Anda di halaman 1dari 2

Kronologis

Proses Manual Kartu Choky Free Fire


SPK 220000739
Order 15.000.000 pcs

Total oder 15.000.000 ada 3 layout


- Layout 1 = 8.000.000 pcs
- Layout 2 = 4.000.000 pcs
- Layout 3 = 3.000.000 pcs

Pembagian pengerjaan per subcont

Subcont Pojur alokasi 13.000.000 pcs


Subcont KMC alokasi 1.500.000 pcs
Subcont KMTH Alokasi 500.000 pcs

Data hasil cetak


Layout 1 = 38.450 druck/lbr x 3 up = 115.350 pcs (yang ditarik)
Layout 2 = 19.109 druck/lbr x 12 up = 229.308 pcs (yang ditarik)
Layout 3 = 14.000 druck/lbr ( Tidak ada yang di tarik)

Total yang ditarik = Layout 1 + Layout 2


115.350 pcs + 229.308 pcs = 344.658 pcs

Data hasil diecut


Layout 1 = 38.163 druck/lbr x 3 up = 114.489 pcs
Layout 2 = 18.933 druck/lbr x 12 up = 227.196 pcs

Total yang ditarik = Layout 1 + Layout 2


114.489 pcs + 227.196 pcs = 341.689 pcs

Total Pilahan dalam TONG ( design 12 / 15 up ) = 6 tong


Total pilahan di KMC : Total kartu yang NG 1.642 pcs
Total pilahan Pojur : Total kartu yang NG belum terlihat masih proses rework

Subcont POJUR :

Total 13.000.000

Layout 1  13.000.000/15 komposisi = 866.666

866.666 x 8 komposisi = 6.933.328 pcs : 216 up = 32.098 x 3 up = 96.294 pcs

Layout 2  13.000.000/15 komposisi = 866.666

866.666 x 4 komposisi = 3.466.664 : 216 up = 16.049 x 12 up = 192.588 pcs +


Total 288.882 pcs
Subcont KMC :

Total1.500.000

Layout 1  1.500.000/15 komposisi = 100.000

100.000 x 8 komposisi = 800.000 pcs : 216 up = 3.703 x 3 up = 11.109 pcs

Layout 2  1.500.000/15 komposisi = 100.000

100.000 x 4 komposisi = 400.000 : 216 up = 1851 x 12 up = 22.212 pcs +


Total 33.321 pcs

Subcont KMTH :

Total 500.000

Layout 1  500.000/15 komposisi = 33.333

33.333 x 8 komposisi = 266.664 pcs : 216 up = 1.234 x 3 up = 3.702 pcs

Layout 2  500.000/15 komposisi = 33.333

33.333 x 4 komposisi = 133.332 : 216 up = 617 x 12 up = 7.404 pcs +


Total 11.106 pcs

Grand total barang yang harus di rework = 288.882 + 33.321 + 11.106 = 333.309 pcs

QTY Kiriman = 10.529.600

Anda mungkin juga menyukai