Data : January 2019

Simulasi Laba Rugi Penambangan dengan SR 4


Rencana Reserve Tertambang, SR 4
No Deskripsi Nilai Keterangan
1 Reserve
a. Overburden 200,000 Bcm Jarak dumping 500 - 800 m
b. Coal 50,000 Ton Batubara diangkut ke Stockpile
c. SR 4
2 Jarak Hauling to Port 60 Km Dari Tambang ke Pelabuhan
3 Luas Lahan dibebaskan

Rincian Untung Rugi Penambangan SR 4


Biaya
No Deskripsi Nilai
$
1 Biaya Operasional
a. Biaya Upah Cangkul 50,000 Ton $ 271,839.08
1) Biaya OB Removal 200,000 Bcm $ 221,839.08
2) Biaya Coal Getting 50,000 Ton $ 50,000.00
b. Biaya Hauling 60 Km $ 289,655.17
c. Biaya Man Power 50,000 Ton $ 50,000.00
d. Biaya Pelabuhan 50,000 Ton $ 155,172.41
e. Overhead 50,000 Ton $ 50,000.00
f. Komdev 50,000 Ton $ 3,448.28
2 Pembebasan Lahan 50,000 Ton $ 17,241.38
3 Fee Jalan 50,000 Ton $ 34,482.76
4 Fee IUP 50,000 Ton $ 172,413.79
5 Royalty 50,000 Ton $ 68,965.52
6 Costing
a. Total Biaya $ 837,356.32
b. Harga Jual Bruto 50,000 Ton $ 1,379,310.34
c. Keuntungan Bersih $ 541,954.02

Simulasi Laba Rugi Penambangan dengan SR 5


Rencana Reserve Tertambang, SR 5
No Deskripsi Nilai Keterangan
1 Reserve
a. Overburden 250,000 Bcm Jarak dumping 500 - 800 m
b. Coal 50,000 Ton Batubara diangkut ke Stockpile
c. SR 5
2 Jarak Hauling to Port 60 Km Dari Tambang ke Pelabuhan
3 Luas Lahan dibebaskan

Rincian Untung Rugi Penambangan SR 5


Biaya
No Deskripsi Nilai
$
1 Biaya Operasional
a. Biaya Upah Cangkul 50,000 Ton $ 327,298.85
1) Biaya OB Removal 250,000 Bcm $ 277,298.85
2) Biaya Coal Getting 50,000 Ton $ 50,000.00
b. Biaya Hauling 60 Km $ 289,655.17
c. Biaya Man Power 50,000 Ton $ 50,000.00
d. Biaya Pelabuhan 50,000 Ton $ 155,172.41
e. Overhead 50,000 Ton $ 50,000.00
f. Komdev 50,000 Ton $ 3,448.28
2 Pembebasan Lahan 50000 Ton $ 17,241.38
3 Fee Jalan 50,000 Ton $ 34,482.76
4 Fee IUP 50,000 Ton $ 172,413.79
5 Royalty 50,000 Ton $ 68,965.52
6 Costing
a. Total Biaya $ 892,816.09
b. Harga Jual Bruto 50,000 Ton $ 1,379,310.34
c. Keuntungan Bersih $ 486,494.25

Simulasi Laba Rugi Penambangan dengan SR 6


Rencana Reserve Tertambang, SR 6
No Deskripsi Nilai Keterangan
1 Reserve
a. Overburden 300,000 Bcm Jarak dumping 500 - 800 m
b. Coal 50,000 Ton Batubara diangkut ke Stockpile
c. SR 6
2 Jarak Hauling to Port 60 Km Dari Tambang ke Pelabuhan
3 Luas Lahan dibebaskan

