XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
LOKASI
KECAMATAN TANJUNG , KECAMATAN MURUNG PUDAK,
KECAMATAN MUARA HARUS DAN KECAMATAN MUARA UYA
KABUPATEN TABALONG
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re U tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
yu
KEC.MUARA HARUS DAN KEC. MUARA UYA
A
S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG
b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
Awayan S S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik
Te
BARABAI Birayang gala Tanjungsamalantakan
l.
Tg. Pamukan
Pa
Pasungkan Labuhannamas Utara i ng
ar
a i antu
m
b a S. C
Kuripan Negara S. Bara G. Besar
uk
eg Pagat
an
. N
Labuhannamas Selatan Haruyan Gunungbatu Besar
S
KANDANGAN Ankinang
US
Telagalangsat
Simpur
AT
H. MUSTA'IN,S.Sos
Padangbatung NIK 6309010
ER
Margasari Sungairaya Pudi
M
G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan
PE
MARABAHAN Ta Kasi Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat an
rito
Anjirmuara S. Alala
k mk
Ria
Ba
S. T
am S. Simpangampat SLAMET KARYADI
S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU NIK 6309042
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR
S.
Tabunganen Ulin S. Batulicin Sungaibali
R
MARTAPURA M
ia
em Pengadaan dan Pemasangan Pipa
m
Karangintan
ka
Aluhaluh baSUNGAI PERAK
BANJARBARU Komplek Pondok Karet Permai Jalan Maluyung
na
Lasung lap
n
i
Cempaka W. Riamkanan Sejaka Kec. Murung Pudak
Sel.
R
Pantaulayung
SA
Kurau
Seb
Tanjungkurong
t
Pagatan
au
Batibati
1150 KONSULTAN
l. L
KA
uku
Sabamban
Se
MA
G. Aurbunak
Tanjungseloka
CV. P R I S M A J A S A
Satui
AT
PELAIHARI
Kintap Karambu
L
Architect & engineering consultant
SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar
Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
Skala 1: 600
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Ru
as
Ja Di Periksa
lan
-1 Kasi Perencaan
Ru 4
Ru as
asJ Ja
ala lan
n- -1
20 3
Ru
as SLAMET KARYADI
-8
Ja NIK 6309042
lan
an
Ru -1
-2
al
-7
JUDUL GAMBAR
sJ
as 2
an
an
-6
a
Ja
Ru
al
al
lan
sJ
-3
sJ
la
a
-1
Ja
a
Pengadaan dan Pemasangan Pipa
Ru
n
Ru
Ru 1
la
as
Ja
as
Ru
Komplek Pondok Karet Permai Jalan Maluyung
Ru
Ja
as
Ru la
as
Ru
as n-
J
Ru
al
Ja 10
an
lan as
Ja
KONSULTAN
-1
-4 lan-
9
CV. P R I S M A J A S A
Architect & engineering consultant
-2
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
n
la
-3
Ja
as
n
la
Ru
Ja
Penanggung Jawab
as
Ru
Ru
as
Ja
5
Ru lan
-1
6
la
Ja Direktris
Ja
lan
as
-1
Ru
Ru 7
Ru as
a sJ Jala
ala Ru n Di Gambar
n- as -1
5 Ja 8
lan
-1
9
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
0 ± 000
0±000
0+
0+ 0+ 40
20 41 2
0 2 SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
Di Setujui
Kabag Teknik
Ru
as Ru
Ja as
4
la Ja
06
n- lan
0+
7
20
03
-1
0+
0+ 0+ 4
05 06 Ru
3 0
as H. MUSTA'IN,S.Sos
-8
NIK 6309010
4
Ja
07
an
lan
0+
l
-2
Ja
-7
-1
Di Periksa
as
3
an
an
-6
Ru
al
Kasi Perencaan
al
an
sJ
sJ
al
a
a
Ru
Ru
Ru
Ru
sJ
as
a
a
Ru
sJ
0
Ru
J ala
09
ala
as
0+
n- Ru n-
Ja
-3
as 12
l
4
an
an
Ru ala
2
-1
08
al
as n SLAMET KARYADI
0+
J
Ja -1
as
0+ Ru
8
1
05
lan NIK 6309042
Ru
18 as
0+
5
Ja -1
9
03
lan 0 JUDUL GAMBAR
0+
0+ -9
4
15
10
0
0+
Pengadaan dan Pemasangan Pipa
-2
Komplek Pondok Karet Permai Jalan Maluyung
n
Kec. Murung Pudak
la
-3
Ja
0
as
an
17
Ru
al
0+
0+
KONSULTAN
J
14
as
0
Ru
CV. P R I S M A J A S A
5
-1
n
0 + 484
Architect & engineering consultant
la
Ru
Ja
as
7
as
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
05
Ja
Ru
0+
0 + 498 Ru la
as n
-1
1
05
Ja 6
lan
0+
Penanggung Jawab
-1
Ru Ru 7
5
as as
05
Ru
Ja Ja
0+
as
lan Ru lan
Ja
-5 as -
4
18
l
04
Ja
an
lan
0+
-1
-1
9 Ir. SITTI UMAYYAH
Direktris
8
09
0+
Di Gambar
0 + 635
MIRZA AZWARI, ST
Draftman
Skala 1: 500
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
0+ H. MUSTA'IN,S.Sos
0+
0+ 41 40
2 NIK 6309010
20 2
0 + 150 0
0+ Di Periksa
37 Ru Kasi Perencaan
2 as
J ala
n-
14
0+ Ru
33 as
7 Ja
Ru lan
as -1
4
Ja
06
lan 3
0+
SLAMET KARYADI
7
0+
03
0+ - 20 30 NIK 6309042
0+
0 + 214 05 0+ 2
3 06 Ru
0 as
Ja
la JUDUL GAMBAR
8
n-
4
n-
-6
07
0+ 12
ala
lan
0+
26 Ru
sJ
Ja
6
-2
as Pengadaan dan Pemasangan Pipa
-7
a
as
Ru
J
n
ala
Ru
n
la
ala
Komplek Pondok Karet Permai Jalan Maluyung
Ja
n-
as
J
11
as
0+
Ru
Ru Kec. Murung Pudak
Ru
Ru 23 as
1.5
as Ja
lan
Ja
0
09
lan
Ru
- 10
KONSULTAN
0+
as
-4 Ru
5
4.
a
Ja
03
sJ
la
ala
-3
0+
n
2
n-
an
08
-1
al
0+
CV. P R I S M A J A S A
sJ
0+
8
0
18
05
Ru
07
5
0+
0+
9
03
Architect & engineering consultant
0+
0+
4
15 Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
10
0
0+
0+
9 .5
14
13
-2 0
Penanggung Jawab
0+
lan
Ja
0
17
as
0+
Ru
-3
lan
Ja
Ru
as
as
Ru
Ja
la
n
-1
0 + 484 Ru
as
6 Ir. SITTI UMAYYAH
Ja
la Direktris
n
7
-1
05
5
0 + 498
-1
0+
Ru
n
9
la
as
02
Ja
Ja 1
0+
05
as
lan
Di Gambar
Ru
0+
Ru -1
as 8
Ja
lan
5
0 + 553 -1
05
4
05
9
0+
0+
Ru
as
J
4
al
04
an
0+
-5
MIRZA AZWARI, ST
8
09
Draftman
0+
0 + 635
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
tr re UTARA tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
0 ± 000
0±000
PEKERJAAN
POTONGAN MELINTANG
Ru
J.1
as
Ja
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0 ± 000
0±000
Ø8 - 10 lan
- 14
Ru Ru
Ø8 - 10 as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
0 + 214
20
Ru
as
3
KABUPATEN TABALONG
-8
J ala
n
n-
ala
-2
-7
12
J
Ru
n
as
DIAJUKAN SEBAGAI GAMBAR :
-6
n
la
as
Ru
la
Ja
Ja
n
Ja
-3
la
as
lan
as
Ja
Ru
n
Ru -1
Ru
la
as
Ru as 1
Ja
Ru
as
Ru
Ja
as
Ja lan
as
Ru
lan Ru
Ja
-4 -1
as
la
0
n
Ja
-1
lan POTONGAN MELINTANG
-2
n
ala
-3
sJ
Mengetahui
n
a
ala
Ru
a sJ
Pejabat Pembuat Komitmen (PPK)
Ru
Ru
as
Ja
la
BEGEL Ø12 0 + 484 Ru n
-1
as 6
LUBANG Ø13 Ja
5
lan
-1
-1
n
8 0 + 498
la
Ru 7
Ja
as
as
5 Ja
Ru
lan
Ru -
VARIABLE
as 18
Ru Jala
0 + 553 as n
Ja -1
lan 9
URUGAN TANAH -5
SLAMET BUDI SANTOSA,S.Sos
Ruas
BETON 1:2:3
NIK 6309023
Ja
10 1
lan -
GATE VALVE Di Setujui
1
Kabag Teknik
0 + 635
PASIR DIPADATKAN
PIPA HDPE
0 + 145
0
J.2
0 + 15 H. MUSTA'IN,S.Sos
NIK 6309010
KETERANGAN VOL
Rubber Packing
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Detail Reducer
HDPE Ø 100 mm HDFE 100 mm - 50 mm
Baut 58"
Not to scale Ir. SITTI UMAYYAH
Detail Tee HDPE Direktris
Not to scale
RUAS JALAN - 1
Stub Flange Ø 100 mm HDPE STA 0+000 s/d STA 0 + 484
Rubber Packing
Di Gambar
Aspal Penetrasi
Sirtu 30 cm
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a UTARA
k e r- s o ft w a
UTARA
Ru
Handel
as
Ja
la
PROGRAM/KEGIATAN
n
-1
0 ± 000
0±000
Ru
0 + 484 as
Ru
Ja
lan
- 14
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ru
as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
0 + 498
20 3
KABUPATEN TABALONG
Ru
0 + 214 Ru
Butterfly Valve Ø 50 mm as
as
-8
J ala
n
n-
ala
Ja
-2
-7
12
J
Ru
la
n
as
DIAJUKAN SEBAGAI GAMBAR :
-6
n
la
Not to Scale as
Ru
la
Ja
Ja
n
Ja
-3
la
-1
as
lan
as
Ja
Ru
n
Ru -1
Ru
la
as
Ru as 1
Ja
Ru
as
Ru
Ja
as
Ja lan
as
Ru
lan Ru
Ja
-4 -1
as
la
0
n
Ja
-1
lan POTONGAN MELINTANG
-2
n
ala
-3
sJ
Mengetahui
n
a
ala
Ru
a sJ
Pejabat Pembuat Komitmen (PPK)
Ru
Ru
as
Ja
la
Ru n
0 + 484 -1
as 6
Ja
5
lan
-1
-1
n
0 + 498
la
Ru 7
Ja
as
as
Ja
Ru
lan
Ru -
as 18
Ru Jala
0 + 553 as n
Ja -1
lan 9
-5
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
Di Setujui
Kabag Teknik
0 + 635
Ø8 - 10
Ø8 - 10
H. MUSTA'IN,S.Sos
NIK 6309010
Baut 58" Baut 58"
Di Periksa
Kasi Perencaan
Ø8 - 10 Ø8 - 10
Stub Flange Ø 100 mm HDPE Stub Flange Ø 50 mm HDPE
TUTUP BETON
Rubber Packing Rubber Packing KETERANGAN VOL
Gate Valve Ø 100 mm 1 Bh
8
5
BEGEL Ø12
LUBANG Ø13
J.3 Tee 100 x 100 x 100 mm
Butterfly Valve Ø 50 mm
1
1
Bh
Bh
SLAMET KARYADI
NIK 6309042
VARIABLE
CV. P R I S M A J A S A
Detail Gate Valve 100 mm Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
HDPE Ø 100 mm
Not to Scale
Penanggung Jawab
MIRZA AZWARI, ST
Draftman
Urugan Pasir 30 cm
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac UTARA ac
k e r- s o ft w a k e r- s o ft w a
UTARA
Ru
as
Ja
anl
-1
PROGRAM/KEGIATAN
Air Vent
Beton Penahan Pipa
Pipa 3 Layer Ø 100 mm PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Bend 45° GI Ø 100 mm KABUPATEN TABALONG
Ru
0 + 498 KABUPATEN TABALONG
as
Ja
la
n
Pipa HDPE Ø 100 mm
-1
Stub Flange HDPE Ø 100 mm DIAJUKAN SEBAGAI GAMBAR :
Thrust Block Thrust Block
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
Flange GI Ø 100 mm 18 Bh
SLAMET KARYADI
NIK 6309042
Bend 45 °
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
Detail Bend GI 45°
Kec. Murung Pudak
Not to Scale
Baut 58"
Baut 58"
KONSULTAN
CV. P R I S M A J A S A
Flange GI Ø 100 mm
Stub Flange Ø 100 mm HDPE
Rubber Packing
Rubber Packing
Penanggung Jawab
Flange GI Ø 100 mm
Stub Flange Ø 100 mm HDPE
Rubber Packing
Rubber Packing
Detail Stub Flange Ø 100 mm HDPE Detail Flange Ø GI 100 mm Ir. SITTI UMAYYAH
Not to Scale
Not to Scale Direktris
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
tr re
UTARA
tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
-2
n
J.4
la
Ja
as
Ru
PROGRAM/KEGIATAN
0 ± 000
0±000
Ru
0 + 150
as
Ru
as
Ja
Ja
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
la
lan
n
- 14
-1
Ru Ru
Ø8 - 10
as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
Ø8 - 10
0 + 214
20
Ru
as
3
KABUPATEN TABALONG
-8
J ala
n
n-
ala
-2
-7
12
J
Ru
n
as
DIAJUKAN SEBAGAI GAMBAR :
-6
n
la
as
Ru
la
Ja
Ja
n
Ja
-3
la
as
lan
as
Ja
Ru
n
Ru -1
Ru
la
as
Ru as 1
Ja
Ru
as
Ru
Ja
as
Ja lan
as
Ru
lan Ru
Ja
-4 -1
as
la
0
n
Ja
-1
lan POTONGAN MELINTANG
Ø8 - 10 Ø8 - 10
-2
n
ala
-3
sJ
Mengetahui
n
a
ala
Ru
TUTUP BETON
a sJ
Pejabat Pembuat Komitmen (PPK)
Ru
Ru
as
Ja
la
Ru n
0 + 484 -1
as 6
Ja
5
lan
-1
-1
n
0 + 498
la
Ru 7
BEGEL Ø12
Ja
as
as
Ja
Ru
lan
LUBANG Ø13 Ru
as - 18
Ru J
8 0 + 553 as ala
n
Ja -1
5 lan
-5
9
10 1
BETON 1:2:3
J.5 0 + 635 0 + 635
Di Setujui
Kabag Teknik
GATE VALVE
PASIR DIPADATKAN
PIPA HDPE
Baut 58"
H. MUSTA'IN,S.Sos
NIK 6309010
Stub Flange Ø 75 mm HDPE
Rubber Packing Di Periksa
Kasi Perencaan
Detail Gate Valve Ø 75 mm
Not to Scale
KETERANGAN VOL
Tee 100 x 100 x 100 mm 1 Bh
Stub Flange Ø 75 mm HDPE
Rubber Packing
J.4 Stub Flange Ø 75 mm
Gate Valve Ø 75 mm 1
2 Bh
Bh
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Reduser 100 mm x 75 mm 1 Bh
Stub Flange Ø 100 mm 4 Bh Pengadaan dan Pemasangan Pipa
Detail Stub Flange Ø 75 mm HDPE
Komplek Pondok Karet Permai Jalan Maluyung
Not to Scale Kec. Murung Pudak
HDPE Ø 100 mm
Ø8 - 10 Baut 58"
KETERANGAN VOL KONSULTAN
Ø8 - 10 Gate Valve Ø 100 mm 1 Bh
Stub Flange Ø 100 mm HDPE
Rubber Packing
J.5 Stub Flange Ø 100 mm 2 Bh CV. P R I S M A J A S A
TEE HDPE 100 X100 X 100 Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Ø8 - 10 Ø8 - 10 HDPE Ø 100 mm
TUTUP BETON
Penanggung Jawab
Detail Tee HDPE
Stub Flange Ø 100 mm HDPE
BEGEL Ø12 Not to scale Rubber Packing
LUBANG Ø13
8
5
VARIABLE
MIRZA AZWARI, ST
Urugan Pasir 30 cm Draftman
Detail Gate Valve Ø 100 mm
Not to Scale Detail Reducer Pipa HDPE Ø 100 mm
HDFE 100 mm - 75 mm Profil Melintang Pipa
Not to scale Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a
UTARA
Ru
as
Ja
PROGRAM/KEGIATAN
lan
-4
J.7 0 ± 000
0±000
0+
17
Ru
a sJ
ala
PEKERJAAN
9 n-
POTONGAN MELINTANG
4
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 + 150
Ru
as
Ru
Ja
lan
- 14
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ru
as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
0 + 214
20
Ru
as
3
KABUPATEN TABALONG
-8
J ala
n
n-
ala
-2
-7
12
J
Ru
n
as
DIAJUKAN SEBAGAI GAMBAR :
-6
n
la
as
Ru
la
Ja
Ja
n
Ja
-3
la
as
lan
as
Ja
Ru
n
Ru -1
Ru
la
as
Ru as 1
Ja
Ru
as
Ru
Ja
as
Ja lan
as
Ru
lan Ru
Ja
-4 -1
as
la
0
n
Ja
-1
lan POTONGAN MELINTANG
-2
Ø8 - 10
n
la
Ja
Ø8 - 10
as
-2
n
Ru
ala
-3
sJ
Mengetahui
n
a
ala
Ru
a sJ
Pejabat Pembuat Komitmen (PPK)
Ru
Ru
as
Ja
la
Ru n
0 + 484 -1
as 6
Ja
5
lan
-1
-1
n
0 + 498
la
Ru 7
Ja
as
as
Ja
Ru
lan
Ru -
as 18
Ru Jala
Ø8 - 10 Ø8 - 10 as
J.6
Ja n -1
lan 9
-5
TUTUP BETON SLAMET BUDI SANTOSA,S.Sos
0+ NIK 6309023
03
8.
