PT.CITRAMASJAYA PLAN TOWER TX .T.O5 TYPE DD+30 PROJECT BATANG

AREA MATERIAL
LICTINGTEKNIKMANDIRI
PT.CITRAMASJAYA PLAN TOWER TX .T.O5 TYPE DD+30 PROJECT BATANG

POSISI CRANE 1
(80 TON)

POSISI CRANE 2
(80 TON)
LICTINGTEKNIKMANDIRI
PT.CITRAMASJAYA PLAN TOWER TX .T.O5 TYPE DD+30 PROJECT BATANG

POSISI
CRANE
1
JARAK AS CRANE DGN LEG TERJAUH 46 METER
LICTINGTEKNIKMANDIRI
PT.CITRAMASJAYA PLAN TOWER TX .T.O5 TYPE DD+30 PROJECT BATANG

UNSAFE CONDITION

1.KONDISI AREA EX RAWA DAN PENGURUGAN DAN PEMADATAN


MENGANDALKAN TANAH HASIL GALIAN

UNSAFE ACTION

2.PENGADAAN PLAT AREA POSISI CRANE 10 LEMBAR