DAFTAR KEPERLUAN MATERIAL PROJECT

Nama Pekerjaan : Kelistrikan Mega Injection


Lokasi : Blok 4
Material & Estimasi Biaya
No Item Pekerjaan Tgl Harga Satuan Jumlah
N0 Item Material Part Number Satuan Jumlah
(Rp)
Diperlukan ( Rp )

1 Kelistrikan Mixer

Panel Kontrol 1 Panel Listrik, 80x60x20cm, out door set 1 0

2 MCB, 3 Phase, 50 A, iC60N Schneider set 1 0

3 MCB, 3 Phase, 16 A, iC60N Schneider set 4 0

4 MCB, 3 Phase, 10 A, iC60N Schneider set 2 0

5 MCB, 1 Phase, 10 A, iC60N Schneider set 3 0


6 MCB, 1 Phase, 6 A, iC60N Schneider set 3 0
7 Surge Arrester 1P, iPF20, Schneider Schneider Pcs 4 0
8 Kontaktor LC1D18, 220VAC, 50HZ Schneider set 6 0
9 Thermal Over Load, LRD12, Schneider Schneider set 4 0
10 Thermal Over Load, LRD14, Schneider Schneider set 2 0
11 Shuntrip MX + OFF, A9A26946, Schneider A9A26946 set 1 0

Emergency Stop, XB5-AS542+ZBE101 NO, Schneider XB5-AS542 Set 1 0


12
13 Push Button ON & OFF, XB5AL73415, Schneider XB5AL73415 pcs 6 0
14 Pilot Lamp XB7EV03MP Green, Schneider Schneider Set 8 0
15 Pilot Lamp XB7EV04MP Red, Schneider Schneider Set 8 0
16 Pilot Lamp XB7EV05MP Yellow, Schneider Schneider Set 8 0
17 Kabel NYAF 1,5 mm2, merah Jembo m 100 0
18 Kabel NYAF 1,5 mm2, hitam Jembo m 100 0
Kabel NYA 2,5 mm2, hitam Jembo m 100 0
19 Omega Rel Simetris, Dudukan MCB PUMA btng 2 0
20 Busbar Sisir, 3 Phase, 63A, 10391 Schneider btng 3 0
Sub Total 2 0
2 Penarikan Kabel
Sumber Listrik dari Gardu
a
Trafo
Panel LVMDP ke SDP1 Kabel NFA 2X, 4x16 mm2 Sutrado m 100 0

Panel SDP1 ke Panel SDP 2 Kabel NYFGbY, 4x6mm2 Supreme m 100 0


Panel SDP2 ke Panel Kontrol Kabel NFA 2X, 4x16 mm2 Sutrado m 100 0

Tiang Listrik 9 m, Tiang Listrik 9 m, standar pln standar pln btg 4 0

b Dari Panel kontrol ke


Motor Agitator (4 unit) Kabel NYY 3x2,5mm2 Supreme m 60 0
Motor Pompa (2 unit) Kabel NYY 3x2,5mm2 Supreme m 200 0

Lampu Penerangan Area Luar Kabel NYY 3x2,5mm2 Supreme m 60 0

Stopkontak dan Lampu


Kabel NYY 3x2,5mm2 Supreme m 60 0
penerangan area kerja

Sub Total 3 0

3 Grounding System

Panel Mixer 1 BC drat 16 mm2 mtr 30 0


2 Root tembaga 5/8" @ 4 mtr/btng btng 3 0
3 Connector ring tembaga pcs 8 0
4 Kabel Schun 16 mm2 pcs 10 0
5 NYAF 16mm2, hijau-kuning, supreme mtr 10 0

Sub Total 5 0
5 Penyalur Petir

Penyalur Petir Penyalur Petir Electrostatic, Current Air Terminal "CR120" set 1 4,500,000 4,500,000
1
2 Kabel NYY 1x70mm2 mtr 20 100,000 2,000,000
3 BC drat 50 mm2 mtr 35 45,000 1,575,000
4 Root tembaga 16 mm x 4 mtr btng 3 1,000,000 3,000,000
5 Connector ring tembaga pcs 10 50,000 500,000
6 Kabel Schun 50 mm2 pcs 8 15,000 120,000
7 Kabel Schun 70 mm2 pcs 5 25,000 125,000
8 Pipa Galvanis 2", medium A btng 1 330,000 330,000
9 Pipa Galvanis 3", medium A btng 1 0
10 Pipa Galvanis 4", medium A btng 1 0
11 Panel 40x30x25 set 1 450,000 450,000

Sub Total 6 12,600,000


Total 12,600,000
Estimasi = Total + 20% 15,120,000
ESTIMASI DAYA YANG DIGUNAKAN
Daya Terpasang Daya Terpakai
No Perangkat
(W) (VA) Jumlah Total (VA) (W) (VA) Jumlah Total (VA)
1 Motor Mixer 2200 3,273.60 4 13,094.40 2200 2,706.00 4 10,824.00
Motor Pompa
2 3000 4,000.00 2 8,000.00 3000 4,000.00 2 8,000.00
air
3 Lampu LED 100 100 4 400.00 100 100 4 400.00
4 Mesin Las 900 900 1 900.00 900 900 1 900.00

Total Beban (VA) 22,394.40 Total Beban (VA) 20,124.00