Gamtek Minggu 12b
Gamtek Minggu 12b
4.0
DEPARTEMEN TEKNIK SIPIL DAN LINGKUNGAN
FAKULTAS TEKNOLOGI PERTANIAN
INSTITUT PERTANIAN BOGOR
2.0
GAMBAR TEKNIK KONSTRUKSI
TAHUN AJARAN 2017 / 2018
1.0
DOSEN PRAKTIKUM
ASISTEN DOSEN
2.0
JUDUL GAMBAR:
2.0
POTONGAN 2
SLUDGE DRYING BED
27.7
P E L
EM
5.7
/ S T
CA P
29.0 10.0
4.0
DEPARTEMEN TEKNIK SIPIL DAN LINGKUNGAN
FAKULTAS TEKNOLOGI PERTANIAN
INSTITUT PERTANIAN BOGOR
2.0
GAMBAR TEKNIK KONSTRUKSI
TAHUN AJARAN 2017 / 2018
1.0
DOSEN PRAKTIKUM
ASISTEN DOSEN
2.0
JUDUL GAMBAR:
2.0
TAMPAK 3D
SLUDGE DRYING BED
27.7
SDB - 04/04
P E L
EM
5.7
/ S T
CA P
LAPISAN LUMPUR T=30 CM
LAPISAN PASIR T=10 CM (D=0,2-0,5 MM)
LAPISAN GRAVEL T=10 CM (D=7-15 MM)
LAPISAN GRAVEL T=20 CM (D=15-30 MM)
-
Skala 1 : 50