038 2039 2040 2041 2042
Tahun ke- 17 18 19 20 21 22 23 24 25 26
Proyeksi Neraca Keuangan - Laporan Neraca
Aset
Aset Tetap
Tanah dan Bangunan Juta Rupiah 779 779 779 779 779 779 779 779 779 779
Mesin dan Peralatan Juta Rupiah 1,614 1,614 1,614 1,614 2,873 2,873 2,873 2,873 2,873 2,873
Kendaraan Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Perkakas dan Peralatan Kecil Juta Rupiah 179 179 179 179 243 243 243 243 243 243
Biaya Perolehan Juta Rupiah 2,572 2,572 2,572 2,572 3,895 3,895 3,895 3,895 3,895 3,895
Tanah dan Bangunan Juta Rupiah 499 530 561 592 623 655 686 717 748 779
Mesin dan Peralatan Juta Rupiah 1,239 1,333 1,426 1,520 1,614 1,740 1,866 1,992 2,117 2,243
Kendaraan Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Perkakas dan Peralatan Kecil Juta Rupiah 134 145 157 168 179 191 204 217 230 243

34/61
2033 2034 2035 2036 2037 2038 2039 2040 2041 2042
Tahun ke- 17 18 19 20 21 22 23 24 25 26
Akumulasi Penyusutan Juta Rupiah 1,872 2,008 2,144 2,280 2,416 2,586 2,756 2,926 3,095 3,265
Nilai Buku Juta Rupiah 700 564 428 292 1,479 1,309 1,139 969 799 630

Aset dalam Pengerjaan Juta Rupiah

Hak Pajak Yang Ditangguhkan Juta Rupiah 386 736 1,941 3,190 5,424 7,538 10,718 13,288 17,039 20,100

Piutang Pajak (PPN Masukan) Juta Rupiah 151 160 170 180 191 203 214 228 241 256
Piutang Usaha
Tipping Fee Juta Rupiah 5,420 5,745 5,745 6,090 6,090 6,455 6,455 6,842 6,842 7,253
Million Rupiah
Hari Perputaran Piutang 90 90 90 90 90 90 90 90 90 90
Refuse Derived Fuel Juta Rupiah 2,434 2,580 2,580 2,736 2,736 2,900 2,900 3,074 3,074 3,259
Hari Perputaran Piutang 45 45 45 45 45 45 45 45 45 45
Recyclabe Juta Rupiah 1,273 1,349 1,349 1,430 1,430 1,516 1,516 1,607 1,607 1,703
Hari Perputaran Piutang 30 30 30 30 30 30 30 30 30 30
Kas Juta Rupiah 82,612 82,076 78,661 74,278 65,135 56,100 43,205 28,589 9,431 1,188
Cash Million Rupiah
Total Aset Juta Rupiah 92,976 93,210 90,873 88,195 82,484 76,021 66,147 54,598 39,034 34,388

35/61
2033 2034 2035 2036 2037 2038 2039 2040 2041 2042
Tahun ke- 17 18 19 20 21 22 23 24 25 26

Ekuitas
Modal Juta Rupiah 19,859 19,859 19,859 19,859 19,859 19,859 19,859 19,859 19,859 19,859
Laba ditahan Juta Rupiah 68,346 68,294 65,676 62,672 56,640 49,818 39,588 27,630 11,661 -6,436

Kewajiban

Hutang Pajak (PPN Keluaran) Juta Rupiah 272 288 288 306 306 324 324 343 343 364
Hutang Usaha Juta Rupiah 4,500 4,770 5,051 5,359 5,680 6,021 6,376 6,765 7,171 7,602
Hari Perputaran Hutang 30 30 30 30 30 30 30 30 30 30
Pinjaman Modal Kerja Juta Rupiah 0 0 0 0 0 0 0 0 0 13,000
Hutang Bunga Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Pinjaman Bank Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Total Ekuitas dan Kewajiban Juta Rupiah 92,976 93,210 90,873 88,195 82,484 76,021 66,147 54,598 39,034 34,388

36/61
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Tahun ke- 0 1 2 3 4 5 6 7 8
Proyeksi Laba Rugi Proyek - Laporan Laba Rugi
Pendapatan
Tipping Fee Juta Rupiah 11,695 14,658 15,495 15,495 16,425 16,470 17,411
Refuse Derived Fuel Juta Rupiah 9,542 11,960 12,643 12,643 13,402 13,439 14,209
Recyclable Juta Rupiah 7,489 9,387 9,924 9,924 10,519 10,548 11,150
Total Pendapatan Juta Rupiah 28,726 36,006 38,062 38,062 40,346 40,457 42,770