Rincian Untung Rugi Penambangan SR 6


Biaya
No Deskripsi Nilai
$
1 Biaya Operasional
a. Biaya Upah Cangkul 50000 ton
1) Biaya OB Removal 300,000 Bcm $ 332,758.62
2) Biaya Coal Getting 50,000 Ton $ 50,000.00
b. Biaya Hauling 60 Km $ 289,655.17
c. Biaya Man Power 50,000 Ton $ 50,000.00
d. Biaya Pelabuhan 50,000 Ton $ 155,172.41
e. Overhead 50,000 Ton $ 50,000.00
f. Komdev 50,000 Ton $ 3,448.28
2 Pembebasan Lahan 50,000 Ton $ 17,241.38
3 Fee Jalan 50,000 Ton $ 34,482.76
4 Fee IUP 50,000 Ton $ 172,413.79
5 Royalty 50,000 Ton $ 68,965.52
6 Costing
a. Total Biaya $ 948,275.86
b. Harga Jual Bruto 50,000 Ton $ 1,379,310.34
c. Keuntungan Bersih $ 431,034.48
Rincian Biaya Penambangan
Biaya
No Deskripsi
Keterangan $ Rupiah
1 Kurs $ 1.00 Rp 14,500
Jarak dumping 500 - 800 m 2 Biaya Operasional
Batubara diangkut ke Stockpile a. Biaya Upah Cangkup $ 7.59 Rp 110,000
1) Biaya OB Removal $ 1.60 Rp 16,083
Dari Tambang ke Pelabuhan 2) Biaya Coal Getting $ 1.00 Rp 14,500
b. Biaya Hauling $ 0.10 Rp 1,400
c. Biaya Man Power $ 1.00 Rp 14,500
d. Biaya Pelabuhan $ 3.10 Rp 45,000
Biaya e. Overhead $ 1.00 Rp 14,500
Rupiah f. Komdev / Adat $ 0.07 Rp 1,000
3 Fee Lahan $ 0.34 Rp 5,000
Rp 3,941,666,667 4 Fee Jalan $ 0.69 Rp 10,000
Rp 3,216,666,667 5 Fee IUP $ 3.45 Rp 50,000
Rp 725,000,000 6 Royalty $ 1.38 Rp 20,000
Rp 4,200,000,000 7 Harga Jual Batubara $ 27.59 Rp 400,000
Rp 725,000,000
Rp 2,250,000,000
Rp 725,000,000
Rp 50,000,000
Rp 250,000,000
Rp 500,000,000
Rp 2,500,000,000
Rp 1,000,000,000

Rp 16,141,666,667
Rp 20,000,000,000
Rp 3,858,333,333

Keterangan

Jarak dumping 500 - 800 m


Batubara diangkut ke Stockpile

Dari Tambang ke Pelabuhan


Biaya
Rupiah

Rp 4,745,833,333
Rp 4,020,833,333
Rp 725,000,000
Rp 4,200,000,000
Rp 725,000,000
Rp 2,250,000,000
Rp 725,000,000
Rp 50,000,000
Rp 250,000,000
Rp 500,000,000
Rp 2,500,000,000
Rp 1,000,000,000

Rp 16,945,833,333
Rp 20,000,000,000
Rp 3,054,166,667

Keterangan

Jarak dumping 500 - 800 m


Batubara diangkut ke Stockpile

Dari Tambang ke Pelabuhan

Biaya
Rupiah

Rp 5,500,000,000
Rp 4,825,000,000
Rp 725,000,000
Rp 4,200,000,000
Rp 725,000,000
Rp 2,250,000,000
Rp 725,000,000
Rp 50,000,000
Rp 250,000,000
Rp 500,000,000
Rp 2,500,000,000
Rp 1,000,000,000

Rp 17,750,000,000
Rp 20,000,000,000
Rp 2,250,000,000
a
Keterangan
Satuan
Nilai Rupiah sekarang