5
Di Setujui
BEGEL Ø12 0+
0 + 635
Kabag Teknik
LUBANG Ø13 03
8 3.5
5
Ru
VARIABLE
as
Ja
URUGAN TANAH lan
-5
BETON 1:2:3
Ru
as
Ja
10 1 H. MUSTA'IN,S.Sos
la
n
NIK 6309010
-1
GATE VALVE
PASIR DIPADATKAN
Di Periksa
Kasi Perencaan
PIPA HDPE
KETERANGAN VOL
Tee 75 x 75 x 75 mm 1 Bh
Detail Gate Valve Ø 75 mm
Not to Scale
J.6 SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
KETERANGAN VOL Kec. Murung Pudak
HDPE Ø 75 mm
Baut 58"
Gate Valve Ø 75 mm 2 Bh
KONSULTAN
Stub Flange Ø 75 mm HDPE
Rubber Packing
J.7 Tee 75 x 75 x 75 mm
Stub Flange Ø 75 mm
2
4
Bh
Bh
TEE HDPE 75 X75 X 75
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
HDPE Ø 75 mm
Not to scale
RUAS JALAN - 1
Di Gambar
STA 0+000 s/d STA 0 + 185
Perkerasan sirtu
Sirtu 30 cm
MIRZA AZWARI, ST
Draftman
Pipa HDPE Ø 75 mm
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
UTARA
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac UTARA
ac
k e r- s o ft w a k e r- s o ft w a
UTARA J.8
PROGRAM/KEGIATAN
0 ± 000
0±000
Handel 0+
41 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
2
KABUPATEN TABALONG
Baut 78 ''
PEKERJAAN
POTONGAN MELINTANG
0+
-8
Ja
lan
n
la
-2
-1
Ja
-7
Ru 2
as
n
-6
n
as
la
la
Ru
Ja
J
n
Ja
DIAJUKAN SEBAGAI GAMBAR :
ala
-3
la
as
as
Ja
n
Ru
n
Ru
Ru
-1
la
as
Ru as 1
Ja
Ru
a
Ru
sJ J
as
ala ala
-2
as
Ru
n- Ru n-
Ja
as 10
la
4
n
Ja
-1
lan
la
-9
Butterfly Valve Ø 75 mm POTONGAN MELINTANG
Ja
0+
as
18
0+ 5
Not to Scale
Ru
17
9
-2
n
la
-3
Ja
as
n
ala
Ru
Mengetahui
a sJ
Ru
Ru
Pejabat Pembuat Komitmen (PPK)
as
Ja
la
Ru
n
as
-1
Ja
6
5
lan
-1
-1
n
0
la
Ru
+
0 7
18
Ja
+ as
5
18
as
5 J ala
Ru
Ru n-
0
+
as 18
18
Ru Ja
5
as lan
Ja -
lan 19
-5
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Stub Flange Ø 75 mm HDPE Kasi Perencaan
Rubber Packing
KETERANGAN VOL
Stub Flange Ø 75 mm 2 Bh
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
RUAS JALAN - 2
STA 0+185 s/d STA 0 + 412
Ir. SITTI UMAYYAH
Cor beton tebal 20 cm Direktris
Jalan Cor beton
Sirtu tebal 10 cm
Di Gambar
Urugan Pasir 30 cm
Pipa HDPE Ø 75 mm
MIRZA AZWARI, ST
Draftman
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a
Ru
as
Jala
n-
4
UTARA
J.10
0+
15
0
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
-3
PENGADAAN DAN PEMASANGAN PIPA HDPE
n
la
0± Ru
as
Ja
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
40 Ja
0± 2 lan
as
37
2 -
Ru
0± Ru 14
Ru
as
Jala
n-
0±
33
36
8 as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
20 7
0± 3
33
3 Ru
Ø8 - 10 0± as
-8
30 J
2 ala
n
0± n-
ala
-2
29
-7
Ø8 - 10 12
J
8 Ru
n
as
DIAJUKAN SEBAGAI GAMBAR :
-6
n
la
as
Ru
la
Ja
0± Ja
-2
n
Ja
-3
la
as
26 lan
as
Ja
6
Ru
n
0± Ru -1
Ru
n
la
as
Ru 26 as 1
Ja
ala
Ru
as 2
Ru
Ja
as
Ja lan
as
0±
Ru
lan
sJ
Ru 23
Ja
-4 1.5 -1
as
la
0+ 0
n
Ja
Ru
22
-1
7.5 lan POTONGAN MELINTANG
0+
15
0
-2
0+
n
ala
14
-3
6
sJ
Mengetahui
n
Ø8 - 10 Ø8 - 10
ala
Ru
a sJ
Pejabat Pembuat Komitmen (PPK)
Ru
Ru
TUTUP BETON as
Ja
la
Ru n
-1
Ru as 6
J.9
Ja
as
5
lan
-1
-1
Ja
n
la
Ru 7
la
Ja
as
as
n Ja
Ru
lan
-5 Ru -
0
BEGEL Ø12 as 18
+
0±
Ru
00
Jala
5
00
as n
0
LUBANG Ø13 Ja
lan -1
9
-5
8
5 SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
VARIABLE
URUGAN TANAH 0+
BETON 1:2:3 00 Di Setujui
0±
00
5 Kabag Teknik
10 1 0
GATE VALVE
PASIR DIPADATKAN
PIPA HDPE
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
JUDUL GAMBAR
Baut 58" Baut 34'
Pengadaan dan Pemasangan Pipa
KETERANGAN VOL Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak
J.10
Stub Flange Ø 50 mm HDPE
Ductile iron with ENP
Tee 75 x 75 x 75 mm 1 Bh
TEE HDPE 75 X75 X 75 Rubber Packing
Stanless stell disc
Butterfly Valve Ø 50 mm 1 Bh KONSULTAN
HDPE Ø 75 mm
Stub Flange Ø 50 mm 2 Bh
Penanggung Jawab
Detail Stub Flange Ø 50 mm HDPE
Not to Scale
RUAS JALAN - 3
Stub Flange Ø 75 mm HDPE
STA 0+000 s/d STA 0 + 150 Di Gambar
Rubber Packing
MIRZA AZWARI, ST
Stub Flange Ø 75 mm HDPE Draftman
Rubber Packing Urugan Pasir 30 cm
Pipa HDPE Ø 75 mm
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a
J.16 k e r- s o ft w a
UTARA
Bend 90°
UTARA
Ru
asJ
J.15 ala
n- PROGRAM/KEGIATAN
14
0 ± 000
0±000
-3
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
n
la
Ja
KABUPATEN TABALONG
as
Detail Bend 90° Ru
Ru
as
J.14
Jala
Not to Scale n -1
3
PEKERJAAN
POTONGAN MELINTANG
Ru
as
PENGADAAN DAN PEMASANGAN PIPA HDPE
Ja
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
J.13
lan
Ru Ru
- 14
as Ru
Ja
lan
as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
-1
2
20
Ru
as
3
KABUPATEN TABALONG
-8
J ala
n
n-
ala
-2
-7
12
J
Ru
n
as
DIAJUKAN SEBAGAI GAMBAR :
-6
n
la
as
Ru
la
Ja
Ja
n
Ja
-3
la
as
lan
as
Ja
Ru
n
Ru -1
Ru
la
as
Ru
Ru as 1
Ja
Ru
as
J.12
Ru
Ja
as
as Ja lan
as
Ru
lan Ru
Ja
-1
Ja -4 as
la
0+ 0
la
n
22 Ja
n-
-1
7.5 lan POTONGAN MELINTANG
-3
0+
15
-2
0
n
0+
n
la
ala
14
-3
6
Ja
sJ
Mengetahui
n
a
ala
Ru
as
sJ
Ru
Ru
a
J.11 Pejabat Pembuat Komitmen (PPK)
Ru
Ru
as as
Ja Ja
la
lan Ru n
-1
as
-1 Ja
6
5
lan
0
-1
-1
Detail Reducer
n
la
Ru 7
Ja
as
as
Ja
Ru
lan
HDFE Ø 75 mm - Ø 50 mm Ru -
0
0+ as 18
+
Ru
00
Jala
5
as
22 Ru Ja n -1
7.5 as
lan 9
Not to scale -5
Ja
la SLAMET BUDI SANTOSA,S.Sos
n-
9 NIK 6309023
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
HDPE Ø 75 mm
NIK 6309010
Di Periksa
Kasi Perencaan
KETERANGAN VOL
TEE HDPE 75 X75 X 75
J.11 Tee 75 x 75 x 75 mm 1 Bh
Reduser Ø 75 x Ø 50 mm 1 Bh
HDPE Ø 75 mm
SLAMET KARYADI
NIK 6309042
KETERANGAN VOL
Detail Tee HDPE
Not to scale
J.12 Tee 75 x 75 x 75 mm 1 Bh
JUDUL GAMBAR
Reduser Ø 75 x Ø 50 mm 1 Bh Pengadaan dan Pemasangan Pipa
Komplek Pondok Karet Permai Jalan Maluyung
Kec. Murung Pudak
KETERANGAN VOL
J.13 Tee 75 x 75 x 75 mm 1 Bh KONSULTAN
Reduser Ø 75 x Ø 50 mm 1 Bh
CV. P R I S M A J A S A
KETERANGAN VOL Architect & engineering consultant
J.14 Tee 75 x 75 x 75 mm 1 Bh
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Reduser Ø 75 x Ø 50 mm 1 Bh
Penanggung Jawab
KETERANGAN VOL
J.15 Tee 75 x 75 x 75 mm 1 Bh
Reduser Ø 75 x Ø 50 mm 1 Bh
Ir. SITTI UMAYYAH
Direktris
KETERANGAN VOL
RUAS JALAN - 3
STA 0+150 s/d STA 0 + 402
J.16 Bend 90°- Ø 75 mm 1 Bh
Di Gambar
Reducer HDPE 75 x 50 mm 1 Bh
Jalan Cor beton Cor beton tebal 20 cm
Sirtu tebal 10 cm
MIRZA AZWARI, ST
Draftman
Urugan Pasir 30 cm
Profil Melintang Pipa Pipa HDPE Ø 75 mm
Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA UTARA
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
Ru
as
Ja
J.17
lan
UTARA -1
-3
4
n
la
Ja
as
Ru
4
PROGRAM/KEGIATAN
06
0+
Ru
as
Ja
lan 0 ± 000
0±000
4
07
Ru
as
0+
Ja
J.18
lan
-1
2 PEKERJAAN
POTONGAN MELINTANG
Ru
as Ru
as
PENGADAAN DAN PEMASANGAN PIPA HDPE
Jala Ja
lan DI KEC. TANJUNG , KEC. MURUNG PUDAK,
-3
n -1 Ru
- 14
Ru
KEC.MUARA HARUS DAN KEC. MUARA UYA
n
as
1
la
as
J Ja
0
Ja ala lan
4
09
06
n- -1
as
0+
20 3
KABUPATEN TABALONG
0+
Ru
Ru
Ru as
-8
as J ala
4
n
07
Ja
J.19
n-
ala
-2
0+
-7
lan 12
J
Ru
n
as
DIAJUKAN SEBAGAI GAMBAR :
-6
n
la
as
Ru
la
Ja
-1 Ja
n
Ja
la
as
lan
as
Ja
0
Ru
2
Ru -1
Ru
as
Ru
08
as 1
Ru
as
Ru
Ja
0
-3
09
Ja lan
0+
as
lan
0+
n
Ru
ala
Ja
-1
J.20
-4 as
Ru
la
0
sJ
n
Ja
2
a
as
-1
08
lan
Ru
0+
POTONGAN MELINTANG
8
05
05
lan
0+
9
03
0+
-9
0+
9
03
-2
J.21
n
0+
ala
-3
sJ
Mengetahui
n
a
ala
Ru
a sJ
Pejabat Pembuat Komitmen (PPK)
Ru
Ru
as
Ja
la
J.22 Ru n
-1
as 6
Ja
5
lan
-1
-1
n
la
Ru 7
Ja
as
as
Ja
Ru
lan
Handel Ru -
as 18
Ru Jala
as n
Ja -1
lan 9
-5
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
Baut 34'
Di Setujui
Kabag Teknik
Rubber Packing
KETERANGAN VOL
SLAMET KARYADI
Butterfly Valve Ø 50 mm 1 Bh NIK 6309042
17,18,19,20,21 dan 22
Cor beton tebal 20 cm
KETERANGAN VOL
Jalan Cor beton Penanggung Jawab
Sirtu tebal 10 cm
Butterfly Valve Ø 50 mm 1 Bh
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
tr re tr re
.
.
ac UTARA
ac
k e r- s o ft w a k e r- s o ft w a
UTARA
8
n-
J.23
la
PROGRAM/KEGIATAN
Ja
as
Handel
Ru
0 ± 000
0±000
-7
lan
PEKERJAAN
Ja
Ru
as
00
as
Ru
Ja
0+
lan POTONGAN MELINTANG
-4
Ductile iron with ENP
Ru
PENGADAAN DAN PEMASANGAN PIPA HDPE
Stanless stell disc as
Ja
lan
- DI KEC. TANJUNG , KEC. MURUNG PUDAK,
J.24
Ru 14
Ru
as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
20 3
KABUPATEN TABALONG
-8
Ru
-6
lan
4.
as
6
-7
Ja
J
-
ala
03
lan
lan
lan
as
n-
-2
Ja
Ru
Ja
0+
Ru 12
Ja
as
n
4
DIAJUKAN SEBAGAI GAMBAR :
as
5
la
00
as
Ru
8.
Ja
Ru
0+
Ja
as
.5
as
lan
03
34
Ru
Ru
+0
Ru
Butterfly Valve 75 mm -1
8.5
as
0
1
0+
03
Ru
Ja
-3
0+
lan
as
n
0
Ru
ala
Ja
-1
07
as
la
0
0+
sJ
Not to Scale
4
n
Ja
07
a
-1
lan
Ru
0+
POTONGAN MELINTANG
J.25
la
4
n-
10
0+
4
0
11
0+
-2
9.5
13
n
ala
0
3.5
0+
-3
07
14
sJ
Mengetahui
n
0+
a
ala
Ru
0
0+
17
Ru
sJ
0+
a
4
Pejabat Pembuat Komitmen (PPK)
Ru
as Ru
07
as
Ja Ja
0+
lan Ru
la
n
-1
-4 as
Ja
6
5
lan
-1
-1
n
la
Ru 7
Ja
as
as
Ja
Ru
lan
Ru -
as 18
Ru J ala
as n
Ja -1
la
HDPE Ø 75 mm
n- 9
5
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
Di Setujui
Kabag Teknik
KETERANGAN VOL
Butterfly Valve Ø 75 mm 1 Bh
J.24 Reduser Ø 75 x Ø 50 mm 1 Bh
KONSULTAN
J.25
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
tr re tr re
.
.
ac UTARA
ac
k e r- s o ft w a k e r- s o ft w a
J.29 0+
UTARA 20
0
PROGRAM/KEGIATAN
J.26 0 ± 000
0±000
Ru
J.27 PEKERJAAN
6
as
n-
Ja
ala
lan POTONGAN MELINTANG
J
-2
J.28
as
0
PENGADAAN DAN PEMASANGAN PIPA HDPE
0+
Ru
20
0
Ru
as
Ja
lan
- 14
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0+ Ru Ru
05
3
as
Jala
n-
as
Ja
lan
-1
KEC.MUARA HARUS DAN KEC. MUARA UYA
0+
06
20
0+ Ru
as
3
KABUPATEN TABALONG
-8
0+ 06
-8
05 0 J ala
0
n
3
Bend 90° n-
ala
lan
-2
-7
12
J
Ru
n
as
DIAJUKAN SEBAGAI GAMBAR :
-6
n
la
Ja
as
Ru
la
Ja
Ja
n
0+
Ja
-3
la
as
lan
as
00
as
Ja
Ru
n
4 Ru -1
Ru
la
Ru
as
Ru as 1
Ja
Ru
as
Ru
Ja
as
Ja 0+ lan
as
Ru
lan 00
Ru
Ja
4 -1
-7
-4 as
la
0
n
Ja
-1
n
0+ lan
ala
POTONGAN MELINTANG
J
00
as
4
Ru
Detail Bend 90° HDPE Ø 50 mm
-2
n
ala
-3
sJ
Mengetahui
n
Not to scale
ala
Ru
a sJ
Pejabat Pembuat Komitmen (PPK)
Ru
Ru
as
Ja
0+ Ru
la
n
-1
00 as 6
Ru 4 Ja
5
lan
-1
-1
as
n
la
Ru 7
Ja
as
J ala
as
Ja
Ru
lan
Ru
n -4 Ru
as
Jala
- 18
as n
Ja -1
lan 9
-5
0+ SLAMET BUDI SANTOSA,S.Sos
00
4 NIK 6309023
Handel
Di Setujui
Kabag Teknik
Baut 34'
Di Periksa
Kasi Perencaan
Stub Flange Ø 50 mm HDPE
KETERANGAN VOL
Rubber Packing
KONSULTAN
KETERANGAN VOL
CV. P R I S M A J A S A
Architect & engineering consultant
Butterfly Valve Ø 50 mm 1 Bh Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
KETERANGAN VOL
Butterfly Valve Ø 50 mm 1 Bh Ir. SITTI UMAYYAH
J.29 Stub Flange Ø 50 mm 2 Bh Direktris
RUAS JALAN
26 , 27 , 28 DAN 29 Di Gambar
Cor beton tebal 20 cm
Jalan Cor beton
Sirtu tebal 10 cm
KETERANGAN :
MIRZA AZWARI, ST
RUAS JALAN - 26 STA 0 + 00 s/d 0 + 037(Jalan Cor) Draftman
Urugan Pasir 30 cm
RUAS JALAN - 27 STA 0 + 00 s/d 0 + 053 (Jalan Cor)
Pipa HDPE Ø 50 mm
RUAS JALAN - 28 STA 0 + 00 s/d 0 + 060 (Jalan Cor)
Profil Melintang Pipa RUAS JALAN - 29 STA 0 + 00 s/d 0 + 200 (Jalan Cor)
Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
UTARA
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
Ru
as
Ja
lan
UTARA
-4 J.35
0+
13
6
0+
14
0
PROGRAM/KEGIATAN
Bend 90° J.34 0 ± 000
0±000
5
6
-1
PENGADAAN DAN PEMASANGAN PIPA HDPE
an
Ru Ru
al
as as
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
sJ
Ja
Ja lan
a
lan
Ru
-1
Ru 4
KEC.MUARA HARUS DAN KEC. MUARA UYA
Ru
-1 as
J.31
as
J Ja
7 ala
n-
lan
-1
Ru
20
Ru
as
3
KABUPATEN TABALONG
-8
as J ala
n
n-
la
J
-2
ala
Ja
-7
Ru 12
n
as
DIAJUKAN SEBAGAI GAMBAR :
-6
la
as
n
la
Ru
Ja
J
Ja
n
ala
-1
-3
la
as
as
Ja
n-
Ru
n
8 Ru
Ru
ala
0
as
Detail Bend 90° - 50 mm Ru as 11
Ru
as
J
+0
Ru
J
as
Ja ala
Ru
as
Ru
lan n-
05 Ru
Ja
a -4 as 10
la
Not to Scale sJ
n
Ja
ala
-1
lan POTONGAN MELINTANG
J.30 0+
-2
14
0
Ru
n
0+
ala
-3
13
as
sJ
Mengetahui
6
n
a
la
Ru
Ja
Ja
lan
as
Pejabat Pembuat Komitmen (PPK)
Ru
Ru
-5 as
Ja
la
Ru n
-1
as 6
Jala
5
-1
n -1
n
Ru
la
a Ru 7
Ja
sJ as
as
ala J ala
Ru
n Ru n-
-5 0+
as 18
00 Ja
5 lan
- 19
Di Setujui
Kabag Teknik
HDPE Ø 50 mm
HDPE Ø 75 mm
H. MUSTA'IN,S.Sos
NIK 6309010
TEE HDPE 75 X75 X 75 TEE HDPE 50 X50 X 50
Di Periksa
Kasi Perencaan
Not to scale
Detail Tee HDPE
KONSULTAN
KETERANGAN VOL
Tee 50 x 50 x 50 mm 1 Bh CV. P R I S M A J A S A
J.32 Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
KETERANGAN VOL
RUAS JALAN - 15 Tee 50 x 50 x 50 mm 1 Bh
Sirtu 30 cm
STA 0+000 s/d STA 0 +140
Perkerasan sirtu J.33
Ir. SITTI UMAYYAH
Direktris
KETERANGAN VOL
Urugan Pasir 30 cm Tee 50 x 50 x 50 mm 1 Bh
Di Gambar
Pipa HDPE Ø 50 mm J.34
Profil Melintang Pipa
Skala 1 : 50 KETERANGAN VOL
MIRZA AZWARI, ST
Tee 50 x 50 x 50 mm 1 Bh Draftman
J.35 Reducer 75 mm x 50 mm
Butterfly Valve Ø 50 mm 1
1 Bh
Bh
Stub Flange Ø 50 mm 2 Bh
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
tr UTARA
Ru tr
re re
.