Biaya Angkut RDF Juta Rupiah 5,303 7,046 7,449 7,895 8,369 8,896 9,404
RDF Logistic Cost Rupiah/ton 140,000 148,400 157,304 166,742 176,747 187,352 198,593 210,508 223,139 236,527
Biaya Gaji dan Upah Juta Rupiah 7,314 7,760 8,234 8,736 9,269 9,834 10,434 11,070 11,746 12,462
Biaya Operasi Juta Rupiah 5,099 5,405 5,729 6,073 6,437 6,824 7,233 7,667 8,127 8,615
Biaya Pemeliharaan Juta Rupiah 1,145 1,214 1,287 1,364 1,446 1,532 1,624 1,722 1,825 1,935
Biaya Asuransi Juta Rupiah 7 7 8 8 8 8 9
Biaya Pembuangan Residu ke Sanitary Landfill Juta Rupiah 53 71 75 79 84 89 94
Rupiah/ton 5,000 5,300 5,618 5,955 6,312 6,691 7,093 7,518 7,969 8,447
Total Biaya Operasi Juta Rupiah 21,537 24,276 25,721 27,274 28,921 30,691 32,518
% dari Pendapatan 75.0% 67.4% 67.6% 71.7% 71.7% 75.9% 76.0%

37/61
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Tahun ke- 0 1 2 3 4 5 6 7 8
Laba Operasi Sebelum Penyusutan Juta Rupiah 7,189 11,730 12,340 10,788 11,425 9,766 10,252
% dari Pendapatan 25.0% 32.6% 32.4% 28.3% 28.3% 24.1% 24.0%
Penyusutan
Tanah dan Bangunan Juta Rupiah 31 31 31 31 31 31 31
Mesin dan Peralatan Juta Rupiah 68 68 68 68 68 68 68
Kendaraan Juta Rupiah 0 0 0 0 0 0 0
Perkakas dan Peralatan Kecil Juta Rupiah 7 7 7 7 7 8 8
Jumlah Juta Rupiah 106 106 106 106 106 107 107

38/61
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Tahun ke- 0 1 2 3 4 5 6 7 8
Laba Operasi Juta Rupiah 7,083 11,624 12,235 10,682 11,320 9,659 10,145
% dari Pendapatan 24.7% 32.3% 32.1% 28.1% 28.1% 23.9% 23.7%
% of Revenues
Pendapatan Bunga Juta Rupiah 0 1,002 944 900 874 854 837
Biaya Bunga Juta Rupiah -6,941 -6,941 -6,074 -5,206 -4,338 -3,471 -2,603
Laba Sebelum Pajak Juta Rupiah 142 5,685 7,105 6,376 7,855 7,042 8,378
% dari Pendapatan 0.5% 15.8% 18.7% 16.8% 19.5% 17.4% 19.6%
Pajak Pendapatan Final Juta Rupiah 0 234 494 499 490 503 500 516
Pajak Tahun Berjalan Juta Rupiah 0 -205 871 1,224 1,053 1,412 1,211 1,530
Pajak Penghasilan yang ditangguhkan Juta Rupiah 0 -7 -7 -7 -7 -4 -7 -7
Pajak Penghasilan Juta Rupiah 22 1,358 1,716 1,536 1,911 1,704 2,039
Laba Bersih Juta Rupiah 120 4,327 5,389 4,840 5,944 5,338 6,339
% dari Pendapatan 0.4% 12.0% 14.2% 12.7% 14.7% 13.2% 14.8%

39/61
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Tahun ke- 9 10 11 12 13 14 15 16 17 18
Proyeksi Laba Rugi Proyek - Laporan Laba Rugi
Pendapatan
Tipping Fee Juta Rupiah 17,411 18,455 18,506 19,563 19,563 20,736 20,793 21,980 21,980 23,299
Refuse Derived Fuel Juta Rupiah 14,209 15,064 15,105 15,970 15,970 16,933 16,979 17,950 17,950 19,028
Recyclable Juta Rupiah 11,150 11,819 11,851 12,528 12,528 13,280 13,316 14,077 14,077 14,921
Total Pendapatan Juta Rupiah 42,770 45,338 45,462 48,061 48,061 50,949 51,088 54,007 54,007 57,248

