PANDUAN SINGKAT PENGGUNAAN
Close Day H-1 (5.2)
Shift Logon/Open Shift (5.3)
Logon
Assign Operator
Close Shift (5.1)
Tank Delivery / Penerimaan BBM (4.3)
Ganti Harga (3.1.3)
PANDUAN SINGKAT PENGGUNAAN
Safe Drop (4.1)
Last Safe Drop
Pump Test
PANDUAN SINGKAT PENGGUNAAN
Settlement Shift (5.4)
Report Shift/Day (4.4)