.
ac as ac
k e r- s o ft w a Ja k e r- s o ft w a
lan
-4
UTARA
PROGRAM/KEGIATAN
04
+0
0 ± 000
0±000
0
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Ru KABUPATEN TABALONG
as
Jal
4
00
an
0+
-1
Ru
6
PEKERJAAN
57
as
+0
POTONGAN MELINTANG
Ja
lan
PENGADAAN DAN PEMASANGAN PIPA HDPE
0
-1
J.40
4
00
Ru
7 as
Ja
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0+
lan
51
-1
+0
Ru 4
KEC.MUARA HARUS DAN KEC. MUARA UYA
Ru
as as
Ja
Ru J
0
ala lan
J.39
-1
n-
as -1
20 3
KABUPATEN TABALONG
n
J
la
ala Ru
Ja
as
n
-8
J ala
as
04
-1
n
n-
la
-2
Ru
Ja
-7
8
+0
Ru 12
n
as
DIAJUKAN SEBAGAI GAMBAR :
-6
la
as
la
Ru
Ja
J
Ja
0
n
ala
-3
la
as
as
Ja
n-
Ru
Ru
n
Ru
Ru
5
ala
as
Ru as 11
05
as
Ru
as
J
Ru
J
as
Ja ala
as
Ja
Ru
0+
lan
J.38
Ru n-
Ja
lan -4 as 10
la
n
Ja
-1
lan
-1 POTONGAN MELINTANG
44
+0
J.37
-2
n
ala
-3
Ru
sJ
Handel
Mengetahui
n
a
la
as
Ru
Ja
as
Jal Pejabat Pembuat Komitmen (PPK)
Ru
Ru
an as
4
Ja
-5
00
la
+
n
0
Ru -1
as 6
00 5
-1
J
4
ala
n
n
+
ala
7
0
-1
05
Ru
8
sJ
Ru 7
+
09
0
a
sJ as
Ru
4
00
1
ala J
05
ala
Baut 34'
0+
0+
+
Ru n-
0
-5 as 18
J.36
Ja
4
00
lan
5
0
-
05
19
+
0
SLAMET BUDI SANTOSA,S.Sos
4
04
+
0
NIK 6309023
Ductile iron with ENP
Stanless stell disc Di Setujui
Kabag Teknik
Butterfly Valve Ø 50 mm
Not to Scale
Handel H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
Baut 78 ''
KETERANGAN VOL
Butterfly Valve Ø 75 mm 1 Bh
Ductile iron with ENP
Stanless stell disc Baut 5
8"
Baut 58"
J.36 Stub Flange Ø 75 mm 2 Bh
Bh
SLAMET KARYADI
NIK 6309042
Butterfly Valve Ø 75 mm
KETERANGAN VOL Pengadaan dan Pemasangan Pipa
Not to Scale Komplek Pondok Karet Permai Jalan Maluyung
Butterfly Valve Ø 50 mm 1 Bh Kec. Murung Pudak
CV. P R I S M A J A S A
KETERANGAN VOL Architect & engineering consultant
Detail Stub Flange Ø 75 mm HDPE Detail Stub Flange Ø 50 mm HDPE Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Not to Scale
Butterfly Valve Ø 50 mm 1 Bh
J.38
Not to Scale
RUAS JALAN Stub Flange Ø 50 mm 2 Bh
36, 37,38,39 dan 40 Penanggung Jawab
Perkerasan sirtu
Sirtu 30 cm
KETERANGAN VOL
Butterfly Valve Ø 50 mm 1 Bh Ir. SITTI UMAYYAH
Direktris
Urugan Pasir 30 cm
Pipa HDPE Ø 50 mm
KETERANGAN :
J.39 Stub Flange Ø 50 mm 2 Bh
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Puri Gardena II
jl.Padat Karya Kec. Murung Pudak
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re U tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
yu
KEC.MUARA HARUS DAN KEC. MUARA UYA
A
S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG
b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
Awayan S S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik
Te
BARABAI Birayang gala Tanjungsamalantakan
l.
Tg. Pamukan
Pa
Pasungkan Labuhannamas Utara i ng
ar
a i antu
m
b a S. C
Kuripan Negara S. Bara G. Besar
uk
eg Pagat
an
. N
Labuhannamas Selatan Haruyan Gunungbatu Besar
S
KANDANGAN Ankinang
US
Telagalangsat
Simpur
AT
H. MUSTA'IN,S.Sos
Padangbatung NIK 6309010
ER
Margasari Sungairaya Pudi
M
G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan
PE
MARABAHAN Ta Kasi Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat an
rito
Anjirmuara S. Alala
k mk SLAMET KARYADI
Ria
Ba
S. T
am S. Simpangampat NIK 6309042
S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR
S.
Tabunganen Ulin S. Batulicin Sungaibali
R
MARTAPURA M
ia
em Pengadaan dan Pemasangan Pipa
m
Karangintan
ka
Aluhaluh baSUNGAI PERAK
BANJARBARU Komplek Puri Gardena II Jl. Padat Karya
na
Lasung lap
n
i
Cempaka W. Riamkanan Sejaka Kec. Murung Pudak
Sel.
R
Pantaulayung
SA
Kurau
Seb
Tanjungkurong
t
Pagatan
au
Batibati
1150 KONSULTAN
l. L
KA
uku
Sabamban
Se
MA
G. Aurbunak
Tanjungseloka
CV. P R I S M A J A S A
Satui
AT
PELAIHARI
Kintap Karambu
L
Architect & engineering consultant
SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar
Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Puri Gardena II Jl. Padat Karya
Kec. Murung Pudak
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Puri Gardena II Jl. Padat Karya
Kec. Murung Pudak
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Skala 1: 600 Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Ruas Jalan
Ruas Jalan
-5 SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
-1
Di Setujui
Kabag Teknik
Ruas Jalan
-6
H. MUSTA'IN,S.Sos
NIK 6309010
Ruas Jalan
-7
Di Periksa
Kasi Perencaan
-9
Ruas Jalan
Ruas
Jalan
Ruas Jalan
-8
SLAMET KARYADI
- 11
NIK 6309042
-2 0
n Jalan-1
J ala Ruas JUDUL GAMBAR
Ruas Jalan as 14
- 12 Ru n -
J ala Pengadaan dan Pemasangan Pipa
as
3 Ru Komplek Puri Gardena II Jl. Padat Karya
n -1
ala Kec. Murung Pudak
sJ
Ru
a
Ru
as
KONSULTAN
Jal
an
-1
15
n-
CV. P R I S M A J A S A
6
ala
a sJ
Ru Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
Skala 1: 500
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA 0 ± 000
0 ± 000 PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Ruas Jalan 0 + 019 KABUPATEN TABALONG
-3
0 + 040
0 ± 000
PEKERJAAN
POTONGAN MELINTANG
KABUPATEN TABALONG
-4
0 + 051
DIAJUKAN SEBAGAI GAMBAR :
0 ± 000
Ruas Ja
POTONGAN MELINTANG
Ruas Jalan
Gambar Rencana Kerja
0 + 093
lan - 1
-5
Mengetahui
0 ± 000
Pejabat Pembuat Komitmen (PPK)
Ruas Jalan
0 + 095
-6 SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
0 ± 000
Di Setujui
Kabag Teknik
Ruas Jalan
0 + 088
-7
0+0
Ruas Jalan - 1
0 ± 000
85
0 ± 000
0 ± 000
H. MUSTA'IN,S.Sos
-9
0 + 078
Ruas
0 ± 000
Di Periksa
Ruas Jalan Kasi Perencaan
Jalan
-8
0±0
0±
00
00
0 + 214
0+0
0
- 11
2 10
22
n- lan -
0+
0 + 026
a Ja
Jal Ruas
07
040
0 ± 00
5
Ruas Jalan as 4 0+ SLAMET KARYADI
- 12 Ru n-
1 NIK 6309042
0
ala
sJ
0+
a
Ru JUDUL GAMBAR
05
0 ± 00
3
7
1
n-
ala
0
as
Ru
0±
00
041
Jal
-1
5 KONSULTAN
6
an
Jal
as
Ru
8
CV. P R I S M A J A S A
07
0+
Penanggung Jawab
Di Gambar
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
0 + 040
0 ± 000
DIAJUKAN SEBAGAI GAMBAR :
Ruas Jalan - 1
POTONGAN MELINTANG
0 + 051
Mengetahui
Pejabat Pembuat Komitmen (PPK)
0 ± 000
Ruas Jalan
-5
0 ± 000
NIK 6309023
Ruas Ja
Di Setujui
lan - 1
Kabag Teknik
Ruas Jalan
-6
0 + 095
0 ± 000
0 + 088
0 ± 000
H. MUSTA'IN,S.Sos
Ruas Jalan
-7
0 + 168 NIK 6309010
Di Periksa
0 + 078
Kasi Perencaan
9 0 ± 000
Ruas Jalan -
0+0
0 ± 000
Ruas
85
Ruas Jalan
-8
0±
Jalan
0±0
00
- 11
0
SLAMET KARYADI
0+
00
-2
0 + 214
Jalan
- 10 040 NIK 6309042
0+
07
ala
n Ruas
5
sJ
Rua
JUDUL GAMBAR
0 ± 00
0+
Ruas Jalan 4
- 12 -1
an
022
Jal
0 + 026
as
0+
3 Ru
-1 Pengadaan dan Pemasangan Pipa
057
an
Jal
Ru
as Komplek Puri Gardena II Jl. Padat Karya
Kec. Murung Pudak
0±
0+
00
KONSULTAN
041
Ru
as
5
0±
-1
Jal
al an
00
an
sJ
0
a
Ru
CV. P R I S M A J A S A
-1
6
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
UTARA
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
0 ± 000
0 ± 000
0 + 006
PROGRAM/KEGIATAN
0 + 062
0 + 019 Ruas Jalan
-4
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Ruas Ja
Ø8 - 10 Ruas Jalan
KABUPATEN TABALONG
lan
-3
0 + 024 Ruas Jalan
-1
Ø8 - 10 -5
0 + 109.5
0 + 030
PEKERJAAN
Ruas Jalan POTONGAN MELINTANG
-6
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ø8 - 10 Ø8 - 10
Ruas Jalan
-7
0 + 168
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Ruas Jalan - 1
9
TUTUP BETON Ruas Jalan -
Ruas
0 + 062
Jalan
Ruas Jalan
Ruas Jalan -8
-4
- 11
0 + 065 2 0 + 214
- 10
n- Jalan
BEGEL Ø12 Jala Ruas
Ruas Jalan as 14
0 + 071 - 12 Ru
POTONGAN MELINTANG
Ruas Ja
ala
VARIABLE
Ru
as
Ru
as
Jala
URUGAN TANAH Mengetahui
n-
lan
BETON 1:2:3 15 Pejabat Pembuat Komitmen (PPK)
16
n-
-1
s Jala
R ua
10 1
Ruas Jalan
GATE VALVE -5
PASIR DIPADATKAN
0 + 103.5
0 + 109.5
SLAMET BUDI SANTOSA,S.Sos
PIPA HDPE
NIK 6309023
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
HDPE Ø 100 mm
HDPE Ø 75 mm
Baut 58"
J.1
Rubber Packing
KETERANGAN VOL
KONSULTAN
J.2
Not to scale Not to scale
Tee 75 x 75 x 75 mm 1 Bh
Detail Stub Flange Ø 75 mm HDPE GIBOULT JOINT Ø 100 mm Reduser 75 - Ø 50 mm 1 Bh CV. P R I S M A J A S A
Not to Scale Not to Scale Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
KETERANGAN VOL
RUAS JALAN - 1
STA 0+000 s/d STA 0 + 019 Cor beton tebal 20 cm
J.3 Tee 75 x 75 x 75 mm 1 Bh
Penanggung Jawab
Reduser 75 - Ø 50 mm 1 Bh
Jalan Cor beton
Sirtu tebal 10 cm
KETERANGAN VOL
J.4 Tee 75 x 75 x 75 mm 1 Bh
Ir. SITTI UMAYYAH
Urugan Pasir 30 cm Reduser 75 - Ø 50 mm 1 Bh Direktris
Detail Reducer HDFE
Profil Melintang Pipa Pipa HDPEØ 75 mm Not to scale
Skala 1 : 50 Di Gambar
Bahu Jalan Bahu Jalan
RUAS JALAN - 1
STA 0+019 s/d STA 0 +140
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a
0 ± 000
Ruas Ja
0 + 145.5
KABUPATEN TABALONG
lan
Ruas Jalan
-1
-5
0 + 109.5
PEKERJAAN
Ruas Jalan POTONGAN MELINTANG
-6
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ruas Jalan
-7
0 + 168
KEC.MUARA HARUS DAN KEC. MUARA UYA
0 + 174
KABUPATEN TABALONG
Ruas Jalan - 1
Ruas Jalan
-7 9
Ruas Jalan -
Ruas
DIAJUKAN SEBAGAI GAMBAR :
Jalan
Ruas Jalan
-8
- 11
2 0 + 214 - 10
0 + 180 n- Jalan
Jala Ruas
Ruas Jalan - 1
Ruas Jalan as 14
- 12 Ru
POTONGAN MELINTANG
Ru
as
Ru
as
Jala
Ruas Jalan -
9 Mengetahui
n-
15 Pejabat Pembuat Komitmen (PPK)
16
n-
s Jala
R ua
Ø8 - 10
0 + 208 Ø8 - 10
Ruas Jalan
-8
Di Setujui
-2 0 + 214
an Ø8 - 10 Ø8 - 10 Kabag Teknik
Jal
as
Ru TUTUP BETON
BEGEL Ø12
LUBANG Ø13
8 H. MUSTA'IN,S.Sos
5 NIK 6309010
VARIABLE
URUGAN TANAH
Di Periksa
BETON 1:2:3
Kasi Perencaan
10 1
Baut 58"
GATE VALVE KETERANGAN VOL
HDPE Ø 75 mm
PASIR DIPADATKAN
PIPA HDPE
Stub Flange Ø 75 mm HDPE
Rubber Packing
J.5 Tee 75 x 75 x 75 mm
Reduser 75 - Ø 50 mm
1
1
Bh
Bh SLAMET KARYADI
NIK 6309042
J.8 Tee 75 x 75 x 75 mm
Stub Flange Ø 75 mm
1
2
Bh
Bh Ir. SITTI UMAYYAH
Urugan Pasir 30 cm Direktris
Pipa HDPE Ø 50 mm
Profil Melintang Pipa
Di Gambar
Skala 1 : 50
RUAS JALAN - 2
STA 0+000 s/d STA 0 +057
Urugan Pasir 30 cm
Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
UTARA
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
Ruas Jalan - 1
UTARA Ruas Jalan
-3
PROGRAM/KEGIATAN
Ruas Jalan
-4
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Ruas Ja
Ruas Jalan
KABUPATEN TABALONG
0±
-8
000
lan
Ruas Jalan
-1
-5
PEKERJAAN
Ruas Jalan POTONGAN MELINTANG
-6
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
-2
Ruas Jalan
-7 KEC.MUARA HARUS DAN KEC. MUARA UYA
an
Jal KABUPATEN TABALONG
Ruas Jalan - 1
as
Ru Ruas Jalan -
9
Ruas
Ruas Ja
lan - 12
DIAJUKAN SEBAGAI GAMBAR :
Jalan
Ruas Jalan
0±
-8
00
- 11
0
2 - 10
n- Jalan
Jala Ruas
Ruas Jalan as 14
0+
- 12 Ru
POTONGAN MELINTANG
057
3 as
-1
0+
3 Ru
n
05
1
ala n-
7
sJ
Rua
ala
Detail Reducer HDFE a J
Ru
as
Ru Ru
as
s
Jala
Mengetahui
Jala
n-
Not to scale
Pejabat Pembuat Komitmen (PPK)
n-1
15
16
n-
Jala
6
s
R ua
Di Setujui
Kabag Teknik
HDPE Ø 50 mm
H. MUSTA'IN,S.Sos
NIK 6309010
TEE HDPE 50 X 50 X 50
Di Periksa
Kasi Perencaan
HDPE Ø 50 mm
KETERANGAN VOL
Detail Tee HDPE
Not to scale
J.9 Tee 50 x 50 x 50 mm
Reducer Ø 75 - Ø 50 mm 1
2 Bh
Bh SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Puri Gardena II Jl. Padat Karya
Kec. Murung Pudak
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
RUAS JALAN - 2
STA 0+000 s/d STA 0 +057
Ir. SITTI UMAYYAH
Direktris
Di Gambar
Urugan Pasir 30 cm
Pipa HDPE Ø 50 mm
MIRZA AZWARI, ST
Profil Melintang Pipa Draftman
Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
UTARA
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
0 + 04
0
0 ± 000
PROGRAM/KEGIATAN
Ruas Jalan
-4
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
0 + 051
Ruas Ja
0 ± 000
KABUPATEN TABALONG
lan
Ruas Jalan
-1
-5
0 + 093
0 ± 000
Ruas Jalan
-3
PEKERJAAN
Ruas Jalan
0 + 040
Handel
POTONGAN MELINTANG
-6
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 ± 000
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ruas Jalan
-7 KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Ruas Jalan - 1
Baut 34'
9
Ruas Jalan -
Ruas
DIAJUKAN SEBAGAI GAMBAR :
Jalan
Ruas Jalan
-8
- 11
2 - 10
n- Jalan
Ductile iron with ENP J ala Ruas
Ruas Jalan Ruas Jalan as 14
- 12 Ru
POTONGAN MELINTANG
0 + 051
J
Ru
as
Ru
as
Jala
Mengetahui
0 ± 000
n-
15 Pejabat Pembuat Komitmen (PPK)
16
n-
Ruas Ja
s Jala
ua
Butterfly Valve Ø 50 mm R
lan
Not to Scale
-1
Ruas Jalan
-5 SLAMET BUDI SANTOSA,S.Sos
0 + 093
NIK 6309023
Di Setujui
Kabag Teknik
0 ± 000
Baut 58"
H. MUSTA'IN,S.Sos
NIK 6309010
Stub Flange Ø 50 mm HDPE
Rubber Packing
Di Periksa
Kasi Perencaan
KETERANGAN VOL
Butterfly Valve Ø 50 mm 1 Bh
JUDUL GAMBAR
CV. P R I S M A J A S A
Architect & engineering consultant
KETERANGAN VOL Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Butterfly Valve Ø 50 mm 1 Bh
RUAS JALAN - 3 , 4 dan 5
J.12 Stub Flange Ø 50 mm 2 Bh Penanggung Jawab
MIRZA AZWARI, ST
RUAS JALAN - 3 STA 0 + 00 s/d 0 + 040 (Perkerasan sirtu) Draftman
RUAS JALAN - 4 STA 0 + 00 s/d 0 + 051 (Perkerasan sirtu)
RUAS JALAN - 5 STA 0 + 00 s/d 0 + 093 (Perkerasan sirtu)
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
UTARA
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
0 + 095
PROGRAM/KEGIATAN
Ruas Jalan
0 ± 000
-4
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
Ruas Ja
KABUPATEN TABALONG
lan
Ruas Jalan
-1
-5
PEKERJAAN
Handel Ruas Jalan POTONGAN MELINTANG
-6
0 + 095
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 ± 000
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0 + 088
Ruas Jalan
-7
Ruas Jalan
-7 KEC.MUARA HARUS DAN KEC. MUARA UYA
0 + 088
KABUPATEN TABALONG
