Anda di halaman 1dari 126

hange E hange E

XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN

PENGADAAN DAN PEMASANGAN PIPA HDPE

LOKASI
KECAMATAN TANJUNG , KECAMATAN MURUNG PUDAK,
KECAMATAN MUARA HARUS DAN KECAMATAN MUARA UYA
KABUPATEN TABALONG

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re U tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PROVINSI KALIMANTAN TIMUR PEKERJAAN


POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,

yu
KEC.MUARA HARUS DAN KEC. MUARA UYA

A
S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG

b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
Awayan S S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik

Te
BARABAI Birayang gala Tanjungsamalantakan

l.
Tg. Pamukan

Pa
Pasungkan Labuhannamas Utara i ng
ar
a i antu

m
b a S. C
Kuripan Negara S. Bara G. Besar

uk
eg Pagat

an
. N
Labuhannamas Selatan Haruyan Gunungbatu Besar
S
KANDANGAN Ankinang

US
Telagalangsat
Simpur

AT
H. MUSTA'IN,S.Sos
Padangbatung NIK 6309010

ER
Margasari Sungairaya Pudi

M
G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan

PE
MARABAHAN Ta Kasi Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat an

rito
Anjirmuara S. Alala
k mk
Ria

Ba
S. T
am S. Simpangampat SLAMET KARYADI

S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU NIK 6309042
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR

S.
Tabunganen Ulin S. Batulicin Sungaibali

R
MARTAPURA M

ia
em Pengadaan dan Pemasangan Pipa

m
Karangintan

ka
Aluhaluh baSUNGAI PERAK
BANJARBARU Komplek Pondok Karet Permai Jalan Maluyung

na
Lasung lap

n
i
Cempaka W. Riamkanan Sejaka Kec. Murung Pudak

Sel.

R
Pantaulayung

SA
Kurau

Seb
Tanjungkurong

t
Pagatan

au
Batibati
1150 KONSULTAN

l. L

KA
uku
Sabamban

Se

MA
G. Aurbunak
Tanjungseloka
CV. P R I S M A J A S A
Satui

AT
PELAIHARI
Kintap Karambu

L
Architect & engineering consultant

SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar

Kota Kabupaten Tg. Selatan


G = Gunung
L A U T
Kota Kecamatan
P = Pulau
Batas Provinsi Ir. SITTI UMAYYAH
J A W A Direktris
Batas Kabupaten
Tel = Teluk
Batas Kecamatan

Jalan Provinsi Peg = Pegunungan Di Gambar

Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
Skala 1: 600
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010
Ru
as
Ja Di Periksa
lan
-1 Kasi Perencaan
Ru 4
Ru as
asJ Ja
ala lan
n- -1
20 3
Ru
as SLAMET KARYADI

-8
Ja NIK 6309042
lan

an
Ru -1

-2
al

-7
JUDUL GAMBAR

sJ
as 2

an
an

-6
a
Ja

Ru

al
al
lan

sJ

-3
sJ

la

a
-1

Ja
a
Pengadaan dan Pemasangan Pipa

Ru

n
Ru
Ru 1

la
as

Ja
as

Ru
Komplek Pondok Karet Permai Jalan Maluyung
Ru

Ja

as
Ru la
as

Kec. Murung Pudak

Ru
as n-
J

Ru
al

Ja 10
an

lan as
Ja
KONSULTAN
-1

-4 lan-
9

CV. P R I S M A J A S A
Architect & engineering consultant

-2
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

n
la

-3
Ja
as

n
la
Ru

Ja
Penanggung Jawab

as
Ru

Ru
as
Ja
5

Ru lan
-1

as -1 Ir. SITTI UMAYYAH


n

6
la

Ja Direktris
Ja

lan
as

-1
Ru

Ru 7
Ru as
a sJ Jala
ala Ru n Di Gambar
n- as -1
5 Ja 8
lan
-1
9

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

0 ± 000
0±000

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

0+
0+ 0+ 40
20 41 2
0 2 SLAMET BUDI SANTOSA,S.Sos
NIK 6309023

Di Setujui
Kabag Teknik
Ru
as Ru
Ja as

4
la Ja

06
n- lan

0+
7
20

03
-1

0+
0+ 0+ 4
05 06 Ru
3 0
as H. MUSTA'IN,S.Sos

-8
NIK 6309010

4
Ja

07
an
lan

0+
l

-2
Ja

-7
-1
Di Periksa

as
3

an
an

-6
Ru

al
Kasi Perencaan

al

an

sJ
sJ

al

a
a
Ru

Ru
Ru
Ru

sJ
as

a
a
Ru

sJ

0
Ru
J ala

09
ala
as

0+
n- Ru n-
Ja

-3
as 12
l

4
an

an
Ru ala

2
-1

08
al
as n SLAMET KARYADI

0+
J
Ja -1

as
0+ Ru

8
1

05
lan NIK 6309042

Ru
18 as

0+
5
Ja -1

9
03
lan 0 JUDUL GAMBAR

0+
0+ -9

4
15

10
0

0+
Pengadaan dan Pemasangan Pipa

-2
Komplek Pondok Karet Permai Jalan Maluyung

n
Kec. Murung Pudak

la

-3
Ja

0
as

an

17
Ru

al
0+

0+
KONSULTAN

J
14

as
0

Ru
CV. P R I S M A J A S A

5
-1
n
0 + 484
Architect & engineering consultant

la
Ru

Ja
as

7
as
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

05
Ja

Ru

0+
0 + 498 Ru la
as n
-1

1
05
Ja 6
lan

0+
Penanggung Jawab
-1
Ru Ru 7

5
as as

05
Ru

Ja Ja
0+
as

lan Ru lan
Ja

-5 as -
4

18
l

04

Ja
an

lan
0+
-1

-1
9 Ir. SITTI UMAYYAH
Direktris
8
09
0+

Di Gambar

0 + 635

MIRZA AZWARI, ST
Draftman
Skala 1: 500
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)
0 ± 000
0±000

0 + 061 SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

0+ H. MUSTA'IN,S.Sos
0+
0+ 41 40
2 NIK 6309010
20 2
0 + 150 0

0+ Di Periksa
37 Ru Kasi Perencaan
2 as
J ala
n-
14
0+ Ru
33 as
7 Ja
Ru lan
as -1

4
Ja

06
lan 3

0+
SLAMET KARYADI

7
0+

03
0+ - 20 30 NIK 6309042

0+
0 + 214 05 0+ 2
3 06 Ru
0 as
Ja
la JUDUL GAMBAR

8
n-

4
n-

-6

07
0+ 12

ala

lan

0+
26 Ru

sJ

Ja
6

-2
as Pengadaan dan Pemasangan Pipa

-7
a

as
Ru
J

n
ala

Ru
n

la
ala
Komplek Pondok Karet Permai Jalan Maluyung

Ja
n-

as
J
11

as
0+

Ru
Ru Kec. Murung Pudak

Ru
Ru 23 as
1.5
as Ja
lan
Ja

0
09
lan
Ru

- 10
KONSULTAN

0+
as

-4 Ru

5
4.
a
Ja

03
sJ
la

ala

-3
0+
n

2
n-

an

08
-1

al

0+
CV. P R I S M A J A S A

sJ
0+

8
0
18

05
Ru
07
5

0+
0+

9
03
Architect & engineering consultant

0+
0+

4
15 Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

10
0

0+
0+

9 .5
14

13
-2 0
Penanggung Jawab

0+
lan
Ja

0
17
as

0+
Ru

-3
lan
Ja

Ru
as

as
Ru

Ja
la
n
-1
0 + 484 Ru
as
6 Ir. SITTI UMAYYAH
Ja
la Direktris
n

7
-1

05
5

0 + 498
-1

0+
Ru
n
9

la

as
02

Ja

Ja 1
0+

05
as

lan
Di Gambar
Ru

0+

Ru -1
as 8
Ja
lan
5

0 + 553 -1
05
4
05

9
0+
0+

Ru
as
J
4

al
04

an
0+

-5
MIRZA AZWARI, ST
8
09

Draftman
0+

0 + 635
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
tr re UTARA tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
0 ± 000
0±000

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


0 + 061 KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


0 + 150

Ru

J.1
as
Ja
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0 ± 000
0±000

Ø8 - 10 lan
- 14
Ru Ru
Ø8 - 10 as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
0 + 214
20
Ru
as
3
KABUPATEN TABALONG

-8
J ala

n
n-

ala

-2
-7
12

J
Ru

n
as
DIAJUKAN SEBAGAI GAMBAR :

-6
n

la
as

Ru

la

Ja
Ja

n
Ja

-3
la

as
lan

as

Ja

Ru

n
Ru -1

Ru

la
as
Ru as 1

Ja
Ru
as

Ru
Ja

as
Ja lan

as

Ru
lan Ru

Ja
-4 -1
as

la
0

n
Ja

-1
lan POTONGAN MELINTANG

Gambar Rencana Kerja


-9
Ø8 - 10 Ø8 - 10 0 + 061
TUTUP BETON

-2
n
ala

-3
sJ
Mengetahui

n
a

ala
Ru

a sJ
Pejabat Pembuat Komitmen (PPK)

Ru
Ru
as
Ja
la
BEGEL Ø12 0 + 484 Ru n
-1
as 6
LUBANG Ø13 Ja

5
lan

-1
-1

n
8 0 + 498

la
Ru 7

Ja
as

as
5 Ja

Ru
lan
Ru -
VARIABLE

as 18
Ru Jala
0 + 553 as n
Ja -1
lan 9
URUGAN TANAH -5
SLAMET BUDI SANTOSA,S.Sos

Ruas
BETON 1:2:3
NIK 6309023

Ja
10 1

lan -
GATE VALVE Di Setujui

1
Kabag Teknik
0 + 635

PASIR DIPADATKAN

PIPA HDPE
0 + 145

0
J.2
0 + 15 H. MUSTA'IN,S.Sos
NIK 6309010

Detail Gate Valve 50 mm Di Periksa


Kasi Perencaan
Not to Scale

KETERANGAN VOL

J.1 Stub Flange Ø 100 mm 1 Bh


SLAMET KARYADI
NIK 6309042
Baut 58" 0 + 214
JUDUL GAMBAR
KETERANGAN VOL
Stub Flange Ø 50 mm HDPE
Pengadaan dan Pemasangan Pipa
Rubber Packing
J.2 Gate Valve Ø 50 mm
Tee 100 x 100 x 100 mm
1
1
Bh
Bh
Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak

Stub Flange Ø 50 mm 4 Bh KONSULTAN


Reduser Ø100 x Ø 50 mm 1 Bh
Stub Flange Ø 50 mm HDPE CV. P R I S M A J A S A
HDPE Ø 100 mm

Rubber Packing
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Detail Stub Flange ∅ 50 mm HDPE


Penanggung Jawab
Not to Scale
TEE HDPE 100 X100 X 100

Detail Reducer
HDPE Ø 100 mm HDFE 100 mm - 50 mm

Baut 58"
Not to scale Ir. SITTI UMAYYAH
Detail Tee HDPE Direktris
Not to scale
RUAS JALAN - 1
Stub Flange Ø 100 mm HDPE STA 0+000 s/d STA 0 + 484
Rubber Packing
Di Gambar
Aspal Penetrasi
Sirtu 30 cm

Stub Flange Ø 100 mm HDPE MIRZA AZWARI, ST


Rubber Packing Draftman
Urugan Pasir 30 cm

Pipa HDPE Ø 100 mm

Detail Stub Flange 100 mm HDPE Profil Melintang Pipa


Not to Scale
Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a UTARA
k e r- s o ft w a

UTARA

Ru
Handel

as
Ja
la
PROGRAM/KEGIATAN

n
-1
0 ± 000
0±000

Baut 34' PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG
J.3 0 + 061

Ductile iron with ENP


Stanless stell disc PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


0 + 150

Ru
0 + 484 as

Ru
Ja
lan
- 14
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ru
as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
0 + 498
20 3
KABUPATEN TABALONG

Ru
0 + 214 Ru
Butterfly Valve Ø 50 mm as

as

-8
J ala

n
n-

ala
Ja

-2
-7
12

J
Ru

la

n
as
DIAJUKAN SEBAGAI GAMBAR :

-6
n

la
Not to Scale as

Ru

la

Ja
Ja

n
Ja

-3
la
-1

as
lan

as

Ja

Ru

n
Ru -1

Ru

la
as
Ru as 1

Ja
Ru
as

Ru
Ja

as
Ja lan

as

Ru
lan Ru

Ja
-4 -1
as

la
0

n
Ja

-1
lan POTONGAN MELINTANG

Gambar Rencana Kerja


-9

-2
n
ala

-3
sJ
Mengetahui

n
a

ala
Ru

a sJ
Pejabat Pembuat Komitmen (PPK)

Ru
Ru
as
Ja
la
Ru n
0 + 484 -1
as 6
Ja

5
lan

-1
-1

n
0 + 498

la
Ru 7

Ja
as

as
Ja

Ru
lan
Ru -
as 18
Ru Jala
0 + 553 as n
Ja -1
lan 9
-5
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023

Di Setujui
Kabag Teknik
0 + 635

Ø8 - 10
Ø8 - 10

H. MUSTA'IN,S.Sos
NIK 6309010
Baut 58" Baut 58"
Di Periksa
Kasi Perencaan
Ø8 - 10 Ø8 - 10
Stub Flange Ø 100 mm HDPE Stub Flange Ø 50 mm HDPE
TUTUP BETON
Rubber Packing Rubber Packing KETERANGAN VOL
Gate Valve Ø 100 mm 1 Bh

8
5
BEGEL Ø12
LUBANG Ø13
J.3 Tee 100 x 100 x 100 mm
Butterfly Valve Ø 50 mm
1
1
Bh
Bh
SLAMET KARYADI
NIK 6309042
VARIABLE

URUGAN TANAH JUDUL GAMBAR


Stub Flange Ø 100 mm HDPE Stub Flange Ø 50 mm HDPE Stub Flange Ø 100 mm 2 Bh
BETON 1:2:3
Rubber Packing
10 1
Rubber Packing
Stub Flange Ø 50 mm 2 Bh Pengadaan dan Pemasangan Pipa
GATE VALVE Komplek Pondok Karet Permai Jalan Maluyung
PASIR DIPADATKAN
Reduser Ø100 x Ø 50 mm 1 Bh Kec. Murung Pudak
Detail Stub Flange Ø 100 mm HDPE Detail Stub Flange Ø 50 mm HDPE
PIPA HDPE
Not to Scale
KONSULTAN
Not to Scale

CV. P R I S M A J A S A
Detail Gate Valve 100 mm Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
HDPE Ø 100 mm

Not to Scale

Penanggung Jawab

TEE HDPE 100 X100 X 100

HDPE Ø 100 mm Ir. SITTI UMAYYAH


Direktris
Detail Tee HDPE RUAS JALAN - 1
Not to scale STA 0+498 s/d STA 0 + 635
Di Gambar
Aspal Penetrasi
Sirtu 30 cm

MIRZA AZWARI, ST
Draftman
Urugan Pasir 30 cm

Pipa HDPE Ø 100 mm

Profil Melintang Pipa


Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac UTARA ac
k e r- s o ft w a k e r- s o ft w a

UTARA

Ru
as
Ja
anl
-1
PROGRAM/KEGIATAN
Air Vent
Beton Penahan Pipa
Pipa 3 Layer Ø 100 mm PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Bend 45° GI Ø 100 mm KABUPATEN TABALONG

BAJA WF 150x75x5x7 PEKERJAAN


Pipa 3 Layer Ø 100 mm POTONGAN MELINTANG

0 + 484 PENGADAAN DAN PEMASANGAN PIPA HDPE


Bend 45° GI Ø 100 mm
JMB-1 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA

Ru
0 + 498 KABUPATEN TABALONG

as
Ja
la
n
Pipa HDPE Ø 100 mm

-1
Stub Flange HDPE Ø 100 mm DIAJUKAN SEBAGAI GAMBAR :
Thrust Block Thrust Block

POTONGAN MELINTANG

Kayu Galam Ø 12 cm Kayu Galam Ø 12 cm Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

Jembatan Pipa (JMB-1) Air Vent


SLAMET BUDI SANTOSA,S.Sos
Skala 1 : 100 NIK 6309023

Di Setujui
Kabag Teknik

KETERANGAN VOL H. MUSTA'IN,S.Sos


NIK 6309010
Air Vent Air Valve 1 Bh
Not to Scale
JBT Bend 45° GI
Stub Flange Ø 100 mm
4
2
Bh
Bh
Di Periksa
Kasi Perencaan

Flange GI Ø 100 mm 18 Bh

SLAMET KARYADI
NIK 6309042
Bend 45 °
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
Detail Bend GI 45°
Kec. Murung Pudak
Not to Scale
Baut 58"
Baut 58"
KONSULTAN

CV. P R I S M A J A S A
Flange GI Ø 100 mm
Stub Flange Ø 100 mm HDPE
Rubber Packing
Rubber Packing

Architect & engineering consultant


Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab
Flange GI Ø 100 mm
Stub Flange Ø 100 mm HDPE
Rubber Packing
Rubber Packing

Detail Stub Flange Ø 100 mm HDPE Detail Flange Ø GI 100 mm Ir. SITTI UMAYYAH
Not to Scale
Not to Scale Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
tr re
UTARA
tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

-2
n
J.4

la
Ja
as
Ru
PROGRAM/KEGIATAN
0 ± 000
0±000

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


0 + 061 KABUPATEN TABALONG
0 + 553
PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE

Ru
0 + 150

as
Ru
as

Ja
Ja
DI KEC. TANJUNG , KEC. MURUNG PUDAK,

la
lan

n
- 14

-1
Ru Ru

Ø8 - 10
as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
Ø8 - 10
0 + 214
20
Ru
as
3
KABUPATEN TABALONG

-8
J ala

n
n-

ala

-2
-7
12

J
Ru

n
as
DIAJUKAN SEBAGAI GAMBAR :

-6
n

la
as

Ru

la

Ja
Ja

n
Ja

-3
la

as
lan

as

Ja

Ru

n
Ru -1

Ru

la
as
Ru as 1

Ja
Ru
as

Ru
Ja

as
Ja lan

as

Ru
lan Ru

Ja
-4 -1
as

la
0

n
Ja

-1
lan POTONGAN MELINTANG

Gambar Rencana Kerja


-9

Ø8 - 10 Ø8 - 10

-2
n
ala

-3
sJ
Mengetahui

n
a

ala
Ru
TUTUP BETON

a sJ
Pejabat Pembuat Komitmen (PPK)

Ru
Ru
as
Ja
la
Ru n
0 + 484 -1
as 6
Ja

5
lan

-1
-1

n
0 + 498

la
Ru 7
BEGEL Ø12

Ja
as

as
Ja

Ru
lan
LUBANG Ø13 Ru
as - 18
Ru J
8 0 + 553 as ala
n
Ja -1
5 lan
-5
9

SLAMET BUDI SANTOSA,S.Sos


VARIABLE

URUGAN TANAH NIK 6309023

10 1
BETON 1:2:3
J.5 0 + 635 0 + 635
Di Setujui
Kabag Teknik
GATE VALVE
PASIR DIPADATKAN

PIPA HDPE
Baut 58"

H. MUSTA'IN,S.Sos
NIK 6309010
Stub Flange Ø 75 mm HDPE
Rubber Packing Di Periksa
Kasi Perencaan
Detail Gate Valve Ø 75 mm
Not to Scale
KETERANGAN VOL
Tee 100 x 100 x 100 mm 1 Bh
Stub Flange Ø 75 mm HDPE
Rubber Packing
J.4 Stub Flange Ø 75 mm
Gate Valve Ø 75 mm 1
2 Bh
Bh
SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Reduser 100 mm x 75 mm 1 Bh
Stub Flange Ø 100 mm 4 Bh Pengadaan dan Pemasangan Pipa
Detail Stub Flange Ø 75 mm HDPE
Komplek Pondok Karet Permai Jalan Maluyung
Not to Scale Kec. Murung Pudak
HDPE Ø 100 mm

Ø8 - 10 Baut 58"
KETERANGAN VOL KONSULTAN
Ø8 - 10 Gate Valve Ø 100 mm 1 Bh
Stub Flange Ø 100 mm HDPE
Rubber Packing
J.5 Stub Flange Ø 100 mm 2 Bh CV. P R I S M A J A S A
TEE HDPE 100 X100 X 100 Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Ø8 - 10 Ø8 - 10 HDPE Ø 100 mm
TUTUP BETON
Penanggung Jawab
Detail Tee HDPE
Stub Flange Ø 100 mm HDPE
BEGEL Ø12 Not to scale Rubber Packing
LUBANG Ø13
8
5
VARIABLE

URUGAN TANAH Ir. SITTI UMAYYAH


Detail Stub Flange Ø 100 mm HDPE
BETON 1:2:3 Direktris
1 Not to Scale
10
GATE VALVE RUAS JALAN - 1
PASIR DIPADATKAN STA 0+498 s/d STA 0 + 635
Di Gambar
Perkerasan sirtu
PIPA HDPE Sirtu 30 cm

MIRZA AZWARI, ST
Urugan Pasir 30 cm Draftman
Detail Gate Valve Ø 100 mm
Not to Scale Detail Reducer Pipa HDPE Ø 100 mm
HDFE 100 mm - 75 mm Profil Melintang Pipa
Not to scale Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a

UTARA
Ru
as
Ja
PROGRAM/KEGIATAN
lan
-4

J.7 0 ± 000
0±000

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG
0+
18
5

0+
17
Ru
a sJ
ala
PEKERJAAN
9 n-
POTONGAN MELINTANG

4
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 + 150

Ru
as

Ru
Ja
lan
- 14
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ru
as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
0 + 214
20
Ru
as
3
KABUPATEN TABALONG

-8
J ala

n
n-

ala

-2
-7
12

J
Ru

n
as
DIAJUKAN SEBAGAI GAMBAR :

-6
n

la
as

Ru

la

Ja
Ja

n
Ja

-3
la

as
lan

as

Ja

Ru

n
Ru -1

Ru

la
as
Ru as 1

Ja
Ru
as

Ru
Ja

as
Ja lan

as

Ru
lan Ru

Ja
-4 -1
as

la
0

n
Ja

-1
lan POTONGAN MELINTANG

Gambar Rencana Kerja


-9

-2
Ø8 - 10

n
la
Ja
Ø8 - 10

as

-2
n
Ru

ala

-3
sJ
Mengetahui

n
a

ala
Ru

a sJ
Pejabat Pembuat Komitmen (PPK)

Ru
Ru
as
Ja
la
Ru n
0 + 484 -1
as 6
Ja

5
lan

-1
-1

n
0 + 498

la
Ru 7

Ja
as

as
Ja

Ru
lan
Ru -
as 18
Ru Jala
Ø8 - 10 Ø8 - 10 as

J.6
Ja n -1
lan 9
-5
TUTUP BETON SLAMET BUDI SANTOSA,S.Sos
0+ NIK 6309023
03
8.
5
Di Setujui
BEGEL Ø12 0+
0 + 635
Kabag Teknik
LUBANG Ø13 03
8 3.5
5
Ru
VARIABLE

as
Ja
URUGAN TANAH lan
-5
BETON 1:2:3
Ru
as
Ja

10 1 H. MUSTA'IN,S.Sos
la
n

NIK 6309010
-1

GATE VALVE
PASIR DIPADATKAN
Di Periksa
Kasi Perencaan
PIPA HDPE

KETERANGAN VOL
Tee 75 x 75 x 75 mm 1 Bh
Detail Gate Valve Ø 75 mm
Not to Scale
J.6 SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
KETERANGAN VOL Kec. Murung Pudak
HDPE Ø 75 mm

Baut 58"

Gate Valve Ø 75 mm 2 Bh
KONSULTAN
Stub Flange Ø 75 mm HDPE
Rubber Packing
J.7 Tee 75 x 75 x 75 mm
Stub Flange Ø 75 mm
2
4
Bh
Bh
TEE HDPE 75 X75 X 75
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
HDPE Ø 75 mm

Detail Tee HDPE


Stub Flange Ø 75 mm HDPE
Penanggung Jawab
Rubber Packing

Not to scale

Detail Stub Flange Ø 75 mm HDPE


Not to Scale Ir. SITTI UMAYYAH
Direktris

RUAS JALAN - 1
Di Gambar
STA 0+000 s/d STA 0 + 185

Perkerasan sirtu
Sirtu 30 cm

MIRZA AZWARI, ST
Draftman

Pipa HDPE Ø 75 mm

Profil Melintang Pipa


Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
UTARA
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac UTARA
ac
k e r- s o ft w a k e r- s o ft w a

UTARA J.8
PROGRAM/KEGIATAN
0 ± 000
0±000

Handel 0+
41 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
2
KABUPATEN TABALONG

Baut 78 ''
PEKERJAAN
POTONGAN MELINTANG

0+

PENGADAAN DAN PEMASANGAN PIPA HDPE


41
2
Ru
as
Ja
lan

Ductile iron with ENP Ru


as
Ru
as
-1
4 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
J ala Jala
n
Stanless stell disc n-
20
-1
3
Ru
as KABUPATEN TABALONG

-8
Ja
lan

n
la

-2
-1

Ja

-7
Ru 2

as

n
-6
n
as

la
la
Ru

Ja
J

n
Ja
DIAJUKAN SEBAGAI GAMBAR :
ala

-3
la

as
as

Ja
n

Ru

n
Ru

Ru
-1

la
as
Ru as 1

Ja
Ru
a

Ru
sJ J

as
ala ala

-2

as

Ru
n- Ru n-

Ja
as 10

la
4

n
Ja

-1
lan

la
-9
Butterfly Valve Ø 75 mm POTONGAN MELINTANG

Ja
0+

Gambar Rencana Kerja

as
18
0+ 5
Not to Scale

Ru
17
9

-2
n
la

-3
Ja
as

n
ala
Ru
Mengetahui

a sJ
Ru

Ru
Pejabat Pembuat Komitmen (PPK)

as
Ja
la
Ru

n
as

-1
Ja

6
5
lan

-1
-1

n
0

la
Ru

+
0 7

18

Ja
+ as

5
18

as
5 J ala

Ru
Ru n-

0
+
as 18

18
Ru Ja

5
as lan
Ja -
lan 19
-5

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Baut 58" Di Setujui


Kabag Teknik

Stub Flange Ø 75 mm HDPE


Rubber Packing

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Stub Flange Ø 75 mm HDPE Kasi Perencaan
Rubber Packing
KETERANGAN VOL
Stub Flange Ø 75 mm 2 Bh

Detail Stub Flange 75 mm HDPE


J.8 Butterfly Valve Ø 75 mm 1 Bh
SLAMET KARYADI
NIK 6309042
Not to Scale
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

RUAS JALAN - 2
STA 0+185 s/d STA 0 + 412
Ir. SITTI UMAYYAH
Cor beton tebal 20 cm Direktris
Jalan Cor beton
Sirtu tebal 10 cm
Di Gambar

Urugan Pasir 30 cm
Pipa HDPE Ø 75 mm
MIRZA AZWARI, ST
Draftman

Profil Melintang Pipa


Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a
Ru
as
Jala
n-
4
UTARA
J.10
0+
15
0
PROGRAM/KEGIATAN

0+ PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


14
6 KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

-3
PENGADAAN DAN PEMASANGAN PIPA HDPE

n
la
0± Ru
as

Ja
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
40 Ja
0± 2 lan

as
37
2 -

Ru
0± Ru 14
Ru
as
Jala
n-

33
36
8 as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
20 7
0± 3
33
3 Ru
Ø8 - 10 0± as

