CONTOH PERHITUNGAN BERAT JENIS TANAH

Contoh perhitungan nomor uji 1 :


Berat picnometer kosong (A) = 38,1 gram
Berat picnometer + aquades (B) = 137,4 gram
Berat picnometer + tanah kering (C) = 52,4 gram
Berat picnometer + aquades + sampel tanah (D) = 153,6 gram

Berat tanah kering = (Berat picnometer + tanah kering) – (Berat picnometer)


= (52,4 – 38,1) gram
= 14,3 gram
Berat aquades = (Berat picnometer + aquades) – (Berat picnometer)
= (137,4– 38,1) gram
= 99,3 gram

Temperatur, T1 = 32°C
Temperatur, T2 = 30°C
Faktor Gt, T1 (Gt1) = 0,9951
Faktor Gt, T2 (Gt2) = 0,9957

C-A
Gs =
( ( B-A ) × Gt 1) -((D-C)× Gt 2 )
52,4 - 3 8,1
=
( ( 13 7,4-38,1 ) ×0,9951 ) - ( ( 153,6-52,4 ) ×0,9957 )
= -7,3280

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |1


BERAT JENIS TANAH

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S.T
Deskripsi Tanah : Lempung Tanggal : 6 Des 2021
Jenis Tanah : Undisturbed
Tabel 1.2 Uji Berat Jenis Tanah Konsolidasi
No. Uji 1 2
No. Picnometer 1 2
Berat pic kosong (gr) 38,1 37,8
Berat tanah kering (gr) 14,3 15
Berat aquades (gr) 99,3 96,6
Berat pic + aquades (gr) 137,4 134,4
Berat pic + tanah kering (gr) 52,4 52,8
Berat pic + aquades + sampel tanah
153,6 148,1
(gr)
Temperatur, T1 32 33
Temperatur, T2 30 30
Faktor Gt, T1 0,9951 0,9947
Faktor Gt, T2 0,9957 0,9957
Gs -7,3280 12,5229
Gs rata-rata 2,5974

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |2


CONTOH PERHITUNGAN KONSOLIDASI

Perhitungan Penurunan pada Beban 0,500 kg, t = 0,250 menit


t = 0,250 menit
Tinggi mula-mula = 20,1 cm
Div =4
Beban = 0,500 kg
Div
Tinggi setelah penurunan = tinggi mula-mula –
100
4
= 20,1 –
100
= 20,06 mm

Perhitungan Rebound pada Beban 4 kg


t = 120 detik
Beban = 4 kg
Div awal = 277
Div setelah 120 menit = 269
Tinggi awal = 17,380 mm

Tinggi setelah 120 menit = tinggi awal –(100


Div setelah 120 menit - Div awal
)
= 17,380–( )
269 - 277
100
= 17,460 mm

Perhitungan Konsolidasi
tring = 2,01 cm
dring = 5,27 cm
A = ¼ .π . d2
= ¼ .π . 5,272
= 21,813 cm2
W, berat total = 136,600 gr
Gs = 2,5974

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |3


Ws, berat tanah awal = 75,500 gr
Ws
Hs =
A × Gs
75 , 500
= 21,813 × 2 ,5974

= 1,333 cm

Hv = Tinggi mula-mula - Hs
= 2 – 1,333
= 0,677 cm

Hv
e0 =
Hs
0,677
=
1,333
= 0,508

Perhitungan Applied Pressure :

A Ps

Beban
6 cm
58 cm

ΣMA = 0
-6Ps + 58P = 0
-6P = -58Ps
-58
Ps = P
-6

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |4


Ps = 9,6667 P

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |5


Menghitung Pressure beban 0,5 kg :
Ps
Pressure =
A
9,6667 × 0,5
= 1 × π × D2
4
9,667 × 0,5
= 1 × 22 ×5,272
4 7
= 0,2215 kg/cm2

Menghitung Pressure beban 1 kg :


Ps
Pressure =
A
9,6667 × P
= 1 × π × D2
4
9,667 × 1
= 1 × 22 × 5,272
4 7
= 0,4430 kg/cm2

Menghitung Pressure beban 2 kg :


Ps
Pressure =
A
9,6667 × P
=1 2
×π× D
4
9,667 × 2
=1 22 2
× × 5,27
4 7
= 0,886 kg/cm2

Menghitung Pressure beban 4 kg :


Ps
Pressure =
A

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |6


9,6667 × P
=1 2
×π× D
4
9,667 × 4
=1 22 2
× × 5,27
4 7
= 1,772 kg/cm2

Menghitung Pressure beban 8 kg :