Ruas Jalan - 1
3
0 ± 000 0 ± 000
0 + 078
Baut 4'
9
Ruas Jalan -
Ruas
Ruas Jalan - 1
DIAJUKAN SEBAGAI GAMBAR :
Jalan
Ruas Jalan
-8
0 ± 000
- 11
2 - 10
n- Jalan
Ductile iron with ENP Jala Ruas
Ruas Jalan as 14
- 12 Ru
POTONGAN MELINTANG
Ru
0 + 078
as
Ru
as
Jala
Mengetahui
n-
15 Pejabat Pembuat Komitmen (PPK)
0 ± 000
16
n-
s Jala
ua
Butterfly Valve Ø 50 mm Ruas Jalan
-8
R
Not to Scale
n-
2 Di Setujui
ala Kabag Teknik
asJ
Ru
Baut 58"
Di Periksa
Kasi Perencaan
KETERANGAN VOL
Butterfly Valve Ø 50 mm 1 Bh
Stub Flange Ø 50 mm HDPE
Rubber Packing J.13 Stub Flange Ø 50 mm 2 Bh SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Detail Stub Flange Ø 50 mm HDPE
Not to Scale Pengadaan dan Pemasangan Pipa
KETERANGAN VOL
Komplek Puri Gardena II Jl. Padat Karya
Butterfly Valve Ø 50 mm 1 Bh Kec. Murung Pudak
RUAS JALAN
6 dan 7
Perkerasan sirtu
J.14 Stub Flange Ø 50 mm 2 Bh KONSULTAN
Sirtu 30 cm
CV. P R I S M A J A S A
Architect & engineering consultant
KETERANGAN VOL Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Urugan Pasir 30 cm
Butterfly Valve Ø 50 mm 1 Bh
Pipa HDPE Ø 50 mm
Skala 1 : 50
KETERANGAN :
Perkerasan sirtu Sirtu 30 cm Di Gambar
RUAS JALAN - 6 STA 0 + 00 s/d 0 + 095 (Perkerasan sirtu)
RUAS JALAN - 7 STA 0 + 00 s/d 0 + 088 (Perkerasan sirtu)
Urugan Pasir 30 cm RUAS JALAN - 8 STA 0 + 00 s/d 0 + 078 (Perkerasan sirtu)
MIRZA AZWARI, ST
Profil Melintang Pipa Pipa HDPE Ø 50 mm Draftman
Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
UTARA
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
Ruas Jalan
-4
PENGEMBANGAN JARINGAN DISTRIBUSI AIR MINUM
Ruas Ja
-9
Ruas Jalan 0 ± 000
KABUPATEN TABALONG
lan
0+0
Ruas Jalan
-1
-5
Ruas
85
PEKERJAAN
Jalan
Detail Bend 90° - Ø 50 mm Ruas Jalan
-
POTONGAN MELINTANG
-6
11
Not to Scale PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0±0
0+
025 Ruas Jalan
-7 KEC.MUARA HARUS DAN KEC. MUARA UYA
00
KABUPATEN TABALONG
Ruas Jalan - 1
9 0 ± 000
Ruas Jalan -
Ruas
0 + 08
0 ± 000
n- 10
s Jala
Ruas Jalan
DIAJUKAN SEBAGAI GAMBAR :
Jalan
5
-8
Rua
0 ± 00
11 -
2 10
0
n- -
ala Jalan
J Ruas 0 40
Ruas Jalan as 0+
0 + 02
- 12 Ru 14
POTONGAN MELINTANG
2
J
as
3 Ru
1
n-
J ala
0+0
Ru
as
Ru
as
Jala
Mengetahui
22
n-
15 Pejabat Pembuat Komitmen (PPK)
16
n-
s Jala
R ua
Handel Di Setujui
Kabag Teknik
Baut 34'
H. MUSTA'IN,S.Sos
Ductile iron with ENP NIK 6309010
Stanless stell disc
Di Periksa
Kasi Perencaan
KETERANGAN VOL
Bend 90° - Ø 50 mm 1 Bh
J.16
Butterfly Valve Ø 50 mm
Not to Scale
SLAMET KARYADI
NIK 6309042
HDPE Ø 50 mm
Baut 58"
J.17
Rubber Packing
Komplek Puri Gardena II Jl. Padat Karya
TEE HDPE 50 X 50 X 50 Butterfly Valve Ø 50 mm 1 Bh Kec. Murung Pudak
Stub Flange Ø 50 mm 2 Bh
HDPE Ø 50 mm
KONSULTAN
Urugan Pasir 30 cm
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
UTARA
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
-2
an
Jal
UTARA Ru
as
Ruas Jalan
Ruas Jalan
0 + 026
- 12 -3
PROGRAM/KEGIATAN
0±0
00
Ruas Jalan
-4
PENGEMBANGAN JARINGAN DISTRIBUSI AIR MINUM
0+
4
Ruas Ja
-1
006
3
-1 an KABUPATEN TABALONG
an Jal
Jal as
lan
Handel s Ru
ua Ruas Jalan
-1
R -5
PEKERJAAN
Ruas Jalan POTONGAN MELINTANG
-6
Baut 34' PENGADAAN DAN PEMASANGAN PIPA HDPE
0+
4.5
02 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
04
0+
1
0.5 Ruas Jalan KEC.MUARA HARUS DAN KEC. MUARA UYA
03 -7
0+
KABUPATEN TABALONG
Ruas Jalan - 1
Ductile iron with ENP 9
Ruas Jalan -
Ru
Ruas
a
Stanless stell disc
s Ja
DIAJUKAN SEBAGAI GAMBAR :
0±
Ruas Jalan
Jalan
-8
lan
00
0
-
-
11
2 10
16
n- -
ala Jalan
5 Ruas
-1 Ruas Jalan
Ru
as
J
14
an - 12
POTONGAN MELINTANG
0 + 026
0 ± 00
Ru 1 3 Ru
n-
0
ala
Butterfly Valve Ø 50 mm J
Ru
as
Ru
as
0+
Jala
Mengetahui
04 1
Not to Scale
n-
15 Pejabat Pembuat Komitmen (PPK)
16
0±
n-
00
Jala
0
s
R ua
8
07 8
0+
07
0+
0+
0+
045
045
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
HDPE Ø 50 mm
Di Setujui
Kabag Teknik
TEE HDPE 50 X 50 X 50
H. MUSTA'IN,S.Sos
NIK 6309010
HDPE Ø 50 mm
Di Periksa
Kasi Perencaan
Detail Tee HDPE
Not to scale
KETERANGAN VOL
RUAS JALAN Butterfly Valve Ø 50 mm 1 Bh
Sirtu 30 cm
12, 13 dan 15 Perkerasan sirtu
J.19 Stub Flange Ø 50 mm 2 Bh
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Urugan Pasir 30 cm Komplek Puri Gardena II Jl. Padat Karya
KETERANGAN VOL
Kec. Murung Pudak
Pipa HDPE Ø 50 mm
Butterfly Valve Ø 50 mm 1 Bh
Profil Melintang Pipa
Skala 1 : 50
J.20 Stub Flange Ø 50 mm 2 Bh
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
KETERANGAN VOL
RUAS JALAN - 16
Perkerasan sirtu Tee 50 x 50 x 50 mm 2 Bh
Baut 58" Sirtu 30 cm
J.21 Penanggung Jawab
KETERANGAN :
Detail Stub Flange Ø 50 mm HDPE
KETERANGAN VOL MIRZA AZWARI, ST
Not to Scale
RUAS JALAN - 12 STA 0 + 00 s/d 0 + 026 (Perkerasan sirtu) Butterfly Valve Ø 50 mm 1 Bh Draftman
RUAS
RUAS
JALAN
JALAN
-
-
13
15
STA 0 + 00 s/d 0 + 041
STA 0 + 00 s/d 0 + 045
(Perkerasan
(Perkerasan
sirtu)
sirtu)
J.23 Stub Flange Ø 50 mm 2 Bh
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
UTARA
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
Handel PROGRAM/KEGIATAN
Ruas Jalan
0+
-4
PENGEMBANGAN JARINGAN DISTRIBUSI AIR MINUM
07
Ruas Ja
5
KABUPATEN TABALONG
lan
3
Baut 4' Ruas Jalan
-1
-5
14
n-
as
Jal
a
PEKERJAAN
Ru Ruas Jalan POTONGAN MELINTANG
-6
Ductile iron with ENP PENGADAAN DAN PEMASANGAN PIPA HDPE
Stanless stell disc
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ruas Jalan
-7 KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Ruas Jalan - 1
9
Ruas Jalan -
Ruas
Ruas Jalan
DIAJUKAN SEBAGAI GAMBAR :
Jalan
-8
Butterfly Valve Ø 50 mm
0+
11 -
10
07
-
Jalan
5
Not to Scale Ruas Jalan n-
2 Ruas
- 12 Jala 14
POTONGAN MELINTANG
Ru 00
as
Ru
as
0±
Jala
0
Mengetahui
n-
15 Pejabat Pembuat Komitmen (PPK)
16
n-
s Jala
R ua
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
Stub Flange Ø 50 mm HDPE
Rubber Packing
KETERANGAN VOL
Butterfly Valve Ø 50 mm 1 Bh
Not to Scale
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
RUAS JALAN - 14 Komplek Puri Gardena II Jl. Padat Karya
Perkerasan sirtu Kec. Murung Pudak
Sirtu 30 cm
KONSULTAN
Urugan Pasir 30 cm
CV. P R I S M A J A S A
Architect & engineering consultant
Pipa HDPE Ø 50 mm Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Tanjung Lestari
Tanjung Selatan Kec. Murung Pudak
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re U tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
yu
KEC.MUARA HARUS DAN KEC. MUARA UYA
A
S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG
b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
Awayan S S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik
Te
BARABAI Birayang gala Tanjungsamalantakan
l.
Tg. Pamukan
Pa
Pasungkan Labuhannamas Utara i ng
ar
a i antu
m
b a S. C
Kuripan Negara S. Bara G. Besar
uk
eg Pagat
an
. N
Labuhannamas Selatan Haruyan Gunungbatu Besar
S
KANDANGAN Ankinang
US
Telagalangsat
Simpur
AT
H. MUSTA'IN,S.Sos
Padangbatung NIK 6309010
ER
Margasari Sungairaya Pudi
M
G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan
PE
MARABAHAN Ta Kasi Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat an
rito
Anjirmuara S. Alala
k mk SLAMET KARYADI
Ria
Ba
S. T
am S. Simpangampat NIK 6309042
S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR
S.
Tabunganen Ulin S. Batulicin Sungaibali
R
MARTAPURA M
ia
em Pengadaan dan Pemasangan Pipa
m
Karangintan
ka
Aluhaluh baSUNGAI PERAK
BANJARBARU Komplek Tanjung Lestari Tanjung Selatan
na
Lasung lap
n
i
Cempaka W. Riamkanan Sejaka Kec. Murung Pudak
Sel.
R
Pantaulayung
SA
Kurau
Seb
Tanjungkurong
t
Pagatan
au
Batibati
1150 KONSULTAN
l. L
KA
uku
Sabamban
Se
MA
G. Aurbunak
Tanjungseloka
CV. P R I S M A J A S A
Satui
AT
PELAIHARI
Kintap Karambu
L
Architect & engineering consultant
SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar
Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Tanjung Lestari Tanjung Selatan
Kec. Murung Pudak
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Tanjung Lestari Tanjung Selatan
Kec. Murung Pudak
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
Skala 1: 600
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Ruas Jalan
POTONGAN MELINTANG
-1
Mengetahui
Pejabat Pembuat Komitmen (PPK)
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Komplek Tanjung Lestari Tanjung Selatan
Kec. Murung Pudak
Ruas Jalan
Ruas Jalan
KONSULTAN
-1
CV. P R I S M A J A S A
-2
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
0 + 297
PEKERJAAN
POTONGAN MELINTANG
0 + 276
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
0 + 268 KABUPATEN TABALONG
Ruas Jalan
DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG
-1
Mengetahui
Pejabat Pembuat Komitmen (PPK)
0 + 040
-3
Ruas Jalan
0 ± 000
0 + 187
0 + 220 SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
Ruas Jalan
Ruas Jalan SLAMET KARYADI
NIK 6309042
-1
JUDUL GAMBAR
-2
0 ± 000
KONSULTAN
CV. P R I S M A J A S A
0 ± 000
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Ruas Jalan
POTONGAN MELINTANG
-1
Mengetahui
Pejabat Pembuat Komitmen (PPK)
0 + 040
NIK 6309023
-3
Ruas Jalan
0 ± 000
0 + 187 Di Setujui
0 + 220 Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Ruas Jalan Komplek Tanjung Lestari Tanjung Selatan
Kec. Murung Pudak
Ruas Jalan
KONSULTAN
-1
CV. P R I S M A J A S A
-2
Penanggung Jawab
0 ± 000
0 ± 000
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
tr re tr re
.
.
ac UTARA
ac
k e r- s o ft w a k e r- s o ft w a
POTONGAN MELINTANG
UTARA 0 + 297
PROGRAM/KEGIATAN
0 + 276
0 + 181 0 + 268
Ruas Jalan
0 + 178 0 + 237.5
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
-1
Ruas Jala
0 + 191
n-3 PEKERJAAN
0 + 187
POTONGAN MELINTANG
0 + 155
PENGADAAN DAN PEMASANGAN PIPA HDPE
Handel 0 + 152 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
0 + 106.5
Gambar Rencana Kerja
Ruas Jalan
Ruas Jalan
Ductile iron with ENP
-1
Ruas Jalan
Stanless stell disc
-2
Mengetahui
Pejabat Pembuat Komitmen (PPK)
-1
0 + 083 0 ± 000
0 + 080
Butterfly Valve Ø 50 mm
Not to Scale SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
0 + 037.5 Di Setujui
Kabag Teknik
0 + 034.5
H. MUSTA'IN,S.Sos
NIK 6309010
0 ± 000 Di Periksa
Kasi Perencaan
Baut 58"
KETERANGAN VOL
Stub Flange Ø 50 mm HDPE
Butterfly Valve Ø 50 mm 1 Bh
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Stub Flange Ø 50 mm HDPE Komplek Tanjung Lestari Tanjung Selatan
Rubber Packing Kec. Murung Pudak
KONSULTAN
Detail Stub Flange Ø 50 mm HDPE
Not to Scale
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
RUAS JALAN - 1
STA 0+000 s/d STA 0 +297
Aspal Latasir
Ir. SITTI UMAYYAH
Aspal Penetrasi Direktris
Lapis Agregat kelas A tebal 30 cm
Di Gambar
Urugan Pasir 30 cm
Pipa HDPEØ 50 mm
MIRZA AZWARI, ST
Draftman
Profil Melintang Pipa
Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
tr re
UTARA tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
POTONGAN MELINTANG
UTARA 0 + 297
PROGRAM/KEGIATAN
0 + 276
0 + 268
Ruas Jalan
0 + 237.5
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
-1
Ruas Jala
0 + 191
n-3 PEKERJAAN
0 + 187
POTONGAN MELINTANG
0 + 220
0 + 297
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
Handel
KABUPATEN TABALONG
0 + 276
DIAJUKAN SEBAGAI GAMBAR :
Baut 34' POTONGAN MELINTANG
Ruas Jalan
0 + 268
Ruas Jalan
-1
-2
Ductile iron with ENP Mengetahui
Stanless stell disc
Pejabat Pembuat Komitmen (PPK)
0 ± 000
0 + 237.5
Ruas Jalan
Not to Scale
Di Setujui
Kabag Teknik
0 + 191
HDPE Ø 50 mm
as Jalan -
3 H. MUSTA'IN,S.Sos
Ru
NIK 6309010
0 + 187
Di Periksa
Ruas Jalan
J.2
-1
Tee 50 x 50 x 50 mm 2 Bh
HDPE Ø 50 mm
Stub Flange Ø 50 mm 2 Bh SLAMET KARYADI
NIK 6309042
Detail Tee HDPE
Crossing 4 M
Not to scale KETERANGAN VOL JUDUL GAMBAR
Baut 58" Butterfly Valve Ø 50 mm 1 Bh Pengadaan dan Pemasangan Pipa
Rubber Packing
Stub Flange Ø 50 mm 2 Bh
Crossing 4 M Penanggung Jawab
Urugan Pasir 30 cm
Detail Stub Flange Ø 50 mm HDPE
Pipa HDPE Ø 50 mm
KETERANGAN VOL
Not to Scale
Butterfly Valve Ø 50 mm 1 Bh
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
UTARA
C
C
.c
.c
w
w
UTARA
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
-3
Ruas Jalan
POTONGAN MELINTANG
UTARA 0 + 220
PROGRAM/KEGIATAN
Ruas Jalan
Bend 90°
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
-1
Ruas Jala
n-3 PEKERJAAN
POTONGAN MELINTANG
0 + 220
Ruas Jalan
Ruas Jalan
-1
-2
Mengetahui
Pejabat Pembuat Komitmen (PPK)
Ruas Jalan
NIK 6309023
Di Setujui
-2
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
KETERANGAN VOL
Stub Flange Ø 100 mm 1 Bh
Detail Reducer HDFE
Not to scale
0 ± 000
J.6 Reducer 100 x 50 mm 1 Bh SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
RUAS JALAN - 2
J.7 KONSULTAN
STA 0+000 s/d STA 0 +220
Baut 58"
CV. P R I S M A J A S A
Aspal Latasir
Aspal Penetrasi Architect & engineering consultant
Lapis Agregat kelas A tebal 30 cm Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Pipa HDPE Ø 50 mm
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Dari Tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re U tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
yu
KEC.MUARA HARUS DAN KEC. MUARA UYA
A
S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG
b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
Awayan S S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik
Te
BARABAI Birayang gala Tanjungsamalantakan
l.