Biaya Angkut RDF Juta Rupiah 9,968 10,566 11,231 11,872 12,584 13,339 14,178 14,988 15,887 16,840
RDF Logistic Cost Rupiah/ton 250,719 265,762 281,708 298,610 316,527 335,518 355,649 376,988 399,607 423,584
Biaya Gaji dan Upah Juta Rupiah 13,222 14,029 14,885 15,793 16,756 17,778 18,863 20,013 21,234 22,529
Biaya Operasi Juta Rupiah 9,131 9,679 10,260 10,876 11,528 12,220 12,953 13,730 14,554 15,427
Biaya Pemeliharaan Juta Rupiah 2,051 2,174 2,304 2,442 2,589 2,744 2,909 3,083 3,268 3,465
Biaya Asuransi Juta Rupiah 9 9 9 10 10 11 11 11 11 12
Biaya Pembuangan Residu ke Sanitary Landfill Juta Rupiah 100 106 113 119 126 134 142 150 160 169
Rupiah/ton 8,954 9,491 10,061 10,665 11,305 11,983 12,702 13,464 14,272 15,128
Total Biaya Operasi Juta Rupiah 34,481 36,563 38,802 41,112 43,594 46,226 49,056 51,977 55,114 58,443
% dari Pendapatan 80.6% 80.6% 85.3% 85.5% 90.7% 90.7% 96.0% 96.2% 102.0% 102.1%

40/61
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Tahun ke- 9 10 11 12 13 14 15 16 17 18
Laba Operasi Sebelum Penyusutan Juta Rupiah 8,289 8,775 6,661 6,949 4,468 4,723 2,033 2,031 -1,107 -1,194
% dari Pendapatan 19.4% 19.4% 14.7% 14.5% 9.3% 9.3% 4.0% 3.8% -2.0% -2.1%
Penyusutan
Tanah dan Bangunan Juta Rupiah 31 31 31 31 31 31 31 31 31 31
Mesin dan Peralatan Juta Rupiah 68 68 68 94 94 94 94 94 94 94
Kendaraan Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Perkakas dan Peralatan Kecil Juta Rupiah 8 8 8 10 10 10 10 10 11 11
Jumlah Juta Rupiah 107 107 107 134 134 134 134 134 136 136

41/61
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Tahun ke- 9 10 11 12 13 14 15 16 17 18
Laba Operasi Juta Rupiah 8,182 8,668 6,554 6,815 4,333 4,588 1,898 1,897 -1,243 -1,330
% dari Pendapatan 19.1% 19.1% 14.4% 14.2% 9.0% 9.0% 3.7% 3.5% -2.3% -2.3%
% of Revenues
Pendapatan Bunga Juta Rupiah 826 815 807 798 881 964 1,037 1,094 1,138 1,160
Biaya Bunga Juta Rupiah -1,735 -868 0 0 0 0 0 0 0 0
Laba Sebelum Pajak Juta Rupiah 7,272 8,615 7,361 7,614 5,214 5,553 2,935 2,990 -105 -170
% dari Pendapatan 17.0% 19.0% 16.2% 15.8% 10.8% 10.9% 5.7% 5.5% -0.2% -0.3%
Pajak Pendapatan Final Juta Rupiah 513 532 532 551 567 608 623 658 667 698
Pajak Tahun Berjalan Juta Rupiah 1,257 1,595 1,285 1,304 684 724 50 29 -440 -466
Pajak Penghasilan yang ditangguhkan Juta Rupiah -7 14 17 -8 -8 -8 -8 -5 -328 -350
Pajak Penghasilan Juta Rupiah 1,763 2,142 1,834 1,847 1,243 1,323 665 682 -100 -117
Laba Bersih Juta Rupiah 5,509 6,473 5,527 5,767 3,971 4,229 2,270 2,308 -5 -52
% dari Pendapatan 12.9% 14.3% 12.2% 12.0% 8.3% 8.3% 4.4% 4.3% 0.0% -0.1%

42/61
2035 2036 2037 2038 2039 2040 2041 2042
Tahun ke- 19 20 21 22 23 24 25 26
Proyeksi Laba Rugi Proyek - Laporan Laba Rugi
Pendapatan
Tipping Fee Juta Rupiah 23,363 24,697 24,697 26,179 26,251 27,750 27,750 29,415
Refuse Derived Fuel Juta Rupiah 19,080 20,173 20,173 21,385 21,444 22,669 22,669 24,033
Recyclable Juta Rupiah 14,962 15,817 15,817 16,766 16,812 17,772 17,772 18,838
Total Pendapatan Juta Rupiah 57,405 60,687 60,687 64,330 64,506 68,191 68,191 72,286

Biaya Angkut RDF Juta Rupiah 17,900 18,922 20,057 21,261 22,598 23,888 25,322 26,841
RDF Logistic Cost Rupiah/ton 448,999 475,939 504,495 534,765 566,851 600,862 636,914 675,128
Biaya Gaji dan Upah Juta Rupiah 23,904 25,362 26,909 28,550 30,292 32,140 34,100 36,180
Biaya Operasi Juta Rupiah 16,353 17,334 18,374 19,477 20,645 21,884 23,197 24,589
Biaya Pemeliharaan Juta Rupiah 3,672 3,893 4,126 4,374 4,636 4,915 5,209 5,522
Biaya Asuransi Juta Rupiah 12 13 13 13 13 14 14 15
Biaya Pembuangan Residu ke Sanitary Landfill Juta Rupiah 180 190 201 213 227 240 254 270
Rupiah/ton 16,036 16,998 18,018 19,099 20,245 21,459 22,747 24,112
Total Biaya Operasi Juta Rupiah 62,020 65,713 69,681 73,888 78,412 83,081 88,097 93,417
% dari Pendapatan 108.0% 108.3% 114.8% 114.9% 121.6% 121.8% 129.2% 129.2%