/Ton Untuk SR 6, akan di breakdown sesuai SR lainnya


/Bcm Alat Berat dan Karyawan dari Kontraktor
/Ton Alat Berat dan Karyawan dari Kontraktor
/Ton/Km Hauling dari Stockpile Ke Port
/Ton Gajih Karyawan
/Ton Biaya Pelabuhan sampai FOB
/Ton Untuk biaya tak terduga
/Ton Biaya untuk CSR, Acara Adat dan Sosial lainnya
/Ton Estimasi Fee Lahan Rp. 15.000 per Ton
/Ton Pembayaran DP Royalty
/Ton Peruntukan Pemilik IUP
/Ton Royalty batubara 5% dari harga jual
/Ton
Subject
Data : January 2019

Simulasi Laba Rugi Penambangan dengan SR 4


Rencana Reserve Tertambang, SR 4
No Deskripsi Nilai Keterangan
1 Reserve
a. Overburden 200,000 Bcm Jarak dumping 500 - 800 m
b. Coal 50,000 Ton Batubara diangkut ke Stockpile
c. SR 4
2 Jarak Hauling to Port 60 Km Dari Tambang ke Pelabuhan
3 Luas Lahan dibebaskan

Rincian Untung Rugi Penambangan SR 4

No Deskripsi Nilai
1
1 Biaya Operasional
a. Biaya Upah Cangkul 50,000 Ton Rp 3,941,666,667

b. Biaya Hauling 60 Km Rp 4,200,000,000

c. Biaya Man Power 50,000 Ton Rp 725,000,000

d. Biaya Pelabuhan 50,000 Ton Rp 2,250,000,000

e. Overhead 50,000 Ton Rp 725,000,000

f. Komdev 50,000 Ton Rp 50,000,000

2 Pembebasan Lahan 50,000 Ton Rp 250,000,000

3 Fee Jalan 50,000 Ton Rp 500,000,000

4 Fee IUP 50,000 Ton Rp 2,500,000,000

5 Royaly 50,000 Ton Rp 1,000,000,000

6 Costing
a. Total Biaya Rp 16,141,666,667

b. Harga Jual Bruto 50,000 Ton Rp 20,000,000,000

c. Keuntungan Bersih Rp 3,858,333,333

Simulasi Laba Rugi Penambangan dengan SR 5


Rencana Reserve Tertambang, SR 5
No Deskripsi Nilai Keterangan
1 Reserve
a. Overburden 250,000 Bcm Jarak dumping 500 - 800 m
b. Coal 50,000 Ton Batubara diangkut ke Stockpile
c. SR 5
2 Jarak Hauling to Port 60 Km Dari Tambang ke Pelabuhan
3 Luas Lahan dibebaskan
Rincian Untung Rugi Penambangan SR 5

No Deskripsi Nilai
1
1 Biaya Operasional
a. Biaya Upah Cangkul 50,000 Ton Rp 4,745,833,333

b. Biaya Hauling 60 Km Rp 4,200,000,000

c. Biaya Man Power 50,000 Ton Rp 725,000,000

d. Biaya Pelabuhan 50,000 Ton Rp 2,250,000,000

e. Overhead 50,000 Ton Rp 725,000,000

f. Komdev 50,000 Ton Rp 50,000,000

2 Pembebasan Lahan 50,000 Ha Rp 250,000,000

3 Fee Jalan 50,000 Ton Rp 500,000,000

4 Fee IUP 50,000 Ton Rp 2,500,000,000

5 Royaly 50,000 Ton Rp 1,000,000,000

6 Costing
a. Total Biaya Rp 16,945,833,333

b. Harga Jual Bruto 50,000 Ton Rp 20,000,000,000

c. Keuntungan Bersih Rp 3,054,166,667

Simulasi Laba Rugi Penambangan dengan SR 6


Rencana Reserve Tertambang, SR 6
No Deskripsi Nilai Keterangan
1 Reserve
a. Overburden 300,000 Bcm Jarak dumping 500 - 800 m
b. Coal 50,000 Ton Batubara diangkut ke Stockpile
c. SR 6
2 Jarak Hauling to Port 60 Km Dari Tambang ke Pelabuhan
3 Luas Lahan dibebaskan