Ps
Pressure =
A
9,6667 × P
=1
× π × D2
4
9,667 × 8
=1 22
× × 5,272
4 7
= 3,544 kg/cm2

Final dial pressure 0 = 2,010 cm


Final dial pressure 0,222 = 2,007 cm

ΔH = Final dial beban 0 – Final dial beban 0,500


= 2,010 – 2,007
= 0,003 cm

∆H
Δe =
Hs
0,003
=
1,333
= 0,002

e = e0 – Δe
= 0,508 – 0,002

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |7


= 0,506

Average Height for Load = tinggi mula-mula - ½ ΔH


= 2,01 – ½ × 0,003
= 2,00 cm

Hdr = ½ x Average Height for Load


= ½ x 2,00
= 1,00 cm

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |8


DATA KONSOLIDASI

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S.T
Deskripsi Tanah : Lempung Tanggal : 30 Nov 2021
Jenis Tanah : Undisturbed
Tabel 1.3 Data Uji Konsolidasi Tanah
Tanggal 30 November2021 1 Desember 2021 2 Desember 2021 3 Desember 2021 4 Desember 2021
T Input
0,5 kg/cm2 1 kg/cm2 2 kg/cm2 4 kg/cm2 8 kg/cm2
(menit) Pressure
√T (div) (mm) (div) (mm) (div) (mm) (div) (mm) (div) (mm)
0 0,000 0,000 20,100 12,500 19,975 31,900 19,781 82,000 19,280 166,000 18,440
0,1 0,316 3,5 20,065 17,9 19,921 46,5 19,635 107 19,030 198 18,120
0,25 0,500 4 20,060 18,5 19,915 48,5 19,615 112 18,980 200 18,100
0,5 0,707 4,5 20,055 19 19,910 50,5 19,595 115 18,950 203 18,070
1 1,000 4,8 20,045 19,2 19,908 52,8 19,572 119 18,910 207 18,030
2 1,414 4,9 20,030 20 19,900 55,8 19,542 122,2 18,878 212 17,980
4 2,000 5,1 20,015 21,1 19,889 58,5 19,515 127 18,830 218 17,920
8 2,828 10 20,000 22,1 19,879 62 19,480 131,2 18,788 225 17,850
15 3,873 10,2 19,998 23,2 19,868 64 19,460 136,5 18,735 232,5 17,775
30 5,477 10,4 19,996 24,8 19,852 68 19,420 143 18,670 242,7 17,673
60 7,746 10,5 19,995 26,1 19,839 71,5 19,385 149,2 18,608 254,8 17,552
90 9,487 11,1 19,989 26,9 19,831 73,2 19,368 153 18,570 258,5 17,515
120 10,954 11,2 19,988 27,5 19,825 74,8 19,352 154,5 18,555 262,5 17,475
180 13,416 11,8 19,982 28,1 19,819 76,5 19,335 156,5 18,535 266,5 17,435
240 15,492 12 19,980 29 19,810 78,6 19,314 162 18,480 269 17,410
1440 37,947 12,5 19,975 31,9 19,781 82 19,280 166 18,440 272 17,380
Tabel 1.4 Data Rebound Uji Konsolidasi

Input
T Pressur 4 kg/cm2 2 kg/cm2 1 kg/cm2 0,5 kg/cm2 0 kg/cm2
(menit) e
√T (div) (mm) (div) (mm) (div) (mm) (div) (mm) (div) (mm)
277,00 17,38 269,00 17,46 250,00 17,65 228,00 17,87 207,00 18,08
0,000 0,000
0 0 0 0 0 0 0 0 0 0
120,00 10,954 269,00 17,46 250,00 17,65 228,00 17,87 207,00 18,08 129,00 18,86

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |9


0 0 0 0 0 0 0 0 0 0 0

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |10


PERHITUNGAN KONSOLIDASI

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S.T
Deskripsi Tanah : Lempung Tanggal : 30 Nov 2021
Jenis Tanah : Undisturbed
tring : 2,01 cm W : 136,6 gr Ws : 75,5 cm
dring : 5,27 cm Gs : 2,597 Hs : 1,333 cm
A : 21,813 cm2 e0 : 0,508 Hv : 0,677
Wring : 61,1 gr

Tabel 1.5 Perhitungan Uji Konsolidasi


Square Root Log Fitting
Fitting Method Method
Average
Applied Applied Final ΔH Height
N Hdr t90 Cv t50 Cv
Load Pressure Dial Δe E for
o (cm) (sec) (cm2/sec) (sec) (cm2/sec)
(kg) (kg/cm2) (cm) (cm) Load
(cm)