43/61
2035 2036 2037 2038 2039 2040 2041 2042
Tahun ke- 19 20 21 22 23 24 25 26
Laba Operasi Sebelum Penyusutan Juta Rupiah -4,615 -5,027 -8,994 -9,558 -13,905 -14,890 -19,906 -21,131
% dari Pendapatan -8.0% -8.3% -14.8% -14.9% -21.6% -21.8% -29.2% -29.2%
Penyusutan
Tanah dan Bangunan Juta Rupiah 31 31 31 31 31 31 31 31
Mesin dan Peralatan Juta Rupiah 94 94 94 126 126 126 126 126
Kendaraan Juta Rupiah 0 0 0 0 0 0 0 0
Perkakas dan Peralatan Kecil Juta Rupiah 11 11 11 13 13 13 13 13
Jumlah Juta Rupiah 136 136 136 170 170 170 170 170

44/61
2035 2036 2037 2038 2039 2040 2041 2042
Tahun ke- 19 20 21 22 23 24 25 26
Laba Operasi Juta Rupiah -4,751 -5,162 -9,130 -9,728 -14,075 -15,060 -20,076 -21,301
% dari Pendapatan -8.3% -8.5% -15.0% -15.1% -21.8% -22.1% -29.4% -29.5%
% of Revenues
Pendapatan Bunga Juta Rupiah 1,160 1,137 1,079 989 833 664 445 179
Biaya Bunga Juta Rupiah 0 0 0 0 0 0 0 0
Laba Sebelum Pajak Juta Rupiah -3,591 -4,025 -8,051 -8,739 -13,242 -14,396 -19,631 -21,122
% dari Pendapatan -6.3% -6.6% -13.3% -13.6% -20.5% -21.1% -28.8% -29.2%
Pajak Pendapatan Final Juta Rupiah 699 721 710 721 692 688 644 624
Pajak Tahun Berjalan Juta Rupiah -467 -494 -494 -524 -525 -555 -555 -588
Pajak Penghasilan yang ditangguhkan Juta Rupiah -1,205 -1,249 -2,234 -2,115 -3,180 -2,570 -3,751 -3,061
Pajak Penghasilan Juta Rupiah -973 -1,022 -2,018 -1,917 -3,013 -2,438 -3,662 -3,025
Laba Bersih Juta Rupiah -2,618 -3,004 -6,032 -6,822 -10,229 -11,958 -15,969 -18,097
% dari Pendapatan -4.6% -4.9% -9.9% -10.6% -15.9% -17.5% -23.4% -25.0%

45/61
Tabel Penyusutan
Depreciation Table

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Tahun ke- 0 1 2 3 4 5 6 7 8 9 10
Year #
Kelompok Aset dan Umur Pakai Komersil
Asset Group and Commercial Usage Life

Tanah dan Bangunan


Land and Building
Nilai Investasi Juta Rupiah 779
Investment Value Million Rupiah
25 Tahun Juta Rupiah 31 31 31 31 31 31 31 31 31
25 Years Million Rupiah
Mesin dan Peralatan
Machineries and Heavy Equipments
Nilai Investasi Juta Rupiah 677
Investment Value Million Rupiah
10 Tahun Juta Rupiah 68 68 68 68 68 68 68 68 68
10 Years Million Rupiah
Kendaraan
Vehicles
Nilai Investasi Juta Rupiah 0
Investment Value Million Rupiah
10 Tahun Juta Rupiah 0 0 0 0 0 0 0 0 0
10 Years Million Rupiah
Perkakas dan Peralatan Kecil
Tools and Small Equipment
Nilai Investasi Juta Rupiah 34 41
Investment Value Million Rupiah
5 Tahun Juta Rupiah 7 7 7 7 7 8 8 8 8
5 Years Million Rupiah

46/61
Tabel Penyusutan
Depreciation Table

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Tahun ke- 0 1 2 3 4 5 6 7 8 9 10
Year #
Total Aset
Asset Total
Nilai Investasi Juta Rupiah 0 1,491 0 0 0 0 41 0 0 0 0
Investment Value Million Rupiah
Nilai Penyusutan Juta Rupiah 106 106 106 106 106 107 107 107 107
Depreciation Value Million Rupiah
Kelompok Aset dan Umur Pakai Pajak
Asset Group and Tax Usage Life