-8
30 J
2 ala

n
0± n-

ala

-2
29

-7
Ø8 - 10 12

J
8 Ru

n
as
DIAJUKAN SEBAGAI GAMBAR :

-6
n

la
as

Ru

la

Ja
0± Ja

-2

n
Ja

-3
la

as
26 lan

as

Ja
6

Ru

n
0± Ru -1

Ru
n

la
as
Ru 26 as 1

Ja
ala

Ru
as 2

Ru
Ja

as
Ja lan

as

Ru
lan

sJ
Ru 23

Ja
-4 1.5 -1
as

la
0+ 0

n
Ja

Ru
22

-1
7.5 lan POTONGAN MELINTANG

Gambar Rencana Kerja


-9

0+
15
0

-2
0+

n
ala
14

-3
6

sJ
Mengetahui

n
Ø8 - 10 Ø8 - 10

ala
Ru

a sJ
Pejabat Pembuat Komitmen (PPK)

Ru
Ru
TUTUP BETON as
Ja
la
Ru n
-1
Ru as 6

J.9
Ja
as

5
lan

-1
-1
Ja

n
la
Ru 7
la

Ja
as

as
n Ja

Ru
lan
-5 Ru -

0
BEGEL Ø12 as 18

+

Ru

00
Jala

5
00
as n

0
LUBANG Ø13 Ja
lan -1
9
-5
8
5 SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
VARIABLE

URUGAN TANAH 0+
BETON 1:2:3 00 Di Setujui

00
5 Kabag Teknik
10 1 0

GATE VALVE
PASIR DIPADATKAN

PIPA HDPE
H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

Detail Gate Valve Ø 75 mm


KETERANGAN VOL
Not to Scale
Gate Valve Ø 75 mm 1 Bh
Handel
J.9 Stub Flange Ø 75 mm
Tee 75 x 75 x 75 mm
2
1
Bh
Bh
SLAMET KARYADI
NIK 6309042
HDPE Ø 75 mm

JUDUL GAMBAR
Baut 58" Baut 34'
Pengadaan dan Pemasangan Pipa
KETERANGAN VOL Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak
J.10
Stub Flange Ø 50 mm HDPE
Ductile iron with ENP
Tee 75 x 75 x 75 mm 1 Bh
TEE HDPE 75 X75 X 75 Rubber Packing
Stanless stell disc
Butterfly Valve Ø 50 mm 1 Bh KONSULTAN
HDPE Ø 75 mm
Stub Flange Ø 50 mm 2 Bh

Detail Tee HDPE


Reduser Ø 75 x Ø 50 mm 1 Bh CV. P R I S M A J A S A
Butterfly Valve Ø 50 mm
Architect & engineering consultant
Stub Flange Ø 50 mm HDPE
Not to scale Not to Scale Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Rubber Packing

Penanggung Jawab
Detail Stub Flange Ø 50 mm HDPE
Not to Scale

Ir. SITTI UMAYYAH


Baut 58" Direktris

RUAS JALAN - 3
Stub Flange Ø 75 mm HDPE
STA 0+000 s/d STA 0 + 150 Di Gambar
Rubber Packing

Detail Reducer Jalan Tanah


HDFE 75 mm - 50 mm
Sirtu 30 cm
Not to scale

MIRZA AZWARI, ST
Stub Flange Ø 75 mm HDPE Draftman
Rubber Packing Urugan Pasir 30 cm

Pipa HDPE Ø 75 mm

Profil Melintang Pipa


Detail Stub Flange Ø 75 mm HDPE
Not to Scale Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a
J.16 k e r- s o ft w a
UTARA

Bend 90°

UTARA
Ru
asJ
J.15 ala
n- PROGRAM/KEGIATAN
14
0 ± 000
0±000

-3
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

n
la
Ja
KABUPATEN TABALONG

as
Detail Bend 90° Ru

Ru
as

J.14
Jala
Not to Scale n -1
3
PEKERJAAN
POTONGAN MELINTANG

Ru
as
PENGADAAN DAN PEMASANGAN PIPA HDPE
Ja
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
J.13
lan
Ru Ru
- 14
as Ru
Ja
lan
as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
-1
2
20
Ru
as
3
KABUPATEN TABALONG

-8
J ala

n
n-

ala

-2
-7
12

J
Ru

n
as
DIAJUKAN SEBAGAI GAMBAR :

-6
n

la
as

Ru

la

Ja
Ja

n
Ja

-3
la

as
lan

as

Ja

Ru

n
Ru -1

Ru

la
as
Ru
Ru as 1

Ja
Ru
as

J.12

Ru
Ja

as
as Ja lan

as

Ru
lan Ru

Ja
-1
Ja -4 as

la
0+ 0
la

n
22 Ja
n-

-1
7.5 lan POTONGAN MELINTANG

Gambar Rencana Kerja


-9
11

-3
0+
15

-2
0

n
0+

n
la

ala
14

-3
6

Ja

sJ
Mengetahui

n
a

ala
Ru
as

sJ
Ru
Ru

a
J.11 Pejabat Pembuat Komitmen (PPK)

Ru
Ru
as as
Ja Ja
la
lan Ru n
-1
as
-1 Ja
6

5
lan
0

-1
-1
Detail Reducer

n
la
Ru 7

Ja
as

as
Ja

Ru
lan
HDFE Ø 75 mm - Ø 50 mm Ru -

0
0+ as 18

+
Ru

00
Jala

5
as
22 Ru Ja n -1
7.5 as
lan 9
Not to scale -5
Ja
la SLAMET BUDI SANTOSA,S.Sos
n-
9 NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
HDPE Ø 75 mm

NIK 6309010

Di Periksa
Kasi Perencaan
KETERANGAN VOL
TEE HDPE 75 X75 X 75
J.11 Tee 75 x 75 x 75 mm 1 Bh
Reduser Ø 75 x Ø 50 mm 1 Bh
HDPE Ø 75 mm
SLAMET KARYADI
NIK 6309042
KETERANGAN VOL
Detail Tee HDPE

Not to scale
J.12 Tee 75 x 75 x 75 mm 1 Bh
JUDUL GAMBAR
Reduser Ø 75 x Ø 50 mm 1 Bh Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak
KETERANGAN VOL
J.13 Tee 75 x 75 x 75 mm 1 Bh KONSULTAN
Reduser Ø 75 x Ø 50 mm 1 Bh
CV. P R I S M A J A S A
KETERANGAN VOL Architect & engineering consultant
J.14 Tee 75 x 75 x 75 mm 1 Bh
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Reduser Ø 75 x Ø 50 mm 1 Bh
Penanggung Jawab

KETERANGAN VOL
J.15 Tee 75 x 75 x 75 mm 1 Bh
Reduser Ø 75 x Ø 50 mm 1 Bh
Ir. SITTI UMAYYAH
Direktris
KETERANGAN VOL
RUAS JALAN - 3
STA 0+150 s/d STA 0 + 402
J.16 Bend 90°- Ø 75 mm 1 Bh
Di Gambar
Reducer HDPE 75 x 50 mm 1 Bh
Jalan Cor beton Cor beton tebal 20 cm

Sirtu tebal 10 cm

MIRZA AZWARI, ST
Draftman

Urugan Pasir 30 cm
Profil Melintang Pipa Pipa HDPE Ø 75 mm

Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA UTARA
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
Ru
as
Ja

J.17
lan
UTARA -1

-3
4

n
la
Ja
as
Ru

4
PROGRAM/KEGIATAN

06
0+
Ru
as
Ja
lan 0 ± 000
0±000

- 13 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

4
07
Ru
as

0+
Ja

J.18
lan
-1
2 PEKERJAAN
POTONGAN MELINTANG

Ru
as Ru
as
PENGADAAN DAN PEMASANGAN PIPA HDPE
Jala Ja
lan DI KEC. TANJUNG , KEC. MURUNG PUDAK,

-3
n -1 Ru
- 14
Ru
KEC.MUARA HARUS DAN KEC. MUARA UYA
n
as
1
la
as
J Ja

0
Ja ala lan

4
09

06
n- -1
as

0+
20 3
KABUPATEN TABALONG

0+
Ru

Ru
Ru as

-8
as J ala

4
n

07
Ja
J.19
n-

ala

-2

0+
-7
lan 12

J
Ru

n
as
DIAJUKAN SEBAGAI GAMBAR :

-6
n

la
as

Ru

la

Ja
-1 Ja

n
Ja

la

as
lan

as

Ja
0

Ru
2
Ru -1

Ru

as
Ru

08
as 1

Ru
as

Ru
Ja

0
-3

09
Ja lan

0+

as
lan

0+
n
Ru

ala
Ja
-1

J.20
-4 as
Ru

la
0

sJ
n
Ja

2
a
as

-1

08
lan

Ru

0+
POTONGAN MELINTANG

Gambar Rencana Kerja


-9
Ja

8
05
05
lan

0+
9
03
0+
-9

0+
9
03

-2
J.21

n
0+

ala

-3
sJ
Mengetahui

n
a

ala
Ru

a sJ
Pejabat Pembuat Komitmen (PPK)

Ru
Ru
as
Ja
la

J.22 Ru n
-1
as 6
Ja

5
lan

-1
-1

n
la
Ru 7

Ja
as

as
Ja

Ru
lan
Handel Ru -
as 18
Ru Jala
as n
Ja -1
lan 9
-5
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
Baut 34'
Di Setujui
Kabag Teknik

Ductile iron with ENP


Stanless stell disc

KETERANGAN VOL H. MUSTA'IN,S.Sos


NIK 6309010
Butterfly Valve Ø 50 mm 1 Bh Baut 58"

J.17 Stub Flange Ø 50 mm 2 Bh


Stub Flange Ø 50 mm HDPE
Butterfly Valve 50 mm
Not to Scale
Di Periksa
Kasi Perencaan

Rubber Packing

KETERANGAN VOL
SLAMET KARYADI
Butterfly Valve Ø 50 mm 1 Bh NIK 6309042

J.18 Stub Flange Ø 50 mm 2 Bh


Rubber Packing
Stub Flange Ø 50 mm HDPE JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak

KETERANGAN VOL Detail Stub Flange Ø 50 mm HDPE


KONSULTAN
Not to Scale
Butterfly Valve Ø 50 mm 1 Bh

J.19 Stub Flange Ø 50 mm 2 Bh


CV. P R I S M A J A S A
Architect & engineering consultant
RUAS JALAN Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

17,18,19,20,21 dan 22
Cor beton tebal 20 cm
KETERANGAN VOL
Jalan Cor beton Penanggung Jawab
Sirtu tebal 10 cm
Butterfly Valve Ø 50 mm 1 Bh

J.20 Stub Flange Ø 50 mm 2 Bh

Urugan Pasir 30 cm Ir. SITTI UMAYYAH


Direktris
Pipa HDPE Ø 50 mm
KETERANGAN VOL
Butterfly Valve Ø 50 mm 1 Bh Profil Melintang Pipa Di Gambar
J.21 Stub Flange Ø 50 mm 2 Bh Skala 1 : 50
KETERANGAN :

RUAS JALAN - 17 STA 0 + 00 s/d 0 + 064 (Jalan Cor) MIRZA AZWARI, ST


KETERANGAN VOL Draftman
RUAS JALAN - 18 STA 0 + 00 s/d 0 + 074 (Jalan Cor)
Butterfly Valve Ø 50 mm 1 Bh RUAS JALAN - 19 STA 0 + 00 s/d 0 + 090 (Jalan Cor)
J.22 Stub Flange Ø 50 mm 2 Bh RUAS JALAN - 20 STA 0 + 00 s/d 0 + 082 (Jalan Cor)
RUAS JALAN - 21 STA 0 + 00 s/d 0 + 058 (Jalan Cor)
RUAS JALAN - 22 STA 0 + 00 s/d 0 + 039 (Jalan Cor)
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
tr re tr re
.

.
ac UTARA
ac
k e r- s o ft w a k e r- s o ft w a

UTARA

8
n-
J.23

la
PROGRAM/KEGIATAN

Ja
as
Handel

Ru
0 ± 000
0±000

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG
Baut 78 ''

-7
lan
PEKERJAAN

Ja
Ru

as
00
as

Ru
Ja

0+
lan POTONGAN MELINTANG

-4
Ductile iron with ENP
Ru
PENGADAAN DAN PEMASANGAN PIPA HDPE
Stanless stell disc as
Ja
lan
- DI KEC. TANJUNG , KEC. MURUNG PUDAK,
J.24
Ru 14
Ru
as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
20 3
KABUPATEN TABALONG

-8
Ru

-6

lan
4.
as

6
-7
Ja
J

-
ala

03

lan
lan

lan
as
n-

-2
Ja
Ru

Ja
0+
Ru 12

Ja

as

n
4
DIAJUKAN SEBAGAI GAMBAR :

as
5

la
00
as

Ru
8.

Ja
Ru
0+
Ja

as

.5

as
lan

03

34

Ru
Ru

+0
Ru
Butterfly Valve 75 mm -1

8.5
as

0
1

0+

03
Ru
Ja

-3
0+
lan

as

n
0
Ru

ala
Ja
-1

07
as

la
0

0+

sJ
Not to Scale

4
n
Ja

07

a
-1
lan

Ru
0+
POTONGAN MELINTANG

Gambar Rencana Kerja


-9
Ru
as
Ja

J.25
la

4
n-

10
0+
4

0
11
0+
-2

9.5
13
n
ala
0

3.5
0+
-3
07

14
sJ
Mengetahui

n
0+
a

ala
Ru

0
0+

17
Ru

sJ

0+
a
4
Pejabat Pembuat Komitmen (PPK)

Ru
as Ru

07
as
Ja Ja

0+
lan Ru
la
n
-1
-4 as
Ja
6

5
lan

-1
-1

n
la
Ru 7

Ja
as

as
Ja

Ru
lan
Ru -
as 18
Ru J ala
as n
Ja -1
la
HDPE Ø 75 mm

n- 9
5
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023

Di Setujui
Kabag Teknik

TEE HDPE 75 X75 X 75

HDPE Ø 75 mm Baut 58"


H. MUSTA'IN,S.Sos
NIK 6309010
Detail Tee HDPE
Stub Flange Ø 75 mm HDPE
Di Periksa
Not to scale Rubber Packing Kasi Perencaan

KETERANGAN VOL
Butterfly Valve Ø 75 mm 1 Bh

Stub Flange Ø 75 mm HDPE


Detail Reducer
J.23 Tee 75 x 75 x 75 mm
Stub Flange Ø 75 mm
1
2
Bh
Bh
SLAMET KARYADI
NIK 6309042
Rubber Packing
HDFE Ø 75 mm - Ø 50 mm
Reduser Ø 75 x Ø 50 mm 1 Bh JUDUL GAMBAR
Not to scale

KETERANGAN VOL Pengadaan dan Pemasangan Pipa


Detail Stub Flange Ø 75 mm HDPE Komplek Pondok Karet Permai Jalan Maluyung
Not to Scale Tee 75 x 75 x 75 mm 1 Bh Kec. Murung Pudak

J.24 Reduser Ø 75 x Ø 50 mm 1 Bh
KONSULTAN

KETERANGAN VOL CV. P R I S M A J A S A


Architect & engineering consultant
Tee 75 x 75 x 75 mm 1 Bh

J.25
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

RUAS JALAN - 4 Reduser Ø 75 x Ø 50 mm 1 Bh


STA 0+000 s/d STA 0 + 104 Penanggung Jawab
Cor beton tebal 20 cm
Jalan Cor beton
Sirtu tebal 10 cm

Ir. SITTI UMAYYAH


Direktris
Urugan Pasir 30 cm
Pipa HDPE Ø 75 mm
Di Gambar

Profil Melintang Pipa


Skala 1 : 50

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
tr re tr re
.

.
ac UTARA
ac
k e r- s o ft w a k e r- s o ft w a

J.29 0+
UTARA 20
0

PROGRAM/KEGIATAN
J.26 0 ± 000
0±000

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

Ru
J.27 PEKERJAAN

6
as

n-
Ja

ala
lan POTONGAN MELINTANG

J
-2

J.28

as
0
PENGADAAN DAN PEMASANGAN PIPA HDPE
0+

Ru
20
0
Ru
as
Ja
lan
- 14
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0+ Ru Ru
05
3
as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
0+
06
20
0+ Ru
as
3
KABUPATEN TABALONG

-8
0+ 06

-8
05 0 J ala
0

n
3
Bend 90° n-

ala
lan

-2
-7
12

J
Ru

n
as
DIAJUKAN SEBAGAI GAMBAR :

-6
n

la
Ja
as

Ru

la

Ja
Ja

n
0+

Ja

-3
la

as
lan

as
00

as

Ja

Ru

n
4 Ru -1

Ru

la
Ru

as
Ru as 1

Ja
Ru
as

Ru
Ja

as
Ja 0+ lan

as

Ru
lan 00
Ru

Ja
4 -1

-7
-4 as

la
0

n
Ja

-1
n
0+ lan

ala
POTONGAN MELINTANG

Gambar Rencana Kerja


00
4 -9
0+

J
00

as
4

Ru
Detail Bend 90° HDPE Ø 50 mm

-2
n
ala

-3
sJ
Mengetahui

n
Not to scale

ala
Ru

a sJ
Pejabat Pembuat Komitmen (PPK)

Ru
Ru
as
Ja
0+ Ru
la
n
-1
00 as 6
Ru 4 Ja

5
lan

-1
-1
as

n
la
Ru 7

Ja
as
J ala

as
Ja

Ru
lan
Ru
n -4 Ru
as
Jala
- 18
as n
Ja -1
lan 9
-5
0+ SLAMET BUDI SANTOSA,S.Sos
00
4 NIK 6309023
Handel
Di Setujui
Kabag Teknik

Baut 34'

Ductile iron with ENP H. MUSTA'IN,S.Sos


Stanless stell disc Baut 58" NIK 6309010

Di Periksa
Kasi Perencaan
Stub Flange Ø 50 mm HDPE
KETERANGAN VOL
Rubber Packing

Butterfly Valve Ø 50 mm Butterfly Valve Ø 50 mm 1 Bh


Not to Scale
J.26 Stub Flange Ø 50 mm 2 Bh
SLAMET KARYADI
NIK 6309042

Stub Flange Ø 50 mm HDPE JUDUL GAMBAR


Rubber Packing
KETERANGAN VOL
Pengadaan dan Pemasangan Pipa
Bend 90 ° - Ø 50 mm 1 Bh Komplek Pondok Karet Permai Jalan Maluyung
Detail Stub Flange Ø 50 mm HDPE
Not to Scale
J.27 Bh
Kec. Murung Pudak

KONSULTAN

KETERANGAN VOL
CV. P R I S M A J A S A
Architect & engineering consultant
Butterfly Valve Ø 50 mm 1 Bh Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

J.28 Stub Flange Ø 50 mm 2 Bh


Penanggung Jawab

KETERANGAN VOL
Butterfly Valve Ø 50 mm 1 Bh Ir. SITTI UMAYYAH
J.29 Stub Flange Ø 50 mm 2 Bh Direktris

RUAS JALAN
26 , 27 , 28 DAN 29 Di Gambar
Cor beton tebal 20 cm
Jalan Cor beton
Sirtu tebal 10 cm
KETERANGAN :
MIRZA AZWARI, ST
RUAS JALAN - 26 STA 0 + 00 s/d 0 + 037(Jalan Cor) Draftman
Urugan Pasir 30 cm
RUAS JALAN - 27 STA 0 + 00 s/d 0 + 053 (Jalan Cor)
Pipa HDPE Ø 50 mm
RUAS JALAN - 28 STA 0 + 00 s/d 0 + 060 (Jalan Cor)
Profil Melintang Pipa RUAS JALAN - 29 STA 0 + 00 s/d 0 + 200 (Jalan Cor)
Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
UTARA
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
Ru
as
Ja
lan

UTARA
-4 J.35
0+
13
6
0+
14
0
PROGRAM/KEGIATAN
Bend 90° J.34 0 ± 000
0±000

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG
J.33 Ru
as
Ja
la PEKERJAAN
n
-1
J.32
POTONGAN MELINTANG

5
6

-1
PENGADAAN DAN PEMASANGAN PIPA HDPE

an
Ru Ru

al
as as
DI KEC. TANJUNG , KEC. MURUNG PUDAK,

sJ
Ja
Ja lan

a
lan

Ru
-1
Ru 4
KEC.MUARA HARUS DAN KEC. MUARA UYA
Ru
-1 as

J.31
as
J Ja
7 ala
n-
lan
-1

Ru
20
Ru
as
3
KABUPATEN TABALONG

-8
as J ala

n
n-

la
J

-2
ala

Ja

-7
Ru 12

n
as
DIAJUKAN SEBAGAI GAMBAR :

-6

la
as
n

la
Ru

Ja
J

Ja

n
ala
-1

-3
la

as
as

Ja
n-

Ru

n
8 Ru

Ru

ala
0

as
Detail Bend 90° - 50 mm Ru as 11

Ru
as

J
+0

Ru
J

as
Ja ala
Ru

as

Ru
lan n-
05 Ru

Ja
a -4 as 10

la
Not to Scale sJ

n
Ja
ala

-1
lan POTONGAN MELINTANG

Gambar Rencana Kerja


-9
n-
19

J.30 0+

-2
14
0
Ru

n
0+

ala

-3
13
as

sJ
Mengetahui
6

n
a

la
Ru
Ja

Ja
lan

as
Pejabat Pembuat Komitmen (PPK)

Ru
Ru
-5 as
Ja
la
Ru n
-1
as 6
Jala

5
-1
n -1

n
Ru

la
a Ru 7

Ja
sJ as

as
ala J ala

Ru
n Ru n-
-5 0+
as 18
00 Ja
5 lan
- 19

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

HDPE Ø 50 mm
HDPE Ø 75 mm

H. MUSTA'IN,S.Sos
NIK 6309010
TEE HDPE 75 X75 X 75 TEE HDPE 50 X50 X 50
Di Periksa
Kasi Perencaan

HDPE Ø 75 mm HDPE Ø 50 mm KETERANGAN VOL


Tee 75 x 75 x 75 mm 1 Bh
Detail Tee HDPE

Not to scale
Detail Tee HDPE

Not to scale Detail Reducer


J.30 Reduser Ø 75 x Ø 50 mm 1 Bh
SLAMET KARYADI
HDFE Ø 75 mm - Ø 50 mm NIK 6309042
Not to scale JUDUL GAMBAR
KETERANGAN VOL
Tee 50 x 50 x 50 mm 1 Bh Pengadaan dan Pemasangan Pipa

J.31 Komplek Pondok Karet Permai Jalan Maluyung


Kec. Murung Pudak

KONSULTAN
KETERANGAN VOL
Tee 50 x 50 x 50 mm 1 Bh CV. P R I S M A J A S A
J.32 Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab
KETERANGAN VOL
RUAS JALAN - 15 Tee 50 x 50 x 50 mm 1 Bh

Sirtu 30 cm
STA 0+000 s/d STA 0 +140
Perkerasan sirtu J.33
Ir. SITTI UMAYYAH
Direktris
KETERANGAN VOL
Urugan Pasir 30 cm Tee 50 x 50 x 50 mm 1 Bh
Di Gambar
Pipa HDPE Ø 50 mm J.34
Profil Melintang Pipa
Skala 1 : 50 KETERANGAN VOL
MIRZA AZWARI, ST
Tee 50 x 50 x 50 mm 1 Bh Draftman

J.35 Reducer 75 mm x 50 mm

Butterfly Valve Ø 50 mm 1
1 Bh
Bh
Stub Flange Ø 50 mm 2 Bh
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
tr UTARA
Ru tr
re re
.

.
ac as ac
k e r- s o ft w a Ja k e r- s o ft w a
lan
-4

UTARA

PROGRAM/KEGIATAN

04
+0
0 ± 000
0±000

0
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Ru KABUPATEN TABALONG
as
Jal

4
00
an

0+
-1

Ru
6
PEKERJAAN

57
as

+0
POTONGAN MELINTANG

Ja
lan
PENGADAAN DAN PEMASANGAN PIPA HDPE

0
-1
J.40

4
00
Ru
7 as
Ja
DI KEC. TANJUNG , KEC. MURUNG PUDAK,

0+
lan

51
-1

+0
Ru 4
KEC.MUARA HARUS DAN KEC. MUARA UYA
Ru
as as
Ja
Ru J

0
ala lan

J.39

-1
n-
as -1
20 3
KABUPATEN TABALONG

n
J

la
ala Ru

Ja
as
n

-8
J ala

as

04
-1

n
n-

la

-2
Ru

Ja

-7
8

+0
Ru 12

n
as
DIAJUKAN SEBAGAI GAMBAR :

-6

la
as

la
Ru

Ja
J

Ja
0

n
ala

-3
la

as
as

Ja
n-
Ru

Ru

n
Ru

Ru
5

ala
as
Ru as 11

05
as

Ru
as

J
Ru
J

as
Ja ala

as
Ja

Ru
0+
lan

J.38
Ru n-

Ja
lan -4 as 10

la
n
Ja

-1
lan
-1 POTONGAN MELINTANG

Gambar Rencana Kerja


-9
9

44
+0
J.37

-2
n
ala

-3
Ru

sJ
Handel
Mengetahui

n
a

la
as

Ru

Ja
as
Jal Pejabat Pembuat Komitmen (PPK)

Ru
Ru
an as

4
Ja
-5

00
la

+
n

0
Ru -1
as 6

00 5
-1
J

4
ala

n
n

+
ala

7
0
-1

05
Ru
8

sJ
Ru 7

+
09

0
a
sJ as

Ru
4
00

1
ala J

05
ala
Baut 34'

0+
0+

+
Ru n-

0
-5 as 18

J.36
Ja

4
00
lan

5
0
-

05
19

+
0
SLAMET BUDI SANTOSA,S.Sos

4
04
+
0
NIK 6309023
Ductile iron with ENP
Stanless stell disc Di Setujui
Kabag Teknik

Butterfly Valve Ø 50 mm
Not to Scale
Handel H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan
Baut 78 ''

KETERANGAN VOL
Butterfly Valve Ø 75 mm 1 Bh
Ductile iron with ENP
Stanless stell disc Baut 5
8"
Baut 58"
J.36 Stub Flange Ø 75 mm 2 Bh
Bh
SLAMET KARYADI
NIK 6309042

Stub Flange Ø 75 mm HDPE Stub Flange 50 mm HDPE


JUDUL GAMBAR
Rubber Packing Rubber Packing

Butterfly Valve Ø 75 mm
KETERANGAN VOL Pengadaan dan Pemasangan Pipa
Not to Scale Komplek Pondok Karet Permai Jalan Maluyung
Butterfly Valve Ø 50 mm 1 Bh Kec. Murung Pudak

Stub Flange Ø 75 mm HDPE Stub Flange Ø 50 mm HDPE


J.37 Stub Flange Ø 50 mm 2 Bh
KONSULTAN
Rubber Packing Rubber Packing

CV. P R I S M A J A S A
KETERANGAN VOL Architect & engineering consultant
Detail Stub Flange Ø 75 mm HDPE Detail Stub Flange Ø 50 mm HDPE Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Not to Scale
Butterfly Valve Ø 50 mm 1 Bh

J.38
Not to Scale
RUAS JALAN Stub Flange Ø 50 mm 2 Bh
36, 37,38,39 dan 40 Penanggung Jawab
Perkerasan sirtu
Sirtu 30 cm

KETERANGAN VOL
Butterfly Valve Ø 50 mm 1 Bh Ir. SITTI UMAYYAH
Direktris
Urugan Pasir 30 cm

Pipa HDPE Ø 50 mm
KETERANGAN :
J.39 Stub Flange Ø 50 mm 2 Bh

Profil Melintang Pipa Di Gambar

Skala 1 : 50 RUAS JALAN - 36 STA 0 + 00 s/d 0 + 098 (Perkerasan sirtu)


RUAS JALAN - 37 STA 0 + 00 s/d 0 + 044 (Perkerasan sirtu) KETERANGAN VOL
RUAS JALAN - 38 STA 0 + 00 s/d 0 + 055 (Perkerasan sirtu) Butterfly Valve Ø 50 mm 1 Bh
RUAS JALAN - 39
RUAS JALAN - 40
STA 0 + 00 s/d 0 + 051
STA 0 + 00 s/d 0 + 057
(Perkerasan sirtu)
(Perkerasan sirtu)
J.40 Stub Flange Ø 50 mm 2 Bh MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Puri Gardena II
jl.Padat Karya Kec. Murung Pudak

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re U tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PROVINSI KALIMANTAN TIMUR PEKERJAAN


POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,

yu
KEC.MUARA HARUS DAN KEC. MUARA UYA

A
S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG

b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
Awayan S S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik

Te
BARABAI Birayang gala Tanjungsamalantakan

l.
Tg. Pamukan

Pa
Pasungkan Labuhannamas Utara i ng
ar
a i antu

m
b a S. C
Kuripan Negara S. Bara G. Besar

uk
eg Pagat

an
. N
Labuhannamas Selatan Haruyan Gunungbatu Besar
S
KANDANGAN Ankinang

US
Telagalangsat
Simpur

AT
H. MUSTA'IN,S.Sos
Padangbatung NIK 6309010

ER
Margasari Sungairaya Pudi

M
G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan

PE
MARABAHAN Ta Kasi Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat an

rito
Anjirmuara S. Alala
k mk SLAMET KARYADI
Ria

Ba
S. T
am S. Simpangampat NIK 6309042

S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR

S.
Tabunganen Ulin S. Batulicin Sungaibali

R
MARTAPURA M

ia
em Pengadaan dan Pemasangan Pipa

m
Karangintan

ka
Aluhaluh baSUNGAI PERAK
BANJARBARU Komplek Puri Gardena II Jl. Padat Karya

na
Lasung lap

n
i
Cempaka W. Riamkanan Sejaka Kec. Murung Pudak

Sel.