Tg. Pamukan
Pa
Pasungkan Labuhannamas Utara i ng
ar
a i antu
m
b a S. C
Kuripan Negara S. Bara G. Besar
uk
eg Pagat
an
. N
Labuhannamas Selatan Haruyan Gunungbatu Besar
S
KANDANGAN Ankinang
US
Telagalangsat
Simpur
AT
H. MUSTA'IN,S.Sos
Padangbatung NIK 6309010
ER
Margasari Sungairaya Pudi
M
G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan
PE
MARABAHAN Ta KasI Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat an
rito
Anjirmuara S. Alala
k mk SLAMET KARYADI
Ria
Ba
S. T
am S. Simpangampat NIK 6309042
S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR
S.
Tabunganen Ulin S. Batulicin Sungaibali
R
MARTAPURA M
ia
em Pengadaan dan Pemasangan Pipa
m
Karangintan
ka
Aluhaluh baSUNGAI PERAK
BANJARBARU Dari tugu Obor Ke Arah Kaltim
na
Lasung lap
n
i
Cempaka W. Riamkanan Sejaka Kecamatan Murung Pudak
Sel.
R
Pantaulayung
SA
Kurau
Seb
Tanjungkurong
t
Pagatan
au
Batibati
1150 KONSULTAN
l. L
KA
uku
Sabamban
Se
MA
G. Aurbunak
Tanjungseloka
CV. P R I S M A J A S A
Satui
AT
PELAIHARI
Kintap Karambu
L
Architect & engineering consultant
SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar
Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
KasI Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
KasI Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
Skala 1: 600
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
1 + 940
2 + 075
UTARA
PROGRAM/KEGIATAN
JALUR 1
2
JALUR
1 + 900
1 + 794
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1 + 759
PEKERJAAN
1 + 865
POTONGAN MELINTANG
1+7
08 PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
JALUR 2
JALUR 1
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
JALUR 1
JALUR 2
Pejabat Pembuat Komitmen (PPK)
JALUR 1
Kabag Teknik
1 + 18
8
JALUR 2
JALUR 1
H. MUSTA'IN,S.Sos
NIK 6309010
0 + 994
0 + 950
Di Periksa
KasI Perencaan
2
JALUR
1
JALUR
5
0 + 82
SLAMET KARYADI
NIK 6309042
72
0+7
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
2
JALUR Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
1
JALUR
KONSULTAN
CV. P R I S M A J A S A
2
JALUR
Penanggung Jawab
4
0 + 27
0 + 311
2
JALUR
00
Di Gambar
0±0
1
JALUR
00
0±0
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
1 + 940
2 + 075
UTARA
PROGRAM/KEGIATAN
JALUR 1
2
JALUR
1 + 900 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
1 + 794
KABUPATEN TABALONG
PEKERJAAN
1 + 759
1 + 865
POTONGAN MELINTANG
JALUR 2
KEC.MUARA HARUS DAN KEC. MUARA UYA
JALUR 1
KABUPATEN TABALONG
JALUR 1
Pejabat Pembuat Komitmen (PPK)
JALUR 2
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
Di Setujui
JALUR 1
Kabag Teknik
JALUR 2
H. MUSTA'IN,S.Sos
JALUR 1
NIK 6309010
Di Periksa
0 + 950
KasI Perencaan
2
JALUR
1
JALUR
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
2
JALUR
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
2
JALUR
Penanggung Jawab
2
JALUR
Di Gambar
00
0±0
1
JALUR
00
0±0
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
2 + 075
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a
UTARA
JALUR 1
1 + 900
UTARA 1 + 865
1
JALUR
JALUR 1
PROGRAM/KEGIATAN
JALUR 1
KABUPATEN TABALONG
Ø8 - 10 0 + 315
Ø8 - 10 1 + 347.5
0 + 311
PEKERJAAN
JALUR 1
POTONGAN MELINTANG
JALUR 1
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0 + 22
4
KEC.MUARA HARUS DAN KEC. MUARA UYA
Ø8 - 10 Ø8 - 10 KABUPATEN TABALONG
R1
9
0 + 21
JALU
TUTUP BETON
DIAJUKAN SEBAGAI GAMBAR :
1
JALUR
POTONGAN MELINTANG
Mengetahui
1
JALUR
URUGAN TANAH
1
Pejabat Pembuat Komitmen (PPK)
JALUR
BETON 1:2:3
0 + 311
10 1
GATE VALVE 0 + 219
0
PASIR DIPADATKAN 0 ± 00
1
JALUR
SLAMET BUDI SANTOSA,S.Sos
PIPA HDPE
0 ± 000 NIK 6309023
Di Setujui
Kabag Teknik
Di Periksa
KasI Perencaan
Flange spigot PVC Ø 50 mm
Ø8 - 10
J.1 Stub Flange Ø 75 mm 2 Bh
JUDUL GAMBAR
HDPE Ø 75 mm
Ø8 - 10
Pengadaan dan Pemasangan Pipa
Baut 58" Baut 58"
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
Stub Flange Ø 75 mm HDPE Stub Flange Ø 50 mm HDPE
KETERANGAN VOL
Rubber Packing Rubber Packing
Tee 75 x 75 x 75 mm 1 Bh
KONSULTAN
Ø8 - 10 Ø8 - 10 TEE HDPE 75 X 75 X 75
TUTUP BETON
HDPE Ø 75 mm
J.2 Gate Valve Ø 50 mm
Stub Flange Ø 50 mm
1
2
Bh
Bh CV. P R I S M A J A S A
Architect & engineering consultant
BEGEL Ø12
LUBANG Ø13
Reduser 75 - Ø 50 mm 1 Bh Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
8 Detail Tee HDPE
Stub Flange Ø 75 mm HDPE Stub Flange Ø 50 mm HDPE
5
VARIABLE
MIRZA AZWARI, ST
Draftman
Urugan Pasir 40 cm
GIBOULT JOINT Ø 50 mm Profil Melintang Pipa
Not to Scale
Pipa HDPE Ø 75 mm
Detail Reducer Skala 1 : 50
HDFE 75 mm - 50 mm
Not to scale
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
2 + 075
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a
UTARA
JALUR 1
1 + 900
UTARA 1 + 351.5
1 + 865
JALUR 1
1 + 347.5
PROGRAM/KEGIATAN
JALUR 1
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
JALUR 1
Ø8 - 10 KABUPATEN TABALONG
Ø8 - 10
1 + 192 1 + 347.5
PEKERJAAN
JALUR 1
1 + 188 POTONGAN MELINTANG
JALUR 1
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
JALUR 1
Ø8 - 10 Ø8 - 10
KABUPATEN TABALONG
1
JALUR
TUTUP BETON
1
BEGEL Ø12
JALUR
POTONGAN MELINTANG
Mengetahui
1
URUGAN TANAH
JALUR
BETON 1:2:3 Pejabat Pembuat Komitmen (PPK)
10 1 0 + 311
GATE VALVE
0 + 219
PASIR DIPADATKAN
1
JALUR
SLAMET BUDI SANTOSA,S.Sos
PIPA HDPE 0 ± 00
0
NIK 6309023
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Baut 58"
Di Periksa
Bend 90° KasI Perencaan
KETERANGAN VOL
HDPE Ø 150 mm
HDPE Ø 75 mm
J.4 Tee 75 x 75 x 75 mm
Tee 150 x 150 x 150 mm 1
1 Bh
Bh
SLAMET KARYADI
NIK 6309042
RUAS JALAN - 1
STA 0+000 s/d STA 1+865
Ir. SITTI UMAYYAH
Stub Flange Ø 150 mm HDPE
Direktris
MIRZA AZWARI, ST
Detail Grip Coupling Ø 150 mm Urugan Pasir 40 cm Draftman
Not to Scale Profil Melintang Pipa
Pipa HDPE Ø 75 mm
Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
2 + 075
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a
UTARA Handel
JALUR 1
1 + 900
UTARA 1 + 865
Baut 78 ''
JALUR 1
075
2+
POTONGAN MELINTANG
PROGRAM/KEGIATAN
Ductile iron with ENP
Stanless stell disc
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
JALUR 1
Ø8 - 10 KABUPATEN TABALONG
Ø8 - 10
1 + 347.5
JALUR 1
Not to Scale POTONGAN MELINTANG
JALUR 1
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
JALUR 1
Ø8 - 10 Ø8 - 10 KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
1
JALUR
TUTUP BETON
1
JALUR
POTONGAN MELINTANG
LUBANG Ø13
8
5 Gambar Rencana Kerja
VARIABLE
1
JALUR
BETON 1:2:3
Pejabat Pembuat Komitmen (PPK)
10 1 0 + 311
GATE VALVE
0 + 219
PASIR DIPADATKAN
1
JALUR
PIPA HDPE
SLAMET BUDI SANTOSA,S.Sos
0 ± 00
0
NIK 6309023
Di Setujui
Kabag Teknik
Handel
H. MUSTA'IN,S.Sos
NIK 6309010
Bend 90°
HDPE Ø 75 mm
Di Periksa
Baut 78 '' KasI Perencaan
POTONGAN MELINTANG
KETERANGAN VOL
Ductile iron with ENP
Stanless stell disc Gate Valve Ø 75 mm 1 Bh
TEE HDPE 75 X 75 X 75
J.6 Tee 75 x 75 x 75 mm
Bend 90°- Ø 50 mm
1
1
Bh
Bh
SLAMET KARYADI
NIK 6309042
Butterfly Valve Ø 50 mm
HDPE Ø 75 mm Detail Bend 90° HDPE Ø 50 mm
Not to Scale
Butterfly Valve Ø 50 mm 1 Bh JUDUL GAMBAR
Not to Scale
CV. P R I S M A J A S A
KETERANGAN VOL Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Baut 58" Detail Reducer Butterfly Valve Ø 75 mm 1 Bh
J.7
HDFE 75 mm - 50 mm
Stub Flange Ø 50 mm HDPE Stub Flange Ø 75 mm 2 Bh
Stub Flange Ø 75 mm HDPE
Not to scale Penanggung Jawab
Rubber Packing
Rubber Packing
MIRZA AZWARI, ST
Urugan Pasir 40 cm Draftman
Profil Melintang Pipa RUAS JALAN - 1
Pipa HDPE Ø 75 mm
Skala 1 : 50 STA 0+000 s/d STA 1+865 (Jalan HRS Base)
STA 1+865 s/d STA 1+900 (Jembatan)
STA 1+900 s/d STA 2+075 (Jalan HRS Base)
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a UTARA 2 + 075
k e r- s o ft w a
JALUR 1
1 + 900
1 + 865
PROGRAM/KEGIATAN
JALUR 1
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
JALUR 1
1 + 347.5 PEKERJAAN
JALUR 1
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
KasI Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
KETERANGAN VOL
Bend GI 45° Ø 75 mm 4 Bh Pengadaan dan Pemasangan Pipa
JMB Air Valve Ø 75 mm 1 Bh
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
Flange GI Ø 75 mm 28 Bh
KONSULTAN
Flexible Joint Ø 75 mm 2 Bh
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
KasI Perencaan
SLAMET KARYADI
NIK 6309042
Bend GI 45° - Ø 75 mm
KONSULTAN
Flange - Ø 75 mm
Liner (Tube)
CV. P R I S M A J A S A
Bend GI 45° - Ø 75 mm Architect & engineering consultant
Air Valve Ø 75 mm Not to Scale Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Not to Scale
Flexibel Joint - Ø 75 mm
Not to Scale
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
1 + 940
lic
lic
C
C
.c
.c
w
w
tr e tr re
ar
.
.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA
2
JALUR
1 + 794
2
JALUR
1 + 759
UTARA 8
1 + 708
0 + 27
2
JALUR
0 + 27
4
1 + 539
PROGRAM/KEGIATAN
JALUR 2
KABUPATEN TABALONG
Ø8 - 10 1 + 228
PEKERJAAN
Ø8 - 10
POTONGAN MELINTANG
JALUR 2
0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
R2
JALU
0 + 825 KABUPATEN TABALONG
Ø8 - 10 Ø8 - 10 0 + 772
2
JALUR
TUTUP BETON
DIAJUKAN SEBAGAI GAMBAR :
2
JALUR
POTONGAN MELINTANG
8
BEGEL Ø12
LUBANG Ø13 Gambar Rencana Kerja
5
R2
JALU
Mengetahui
VARIABLE
2
JALUR
10 1
GATE VALVE
2
JALUR
0 ± 000
PASIR DIPADATKAN
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
PIPA HDPE
Di Setujui
Kabag Teknik
Di Periksa
KasI Perencaan
SLAMET KARYADI
KETERANGAN VOL NIK 6309042
GIBOULT JOINT Ø 50 mm
Gate Valve Ø 75 mm 1 Bh
JUDUL GAMBAR
J.8
Not to Scale
Baut 58" Baut 58" Stub Flange Ø 75 mm 2 Bh
Pengadaan dan Pemasangan Pipa
Ø8 - 10
Ø8 - 10
Dari tugu Obor Ke Arah Kaltim
Stub Flange Ø 75 mm HDPE Stub Flange Ø 50 mm HDPE Bend 90° Kecamatan Murung Pudak
Rubber Packing Rubber Packing
KONSULTAN
KETERANGAN VOL
Tee 75 x 75 x 75 mm 1 Bh
CV. P R I S M A J A S A
Ø8 - 10
TUTUP BETON
Ø8 - 10
BEGEL Ø12
Detail Bend 90° HDPE Ø 50 mm
Stub Flange Ø 50 mm 2 Bh
LUBANG Ø13
8
5
Not to scale Bend 90° - Ø 50 mm 1 Bh Penanggung Jawab
VARIABLE
Direktris
PIPA HDPE
Median Jalan
Trotoar
Di Gambar
TEE HDPE 75 X 75 X 75
MIRZA AZWARI, ST
Detail Tee HDPE Draftman
Not to scale
Pipa PVC Ø 250 mm (existing)
Profil Melintang Pipa
Skala 1 : 50
Urugan Pasir 35 cm
Pipa HDPE Ø 75 mm
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
1 + 940
lic
lic
C
C
.c
.c
w
w
tr e tr re
ar
.
.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA
2
JALUR
1 + 794
2
JALUR
1 + 759
UTARA 8
1 + 708
0 + 27
2
JALUR
0 + 27
4
1 + 539
PROGRAM/KEGIATAN
JALUR 2
KABUPATEN TABALONG
1 + 228
PEKERJAAN
POTONGAN MELINTANG
Ø8 - 10
JALUR 2
Ø8 - 10 0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
R2
JALU
0 + 825 KABUPATEN TABALONG
0 + 772
2
JALUR
DIAJUKAN SEBAGAI GAMBAR :
2
JALUR
Ø8 - 10 Ø8 - 10
POTONGAN MELINTANG
R2
JALU
BEGEL Ø12 Mengetahui
LUBANG Ø13 0 + 274
Pejabat Pembuat Komitmen (PPK)
8 0
0 ± 00
5
2
JALUR
VARIABLE
URUGAN TANAH
2
JALUR
BETON 1:2:3
0 ± 000
H. MUSTA'IN,S.Sos
Detail Gate Valve Ø 150 mm NIK 6309010
Not to Scale
Di Periksa
KasI Perencaan
HDPE Ø 250 mm
SLAMET KARYADI
KETERANGAN VOL NIK 6309042
Stub Flange Ø 150 mm Stub Flange Ø 250 mm HDPE
Stub Flange Ø 150 mm HDPE
Tee 250 x 250 x 250 mm 1 Bh
Rubber Packing
JUDUL GAMBAR
TEE HDPE 250 X 250 X 250
J.20 Gate Valve Ø 150 mm
Reducer 250 x 150 mm
1
1
Bh
Bh
Pengadaan dan Pemasangan Pipa
HDPE Ø 250 mm Dari tugu Obor Ke Arah Kaltim
Stub Flange Ø 150 mm 2 Bh Kecamatan Murung Pudak
Baut dan Mur
Penanggung Jawab
Trotoar Trotoar
Di Gambar
Pipa GI Ø 250 mm
POTONGAN CROSING PIPA (CR.1) TAMPAK CROSING PIPA (CR.1) TAMPAK CROSING PIPA (CR.1)
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
1 + 940
lic
lic
C
C
.c
.c
w
w
tr e tr re
ar
.
.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA
2
JALUR
1 + 794
1 + 759
1 + 708
2
JALUR 2
JALUR
UTARA
1 + 539
PROGRAM/KEGIATAN
0 + 998
JALUR 2
0 + 994
KABUPATEN TABALONG
0 + 954
1 + 228
0 + 950 PEKERJAAN
POTONGAN MELINTANG
JALUR 2
0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
R2
JALU
0 + 825 KABUPATEN TABALONG
Ø8 - 10 0 + 772
Ø8 - 10
DIAJUKAN SEBAGAI GAMBAR :
2
JALUR
2
JALUR
9
0 + 82 POTONGAN MELINTANG
0 + 82
5
Gambar Rencana Kerja
2
JALUR
0 + 77
6
Ø8 - 10 Ø8 - 10 Mengetahui
0 + 274
Pejabat Pembuat Komitmen (PPK)
0 + 77
2 TUTUP BETON
2
JALUR
BEGEL Ø12
0 ± 000
LUBANG Ø13
8 SLAMET BUDI SANTOSA,S.Sos
5
NIK 6309023
VARIABLE
URUGAN TANAH
Di Setujui
BETON 1:2:3 Kabag Teknik
10 1
GATE VALVE
PASIR DIPADATKAN
PIPA HDPE
H. MUSTA'IN,S.Sos
HDPE Ø 75 mm
Baut 58"
NIK 6309010
Di Periksa
Stub Flange Ø 50 mm HDPE KasI Perencaan
Rubber Packing Detail Gate Valve Ø 50 mm
Not to Scale
TEE HDPE 75 X 75 X 75
SLAMET KARYADI
HDPE Ø 75 mm KETERANGAN VOL NIK 6309042
Tee 75 x 75 x 75 mm 1 Bh
J.10
Stub Flange Ø 50 mm HDPE
Detail Tee HDPE Rubber Packing
Gate Valve Ø 50 mm 1 Bh
JUDUL GAMBAR
Not to scale
Stub Flange Ø 50 mm 2 Bh Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Detail Stub Flange Ø 50 mm HDPE
Reducer 75 - Ø 50 mm 1 Bh Kecamatan Murung Pudak
Not to Scale
Detail Reducer KETERANGAN VOL KONSULTAN
HDFE 75 mm - 50 mm
Tee 75 x 75 x 75 mm 1 Bh
J.11
Not to scale
Gate Valve Ø 50 mm 1 Bh CV. P R I S M A J A S A
Stub Flange Ø 50 mm 2 Bh Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Reducer 75 - Ø 50 mm 1 Bh
Median Jalan
Trotoar
J.12 Gate Valve Ø 50 mm
Stub Flange Ø 50 mm
1
2
Bh
Bh
Ir. SITTI UMAYYAH
Reducer 75 - Ø 50 mm 1 Bh Direktris
KETERANGAN VOL
Di Gambar
Tee 75 x 75 x 75 mm 1 Bh
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
1 + 940
lic
lic
C
C
.c
.c
w
w
tr e tr re
ar
.
