113,000 209 23,617,000

177,000 93 16,461,000
40,078,000
4,007,800

44,085,800

112,500 209 23,512,500


176,500 93 16,414,500
39,927,000
ppn 3,992,700
pph
43,919,700

1,500,000 10 15,000,000 1,350,000 10 13,500,000


5,000,000 1 5,000,000 4,500,000 1 4,500,000
2,000,000 1 2,000,000 1,800,000 1 1,800,000
22,000,000 19,800,000
PPN 2,000,000 PPN 1,800,000
20,000,000 18,000,000
PPH 300,000 PPH 270,000
19,700,000 17,730,000

RUP 21476653
PPTK Ai Kurniawati, S.Ip 19650415
41,240,000
3,749,091

1,370,000 10 13,700,000
4,550,000 1 4,550,000
1,850,000 1 1,850,000
21,870,000 20,100,000
21,600,000 1,827,273
21,927,273
2.KLASIFIKASI HARGA

SEBELUM NEGOSIASI
NO URAIAN URAIAN
VOLUME SATUAN HARGA SATUAN JUMLAH HARGA

1
Belanja Modal Pengadaan Alat Belanja Modal Pengadaan Alat
Pendingin Pendingin

Air Conditioner (AC) +


6 Set 5,000,000 30,000,000
Pemasangan

Kulkas 2 Buah 1,800,000 3,600,000

JUMLAH 33,600,000

Terbilang : Tiga Puluh Tiga Juta Enam Ratus Ribu Rupiah


* Harga Sudah Termasuk Pajak
SETELAH NEGOSIASI
URAIAN
VOLUME SATUAN HARGA SATUAN JUMLAH HARGA

Belanja Modal Pengadaan Alat


Pendingin

Air Conditioner (AC) +


6 Set 5,000,000 30,000,000
Pemasangan

Kulkas 2 Buah 1,800,000 3,600,000

JUMLAH 33,600,000

Terbilang : Tiga Puluh Tiga Juta Enam Ratus Ribu Rupiah