R
Pantaulayung

SA
Kurau

Seb
Tanjungkurong

t
Pagatan

au
Batibati
1150 KONSULTAN

l. L

KA
uku
Sabamban

Se

MA
G. Aurbunak
Tanjungseloka
CV. P R I S M A J A S A
Satui

AT
PELAIHARI
Kintap Karambu

L
Architect & engineering consultant

SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar

Kota Kabupaten Tg. Selatan


G = Gunung
L A U T
Kota Kecamatan
P = Pulau
Batas Provinsi Ir. SITTI UMAYYAH
J A W A Direktris
Batas Kabupaten
Tel = Teluk
Batas Kecamatan

Jalan Provinsi Peg = Pegunungan Di Gambar

Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Puri Gardena II Jl. Padat Karya
Kec. Murung Pudak

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Puri Gardena II Jl. Padat Karya
Kec. Murung Pudak

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Skala 1: 600 Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
Ruas Jalan KABUPATEN TABALONG
-3
DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG

Gambar Rencana Kerja


Ruas Jalan Mengetahui
-4
Pejabat Pembuat Komitmen (PPK)

Ruas Jalan
Ruas Jalan
-5 SLAMET BUDI SANTOSA,S.Sos
NIK 6309023

-1
Di Setujui
Kabag Teknik

Ruas Jalan
-6

H. MUSTA'IN,S.Sos
NIK 6309010
Ruas Jalan
-7
Di Periksa
Kasi Perencaan

-9
Ruas Jalan

Ruas
Jalan
Ruas Jalan
-8
SLAMET KARYADI

- 11
NIK 6309042
-2 0
n Jalan-1
J ala Ruas JUDUL GAMBAR
Ruas Jalan as 14
- 12 Ru n -
J ala Pengadaan dan Pemasangan Pipa
as
3 Ru Komplek Puri Gardena II Jl. Padat Karya
n -1
ala Kec. Murung Pudak
sJ
Ru

a
Ru
as

KONSULTAN
Jal
an
-1

15
n-
CV. P R I S M A J A S A
6

ala
a sJ
Ru Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman

Skala 1: 500
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA 0 ± 000

0 ± 000 PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Ruas Jalan 0 + 019 KABUPATEN TABALONG
-3

0 + 040

0 ± 000
PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
Ruas Jalan POTONGAN MELINTANG

KABUPATEN TABALONG
-4

0 + 051
DIAJUKAN SEBAGAI GAMBAR :

0 ± 000
Ruas Ja
POTONGAN MELINTANG

Ruas Jalan
Gambar Rencana Kerja

0 + 093

lan - 1
-5
Mengetahui

0 ± 000
Pejabat Pembuat Komitmen (PPK)

Ruas Jalan
0 + 095
-6 SLAMET BUDI SANTOSA,S.Sos
NIK 6309023

0 ± 000
Di Setujui
Kabag Teknik

Ruas Jalan
0 + 088

-7

0+0
Ruas Jalan - 1
0 ± 000

85
0 ± 000

0 ± 000
H. MUSTA'IN,S.Sos
-9
0 + 078

Ruas Jalan NIK 6309010

Ruas
0 ± 000
Di Periksa
Ruas Jalan Kasi Perencaan

Jalan
-8

0±0

00

00
0 + 214

0+0
0

- 11
2 10

22
n- lan -

0+
0 + 026

a Ja
Jal Ruas

07
040
0 ± 00

5
Ruas Jalan as 4 0+ SLAMET KARYADI
- 12 Ru n-
1 NIK 6309042
0

ala
sJ
0+

a
Ru JUDUL GAMBAR
05
0 ± 00

3
7

1
n-
ala
0

J Pengadaan dan Pemasangan Pipa


Ru

as
Ru

Komplek Puri Gardena II Jl. Padat Karya


as
0+

00
041

Jal

Kec. Murung Pudak


0
an0 ± 00
-10

-1
5 KONSULTAN
6

an
Jal
as
Ru
8
CV. P R I S M A J A S A
07
0+

0+ Architect & engineering consultant


045

Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

Skala 1: 500 MIRZA AZWARI, ST


Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0 + 019 KEC.MUARA HARUS DAN KEC. MUARA UYA
Ruas Jalan
-3 KABUPATEN TABALONG

0 + 040

0 ± 000
DIAJUKAN SEBAGAI GAMBAR :

Ruas Jalan - 1
POTONGAN MELINTANG

0 + 062 Gambar Rencana Kerja


Ruas Jalan
-4

0 + 051
Mengetahui
Pejabat Pembuat Komitmen (PPK)

0 ± 000
Ruas Jalan
-5

0 + 093 SLAMET BUDI SANTOSA,S.Sos

0 ± 000
NIK 6309023

Ruas Ja
Di Setujui

lan - 1
Kabag Teknik
Ruas Jalan
-6
0 + 095

0 ± 000
0 + 088

0 ± 000
H. MUSTA'IN,S.Sos
Ruas Jalan
-7
0 + 168 NIK 6309010

Di Periksa
0 + 078

Kasi Perencaan
9 0 ± 000
Ruas Jalan -

0+0
0 ± 000

Ruas
85
Ruas Jalan
-8

Jalan
0±0
00

- 11
0

SLAMET KARYADI

0+

00
-2
0 + 214
Jalan
- 10 040 NIK 6309042
0+

07
ala
n Ruas

5
sJ
Rua
JUDUL GAMBAR
0 ± 00

0+
Ruas Jalan 4
- 12 -1
an

022
Jal
0 + 026

as
0+

3 Ru
-1 Pengadaan dan Pemasangan Pipa
057

an
Jal
Ru
as Komplek Puri Gardena II Jl. Padat Karya
Kec. Murung Pudak

0+

00

KONSULTAN
041

Ru
as

5

-1
Jal

al an
00

an

sJ
0

a
Ru
CV. P R I S M A J A S A
-1
6

0 78 Architect & engineering consultant


0+
0+

Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin


045

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
UTARA

.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
0 ± 000
0 ± 000

UTARA Ruas Jalan 0 + 019


-3

0 + 006
PROGRAM/KEGIATAN
0 + 062
0 + 019 Ruas Jalan
-4
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

Ruas Ja
Ø8 - 10 Ruas Jalan
KABUPATEN TABALONG

lan
-3
0 + 024 Ruas Jalan

-1
Ø8 - 10 -5
0 + 109.5
0 + 030
PEKERJAAN
Ruas Jalan POTONGAN MELINTANG

-6
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ø8 - 10 Ø8 - 10
Ruas Jalan
-7
0 + 168
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

Ruas Jalan - 1
9
TUTUP BETON Ruas Jalan -

Ruas
0 + 062

DIAJUKAN SEBAGAI GAMBAR :

Jalan
Ruas Jalan
Ruas Jalan -8
-4

- 11
0 + 065 2 0 + 214
- 10
n- Jalan
BEGEL Ø12 Jala Ruas
Ruas Jalan as 14
0 + 071 - 12 Ru
POTONGAN MELINTANG

Gambar Rencana Kerja


LUBANG Ø13 n-
Jala
8 as
3 Ru
5 n-
1

Ruas Ja
ala
VARIABLE

Ru
as
Ru

as
Jala
URUGAN TANAH Mengetahui

n-
lan
BETON 1:2:3 15 Pejabat Pembuat Komitmen (PPK)

16
n-

-1
s Jala
R ua
10 1
Ruas Jalan
GATE VALVE -5
PASIR DIPADATKAN
0 + 103.5

0 + 109.5
SLAMET BUDI SANTOSA,S.Sos
PIPA HDPE
NIK 6309023

Di Setujui
Kabag Teknik

Detail Gate Valve Ø 75 mm


Not to scale

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan
HDPE Ø 100 mm

HDPE Ø 75 mm

Baut 58"

KETERANGAN VOL SLAMET KARYADI


Stub Flange Ø 75 mm HDPE NIK 6309042
Tee 100 x 100 x 100 mm 1 Bh

J.1
Rubber Packing

Gate Valve Ø 75 mm 1 Bh JUDUL GAMBAR


TEE HDPE 100 X100 X 100 TEE HDPE 75 X 75 X 75
Giboult Joint Ø 100 mm 2 Bh
Pengadaan dan Pemasangan Pipa
HDPE Ø 75 mm
Stub Flange Ø 75 mm 2 Bh Komplek Puri Gardena II Jl. Padat Karya
Stub Flange HDPE HDPE Ø 100 mm
Reduser 100 - Ø 75 mm 1 Bh Kec. Murung Pudak
Stub Flange Ø 75 mm HDPE
Detail Tee HDPE Detail Tee HDPE Rubber Packing

KETERANGAN VOL
KONSULTAN

J.2
Not to scale Not to scale

Tee 75 x 75 x 75 mm 1 Bh
Detail Stub Flange Ø 75 mm HDPE GIBOULT JOINT Ø 100 mm Reduser 75 - Ø 50 mm 1 Bh CV. P R I S M A J A S A
Not to Scale Not to Scale Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
KETERANGAN VOL
RUAS JALAN - 1
STA 0+000 s/d STA 0 + 019 Cor beton tebal 20 cm
J.3 Tee 75 x 75 x 75 mm 1 Bh
Penanggung Jawab
Reduser 75 - Ø 50 mm 1 Bh
Jalan Cor beton
Sirtu tebal 10 cm
KETERANGAN VOL
J.4 Tee 75 x 75 x 75 mm 1 Bh
Ir. SITTI UMAYYAH
Urugan Pasir 30 cm Reduser 75 - Ø 50 mm 1 Bh Direktris
Detail Reducer HDFE
Profil Melintang Pipa Pipa HDPEØ 75 mm Not to scale

Skala 1 : 50 Di Gambar
Bahu Jalan Bahu Jalan

RUAS JALAN - 1
STA 0+019 s/d STA 0 +140

Perkerasan sirtu Sirtu 30 cm MIRZA AZWARI, ST


Selubung Pipa GI Ø 100 mm Draftman
Pipa HDPE Ø 75 mm
Urugan Pasir 10 cm

Urugan Pasir 30 cm Pipa HDPE Ø 75 mm Urugan Pasir 10 cm Selubung Pipa GI Ø 100 mm

Profil Melintang Pipa Pipa HDPE Ø 75 mm


Tampak Crossing Pipa

Skala 1 : 50 Crossing Pipa (CS-1) Skala 1 : 60


Skala 1 : 60
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a

0 ± 000

UTARA Ruas Jalan 0 + 019


-3
0 + 139.5
Ruas Jalan
-6
PROGRAM/KEGIATAN
0 + 062
Ruas Jalan
-4
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

Ruas Ja
0 + 145.5
KABUPATEN TABALONG

lan
Ruas Jalan

-1
-5
0 + 109.5

PEKERJAAN
Ruas Jalan POTONGAN MELINTANG

-6
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ruas Jalan
-7
0 + 168
KEC.MUARA HARUS DAN KEC. MUARA UYA
0 + 174
KABUPATEN TABALONG

Ruas Jalan - 1
Ruas Jalan
-7 9
Ruas Jalan -

Ruas
DIAJUKAN SEBAGAI GAMBAR :

Jalan
Ruas Jalan
-8

- 11
2 0 + 214 - 10
0 + 180 n- Jalan
Jala Ruas
Ruas Jalan - 1
Ruas Jalan as 14
- 12 Ru
POTONGAN MELINTANG

Gambar Rencana Kerja


n-
Jala
as
3 Ru
1
n-
J ala

Ru
as
Ru

as
Jala
Ruas Jalan -
9 Mengetahui

n-
15 Pejabat Pembuat Komitmen (PPK)

16
n-
s Jala
R ua
Ø8 - 10
0 + 208 Ø8 - 10
Ruas Jalan
-8

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
-2 0 + 214
an Ø8 - 10 Ø8 - 10 Kabag Teknik
Jal
as
Ru TUTUP BETON

BEGEL Ø12
LUBANG Ø13
8 H. MUSTA'IN,S.Sos
5 NIK 6309010

VARIABLE
URUGAN TANAH
Di Periksa
BETON 1:2:3
Kasi Perencaan
10 1
Baut 58"
GATE VALVE KETERANGAN VOL
HDPE Ø 75 mm

PASIR DIPADATKAN

PIPA HDPE
Stub Flange Ø 75 mm HDPE
Rubber Packing
J.5 Tee 75 x 75 x 75 mm
Reduser 75 - Ø 50 mm
1
1
Bh
Bh SLAMET KARYADI
NIK 6309042

TEE HDPE 75 X 75 X 75 JUDUL GAMBAR


KETERANGAN VOL
Pengadaan dan Pemasangan Pipa
HDPE Ø 75 mm
Detail Gate Valve Ø 75 mm
Not to scale
Stub Flange Ø 75 mm HDPE
Rubber Packing
J.6 Tee 75 x 75 x 75 mm
Reduser 75 - Ø 50 mm
1
1
Bh
Bh
Komplek Puri Gardena II Jl. Padat Karya
Kec. Murung Pudak
Detail Tee HDPE
KONSULTAN
Not to scale

Detail Stub Flange Ø 75 mm HDPE KETERANGAN VOL


Not to Scale
Tee 75 x 75 x 75 mm 2 Bh CV. P R I S M A J A S A
RUAS JALAN - 1
J.7 Reduser 75 - Ø 50 mm 1 Bh
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

STA 0+019 s/d STA 0 +140


Penanggung Jawab
KETERANGAN VOL
Perkerasan sirtu Sirtu 30 cm Gate Valve Ø 75 mm 1 Bh

J.8 Tee 75 x 75 x 75 mm
Stub Flange Ø 75 mm
1
2
Bh
Bh Ir. SITTI UMAYYAH
Urugan Pasir 30 cm Direktris
Pipa HDPE Ø 50 mm
Profil Melintang Pipa
Di Gambar
Skala 1 : 50
RUAS JALAN - 2
STA 0+000 s/d STA 0 +057

Detail Reducer HDFE


Perkerasan sirtu Sirtu 30 cm Not to scale MIRZA AZWARI, ST
Draftman

Urugan Pasir 30 cm

Profil Melintang Pipa Pipa HDPEØ 50 mm

Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

UTARA

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

Ruas Jalan - 1
UTARA Ruas Jalan
-3

PROGRAM/KEGIATAN
Ruas Jalan
-4
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

Ruas Ja
Ruas Jalan
KABUPATEN TABALONG


-8

000

lan
Ruas Jalan

-1
-5

PEKERJAAN
Ruas Jalan POTONGAN MELINTANG

-6
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
-2
Ruas Jalan
-7 KEC.MUARA HARUS DAN KEC. MUARA UYA
an
Jal KABUPATEN TABALONG

Ruas Jalan - 1
as
Ru Ruas Jalan -
9

Ruas
Ruas Ja
lan - 12
DIAJUKAN SEBAGAI GAMBAR :

Jalan
Ruas Jalan


-8

00

- 11
0
2 - 10
n- Jalan
Jala Ruas
Ruas Jalan as 14

0+
- 12 Ru
POTONGAN MELINTANG

Gambar Rencana Kerja


n-
Jala

057
3 as
-1

0+
3 Ru
n

05
1
ala n-

7
sJ

Rua
ala
Detail Reducer HDFE a J

Ru
as
Ru Ru

as
s

Jala
Mengetahui

Jala

n-
Not to scale
Pejabat Pembuat Komitmen (PPK)

n-1
15

16
n-
Jala

6
s
R ua

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik
HDPE Ø 50 mm

H. MUSTA'IN,S.Sos
NIK 6309010
TEE HDPE 50 X 50 X 50

Di Periksa
Kasi Perencaan
HDPE Ø 50 mm
KETERANGAN VOL
Detail Tee HDPE

Not to scale
J.9 Tee 50 x 50 x 50 mm
Reducer Ø 75 - Ø 50 mm 1
2 Bh
Bh SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Puri Gardena II Jl. Padat Karya
Kec. Murung Pudak

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

RUAS JALAN - 2
STA 0+000 s/d STA 0 +057
Ir. SITTI UMAYYAH
Direktris

Sirtu 30 cm Perkerasan sirtu

Di Gambar

Urugan Pasir 30 cm

Pipa HDPE Ø 50 mm
MIRZA AZWARI, ST
Profil Melintang Pipa Draftman

Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

UTARA

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA Ruas Jalan


-3

0 + 04
0

0 ± 000
PROGRAM/KEGIATAN
Ruas Jalan
-4
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

0 + 051

Ruas Ja
0 ± 000
KABUPATEN TABALONG

lan
Ruas Jalan

-1
-5

0 + 093

0 ± 000
Ruas Jalan
-3
PEKERJAAN
Ruas Jalan

0 + 040
Handel
POTONGAN MELINTANG

-6
PENGADAAN DAN PEMASANGAN PIPA HDPE

0 ± 000
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ruas Jalan
-7 KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

Ruas Jalan - 1
Baut 34'
9
Ruas Jalan -

Ruas
DIAJUKAN SEBAGAI GAMBAR :

Jalan
Ruas Jalan
-8

- 11
2 - 10
n- Jalan
Ductile iron with ENP J ala Ruas
Ruas Jalan Ruas Jalan as 14
- 12 Ru
POTONGAN MELINTANG

Gambar Rencana Kerja


Stanless stell disc -4 n-
Jala
as
3 Ru
1
n-
ala

0 + 051
J

Ru
as
Ru

as
Jala
Mengetahui

0 ± 000

n-
15 Pejabat Pembuat Komitmen (PPK)

16
n-

Ruas Ja
s Jala
ua
Butterfly Valve Ø 50 mm R

lan
Not to Scale

-1
Ruas Jalan
-5 SLAMET BUDI SANTOSA,S.Sos
0 + 093

NIK 6309023

Di Setujui
Kabag Teknik

0 ± 000
Baut 58"
H. MUSTA'IN,S.Sos
NIK 6309010
Stub Flange Ø 50 mm HDPE
Rubber Packing
Di Periksa
Kasi Perencaan

KETERANGAN VOL
Butterfly Valve Ø 50 mm 1 Bh

Stub Flange Ø 50 mm HDPE


J.10 Stub Flange Ø 50 mm 2 Bh SLAMET KARYADI
NIK 6309042
Rubber Packing

JUDUL GAMBAR

KETERANGAN VOL Pengadaan dan Pemasangan Pipa


Detail Stub Flange Ø 50 mm HDPE
Komplek Puri Gardena II Jl. Padat Karya
Not to Scale Butterfly Valve Ø 50 mm 1 Bh Kec. Murung Pudak

J.11 Stub Flange Ø 50 mm 2 Bh


KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
KETERANGAN VOL Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Butterfly Valve Ø 50 mm 1 Bh
RUAS JALAN - 3 , 4 dan 5
J.12 Stub Flange Ø 50 mm 2 Bh Penanggung Jawab

Sirtu 30 cm Perkerasan sirtu

Ir. SITTI UMAYYAH


Direktris
Urugan Pasir 30 cm

Pipa HDPE Ø 50 mm Di Gambar


Profil Melintang Pipa
Skala 1 : 50 KETERANGAN :

MIRZA AZWARI, ST
RUAS JALAN - 3 STA 0 + 00 s/d 0 + 040 (Perkerasan sirtu) Draftman
RUAS JALAN - 4 STA 0 + 00 s/d 0 + 051 (Perkerasan sirtu)
RUAS JALAN - 5 STA 0 + 00 s/d 0 + 093 (Perkerasan sirtu)
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

UTARA

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA Ruas Jalan


-6 Ruas Jalan
-3

0 + 095
PROGRAM/KEGIATAN
Ruas Jalan

0 ± 000
-4
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

Ruas Ja
KABUPATEN TABALONG

lan
Ruas Jalan

-1
-5

PEKERJAAN
Handel Ruas Jalan POTONGAN MELINTANG

-6

0 + 095
PENGADAAN DAN PEMASANGAN PIPA HDPE

0 ± 000
DI KEC. TANJUNG , KEC. MURUNG PUDAK,

0 + 088
Ruas Jalan
-7
Ruas Jalan
-7 KEC.MUARA HARUS DAN KEC. MUARA UYA

0 + 088
KABUPATEN TABALONG

Ruas Jalan - 1
3

0 ± 000 0 ± 000
0 + 078
Baut 4'
9
Ruas Jalan -

Ruas
Ruas Jalan - 1
DIAJUKAN SEBAGAI GAMBAR :

Jalan
Ruas Jalan
-8

0 ± 000

- 11
2 - 10
n- Jalan
Ductile iron with ENP Jala Ruas
Ruas Jalan as 14
- 12 Ru
POTONGAN MELINTANG

Gambar Rencana Kerja


Stanless stell disc n-
J ala
as
3 Ru
1
n-
Ruas Jalan - 9 J ala

Ru
0 + 078
as
Ru

as
Jala
Mengetahui

n-
15 Pejabat Pembuat Komitmen (PPK)

0 ± 000

16
n-
s Jala
ua
Butterfly Valve Ø 50 mm Ruas Jalan
-8
R

Not to Scale

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

n-
2 Di Setujui
ala Kabag Teknik
asJ
Ru

Baut 58"

Stub Flange Ø 50 mm HDPE


H. MUSTA'IN,S.Sos
NIK 6309010
Rubber Packing

Di Periksa
Kasi Perencaan

KETERANGAN VOL
Butterfly Valve Ø 50 mm 1 Bh
Stub Flange Ø 50 mm HDPE
Rubber Packing J.13 Stub Flange Ø 50 mm 2 Bh SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Detail Stub Flange Ø 50 mm HDPE
Not to Scale Pengadaan dan Pemasangan Pipa
KETERANGAN VOL
Komplek Puri Gardena II Jl. Padat Karya
Butterfly Valve Ø 50 mm 1 Bh Kec. Murung Pudak
RUAS JALAN
6 dan 7
Perkerasan sirtu
J.14 Stub Flange Ø 50 mm 2 Bh KONSULTAN
Sirtu 30 cm

CV. P R I S M A J A S A
Architect & engineering consultant
KETERANGAN VOL Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Urugan Pasir 30 cm
Butterfly Valve Ø 50 mm 1 Bh
Pipa HDPE Ø 50 mm

Profil Melintang Pipa


J.15 Stub Flange Ø 50 mm 2 Bh Penanggung Jawab

Skala 1 : 50

Ir. SITTI UMAYYAH


RUAS JALAN - 8 Direktris

KETERANGAN :
Perkerasan sirtu Sirtu 30 cm Di Gambar
RUAS JALAN - 6 STA 0 + 00 s/d 0 + 095 (Perkerasan sirtu)
RUAS JALAN - 7 STA 0 + 00 s/d 0 + 088 (Perkerasan sirtu)
Urugan Pasir 30 cm RUAS JALAN - 8 STA 0 + 00 s/d 0 + 078 (Perkerasan sirtu)
MIRZA AZWARI, ST
Profil Melintang Pipa Pipa HDPE Ø 50 mm Draftman

Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

UTARA

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA Bend 90°


Ruas Jalan
-3

PROGRAM/KEGIATAN
Ruas Jalan
-4
PENGEMBANGAN JARINGAN DISTRIBUSI AIR MINUM

Ruas Ja
-9
Ruas Jalan 0 ± 000
KABUPATEN TABALONG

lan
0+0
Ruas Jalan

-1
-5

Ruas
85
PEKERJAAN

Jalan
Detail Bend 90° - Ø 50 mm Ruas Jalan

-
POTONGAN MELINTANG

-6

11
Not to Scale PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,

0±0
0+
025 Ruas Jalan
-7 KEC.MUARA HARUS DAN KEC. MUARA UYA

00
KABUPATEN TABALONG

Ruas Jalan - 1
9 0 ± 000
Ruas Jalan -

Ruas
0 + 08
0 ± 000
n- 10
s Jala
Ruas Jalan
DIAJUKAN SEBAGAI GAMBAR :

Jalan
5
-8
Rua

0 ± 00

11 -
2 10

0
n- -
ala Jalan
J Ruas 0 40
Ruas Jalan as 0+

0 + 02
- 12 Ru 14
POTONGAN MELINTANG

Gambar Rencana Kerja


n-
40 ala
0+0

2
J
as
3 Ru
1
n-
J ala

0+0

Ru
as
Ru

as
Jala
Mengetahui

22

n-
15 Pejabat Pembuat Komitmen (PPK)

16
n-
s Jala
R ua

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Handel Di Setujui
Kabag Teknik

Baut 34'

H. MUSTA'IN,S.Sos
Ductile iron with ENP NIK 6309010
Stanless stell disc
Di Periksa
Kasi Perencaan
KETERANGAN VOL
Bend 90° - Ø 50 mm 1 Bh

J.16
Butterfly Valve Ø 50 mm
Not to Scale
SLAMET KARYADI
NIK 6309042
HDPE Ø 50 mm

Baut 58"

KETERANGAN VOL JUDUL GAMBAR


Stub Flange Ø 50 mm HDPE
Tee 50 x 50 x 50 mm 1 Bh Pengadaan dan Pemasangan Pipa

J.17
Rubber Packing
Komplek Puri Gardena II Jl. Padat Karya
TEE HDPE 50 X 50 X 50 Butterfly Valve Ø 50 mm 1 Bh Kec. Murung Pudak
Stub Flange Ø 50 mm 2 Bh
HDPE Ø 50 mm
KONSULTAN

