Anda di halaman 1dari 3

MANUAL TRANSAKSI

Title: Contract – Change


Author: Rhesa Syahrial Release: SAP ECC 6.0
Role: Change Contract Status:

Langkah-Langkah Prosedural

1.1. Akses “Contract – Change” dengan:

Via Menus Logistics > Sales and Distribution > Sales > Contract > Change
Via Transaction Code VA42

1.2. Pada tampilan “Change Contract: Initial Screen”, masukkan informasi di field-field yang
dijelaskan dalam tabel berikut:

Nama Field Deskripsi R/O/C Input dari User Comments


Contract Masukkan nomor Contract Input nomor contract

Catatan: R: Required; O: Optional; C: Conditional

Klik atau tekan ”Enter”, maka akan masuk ke tampilan Change Quantity Contract 1400010 :
Overview.

Perubahan Terakhir: Nama File: <nama_file>.doc Versi: Halaman:


8-May-2023 663148752.doc 0.0 1 of 3
MANUAL TRANSAKSI

Title: Contract – Change


Author: Rhesa Syahrial Release: SAP ECC 6.0
Role: Change Contract Status:

1.3. Pada tampilan “Change Quantity Contract 1400010 : Overview”, masukkan informasi di
field-field yang dijelaskan dalam tabel berikut:

Dari tampilan Overview ini, perubahan data dapat langsung dilakukan sesuai dengan kebutuhan.

Jika sudah selesai mengubah dokumen Value Contract, tekan tombol save untuk menyimpan
dokumen Contract, sehingga akan muncul tampilan :

Perubahan Terakhir: Nama File: <nama_file>.doc Versi: Halaman:


8-May-2023 663148752.doc 0.0 2 of 3
MANUAL TRANSAKSI

Title: Contract – Change


Author: Rhesa Syahrial Release: SAP ECC 6.0
Role: Change Contract Status:

Tanda menunjukkan bahwa contract telah berhasil di-change


dan telah di-save ke dalam system.

Perubahan Terakhir: Nama File: <nama_file>.doc Versi: Halaman:


8-May-2023 663148752.doc 0.0 3 of 3

Anda mungkin juga menyukai