51 2,01 0,50
0 0 0 0,000 2,010 1,005
0 8
2 2,00 0,50
0,500 0,222 0,003 0,003 2,008 1,004 12615 6,8E-05 1440 1,4E-04
7 6
3 1,99 0,49 2306,
1,000 0,443 0,013 0,009 2,004 1,002 3,7E-04 96000 2E-06
8 9 4
4 1,97 0,48
2,000 0,886 0,032 0,024 1,994 0,997 17340 4,9E-05 4500 4,4E-05
8 4
5 1,92 0,44
4,000 1,773 0,082 0,062 1,969 0,985 540 1,5E-03 7200 2,7E-05
8 7
6 1,84 0,38 290,4 2,7E-03 9000 2,0E-05
8 3,545 0,166 0,125 1,927 0,964
4 4
7 1,74 0,31 - - - -
4,000 1,773 0,264 0,198 1,878 0,939
6 0
8 1,76 0,32 - -  - -
2,000 0,886 0,245 0,184 1,888 0,944
5 4
9 1,78 0,34 - - - -
1,000 0,443 0,223 0,167 1,899 0,949
7 1
10 0,500 0,222 1,808 0,202 0,152 0,357 1,909 0,955 - -   - -

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |11


PERHITUNGAN KONSOLIDASI

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S.T
Deskripsi Tanah : Lempung Tanggal : 30 Nov 2021
Jenis Tanah : Undisturbed
tring = 2,01 cm dring = 5,27 cm A = 21,813 cm2

Tabel 1.6 Perhitungan Applied Pressure Uji Konsolidasi

58 Ps
Beban Ps = ×P Pressure =
No. 6 A
(kg)
(kg) (kg/cm2)
1 0,5 4,83333 0,221583
2 1 9,66667 0,443165
3 2 19,33333 0,886330
4 4 38,66667 1,772661
5 8 77,33333 3,545321

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |12


SQUARE ROOT FITTING METHOD CURVE

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S
Deskripsi Tanah : Undisturbed Tanggal : 30 Nov 2021
Load : 0,5 kg

SQUARE ROOT FITTING METHOD CURVE


20.2
Penurunan (mm)

20.0

19.8
0 5 10 15 20 25 30 35 40

√T (menit)

Grafik 1.1 Square Root Fitting Method (Load 0,5 kg)


R0 = mm tA = = menit
R90 = mm tB = (1.15 x tA)

√ t 90 = menit =

t90 = menit = menit


2
0.848 x H dr
t90 = detik Cv =
t 90

=
= cm2/s

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |13


SQUARE ROOT FITTING METHOD CURVE

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S
Deskripsi Tanah : Undisturbed Tanggal : 1 Des 2021
Load : 1,0 kg

SQUARE ROOT FITTING METHOD CURVE


20.00

19.95
Penurunan (mm)

19.90

19.85

19.80

19.75

19.70

19.65
0 5 10 15 20 25 30 35 40

√T (menit)

Grafik 1.3 Square Root Fitting Method (Load 1,0 kg)


R0 = mm tA = = menit
R90 = mm tB = (1.15 x tA)

√ t 90 = menit =

t90 = menit = menit

0.848 x H dr2
t90 = detik Cv =
t 90

=
= cm2/s

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |14


SQUARE ROOT FITTING METHOD CURVE

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S
Deskripsi Tanah : Undisturbed Tanggal : 2 Des 2021
Load : 2,0 kg

SQUARE ROOT FITTING METHOD CURVE


19.9
19.8
19.7
Penurunan (mm)

19.6
19.5
19.4
19.3
19.2
19.1
19.0
0 5 10 15 20 25 30 35 40

√T (menit)

Grafik 1.5 Square Root Fitting Method (Load 2,0 kg)


R0 = mm tA = menit
R90 = mm tB = (1.15 x tA)

√ t 90 = menit =

t90 = menit = menit


2
0.848 x H dr
t90 = detik Cv =
t 90

=
= cm2/s

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |15


SQUARE ROOT FITTING METHOD CURVE

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S
Deskripsi Tanah : Undisturbed Tanggal : 3 Des 2021
Load : 4,0 kg

SQUARE ROOT FITTING METHOD CURVE


19.4

19.2
Penurunan (mm)

19.0

18.8

18.6

18.4

18.2

18.0
0 5 10 15 20 25 30 35 40

√T (menit)

Grafik 1.7 Square Root Fitting Method (Load 4,0 kg)


R0 = mm tA = menit
R90 = mm tB = (1.15 x tA)

√ t 90 = menit =

t90 = menit = menit


2
0.848 x H dr
t90 = detik Cv =
t 90

=
= cm2/s

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |16


SQUARE ROOT FITTING METHOD CURVE

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S
Deskripsi Tanah : Undisturbed Tanggal : 4 Des 2021
Load : 8,0 kg