Tanah dan Bangunan


Land and Building
Nilai Investasi Juta Rupiah 0 779 0 0 0 0 0 0 0 0 0
Investment Value Million Rupiah
20 Tahun Juta Rupiah 39 39 39 39 39 39 39 39 39
20 Years Million Rupiah

47/61
Tabel Penyusutan
Depreciation Table

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
Tahun ke- 0 1 2 3 4 5 6 7 8 9 10
Year #
Mesin dan Peralatan
Machineries and Heavy Equipments
Nilai Investasi Juta Rupiah 0 677 0 0 0 0 0 0 0 0 0
Investment Value Million Rupiah
8 Tahun Juta Rupiah 85 85 85 85 85 85 85 85 0
8 Years Million Rupiah
Kendaraan
Vehicles
Nilai Investasi Juta Rupiah 0 0 0 0 0 0 0 0 0 0 0
Investment Value Million Rupiah
8 Tahun Juta Rupiah 0 0 0 0 0 0 0 0 0
8 Years Million Rupiah
Perkakas dan Peralatan Kecil
Tools and Small Equipment
Nilai Investasi Juta Rupiah 0 34 0 0 0 0 41 0 0 0 0
Investment Value Million Rupiah
4 Tahun Juta Rupiah 9 9 9 9 0 10 10 10 10
4 Years Million Rupiah
Total Aset
Asset Total
Nilai Investasi Juta Rupiah 0 1,491 0 0 0 0 41 0 0 0 0
Investment Value Million Rupiah
Nilai Penyusutan Juta Rupiah 132 132 132 132 124 134 134 134 49
Depreciation Value Million Rupiah
Koreksi Fiskal
Fiscal Correction
Nilai Penyusutan Juta Rupiah 26 26 26 26 18 27 27 27 -58
Depreciation Value Million Rupiah

48/61
Tabel Penyusutan
Depreciation Table

2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042
Tahun ke- 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Year #
Kelompok Aset dan Umur Pakai Komersil
Asset Group and Commercial Usage Life

Tanah dan Bangunan


Land and Building
Nilai Investasi Juta Rupiah
Investment Value Million Rupiah
25 Tahun Juta Rupiah 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31 31
25 Years Million Rupiah
Mesin dan Peralatan
Machineries and Heavy Equipments
Nilai Investasi Juta Rupiah 937 1,259
Investment Value Million Rupiah
10 Tahun Juta Rupiah 68 94 94 94 94 94 94 94 94 94 94 126 126 126 126 126
10 Years Million Rupiah
Kendaraan
Vehicles
Nilai Investasi Juta Rupiah 0 0
Investment Value Million Rupiah
10 Tahun Juta Rupiah 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
10 Years Million Rupiah
Perkakas dan Peralatan Kecil
Tools and Small Equipment
Nilai Investasi Juta Rupiah 48 55 64
Investment Value Million Rupiah
5 Tahun Juta Rupiah 8 10 10 10 10 10 11 11 11 11 11 13 13 13 13 13
5 Years Million Rupiah

49/61
Tabel Penyusutan
Depreciation Table

2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042
Tahun ke- 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Year #
Total Aset
Asset Total
Nilai Investasi Juta Rupiah 985 0 0 0 0 55 0 0 0 0 1,323 0 0 0 0 0
Investment Value Million Rupiah
Nilai Penyusutan Juta Rupiah 107 134 134 134 134 134 136 136 136 136 136 170 170 170 170 170
Depreciation Value Million Rupiah
Kelompok Aset dan Umur Pakai Pajak
Asset Group and Tax Usage Life

Tanah dan Bangunan


Land and Building
Nilai Investasi Juta Rupiah 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Investment Value Million Rupiah
20 Tahun Juta Rupiah 39 39 39 39 39 39 39 39 39 39 39 0 0 0 0 0
20 Years Million Rupiah

50/61
Tabel Penyusutan
Depreciation Table

2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042
Tahun ke- 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
Year #
Mesin dan Peralatan
Machineries and Heavy Equipments
Nilai Investasi Juta Rupiah 937 0 0 0 0 0 0 0 0 0 1,259 0 0 0 0 0
Investment Value Million Rupiah
8 Tahun Juta Rupiah 0 117 117 117 117 117 117 117 117 0 0 157 157 157 157 157
8 Years Million Rupiah
Kendaraan
Vehicles
Nilai Investasi Juta Rupiah 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Investment Value Million Rupiah
8 Tahun Juta Rupiah 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
8 Years Million Rupiah
Perkakas dan Peralatan Kecil
Tools and Small Equipment
Nilai Investasi Juta Rupiah 48 0 0 0 0 55 0 0 0 0 64 0 0 0 0 0
Investment Value Million Rupiah
4 Tahun Juta Rupiah 0 12 12 12 12 0 14 14 14 14 0 16 16 16 16 0
4 Years Million Rupiah
Total Aset
Asset Total
Nilai Investasi Juta Rupiah 985 0 0 0 0 55 0 0 0 0 1,323 0 0 0 0 0
Investment Value Million Rupiah
Nilai Penyusutan Juta Rupiah 39 168 168 168 168 156 170 170 170 53 39 173 173 173 173 157
Depreciation Value Million Rupiah
Koreksi Fiskal
Fiscal Correction
Nilai Penyusutan Juta Rupiah -68 34 34 34 34 22 34 34 34 -83 -97 4 4 4 4 -13
Depreciation Value Million Rupiah