Detail Tee HDPE Stub Flange Ø 50 mm HDPE


Rubber Packing KETERANGAN VOL CV. P R I S M A J A S A
Not to scale
Butterfly Valve Ø 50 mm 1 Bh Architect & engineering consultant

Detail Stub Flange Ø 50 mm HDPE


J.18 Stub Flange Ø 50 mm 2 Bh
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Not to Scale Penanggung Jawab

RUAS JALAN Ir. SITTI UMAYYAH


9, 10 dan 11 Direktris
Perkerasan sirtu Sirtu 30 cm
Di Gambar

Urugan Pasir 30 cm

Pipa HDPE Ø 75 mm KETERANGAN :


Profil Melintang Pipa MIRZA AZWARI, ST
Draftman
Skala 1 : 50 RUAS JALAN - 9 STA 0 + 00 s/d 0 + 085 (Perkerasan sirtu)
RUAS JALAN - 10 STA 0 + 00 s/d 0 + 022 (Perkerasan sirtu)
RUAS JALAN - 11 STA 0 + 00 s/d 0 + 040 (Perkerasan sirtu)
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

UTARA

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

-2
an
Jal
UTARA Ru
as
Ruas Jalan
Ruas Jalan

0 + 026
- 12 -3

PROGRAM/KEGIATAN

0±0
00
Ruas Jalan
-4
PENGEMBANGAN JARINGAN DISTRIBUSI AIR MINUM

0+
4

Ruas Ja
-1

006
3
-1 an KABUPATEN TABALONG
an Jal
Jal as

lan
Handel s Ru
ua Ruas Jalan

-1
R -5

PEKERJAAN
Ruas Jalan POTONGAN MELINTANG

-6
Baut 34' PENGADAAN DAN PEMASANGAN PIPA HDPE

0+
4.5
02 DI KEC. TANJUNG , KEC. MURUNG PUDAK,

04
0+

1
0.5 Ruas Jalan KEC.MUARA HARUS DAN KEC. MUARA UYA
03 -7
0+
KABUPATEN TABALONG

Ruas Jalan - 1
Ductile iron with ENP 9
Ruas Jalan -

Ru

Ruas
a
Stanless stell disc

s Ja
DIAJUKAN SEBAGAI GAMBAR :


Ruas Jalan

Jalan
-8

lan
00
0

-
-

11
2 10

16
n- -
ala Jalan
5 Ruas
-1 Ruas Jalan
Ru
as
J
14
an - 12
POTONGAN MELINTANG

Gambar Rencana Kerja


n-
Jal ala
as as
J

0 + 026

0 ± 00
Ru 1 3 Ru
n-

0
ala
Butterfly Valve Ø 50 mm J

Ru
as
Ru

as
0+

Jala
Mengetahui

04 1
Not to Scale

n-
15 Pejabat Pembuat Komitmen (PPK)

16

n-

00
Jala

0
s
R ua
8
07 8
0+
07
0+

0+
0+

045
045
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
HDPE Ø 50 mm

Di Setujui
Kabag Teknik

TEE HDPE 50 X 50 X 50
H. MUSTA'IN,S.Sos
NIK 6309010
HDPE Ø 50 mm
Di Periksa
Kasi Perencaan
Detail Tee HDPE

Not to scale
KETERANGAN VOL
RUAS JALAN Butterfly Valve Ø 50 mm 1 Bh

Sirtu 30 cm
12, 13 dan 15 Perkerasan sirtu
J.19 Stub Flange Ø 50 mm 2 Bh
SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Urugan Pasir 30 cm Komplek Puri Gardena II Jl. Padat Karya
KETERANGAN VOL
Kec. Murung Pudak
Pipa HDPE Ø 50 mm
Butterfly Valve Ø 50 mm 1 Bh
Profil Melintang Pipa
Skala 1 : 50
J.20 Stub Flange Ø 50 mm 2 Bh
KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
KETERANGAN VOL
RUAS JALAN - 16
Perkerasan sirtu Tee 50 x 50 x 50 mm 2 Bh
Baut 58" Sirtu 30 cm
J.21 Penanggung Jawab

Stub Flange Ø 50 mm HDPE


Rubber Packing
Urugan Pasir 30 cm
Pipa HDPE Ø 50 mm
Ir. SITTI UMAYYAH
KETERANGAN VOL Direktris
Profil Melintang Pipa Butterfly Valve Ø 50 mm 1 Bh

Stub Flange Ø 50 mm HDPE


Rubber Packing
Skala 1 : 50
J.22 Stub Flange Ø 50 mm 2 Bh Di Gambar

KETERANGAN :
Detail Stub Flange Ø 50 mm HDPE
KETERANGAN VOL MIRZA AZWARI, ST
Not to Scale
RUAS JALAN - 12 STA 0 + 00 s/d 0 + 026 (Perkerasan sirtu) Butterfly Valve Ø 50 mm 1 Bh Draftman
RUAS
RUAS
JALAN
JALAN
-
-
13
15
STA 0 + 00 s/d 0 + 041
STA 0 + 00 s/d 0 + 045
(Perkerasan
(Perkerasan
sirtu)
sirtu)
J.23 Stub Flange Ø 50 mm 2 Bh

RUAS JALAN - 16 STA 0 + 00 s/d 0 + 078 (Perkerasan sirtu)


hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

UTARA

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA Ruas Jalan


-3

Handel PROGRAM/KEGIATAN
Ruas Jalan

0+
-4
PENGEMBANGAN JARINGAN DISTRIBUSI AIR MINUM

07

Ruas Ja
5
KABUPATEN TABALONG

lan
3
Baut 4' Ruas Jalan

-1
-5

14
n-
as
Jal
a
PEKERJAAN
Ru Ruas Jalan POTONGAN MELINTANG

-6
Ductile iron with ENP PENGADAAN DAN PEMASANGAN PIPA HDPE
Stanless stell disc
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ruas Jalan
-7 KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

Ruas Jalan - 1
9
Ruas Jalan -

Ruas
Ruas Jalan
DIAJUKAN SEBAGAI GAMBAR :

Jalan
-8
Butterfly Valve Ø 50 mm

0+

11 -
10

07
-
Jalan

5
Not to Scale Ruas Jalan n-
2 Ruas
- 12 Jala 14
POTONGAN MELINTANG

Gambar Rencana Kerja


as n-
Ru Jala
as
3 Ru
1
n-
J ala

Ru 00
as
Ru

as

Jala
0
Mengetahui

n-
15 Pejabat Pembuat Komitmen (PPK)

16
n-
s Jala
R ua

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Baut 58" Di Setujui


Kabag Teknik

Stub Flange Ø 50 mm HDPE


Rubber Packing

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan
Stub Flange Ø 50 mm HDPE
Rubber Packing
KETERANGAN VOL
Butterfly Valve Ø 50 mm 1 Bh

Detail Stub Flange Ø 50 mm HDPE J.24 Stub Flange Ø 50 mm 2 Bh


SLAMET KARYADI
NIK 6309042

Not to Scale
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
RUAS JALAN - 14 Komplek Puri Gardena II Jl. Padat Karya
Perkerasan sirtu Kec. Murung Pudak
Sirtu 30 cm
KONSULTAN

Urugan Pasir 30 cm
CV. P R I S M A J A S A
Architect & engineering consultant
Pipa HDPE Ø 50 mm Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Profil Melintang Pipa


Skala 1 : 50 Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Tanjung Lestari
Tanjung Selatan Kec. Murung Pudak

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re U tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PROVINSI KALIMANTAN TIMUR PEKERJAAN


POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,

yu
KEC.MUARA HARUS DAN KEC. MUARA UYA

A
S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG

b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
Awayan S S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik

Te
BARABAI Birayang gala Tanjungsamalantakan

l.
Tg. Pamukan

Pa
Pasungkan Labuhannamas Utara i ng
ar
a i antu

m
b a S. C
Kuripan Negara S. Bara G. Besar

uk
eg Pagat

an
. N
Labuhannamas Selatan Haruyan Gunungbatu Besar
S
KANDANGAN Ankinang

US
Telagalangsat
Simpur

AT
H. MUSTA'IN,S.Sos
Padangbatung NIK 6309010

ER
Margasari Sungairaya Pudi

M
G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan

PE
MARABAHAN Ta Kasi Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat an

rito
Anjirmuara S. Alala
k mk SLAMET KARYADI
Ria

Ba
S. T
am S. Simpangampat NIK 6309042

S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR

S.
Tabunganen Ulin S. Batulicin Sungaibali

R
MARTAPURA M

ia
em Pengadaan dan Pemasangan Pipa

m
Karangintan

ka
Aluhaluh baSUNGAI PERAK
BANJARBARU Komplek Tanjung Lestari Tanjung Selatan

na
Lasung lap

n
i
Cempaka W. Riamkanan Sejaka Kec. Murung Pudak

Sel.

R
Pantaulayung

SA
Kurau

Seb
Tanjungkurong

t
Pagatan

au
Batibati
1150 KONSULTAN

l. L

KA
uku
Sabamban

Se

MA
G. Aurbunak
Tanjungseloka
CV. P R I S M A J A S A
Satui

AT
PELAIHARI
Kintap Karambu

L
Architect & engineering consultant

SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar

Kota Kabupaten Tg. Selatan


G = Gunung
L A U T
Kota Kecamatan
P = Pulau
Batas Provinsi Ir. SITTI UMAYYAH
J A W A Direktris
Batas Kabupaten
Tel = Teluk
Batas Kecamatan

Jalan Provinsi Peg = Pegunungan Di Gambar

Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Tanjung Lestari Tanjung Selatan
Kec. Murung Pudak

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Tanjung Lestari Tanjung Selatan
Kec. Murung Pudak

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

Skala 1: 600
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :

Ruas Jalan
POTONGAN MELINTANG

Gambar Rencana Kerja

-1
Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023
-3
Ruas Jalan
Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Tanjung Lestari Tanjung Selatan
Kec. Murung Pudak

Ruas Jalan
Ruas Jalan
KONSULTAN

-1
CV. P R I S M A J A S A
-2
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

0 + 297
PEKERJAAN
POTONGAN MELINTANG

0 + 276
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
0 + 268 KABUPATEN TABALONG

Ruas Jalan
DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG

Gambar Rencana Kerja

-1
Mengetahui
Pejabat Pembuat Komitmen (PPK)

0 + 040
-3
Ruas Jalan

0 ± 000
0 + 187
0 + 220 SLAMET BUDI SANTOSA,S.Sos
NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

Ruas Jalan
Ruas Jalan SLAMET KARYADI
NIK 6309042

-1
JUDUL GAMBAR
-2

Pengadaan dan Pemasangan Pipa


Komplek Tanjung Lestari Tanjung Selatan
Kec. Murung Pudak

0 ± 000
KONSULTAN

CV. P R I S M A J A S A
0 ± 000

Architect & engineering consultant


Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


0 + 297 KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

0 + 276 PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
0 + 268 KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :

Ruas Jalan
POTONGAN MELINTANG

Gambar Rencana Kerja


0 + 237.5

-1
Mengetahui
Pejabat Pembuat Komitmen (PPK)

0 + 191 SLAMET BUDI SANTOSA,S.Sos

0 + 040
NIK 6309023
-3
Ruas Jalan

0 ± 000
0 + 187 Di Setujui
0 + 220 Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Ruas Jalan Komplek Tanjung Lestari Tanjung Selatan
Kec. Murung Pudak
Ruas Jalan

KONSULTAN
-1

CV. P R I S M A J A S A
-2

Architect & engineering consultant


Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab
0 ± 000

0 ± 000

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
tr re tr re
.

.
ac UTARA
ac
k e r- s o ft w a k e r- s o ft w a
POTONGAN MELINTANG

UTARA 0 + 297

PROGRAM/KEGIATAN
0 + 276

0 + 181 0 + 268

Ruas Jalan
0 + 178 0 + 237.5
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

-1
Ruas Jala
0 + 191

n-3 PEKERJAAN
0 + 187
POTONGAN MELINTANG

0 + 155
PENGADAAN DAN PEMASANGAN PIPA HDPE
Handel 0 + 152 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

Baut 34' DIAJUKAN SEBAGAI GAMBAR :


0 + 109.5
POTONGAN MELINTANG

0 + 106.5
Gambar Rencana Kerja

Ruas Jalan
Ruas Jalan
Ductile iron with ENP

-1
Ruas Jalan
Stanless stell disc

-2
Mengetahui
Pejabat Pembuat Komitmen (PPK)

-1
0 + 083 0 ± 000

0 + 080
Butterfly Valve Ø 50 mm
Not to Scale SLAMET BUDI SANTOSA,S.Sos
NIK 6309023

0 + 037.5 Di Setujui
Kabag Teknik
0 + 034.5

H. MUSTA'IN,S.Sos
NIK 6309010

0 ± 000 Di Periksa
Kasi Perencaan
Baut 58"

KETERANGAN VOL
Stub Flange Ø 50 mm HDPE
Butterfly Valve Ø 50 mm 1 Bh

J.1 SLAMET KARYADI


Rubber Packing
Stub Flange Ø 50 mm 2 Bh NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Stub Flange Ø 50 mm HDPE Komplek Tanjung Lestari Tanjung Selatan
Rubber Packing Kec. Murung Pudak

KONSULTAN
Detail Stub Flange Ø 50 mm HDPE
Not to Scale
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

RUAS JALAN - 1
STA 0+000 s/d STA 0 +297

Aspal Latasir
Ir. SITTI UMAYYAH
Aspal Penetrasi Direktris
Lapis Agregat kelas A tebal 30 cm

Di Gambar

Urugan Pasir 30 cm

Pipa HDPEØ 50 mm

MIRZA AZWARI, ST
Draftman
Profil Melintang Pipa
Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
tr re
UTARA tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
POTONGAN MELINTANG

UTARA 0 + 297

PROGRAM/KEGIATAN
0 + 276

0 + 268

Ruas Jalan
0 + 237.5
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

-1
Ruas Jala
0 + 191

n-3 PEKERJAAN
0 + 187
POTONGAN MELINTANG

0 + 220

0 + 297
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
Handel
KABUPATEN TABALONG
0 + 276
DIAJUKAN SEBAGAI GAMBAR :
Baut 34' POTONGAN MELINTANG

Gambar Rencana Kerja

Ruas Jalan
0 + 268

Ruas Jalan

-1
-2
Ductile iron with ENP Mengetahui
Stanless stell disc
Pejabat Pembuat Komitmen (PPK)
0 ± 000

0 + 237.5
Ruas Jalan

Butterfly Valve Ø 50 mm SLAMET BUDI SANTOSA,S.Sos


NIK 6309023
-1

Not to Scale

Di Setujui
Kabag Teknik

0 + 191

HDPE Ø 50 mm
as Jalan -
3 H. MUSTA'IN,S.Sos
Ru
NIK 6309010
0 + 187
Di Periksa
Ruas Jalan

KETERANGAN VOL Kasi Perencaan


TEE HDPE 50 X 50 X 50 Butterfly Valve Ø 50 mm 1 Bh

J.2
-1

Tee 50 x 50 x 50 mm 2 Bh
HDPE Ø 50 mm
Stub Flange Ø 50 mm 2 Bh SLAMET KARYADI
NIK 6309042
Detail Tee HDPE
Crossing 4 M
Not to scale KETERANGAN VOL JUDUL GAMBAR
Baut 58" Butterfly Valve Ø 50 mm 1 Bh Pengadaan dan Pemasangan Pipa

Stub Flange Ø 50 mm HDPE


J.3 Tee 50 x 50 x 50 mm
Stub Flange Ø 50 mm
1
2
Bh
Bh
Komplek Tanjung Lestari Tanjung Selatan
Kec. Murung Pudak
Rubber Packing
Crossing 4 M KONSULTAN
RUAS JALAN - 1
STA 0+000 s/d STA 0 +297 KETERANGAN VOL
Aspal Latasir Butterfly Valve Ø 50 mm 1 Bh
CV. P R I S M A J A S A
Architect & engineering consultant
J.4
Aspal Penetrasi
Stub Flange Ø 50 mm HDPE Lapis Agregat kelas A tebal 30 cm Tee 50 x 50 x 50 mm 1 Bh Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Rubber Packing
Stub Flange Ø 50 mm 2 Bh
Crossing 4 M Penanggung Jawab
Urugan Pasir 30 cm
Detail Stub Flange Ø 50 mm HDPE
Pipa HDPE Ø 50 mm
KETERANGAN VOL
Not to Scale
Butterfly Valve Ø 50 mm 1 Bh

J.5 Stub Flange Ø 50 mm 2 Bh Ir. SITTI UMAYYAH


Direktris

Bahu Jalan Bahu Jalan


Di Gambar
Aspal Latasir

Selubung Pipa GI Ø 75 mm MIRZA AZWARI, ST


Pipa HDPE Ø 50 mm
Draftman
Urugan Pasir 10 cm

Pipa HDPE Ø 50 mm Urugan Pasir 10 cm Selubung Pipa GI Ø 75 mm

Tampak Crossing Pipa


Crossing Pipa (CS-1) Skala 1 : 60
Skala 1 : 60
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
UTARA
C

C
.c

.c
w

w
UTARA
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
-3
Ruas Jalan
POTONGAN MELINTANG

UTARA 0 + 220

PROGRAM/KEGIATAN

Ruas Jalan
Bend 90°
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

-1
Ruas Jala
n-3 PEKERJAAN
POTONGAN MELINTANG

0 + 220

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


Detail Bend 90° HDPE ∅ 50 mm
Not to scale POTONGAN MELINTANG

Gambar Rencana Kerja

Ruas Jalan
Ruas Jalan

-1
-2
Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos

Ruas Jalan
NIK 6309023

Di Setujui

-2
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

KETERANGAN VOL
Stub Flange Ø 100 mm 1 Bh
Detail Reducer HDFE
Not to scale
0 ± 000
J.6 Reducer 100 x 50 mm 1 Bh SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR

KETERANGAN VOL Pengadaan dan Pemasangan Pipa


Komplek Tanjung Lestari Tanjung Selatan
Bend 90 ° - Ø 50 mm 1 Bh Kec. Murung Pudak

RUAS JALAN - 2
J.7 KONSULTAN
STA 0+000 s/d STA 0 +220

Baut 58"
CV. P R I S M A J A S A
Aspal Latasir
Aspal Penetrasi Architect & engineering consultant
Lapis Agregat kelas A tebal 30 cm Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Stub Flange Ø 50 mm HDPE


Rubber Packing
Penanggung Jawab
Urugan Pasir 30 cm

Pipa HDPE Ø 50 mm

Stub Flange Ø 50 mm HDPE


Ir. SITTI UMAYYAH
Rubber Packing
RUAS JALAN - 3 Direktris
STA 0+000 s/d STA 0 +040

Aspal Latasir Detail Stub Flange 50 mm HDPE Di Gambar


Aspal Penetrasi
Not to Scale
Lapis Agregat kelas A tebal 30 cm

Urugan Pasir 30 cm MIRZA AZWARI, ST


Draftman
Pipa HDPE Ø 50 mm
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Dari Tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re U tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PROVINSI KALIMANTAN TIMUR PEKERJAAN


POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,

yu
KEC.MUARA HARUS DAN KEC. MUARA UYA

A
S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG

b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
Awayan S S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik

Te
BARABAI Birayang gala Tanjungsamalantakan

l.
Tg. Pamukan

Pa
Pasungkan Labuhannamas Utara i ng
ar
a i antu

m
b a S. C
Kuripan Negara S. Bara G. Besar

uk
eg Pagat

an
. N
Labuhannamas Selatan Haruyan Gunungbatu Besar
S
KANDANGAN Ankinang

US
Telagalangsat
Simpur

AT
H. MUSTA'IN,S.Sos
Padangbatung NIK 6309010

ER
Margasari Sungairaya Pudi

M
G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan

PE
MARABAHAN Ta KasI Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat an

rito
Anjirmuara S. Alala
k mk SLAMET KARYADI
Ria

Ba
S. T
am S. Simpangampat NIK 6309042

S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR

S.
Tabunganen Ulin S. Batulicin Sungaibali

R
MARTAPURA M

ia
em Pengadaan dan Pemasangan Pipa

m
Karangintan

ka
Aluhaluh baSUNGAI PERAK
BANJARBARU Dari tugu Obor Ke Arah Kaltim

na
Lasung lap

n
i
Cempaka W. Riamkanan Sejaka Kecamatan Murung Pudak

Sel.

R
Pantaulayung

SA
Kurau

Seb
Tanjungkurong

t
Pagatan

au
Batibati
1150 KONSULTAN

l. L

KA
uku
Sabamban

Se

MA
G. Aurbunak
Tanjungseloka
CV. P R I S M A J A S A
Satui

AT
PELAIHARI
Kintap Karambu

L
Architect & engineering consultant

SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar

Kota Kabupaten Tg. Selatan


G = Gunung
L A U T
Kota Kecamatan
P = Pulau
Batas Provinsi Ir. SITTI UMAYYAH
J A W A Direktris
Batas Kabupaten
Tel = Teluk
Batas Kecamatan

Jalan Provinsi Peg = Pegunungan Di Gambar

Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
KasI Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
KasI Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman

Skala 1: 600
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
1 + 940
2 + 075

UTARA

PROGRAM/KEGIATAN

JALUR 1

2
JALUR
1 + 900
1 + 794
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

1 + 759
PEKERJAAN
1 + 865

POTONGAN MELINTANG

1+7
08 PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,

JALUR 2
JALUR 1
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


1 + 53
9 POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui

JALUR 1

JALUR 2
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


1 + 347.5 NIK 6309023
1 + 228
Di Setujui

JALUR 1
Kabag Teknik

1 + 18
8

JALUR 2
JALUR 1
H. MUSTA'IN,S.Sos
NIK 6309010
0 + 994

0 + 950
Di Periksa
KasI Perencaan

2
JALUR
1
JALUR
5
0 + 82
SLAMET KARYADI
NIK 6309042
72
0+7

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
2
JALUR Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
1
JALUR

KONSULTAN

CV. P R I S M A J A S A
2
JALUR

Architect & engineering consultant


Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
1
JALUR

Penanggung Jawab
4
0 + 27

0 + 311
2
JALUR

Ir. SITTI UMAYYAH


19
Direktris
0+2
2
JALUR

00
Di Gambar
0±0
1
JALUR

00
0±0

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
1 + 940
2 + 075

UTARA

PROGRAM/KEGIATAN

JALUR 1

2
JALUR
1 + 900 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
1 + 794
KABUPATEN TABALONG

PEKERJAAN
1 + 759
1 + 865

POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,

JALUR 2
KEC.MUARA HARUS DAN KEC. MUARA UYA

JALUR 1
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui

JALUR 1
Pejabat Pembuat Komitmen (PPK)

JALUR 2
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023

Di Setujui

JALUR 1
Kabag Teknik

JALUR 2
H. MUSTA'IN,S.Sos

JALUR 1
NIK 6309010

Di Periksa
0 + 950
KasI Perencaan

2
JALUR
1
JALUR
SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
2
JALUR

Kecamatan Murung Pudak


UR 1JAL

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
2
JALUR

Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin


1
JALUR

Penanggung Jawab
2
JALUR

Ir. SITTI UMAYYAH


Direktris
2
JALUR

Di Gambar
00
0±0
1
JALUR

00
0±0

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
2 + 075

.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a
UTARA

JALUR 1
1 + 900

UTARA 1 + 865

1
JALUR

JALUR 1
PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

JALUR 1
KABUPATEN TABALONG
Ø8 - 10 0 + 315

Ø8 - 10 1 + 347.5

0 + 311
PEKERJAAN

JALUR 1
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


1 + 188

JALUR 1
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0 + 22
4
KEC.MUARA HARUS DAN KEC. MUARA UYA
Ø8 - 10 Ø8 - 10 KABUPATEN TABALONG

R1
9
0 + 21

JALU
TUTUP BETON
DIAJUKAN SEBAGAI GAMBAR :

1
JALUR
POTONGAN MELINTANG

Gambar Rencana Kerja


BEGEL Ø12
LUBANG Ø13
8
5
VARIABLE

Mengetahui

1
JALUR
URUGAN TANAH

1
Pejabat Pembuat Komitmen (PPK)

JALUR
BETON 1:2:3
0 + 311

10 1
GATE VALVE 0 + 219

0
PASIR DIPADATKAN 0 ± 00

1
JALUR
SLAMET BUDI SANTOSA,S.Sos
PIPA HDPE
0 ± 000 NIK 6309023

Di Setujui
Kabag Teknik

Detail Gate Valve 50 mm


Not to Scale
H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
KasI Perencaan
Flange spigot PVC Ø 50 mm

Detail Flange Spigot PVC Ø 50 mm KETERANGAN VOL


SLAMET KARYADI
Not to Scale NIK 6309042
Gate Valve Ø 75 mm 1 Bh

Ø8 - 10
J.1 Stub Flange Ø 75 mm 2 Bh
JUDUL GAMBAR
HDPE Ø 75 mm

Ø8 - 10
Pengadaan dan Pemasangan Pipa
Baut 58" Baut 58"
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
Stub Flange Ø 75 mm HDPE Stub Flange Ø 50 mm HDPE
KETERANGAN VOL
Rubber Packing Rubber Packing
Tee 75 x 75 x 75 mm 1 Bh
KONSULTAN
Ø8 - 10 Ø8 - 10 TEE HDPE 75 X 75 X 75
TUTUP BETON

HDPE Ø 75 mm
J.2 Gate Valve Ø 50 mm
Stub Flange Ø 50 mm
1
2
Bh
Bh CV. P R I S M A J A S A
Architect & engineering consultant
BEGEL Ø12
LUBANG Ø13
Reduser 75 - Ø 50 mm 1 Bh Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
8 Detail Tee HDPE
Stub Flange Ø 75 mm HDPE Stub Flange Ø 50 mm HDPE
5
VARIABLE

Not to scale Rubber Packing Rubber Packing


KETERANGAN VOL
URUGAN TANAH
Penanggung Jawab
BETON 1:2:3 Tee 75 x 75 x 75 mm 1 Bh
10 1
GATE VALVE
PASIR DIPADATKAN
Detail Stub Flange Ø 75 mm HDPE
Not to Scale
Detail Stub Flange Ø 50 mm HDPE
Not to Scale
J.3 Gate Valve Ø 50 mm
Flange spigot PVC Ø 50 mm
1
1
Bh
Bh
PIPA HDPE RUAS JALAN - 1 Stub Flange Ø 50 mm 1 Bh Ir. SITTI UMAYYAH
STA 0+000 s/d STA 1+865 Direktris
Giboult Joint Ø 50 mm 1 Bh
Reduser 75 - Ø 50 mm 1 Bh
Di Gambar
Detail Gate Valve ∅ 75 mm HRS Base tebal 5cm
Not to Scale
Median Jalan
Trotoar Lapis Pondasi Agregat Atas (LPA) Tebal 30 cm
Jalan yang ada

MIRZA AZWARI, ST
Draftman

Urugan Pasir 40 cm
GIBOULT JOINT Ø 50 mm Profil Melintang Pipa
Not to Scale
Pipa HDPE Ø 75 mm
Detail Reducer Skala 1 : 50
HDFE 75 mm - 50 mm
Not to scale
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
2 + 075

.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a
UTARA

JALUR 1
1 + 900

UTARA 1 + 351.5
1 + 865

JALUR 1
1 + 347.5

PROGRAM/KEGIATAN

JALUR 1
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

JALUR 1
Ø8 - 10 KABUPATEN TABALONG
Ø8 - 10
1 + 192 1 + 347.5

PEKERJAAN

JALUR 1
1 + 188 POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


1 + 188

JALUR 1
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA

JALUR 1
Ø8 - 10 Ø8 - 10
KABUPATEN TABALONG

1
JALUR
TUTUP BETON

DIAJUKAN SEBAGAI GAMBAR :