SQUARE ROOT FITTING METHOD CURVE


18.6

18.4

18.2
Penurunan (mm)

18.0

17.8

17.6

17.4

17.2

17.0

16.8
0 5 10 15 20 25 30 35 40

√T (menit)

Grafik 1.7 Square Root Fitting Method (Load 8,0 kg)


R0 = mm tA = menit
R90 = mm tB = (1.15 x tA)

√ t 90 = menit =

t90 = menit = menit


2
0.848 x H dr
t90 = detik Cv =
t 90

=
= cm2/s

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |17


LOG FITTING METHOD CURVE

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S
Deskripsi Tanah : Undisturbed Tanggal : 30 Nov 2021
Load : 0,5 kg

LOG FITTING METHOD CURVE


20.08

20.06
Penurunan (mm)

20.04

20.02

20

19.98

19.96

19.94

19.92
0.01 0.1 1 10 100 1000 10000

t (menit)

Grafik 1.2 Log Fitting Method Curve (Load 0,5 kg)


2
0.197 x H dr
R0 = mm Cv =
t 50

R100 = mm =
R 0 + R 100
R50 = = cm2/s
2
=
= mm
t50 = menit
t50 = detik

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |18


LOG FITTING METHOD CURVE

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S
Deskripsi Tanah : Undisturbed Tanggal : 1 Des 2021
Load : 1,0 kg

LOG FITTING METHOD CURVE


19.95

19.9
Penurunan (mm)

19.85

19.8

19.75

19.7
0.01 0.1 1 10 100 1000 10000

t (menit)

Grafik 1.4 Log Fitting Method Curve (Load 1,0 kg)


2
0.197 x H dr
R0 = mm Cv =
t 50

R100 = mm =
R 0 + R 100
R50 = = cm2/s
2
=
= mm
t50 = menit
t50 = detik

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |19


LOG FITTING METHOD CURVE

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S
Deskripsi Tanah : Undisturbed Tanggal : 2 Des 2021
Load : 2,0 kg

LOG FITTING METHOD CURVE


19.7

19.6
Penurunan (mm)

19.5

19.4

19.3

19.2

19.1
0.01 0.1 1 10 100 1000 10000

t (menit)

Grafik 1.6 Log Fitting Method Curve (Load 2,0 kg)


2
0.197 x H dr
R0 = mm Cv =
t 50

R100 = mm =
R 0 + R 100
R50 = = cm2/s
2
=
= mm
t50 = menit
t50 = detik

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |20


LOG FITTING METHOD CURVE

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S
Deskripsi Tanah : Undisturbed Tanggal : 3 Des 2021
Load : 4,0 kg

LOG FITTING METHOD CURVE


19.1
19
18.9
Penurunan (mm)

18.8
18.7
18.6
18.5
18.4
18.3
18.2
18.1
0.01 0.1 1 10 100 1000 10000

t (menit)

Grafik 1.8 Log Fitting Method Curve (Load 4,0 kg)


2
0.197 x H dr
R0 = mm Cv =
t 50

R100 = mm =
R 0 + R 100
R50 = = cm2/s
2
=
= mm
t50 = menit
t50 = detik

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |21


LOG FITTING METHOD CURVE

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S
Deskripsi Tanah : Undisturbed Tanggal : 4 Des 2021
Load : 8,0 kg

LOG FITTING METHOD CURVE


18.2

18
Penurunan (mm)

17.8

17.6

17.4

17.2

17
0.01 0.1 1 10 100 1000 10000

t (menit)

Grafik 1.8 Log Fitting Method Curve (Load 8,0 kg)


2
0.197 x H dr
R0 = mm Cv =
t 50

R100 = mm =
R 0 + R 100
R50 = = cm2/s
2
=
= mm
t50 = menit
t50 = detik

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |22


GRAFIK HUBUNGAN ANGKA PORI DENGAN LOG
TEKANAN

Nama Instansi : Unika Soegijapranata Kedalaman :1m


Nama Proyek : Praktikum Mekanika Tanah II Nama Operator : Kelompok 6
Lokasi Proyek : Trangkil Nama Engineer : Marshall O.S
Deskripsi Tanah : Lempung Tanggal : 2021
Jenis Tanah : Undisturbed

LOAD-UNLOAD CURVE
1.0
0.9
0.8
0.7
Angka Pori (e)

0.6
0.5
0.4
0.3
0.2
0.1
0.0
0.0 1.0 2.0 3.0 4.0

Input Pressure (kg/m2)