51/61
Perhitungan Pajak
Tax Calculation

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Tahun ke- 0 1 2 3 4 5 6 7 8
Year #

Laba Komersil Sebelum Pajak Juta Rupiah 0 142 5,685 7,105 6,376 7,855 7,042 8,378
Commercial Income Before Tax Million Rupiah

Koreksi Fiskal - Perbedaan Tetap


Fiscal Correction - Permanent Difference
Pendapatan yang dipotong Pajak Final Juta Rupiah 0 0 -1,002 -944 -900 -874 -854 -837
Income with Final Tax Million Rupiah
Laba Sebelum Pajak - Perbedaan Tetap Juta Rupiah 142 4,683 6,161 5,476 6,981 6,188 7,542
Income Before Tax - Permanent Difference Million Rupiah
Koreksi Fiskal - Perbedaan Waktu
Fiscal Correction - Timing Difference
Penyusutan Juta Rupiah 0 -26 -26 -26 -26 -18 -27 -27
Depreciation Million Rupiah

Laba Sebelum Pajak - Dasar Pajak Juta Rupiah 116 4,656 6,135 5,450 6,964 6,161 7,515
Income Before Tax - Tax Base Million Rupiah
Kerugian Pajak yang diakumulasikan Juta Rupiah 0 0 0 0 0 0 0
Tax Loss Carry Forward Million Rupiah
Utilisasi Juta Rupiah 0 0 0 0 0 0 0
Utilized Million Rupiah

52/61
Perhitungan Pajak
Tax Calculation

2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Tahun ke- 0 1 2 3 4 5 6 7 8
Year #
Dasar Pengenaan Pajak Juta Rupiah 116 4,656 6,135 5,450 6,964 6,161 7,515
Tax Base Amount Million Rupiah
Rugi Pajak Tidak Terpakai Juta Rupiah 0 0 0 0 0 0
Expired Tax Loss Carry Forward Million Rupiah

Pajak Tahun Berjalan Juta Rupiah 0 -205 871 1,224 1,053 1,412 1,211 1,530
Current Income Tax Million Rupiah
Pajak Tangguhan Juta Rupiah 0 -7 -7 -7 -7 -4 -7 -7
Deferred Income Tax Million Rupiah
Potongan Pajak Penghasilan Juta Rupiah 0 234 494 499 490 503 500 516
Income Tax Cut Million Rupiah

Hak Pajak yang Ditangguhkan Juta Rupiah 0 7 13 20 26 31 38 44


Deferred Tax Assets Million Rupiah

53/61
Perhitungan Pajak
Tax Calculation

2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Tahun ke- 9 10 11 12 13 14 15 16 17 18
Year #

Laba Komersil Sebelum Pajak Juta Rupiah 7,272 8,615 7,361 7,614 5,214 5,553 2,935 2,990 -105 -170
Commercial Income Before Tax Million Rupiah

Koreksi Fiskal - Perbedaan Tetap


Fiscal Correction - Permanent Difference
Pendapatan yang dipotong Pajak Final Juta Rupiah -826 -815 -807 -798 -881 -964 -1,037 -1,094 -1,138 -1,160
Income with Final Tax Million Rupiah
Laba Sebelum Pajak - Perbedaan Tetap Juta Rupiah 6,446 7,800 6,554 6,815 4,333 4,588 1,898 1,897 -1,243 -1,330
Income Before Tax - Permanent Difference Million Rupiah
Koreksi Fiskal - Perbedaan Waktu
Fiscal Correction - Timing Difference
Penyusutan Juta Rupiah -27 58 68 -34 -34 -34 -34 -22 -34 -34
Depreciation Million Rupiah

Laba Sebelum Pajak - Dasar Pajak Juta Rupiah 6,419 7,858 6,622 6,781 4,300 4,555 1,865 1,875 -1,277 -1,364
Income Before Tax - Tax Base Million Rupiah
Kerugian Pajak yang diakumulasikan Juta Rupiah 0 0 0 0 0 0 0 0 -1,277 -1,364
Tax Loss Carry Forward Million Rupiah
Utilisasi Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Utilized Million Rupiah

