LOKASI : IUP PT BERKAT BERKAH BERSAMA LUAS WILAYAH : 675 HA
RENCANA KERJA
KEGIATAN 1 2 3 4 5 6 PERSIAPAN MAPPING BAGIAN BAWAH MAPPING BAGIAN TENGAH MAPPING BAGIAN ATAS PENGECEKAN DATA DAN LAPORAN
ANGGARAN KERJA
ANGGARAN BIAYA QTY JUMLAH (Rp)
TRANSPORTASI 3 ORANG 1,000,000 UPAH + MAKAN TIM GEOLOGI 1 TIM 8,000,000 UPAH + MAKAN TENAGA BANTU LOKAL 1 ORANG 2,000,000 ATK + BATERAY 1 SET 500,000 ALAT-ALAT GEOLOGI 1 SET 1,500,000 PEMBUATAN LAPORAN 1 SET 2,000,000 TOTAL BIAYA 15,000,000
UNTUK MENUNJANG KINERJA EKSPLORASI, TIM MEMINTA BANTUAN MINIMAL