Anda di halaman 1dari 3

PANDUAN SINGKAT PENGGUNAAN

Close Day H-1 (5.2)

Shift Logon/Open Shift (5.3)

Logon
Assign Operator

Close Shift (5.1)

Tank Delivery / Penerimaan BBM (4.3)

Ganti Harga (3.1.3)


PANDUAN SINGKAT PENGGUNAAN

Safe Drop (4.1)

Last Safe Drop

Pump Test
PANDUAN SINGKAT PENGGUNAAN

Settlement Shift (5.4)

Report Shift/Day (4.4)

Manual Update Tank / Theorectical Volume

Anda mungkin juga menyukai