54/61
Perhitungan Pajak
Tax Calculation

2025 2026 2027 2028 2029 2030 2031 2032 2033 2034
Tahun ke- 9 10 11 12 13 14 15 16 17 18
Year #
Dasar Pengenaan Pajak Juta Rupiah 6,419 7,858 6,622 6,781 4,300 4,555 1,865 1,875 -1,277 -1,364
Tax Base Amount Million Rupiah
Rugi Pajak Tidak Terpakai Juta Rupiah 0 0 0 0 0 0 0 0 0 0
Expired Tax Loss Carry Forward Million Rupiah

Pajak Tahun Berjalan Juta Rupiah 1,257 1,595 1,285 1,304 684 724 50 29 -440 -466
Current Income Tax Million Rupiah
Pajak Tangguhan Juta Rupiah -7 14 17 -8 -8 -8 -8 -5 -328 -350
Deferred Income Tax Million Rupiah
Potongan Pajak Penghasilan Juta Rupiah 513 532 532 551 567 608 623 658 667 698
Income Tax Cut Million Rupiah

Hak Pajak yang Ditangguhkan Juta Rupiah 51 37 19 28 36 45 53 58 386 736


Deferred Tax Assets Million Rupiah

55/61
Perhitungan Pajak
Tax Calculation

2035 2036 2037 2038 2039 2040 2041 2042


Tahun ke- 19 20 21 22 23 24 25 26
Year #

Laba Komersil Sebelum Pajak Juta Rupiah -3,591 -4,025 -8,051 -8,739 -13,242 -14,396 -19,631 -21,122
Commercial Income Before Tax Million Rupiah

Koreksi Fiskal - Perbedaan Tetap


Fiscal Correction - Permanent Difference
Pendapatan yang dipotong Pajak Final Juta Rupiah -1,160 -1,137 -1,079 -989 -833 -664 -445 -179
Income with Final Tax Million Rupiah
Laba Sebelum Pajak - Perbedaan Tetap Juta Rupiah -4,751 -5,162 -9,130 -9,728 -14,075 -15,060 -20,076 -21,301
Income Before Tax - Permanent Difference Million Rupiah
Koreksi Fiskal - Perbedaan Waktu
Fiscal Correction - Timing Difference
Penyusutan Juta Rupiah -34 83 97 -4 -4 -4 -4 13
Depreciation Million Rupiah

Laba Sebelum Pajak - Dasar Pajak Juta Rupiah -4,785 -5,079 -9,033 -9,732 -14,079 -15,063 -20,079 -21,288
Income Before Tax - Tax Base Million Rupiah
Kerugian Pajak yang diakumulasikan Juta Rupiah -4,785 -5,079 -9,033 -9,732 -14,079 -15,063 -20,079 -21,288
Tax Loss Carry Forward Million Rupiah
Utilisasi Juta Rupiah 0 0 0 0 0 0 0 0
Utilized Million Rupiah

56/61
Perhitungan Pajak
Tax Calculation

2035 2036 2037 2038 2039 2040 2041 2042


Tahun ke- 19 20 21 22 23 24 25 26
Year #
Dasar Pengenaan Pajak Juta Rupiah -4,785 -5,079 -9,033 -9,732 -14,079 -15,063 -20,079 -21,288
Tax Base Amount Million Rupiah
Rugi Pajak Tidak Terpakai Juta Rupiah 0 0 0 1,277 1,364 4,785 5,079 9,033
Expired Tax Loss Carry Forward Million Rupiah

Pajak Tahun Berjalan Juta Rupiah -467 -494 -494 -524 -525 -555 -555 -588
Current Income Tax Million Rupiah
Pajak Tangguhan Juta Rupiah -1,205 -1,249 -2,234 -2,115 -3,180 -2,570 -3,751 -3,061
Deferred Income Tax Million Rupiah
Potongan Pajak Penghasilan Juta Rupiah 699 721 710 721 692 688 644 624
Income Tax Cut Million Rupiah

Hak Pajak yang Ditangguhkan Juta Rupiah 1,941 3,190 5,424 7,538 10,718 13,288 17,039 20,100
Deferred Tax Assets Million Rupiah

57/61
Jadwal Pembayaran Pokok Hutang dan Bunga
Principle and Interest Loan Payment Schedule
dari tahun 2018-2042
for 2018-2042