1
BEGEL Ø12

JALUR
POTONGAN MELINTANG

Gambar Rencana Kerja


LUBANG Ø13
8
5
VARIABLE

Mengetahui

1
URUGAN TANAH

JALUR
BETON 1:2:3 Pejabat Pembuat Komitmen (PPK)
10 1 0 + 311

GATE VALVE
0 + 219

PASIR DIPADATKAN

1
JALUR
SLAMET BUDI SANTOSA,S.Sos
PIPA HDPE 0 ± 00
0
NIK 6309023

Di Setujui
Kabag Teknik

Detail Gate Valve Ø 75 mm


Not to Scale

H. MUSTA'IN,S.Sos
NIK 6309010
Baut 58"
Di Periksa
Bend 90° KasI Perencaan
KETERANGAN VOL
HDPE Ø 150 mm
HDPE Ø 75 mm

Stub Flange Ø 75 mm HDPE


Rubber Packing Gate Valve Ø 75 mm 1 Bh

J.4 Tee 75 x 75 x 75 mm
Tee 150 x 150 x 150 mm 1
1 Bh
Bh
SLAMET KARYADI
NIK 6309042

TEE HDPE 75 X 75 X 75 TEE HDPE 150 X 150 X 150 Stub Flange Ø 75 mm 2 Bh


JUDUL GAMBAR
Stub Flange Ø 75 mm HDPE Grip Couplings - Ø 150 mm 2 Bh
Rubber Packing
HDPE Ø 75 mm HDPE Ø 150 mm
Detail Bend 90° HDPE - Ø 75 mm Bend 90° - Ø 75 mm 4 Bh Pengadaan dan Pemasangan Pipa
Not to Scale
Dari tugu Obor Ke Arah Kaltim
Detail Tee HDPE Detail Tee HDPE Reduser 150 - Ø 75 mm 1 Bh Kecamatan Murung Pudak
Not to scale Not to scale Detail Stub Flange Ø 75 mm HDPE
Not to Scale
KETERANGAN VOL KONSULTAN
Gate Valve Ø 75 mm 1 Bh
Tee 75 x 75 x 75 mm 1 Bh CV. P R I S M A J A S A
Tee 150 x 150 x 150 mm 1 Bh Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

J.5 Stub Flange Ø 75 mm 2


Grip Couplings - Ø 150 mm 2
Bh
Bh
Penanggung Jawab
Baut dan Mur Bend 90° - Ø 75 mm 4 Bh
Reduser 150 - Ø 75 mm 1 Bh

RUAS JALAN - 1
STA 0+000 s/d STA 1+865
Ir. SITTI UMAYYAH
Stub Flange Ø 150 mm HDPE
Direktris

Detail Reducer HRS Base tebal 5cm


HDFE 150 mm - 75 mm
Median Jalan Di Gambar
Not to scale Trotoar Lapis Pondasi Agregat Atas (LPA) Tebal 30 cm
Jalan yang ada

Baut dan Mur

MIRZA AZWARI, ST
Detail Grip Coupling Ø 150 mm Urugan Pasir 40 cm Draftman
Not to Scale Profil Melintang Pipa
Pipa HDPE Ø 75 mm
Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
2 + 075

.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a
UTARA Handel

JALUR 1
1 + 900

UTARA 1 + 865

Baut 78 ''

JALUR 1
075
2+
POTONGAN MELINTANG

PROGRAM/KEGIATAN
Ductile iron with ENP
Stanless stell disc
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

JALUR 1
Ø8 - 10 KABUPATEN TABALONG
Ø8 - 10
1 + 347.5

Butterfly Valve 75 mm PEKERJAAN

JALUR 1
Not to Scale POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


1 + 188

JALUR 1
DI KEC. TANJUNG , KEC. MURUNG PUDAK,

JALUR 1
Ø8 - 10 Ø8 - 10 KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

1
JALUR
TUTUP BETON

1 + 900 DIAJUKAN SEBAGAI GAMBAR :


BEGEL Ø12

1
JALUR
POTONGAN MELINTANG

LUBANG Ø13
8
5 Gambar Rencana Kerja
VARIABLE

URUGAN TANAH 1 + 865


Mengetahui

1
JALUR
BETON 1:2:3
Pejabat Pembuat Komitmen (PPK)
10 1 0 + 311

GATE VALVE
0 + 219
PASIR DIPADATKAN

1
JALUR
PIPA HDPE
SLAMET BUDI SANTOSA,S.Sos
0 ± 00
0
NIK 6309023

Di Setujui
Kabag Teknik

Detail Gate Valve Ø 75 mm


Not to Scale

Handel
H. MUSTA'IN,S.Sos
NIK 6309010
Bend 90°
HDPE Ø 75 mm

Di Periksa
Baut 78 '' KasI Perencaan
POTONGAN MELINTANG

KETERANGAN VOL
Ductile iron with ENP
Stanless stell disc Gate Valve Ø 75 mm 1 Bh
TEE HDPE 75 X 75 X 75
J.6 Tee 75 x 75 x 75 mm
Bend 90°- Ø 50 mm
1
1
Bh
Bh
SLAMET KARYADI
NIK 6309042

Butterfly Valve Ø 50 mm
HDPE Ø 75 mm Detail Bend 90° HDPE Ø 50 mm
Not to Scale
Butterfly Valve Ø 50 mm 1 Bh JUDUL GAMBAR
Not to Scale

Detail Tee HDPE Stub Flange Ø 75 mm 2 Bh Pengadaan dan Pemasangan Pipa


Not to scale Stub Flange Ø 50 mm 2 Bh Dari tugu Obor Ke Arah Kaltim
Baut 58"
Kecamatan Murung Pudak
Jembatan Pipa GIP 1 Unit
Reducer 75 - Ø 50 mm 1 Bh KONSULTAN
Stub Flange Ø 50 mm HDPE
Rubber Packing

CV. P R I S M A J A S A
KETERANGAN VOL Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Baut 58" Detail Reducer Butterfly Valve Ø 75 mm 1 Bh

J.7
HDFE 75 mm - 50 mm
Stub Flange Ø 50 mm HDPE Stub Flange Ø 75 mm 2 Bh
Stub Flange Ø 75 mm HDPE
Not to scale Penanggung Jawab
Rubber Packing
Rubber Packing

Detail Stub Flange Ø 50 mm HDPE


RUAS JALAN - 1
STA 0+000 s/d STA 1+865
Not to Scale
Ir. SITTI UMAYYAH
Direktris
Stub Flange Ø 75 mm HDPE
Rubber Packing
HRS Base tebal 5cm
Median Jalan Di Gambar
Trotoar Lapis Pondasi Agregat Atas (LPA) Tebal 30 cm
Detail Stub Flange Ø 75 mm HDPE Jalan yang ada
Not to Scale

MIRZA AZWARI, ST
Urugan Pasir 40 cm Draftman
Profil Melintang Pipa RUAS JALAN - 1
Pipa HDPE Ø 75 mm
Skala 1 : 50 STA 0+000 s/d STA 1+865 (Jalan HRS Base)
STA 1+865 s/d STA 1+900 (Jembatan)
STA 1+900 s/d STA 2+075 (Jalan HRS Base)
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a UTARA 2 + 075
k e r- s o ft w a

JALUR 1
1 + 900

1 + 865

PROGRAM/KEGIATAN

JALUR 1
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

JALUR 1
1 + 347.5 PEKERJAAN

JALUR 1
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
M.T M.T M.T M.T KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
KasI Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
KETERANGAN VOL
Bend GI 45° Ø 75 mm 4 Bh Pengadaan dan Pemasangan Pipa
JMB Air Valve Ø 75 mm 1 Bh
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
Flange GI Ø 75 mm 28 Bh
KONSULTAN
Flexible Joint Ø 75 mm 2 Bh

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
KasI Perencaan

SLAMET KARYADI
NIK 6309042

Air Valve Ø 75 mm Flange - Ø 75 mm


JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Liner (Tube)
Kecamatan Murung Pudak

Bend GI 45° - Ø 75 mm
KONSULTAN
Flange - Ø 75 mm

Liner (Tube)
CV. P R I S M A J A S A
Bend GI 45° - Ø 75 mm Architect & engineering consultant
Air Valve Ø 75 mm Not to Scale Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Not to Scale

Flexibel Joint - Ø 75 mm
Not to Scale
Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
1 + 940
lic

lic
C

C
.c

.c
w

w
tr e tr re
ar
.

.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA

2
JALUR
1 + 794

2
JALUR
1 + 759

UTARA 8
1 + 708

0 + 27

2
JALUR
0 + 27
4
1 + 539
PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

JALUR 2
KABUPATEN TABALONG
Ø8 - 10 1 + 228

PEKERJAAN
Ø8 - 10

POTONGAN MELINTANG

JALUR 2
0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA

R2
JALU
0 + 825 KABUPATEN TABALONG
Ø8 - 10 Ø8 - 10 0 + 772

2
JALUR
TUTUP BETON
DIAJUKAN SEBAGAI GAMBAR :

2
JALUR
POTONGAN MELINTANG

8
BEGEL Ø12
LUBANG Ø13 Gambar Rencana Kerja
5

R2
JALU
Mengetahui
VARIABLE

URUGAN TANAH 0 + 274


Pejabat Pembuat Komitmen (PPK)
0
0 ± 00
BETON 1:2:3

2
JALUR
10 1
GATE VALVE

2
JALUR
0 ± 000
PASIR DIPADATKAN
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
PIPA HDPE
Di Setujui
Kabag Teknik

Detail Gate Valve Ø 50 mm


Not to Scale
H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
KasI Perencaan

SLAMET KARYADI
KETERANGAN VOL NIK 6309042
GIBOULT JOINT Ø 50 mm
Gate Valve Ø 75 mm 1 Bh
JUDUL GAMBAR
J.8
Not to Scale
Baut 58" Baut 58" Stub Flange Ø 75 mm 2 Bh
Pengadaan dan Pemasangan Pipa
Ø8 - 10
Ø8 - 10
Dari tugu Obor Ke Arah Kaltim
Stub Flange Ø 75 mm HDPE Stub Flange Ø 50 mm HDPE Bend 90° Kecamatan Murung Pudak
Rubber Packing Rubber Packing

KONSULTAN
KETERANGAN VOL
Tee 75 x 75 x 75 mm 1 Bh
CV. P R I S M A J A S A
Ø8 - 10

TUTUP BETON
Ø8 - 10

Stub Flange Ø 75 mm HDPE Stub Flange Ø 50 mm HDPE


J.9 Gate Valve Ø 50 mm
Giboult Joint Ø 50 mm
1
2
Bh
Bh
Architect & engineering consultant
Rubber Packing Rubber Packing Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

BEGEL Ø12
Detail Bend 90° HDPE Ø 50 mm
Stub Flange Ø 50 mm 2 Bh
LUBANG Ø13
8
5
Not to scale Bend 90° - Ø 50 mm 1 Bh Penanggung Jawab
VARIABLE

Detail Stub Flange Ø 75 mm HDPE Detail Stub Flange Ø 50 mm HDPE Tee 50 x 50 x 50 Ø 50 mm 1 Bh


URUGAN TANAH
Not to Scale Not to Scale
BETON 1:2:3
RUAS JALAN - 2 Reducer 75 - Ø 50 mm 1 Bh
10 1
STA 0+000 s/d STA 1+759
GATE VALVE
Lapis Pondasi Agregat Atas (LPA) Tebal 45 cm
PASIR DIPADATKAN Ir. SITTI UMAYYAH
HDPE Ø 75 mm

Direktris
PIPA HDPE
Median Jalan
Trotoar
Di Gambar

TEE HDPE 75 X 75 X 75

Detail Gate Valve Ø 75 mm


Not to Scale HDPE Ø 75 mm

MIRZA AZWARI, ST
Detail Tee HDPE Draftman
Not to scale
Pipa PVC Ø 250 mm (existing)
Profil Melintang Pipa
Skala 1 : 50
Urugan Pasir 35 cm
Pipa HDPE Ø 75 mm
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
1 + 940
lic

lic
C

C
.c

.c
w

w
tr e tr re
ar
.

.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA

2
JALUR
1 + 794

2
JALUR
1 + 759

UTARA 8
1 + 708

0 + 27

2
JALUR
0 + 27
4
1 + 539
PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

JALUR 2
KABUPATEN TABALONG
1 + 228

PEKERJAAN
POTONGAN MELINTANG

Ø8 - 10

JALUR 2
Ø8 - 10 0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA

R2
JALU
0 + 825 KABUPATEN TABALONG
0 + 772

2
JALUR
DIAJUKAN SEBAGAI GAMBAR :

2
JALUR
Ø8 - 10 Ø8 - 10
POTONGAN MELINTANG

Gambar Rencana Kerja


TUTUP BETON

R2
JALU
BEGEL Ø12 Mengetahui
LUBANG Ø13 0 + 274
Pejabat Pembuat Komitmen (PPK)
8 0
0 ± 00
5

2
JALUR
VARIABLE

URUGAN TANAH

2
JALUR
BETON 1:2:3
0 ± 000

10 1 SLAMET BUDI SANTOSA,S.Sos


GATE VALVE NIK 6309023
PASIR DIPADATKAN
Di Setujui
Kabag Teknik
PIPA HDPE

H. MUSTA'IN,S.Sos
Detail Gate Valve Ø 150 mm NIK 6309010

Not to Scale
Di Periksa
KasI Perencaan
HDPE Ø 250 mm

Baut dan Mur


Baut 1 38" Baut dan Mur

SLAMET KARYADI
KETERANGAN VOL NIK 6309042
Stub Flange Ø 150 mm Stub Flange Ø 250 mm HDPE
Stub Flange Ø 150 mm HDPE
Tee 250 x 250 x 250 mm 1 Bh
Rubber Packing
JUDUL GAMBAR
TEE HDPE 250 X 250 X 250
J.20 Gate Valve Ø 150 mm
Reducer 250 x 150 mm
1
1
Bh
Bh
Pengadaan dan Pemasangan Pipa
HDPE Ø 250 mm Dari tugu Obor Ke Arah Kaltim
Stub Flange Ø 150 mm 2 Bh Kecamatan Murung Pudak
Baut dan Mur

Detail Tee HDPE Baut dan Mur


Stub Flange Ø 150 mm Detail Grip Couplings Ø 250 mm Grip Couplings - Ø 250 mm 2 Bh KONSULTAN
Detail Grip Couplings Ø 150 mm
Rubber Packing Not to Scale
Not to scale Not to Scale
Grip Couplings - Ø 150 mm 1 Bh
Crosing Pipa 30 M
CV. P R I S M A J A S A
Detail Stub Flange Ø 150 mm Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Not to Scale

Penanggung Jawab

Detail Reducer Ir. SITTI UMAYYAH


Ø 250 mm - Ø 150 mm Direktris
Not to scale

Trotoar Trotoar
Di Gambar

Pipa GI Ø 250 mm

Pipa HDPE PN 10 OD 315 mm


Pipa GI Ø 200 mm Pipa GI Ø 250 mm
Pipa HDPE PN 10 OD 160 mm
Pipa HDPE PN 10 OD 160 mm MIRZA AZWARI, ST
Pipa HDPE PN 10 OD 150 mm Draftman

POTONGAN CROSING PIPA (CR.1) TAMPAK CROSING PIPA (CR.1) TAMPAK CROSING PIPA (CR.1)
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
1 + 940
lic

lic
C

C
.c

.c
w

w
tr e tr re
ar
.

.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA

2
JALUR
1 + 794

1 + 759

1 + 708

2
JALUR 2

JALUR
UTARA
1 + 539
PROGRAM/KEGIATAN
0 + 998

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

JALUR 2
0 + 994

KABUPATEN TABALONG
0 + 954
1 + 228

0 + 950 PEKERJAAN
POTONGAN MELINTANG

JALUR 2
0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA

R2
JALU
0 + 825 KABUPATEN TABALONG
Ø8 - 10 0 + 772

Ø8 - 10
DIAJUKAN SEBAGAI GAMBAR :
2
JALUR

2
JALUR
9
0 + 82 POTONGAN MELINTANG

0 + 82
5
Gambar Rencana Kerja

2
JALUR
0 + 77
6
Ø8 - 10 Ø8 - 10 Mengetahui
0 + 274
Pejabat Pembuat Komitmen (PPK)
0 + 77
2 TUTUP BETON

2
JALUR
BEGEL Ø12
0 ± 000
LUBANG Ø13
8 SLAMET BUDI SANTOSA,S.Sos
5
NIK 6309023

VARIABLE
URUGAN TANAH
Di Setujui
BETON 1:2:3 Kabag Teknik
10 1
GATE VALVE
PASIR DIPADATKAN

PIPA HDPE
H. MUSTA'IN,S.Sos
HDPE Ø 75 mm

Baut 58"
NIK 6309010

Di Periksa
Stub Flange Ø 50 mm HDPE KasI Perencaan
Rubber Packing Detail Gate Valve Ø 50 mm
Not to Scale
TEE HDPE 75 X 75 X 75

SLAMET KARYADI
HDPE Ø 75 mm KETERANGAN VOL NIK 6309042
Tee 75 x 75 x 75 mm 1 Bh

J.10
Stub Flange Ø 50 mm HDPE
Detail Tee HDPE Rubber Packing
Gate Valve Ø 50 mm 1 Bh
JUDUL GAMBAR
Not to scale
Stub Flange Ø 50 mm 2 Bh Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Detail Stub Flange Ø 50 mm HDPE
Reducer 75 - Ø 50 mm 1 Bh Kecamatan Murung Pudak
Not to Scale
Detail Reducer KETERANGAN VOL KONSULTAN
HDFE 75 mm - 50 mm
Tee 75 x 75 x 75 mm 1 Bh

J.11
Not to scale
Gate Valve Ø 50 mm 1 Bh CV. P R I S M A J A S A
Stub Flange Ø 50 mm 2 Bh Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Reducer 75 - Ø 50 mm 1 Bh

RUAS JALAN - 2 Penanggung Jawab


STA 0+000 s/d STA 1+759 Lapis Pondasi Agregat Atas (LPA) Tebal 45 cm KETERANGAN VOL
Tee 75 x 75 x 75 mm 1 Bh

Median Jalan
Trotoar
J.12 Gate Valve Ø 50 mm
Stub Flange Ø 50 mm
1
2
Bh
Bh
Ir. SITTI UMAYYAH
Reducer 75 - Ø 50 mm 1 Bh Direktris

KETERANGAN VOL
Di Gambar
Tee 75 x 75 x 75 mm 1 Bh

J.13 Gate Valve Ø 50 mm


Stub Flange Ø 50 mm
1
2
Bh
Bh
Pipa PVC Ø 250 mm (existing)
Reducer 75 - Ø 50 mm 1 Bh
Profil Melintang Pipa MIRZA AZWARI, ST
Draftman
Skala 1 : 50
Urugan Pasir 35 cm
Pipa HDPE Ø 75 mm
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
1 + 940
lic

lic
C

C
.c

.c
w

w
tr e tr re
ar
.

.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA

2
JALUR
1 + 794

1 + 759

1 + 708

JALUR 2
UTARA
1 + 539
PROGRAM/KEGIATAN
1 + 58
5
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

JALUR 2
Ø8 - 10
CROSSING 40 M
KABUPATEN TABALONG
Ø8 - 10
1 + 53
9 1 + 228

Koneksi 8 - 3 "
PEKERJAAN
POTONGAN MELINTANG

JALUR 2
0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ø8 - 10 Ø8 - 10 KEC.MUARA HARUS DAN KEC. MUARA UYA

R2
JALU
TUTUP BETON 0 + 825 KABUPATEN TABALONG
0 + 772

2
DIAJUKAN SEBAGAI GAMBAR :

JALUR

2
JALUR
BEGEL Ø12
LUBANG Ø13 POTONGAN MELINTANG

Gambar Rencana Kerja


8
5
VARIABLE

2
JALUR
URUGAN TANAH
BETON 1:2:3 Mengetahui
0 + 274
Pejabat Pembuat Komitmen (PPK)
10 1

2
JALUR
GATE VALVE
1 + 234
PASIR DIPADATKAN

0 ± 000
1 + 228
PIPA HDPE SLAMET BUDI SANTOSA,S.Sos
NIK 6309023

Di Setujui
Kabag Teknik
Detail Gate Valve Ø 50 mm
Not to Scale

H. MUSTA'IN,S.Sos
NIK 6309010
HDPE Ø 50 mm

Baut 58"

Di Periksa
KasI Perencaan
Stub Flange Ø 50 mm HDPE
Rubber Packing

TEE HDPE 75 X 75 X 50
SLAMET KARYADI
NIK 6309042
HDPE Ø 75 mm

Detail Reducer KETERANGAN VOL JUDUL GAMBAR


Stub Flange Ø 50 mm HDPE
Detail Tee HDPE HDFE 75 mm - 50 mm
Rubber Packing Tee 75 x 75 x 75 mm 1 Bh
Not to scale
Not to scale
J.14 Gate Valve Ø 50 mm
Stub Flange Ø 50 mm
1
2
Bh
Bh
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
Detail Stub Flange Ø 50 mm HDPE
Not to Scale Reducer 75 - Ø 50 mm 1 Bh KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

RUAS JALAN - 2 Penanggung Jawab


STA 0+000 s/d STA 1+759 Lapis Pondasi Agregat Atas (LPA) Tebal 45 cm

Median Jalan
Trotoar
Ir. SITTI UMAYYAH
Direktris

Di Gambar

Pipa PVC Ø 250 mm (existing)


Profil Melintang Pipa MIRZA AZWARI, ST
Draftman
Skala 1 : 50
Urugan Pasir 35 cm
Pipa HDPE Ø 75 mm
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
1 + 940
lic

lic
C

C
.c

.c
w

w
tr e tr re
ar
.

.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA

2
JALUR
1 + 794

1 + 759

1 + 708

JALUR 2
UTARA
1 + 539
PROGRAM/KEGIATAN
1 + 58
5
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

JALUR 2
Ø8 - 10
CROSSING 40 M
KABUPATEN TABALONG
Ø8 - 10
1 + 53
9 1 + 228

Koneksi 200 mm - 75 mm
PEKERJAAN
POTONGAN MELINTANG

JALUR 2
0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ø8 - 10 Ø8 - 10 KEC.MUARA HARUS DAN KEC. MUARA UYA

R2
JALU
TUTUP BETON 0 + 825 KABUPATEN TABALONG
0 + 772

JALUR 2
DIAJUKAN SEBAGAI GAMBAR :

2
JALUR
BEGEL Ø12
LUBANG Ø13 POTONGAN MELINTANG

Gambar Rencana Kerja


8
5
VARIABLE

2
JALUR
URUGAN TANAH
BETON 1:2:3 Mengetahui
0 + 274
Pejabat Pembuat Komitmen (PPK)
10 1

2
JALUR
GATE VALVE
1 + 234
PASIR DIPADATKAN

0 ± 000
1 + 228
PIPA HDPE SLAMET BUDI SANTOSA,S.Sos
NIK 6309023

Di Setujui
Kabag Teknik
Detail Gate Valve Ø 75 mm
Not to Scale

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
KasI Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Trotoar Trotoar

Penanggung Jawab
Pipa GI Ø 200 mm

Pipa HDPE PN 10 OD 315 mm


Pipa GI Ø 100 mm Pipa GI Ø 200 mm
Pipa HDPE PN 10 OD 160 mm
Pipa HDPE PN 10 OD 160 mm
Pipa HDPE PN 10 OD 75 mm
Ir. SITTI UMAYYAH
Direktris

POTONGAN CROSING PIPA (CR.2) TAMPAK CROSING PIPA (CR.2) TAMPAK CROSING PIPA (CR.2)
Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
1 + 940
lic

lic
C

C
.c

.c
w

w
tr e tr re
ar
.

.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA

JALUR 2
1 + 794

1 + 940 1 + 759

1 + 708

JALUR 2
UTARA
1 + 539
PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

2
JALUR
KABUPATEN TABALONG
1 + 228

PEKERJAAN

2
JALUR
POTONGAN MELINTANG

JALUR 2
0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
1 + 794
0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA

R2
JALU
0 + 825 KABUPATEN TABALONG
Ø8 - 10 0 + 772

Ø8 - 10
DIAJUKAN SEBAGAI GAMBAR :

2
JALUR
1 + 759
POTONGAN MELINTANG

Gambar Rencana Kerja

0 + 000

0 + 270

2
JALUR
Ø8 - 10 Ø8 - 10 Mengetahui

0 + 000
0 + 274
Pejabat Pembuat Komitmen (PPK)

0 + 275
TUTUP BETON

R2
JALU
JALUR 2
BEGEL Ø12 0
0 ± 00
LUBANG Ø13
0 + 000 SLAMET BUDI SANTOSA,S.Sos
8

0 + 282
5
NIK 6309023

VARIABLE
URUGAN TANAH
Di Setujui
BETON 1:2:3 Kabag Teknik
10 1
GATE VALVE
PASIR DIPADATKAN

PIPA HDPE
H. MUSTA'IN,S.Sos
NIK 6309010
Baut 58"
HDPE Ø 75 mm

Di Periksa
KasI Perencaan
Stub Flange Ø 50 mm HDPE
Rubber Packing Detail Gate Valve Ø 50 mm
Not to Scale

TEE HDPE 75 X 75 X 75
KETERANGAN VOL SLAMET KARYADI
NIK 6309042
Tee 75 x 75 x 75 mm 1 Bh

J.15
HDPE Ø 75 mm

Stub Flange Ø 50 mm HDPE Gate Valve Ø 50 mm 1 Bh JUDUL GAMBAR


Detail Tee HDPE Rubber Packing
Stub Flange Ø 50 mm 2 Bh
Pengadaan dan Pemasangan Pipa
Not to scale
Reducer 75 - Ø 50 mm 1 Bh Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
Detail Stub Flange Ø 50 mm HDPE
KETERANGAN VOL
Not to Scale KONSULTAN
Tee 75 x 75 x 75 mm 1 Bh
Detail Reducer
HDFE 75 mm - 50 mm J.16 Gate Valve Ø 50 mm
Stub Flange Ø 50 mm
1
2
Bh
Bh
CV. P R I S M A J A S A
Not to scale Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Reducer 75 - Ø 50 mm 1 Bh

RUAS JALAN - 2 KETERANGAN VOL Penanggung Jawab


STA 0+000 s/d STA 1+759 Lapis Pondasi Agregat Atas (LPA) Tebal 45 cm
Tee 75 x 75 x 75 mm 1 Bh

Median Jalan
J.17 Gate Valve Ø 50 mm
Stub Flange Ø 50 mm
1
2
Bh
Bh
Trotoar
Reducer 75 - Ø 50 mm 1 Bh Ir. SITTI UMAYYAH
Direktris

Di Gambar

Pipa PVC Ø 250 mm (existing)


Profil Melintang Pipa MIRZA AZWARI, ST
Draftman
Skala 1 : 50
Urugan Pasir 35 cm
Pipa HDPE Ø 75 mm
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
1 + 940
lic

lic
C

C
.c

.c
w

w
tr e tr re
ar
.