.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA
2
JALUR
1 + 794
1 + 759
1 + 708
JALUR 2
UTARA
1 + 539
PROGRAM/KEGIATAN
1 + 58
5
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
JALUR 2
Ø8 - 10
CROSSING 40 M
KABUPATEN TABALONG
Ø8 - 10
1 + 53
9 1 + 228
Koneksi 8 - 3 "
PEKERJAAN
POTONGAN MELINTANG
JALUR 2
0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ø8 - 10 Ø8 - 10 KEC.MUARA HARUS DAN KEC. MUARA UYA
R2
JALU
TUTUP BETON 0 + 825 KABUPATEN TABALONG
0 + 772
2
DIAJUKAN SEBAGAI GAMBAR :
JALUR
2
JALUR
BEGEL Ø12
LUBANG Ø13 POTONGAN MELINTANG
2
JALUR
URUGAN TANAH
BETON 1:2:3 Mengetahui
0 + 274
Pejabat Pembuat Komitmen (PPK)
10 1
2
JALUR
GATE VALVE
1 + 234
PASIR DIPADATKAN
0 ± 000
1 + 228
PIPA HDPE SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
Di Setujui
Kabag Teknik
Detail Gate Valve Ø 50 mm
Not to Scale
H. MUSTA'IN,S.Sos
NIK 6309010
HDPE Ø 50 mm
Baut 58"
Di Periksa
KasI Perencaan
Stub Flange Ø 50 mm HDPE
Rubber Packing
TEE HDPE 75 X 75 X 50
SLAMET KARYADI
NIK 6309042
HDPE Ø 75 mm
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Median Jalan
Trotoar
Ir. SITTI UMAYYAH
Direktris
Di Gambar
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
1 + 940
lic
lic
C
C
.c
.c
w
w
tr e tr re
ar
.
.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA
2
JALUR
1 + 794
1 + 759
1 + 708
JALUR 2
UTARA
1 + 539
PROGRAM/KEGIATAN
1 + 58
5
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
JALUR 2
Ø8 - 10
CROSSING 40 M
KABUPATEN TABALONG
Ø8 - 10
1 + 53
9 1 + 228
Koneksi 200 mm - 75 mm
PEKERJAAN
POTONGAN MELINTANG
JALUR 2
0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Ø8 - 10 Ø8 - 10 KEC.MUARA HARUS DAN KEC. MUARA UYA
R2
JALU
TUTUP BETON 0 + 825 KABUPATEN TABALONG
0 + 772
JALUR 2
DIAJUKAN SEBAGAI GAMBAR :
2
JALUR
BEGEL Ø12
LUBANG Ø13 POTONGAN MELINTANG
2
JALUR
URUGAN TANAH
BETON 1:2:3 Mengetahui
0 + 274
Pejabat Pembuat Komitmen (PPK)
10 1
2
JALUR
GATE VALVE
1 + 234
PASIR DIPADATKAN
0 ± 000
1 + 228
PIPA HDPE SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
Di Setujui
Kabag Teknik
Detail Gate Valve Ø 75 mm
Not to Scale
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
KasI Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Dari tugu Obor Ke Arah Kaltim
Kecamatan Murung Pudak
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Trotoar Trotoar
Penanggung Jawab
Pipa GI Ø 200 mm
POTONGAN CROSING PIPA (CR.2) TAMPAK CROSING PIPA (CR.2) TAMPAK CROSING PIPA (CR.2)
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
1 + 940
lic
lic
C
C
.c
.c
w
w
tr e tr re
ar
.
.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA
JALUR 2
1 + 794
1 + 940 1 + 759
1 + 708
JALUR 2
UTARA
1 + 539
PROGRAM/KEGIATAN
2
JALUR
KABUPATEN TABALONG
1 + 228
PEKERJAAN
2
JALUR
POTONGAN MELINTANG
JALUR 2
0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
1 + 794
0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
R2
JALU
0 + 825 KABUPATEN TABALONG
Ø8 - 10 0 + 772
Ø8 - 10
DIAJUKAN SEBAGAI GAMBAR :
2
JALUR
1 + 759
POTONGAN MELINTANG
0 + 000
0 + 270
2
JALUR
Ø8 - 10 Ø8 - 10 Mengetahui
0 + 000
0 + 274
Pejabat Pembuat Komitmen (PPK)
0 + 275
TUTUP BETON
R2
JALU
JALUR 2
BEGEL Ø12 0
0 ± 00
LUBANG Ø13
0 + 000 SLAMET BUDI SANTOSA,S.Sos
8
0 + 282
5
NIK 6309023
VARIABLE
URUGAN TANAH
Di Setujui
BETON 1:2:3 Kabag Teknik
10 1
GATE VALVE
PASIR DIPADATKAN
PIPA HDPE
H. MUSTA'IN,S.Sos
NIK 6309010
Baut 58"
HDPE Ø 75 mm
Di Periksa
KasI Perencaan
Stub Flange Ø 50 mm HDPE
Rubber Packing Detail Gate Valve Ø 50 mm
Not to Scale
TEE HDPE 75 X 75 X 75
KETERANGAN VOL SLAMET KARYADI
NIK 6309042
Tee 75 x 75 x 75 mm 1 Bh
J.15
HDPE Ø 75 mm
Median Jalan
J.17 Gate Valve Ø 50 mm
Stub Flange Ø 50 mm
1
2
Bh
Bh
Trotoar
Reducer 75 - Ø 50 mm 1 Bh Ir. SITTI UMAYYAH
Direktris
Di Gambar
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
1 + 940
lic
lic
C
C
.c
.c
w
w
tr e tr re
ar
.
.
ac ac
k e r- s o ft w UTARA k e r- s o ft w a
UTARA
JALUR 2
1 + 794
1 + 940 1 + 759
1 + 708
JALUR 2
UTARA
1 + 539
PROGRAM/KEGIATAN
Handel
2
JALUR
Handel KABUPATEN TABALONG
1 + 228
Baut 34'
PEKERJAAN
JALUR 2
POTONGAN MELINTANG
Baut 78 ''
JALUR 2
0 + 994
PENGADAAN DAN PEMASANGAN PIPA HDPE
1 + 794
Ductile iron with ENP 0 + 950 DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Stanless stell disc
KEC.MUARA HARUS DAN KEC. MUARA UYA
R2
JALU
Ductile iron with ENP 0 + 825 KABUPATEN TABALONG
Stanless stell disc 0 + 772
2
JALUR
1 + 759
Butterfly Valve Ø 50 mm POTONGAN MELINTANG
Butterfly Valve Ø 75 mm
1 + 71
2
Not to Scale
Gambar Rencana Kerja
1 + 70
2
JALUR
8
Not to Scale
Mengetahui
0 + 274
Pejabat Pembuat Komitmen (PPK)
Bend 90°
R2
JALU
JALUR 2
0
0 ± 00
Di Setujui
Kabag Teknik
Ø8 - 10 5
Baut 8"
Di Periksa
KasI Perencaan
Stub Flange Ø 75 mm HDPE
Rubber Packing
TEE HDPE 75 X 75 X 75
Ø8 - 10 Ø8 - 10
KETERANGAN VOL
TUTUP BETON SLAMET KARYADI
Gate Valve Ø 75 mm 1 Bh NIK 6309042
HDPE Ø 75 mm
8
BEGEL Ø12
LUBANG Ø13 Detail Tee HDPE Stub Flange Ø 75 mm HDPE
J.18 Tee 75 x 75 x 75 mm
Bend 90°- Ø 50 mm
1
1
Bh
Bh
JUDUL GAMBAR
5 Rubber Packing
Not to scale Pengadaan dan Pemasangan Pipa
VARIABLE
PIPA HDPE
Reducer 75 - Ø 50 mm 1 Bh
CV. P R I S M A J A S A
Architect & engineering consultant
KETERANGAN VOL Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
RUAS JALAN - 2
STA 0+000 s/d STA 1+759 Butterfly Valve Ø 75 mm 1 Bh
Detail Gate Valve Ø 75 mm
Not to Scale
Lapis Pondasi Agregat Atas (LPA) Tebal 45 cm J.19 Stub Flange Ø 75 mm 2 Bh Penanggung Jawab
Median Jalan
Trotoar
Baut 58"
Ir. SITTI UMAYYAH
Direktris
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a UTARA 2 + 075
k e r- s o ft w a
JALUR 1
1 + 900
1 + 865
PROGRAM/KEGIATAN
JALUR 1
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
JALUR 1
1 + 347.5 PEKERJAAN
JALUR 1
M.T M.T M.T M.T POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
KasI Perencaan
SLAMET KARYADI
NIK 6309042
KETERANGAN VOL
Bend GI 45° Ø 75 mm 4 Bh JUDUL GAMBAR
JMB Air Valve Ø 75 mm 1 Bh
Pengadaan dan Pemasangan Pipa
Flange GI Ø 75 mm 28 Bh Dari tugu Obor Ke Arah Kaltim
Flexible Joint Ø 75 mm 2 Bh Kecamatan Murung Pudak
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
KasI Perencaan
SLAMET KARYADI
NIK 6309042
Bend GI 45° - Ø 75 mm
KONSULTAN
Flange - Ø 75 mm
Liner (Tube)
CV. P R I S M A J A S A
Bend GI 45° - Ø 75 mm Architect & engineering consultant
Air Valve Ø 75 mm Not to Scale Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Not to Scale
Flexibel Joint - Ø 75 mm
Not to Scale
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
U
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
u
Ay
KEC.MUARA HARUS DAN KEC. MUARA UYA
S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG
b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
AwayanS S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik
Te
BARABAI Birayang gala Tanjungsamalantakan
l
Tg. Pamukan
.P
Pasungkan Labuhannamas Utara i ng
am
ar
a a i antu
Kuripan Negara S. Bara b G. Besar S. C
uk
eg Pagat
a
N
n
.
Labuhannamas
S Selatan Haruyan Gunungbatu Besar
KANDANGAN Ankinang
S
TU
Telagalangsat
Simpur H. MUSTA'IN,S.Sos
RA
Padangbatung NIK 6309010
ME
Margasari Sungairaya Pudi
G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan
PE
MARABAHAN Ta Kasi Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat n
rito
Anjirmuara k ka
S. Alala Ria
m SLAMET KARYADI
Ba
S. T
am S. Simpangampat NIK 6309042
S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR
S.
Tabunganen Ulin S. Batulicin Sungaibali
R
MARTAPURA M
ia
em Pengadaan dan Pemasangan Pipa
m
Karangintan
ka
Aluhaluh baSUNGAI PERAK
BANJARBARU Jalan Desa Murung Karangan
na
Lasung lap
n
i
Cempaka W. Riamkanan Sejaka Kecamatan Muara Harus
Sel.
AR
Pantaulayung
Kurau
Seb
Tanjungkurong
t
Pagatan
au
Batibati
KONSULTAN
AS
1150
l. L
uku
Sabamban
AK
Se
G. Aurbunak
Tanjungseloka
TM
CV. P R I S M A J A S A
Satui
PELAIHARI
LA
Kintap Karambu
Architect & engineering consultant
SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar
Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
U
U
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
U
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus
KONSULTAN
KETERANGAN : CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Pipa HDPE Ø 150 mm / 6" (Eksisting)
Pipa HDPE Ø 150 mm / 6" Penanggung Jawab
Di Gambar
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
U
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H.MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
KETERANGAN : NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Pipa HDPE Ø 150 mm / 6" ( P= 266 m) Jalan Desa Murung Karangan
Kecamatan Muara Harus
Pipa HDPE Ø 100 mm / 4" ( P= 6 m)
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
U
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
KETERANGAN : H.MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
Pipa HDPE Ø 150 mm / 6" ( P= 266 m)
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
DENAH PIPA
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
U
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
KETERANGAN : H.MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
Pipa HDPE Ø 150 mm / 6" ( P= 266 m)
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
DENAH PIPA
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
DETAIL JUNCTION 01
lic
lic
C
C
.c
.c
w
w
JUNCTION 01
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PENGADAAN ACCESSORIES
Di Setujui
Gibel Join Ø 75 mm
Kabag Teknik
DETAIL JUNCTION 02
PENGADAAN ACCESSORIES
H.MUSTA'IN,S.Sos
NIK 6309010
No. Node JUMLAH
Di Periksa
1 Pipa HDPE PN 10 OD Ø 150 mm Kasi Perencaan
m
m 2 Tee HDPE Ø 150x150x150 m
75 2
Ø
Pipa HDPE Ø 150 mm
SLAMET KARYADI
PE 3 Tee HDPE Ø 75x75x75 m 1 NIK 6309042
HD Pipa HDPE Ø 150 mm
pa
Pi Reduser 150 - Ø 75 mm 1
4
Crosing jalan ( c1)
JUDUL GAMBAR
5 Dop Flange Ø 150 mm ( 6") 1
Pengadaan dan Pemasangan Pipa
6 Giboult joint Ø 75 2 Jalan Desa Murung Karangan
Kecamatan Muara Harus
7 bend 45° Ø 75 4
KONSULTAN
8 stub flange Ø 75 2
9 pipa HDPE Ø 75 6m CV. P R I S M A J A S A
Architect & engineering consultant
10 Gate Valve Ø 75 1 Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Pipa HDPE Ø 150 mm
Penanggung Jawab
Pi
pa
HD
PE
Ir. SITTI UMAYYAH
Ø
75
m
m
SKEMA JUNCTION -2 ( J2) Direktris
Di Gambar
Gibel Join Ø 75 mm
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
HDPE Ø 150 mm
to
to
ww
ww
om
om
k
k
Be
lic
lic
C
C
.c
.c
w
w
tr re tr re
nd
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
45
°
TEE HDPE 150 X150X 150
PROGRAM/KEGIATAN
Stub Flange HDPE
PEKERJAAN
POTONGAN MELINTANG
Rubber Packing
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
Tee HDPE KABUPATEN TABALONG
Tee HDPE
Stub Flange HDPE
Stub Flange HDPE DIAJUKAN SEBAGAI GAMBAR :
Detail Bend 90° HDPE ∅ 50 mm Detail Stub Flange ∅ 75 mm HDPE POTONGAN MELINTANG
Tee HDPE
Di Setujui
Kabag Teknik
H.MUSTA'IN,S.Sos
NIK 6309010
SLAMET KARYADI
HDPE Ø 75mm
not to scale
HDPE Ø 75mm
Stub Flange HDPE HDPE Ø 150 mm
KONSULTAN
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
DETAIL JUNCTION 03
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
JUMLAH
1 Tee HDPE Ø 150x150x 150 m 1 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
2 stub Flange Ø 100 mm 2
1 PEKERJAAN
3 Gate Valve Ø 100 mm POTONGAN MELINTANG
H.MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
40
60
Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus
TEE HDPE 150 X150X 100
Ø8 - 10
Ø8 - 10
KONSULTAN
Stub Flange HDPE HDPE Ø 150 mm
60
CV. P R I S M A J A S A
Architect & engineering consultant
6
8
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Stub Flange HDPE
Ø8 - 10 Ø8 - 10
Tee HDPE Tee HDPE
Stub Flange HDPE Baut 58" - 12 bh TUTUP BETON Penanggung Jawab
Stub Flange HDPE
60
40
Stub Flange HDPE BEGEL Ø10
Rubber Packing LUBANG Ø13
Tee HDPE 8
5 Ir. SITTI UMAYYAH
VARIABLE
Direktris
Tee HDPE URUGAN TANAH
BETON 1:2:3
Stub Flange HDPE
10 1 Di Gambar
Stub Flange HDPE GATE VALVE
not to scale
PIPA HDPE
MIRZA AZWARI, ST
20 20 Draftman
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
1.00 6.00 1.00
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
55
PEKERJAAN
Urugan Sirtu POTONGAN MELINTANG
Di Periksa
Urugan Sirtu Kasi Perencaan
NIK 6309042
Urugan Pasir
Pot. Galian pipa Sta 0+100a sd 0+200a Pengadaan dan Pemasangan Pipa
Jalan Desa Murung Karangan
Kecamatan Muara Harus
KONSULTAN
55
Penanggung Jawab
Bahu Jalan Perkerasan Aspal Bahu Jalan
Urugan Sirtu
Di Gambar
Urugan tanah
150
Pipa HDPE PN 10 OD 150 mm Pot. Galian pipa Sta 0+200a sd 0+260aa MIRZA AZWARI, ST
Draftman
Urugan Pasir
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
U
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H.MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
KETERANGAN :
SLAMET KARYADI
NIK 6309042
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 9.00 1.00
PEKERJAAN
POTONGAN MELINTANG
Pipa GI Ø 200 mm
Gambar Rencana Kerja
Pipa HDPE PN 10 OD 150 mm Mengetahui
Pejabat Pembuat Komitmen (PPK)
Di Setujui
Kabag Teknik
H.MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
Perkerasan Aspal
Pipa GI Ø 200 mm SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
1.10
KONSULTAN
DETAIL CROSING PIPA (C3)
TAMPAK CROSING PIPA (C1) CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 7.00 1.00
PEKERJAAN
POTONGAN MELINTANG
Pipa GI Ø 200 mm
Gambar Rencana Kerja
Pipa HDPE PN 10 OD 150 mm Mengetahui
Pejabat Pembuat Komitmen (PPK)
Di Setujui
Kabag Teknik
H.MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Perkerasan Aspal Kasi Perencaan
SLAMET KARYADI
NIK 6309042
1.10
KONSULTAN
TAMPAK CROSING PIPA (C1) Pipa HDPE PN 10 OD 150 mm
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a UTARA k e r- s o ft w a
UTARA
HDPE Ø 50 mm
UTARA
PROGRAM/KEGIATAN
0±
TEE HDPE 50 X 50 X 50 00
0
0± PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
00
0
0
+6
KABUPATEN TABALONG
HDPE Ø 50 mm 75
0
±0
0+ 00
200
PENGADAAN DAN PEMASANGAN PIPA HDPE
0+
09
7
Not to scale
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0±
00
0+ 0
200
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
0+5
00
Gambar Rencana Kerja
0±
00
0
0±
00
0
Bend 90° 0+
200
0 + 200
Mengetahui
Pejabat Pembuat Komitmen (PPK)
0 + 500
0 + 500
0+7
86
0 + 786
0+7
86 0 + 786
Di Setujui
Kabag Teknik
Detail Bend 90°
HDPE - Ø 50 mm
Not to Scale
GIBOULT JOINT 50 mm 1+2
35
Not to Scale
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
KETERANGAN VOL
Tee 50 x 50 x 50 mm 1 Bh
J.6
Handel
Baut 58" Giboult Joint Ø 50 mm 2 Bh
SLAMET KARYADI
Bend HDPE 90° Ø 50 mm 4 Bh NIK 6309042
3
Stub Flange 50 mm HDPE Baut 4'
Butterfly Valve 50 mm
Not to Scale CV. P R I S M A J A S A
Detail Stub Flange 50 mm HDPE KETERANGAN VOL Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Not to Scale
Stub Flange Ø 50 mm 2 Bh
RUAS JALAN. 4
Jalan Aspal
Sirtu 60 cm
KETERANGAN : MIRZA AZWARI, ST
Draftman
Skala 1 : 50
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA UTARA
UTARA
PROGRAM/KEGIATAN
Ø8 - 10
PEKERJAAN
Ø8 - 10
POTONGAN MELINTANG
0±
00
0
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
0+
09
7
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Ø8 - 10 Ø8 - 10
0+
02
TUTUP BETON 3
DIAJUKAN SEBAGAI GAMBAR :
0+
01
2 POTONGAN MELINTANG
8
BEGEL Ø12
LUBANG Ø13
0±
00
0
0±
00
0
0±
00
0
Gambar Rencana Kerja
5 0 + 200
Mengetahui
VARIABLE
0+
200
0 + 500
10 1
GATE VALVE 0 + 786
0 + 786
PASIR DIPADATKAN
SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
PIPA HDPE 1 + 235
Di Setujui
Kabag Teknik
Di Periksa
Stub Flange 50 mm HDPE Baut 34' Kasi Perencaan
Rubber Packing
Bend 90° KETERANGAN VOL
Ductile iron with ENP Stub Flange Ø 50 mm 2 Bh
Stanless stell disc
J.3 Buterfly Ø 50 mm
Tee Ø 50 x 50 x 50 mm 1
1 Bh
M
SLAMET KARYADI
NIK 6309042
Stub Flange 50 mm HDPE
Rubber Packing Crosing 9 M JUDUL GAMBAR
Butterfly Valve 50 mm
Gibel Joint Ø 50 mm 2 M
Not to Scale Pengadaan dan Pemasangan Pipa
Detail Bend 90° Detail Stub Flange 50 mm HDPE Jalan A.Yani Kecamatan Muara Uya
HDPE - Ø 50 mm GIBOULT JOINT 50 mm Not to Scale