Rincian Untung Rugi Penambangan SR 6

No Deskripsi Nilai
1
1 Biaya Operasional
a. Biaya Upah Cangkul 50,000 Ton Rp 5,500,000,000

b. Biaya Hauling 60 Km Rp 4,200,000,000

c. Biaya Man Power 50,000 Ton Rp 725,000,000

d. Biaya Pelabuhan 50,000 Ton Rp 2,250,000,000

e. Overhead 50,000 Ton Rp 725,000,000


f. Komdev 50,000 Ton Rp 50,000,000

2 Pembebasan Lahan 50000 Ha Rp 250,000,000

3 Fee Jalan 50,000 Ton Rp 500,000,000

4 Fee IUP 50,000 Ton Rp 2,500,000,000

5 Royaly 50,000 Ton Rp 1,000,000,000

6 Costing
a. Total Biaya Rp 17,700,000,000

b. Harga Jual Bruto 50,000 Ton Rp 20,000,000,000

c. Keuntungan Bersih Rp 2,300,000,000


Keterangan

rak dumping 500 - 800 m


ubara diangkut ke Stockpile

ri Tambang ke Pelabuhan

Bulan Ke
2 3 4 5

Rp 3,941,666,667 Rp 3,941,666,667 Rp 3,941,666,667 Rp 3,941,666,667

Rp 4,200,000,000 Rp 4,200,000,000 Rp 4,200,000,000 Rp 4,200,000,000

Rp 725,000,000 Rp 725,000,000 Rp 725,000,000 Rp 725,000,000

Rp 2,250,000,000 Rp 2,250,000,000 Rp 2,250,000,000 Rp 2,250,000,000

Rp 725,000,000 Rp 725,000,000 Rp 725,000,000 Rp 725,000,000

Rp 50,000,000 Rp 50,000,000 Rp 50,000,000 Rp 50,000,000

Rp 250,000,000 Rp 250,000,000 Rp 250,000,000 Rp 250,000,000

Rp 500,000,000 Rp 500,000,000 Rp 500,000,000 Rp 500,000,000

Rp 2,500,000,000 Rp 2,500,000,000 Rp 2,500,000,000 Rp 2,500,000,000

Rp 1,000,000,000 Rp 1,000,000,000 Rp 1,000,000,000 Rp 1,000,000,000

Rp 16,141,666,667 Rp 16,141,666,667 Rp 16,141,666,667 Rp 16,141,666,667

Rp 20,000,000,000 Rp 20,000,000,000 Rp 20,000,000,000 Rp 20,000,000,000

Rp 3,858,333,333 Rp 3,858,333,333 Rp 3,858,333,333 Rp 3,858,333,333

Keterangan

rak dumping 500 - 800 m


ubara diangkut ke Stockpile

ri Tambang ke Pelabuhan
Bulan Ke
2 3 4 5

Rp 4,745,833,333 Rp 4,745,833,333 Rp 4,745,833,333 Rp 4,745,833,333

Rp 4,200,000,000 Rp 4,200,000,000 Rp 4,200,000,000 Rp 4,200,000,000

Rp 725,000,000 Rp 725,000,000 Rp 725,000,000 Rp 725,000,000

Rp 2,250,000,000 Rp 2,250,000,000 Rp 2,250,000,000 Rp 2,250,000,000

Rp 725,000,000 Rp 725,000,000 Rp 725,000,000 Rp 725,000,000

Rp 50,000,000 Rp 50,000,000 Rp 50,000,000 Rp 50,000,000

Rp 250,000,000 Rp 250,000,000 Rp 250,000,000 Rp 250,000,000

Rp 500,000,000 Rp 500,000,000 Rp 500,000,000 Rp 500,000,000

Rp 2,500,000,000 Rp 2,500,000,000 Rp 2,500,000,000 Rp 2,500,000,000

Rp 1,000,000,000 Rp 1,000,000,000 Rp 1,000,000,000 Rp 1,000,000,000

Rp 16,945,833,333 Rp 16,945,833,333 Rp 16,945,833,333 Rp 16,945,833,333