.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA

JALUR 2
1 + 794

1 + 940 1 + 759

1 + 708

JALUR 2
UTARA
1 + 539
PROGRAM/KEGIATAN
Handel

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

2
JALUR
Handel KABUPATEN TABALONG
1 + 228
Baut 34'
PEKERJAAN

JALUR 2
POTONGAN MELINTANG

Baut 78 ''

JALUR 2
0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
1 + 794
Ductile iron with ENP 0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Stanless stell disc
KEC.MUARA HARUS DAN KEC. MUARA UYA

R2
JALU
Ductile iron with ENP 0 + 825 KABUPATEN TABALONG
Stanless stell disc 0 + 772

DIAJUKAN SEBAGAI GAMBAR :

2
JALUR
1 + 759
Butterfly Valve Ø 50 mm POTONGAN MELINTANG

Butterfly Valve Ø 75 mm
1 + 71
2
Not to Scale
Gambar Rencana Kerja
1 + 70

2
JALUR
8
Not to Scale
Mengetahui
0 + 274
Pejabat Pembuat Komitmen (PPK)
Bend 90°

R2
JALU
JALUR 2
0
0 ± 00

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

Detail Bend 90°


HDPE - Ø 50 mm
Not to Scale
H. MUSTA'IN,S.Sos
Ø8 - 10
NIK 6309010
HDPE Ø 75 mm

Ø8 - 10 5
Baut 8"

Di Periksa
KasI Perencaan
Stub Flange Ø 75 mm HDPE
Rubber Packing

TEE HDPE 75 X 75 X 75
Ø8 - 10 Ø8 - 10
KETERANGAN VOL
TUTUP BETON SLAMET KARYADI
Gate Valve Ø 75 mm 1 Bh NIK 6309042
HDPE Ø 75 mm

8
BEGEL Ø12
LUBANG Ø13 Detail Tee HDPE Stub Flange Ø 75 mm HDPE
J.18 Tee 75 x 75 x 75 mm
Bend 90°- Ø 50 mm
1
1
Bh
Bh
JUDUL GAMBAR
5 Rubber Packing
Not to scale Pengadaan dan Pemasangan Pipa
VARIABLE

Detail Reducer Butterfly Valve Ø 50 mm 1 Bh Dari tugu Obor Ke Arah Kaltim


URUGAN TANAH HDFE 75 mm - 50 mm
BETON 1:2:3 Stub Flange Ø 75 mm 2 Bh Kecamatan Murung Pudak
Not to scale
10 1 Detail Stub Flange Ø 75 mm HDPE
GATE VALVE Not to Scale
Stub Flange Ø 50 mm 2 Bh KONSULTAN
PASIR DIPADATKAN Jembatan Pipa GIP 1 Unit

PIPA HDPE
Reducer 75 - Ø 50 mm 1 Bh
CV. P R I S M A J A S A
Architect & engineering consultant
KETERANGAN VOL Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
RUAS JALAN - 2
STA 0+000 s/d STA 1+759 Butterfly Valve Ø 75 mm 1 Bh
Detail Gate Valve Ø 75 mm
Not to Scale
Lapis Pondasi Agregat Atas (LPA) Tebal 45 cm J.19 Stub Flange Ø 75 mm 2 Bh Penanggung Jawab

Median Jalan
Trotoar
Baut 58"
Ir. SITTI UMAYYAH
Direktris

Stub Flange Ø 50 mm HDPE


RUAS JALAN - 2
Rubber Packing Di Gambar
STA 0+000 s/d STA 1+759 (Jalan HRS Base)
STA 1+759 s/d STA 1+794 (Jembatan)
STA 1+794 s/d STA 1+940 (Jalan HRS Base)
Pipa PVC Ø 250 mm (existing)
Stub Flange Ø 50 mm HDPE
Profil Melintang Pipa MIRZA AZWARI, ST
Rubber Packing Draftman
Skala 1 : 50
Urugan Pasir 35 cm
Pipa HDPE Ø 75 mm
Detail Stub Flange Ø 50 mm HDPE
Not to Scale
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a UTARA 2 + 075
k e r- s o ft w a

JALUR 1
1 + 900

1 + 865

PROGRAM/KEGIATAN

JALUR 1
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

JALUR 1
1 + 347.5 PEKERJAAN

JALUR 1
M.T M.T M.T M.T POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
KasI Perencaan

SLAMET KARYADI
NIK 6309042
KETERANGAN VOL
Bend GI 45° Ø 75 mm 4 Bh JUDUL GAMBAR
JMB Air Valve Ø 75 mm 1 Bh
Pengadaan dan Pemasangan Pipa
Flange GI Ø 75 mm 28 Bh Dari tugu Obor Ke Arah Kaltim
Flexible Joint Ø 75 mm 2 Bh Kecamatan Murung Pudak

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
KasI Perencaan

SLAMET KARYADI
NIK 6309042

Air Valve Ø 75 mm Flange - Ø 75 mm


JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Liner (Tube)
Kecamatan Murung Pudak

Bend GI 45° - Ø 75 mm
KONSULTAN
Flange - Ø 75 mm

Liner (Tube)
CV. P R I S M A J A S A
Bend GI 45° - Ø 75 mm Architect & engineering consultant
Air Valve Ø 75 mm Not to Scale Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Not to Scale

Flexibel Joint - Ø 75 mm
Not to Scale
Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
U
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PROVINSI KALIMANTAN TIMUR PEKERJAAN


POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,

u
Ay
KEC.MUARA HARUS DAN KEC. MUARA UYA

S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG

b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
AwayanS S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik

Te
BARABAI Birayang gala Tanjungsamalantakan

l
Tg. Pamukan

.P
Pasungkan Labuhannamas Utara i ng

am
ar
a a i antu
Kuripan Negara S. Bara b G. Besar S. C

uk
eg Pagat

a
N

n
.
Labuhannamas
S Selatan Haruyan Gunungbatu Besar
KANDANGAN Ankinang

S
TU
Telagalangsat
Simpur H. MUSTA'IN,S.Sos

RA
Padangbatung NIK 6309010

ME
Margasari Sungairaya Pudi

G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan

PE
MARABAHAN Ta Kasi Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat n

rito
Anjirmuara k ka
S. Alala Ria
m SLAMET KARYADI

Ba
S. T
am S. Simpangampat NIK 6309042

S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR

S.
Tabunganen Ulin S. Batulicin Sungaibali

R
MARTAPURA M

ia
em Pengadaan dan Pemasangan Pipa

m
Karangintan

ka
Aluhaluh baSUNGAI PERAK
BANJARBARU Jalan Desa Murung Karangan

na
Lasung lap

n
i
Cempaka W. Riamkanan Sejaka Kecamatan Muara Harus

Sel.

AR
Pantaulayung
Kurau

Seb
Tanjungkurong

t
Pagatan

au
Batibati
KONSULTAN

AS
1150

l. L

uku
Sabamban

AK
Se
G. Aurbunak
Tanjungseloka

TM
CV. P R I S M A J A S A
Satui
PELAIHARI

LA
Kintap Karambu
Architect & engineering consultant

SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar

Kota Kabupaten Tg. Selatan


G = Gunung
L A U T
Kota Kecamatan
P = Pulau
Batas Provinsi Ir. SITTI UMAYYAH
J A W A Direktris
Batas Kabupaten
Tel = Teluk
Batas Kecamatan

Jalan Provinsi Peg = Pegunungan Di Gambar

Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

U
U
H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

PETA WILAYAH PETA WILAYAH


Ir. SITTI UMAYYAH
KABUPATEN TABALONG KECAMATAN MUARA HARUS Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
U
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus

KONSULTAN

KETERANGAN : CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Pipa HDPE Ø 150 mm / 6" (Eksisting)
Pipa HDPE Ø 150 mm / 6" Penanggung Jawab

Pipa HDPE Ø 100 mm / 4"

Ir. SITTI UMAYYAH


Direktris

Di Gambar

LAYOUT PLAN PIPA MIRZA AZWARI, ST


Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
U
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H.MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
KETERANGAN : NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Pipa HDPE Ø 150 mm / 6" ( P= 266 m) Jalan Desa Murung Karangan
Kecamatan Muara Harus
Pipa HDPE Ø 100 mm / 4" ( P= 6 m)
KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
U
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

KETERANGAN : H.MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan
Pipa HDPE Ø 150 mm / 6" ( P= 266 m)

Pipa HDPE Ø 100 mm / 4" ( P= 6 m) SLAMET KARYADI


NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

DENAH PIPA
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
U
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

KETERANGAN : H.MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan
Pipa HDPE Ø 150 mm / 6" ( P= 266 m)

Pipa HDPE Ø 100 mm / 4" ( P= 6 m) SLAMET KARYADI


NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

DENAH PIPA
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
DETAIL JUNCTION 01
lic

lic
C

C
.c

.c
w

w
JUNCTION 01
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PENGADAAN ACCESSORIES

No. Node JUMLAH PROGRAM/KEGIATAN


Pipa HDPE Ø 150 mm Pipa eksisiting
1 stub flange 150 1 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
2 Gate Valve Ø 150 mm ( eksisting)
PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

SKEMA JUNCTION -1 ( J1) POTONGAN MELINTANG


DIAJUKAN SEBAGAI GAMBAR :

Gambar Rencana Kerja


Mengetahui

JUNCTION 02 Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023
Pipa HDPE Ø 150 mm

Di Setujui
Gibel Join Ø 75 mm

Kabag Teknik
DETAIL JUNCTION 02

PENGADAAN ACCESSORIES
H.MUSTA'IN,S.Sos
NIK 6309010
No. Node JUMLAH
Di Periksa
1 Pipa HDPE PN 10 OD Ø 150 mm Kasi Perencaan

m
m 2 Tee HDPE Ø 150x150x150 m
75 2
Ø
Pipa HDPE Ø 150 mm

SLAMET KARYADI
PE 3 Tee HDPE Ø 75x75x75 m 1 NIK 6309042
HD Pipa HDPE Ø 150 mm
pa
Pi Reduser 150 - Ø 75 mm 1
4
Crosing jalan ( c1)
JUDUL GAMBAR
5 Dop Flange Ø 150 mm ( 6") 1
Pengadaan dan Pemasangan Pipa
6 Giboult joint Ø 75 2 Jalan Desa Murung Karangan
Kecamatan Muara Harus
7 bend 45° Ø 75 4
KONSULTAN
8 stub flange Ø 75 2
9 pipa HDPE Ø 75 6m CV. P R I S M A J A S A
Architect & engineering consultant
10 Gate Valve Ø 75 1 Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Pipa HDPE Ø 150 mm

Penanggung Jawab

Pi
pa
HD
PE
Ir. SITTI UMAYYAH
Ø
75
m
m
SKEMA JUNCTION -2 ( J2) Direktris

Di Gambar
Gibel Join Ø 75 mm

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
HDPE Ø 150 mm
to

to
ww

ww
om

om
k

k
Be
lic

lic
C

C
.c

.c
w

w
tr re tr re

nd
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

45
°
TEE HDPE 150 X150X 150
PROGRAM/KEGIATAN
Stub Flange HDPE

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


HDPE Ø 150 mm Baut 58" - 12 bh
KABUPATEN TABALONG
Stub Flange HDPE

PEKERJAAN
POTONGAN MELINTANG

Stub Flange HDPE

Rubber Packing
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
Tee HDPE KABUPATEN TABALONG
Tee HDPE
Stub Flange HDPE
Stub Flange HDPE DIAJUKAN SEBAGAI GAMBAR :
Detail Bend 90° HDPE ∅ 50 mm Detail Stub Flange ∅ 75 mm HDPE POTONGAN MELINTANG

not to scale not to scale Gambar Rencana Kerja


Tee HDPE Mengetahui
Pejabat Pembuat Komitmen (PPK)

Tee HDPE

Stub Flange HDPE


SLAMET BUDI SANTOSA,S.Sos
Stub Flange HDPE NIK 6309023

Di Setujui
Kabag Teknik

H.MUSTA'IN,S.Sos
NIK 6309010

Detail Tee HDPE 150 x 150 x 150 Di Periksa


not to scale Kasi Perencaan

SLAMET KARYADI
HDPE Ø 75mm

Detail GIBOULT JOINT ∅ 75 mm HDPE NIK 6309042

not to scale

Detail Dup Flange ∅ 150 mm HDPE JUDUL GAMBAR


not to scale
TEE HDPE 150 X150X 75 Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus

HDPE Ø 75mm
Stub Flange HDPE HDPE Ø 150 mm
KONSULTAN

TEE HDPE 75 X 75 X 75 CV. P R I S M A J A S A


Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Stub Flange HDPE HDPE Ø 75 mm
Tee HDPE Tee HDPE
Stub Flange HDPE
Stub Flange HDPE Penanggung Jawab
Stub Flange HDPE

Tee HDPE Tee HDPE Baut 58" - 12 bh


Stub Flange HDPE
Tee HDPE Stub Flange HDPE

Ir. SITTI UMAYYAH


Stub Flange HDPE Direktris
Tee HDPE
Rubber Packing
Tee HDPE

Stub Flange HDPE


Di Gambar
Tee HDPE
Stub Flange HDPE

Stub Flange HDPE

Stub Flange HDPE


Detail Stub Flange 150 mm HDPE
not to scale
MIRZA AZWARI, ST
Draftman

Detail Tee HDPE 150 x 150 x 75 Detail Tee HDPE 75 x 75 x 75


not to scale not to scale
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
DETAIL JUNCTION 03
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

JUNCTION 03 No. Node


PENGADAAN ACCESSORIES

PROGRAM/KEGIATAN
JUMLAH
1 Tee HDPE Ø 150x150x 150 m 1 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
2 stub Flange Ø 100 mm 2
1 PEKERJAAN
3 Gate Valve Ø 100 mm POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


Dup Flange Ø 150 mm ( 6") 1 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
4 KEC.MUARA HARUS DAN KEC. MUARA UYA
Reduser Ø 150 x 100 mm 1 KABUPATEN TABALONG
Crosing jalan ( c2) 5
Pipa HDPE Ø 100 mm 6m DIAJUKAN SEBAGAI GAMBAR :
6
POTONGAN MELINTANG

Gambar Rencana Kerja

SKEMA JUNCTION -3 ( J3) Mengetahui


Pejabat Pembuat Komitmen (PPK)
Pipa HDPE Ø 150 mm

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023
Pipa HDPE Ø 100 mm
Di Setujui
Kabag Teknik

H.MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

Detail Dup Flange ∅ 150 mm HDPE


HDPE Ø 100 mm

not to scale JUDUL GAMBAR

40
60
Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus
TEE HDPE 150 X150X 100
Ø8 - 10
Ø8 - 10
KONSULTAN
Stub Flange HDPE HDPE Ø 150 mm

60
CV. P R I S M A J A S A
Architect & engineering consultant

6
8
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Stub Flange HDPE

Ø8 - 10 Ø8 - 10
Tee HDPE Tee HDPE
Stub Flange HDPE Baut 58" - 12 bh TUTUP BETON Penanggung Jawab
Stub Flange HDPE
60
40
Stub Flange HDPE BEGEL Ø10
Rubber Packing LUBANG Ø13
Tee HDPE 8
5 Ir. SITTI UMAYYAH

VARIABLE
Direktris
Tee HDPE URUGAN TANAH
BETON 1:2:3
Stub Flange HDPE
10 1 Di Gambar
Stub Flange HDPE GATE VALVE

Detail Stub Flange ∅ 100 mm HDPE PASIR DIPADATKAN

not to scale
PIPA HDPE
MIRZA AZWARI, ST
20 20 Draftman

Detail Gate Valve 100 mm


Detail Tee HDPE 150 x 150 x 100 not to scale
not to scale
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
1.00 6.00 1.00
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
55

Bahu Jalan Perkerasan Aspal Bahu Jalan PROGRAM/KEGIATAN


PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
Urugan Sirtu POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
Urugan tanah KABUPATEN TABALONG
150

DIAJUKAN SEBAGAI GAMBAR :


Pipa HDPE PN 10 OD 150 mm POTONGAN MELINTANG

Pot. Galian pipa Sta 0+000 sd 0+100a Gambar Rencana Kerja


Urugan Pasir Mengetahui
Pejabat Pembuat Komitmen (PPK)

1.00 6.00 1.00

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023
55 Di Setujui
Kabag Teknik

Bahu Jalan Perkerasan Aspal Bahu Jalan


H.MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Urugan Sirtu Kasi Perencaan

Urugan tanah SLAMET KARYADI


150

NIK 6309042

Pipa HDPE PN 10 OD 150 mm JUDUL GAMBAR

Urugan Pasir
Pot. Galian pipa Sta 0+100a sd 0+200a Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus

KONSULTAN

1.00 6.00 1.00


CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

55

Penanggung Jawab
Bahu Jalan Perkerasan Aspal Bahu Jalan

Ir. SITTI UMAYYAH


Direktris

Urugan Sirtu
Di Gambar

Urugan tanah
150

Pipa HDPE PN 10 OD 150 mm Pot. Galian pipa Sta 0+200a sd 0+260aa MIRZA AZWARI, ST
Draftman

Urugan Pasir
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
U
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H.MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

KETERANGAN :
SLAMET KARYADI
NIK 6309042

Pipa HDPE Ø 150 mm / 6" ( P= JUDUL GAMBAR


266 m) Pengadaan dan Pemasangan Pipa
Pipa HDPE Ø 100 mm / 4" ( P= 6 Jalan Desa Murung Karangan
m) Kecamatan Muara Harus

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 9.00 1.00

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


Bahu Jalan Perkerasan Aspal Bahu Jalan DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Pipa GI Ø 200 mm
Gambar Rencana Kerja
Pipa HDPE PN 10 OD 150 mm Mengetahui
Pejabat Pembuat Komitmen (PPK)

POTONGAN CROSING PIPA (C1) SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H.MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

Perkerasan Aspal
Pipa GI Ø 200 mm SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
1.10

Pipa HDPE PN 10 OD 150 mm


Pipa GI Ø 200 mm Pengadaan dan Pemasangan Pipa
Pipa HDPE PN 10 OD 150 mm Jalan Desa Murung Karangan
Kecamatan Muara Harus

KONSULTAN
DETAIL CROSING PIPA (C3)
TAMPAK CROSING PIPA (C1) CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 7.00 1.00

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


Bahu Jalan Perkerasan Aspal Bahu Jalan DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Pipa GI Ø 200 mm
Gambar Rencana Kerja
Pipa HDPE PN 10 OD 150 mm Mengetahui
Pejabat Pembuat Komitmen (PPK)

POTONGAN CROSING PIPA (C1) SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H.MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Perkerasan Aspal Kasi Perencaan

SLAMET KARYADI
NIK 6309042
1.10

Pipa GI Ø 200 mm JUDUL GAMBAR


Pipa HDPE PN 10 OD 150 mm
Pengadaan dan Pemasangan Pipa
Pipa GI Ø 200 mm Jalan Desa Murung Karangan
Kecamatan Muara Harus

KONSULTAN
TAMPAK CROSING PIPA (C1) Pipa HDPE PN 10 OD 150 mm

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

DETAIL CROSING PIPA (C3) Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a
UTARA

HDPE Ø 50 mm
UTARA

PROGRAM/KEGIATAN

TEE HDPE 50 X 50 X 50 00
0
0± PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
00
0
0
+6
KABUPATEN TABALONG
HDPE Ø 50 mm 75

Detail Tee HDPE


PEKERJAAN
POTONGAN MELINTANG

0
±0
0+ 00

200
PENGADAAN DAN PEMASANGAN PIPA HDPE
0+
09
7

Not to scale
DI KEC. TANJUNG , KEC. MURUNG PUDAK,

00
0+ 0

200
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


0+5
00
POTONGAN MELINTANG

0+5
00
Gambar Rencana Kerja

00
0

00
0

Bend 90° 0+
200

0 + 200
Mengetahui
Pejabat Pembuat Komitmen (PPK)
0 + 500

0 + 500

0+7
86
0 + 786

0+7
86 0 + 786

SLAMET BUDI SANTOSA,S.Sos


1 + 235
NIK 6309023

Di Setujui
Kabag Teknik
Detail Bend 90°
HDPE - Ø 50 mm
Not to Scale
GIBOULT JOINT 50 mm 1+2
35
Not to Scale
H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan
KETERANGAN VOL
Tee 50 x 50 x 50 mm 1 Bh

J.6
Handel
Baut 58" Giboult Joint Ø 50 mm 2 Bh
SLAMET KARYADI
Bend HDPE 90° Ø 50 mm 4 Bh NIK 6309042
3
Stub Flange 50 mm HDPE Baut 4'

Rubber Packing JUDUL GAMBAR

KETERANGAN VOL Pengadaan dan Pemasangan Pipa


Ductile iron with ENP
Stanless stell disc
Tee 50 x 50 x 50 mm 1 Bh Jalan A.Yani Kecamatan Muara Uya

Stub Flange 50 mm HDPE


J.7 Bend HDPE 90° Ø 50 mm 4 Bh
KONSULTAN
Rubber Packing

Butterfly Valve 50 mm
Not to Scale CV. P R I S M A J A S A
Detail Stub Flange 50 mm HDPE KETERANGAN VOL Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Not to Scale
Stub Flange Ø 50 mm 2 Bh

RUAS JALAN. 5 J.8 Buterfly Ø 50 mm 1 Bh


Penanggung Jawab
Jalan Aspal
Sirtu 60 cm

Ir. SITTI UMAYYAH


Urugan Pasir 90 cm Direktris
Pipa HDPE Ø 50 mm
Profil Melintang Pipa
Skala 1 : 50
Di Gambar

RUAS JALAN. 4
Jalan Aspal
Sirtu 60 cm
KETERANGAN : MIRZA AZWARI, ST
Draftman

RUAS JALAN - 4 STA 0 + 00 s/d 1 + 235 (Urugan Sirtu)


Urugan Pasir 90 cm
RUAS JALAN - 5 STA 0 + 00 s/d 0 + 786 (Urugan Sirtu)
Profil Melintang Pipa Pipa HDPE Ø 50 mm

Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA UTARA

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


0+
KABUPATEN TABALONG
67
5

Ø8 - 10

PEKERJAAN
Ø8 - 10

POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE



00 0+
0 09
7


00
0
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0+
09
7
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Ø8 - 10 Ø8 - 10
0+
02
TUTUP BETON 3
DIAJUKAN SEBAGAI GAMBAR :
0+
01
2 POTONGAN MELINTANG

8
BEGEL Ø12
LUBANG Ø13

00
0

00
0

00
0
Gambar Rencana Kerja
5 0 + 200

Mengetahui
VARIABLE

0+
200

URUGAN TANAH Pejabat Pembuat Komitmen (PPK)


BETON 1:2:3 0 + 500

0 + 500

10 1
GATE VALVE 0 + 786

0 + 786

PASIR DIPADATKAN
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
PIPA HDPE 1 + 235

Di Setujui
Kabag Teknik

Detail Gate Valve 50 mm


Handel
H. MUSTA'IN,S.Sos
Not to Scale NIK 6309010
Baut 58"

Di Periksa
Stub Flange 50 mm HDPE Baut 34' Kasi Perencaan
Rubber Packing
Bend 90° KETERANGAN VOL
Ductile iron with ENP Stub Flange Ø 50 mm 2 Bh
Stanless stell disc

J.3 Buterfly Ø 50 mm
Tee Ø 50 x 50 x 50 mm 1
1 Bh
M
SLAMET KARYADI
NIK 6309042
Stub Flange 50 mm HDPE
Rubber Packing Crosing 9 M JUDUL GAMBAR
Butterfly Valve 50 mm
Gibel Joint Ø 50 mm 2 M
Not to Scale Pengadaan dan Pemasangan Pipa
Detail Bend 90° Detail Stub Flange 50 mm HDPE Jalan A.Yani Kecamatan Muara Uya
HDPE - Ø 50 mm GIBOULT JOINT 50 mm Not to Scale
KETERANGAN VOL
Not to Scale
Not to Scale Stub Flange Ø 50 mm 4 Bh KONSULTAN
J.4 Buterfly Ø 50 mm
Tee Ø 50 x 50 x 50 mm 1
4 Bh
M CV. P R I S M A J A S A
Gate Valve Ø 50 1 M Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Bend 90 Ø 50 mm 1 M

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Pipa GI Ø 75 mm
Di Gambar

Pipa GI Ø 75 mm Pipa GI Ø 75 mm
Pipa HDPE 50 mm
Pipa HDPE PN 10 OD 50 mm
Pipa HDPE PN 10 OD 50 mm

MIRZA AZWARI, ST
Draftman
POTONGAN CROSING PIPA (CR.2) TAMPAK CROSING PIPA (CR.2) TAMPAK CROSING PIPA (CR.2)
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA UTARA

HDPE Ø 50 mm
UTARA

0+
67
PROGRAM/KEGIATAN
5
TEE HDPE 50 X 50 X 50
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
0+
KABUPATEN TABALONG
HDPE Ø 50 mm 67
5

Detail Reducer
HDFE ∅ 75 mm - ∅ 50 mm PEKERJAAN
Detail Tee HDPE POTONGAN MELINTANG

Not to scale 0±
00
0
0+
09
7
0+
579

PENGADAAN DAN PEMASANGAN PIPA HDPE


Not to scale

00
0 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG


00
DIAJUKAN SEBAGAI GAMBAR :
0

POTONGAN MELINTANG


00
0

00
0
Gambar Rencana Kerja
0 + 200

0+
200 Mengetahui
Pejabat Pembuat Komitmen (PPK)
0 + 500

0 + 500

0 + 786

0 + 786

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023
1 + 235

Detail Reducer Di Setujui


HDFE ∅ 150 mm - 75 mm Kabag Teknik

Not to scale

H. MUSTA'IN,S.Sos
NIK 6309010

Baut 58"
Baut 58"
GIBOULT JOINT 50 mm Di Periksa
Kasi Perencaan
Not to Scale
Stub Flange 150 mm HDPE
Stub Flange 75 mm HDPE Rubber Packing KETERANGAN VOL
Rubber Packing
Stub Flange Ø 150 mm 1 Bh

J.1 Stub Flange Ø 75 mm


Reducer Ø 150 - Ø 75 mm
2
1
Bh
Bh
SLAMET KARYADI
NIK 6309042

Stub Flange 150 mm HDPE


JUDUL GAMBAR
Stub Flange 75 mm HDPE Rubber Packing
Rubber Packing
KETERANGAN VOL Pengadaan dan Pemasangan Pipa
Jalan A.Yani Kecamatan Muara Uya
Tee 50 x 50 x 50 mm 1 Bh

J.2
Detail Stub Flange 150 mm HDPE
Detail Stub Flange 75 mm HDPE
Not to Scale
Reducer Ø 75 - Ø 50 mm 1 Bh KONSULTAN
Not to Scale
Giboult Joint Ø 50 mm 2 Bh

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab
RUAS JALAN. 1
Jalan Aspal
Sirtu 60 cm

Ir. SITTI UMAYYAH


Direktris
Urugan Pasir 90 cm
Pipa HDPE Ø 50 mm
Di Gambar
Profil Melintang Pipa
Skala 1 : 50

MIRZA AZWARI, ST
Draftman
KETERANGAN :

RUAS JALAN - 1 STA 0 + 00 s/d 0 + 675 (Urugan Sirtu)


hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)
0+
67
5

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

00
0 0+
09
7

0± H. MUSTA'IN,S.Sos
00
0 NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR

Pengadaan dan Pemasangan Pipa


Jalan A.Yani Kecamatan Muara Uya


00
KONSULTAN
0

00
0

CV. P R I S M A J A S A
Architect & engineering consultant
0+
200 Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

0+
200

Penanggung Jawab

0+5
00
0+5
00

Ir. SITTI UMAYYAH


Direktris

0+7
86

0+7
86 Di Gambar

1+2
MIRZA AZWARI, ST
35
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)
0+
67
5

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik


00
0 0+
09
7

H. MUSTA'IN,S.Sos

00 NIK 6309010
0

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR

Pengadaan dan Pemasangan Pipa


Jalan A.Yani Kecamatan Muara Uya


KONSULTAN
00
0

CV. P R I S M A J A S A
00
0

Architect & engineering consultant


Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
0+
200

0+
200

Penanggung Jawab

0+5
00
0+5
00

Ir. SITTI UMAYYAH


Direktris

0+7
86

0+7
86
Di Gambar

MIRZA AZWARI, ST
1+2
35
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR

Pengadaan dan Pemasangan Pipa


Jalan A.Yani Kecamatan Muara Uya

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman

Skala 1: 600
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR

Pengadaan dan Pemasangan Pipa


Jalan A.Yani Kecamatan Muara Uya

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re U tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PROVINSI KALIMANTAN TIMUR PEKERJAAN


POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,

yu
KEC.MUARA HARUS DAN KEC. MUARA UYA

A
S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG

b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
Awayan S S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik

Te
BARABAI Birayang gala Tanjungsamalantakan

l.
Tg. Pamukan

Pa
Pasungkan Labuhannamas Utara i ng
ar
a i antu

m
b a S. C
Kuripan Negara S. Bara G. Besar

uk
eg Pagat

an
. N
Labuhannamas Selatan Haruyan Gunungbatu Besar
S
KANDANGAN Ankinang

US
Telagalangsat H. MUSTA'IN,S.Sos
Simpur

AT
NIK 6309010
Padangbatung

ER
Margasari Sungairaya Pudi

M
G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan

PE
MARABAHAN Ta Kasi Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat an

rito
Anjirmuara S. Alala
k mk
Ria

Ba
S. T
am S. Simpangampat SLAMET KARYADI

S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU NIK 6309042
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR

S.
Tabunganen Ulin S. Batulicin Sungaibali

R
MARTAPURA M

ia
em

m
Karangintan Pengadaan dan Pemasangan Pipa

ka
Aluhaluh baSUNGAI PERAK
BANJARBARU

na
Lasung lap
Jalan A.Yani Kecamatan Muara Uya

n
Cempaka W. Riamkanan i Sejaka

Sel.