KETERANGAN VOL
Not to Scale
Not to Scale Stub Flange Ø 50 mm 4 Bh KONSULTAN
J.4 Buterfly Ø 50 mm
Tee Ø 50 x 50 x 50 mm 1
4 Bh
M CV. P R I S M A J A S A
Gate Valve Ø 50 1 M Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Bend 90 Ø 50 mm 1 M
Penanggung Jawab
Pipa GI Ø 75 mm
Di Gambar
Pipa GI Ø 75 mm Pipa GI Ø 75 mm
Pipa HDPE 50 mm
Pipa HDPE PN 10 OD 50 mm
Pipa HDPE PN 10 OD 50 mm
MIRZA AZWARI, ST
Draftman
POTONGAN CROSING PIPA (CR.2) TAMPAK CROSING PIPA (CR.2) TAMPAK CROSING PIPA (CR.2)
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA UTARA
HDPE Ø 50 mm
UTARA
0+
67
PROGRAM/KEGIATAN
5
TEE HDPE 50 X 50 X 50
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
0+
KABUPATEN TABALONG
HDPE Ø 50 mm 67
5
Detail Reducer
HDFE ∅ 75 mm - ∅ 50 mm PEKERJAAN
Detail Tee HDPE POTONGAN MELINTANG
Not to scale 0±
00
0
0+
09
7
0+
579
0±
00
DIAJUKAN SEBAGAI GAMBAR :
0
POTONGAN MELINTANG
0±
00
0
0±
00
0
Gambar Rencana Kerja
0 + 200
0+
200 Mengetahui
Pejabat Pembuat Komitmen (PPK)
0 + 500
0 + 500
0 + 786
0 + 786
Not to scale
H. MUSTA'IN,S.Sos
NIK 6309010
Baut 58"
Baut 58"
GIBOULT JOINT 50 mm Di Periksa
Kasi Perencaan
Not to Scale
Stub Flange 150 mm HDPE
Stub Flange 75 mm HDPE Rubber Packing KETERANGAN VOL
Rubber Packing
Stub Flange Ø 150 mm 1 Bh
J.2
Detail Stub Flange 150 mm HDPE
Detail Stub Flange 75 mm HDPE
Not to Scale
Reducer Ø 75 - Ø 50 mm 1 Bh KONSULTAN
Not to Scale
Giboult Joint Ø 50 mm 2 Bh
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
RUAS JALAN. 1
Jalan Aspal
Sirtu 60 cm
MIRZA AZWARI, ST
Draftman
KETERANGAN :
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
0±
00
0 0+
09
7
0± H. MUSTA'IN,S.Sos
00
0 NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
0±
00
KONSULTAN
0
0±
00
0
CV. P R I S M A J A S A
Architect & engineering consultant
0+
200 Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
0+
200
Penanggung Jawab
0+5
00
0+5
00
0+7
86
0+7
86 Di Gambar
1+2
MIRZA AZWARI, ST
35
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
0±
00
0 0+
09
7
H. MUSTA'IN,S.Sos
0±
00 NIK 6309010
0
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
0±
KONSULTAN
00
0
0±
CV. P R I S M A J A S A
00
0
0+
200
Penanggung Jawab
0+5
00
0+5
00
0+7
86
0+7
86
Di Gambar
MIRZA AZWARI, ST
1+2
35
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
Skala 1: 600
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re U tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
yu
KEC.MUARA HARUS DAN KEC. MUARA UYA
A
S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG
b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
Awayan S S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik
Te
BARABAI Birayang gala Tanjungsamalantakan
l.
Tg. Pamukan
Pa
Pasungkan Labuhannamas Utara i ng
ar
a i antu
m
b a S. C
Kuripan Negara S. Bara G. Besar
uk
eg Pagat
an
. N
Labuhannamas Selatan Haruyan Gunungbatu Besar
S
KANDANGAN Ankinang
US
Telagalangsat H. MUSTA'IN,S.Sos
Simpur
AT
NIK 6309010
Padangbatung
ER
Margasari Sungairaya Pudi
M
G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan
PE
MARABAHAN Ta Kasi Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat an
rito
Anjirmuara S. Alala
k mk
Ria
Ba
S. T
am S. Simpangampat SLAMET KARYADI
S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU NIK 6309042
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR
S.
Tabunganen Ulin S. Batulicin Sungaibali
R
MARTAPURA M
ia
em
m
Karangintan Pengadaan dan Pemasangan Pipa
ka
Aluhaluh baSUNGAI PERAK
BANJARBARU
na
Lasung lap
Jalan A.Yani Kecamatan Muara Uya
n
Cempaka W. Riamkanan i Sejaka
Sel.
R
Pantaulayung
SA
Kurau
Seb
Tanjungkurong
t
Pagatan
au
Batibati
1150 KONSULTAN
l. L
KA
uku
Sabamban
Se
MA
G. Aurbunak
Tanjungseloka
CV. P R I S M A J A S A
Satui
AT
PELAIHARI
Kintap Karambu
L
Architect & engineering consultant
SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar
Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
JUDUL GAMBAR
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
POTONGAN MELINTANG
PEKERJAAN
Pipa 3 Layer Ø 200
PENGADAAN DAN PEMASANGAN PIPA HDPE
Bend 45° GI DI KEC. TANJUNG , KEC. MURUNG PUDAK,
KEC.MUARA HARUS DAN KEC. MUARA UYA
Stub Flange PE Ø200 mm KABUPATEN TABALONG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
KONSULTAN
Tulangan Ø 12 - 15 Tulangan Ø 12 - 15
CV. P R I S M A J A S A
Architect & engineering consultant
Tulangan Ø 10 - 15 Tulangan Ø 10 - 15 Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
PENGADAAN ACCESSORIES
Ir. SITTI UMAYYAH
Tulangan Ø 12 - 15 Direktris
No. Node JUMLAH
Jembatan P= 7 m Di Gambar
Tulangan Ø 10 - 15
1 Air Valve 1
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
steel band NIK 6309042
JUDUL GAMBAR
pc wire 4-Ø7mm
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
spiral 6mm dan Jalan Pasar Lama Kec. Tanjumg
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
DENAH PONDASI
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
JEMBATAN PIPA (JM2)
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PEKERJAAN
denah jembatan eksisting
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
Rubber Packing
Bend GI Ø 50 mm
H. MUSTA'IN,S.Sos
Flange GI Ø 50 mm NIK 6309010
Di Periksa
Kasi Perencaan
Tampak jembatan eksisting
SLAMET KARYADI
Clam Besi pengikat Pipa Clam Besi pengikat Pipa NIK 6309042
Clam Besi pengikat Pipa
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
Pipa GI Ø 150 mm
Pipa GI Ø 150 mm
Pipa GI Ø 150 mm KONSULTAN
CV. P R I S M A J A S A
POTONGAN A-A Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
PENGADAAN ACCESSORIES
1 Air Valve 1
Di Gambar
2 Pipa 3 Layer Ø 50 mm 31 m
3 Bend GI 45° mm 4
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
JEMBATAN PIPA (JM1) PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
POTONGAN MELINTANG
PEKERJAAN
PENGADAAN DAN PEMASANGAN PIPA HDPE
Air Vent
Beton Penahan Pipa
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Pipa 3 Layer Ø 200 KEC.MUARA HARUS DAN KEC. MUARA UYA
Bend 45° GI Ø KABUPATEN TABALONG
Bend 45° GI
Gambar Rencana Kerja
Stub Flange PE Ø200 mm
Mengetahui
Pejabat Pembuat Komitmen (PPK)
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
JEMBATAN PIPA TIPE -A Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
KONSULTAN
Tulangan Ø 12 - 15 Tulangan Ø 12 - 15
5 Rubber Packing 5
Tulangan Ø 10 - 15
Di Gambar
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 8,00 1.00
PEKERJAAN
POTONGAN MELINTANG
Pipa GI Ø 200 mm
Gambar Rencana Kerja
Pipa HDPE PN 10 OD 150 mm
Mengetahui
Pejabat Pembuat Komitmen (PPK)
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Perkerasan Aspal Kasi Perencaan
SLAMET KARYADI
NIK 6309042
1.10
KONSULTAN
TAMPAK CROSING PIPA (C5) Pipa HDPE PN 10 OD 150 mm
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
CROSING PIPA (C4)
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 6,00 1.00
PEKERJAAN
POTONGAN MELINTANG
Pipa GI Ø 100 mm
Gambar Rencana Kerja
Pipa HDPE PN 10 OD 75 mm
Mengetahui
Pejabat Pembuat Komitmen (PPK)
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Perkerasan Aspal Kasi Perencaan
SLAMET KARYADI
NIK 6309042
1.10
KONSULTAN
TAMPAK CROSING PIPA (C4) Pipa HDPE PN 10 OD 75 mm
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
CROSING PIPA (C3)
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 10.00 1.00
PEKERJAAN
POTONGAN MELINTANG
Pipa GI Ø 300 mm
Gambar Rencana Kerja
Mengetahui
Pejabat Pembuat Komitmen (PPK)
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Perkerasan Aspal Kasi Perencaan
SLAMET KARYADI
NIK 6309042
1.10
KONSULTAN
TAMPAK CROSING PIPA (C3) Pipa HDPE PN 10 OD 200 mm
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
CROSING PIPA (C2)
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 11.00 1.00
PEKERJAAN
POTONGAN MELINTANG
Pipa GI Ø 200 mm
Gambar Rencana Kerja
Pipa HDPE PN 10 OD 150 mm
Mengetahui
Pejabat Pembuat Komitmen (PPK)
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Perkerasan Aspal Kasi Perencaan
SLAMET KARYADI
NIK 6309042
1.10
KONSULTAN
TAMPAK CROSING PIPA (C2) Pipa HDPE PN 10 OD 150 mm
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1.00 9.00 1.00
PEKERJAAN
POTONGAN MELINTANG
Pipa GI Ø 400 mm
Gambar Rencana Kerja
Pipa HDPE PN 10 OD 300 mm
Mengetahui
Pejabat Pembuat Komitmen (PPK)
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Perkerasan Aspal Kasi Perencaan
SLAMET KARYADI
NIK 6309042
1.10
KONSULTAN
TAMPAK CROSING PIPA (C1) Pipa HDPE PN 10 OD 300 mm
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
U
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
KONSULTAN
KETERANGAN : CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Di Gambar
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
1.00 6.00 1.00
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
55
PEKERJAAN
POTONGAN MELINTANG
55 Di Setujui
Kabag Teknik
Di Periksa
Kasi Perencaan
Urugan tanah
110
SLAMET KARYADI
NIK 6309042
50
KONSULTAN
55
Penanggung Jawab
Bahu Jalan aspal Perkerasan Aspal Bahu Jalan
Urugan tanah
110
50
Urugan Pasir
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
1.00 6.00 1.00
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
55
PEKERJAAN
POTONGAN MELINTANG
55 Di Setujui
Kabag Teknik
Di Periksa
Kasi Perencaan
Urugan tanah
110
SLAMET KARYADI
NIK 6309042
50
KONSULTAN
55
Penanggung Jawab
Bahu Jalan aspal Perkerasan Aspal Bahu Jalan
Urugan tanah
110
50
Urugan Pasir
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
1.00 6.00 1.00
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
55
PEKERJAAN
POTONGAN MELINTANG
55 Di Setujui
Kabag Teknik
Di Periksa
Kasi Perencaan
Urugan tanah
110
SLAMET KARYADI
NIK 6309042
50
KONSULTAN
55
Penanggung Jawab
Bahu Jalan aspal Perkerasan Aspal Bahu Jalan
Urugan tanah
110
50
Urugan Pasir
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
1.00 6.00 1.00
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
55
PEKERJAAN
POTONGAN MELINTANG
55 Di Setujui
Kabag Teknik
Di Periksa
Kasi Perencaan
Urugan tanah
110
SLAMET KARYADI
NIK 6309042
55
KONSULTAN
55
Penanggung Jawab
Bahu Jalan aspal Perkerasan Aspal Bahu Jalan
Urugan tanah
110
55
Urugan Pasir
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
Stub Flange HDPE
HDPE Ø 100 mm
KABUPATEN TABALONG
Stub Flange HDPE
PEKERJAAN
Rubber Packing
POTONGAN MELINTANG
Tee HDPE
Tee HDPE
Di Setujui
Kabag Teknik
Detail Tee HDPE 150x150x100 Detail Bend 45° HDPE ∅150 mm Detail Coupling With Grip Ø 100 mm
not to scale not to scale H. MUSTA'IN,S.Sos
not to scale
NIK 6309010
Di Periksa
Kasi Perencaan
40
60
40
60
Stub Flange HDPE
JUDUL GAMBAR
Rubber Packing
6
8
8
Architect & engineering consultant
not to scale Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Ø8 - 10 Ø8 - 10 Ø8 - 10 Ø8 - 10
60 Penanggung Jawab
60
Bend 90° 40 40
BEGEL Ø10 BEGEL Ø10
LUBANG Ø13 LUBANG Ø13
8 8
5 5
VARIABLE
VARIABLE
Ir. SITTI UMAYYAH
Bend 45° URUGAN TANAH URUGAN TANAH
Direktris
BETON 1:2:3 BETON 1:2:3
1 10 10 1
GATE VALVE GATE VALVE Di Gambar
PASIR DIPADATKAN PASIR DIPADATKAN
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
DETAIL JUNCTION 13
JUNCTION 13
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PENGADAAN ACCESSORIES
PROGRAM/KEGIATAN
No. Node JUMLAH
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
1 Bend HDPE 90°-Ø 200 mm 1 KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
JUNCTION 14 Di Setujui
Kabag Teknik
Di Periksa
Kasi Perencaan
SLAMET KARYADI
DETAIL JUNCTION 14 NIK 6309042
MIRZA AZWARI, ST
Draftman
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
DETAIL JUNCTION 12
B
B
to
to
ww
ww
om
om
k
k
lic
lic
JUNCTION 12
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PENGADAAN ACCESSORIES
No. Node
JEMBATAN PIPA
JUMLAH
PROGRAM/KEGIATAN
1 Gate Valve Ø 150 mm 1
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
2 Stub Flange Ø 150 mm 2 KABUPATEN TABALONG
Washout PEKERJAAN
POTONGAN MELINTANG
3 Tee HDPE 150 x 150 x 150 mm 1 PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Bend HDPE 90 ° Ø 75 mm 1 KEC.MUARA HARUS DAN KEC. MUARA UYA
4 KABUPATEN TABALONG
Pipa HDPE Ø 150 mm
HDPE Ø 75 mm
SLAMET BUDI SANTOSA,S.Sos
TEE HDPE 150 X150X 75 NIK 6309023
Di Setujui
HDPE Ø 150 mm
Stub Flange HDPE
Kabag Teknik
40
60
Tee HDPE Tee HDPE H. MUSTA'IN,S.Sos
Stub Flange HDPE NIK 6309010
Stub Flange HDPE
Ø8 - 10
Ø8 - 10 Di Periksa
Kasi Perencaan
Tee HDPE
60
Tee HDPE
6
8
Stub Flange HDPE
SLAMET KARYADI
Stub Flange HDPE
NIK 6309042
Ø8 - 10 Ø8 - 10
TUTUP BETON
JUDUL GAMBAR
60
Detail Tee HDPE 150x150x75 40 Pengadaan dan Pemasangan Pipa
not to scale BEGEL Ø10 Jalan Basuki Rahmat, Jalan Kapar Hulu
8
LUBANG Ø13 dan Jalan Pasar Lama Kec. Tanjumg
5
KONSULTAN
VARIABLE
URUGAN TANAH
BETON 1:2:3
10 1 CV. P R I S M A J A S A
GATE VALVE Architect & engineering consultant
PASIR DIPADATKAN Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Bend 90°
PIPA HDPE
Penanggung Jawab
Stub Flange HDPE 20 20
Di Gambar
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
HDPE Ø 200 mm
PROGRAM/KEGIATAN
40
60
40
60
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
TEE HDPE 200 X200X 200
KABUPATEN TABALONG
Ø8 - 10 Ø8 - 10
PEKERJAAN
POTONGAN MELINTANG
Ø8 - 10
Ø8 - 10 PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
60 60 KEC.MUARA HARUS DAN KEC. MUARA UYA
Tee HDPE
Stub Flange HDPE
Tee HDPE
KABUPATEN TABALONG
6
Stub Flange HDPE
8
DIAJUKAN SEBAGAI GAMBAR :
8
Ø8 - 10 Ø8 - 10 Ø8 - 10 Ø8 - 10 POTONGAN MELINTANG
Tee HDPE
TUTUP BETON TUTUP BETON Gambar Rencana Kerja
Tee HDPE
60 60
Stub Flange HDPE 40 40 Mengetahui
BEGEL Ø10 BEGEL Ø10 Pejabat Pembuat Komitmen (PPK)
Stub Flange HDPE
LUBANG Ø13 LUBANG Ø13
8 8
5 5
VARIABLE
VARIABLE
URUGAN TANAH SLAMET BUDI SANTOSA,S.Sos
URUGAN TANAH
Detail Tee HDPE 200x200x200 BETON 1:2:3 BETON 1:2:3
NIK 6309023
not to scale
1 10 10 1 Di Setujui
Kabag Teknik
GATE VALVE GATE VALVE
Di Periksa
Detail Gate Valve ∅ 150 mm Detail Butterfly Valve ∅50 mm Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
DETAIL JUNCTION 11
ww
ww
om
om
k
k
JUNCTION 11
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PENGADAAN ACCESSORIES
H. MUSTA'IN,S.Sos
Di Periksa
SLAMET KARYADI
NIK 6309042
40
60
dan Jalan Pasar Lama Kec. Tanjumg
KONSULTAN
Ø8 - 10
Ø8 - 10
CV. P R I S M A J A S A
Detail Stub Flange Architect & engineering consultant
60 Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
∅150 mm HDPE
6
not to scale
8
Stub Flange HDPE Penanggung Jawab
Ø8 - 10 Ø8 - 10
TUTUP BETON
60
40
Stub Flange HDPE
BEGEL Ø10 Ir. SITTI UMAYYAH
Rubber Packing LUBANG Ø13 Direktris
8
Stub Flange HDPE
5
VARIABLE
URUGAN TANAH Di Gambar
BETON 1:2:3
10 1
MIRZA AZWARI, ST
Draftman
∅50 mm HDPE PIPA HDPE
not to scale
20 20
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
40
60
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
Stub Flange HDPE
Ø8 - 10
PEKERJAAN
POTONGAN MELINTANG
Ø8 - 10
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
Stub Flange HDPE 60 KEC.MUARA HARUS DAN KEC. MUARA UYA
Stub Flange HDPE Rubber Packing KABUPATEN TABALONG
6
Rubber Packing
8
DIAJUKAN SEBAGAI GAMBAR :
Ø8 - 10 Ø8 - 10 POTONGAN MELINTANG
VARIABLE
URUGAN TANAH SLAMET BUDI SANTOSA,S.Sos
NIK 6309023
BETON 1:2:3
10 1 Di Setujui
Kabag Teknik
GATE VALVE
PASIR DIPADATKAN
PIPA HDPE
H. MUSTA'IN,S.Sos
NIK 6309010
20 20
Stub Flange HDPE
Di Periksa
Detail Butterfly Valve ∅75 mm Kasi Perencaan
not to scale
JUDUL GAMBAR
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
JUNCTION 10
Y
U
U
B
B
to
to
DETAIL JUNCTION 10
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PENGADAAN ACCESSORIES
PEKERJAAN
3
JUNCTION -10 4
Stub Flange Ø 75 mm
Di Setujui
Kabag Teknik
40
60
H. MUSTA'IN,S.Sos
NIK 6309010
Bend 45°
Ø8 - 10
Di Periksa
Ø8 - 10
Kasi Perencaan
60
6
8
SLAMET KARYADI
NIK 6309042
Ø8 - 10 Ø8 - 10
JUDUL GAMBAR
HDPE Ø 75 mm
TUTUP BETON
VARIABLE
URUGAN TANAH
PIPA HDPE
Penanggung Jawab
Di Gambar
Tee HDPE
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
DETAIL JUNCTION 09
ww
ww
om
om
k
k
JUNCTION 09
lic
lic
C
C
.c
.c
w
w
tr e tr re
ar
.
