Anda di halaman 1dari 4

Soal 1 – Standard Costing

PT BAKING EXPERT

JAWABAN
Diketahui : AQ 32,000 cm
SQ 29,600 CM
AP 4,800
SP 5,000
AH 6,400 jam
SH 7,200
AR 8,000
SR 7,500

MPV = AQ (AP - SP) LRV = AH (AR - SR)


= 32,000 (4,800 - 5,000) = 6,400 (8,000 - 7,500)
= 6,400,000 F = 3,200,000 UF

MUV = SP (AQ - SQ) LEV = SR (AH - SH)


= 5,000 (32,000 - 29,600) = 7,500 (6,400 - 7,200)
= 12,000,000 UF = 6,000,000 F

Jurnal : Jurnal :
Raw Material 160,000,000 WIP 54,000,000
MPV 6,400,000 LRV 3,200,000
AP 153,600,000 LEV 6,000,000
(untuk mencatat pembelian bahan baku) Wages Payable 51,200,000

WIP 148,000,000
MUV 12,000,000
Raw Material 160,000,000
(untuk mencatat penggunaan bahan baku)

Spending Variance
AH (AVOR - SVOR)
0.8*8,000 (2.750 - 2500)
1,600,000 UF

Efficiency Variance
SVOR (AH - SH)
2,500 ((0.8*8,000) - (0.9*8,000)
-2,000,000 F
Soal 2 – Budgeting (Cash Budget)
PT SWIM EXPERT

JAWABAN
Penerimaan Kas
Penjualan Tunai Bulan Maret 83,000,000
Penjualan Kredit & Penerimaan piutang
Bulan ini, Maret =600juta x 20% 120,000,000
Bulan lalu, Feb =525juta x 60% 315,000,000
Dua bulan lalu, Jan = 400juta x 18% 72,000,000 507,000,000
Denda - -
Total Penerimaan Kas 590,000,000

Pembayaran Kepada Vendor


Pembelian persediaan
Bulan ini, Juli =280juta x 30% 84,000,000
Bulan lalu, Juni =161juta x 100% 161,000,000
Total Pembayaran Kepada Vendor 245,000,000

PT SWIM EXPERT
ANGGARAN KAS
Maret 2020

Saldo Awal Kas 40,000,000


Penerimaan Kas 590,000,000
Kas Yang Tersedia 630,000,000
Pengeluaran Kas
Pembayaran Kepada Vendor 245,000,000
Beban Penjualan dan Administrasi 380,000,000
Pembelian mesin baru 76,000,000
Pembayaran Dividen 9,000,000
Total Pengeluaran Kas 710,000,000
Kelebihan/Kekurangan Setelah Pengeluaran - 80,000,000
Pembiayaan :
Pinjaman untuk menutupi kerugian 100,000,000
Pembayaran pinjaman lama -
Bunga Pinjaman -
Total Pembiayaan 100,000,000
SALDO AKHIR KAS 20,000,000 KARENA ADA KEHARUSAN
DARI PERUSAHAAN BAHWA SALDO
AKHIR KAS PERUSAHAAN
HARUS 20JUTA
Soal 3 – Flexible Budget

PT HOME EXPERT

JAWABAN

BIAYA
ANGGARAN ANGGARAN
AKTUAL 83%
KET Var / unit 75% (4.800 jam 83% (5.312 VARIANCE
(5.312 jam
mesin) jam mesin)
mesin)
BIAYA VARIABLE
Tenaga kerja tidak langsung $ 10 $ 48,000 $ 49,800 $ 53,120 $ 3,320 F
Perlengkapan pabrik $ 5 $ 24,000 $ 29,000 $ 26,560 $ -2,440 UF
Listrik dan air $ 2 $ 9,600 $ 11,000 $ 10,624 $ -376 UF
Pajak penghasilan $ 7 $ 33,600 $ 40,000 $ 37,184 $ -2,816 UF
Perbaikan dan pemeliharaan $ 5 $ 24,000 $ 29,200 $ 26,560 $ -2,640 UF
Gas $ 3 $ 14,400 $ 16,800 $ 15,936 $ -864 UF
Upah lembur $ 6 $ 28,800 $ 35,100 $ 31,872 $ -3,228 UF
Pabrik umum $ 4 $ 19,200 $ 20,000 $ 21,248 $ 1,248 F
BIAYA TETAP
Tenaga kerja tidak langsung $ 24,600 $ 24,600 $ 24,600 $ -
Perlengkapan pabrik $ 16,800 $ 16,800 $ 16,800 $ -
Listrik dan air $ 14,200 $ 14,200 $ 14,200 $ -
Pajak penghasilan $ 4,300 $ 4,800 $ 4,300 $ -500 UF
Perbaikan dan pemeliharaan $ 26,100 $ 27,000 $ 26,100 $ -900 UF
Gas $ 21,600 $ 21,000 $ 21,600 $ 600 F
Pabrik umum $ 27,000 $ 27,800 $ 27,000 $ -800 UF
Asuransi property $ 13,500 $ 13,750 $ 13,500 $ -250 UF
Pajak properti $ 10,700 $ 11,500 $ 10,700 $ -800 UF
Penyusutan $ 30,000 $ 25,000 $ 30,000 $ 5,000 F
Sewa bangunan $ 32,400 $ 33,000 $ 32,400 $ -600 UF
ANGGARAN ANGGARAN
80% (5.120 90% (5.760
jam mesin) jam mesin)

$ 51,200 $ 57,600
$ 25,600 $ 28,800
$ 10,240 $ 11,520
$ 35,840 $ 40,320
$ 25,600 $ 28,800
$ 15,360 $ 17,280
$ 30,720 $ 34,560
$ 20,480 $ 23,040

$ 24,600 $ 24,600
$ 16,800 $ 16,800
$ 14,200 $ 14,200
$ 4,300 $ 4,300
$ 26,100 $ 26,100
$ 21,600 $ 21,600
$ 27,000 $ 27,000
$ 13,500 $ 13,500
$ 10,700 $ 10,700
$ 30,000 $ 30,000
$ 32,400 $ 32,400

Anda mungkin juga menyukai