R
Pantaulayung

SA
Kurau

Seb
Tanjungkurong

t
Pagatan

au
Batibati
1150 KONSULTAN

l. L

KA
uku
Sabamban

Se

MA
G. Aurbunak
Tanjungseloka
CV. P R I S M A J A S A
Satui

AT
PELAIHARI
Kintap Karambu

L
Architect & engineering consultant

SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar

Kota Kabupaten Tg. Selatan


G = Gunung
L A U T
Kota Kecamatan
P = Pulau
Batas Provinsi Ir. SITTI UMAYYAH
J A W A Direktris
Batas Kabupaten
Tel = Teluk
Batas Kecamatan

Jalan Provinsi Peg = Pegunungan Di Gambar

Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

JUDUL GAMBAR

Pengadaan dan Pemasangan Pipa


Jalan A.Yani Kecamatan Muara Uya

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

JEMBATAN PIPA (JM3)


PROGRAM/KEGIATAN
Air Vent
Beton Penahan Pipa PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Pipa 3 Layer Ø 200 KABUPATEN TABALONG
Bend 45° GI Ø

POTONGAN MELINTANG
PEKERJAAN
Pipa 3 Layer Ø 200
PENGADAAN DAN PEMASANGAN PIPA HDPE
Bend 45° GI DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
Stub Flange PE Ø200 mm KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

JEMBATAN PIPA TIPE -A SLAMET KARYADI


NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

Tulangan Ø 12 - 15 Tulangan Ø 12 - 15
CV. P R I S M A J A S A
Architect & engineering consultant
Tulangan Ø 10 - 15 Tulangan Ø 10 - 15 Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

PENGADAAN ACCESSORIES
Ir. SITTI UMAYYAH
Tulangan Ø 12 - 15 Direktris
No. Node JUMLAH
Jembatan P= 7 m Di Gambar
Tulangan Ø 10 - 15
1 Air Valve 1

2 Pipa 3 Layer Ø 150 mm 11 m

3 Bend GI 45° mm 4 MIRZA AZWARI, ST


Draftman
Stub Flange GI Ø 150 mm
4 10 DETAIL TULANGAN JEMBATAN PIPA TIPE B
Rubber Packing 5
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

steel band Gambar Rencana Kerja


pc wire 4-Ø7mm
Mengetahui
spiral 6mm Pejabat Pembuat Komitmen (PPK)
filled weld

steel band SLAMET BUDI SANTOSA,S.Sos


NIK 6309023
pc wire 4-Ø7mm
Di Setujui
filled weld Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
steel band NIK 6309042

JUDUL GAMBAR
pc wire 4-Ø7mm
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
spiral 6mm dan Jalan Pasar Lama Kec. Tanjumg

filled weld KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

MINI PILE 20 x 20 - 6 m (PABRIKASI) Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


DETAIL 1 TULANGAN DUDUKAN JEMBATAN Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

Pondasi Dudukan Jembatan


DETAIL TULANGAN JEMBATAN PIPA TIPE A SLAMET KARYADI
NIK 6309042

DENAH PONDASI JUDUL GAMBAR


Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab
DENAH PONDASI

Ir. SITTI UMAYYAH


DETAIL 2 TULANGAN TIANG PENYANGGA Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
JEMBATAN PIPA (JM2)
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

BAJA IWF PROGRAM/KEGIATAN


PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
Pipa GI Ø 150 mm

PEKERJAAN
denah jembatan eksisting
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

Pipa GI Ø 50 mm DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

Rubber Packing
Bend GI Ø 50 mm
H. MUSTA'IN,S.Sos
Flange GI Ø 50 mm NIK 6309010

Di Periksa
Kasi Perencaan
Tampak jembatan eksisting

SLAMET KARYADI
Clam Besi pengikat Pipa Clam Besi pengikat Pipa NIK 6309042
Clam Besi pengikat Pipa
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
Pipa GI Ø 150 mm
Pipa GI Ø 150 mm
Pipa GI Ø 150 mm KONSULTAN

CV. P R I S M A J A S A
POTONGAN A-A Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

PENGADAAN ACCESSORIES

No. Node JUMLAH Ir. SITTI UMAYYAH


Direktris
Jembatan P= 26m

1 Air Valve 1
Di Gambar
2 Pipa 3 Layer Ø 50 mm 31 m

3 Bend GI 45° mm 4

4 Flange GI Ø 150 mm 22 MIRZA AZWARI, ST


Draftman
5 Rubber Packing 11
clam Besi pengikat Pipa 16 POTONGAN B-B POTONGAN C-C
Jembatan baja IWF 26 m
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
JEMBATAN PIPA (JM1) PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

POTONGAN MELINTANG
PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
Air Vent
Beton Penahan Pipa
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Pipa 3 Layer Ø 200 KEC.MUARA HARUS DAN KEC. MUARA UYA
Bend 45° GI Ø KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


Pipa 3 Layer Ø 200 POTONGAN MELINTANG

Bend 45° GI
Gambar Rencana Kerja
Stub Flange PE Ø200 mm
Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
JEMBATAN PIPA TIPE -A Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN
Tulangan Ø 12 - 15 Tulangan Ø 12 - 15

PENGADAAN ACCESSORIES CV. P R I S M A J A S A


Tulangan Ø 10 - 15 Tulangan Ø 10 - 15 Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
No. Node JUMLAH
Jembatan P= 9 m
Penanggung Jawab
1 Air Valve + aksesoris 1

2 Pipa 3 Layer Ø 200 mm 12 m

Tulangan Ø 12 - 15 3 Bend GI 45° Ø 200 mm 4


Ir. SITTI UMAYYAH
4 Flange GI Ø 200 mm 10 Direktris

5 Rubber Packing 5
Tulangan Ø 10 - 15
Di Gambar

DETAIL TULANGAN JEMBATAN PIPA TIPE B MIRZA AZWARI, ST


Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

CROSING PIPA (C5)

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 8,00 1.00

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


Bahu Jalan Perkerasan Aspal Bahu Jalan DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Pipa GI Ø 200 mm
Gambar Rencana Kerja
Pipa HDPE PN 10 OD 150 mm
Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


POTONGAN CROSING PIPA (C5) NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Perkerasan Aspal Kasi Perencaan

SLAMET KARYADI
NIK 6309042
1.10

Pipa GI Ø 200 mm JUDUL GAMBAR


Pipa HDPE PN 10 OD 150 mm
Pengadaan dan Pemasangan Pipa
Pipa GI Ø 200 mm Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN
TAMPAK CROSING PIPA (C5) Pipa HDPE PN 10 OD 150 mm

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

DETAIL CROSING PIPA (C5) Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
CROSING PIPA (C4)
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 6,00 1.00

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


Bahu Jalan Perkerasan Aspal Bahu Jalan DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Pipa GI Ø 100 mm
Gambar Rencana Kerja
Pipa HDPE PN 10 OD 75 mm
Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


POTONGAN CROSING PIPA (C4) NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Perkerasan Aspal Kasi Perencaan

SLAMET KARYADI
NIK 6309042
1.10

Pipa GI Ø 100 mm JUDUL GAMBAR


Pipa HDPE PN 10 OD 75 mm
Pengadaan dan Pemasangan Pipa
Pipa GI Ø 100 mm Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN
TAMPAK CROSING PIPA (C4) Pipa HDPE PN 10 OD 75 mm

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

DETAIL CROSING PIPA (C4) Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
CROSING PIPA (C3)
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 10.00 1.00

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


Bahu Jalan Perkerasan Aspal Bahu Jalan DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Pipa GI Ø 300 mm
Gambar Rencana Kerja
Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


POTONGAN CROSING PIPA (C3) NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Perkerasan Aspal Kasi Perencaan

SLAMET KARYADI
NIK 6309042
1.10

Pipa GI Ø 300 mm JUDUL GAMBAR


Pipa HDPE PN 10 OD 200 mm
Pengadaan dan Pemasangan Pipa
Pipa GI Ø 300 mm Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN
TAMPAK CROSING PIPA (C3) Pipa HDPE PN 10 OD 200 mm

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

DETAIL CROSING PIPA (C3) Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
CROSING PIPA (C2)
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 11.00 1.00

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


Bahu Jalan Perkerasan Aspal Bahu Jalan DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Pipa GI Ø 200 mm
Gambar Rencana Kerja
Pipa HDPE PN 10 OD 150 mm
Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


POTONGAN CROSING PIPA (C2) NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Perkerasan Aspal Kasi Perencaan

SLAMET KARYADI
NIK 6309042
1.10

Pipa GI Ø 200 mm JUDUL GAMBAR


Pipa HDPE PN 10 OD 150 mm
Pengadaan dan Pemasangan Pipa
Pipa GI Ø 200 mm Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN
TAMPAK CROSING PIPA (C2) Pipa HDPE PN 10 OD 150 mm

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

DETAIL CROSING PIPA (C2) Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac

CROSING PIPA (C1)


k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 9.00 1.00

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


Bahu Jalan Perkerasan Aspal Bahu Jalan DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Pipa GI Ø 400 mm
Gambar Rencana Kerja
Pipa HDPE PN 10 OD 300 mm
Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


POTONGAN CROSING PIPA (C1) NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Perkerasan Aspal Kasi Perencaan

SLAMET KARYADI
NIK 6309042
1.10

Pipa GI Ø 400 mm JUDUL GAMBAR


Pipa HDPE PN 10 OD 300 mm
Pengadaan dan Pemasangan Pipa
Pipa GI Ø 400 mm Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN
TAMPAK CROSING PIPA (C1) Pipa HDPE PN 10 OD 300 mm

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

DETAIL CROSING PIPA (C1) Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
U
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

KETERANGAN : CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Pipa HDPE Ø 400 mm / (Eksisting)


Pipa HDPE Ø 300 mm ( P= 1500m) Penanggung Jawab

Pipa HDPE Ø 200 mm (P = 1400m)

Pipa HDPE Ø 150 mm ( P = 1255m) Ir. SITTI UMAYYAH


Direktris

Di Gambar

DENAH CROSING PIPA , JEMBATAN & HDD MIRZA AZWARI, ST


Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
1.00 6.00 1.00
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
55

Bahu Jalan aspal Perkerasan Aspal Bahu Jalan PROGRAM/KEGIATAN


PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

Timbunan LPA dipadatkan PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Urugan tanah
110

DIAJUKAN SEBAGAI GAMBAR :


50

Pipa HDPE PN 10 OD 200 mm POTONGAN MELINTANG

Gambar Rencana Kerja


Urugan Pasir
Mengetahui
Pejabat Pembuat Komitmen (PPK)

1.00 6.00 1.00

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

55 Di Setujui
Kabag Teknik

Bahu Jalan aspal Perkerasan Aspal Bahu Jalan


H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

Timbunan LPA dipadatkan

Urugan tanah
110

SLAMET KARYADI
NIK 6309042
50

Pipa HDPE PN 10 OD 200 mm JUDUL GAMBAR


Pengadaan dan Pemasangan Pipa
Urugan Pasir Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

1.00 6.00 1.00


CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

55

Penanggung Jawab
Bahu Jalan aspal Perkerasan Aspal Bahu Jalan

Ir. SITTI UMAYYAH


Direktris

Timbunan LPA dipadatkan Di Gambar

Urugan tanah
110
50

Pipa HDPE PN 10 OD 200 mm MIRZA AZWARI, ST


Draftman

Urugan Pasir
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
1.00 6.00 1.00
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
55

Bahu Jalan aspal Perkerasan Aspal Bahu Jalan PROGRAM/KEGIATAN


PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

Timbunan LPA dipadatkan PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Urugan tanah
110

DIAJUKAN SEBAGAI GAMBAR :


50

Pipa HDPE PN 10 OD 200 mm POTONGAN MELINTANG

Gambar Rencana Kerja


Urugan Pasir
Mengetahui
Pejabat Pembuat Komitmen (PPK)

1.00 6.00 1.00

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

55 Di Setujui
Kabag Teknik

Bahu Jalan aspal Perkerasan Aspal Bahu Jalan


H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

Timbunan LPA dipadatkan

Urugan tanah
110

SLAMET KARYADI
NIK 6309042
50

Pipa HDPE PN 10 OD 200 mm JUDUL GAMBAR


Pengadaan dan Pemasangan Pipa
Urugan Pasir Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

1.00 6.00 1.00


CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

55

Penanggung Jawab
Bahu Jalan aspal Perkerasan Aspal Bahu Jalan

Ir. SITTI UMAYYAH


Direktris

Timbunan LPA dipadatkan Di Gambar

Urugan tanah
110
50

Pipa HDPE PN 10 OD 200 mm MIRZA AZWARI, ST


Draftman

Urugan Pasir
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
1.00 6.00 1.00
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
55

Bahu Jalan aspal Perkerasan Aspal Bahu Jalan PROGRAM/KEGIATAN


PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

Timbunan LPA dipadatkan PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Urugan tanah
110

DIAJUKAN SEBAGAI GAMBAR :


50

Pipa HDPE PN 10 OD 200 mm POTONGAN MELINTANG

Gambar Rencana Kerja


Urugan Pasir
Mengetahui
Pejabat Pembuat Komitmen (PPK)

1.00 6.00 1.00

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

55 Di Setujui
Kabag Teknik

Bahu Jalan aspal Perkerasan Aspal Bahu Jalan


H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

Timbunan LPA dipadatkan

Urugan tanah
110

SLAMET KARYADI
NIK 6309042
50

Pipa HDPE PN 10 OD 200 mm JUDUL GAMBAR


Pengadaan dan Pemasangan Pipa
Urugan Pasir Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

1.00 6.00 1.00


CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

55

Penanggung Jawab
Bahu Jalan aspal Perkerasan Aspal Bahu Jalan

Ir. SITTI UMAYYAH


Direktris

Timbunan LPA dipadatkan Di Gambar

Urugan tanah
110
50

Pipa HDPE PN 10 OD 200 mm MIRZA AZWARI, ST


Draftman

Urugan Pasir
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
1.00 6.00 1.00
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
55

Bahu Jalan aspal Perkerasan Aspal Bahu Jalan PROGRAM/KEGIATAN


PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

Timbunan LPA dipadatkan PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Urugan tanah
110

DIAJUKAN SEBAGAI GAMBAR :


55

Pipa HDPE PN 10 OD 300 mm POTONGAN MELINTANG

Gambar Rencana Kerja


Urugan Pasir
Mengetahui
Pejabat Pembuat Komitmen (PPK)

1.00 6.00 1.00

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

55 Di Setujui
Kabag Teknik

Bahu Jalan aspal Perkerasan Aspal Bahu Jalan


H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

Timbunan LPA dipadatkan

Urugan tanah
110

SLAMET KARYADI
NIK 6309042
55

Pipa HDPE PN 10 OD 300 mm JUDUL GAMBAR


Pengadaan dan Pemasangan Pipa
Urugan Pasir Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

1.00 6.00 1.00


CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

55

Penanggung Jawab
Bahu Jalan aspal Perkerasan Aspal Bahu Jalan

Ir. SITTI UMAYYAH


Direktris

Timbunan LPA dipadatkan Di Gambar

Urugan tanah
110
55

Pipa HDPE PN 10 OD 300 mm MIRZA AZWARI, ST


Draftman

Urugan Pasir
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
Stub Flange HDPE

Baut PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

HDPE Ø 100 mm
KABUPATEN TABALONG
Stub Flange HDPE

PEKERJAAN
Rubber Packing

POTONGAN MELINTANG

TEE HDPE 150 X150 X 100


PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Stub Flange HDPE HDPE Ø 150 mm Detail Stub Flange ∅150 mm HDPE KEC.MUARA HARUS DAN KEC. MUARA UYA
not to scale KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Tee HDPE

Gambar Rencana Kerja


Tee HDPE
Stub Flange HDPE
Stub Flange HDPE

Bend 45° Mengetahui


Tee HDPE Pejabat Pembuat Komitmen (PPK)

Tee HDPE

Stub Flange HDPE SLAMET BUDI SANTOSA,S.Sos


Stub Flange HDPE NIK 6309023

Di Setujui
Kabag Teknik

Detail Tee HDPE 150x150x100 Detail Bend 45° HDPE ∅150 mm Detail Coupling With Grip Ø 100 mm
not to scale not to scale H. MUSTA'IN,S.Sos
not to scale
NIK 6309010

Di Periksa
Kasi Perencaan

Stub Flange HDPE SLAMET KARYADI


NIK 6309042
Baut

40
60

40
60
Stub Flange HDPE
JUDUL GAMBAR
Rubber Packing

Pengadaan dan Pemasangan Pipa


Jalan Basuki Rahmat, Jalan Kapar Hulu
Ø8 - 10 Ø8 - 10
dan Jalan Pasar Lama Kec. Tanjumg
Detail Stub Flange ∅100 mm HDPE Ø8 - 10 Ø8 - 10
not to scale KONSULTAN
60 60
CV. P R I S M A J A S A
6

Detail Coupling With Grip Ø 150 mm

6
8

8
Architect & engineering consultant
not to scale Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Ø8 - 10 Ø8 - 10 Ø8 - 10 Ø8 - 10

TUTUP BETON TUTUP BETON

60 Penanggung Jawab
60
Bend 90° 40 40
BEGEL Ø10 BEGEL Ø10
LUBANG Ø13 LUBANG Ø13
8 8
5 5
VARIABLE

VARIABLE
Ir. SITTI UMAYYAH
Bend 45° URUGAN TANAH URUGAN TANAH
Direktris
BETON 1:2:3 BETON 1:2:3

1 10 10 1
GATE VALVE GATE VALVE Di Gambar
PASIR DIPADATKAN PASIR DIPADATKAN

PIPA HDPE PIPA HDPE


Detail Bend 90° 20 20 20 20
MIRZA AZWARI, ST
Detail Bend 45° HDPE ∅100 mm HDPE ∅100 mm Draftman
not to scale
not to scale
Detail Gate Valve ∅100 mm Detail Gate Valve ∅150 mm
not to scale not to scale
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
DETAIL JUNCTION 13
JUNCTION 13
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PENGADAAN ACCESSORIES
PROGRAM/KEGIATAN
No. Node JUMLAH
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
1 Bend HDPE 90°-Ø 200 mm 1 KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

Bend 90° DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

SKEMA JUNCTION -13 ( J13) Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

JUNCTION 14 Di Setujui
Kabag Teknik

Detail Bend 90° HDPE ∅ 200 mm H. MUSTA'IN,S.Sos


not to scale NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
DETAIL JUNCTION 14 NIK 6309042

PENGADAAN ACCESSORIES JUDUL GAMBAR


Pengadaan dan Pemasangan Pipa
No. Node Jalan Basuki Rahmat, Jalan Kapar Hulu
JUMLAH dan Jalan Pasar Lama Kec. Tanjumg
1 Tee HDPE Ø 150x150x150 m 1 KONSULTAN
2 Stub Flange Ø 150 mm 2
3 Stub Flange Ø 100 mm 2
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
4 Gate Valve Ø 150 mm 1

5 Gate Valve Ø 100 mm 1 Penanggung Jawab

6 Coupling With Grip Ø 150 mm 1


7 Coupling With Grip Ø 100 mm 1
8 Ir. SITTI UMAYYAH
Bend HDPE 45°-Ø 150 mm 4 Direktris
9 Bend HDPE 45°-Ø 100 mm 4
Di Gambar
10 Reducer 150 -Ø 100 mm 1

MIRZA AZWARI, ST
Draftman

SKEMA JUNCTION -14 ( J14)


hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
DETAIL JUNCTION 12
B

B
to

to
ww

ww
om

om
k

k
lic

lic
JUNCTION 12
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
PENGADAAN ACCESSORIES

No. Node
JEMBATAN PIPA
JUMLAH
PROGRAM/KEGIATAN
1 Gate Valve Ø 150 mm 1
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
2 Stub Flange Ø 150 mm 2 KABUPATEN TABALONG

Washout PEKERJAAN
POTONGAN MELINTANG

3 Tee HDPE 150 x 150 x 150 mm 1 PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Bend HDPE 90 ° Ø 75 mm 1 KEC.MUARA HARUS DAN KEC. MUARA UYA
4 KABUPATEN TABALONG
Pipa HDPE Ø 150 mm

5 Butterfly Valve Ø 75 mm 1 DIAJUKAN SEBAGAI GAMBAR :


6 Stub Flange Ø 75 mm 2 POTONGAN MELINTANG

Gambar Rencana Kerja


7 Reducer 150 - Ø 75 mm 1
Mengetahui
Pejabat Pembuat Komitmen (PPK)

HDPE Ø 75 mm
SLAMET BUDI SANTOSA,S.Sos
TEE HDPE 150 X150X 75 NIK 6309023

Di Setujui
HDPE Ø 150 mm
Stub Flange HDPE
Kabag Teknik

40
60
Tee HDPE Tee HDPE H. MUSTA'IN,S.Sos
Stub Flange HDPE NIK 6309010
Stub Flange HDPE
Ø8 - 10
Ø8 - 10 Di Periksa
Kasi Perencaan
Tee HDPE
60
Tee HDPE

SKEMA JUNCTION -12 ( J12)

6
8
Stub Flange HDPE
SLAMET KARYADI
Stub Flange HDPE
NIK 6309042
Ø8 - 10 Ø8 - 10

TUTUP BETON
JUDUL GAMBAR
60
Detail Tee HDPE 150x150x75 40 Pengadaan dan Pemasangan Pipa
not to scale BEGEL Ø10 Jalan Basuki Rahmat, Jalan Kapar Hulu
8
LUBANG Ø13 dan Jalan Pasar Lama Kec. Tanjumg
5
KONSULTAN

VARIABLE
URUGAN TANAH
BETON 1:2:3

10 1 CV. P R I S M A J A S A
GATE VALVE Architect & engineering consultant
PASIR DIPADATKAN Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Bend 90°
PIPA HDPE
Penanggung Jawab
Stub Flange HDPE 20 20

Detail Gate Valve ∅150 mm Ir. SITTI UMAYYAH


Stub Flange HDPE Direktris
not to scale
Rubber Packing

Di Gambar

Detail Stub Flange ∅150 mm HDPE


not to scale
Detail Bend 90° HDPE ∅75 mm MIRZA AZWARI, ST
not to scale
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

HDPE Ø 200 mm
PROGRAM/KEGIATAN

40
60
40
60
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
TEE HDPE 200 X200X 200
KABUPATEN TABALONG

Stub Flange HDPE HDPE Ø 200 mm

Ø8 - 10 Ø8 - 10
PEKERJAAN
POTONGAN MELINTANG

Ø8 - 10
Ø8 - 10 PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
60 60 KEC.MUARA HARUS DAN KEC. MUARA UYA
Tee HDPE
Stub Flange HDPE
Tee HDPE
KABUPATEN TABALONG

6
Stub Flange HDPE

8
DIAJUKAN SEBAGAI GAMBAR :

8
Ø8 - 10 Ø8 - 10 Ø8 - 10 Ø8 - 10 POTONGAN MELINTANG

Tee HDPE
TUTUP BETON TUTUP BETON Gambar Rencana Kerja
Tee HDPE
60 60
Stub Flange HDPE 40 40 Mengetahui
BEGEL Ø10 BEGEL Ø10 Pejabat Pembuat Komitmen (PPK)
Stub Flange HDPE
LUBANG Ø13 LUBANG Ø13
8 8
5 5

VARIABLE
VARIABLE
URUGAN TANAH SLAMET BUDI SANTOSA,S.Sos
URUGAN TANAH
Detail Tee HDPE 200x200x200 BETON 1:2:3 BETON 1:2:3
NIK 6309023

not to scale
1 10 10 1 Di Setujui
Kabag Teknik
GATE VALVE GATE VALVE

PASIR DIPADATKAN PASIR DIPADATKAN

PIPA HDPE PIPA HDPE


H. MUSTA'IN,S.Sos
NIK 6309010
20 20 20 20

Di Periksa
Detail Gate Valve ∅ 150 mm Detail Butterfly Valve ∅50 mm Kasi Perencaan

not to scale not to scale

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
DETAIL JUNCTION 11
ww

ww
om

om
k

k
JUNCTION 11
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PENGADAAN ACCESSORIES

No. Node JUMLAH PROGRAM/KEGIATAN


1 Tee HDPE Ø 200x200x 200 m 1 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
2 Stub Flange Ø 200 mm 2
PEKERJAAN
3
Gate Valve Ø 200 mm
POTONGAN MELINTANG

1 PENGADAAN DAN PEMASANGAN PIPA HDPE


4 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Gate Valve Ø 150 mm 1 KEC.MUARA HARUS DAN KEC. MUARA UYA
Crosing jalan ( c4)
KABUPATEN TABALONG
5 Stub Flange Ø 150 mm 2
6 DIAJUKAN SEBAGAI GAMBAR :
Tee HDPE Ø 200x200x200 m 1 POTONGAN MELINTANG

7 Butterfly Valve Ø 50 mm 1 Gambar Rencana Kerja


8 Stub Flange Ø 50 mm 2 Mengetahui
Pejabat Pembuat Komitmen (PPK)
9 Giboult joint Ø 50 mm 1
10 Giboult joint Ø 50 mm 1
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
11 Reduser 200 x Ø 150 mm 1
Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos

SKEMA NIK 6309010

Di Periksa

JUNCTION -11 ( J11) Kasi Perencaan

Stub Flange HDPE

SLAMET KARYADI
NIK 6309042

Stub Flange HDPE


JUDUL GAMBAR
Rubber Packing
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu

40
60
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN
Ø8 - 10
Ø8 - 10
CV. P R I S M A J A S A
Detail Stub Flange Architect & engineering consultant
60 Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
∅150 mm HDPE