Rp 20,000,000,000 Rp 20,000,000,000 Rp 20,000,000,000 Rp 20,000,000,000

Rp 3,054,166,667 Rp 3,054,166,667 Rp 3,054,166,667 Rp 3,054,166,667

Keterangan

rak dumping 500 - 800 m


ubara diangkut ke Stockpile

ri Tambang ke Pelabuhan

Bulan Ke
2 3 4 5

Rp 5,500,000,000 Rp 5,500,000,000 Rp 5,500,000,000 Rp 5,500,000,000

Rp 4,200,000,000 Rp 4,200,000,000 Rp 4,200,000,000 Rp 4,200,000,000

Rp 725,000,000 Rp 725,000,000 Rp 725,000,000 Rp 725,000,000

Rp 2,250,000,000 Rp 2,250,000,000 Rp 2,250,000,000 Rp 2,250,000,000

Rp 725,000,000 Rp 725,000,000 Rp 725,000,000 Rp 725,000,000


Rp 50,000,000 Rp 50,000,000 Rp 50,000,000 Rp 50,000,000

Rp 250,000,000 Rp 250,000,000 Rp 250,000,000 Rp 250,000,000

Rp 500,000,000 Rp 500,000,000 Rp 500,000,000 Rp 500,000,000

Rp 2,500,000,000 Rp 2,500,000,000 Rp 2,500,000,000 Rp 2,500,000,000

Rp 1,000,000,000 Rp 1,000,000,000 Rp 1,000,000,000 Rp 1,000,000,000

Rp 17,700,000,000 Rp 17,700,000,000 Rp 17,700,000,000 Rp 17,700,000,000

Rp 20,000,000,000 Rp 20,000,000,000 Rp 20,000,000,000 Rp 20,000,000,000

Rp 2,300,000,000 Rp 2,300,000,000 Rp 2,300,000,000 Rp 2,300,000,000


6

Rp 3,941,666,667

Rp 4,200,000,000

Rp 725,000,000

Rp 2,250,000,000

Rp 725,000,000

Rp 50,000,000

Rp 250,000,000

Rp 500,000,000

Rp 2,500,000,000

Rp 1,000,000,000

Rp 16,141,666,667

Rp 20,000,000,000

Rp 3,858,333,333
6

Rp 4,745,833,333

Rp 4,200,000,000

Rp 725,000,000

Rp 2,250,000,000

Rp 725,000,000

Rp 50,000,000

Rp 250,000,000

Rp 500,000,000

Rp 2,500,000,000

Rp 1,000,000,000

Rp 16,945,833,333

Rp 20,000,000,000

Rp 3,054,166,667

Rp 5,500,000,000

Rp 4,200,000,000

Rp 725,000,000

Rp 2,250,000,000

Rp 725,000,000
Rp 50,000,000

Rp 250,000,000

Rp 500,000,000

Rp 2,500,000,000

Rp 1,000,000,000

Rp 17,700,000,000

Rp 20,000,000,000

Rp 2,300,000,000
Subject : Request Equipment
Data : January 2019

Request Unit Kontraktor, Untuk Penambangan SR 4


No Brand Type Quantity
1 Komatsu Excavator PC400-LC8 3 Unit OB Excavator

2 Komatsu Excavator PC300-LC6 2 Unit Coal Getting

3 Komatsu Excavator PC200 2 Unit General Support

4 Scania Dump Truck P380 13 Unit OB Hauler

5 Hino Dump Truck FM 260 JD 4 Unit Coal Hauling

6 Komatsu Buldozer D85ESS 3 Unit Support


7 Multiflow Pump Unit MF290 1 Unit Water Pump
8 Other Brand Truck - 1 Unit Service Truck
9 Other Brand Truck - 1 Unit Fuel Truck
10 Other Brand Truck - 1 Unit Water Truck
11 Yanmar Tower Lamp - 4 Unit Lighting