Grafik 1.9 Load – Unload

e1 = p1’ =
e2 = p2’ =

e1 - e2
e1 - e2
Cc = p2’ av =
log( ) p2 ’- p1 ’
p1’
a - Δp
mv = v
1 - e1
= = =

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |23


= = =

KESIMPULAN
1. Konsolidasi merupakan uji coba penurunan tanah yang berhubungan dengan
waktu dan juga berat dari beban konsolidasi yang diberikan berikut asalah
tabel hubungan applied load , applied presure dan ΔH :
Tabel 1.7 Tabel Hubungan Applied Load , Applied Pressure dan ΔH.
Applied Applied
ΔH
Load Pressure
(cm)
(kg) (kg/cm2)
0 0 0
0,500 0,246 0,004
1,000 0,492 0,013
2,000 0,985 0,032
4,000 1,969 0,082
8 3,939 0,166
4,000 1,969 0,264
2,000 0,985 0,245
1,000 0,492 0,223
0,500 0,246 0,202

Dari tabel hasil uji konsolidasi nilai applied pressure dan ΔH mengalami
peningkatan dan penurunan berbanding lurus dengan penambahan dan
pengurangan beban atau applied load yang diberikan pada uji konsolidasi.
Hal ini disebabkan oleh beban yang semakin membesar membuat tekanan
yang bekerja akan naik dan tanah akan mengalami penurunan sehingga ΔH
akan bertambah.
2. Berikut tabel hubungan applied load , applied pressure, CV square fitting dan
CV log fitting method pada uji konsolidasi :
Tabel 1.8 Hubungan Applied Load , Applied Pressure, CV Square Fitting Method
dan CV Log Fitting Method.
CV square CV log fitting
Applied Load Applied Pressure
fitting method method
(kg) (kg/cm2)
(cm/detik )
2
(cm/detik2)

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |24


0,5 0,221583 2,22604×10−4 1,43898×10−3
1 0,443165 4,69088×10−4 8,45251×10−5
2 0,886330 2,25103×10−4 1,63183×10−4
4 1,772661 4,53305×10−4 1,59279×10−4

8 3,545321 2,0522×10−4 2,54266×10−4

Dari uji konsolidasi nilai hasil CV square fitting method dan CV log fitting
method tidak jauh berbeda. Nilai CV semakin mengecil dengan penambahan
beban. Hal ini disebabkan pada tanah uji konsolidasi dalam keadaan jenuh,
ketika mendapatkan pembebanan maka udara dan air akan tertekan keluar
sehingga pada beban yang semakin bertambah maka angka pori akan
mengecil dan tanah akan semakin memadat sehingga penurunan akan
semakin melambat.

3. Uji konsolidasi pada kali ini didapatkan nilai Cc, av, dan mv sebagai berikut:
Cc = 0,619895
av = 0,841629 cm2/kg
mv = 1,26659

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |25


DOKUMENTASI

NO
GAMBAR KETERANGAN
GAMBAR

Alat ex truder
Gambar 1.1
(Sumber: Dokumentasi Pribadi)

Ring dan satu timbangan cetakan


Gambar 1.2 sampel tanah
(Sumber: Dokumentasi Pribadi)

Dial konsolidasi
Gambar 1.3 kalibrasi 0,01 mm/div
(Sumber: Dokumentasi Pribadi)

Sampel tanah konsolidasi


Gambar 1.4 ditimbang
(Sumber: Dokumentasi Pribadi)

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |26


NO
GAMBAR KETERANGAN
GAMBAR

Sel konsolidasi
Gambar 1.5 (Sumber: Dokumentasi
Pribadi)

Pemasangan sampel tanah ke


dalam sel konsolidasi
Gambar 1.6
(Sumber: Dokumentasi
Pribadi)

Sampel tanah konsolidasi di


oven selama 24 jam
Gambar 1.7 (Sumber: Dokumentasi
Pribadi)

Alat konsolidasi

Gambar 1.8 (Sumber: Dokumentasi


Pribadi)

Beban Konsolidasi
Gambar 1.9 (Sumber: Dokumentasi
Pribadi)

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |27


NO
GAMBAR KETERANGAN
GAMBAR

Sampel tanah konsolidasi di


oven selama 24 jam
Gambar 1.10
(Sumber: Dokumentasi
Pribadi)

Penimbangan tanah
konsolidasi sesudah di oven
Gambar 1.11 selama 24 jam
(Sumber: Dokumentasi
Pribadi)

Stopwatch HP
(Sumber: Dokumentasi
Gambar 1.12 Pribadi)

Marshall Octorio Saragih– 19.B1.0055 Konsolidasi |28