6
not to scale

8
Stub Flange HDPE Penanggung Jawab
Ø8 - 10 Ø8 - 10

TUTUP BETON

60
40
Stub Flange HDPE
BEGEL Ø10 Ir. SITTI UMAYYAH
Rubber Packing LUBANG Ø13 Direktris
8
Stub Flange HDPE
5

VARIABLE
URUGAN TANAH Di Gambar
BETON 1:2:3

10 1

Stub Flange HDPE Detail Stub GATE VALVE


PASIR DIPADATKAN
Flange
Rubber Packing

MIRZA AZWARI, ST
Draftman
∅50 mm HDPE PIPA HDPE

not to scale
20 20

Detail Stub Flange ∅200 mm HDPE Detail Giboult joint Ø 50 mm


not to scale not to scale Detail Gate Valve ∅ 200 mm
not to scale
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN

40
60
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
Stub Flange HDPE

Stub Flange HDPE

Ø8 - 10
PEKERJAAN
POTONGAN MELINTANG

Ø8 - 10
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Stub Flange HDPE 60 KEC.MUARA HARUS DAN KEC. MUARA UYA
Stub Flange HDPE Rubber Packing KABUPATEN TABALONG

6
Rubber Packing

8
DIAJUKAN SEBAGAI GAMBAR :
Ø8 - 10 Ø8 - 10 POTONGAN MELINTANG

TUTUP BETON Gambar Rencana Kerja


Detail Stub Flange ∅75 mm HDPE 60
Detail Stub Flange ∅150 mm HDPE not to scale 40 Mengetahui
BEGEL Ø10 Pejabat Pembuat Komitmen (PPK)
not to scale
LUBANG Ø13
8
5

VARIABLE
URUGAN TANAH SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
BETON 1:2:3

10 1 Di Setujui
Kabag Teknik
GATE VALVE
PASIR DIPADATKAN

PIPA HDPE
H. MUSTA'IN,S.Sos
NIK 6309010
20 20
Stub Flange HDPE

Di Periksa
Detail Butterfly Valve ∅75 mm Kasi Perencaan

not to scale

Stub Flange HDPE

Rubber Packing SLAMET KARYADI


NIK 6309042

JUDUL GAMBAR

Detail Flange Grip Ø 75 mm Pengadaan dan Pemasangan Pipa


Jalan Basuki Rahmat, Jalan Kapar Hulu
not to scale
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

JUNCTION 10

Y
U

U
B

B
to

to
DETAIL JUNCTION 10
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PENGADAAN ACCESSORIES

No. Node JUMLAH PROGRAM/KEGIATAN


1 Tee HDPE Ø 150x150x 150 m 1 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM

SKEMA 2 Stub Flange Ø 150 mm 2


KABUPATEN TABALONG

PEKERJAAN
3
JUNCTION -10 4
Stub Flange Ø 75 mm

Gate Valve Ø 150 mm


2
1
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
( J10) 5 Giboult joint Ø 75 mm 2 KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


6 Tee HDPE Ø 75x75x75 m 1
POTONGAN MELINTANG

7 Bend 45 ° Ø 75 mm 4 Gambar Rencana Kerja


8 Butterfly Valve Ø 75 mm 1
Mengetahui
Pejabat Pembuat Komitmen (PPK)
8 Reduser 150 x Ø 75 mm 1
Crosing jalan ( c4)
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023

Di Setujui
Kabag Teknik

40
60
H. MUSTA'IN,S.Sos
NIK 6309010
Bend 45°
Ø8 - 10
Di Periksa
Ø8 - 10
Kasi Perencaan

60

6
8
SLAMET KARYADI
NIK 6309042
Ø8 - 10 Ø8 - 10
JUDUL GAMBAR
HDPE Ø 75 mm

TUTUP BETON

60 Pengadaan dan Pemasangan Pipa


40 Jalan Basuki Rahmat, Jalan Kapar Hulu
BEGEL Ø10
dan Jalan Pasar Lama Kec. Tanjumg
Detail Bend 45° HDPE ∅75 mm 8
LUBANG Ø13

TEE HDPE 75 X75X 75 not to scale 5


KONSULTAN

VARIABLE
URUGAN TANAH

Stub Flange HDPE HDPE Ø 75 mm


10 1
BETON 1:2:3
CV. P R I S M A J A S A
Architect & engineering consultant
GATE VALVE Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
PASIR DIPADATKAN

PIPA HDPE
Penanggung Jawab

Tee HDPE Tee HDPE 20 20


Stub Flange HDPE
Stub Flange HDPE

Ir. SITTI UMAYYAH


Direktris
Detail Gate Valve ∅150 mm
Tee HDPE not to scale

Di Gambar
Tee HDPE

Stub Flange HDPE

Stub Flange HDPE


MIRZA AZWARI, ST
Draftman

Detail Tee HDPE 75x75x75


not to scale
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
DETAIL JUNCTION 09
ww

ww
om

om
k

k
JUNCTION 09
lic

lic
C

C
.c

.c
w

w
tr e tr re
ar
.

.
ac ac
k e r- s o ft w k e r- s o ft w a
PENGADAAN ACCESSORIES

HDPE Ø 75 mm
No. Node JUMLAH PROGRAM/KEGIATAN
1 Gate Valve Ø 150 mm 1
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
TEE HDPE 150 X150X 75 KABUPATEN TABALONG
2 Stub Flange Ø 150 mm 2
HDPE Ø 150 mm
PEKERJAAN
Stub Flange HDPE
Washout POTONGAN MELINTANG

1 PENGADAAN DAN PEMASANGAN PIPA HDPE


3 Tee HDPE 150 x 150 x 75 mm DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
Tee HDPE
Stub Flange HDPE
Tee HDPE
4 Bend HDPE 90 ° Ø 75 mm 1 KABUPATEN TABALONG
Stub Flange HDPE

5 Butterfly Valve Ø 75 mm DIAJUKAN SEBAGAI GAMBAR :


Pipa HDPE Ø 150 mm

1
6 Stub Flange Ø 75 mm
POTONGAN MELINTANG

Tee HDPE 2 Gambar Rencana Kerja


Tee HDPE

Stub Flange HDPE


Mengetahui
Pejabat Pembuat Komitmen (PPK)
Stub Flange HDPE

SLAMET BUDI SANTOSA,S.Sos


Detail Tee HDPE 150x150x75 NIK 6309023

not to scale Di Setujui


Kabag Teknik

40
60
JEMBATAN PIPA

H. MUSTA'IN,S.Sos
NIK 6309010

Bend 90° Ø8 - 10
Ø8 - 10
Di Periksa
Kasi Perencaan
60

6
8
SLAMET KARYADI
NIK 6309042

SKEMA JUNCTION -9 ( J9)


Ø8 - 10 Ø8 - 10

TUTUP BETON
JUDUL GAMBAR
60
40 Pengadaan dan Pemasangan Pipa
BEGEL Ø10
LUBANG Ø13
Jalan Basuki Rahmat, Jalan Kapar Hulu
8 dan Jalan Pasar Lama Kec. Tanjumg
5

VARIABLE
KONSULTAN
Detail Bend 90° HDPE ∅75 mm URUGAN TANAH
BETON 1:2:3
not to scale
10 1 CV. P R I S M A J A S A
GATE VALVE
Architect & engineering consultant
PASIR DIPADATKAN Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

PIPA HDPE
Penanggung Jawab
20 20

Detail Gate Valve ∅150 mm Ir. SITTI UMAYYAH


Stub Flange HDPE
not to scale Direktris

Di Gambar

Stub Flange HDPE

Rubber Packing

MIRZA AZWARI, ST
Draftman

Detail Stub Flange ∅150 mm HDPE


not to scale
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

HDPE Ø 150 mm
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

TEE HDPE 200 X200 X 150 PEKERJAAN

40
POTONGAN MELINTANG

60
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
HDPE Ø 200 mm
Stub Flange HDPE KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Ø8 - 10
Ø8 - 10
DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG

60 Gambar Rencana Kerja


Tee HDPE Tee HDPE

6
Stub Flange HDPE

8
Stub Flange HDPE Mengetahui
Pejabat Pembuat Komitmen (PPK)
Ø8 - 10 Ø8 - 10

TUTUP BETON

60 SLAMET BUDI SANTOSA,S.Sos


Tee HDPE
NIK 6309023
40
BEGEL Ø10
LUBANG Ø13 Di Setujui
Tee HDPE 8 Kabag Teknik
5

VARIABLE
Stub Flange HDPE
URUGAN TANAH
Stub Flange HDPE BETON 1:2:3
H. MUSTA'IN,S.Sos
10 1
NIK 6309010
GATE VALVE
PASIR DIPADATKAN
Di Periksa
Kasi Perencaan
PIPA HDPE

20 20
Detail Tee HDPE 200x200x150
not to scale SLAMET KARYADI
NIK 6309042
Detail Gate Valve ∅150 mm
not to scale JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

Bend 90° CV. P R I S M A J A S A


Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Stub Flange HDPE


Penanggung Jawab
Baut

Stub Flange HDPE

Rubber Packing Ir. SITTI UMAYYAH


Direktris

Di Gambar

Detail Stub Flange ∅ 150 mm HDPE Detail Bend 90° HDPE ∅ 200 mm
not to scale not to scale

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
DETAIL JUNCTION 07
.

.
ac ac
k e r- s o ft w a

JUNCTION 07 PENGADAAN ACCESSORIES


k e r- s o ft w a

PROGRAM/KEGIATAN
No. Node JUMLAH
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
1 Bend HDPE 90°-Ø 200 mm 1 KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Bend 90°
DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos

SKEMA JUNCTION -7 ( J7) NIK 6309023

Di Setujui
Kabag Teknik

Detail Bend 90° HDPE ∅ 200 mm


not to scale
H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

JUNCTION 08 DETAIL JUNCTION 08

PENGADAAN ACCESSORIES SLAMET KARYADI


NIK 6309042

No. Node JUMLAH JUDUL GAMBAR

1 Tee HDPE Ø 200x200x150 m Pengadaan dan Pemasangan Pipa


1 Jalan Basuki Rahmat, Jalan Kapar Hulu
Stub Flange Ø 150 mm dan Jalan Pasar Lama Kec. Tanjumg
2 2
3 KONSULTAN
Bend HDPE 90°-Ø 200 mm 1

Crosing jalan ( c3 ) 4 Gate Valve Ø 150 mm 1 CV. P R I S M A J A S A


Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Pipa HDPE Ø 200 mm

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman

SKEMA JUNCTION -8 ( J8)


hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
DETAIL JUNCTION 06
to

to
ww

ww
om

om
k

k
lic

lic
JUNCTION 06
C

C
.c

.c
w

w
tr e tr re
ar
.

.
ac ac
k e r- s o ft w k e r- s o ft w a
PENGADAAN ACCESSORIES

JEMBATAN PIPA
No. Node JUMLAH
PROGRAM/KEGIATAN
1 Stub Flange Ø 200 mm 4 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
2 Gate Valve Ø 200 mm 2 KABUPATEN TABALONG

Washout PEKERJAAN
POTONGAN MELINTANG

3 1 PENGADAAN DAN PEMASANGAN PIPA HDPE


Tee HDPE 200 x 200 x 200 mm DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
Pipa HDPE Ø 200 mm 4 Bend HDPE 90 ° Ø 200 mm 1 KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja

HDPE Ø 75 mm
Mengetahui
Pejabat Pembuat Komitmen (PPK)

TEE HDPE 200 X200X 75


SLAMET BUDI SANTOSA,S.Sos

40
60
NIK 6309023
Stub Flange HDPE HDPE Ø 200 mm

Di Setujui
Kabag Teknik

Ø8 - 10
Ø8 - 10
Tee HDPE Tee HDPE
Stub Flange HDPE
Stub Flange HDPE H. MUSTA'IN,S.Sos
60 NIK 6309010

6
8
Tee HDPE Di Periksa
Kasi Perencaan
Tee HDPE
Ø8 - 10 Ø8 - 10

SKEMA JUNCTION -6 ( J6)


TUTUP BETON
Stub Flange HDPE

Stub Flange HDPE 60


SLAMET KARYADI
40 NIK 6309042
BEGEL Ø10
LUBANG Ø13

Detail Tee HDPE 200x200x200


8
5 JUDUL GAMBAR

VARIABLE
not to scale
URUGAN TANAH Pengadaan dan Pemasangan Pipa
BETON 1:2:3 Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
10 1
GATE VALVE
KONSULTAN
PASIR DIPADATKAN
Bend 90°
PIPA HDPE CV. P R I S M A J A S A
20 20 Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Stub Flange HDPE

Detail Gate Valve ∅ 200 mm Penanggung Jawab


Baut
not to scale

Stub Flange HDPE

Rubber Packing Ir. SITTI UMAYYAH


Direktris

Di Gambar
Detail Stub Flange Detail Bend 90° HDPE ∅200 mm
∅200 mm HDPE not to scale

not to scale

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
HDPE Ø 150 mm
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
Bend 90°

40
60
TEE HDPE 150 X150X 150 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

Stub Flange HDPE HDPE Ø 150 mm


PEKERJAAN
Ø8 - 10
POTONGAN MELINTANG

Ø8 - 10 PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
60 KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :

6
Tee HDPE Tee HDPE

8
Stub Flange HDPE
Stub Flange HDPE POTONGAN MELINTANG

Gambar Rencana Kerja


Ø8 - 10 Ø8 - 10

TUTUP BETON

60
Mengetahui
Tee HDPE Detail Bend 90° HDPE ∅300 mm 40
BEGEL Ø10
Pejabat Pembuat Komitmen (PPK)

not to scale LUBANG Ø13


8
Tee HDPE 5

VARIABLE
SLAMET BUDI SANTOSA,S.Sos
URUGAN TANAH NIK 6309023
Stub Flange HDPE
BETON 1:2:3
Stub Flange HDPE Di Setujui
10 1 Kabag Teknik
GATE VALVE
PASIR DIPADATKAN
Stub Flange HDPE

Detail Tee HDPE 150x150x150 PIPA HDPE H. MUSTA'IN,S.Sos


not to scale
NIK 6309010
20 20
Di Periksa
Baut Kasi Perencaan

Detail Gate Valve ∅ 150 mm


not to scale
Stub Flange HDPE

Rubber Packing SLAMET KARYADI


NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Stub Flange HDPE
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
Detail Stub Flange
∅150 mm HDPE KONSULTAN
not to scale

CV. P R I S M A J A S A
Stub Flange HDPE

Rubber Packing

Architect & engineering consultant


Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Detail Flange Grip Ø 150 mm Penanggung Jawab


not to scale

Ir. SITTI UMAYYAH


Detail Dup Flange Ø 300 mm Direktris
not to scale

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
JUNCTION 04
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
DETAIL JUNCTION 04
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PENGADAAN ACCESSORIES

No. Node JUMLAH PROGRAM/KEGIATAN

1 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


Tee HDPE Ø 300x300x300 m 1 KABUPATEN TABALONG
2 Stub Flange Ø 300 mm 1
PEKERJAAN
3 Stub Flange Ø 150 mm 2 POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


1 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
4 REDUCER 300 ke 150 KEC.MUARA HARUS DAN KEC. MUARA UYA
1 KABUPATEN TABALONG
5 Dup Flange Ø 300 mm
2 DIAJUKAN SEBAGAI GAMBAR :
6 Flange Grip Ø 150 mm
POTONGAN MELINTANG

7 Tee HDPE Ø 150x150x150 m 1 Gambar Rencana Kerja


8 Bend HDPE 45° Ø 150 mm 4
Mengetahui
Pejabat Pembuat Komitmen (PPK)
9 Gate Valve Ø 150 mm 1

DETAIL JUNCTION 04.1 SLAMET BUDI SANTOSA,S.Sos


Crosing jalan ( c2) NIK 6309023

Di Setujui
PENGADAAN ACCESSORIES Kabag Teknik

No. Node JUMLAH


1 H. MUSTA'IN,S.Sos
Coupling Grif Ø 300 mm 1 NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
SKEMA JUNCTION -4 ( J4) Pengadaan dan Pemasangan Pipa

HDPE Ø 300 mm
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

TEE HDPE 300 X300X 300 CV. P R I S M A J A S A


Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Stub Flange HDPE HDPE Ø 300 mm

Penanggung Jawab

Tee HDPE Tee HDPE


Stub Flange HDPE
Stub Flange HDPE Ir. SITTI UMAYYAH
Stub Flange HDPE Direktris
Baut

Di Gambar

Stub Flange HDPE


Tee HDPE

Rubber Packing

Tee HDPE

MIRZA AZWARI, ST
Stub Flange HDPE Draftman
Stub Flange HDPE

Detail Stub Flange


∅300 mm HDPE Detail Reducer 300 ke 150 mm HDPE Detail Tee HDPE 300x300x300
not to scale
not to scale not to scale
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

40
60

40
60
PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ø8 - 10
Ø8 - 10 KEC.MUARA HARUS DAN KEC. MUARA UYA
Ø8 - 10
Ø8 - 10 KABUPATEN TABALONG

60 60 DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

6
Gambar Rencana Kerja

6
8

8
Ø8 - 10 Ø8 - 10
Ø8 - 10 Ø8 - 10
Mengetahui
TUTUP BETON
TUTUP BETON Pejabat Pembuat Komitmen (PPK)
60 60
40 40
BEGEL Ø10
BEGEL Ø10
LUBANG Ø13
LUBANG Ø13
SLAMET BUDI SANTOSA,S.Sos
8
8 NIK 6309023
5
5

VARIABLE

VARIABLE
Di Setujui
URUGAN TANAH
URUGAN TANAH Kabag Teknik
BETON 1:2:3
BETON 1:2:3
1 10
10 1
GATE VALVE
GATE VALVE
PASIR DIPADATKAN H. MUSTA'IN,S.Sos
PASIR DIPADATKAN
NIK 6309010

PIPA HDPE
PIPA HDPE
Di Periksa
20 20 Kasi Perencaan
20 20

Detail Gate Valve ∅ 300 mm Detail Gate Valve ∅ 200 mm SLAMET KARYADI
not to scale NIK 6309042
not to scale

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab

Ir. SITTI UMAYYAH


Direktris

Di Gambar

MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
JUNCTION 03
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a
DETAIL JUNCTION 03

PENGADAAN ACCESSORIES
PROGRAM/KEGIATAN
No. Node JUMLAH PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1 Tee HDPE Ø 300x300x200 m 1
2 Stub Flange Ø 300 mm PEKERJAAN
2 POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


3 Gate Valve Ø 300 mm 1 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
4 Stub Flange Ø 200 mm 2 KABUPATEN TABALONG

5 Gate Valve Ø 200 mm 1 DIAJUKAN SEBAGAI GAMBAR :


pipa GI Ø 400 mm POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Crosing jalan ( c1)

Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

HDPE Ø 200 mm
SKEMA JUNCTION -3 ( J3) SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR

TEE HDPE 300 X300X 200


Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
HDPE Ø 300 mm
Stub Flange HDPE
KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Stub Flange HDPE Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Stub Flange HDPE
Tee HDPE Tee HDPE
Baut
Stub Flange HDPE
Baut Stub Flange HDPE Penanggung Jawab

Stub Flange HDPE


Stub Flange HDPE
Rubber Packing
Rubber Packing
Tee HDPE
Ir. SITTI UMAYYAH
Direktris
Tee HDPE

Detail Stub Flange Detail Stub Flange Stub Flange HDPE Di Gambar
∅300 mm HDPE ∅200 mm HDPE Stub Flange HDPE
not to scale
not to scale

MIRZA AZWARI, ST
Detail Tee HDPE 300x300x200 Draftman
not to scale
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
JUNCTION 02 DETAIL JUNCTION 02
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PENGADAAN ACCESSORIES

No. Node PROGRAM/KEGIATAN


JUMLAH

Pipa HDPE Ø 300 mm


PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
1 Bend 45° Ø 300 mm 4 KABUPATEN TABALONG

2 Stub Flange Ø 300 mm 2


PEKERJAAN
1
POTONGAN MELINTANG

3 Gate Valve Ø 300 mm PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pipa HDPE Ø 300 mm

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

SKEMA JUNCTION -2 ( J2)


H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

40
60
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
Ø8 - 10 dan Jalan Pasar Lama Kec. Tanjumg
Ø8 - 10

Bend 90° KONSULTAN


60
Stub Flange HDPE
CV. P R I S M A J A S A

6
8
Baut Architect & engineering consultant
Ø8 - 10 Ø8 - 10 Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

TUTUP BETON

Stub Flange HDPE


60 Penanggung Jawab
Rubber Packing
40
BEGEL Ø10
LUBANG Ø13
8
5

VARIABLE
URUGAN TANAH Ir. SITTI UMAYYAH
BETON 1:2:3 Direktris

Detail Stub Flange HDPE ∅ 300 mm 10 1


Detail Bend 90° HDPE ∅300 mm not to scale GATE VALVE
Di Gambar
not to scale PASIR DIPADATKAN

PIPA HDPE

20 20
MIRZA AZWARI, ST
Draftman

Detail Gate Valve ∅ 300 mm


not to scale
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
JUNCTION 01
to

to
ww

ww
om

om
k

k
lic

lic
DETAIL JUNCTION 01
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PENGADAAN ACCESSORIES

Pipa HDPE Ø 300 mm


No. Node JUMLAH PROGRAM/KEGIATAN

Tee HDPE Ø 400x400x400 m PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


1 1 KABUPATEN TABALONG
2 Coupling Grip Ø 400 mm 3
PEKERJAAN
3 Stub Flange Ø 300 mm 2
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


REDUCER 400 ke 300 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
4 1 KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Pipa HDPE Ø 400 mm Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

HDPE Ø 400 mm
SKEMA H. MUSTA'IN,S.Sos
NIK 6309010

JUNCTION -1 TEE HDPE 400 X400X 400 Di Periksa


Kasi Perencaan

( J1) Stub Flange HDPE HDPE Ø 400 mm

SLAMET KARYADI
NIK 6309042

Detail Coupling Grip Ø 400 mm JUDUL GAMBAR


not to scale

Tee HDPE Tee HDPE Pengadaan dan Pemasangan Pipa


Stub Flange HDPE Jalan Basuki Rahmat, Jalan Kapar Hulu
Stub Flange HDPE dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

Tee HDPE
CV. P R I S M A J A S A
Architect & engineering consultant
Tee HDPE Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Stub Flange HDPE


Penanggung Jawab
Stub Flange HDPE

Stub Flange HDPE

Baut

Detail Tee HDPE 400x400x400 Ir. SITTI UMAYYAH


Direktris
not to scale
Stub Flange HDPE

Rubber Packing

Di Gambar

Detail Reducer 400 ke 300 mm HDPE


Detail Stub Flange HDPE ∅ 300 mm not to scale
MIRZA AZWARI, ST
not to scale
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
U
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

KETERANGAN : Penanggung Jawab

Pipa HDPE Ø 400 mm / (Eksisting)


Pipa HDPE Ø 300 mm ( P= 1500m) Ir. SITTI UMAYYAH
Direktris
Pipa HDPE Ø 200 mm (P = 1400m)
Pipa HDPE Ø 150 mm ( P = 1255m) Di Gambar

MIRZA AZWARI, ST
Draftman

DENAH PIPA PERJUNCTION


hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
U
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
KETERANGAN : Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab
Pipa HDPE Ø 400 mm / (Eksisting)
Pipa HDPE Ø 300 mm ( P= 1500m)

Pipa HDPE Ø 200 mm (P = 1400m) Ir. SITTI UMAYYAH


Direktris
Pipa HDPE Ø 150 mm ( P = 1255m)
Di Gambar

DENAH PIPA PER- STA MIRZA AZWARI, ST


Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
U
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PEKERJAAN
POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG

DIAJUKAN SEBAGAI GAMBAR :


POTONGAN MELINTANG

Gambar Rencana Kerja


Mengetahui
Pejabat Pembuat Komitmen (PPK)

SLAMET BUDI SANTOSA,S.Sos


NIK 6309023

Di Setujui
Kabag Teknik

H. MUSTA'IN,S.Sos
NIK 6309010

Di Periksa
Kasi Perencaan

SLAMET KARYADI
NIK 6309042

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg

KONSULTAN

CV. P R I S M A J A S A
Architect & engineering consultant
KETERANGAN : Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Penanggung Jawab
Pipa HDPE Ø 400 mm / (Eksisting)
Pipa HDPE Ø 300 mm ( P= 1500m)

Pipa HDPE Ø 200 mm (P = 1400m) Ir. SITTI UMAYYAH


Direktris
Pipa HDPE Ø 150 mm ( P = 1255m)
Di Gambar

LAYOUT PLAN PIPA MIRZA AZWARI, ST


Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
U
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

UTARA

PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG

PROVINSI KALIMANTAN TIMUR PEKERJAAN


POTONGAN MELINTANG

PENGADAAN DAN PEMASANGAN PIPA HDPE


DI KEC. TANJUNG , KEC. MURUNG PUDAK,

u
Ay
KEC.MUARA HARUS DAN KEC. MUARA UYA

S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG

b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
AwayanS S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik

Te
BARABAI Birayang gala Tanjungsamalantakan

l
Tg. Pamukan

.P
Pasungkan Labuhannamas Utara i ng

am
ar
a a i antu
Kuripan Negara S. Bara b G. Besar S. C

uk
eg Pagat

a
N

n
.
Labuhannamas
S Selatan Haruyan Gunungbatu Besar
KANDANGAN Ankinang

S
TU
Telagalangsat
Simpur H. MUSTA'IN,S.Sos

RA
Padangbatung NIK 6309010

ME
Margasari Sungairaya Pudi

G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan

PE
MARABAHAN Ta Kasi Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat n

rito
Anjirmuara k ka
S. Alala Ria
m

Ba
S. T
am S. Simpangampat SLAMET KARYADI

S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU NIK 6309042
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR

S.
Tabunganen Ulin S. Batulicin Sungaibali

R
MARTAPURA M

ia
em Pengadaan dan Pemasangan Pipa

m
Karangintan

ka
Aluhaluh baSUNGAI PERAK
BANJARBARU Jalan Basuki Rahmat, Jalan Kapar Hulu

na
Lasung lap

n
i
Cempaka W. Riamkanan Sejaka dan Jalan Pasar Lama Kec. Tanjumg

Sel.

AR
Pantaulayung
Kurau

Seb
Tanjungkurong

t
Pagatan

au
Batibati
KONSULTAN

AS
1150

l. L

uku
Sabamban

AK
Se
G. Aurbunak
Tanjungseloka

TM
CV. P R I S M A J A S A
Satui
PELAIHARI

LA
Kintap Karambu
Architect & engineering consultant

SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar

Kota Kabupaten Tg. Selatan


G = Gunung
L A U T
Kota Kecamatan
P = Pulau
Batas Provinsi Ir. SITTI UMAYYAH
J A W A Direktris
Batas Kabupaten
Tel = Teluk
Batas Kecamatan

Jalan Provinsi Peg = Pegunungan Di Gambar

Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD

PD
or

or
!

!
W

W
O

O
N

N
Y

Y
U

U
B

B
to

to
ww

ww
om

om
k

k
lic

lic
C

C
.c

.c
w

w
tr re tr re
.

.
ac ac
k e r- s o ft w a k e r- s o ft w a

PROGRAM/KEGIATAN

PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KABUPATEN TABALONG

PEKERJAAN

PENGADAAN DAN PEMASANGAN PIPA HDPE

JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama
Kec. Tanjung

CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin

Anda mungkin juga menyukai