Request Unit Kontraktor, Untuk Penambangan SR 5


No Brand Type Quantity
1 Komatsu Excavator PC400-LC8 4 Unit OB Excavator

2 Komatsu Excavator PC300-LC6 2 Unit Coal Getting

3 Komatsu Excavator PC200 2 Unit General Support

4 Scania Dump Truck P380 16 Unit OB Hauler

5 Hino Dump Truck FM 260 JD 4 Unit Coal Hauling

6 Komatsu Buldozer D85ESS 3 Unit Support


7 Multiflow Pump Unit MF290 1 Unit Water Pump
8 Other Brand Truck - 1 Unit Service Truck
9 Other Brand Truck - 1 Unit Fuel Truck
10 Other Brand Truck - 1 Unit Water Truck
11 Yanmar Tower Lamp - 4 Unit Lighting

Request Unit Kontraktor, Untuk Penambangan SR 6


No Brand Type Quantity
1 Komatsu Excavator PC400-LC8 5 Unit OB Excavator

2 Komatsu Excavator PC300-LC6 2 Unit Coal Getting

3 Komatsu Excavator PC200 2 Unit General Support

4 Scania Dump Truck P380 20 Unit OB Hauler


5 Hino Dump Truck FM 260 JD 4 Unit Coal Hauling

6 Komatsu Buldozer D85ESS 3 Unit Support


7 Multiflow Pump Unit MF290 1 Unit Water Pump
8 Other Brand Truck - 1 Unit Service Truck
9 Other Brand Truck - 1 Unit Fuel Truck
10 Other Brand Truck - 1 Unit Water Truck
11 Yanmar Tower Lamp - 4 Unit Lighting
Description
Untuk kupas OB 250.000 Bcm

Untuk Coal Getting Pit to Stockpile dan Stockpile to Port

Untuk Support Perapian dan Coal Cleaning

DT Khusus untuk buang OB Pit to Disposal, Jarak 500 - 800 m

DT Khusus untuk langsir batubara dari Pit ke Stockpile (ROM),


Jarak 1.5 km - 2 km
Support front kerja dan disposal
Pompa air tambang skala menengah
Truck untuk membawa Oli, Grease, Air Radiator, dll
Truck untuk pengisian fuel
Truck penyiraman debu tambang
Penerangan

Description
Untuk kupas OB 250.000 Bcm

Untuk Coal Getting Pit to Stockpile dan Stockpile to Port

Untuk Support Perapian dan Coal Cleaning

DT Khusus untuk buang OB Pit to Disposal, Jarak 500 - 800 m

DT Khusus untuk langsir batubara dari Pit ke Stockpile (ROM),


Jarak 1.5 km - 2 km
Support front kerja dan disposal
Pompa air tambang skala menengah
Truck untuk membawa Oli, Grease, Air Radiator, dll
Truck untuk pengisian fuel
Truck penyiraman debu tambang
Penerangan

Description
Untuk kupas OB 250.000 Bcm

Untuk Coal Getting Pit to Stockpile dan Stockpile to Port

Untuk Support Perapian dan Coal Cleaning

DT Khusus untuk buang OB Pit to Disposal, Jarak 500 - 800 m


DT Khusus untuk langsir batubara dari Pit ke Stockpile (ROM),
Jarak 1.5 km - 2 km
Support front kerja dan disposal
Pompa air tambang skala menengah
Truck untuk membawa Oli, Grease, Air Radiator, dll
Truck untuk pengisian fuel
Truck penyiraman debu tambang
Penerangan
Subject : Kesimpulan
Data : January 2019

Kesimpulan Hasil Perhitungan Untung Rugi Penambangan


No Description Hasil
Tetap Menguntungkan, dengan minimal keutungan
1 Striping Ratio 4
stabil Rp. 2,85 M per Bulan
Masih Menguntungkan, dengan minimal keuntungan
2 Striping Ratio 5
stabil Rp. 2 M Per Bulan
3 Striping Ratio 6 Keuntungan Masih Ada, Rp. 1,25 M Per bulan