.
ac ac
k e r- s o ft w k e r- s o ft w a
PENGADAAN ACCESSORIES
HDPE Ø 75 mm
No. Node JUMLAH PROGRAM/KEGIATAN
1 Gate Valve Ø 150 mm 1
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
TEE HDPE 150 X150X 75 KABUPATEN TABALONG
2 Stub Flange Ø 150 mm 2
HDPE Ø 150 mm
PEKERJAAN
Stub Flange HDPE
Washout POTONGAN MELINTANG
1
6 Stub Flange Ø 75 mm
POTONGAN MELINTANG
40
60
JEMBATAN PIPA
H. MUSTA'IN,S.Sos
NIK 6309010
Bend 90° Ø8 - 10
Ø8 - 10
Di Periksa
Kasi Perencaan
60
6
8
SLAMET KARYADI
NIK 6309042
TUTUP BETON
JUDUL GAMBAR
60
40 Pengadaan dan Pemasangan Pipa
BEGEL Ø10
LUBANG Ø13
Jalan Basuki Rahmat, Jalan Kapar Hulu
8 dan Jalan Pasar Lama Kec. Tanjumg
5
VARIABLE
KONSULTAN
Detail Bend 90° HDPE ∅75 mm URUGAN TANAH
BETON 1:2:3
not to scale
10 1 CV. P R I S M A J A S A
GATE VALVE
Architect & engineering consultant
PASIR DIPADATKAN Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
PIPA HDPE
Penanggung Jawab
20 20
Di Gambar
Rubber Packing
MIRZA AZWARI, ST
Draftman
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
HDPE Ø 150 mm
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
40
POTONGAN MELINTANG
60
PENGADAAN DAN PEMASANGAN PIPA HDPE
DI KEC. TANJUNG , KEC. MURUNG PUDAK,
HDPE Ø 200 mm
Stub Flange HDPE KEC.MUARA HARUS DAN KEC. MUARA UYA
KABUPATEN TABALONG
Ø8 - 10
Ø8 - 10
DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG
6
Stub Flange HDPE
8
Stub Flange HDPE Mengetahui
Pejabat Pembuat Komitmen (PPK)
Ø8 - 10 Ø8 - 10
TUTUP BETON
VARIABLE
Stub Flange HDPE
URUGAN TANAH
Stub Flange HDPE BETON 1:2:3
H. MUSTA'IN,S.Sos
10 1
NIK 6309010
GATE VALVE
PASIR DIPADATKAN
Di Periksa
Kasi Perencaan
PIPA HDPE
20 20
Detail Tee HDPE 200x200x150
not to scale SLAMET KARYADI
NIK 6309042
Detail Gate Valve ∅150 mm
not to scale JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
KONSULTAN
Di Gambar
Detail Stub Flange ∅ 150 mm HDPE Detail Bend 90° HDPE ∅ 200 mm
not to scale not to scale
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
DETAIL JUNCTION 07
.
.
ac ac
k e r- s o ft w a
PROGRAM/KEGIATAN
No. Node JUMLAH
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
1 Bend HDPE 90°-Ø 200 mm 1 KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
Di Periksa
Kasi Perencaan
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
DETAIL JUNCTION 06
to
to
ww
ww
om
om
k
k
lic
lic
JUNCTION 06
C
C
.c
.c
w
w
tr e tr re
ar
.
.
ac ac
k e r- s o ft w k e r- s o ft w a
PENGADAAN ACCESSORIES
JEMBATAN PIPA
No. Node JUMLAH
PROGRAM/KEGIATAN
1 Stub Flange Ø 200 mm 4 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
2 Gate Valve Ø 200 mm 2 KABUPATEN TABALONG
Washout PEKERJAAN
POTONGAN MELINTANG
HDPE Ø 75 mm
Mengetahui
Pejabat Pembuat Komitmen (PPK)
40
60
NIK 6309023
Stub Flange HDPE HDPE Ø 200 mm
Di Setujui
Kabag Teknik
Ø8 - 10
Ø8 - 10
Tee HDPE Tee HDPE
Stub Flange HDPE
Stub Flange HDPE H. MUSTA'IN,S.Sos
60 NIK 6309010
6
8
Tee HDPE Di Periksa
Kasi Perencaan
Tee HDPE
Ø8 - 10 Ø8 - 10
VARIABLE
not to scale
URUGAN TANAH Pengadaan dan Pemasangan Pipa
BETON 1:2:3 Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
10 1
GATE VALVE
KONSULTAN
PASIR DIPADATKAN
Bend 90°
PIPA HDPE CV. P R I S M A J A S A
20 20 Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Di Gambar
Detail Stub Flange Detail Bend 90° HDPE ∅200 mm
∅200 mm HDPE not to scale
not to scale
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
HDPE Ø 150 mm
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
Bend 90°
40
60
TEE HDPE 150 X150X 150 PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
6
Tee HDPE Tee HDPE
8
Stub Flange HDPE
Stub Flange HDPE POTONGAN MELINTANG
TUTUP BETON
60
Mengetahui
Tee HDPE Detail Bend 90° HDPE ∅300 mm 40
BEGEL Ø10
Pejabat Pembuat Komitmen (PPK)
VARIABLE
SLAMET BUDI SANTOSA,S.Sos
URUGAN TANAH NIK 6309023
Stub Flange HDPE
BETON 1:2:3
Stub Flange HDPE Di Setujui
10 1 Kabag Teknik
GATE VALVE
PASIR DIPADATKAN
Stub Flange HDPE
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Stub Flange HDPE
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
Detail Stub Flange
∅150 mm HDPE KONSULTAN
not to scale
CV. P R I S M A J A S A
Stub Flange HDPE
Rubber Packing
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
JUNCTION 04
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
DETAIL JUNCTION 04
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PENGADAAN ACCESSORIES
Di Setujui
PENGADAAN ACCESSORIES Kabag Teknik
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
SKEMA JUNCTION -4 ( J4) Pengadaan dan Pemasangan Pipa
HDPE Ø 300 mm
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
KONSULTAN
Penanggung Jawab
Di Gambar
Rubber Packing
Tee HDPE
MIRZA AZWARI, ST
Stub Flange HDPE Draftman
Stub Flange HDPE
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
40
60
40
60
PEKERJAAN
POTONGAN MELINTANG
6
Gambar Rencana Kerja
6
8
8
Ø8 - 10 Ø8 - 10
Ø8 - 10 Ø8 - 10
Mengetahui
TUTUP BETON
TUTUP BETON Pejabat Pembuat Komitmen (PPK)
60 60
40 40
BEGEL Ø10
BEGEL Ø10
LUBANG Ø13
LUBANG Ø13
SLAMET BUDI SANTOSA,S.Sos
8
8 NIK 6309023
5
5
VARIABLE
VARIABLE
Di Setujui
URUGAN TANAH
URUGAN TANAH Kabag Teknik
BETON 1:2:3
BETON 1:2:3
1 10
10 1
GATE VALVE
GATE VALVE
PASIR DIPADATKAN H. MUSTA'IN,S.Sos
PASIR DIPADATKAN
NIK 6309010
PIPA HDPE
PIPA HDPE
Di Periksa
20 20 Kasi Perencaan
20 20
Detail Gate Valve ∅ 300 mm Detail Gate Valve ∅ 200 mm SLAMET KARYADI
not to scale NIK 6309042
not to scale
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Di Gambar
MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
JUNCTION 03
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
DETAIL JUNCTION 03
PENGADAAN ACCESSORIES
PROGRAM/KEGIATAN
No. Node JUMLAH PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
1 Tee HDPE Ø 300x300x200 m 1
2 Stub Flange Ø 300 mm PEKERJAAN
2 POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
HDPE Ø 200 mm
SKEMA JUNCTION -3 ( J3) SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
CV. P R I S M A J A S A
Architect & engineering consultant
Stub Flange HDPE Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Stub Flange HDPE
Tee HDPE Tee HDPE
Baut
Stub Flange HDPE
Baut Stub Flange HDPE Penanggung Jawab
Detail Stub Flange Detail Stub Flange Stub Flange HDPE Di Gambar
∅300 mm HDPE ∅200 mm HDPE Stub Flange HDPE
not to scale
not to scale
MIRZA AZWARI, ST
Detail Tee HDPE 300x300x200 Draftman
not to scale
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
JUNCTION 02 DETAIL JUNCTION 02
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PENGADAAN ACCESSORIES
Di Setujui
Kabag Teknik
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
40
60
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
Ø8 - 10 dan Jalan Pasar Lama Kec. Tanjumg
Ø8 - 10
6
8
Baut Architect & engineering consultant
Ø8 - 10 Ø8 - 10 Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
TUTUP BETON
VARIABLE
URUGAN TANAH Ir. SITTI UMAYYAH
BETON 1:2:3 Direktris
PIPA HDPE
20 20
MIRZA AZWARI, ST
Draftman
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
JUNCTION 01
to
to
ww
ww
om
om
k
k
lic
lic
DETAIL JUNCTION 01
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PENGADAAN ACCESSORIES
Di Setujui
Kabag Teknik
HDPE Ø 400 mm
SKEMA H. MUSTA'IN,S.Sos
NIK 6309010
SLAMET KARYADI
NIK 6309042
KONSULTAN
Tee HDPE
CV. P R I S M A J A S A
Architect & engineering consultant
Tee HDPE Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Baut
Rubber Packing
Di Gambar
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
U
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
MIRZA AZWARI, ST
Draftman
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
U
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
KETERANGAN : Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Pipa HDPE Ø 400 mm / (Eksisting)
Pipa HDPE Ø 300 mm ( P= 1500m)
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
U
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
PEKERJAAN
POTONGAN MELINTANG
Di Setujui
Kabag Teknik
H. MUSTA'IN,S.Sos
NIK 6309010
Di Periksa
Kasi Perencaan
SLAMET KARYADI
NIK 6309042
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama Kec. Tanjumg
KONSULTAN
CV. P R I S M A J A S A
Architect & engineering consultant
KETERANGAN : Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Penanggung Jawab
Pipa HDPE Ø 400 mm / (Eksisting)
Pipa HDPE Ø 300 mm ( P= 1500m)
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
U
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
UTARA
PROGRAM/KEGIATAN
PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KABUPATEN TABALONG
u
Ay
KEC.MUARA HARUS DAN KEC. MUARA UYA
S.
KABUPATEN TABALONG
Muarauya
PROVINSI KALIMANTAN TENGAH DIAJUKAN SEBAGAI GAMBAR :
POTONGAN MELINTANG
b
on
g
al Hauai Gambar Rencana Kerja
Ta ling
S. Jai
TANJUNG S. Mengetahui
Pejabat Pembuat Komitmen (PPK)
Pasar panas Warukin
Klua
Tanta map
Pasararba Ku
Sungai turok S. Juai
Telagasilaba Putiklayung
PARINGIN SLAMET BUDI SANTOSA,S.Sos
AMUNTAI Batumandi Lampihong
G. Banyutawar Pondokbaru NIK 6309023
Danaupanggang
Alabio .B
AwayanS S. Manungg Bakaucengal
Batoli utara Timbaru ul Di Setujui
Pandawan at
Pabirik an Kabag Teknik
Te
BARABAI Birayang gala Tanjungsamalantakan
l
Tg. Pamukan
.P
Pasungkan Labuhannamas Utara i ng
am
ar
a a i antu
Kuripan Negara S. Bara b G. Besar S. C
uk
eg Pagat
a
N
n
.
Labuhannamas
S Selatan Haruyan Gunungbatu Besar
KANDANGAN Ankinang
S
TU
Telagalangsat
Simpur H. MUSTA'IN,S.Sos
RA
Padangbatung NIK 6309010
ME
Margasari Sungairaya Pudi
G.
RANTAU Sungaianyar Di Periksa
Pamatangkarang pin Limpungan
PE
MARABAHAN Ta Kasi Perencaan
Tambarangan S. Belimbing
Te Tanjungbatu
A. l. Klu
Se Belawan Bantul Binuang Tanjunghulu mp
iap ang
at Simpangampa Sungaikupang Pantai
Pasar Pengaron an Tg. Dewa
Sungaiputik Simpangempat n
rito
Anjirmuara k ka
S. Alala Ria
m
Ba
S. T
am S. Simpangampat SLAMET KARYADI
S.
ban S. M Sungaitabuk
ar Astambul Pangapin S. KOTABARU NIK 6309042
BANJARMASIN Kertahanyartapura Ba
tu Stagen Stagen
Berangas
Purwosari Syamsudinnoor lic
in JUDUL GAMBAR
S.
Tabunganen Ulin S. Batulicin Sungaibali
R
MARTAPURA M
ia
em Pengadaan dan Pemasangan Pipa
m
Karangintan
ka
Aluhaluh baSUNGAI PERAK
BANJARBARU Jalan Basuki Rahmat, Jalan Kapar Hulu
na
Lasung lap
n
i
Cempaka W. Riamkanan Sejaka dan Jalan Pasar Lama Kec. Tanjumg
Sel.
AR
Pantaulayung
Kurau
Seb
Tanjungkurong
t
Pagatan
au
Batibati
KONSULTAN
AS
1150
l. L
uku
Sabamban
AK
Se
G. Aurbunak
Tanjungseloka
TM
CV. P R I S M A J A S A
Satui
PELAIHARI
LA
Kintap Karambu
Architect & engineering consultant
SE
Takisung
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin
Jorong
Gumuru
Ibukota Provinsi Arti - Singkatan
Batakan Penanggung Jawab
Kota S = Sungai Tg. Layar
Sungai P. Kadapangan
Tg = Tanjung
Bandara P. Matasirih
KEP. LAUT KECIL
Waduk
P. Kalambau MIRZA AZWARI, ST
Draftman
hange E hange E
XC di XC di
F- t F- t
PD
PD
or
or
!
!
W
W
O
O
N
N
Y
Y
U
U
B
B
to
to
ww
ww
om
om
k
k
lic
lic
C
C
.c
.c
w
w
tr re tr re
.
.
ac ac
k e r- s o ft w a k e r- s o ft w a
PROGRAM/KEGIATAN
PEKERJAAN
JUDUL GAMBAR
Pengadaan dan Pemasangan Pipa
Jalan Basuki Rahmat, Jalan Kapar Hulu
dan Jalan Pasar Lama
Kec. Tanjung
CV. P R I S M A J A S A
Architect & engineering consultant
Jl. Cempaka raya blok 1a akasia 11 no.9 banjarmasin