Saldo Pinjaman Pembayaran Saldo Pinjaman Pembayaran Pembayaran Total


Tahun atas Investasi Awal Pokok Pinjaman Modal Kerja Pinjaman Modal Kerja Bunga Biaya Pinjaman
Initial Investment Principle Working Capital Working Capital Interest Debt Service
Year Loan Balance Loan Payments Loan Loan Payments Payment Total
2016 0 0 0
2017 49,580 0 0
2018 49,580 0 0 0 -6,941 -6,941
2019 43,383 -6,198 0 0 -6,941 -13,139
2020 37,185 -6,198 0 0 -6,074 -12,271
2021 30,988 -6,198 0 0 -5,206 -11,403
2022 24,790 -6,198 0 0 -4,338 -10,536
2023 18,593 -6,198 0 0 -3,471 -9,668
2024 12,395 -6,198 0 0 -2,603 -8,800
2025 6,198 -6,198 0 0 -1,735 -7,933
2026 0 -6,198 0 0 -868 -7,065
2027 0 0 0 0 0 0
2028 0 0 0 0 0 0
2029 0 0 0 0 0 0
2030 0 0 0 0 0 0
2031 0 0 0 0 0 0
2032 0 0 0 0 0 0
2033 0 0 0 0 0 0
2034 0 0 0 0 0 0
2035 0 0 0 0 0 0
2036 0 0 0 0 0 0
2037 0 0 0 0 0 0
2038 0 0 0 0 0 0
2039 0 0 0 0 0 0
2040 0 0 0 0 0 0
2041 0 0 0 0 0 0
2042 0 0 13,000 0 0 0

58/61
Rasio Kecukupan Pembayaran Kewajiban Keuangan
Debt Service Coverage Ratio
dari tahun 2018-2042
for 2018-2042

Total Laba Operasi Sebelum Rasio Kecukupan Pembayaran


Tahun Biaya Pinjaman Penyusutan Kewajiban Keuangan
Debt Service Operating Income Before
Year Total Depreciation Debt Service Coverage Ratio
2016 0 0 0.00
2017 0 0 0.00
2018 -6,941 7,189 1.04
2019 -13,139 11,730 0.89
2020 -12,271 12,340 1.01
2021 -11,403 10,788 0.95
2022 -10,536 11,425 1.08
2023 -9,668 9,766 1.01
2024 -8,800 10,252 1.16
2025 -7,933 8,289 1.04
2026 -7,065 8,775 1.24
2027 0 6,661 0.00
2028 0 6,949 0.00
2029 0 4,468 0.00
2030 0 4,723 0.00
2031 0 2,033 0.00
2032 0 2,031 0.00
2033 0 -1,107 0.00
2034 0 -1,194 0.00
2035 0 -4,615 0.00
2036 0 -5,027 0.00
2037 0 -8,994 0.00
2038 0 -9,558 0.00
2039 0 -13,905 0.00
2040 0 -14,890 0.00
2041 0 -19,906 0.00
2042 0 -21,131 0.00

59/61
Ringkasan Keuangan
Financial Summary

Keterangan Angka
Descriptions Amount
Tingkat Pengembalian Modal
Internal Rate of Return
Jika Atas Permodalan Sendiri % 53.7%
If Based on Own Equity
Dengan Pinjaman % 2.2%
With Debt Service

Nilai Bersih Investasi Saat ini


Net Present Value
Jika Atas Permodalan Sendiri Juta Rupiah 27,508
If Based on Own Equity Million Rupiah
Dengan Pinjaman Juta Rupiah 33,522
With Debt Service Million Rupiah

Tahun Pengembalian Modal


Payback Year
Jika Atas Permodalan Sendiri Tahun ke- 0.3
If Based on Own Equity Year #
Dengan Pinjaman Tahun ke- 287.6
With Debt Service Year #

Tahun Pengembalian Modal Terdiskonto


Discounted Payback Year
Jika Atas Permodalan Sendiri Tahun ke- 1.6
If Based on Own Equity Year #
Dengan Pinjaman Tahun ke- 770.5
With Debt Service Year #

60/61
Tabel E-1 Lampiran Penawaran Biaya
Table E-1: Cost Offer
Jasa Pengolahan Sampah dari tahun 2018-2042
Tipping Fee for 2018-2042

Tahun Biaya Jasa Pengolahan Sampah (dalam Rp)*


Year Tipping Fee
2018 89,000
2019 89,000
2020 94,340
2021 94,340
2022 100,000
2023 100,000
2024 106,000
2025 106,000
2026 112,360
2027 112,360
2028 119,102
2029 119,102
2030 126,248
2031 126,248
2032 133,823
2033 133,823
2034 141,852
2035 141,852
2036 150,364
2037 150,364
2038 159,385
2039 159,385
2040 168,949
2041 168,949
2042 179,085

*) Maksimum Kenaikan Biaya Jasa Pengolahan Sampah adalah enam persen (6%)
per dua tahun setelah Proyek beroperasi secara komersial
*) Maximum tipping fee increase is six percent (6%) per two years after Project
operates commercially.