Anda di halaman 1dari 204

ANALISA HARGA SATUAN PEKERJAAN

KABUPATEN TASIKMALAYA
TAHUN ANGGARAN 2016

HARGA
HARGA UPAH
KODE JENIS PEKERJAAN KOEF. SAT.
(Rp)
(Rp)
a b c d e f = ( cxe )

A PEKERJAAN PERSIAPAN

A-01 1 m' PAGAR SEMENTARA /PENGAMAN PROYEK DARI SENG GELOMBANG, tinggi=2 METER
Dolken Kayu Ø 8 - 10/400 cm 1.2500 Batang 90,562.50
Seng gelombang 3"-5" 1.2000 Lbr 30,000.00
Semen Portland (PC) 0.0500 Zak 67,000.00
Pasir Beton 0.0050 m3 175,000.00
Koral Beton 0.0090 m3 123,000.00
Kayu 5/7 0.0720 m3 1,600,000.00
Paku biasa 2"-5" 0.0600 Kg 14,500.00
Meni besi 0.4500 Kg 28,000.00
Pekerja 0.2000 HOK 57,500.00 11,500.00
Tukang kayu 0.4000 HOK 75,000.00 30,000.00
Kepala tukang 0.0200 HOK 85,000.00 1,700.00
Mandor 0.0200 HOK 85,000.00 1,700.00
Jumlah 44,900.00

Jumlah Total 44,900.00


Dibulatkan

A-01 1 m2 PEKERJAAN PEMASANGAN BOUWPLANK


Kayu 5/7 0.0100 m3 1,600,000.00
Paku biasa 2"-5" 0.0380 Kg 14,500.00
Ongkos Pasang 0.1550 ls 16,551.00 2,565.41
Jumlah 2,565.41

Jumlah Total 2,565.41


Dibulatkan

A-02 1 m2 PEKERJAAN PEMASANGAN BOUWPLANK


Kayu 5/7 0.1200 m3 1,600,000.00
Paku biasa 2"-5" 0.0200 kg 14,500.00
Kayu papan 3/20 0.0070 m3 1,600,000.00
Pekerja 0.1000 HOK 57,500.00
Tukang Kayu 0.1000 HOK 75,000.00
Kepala Tukang 0.0100 HOK 85,000.00
Mandor 0.0050 HOK 85,000.00 425.00
Jumlah 425.00

Jumlah Total 425.00


Dibulatkan

A-03 1 m2 PEMBUATAN KANTOR SEMENTARA /DIREKSI


Kayu 0.1800 m3 1,600,000.00
Paku biasa 0.8500 Kg 14,500.00
Besi strip 1.1000 Kg 19,000.00
Semen Portland (PC) 0.7000 zak 67,000.00
Pasir Pasang 0.1500 m3 132,000.00
Seng gelombang BJLS 32 0.2500 Lbr 30,000.00
Kawat Ram 1 x 1 0.0800 m2 32,500.00
Kunci gembok 0.1500 Bh 5,900.00
Tripleks 3 mm 0.0600 Lbr 53,000.00
Pekerja 2.0000 HOK 57,500.00 115,000.00
Tukang kayu 2.0000 HOK 75,000.00 150,000.00
Kepala tukang 0.3000 HOK 85,000.00 25,500.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 294,750.00

Jumlah Total 294,750.00


Dibulatkan

A-04 1 m2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


Kayu 0.2100 m3 1,600,000.00
Paku biasa 0.3000 Kg 14,500.00
Semen Portland (PC) 0.2100 zak 67,000.00
Pasir Pasang 0.0300 m3 132,000.00
Seng gelombang BJLS 32 1.5000 Lbr 30,000.00
Pekerja 1.0000 HOK 57,500.00 57,500.00
Tukang kayu 2.0000 HOK 75,000.00 150,000.00
Kepala tukang 0.2000 HOK 85,000.00 17,000.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 228,750.00

Jumlah Total 228,750.00


Dibulatkan

A-05 1 m2 PEKERJAAN MEMBERSIHKAN DAN PERATAAN LAPANGAN


Pekerja 0.1000 HOK 57,500.00 5,750.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 10,000.00

Jumlah Total 10,000.00


Dibulatkan

A-05 1 m2 STEGER/PERANCAH DARI BAMBU


Bambu 1.2500 btg 8,000.00
Tali Ijuk 1.0000 ls 2,500.00
Pekerja 1.0000 HOK 57,500.00 57,500.00
Tukang Kayu 2.0000 HOK 75,000.00 150,000.00
Kepala Tukang 0.2000 HOK 85,000.00 17,000.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 228,750.00
Jumlah Total 228,750.00
Dibulatkan

B PEKERJAAN TANAH

B-01 1 m3 GALIAN TANAH BIASA SEDALAM 1 METER


Pekerja 0.7500 HOK 57,500.00 43,125.00
Mandor 0.0250 HOK 85,000.00 2,125.00
Jumlah 45,250.00

Jumlah Total 45,250.00


Dibulatkan

B-02 1 m3 GALIAN TANAH BIASA SEDALAM 2 METER


Pekerja 0.9000 HOK 57,500.00 51,750.00
Mandor 0.0450 HOK 85,000.00 3,825.00
Jumlah 55,575.00

Jumlah Total 55,575.00


Dibulatkan

B-03 1 m3 GALIAN TANAH BIASA SEDALAM 3 METER


Pekerja 1.0500 HOK 57,500.00 60,375.00
Mandor 0.0670 HOK 85,000.00 5,695.00
Jumlah 66,070.00

Jumlah Total 66,070.00


Dibulatkan

B-03 1 m3 PEKERJAAN PEMBUANGAN TANAH SEJAUH 30 METER


Pekerja 0.3300 HOK 57,500.00 18,975.00
Mandor 0.0100 HOK 57,500.00 575.00
Alat Bantu 0.0000 Lot 19,550.00 0.00
Jumlah 19,550.00

Jumlah Total 19,550.00


Dibulatkan

B-04 1 m3 GALIAN TANAH KERAS SEDALAM 1 METER


Pekerja 1.0000 HOK 57,500.00 57,500.00
Mandor 0.0320 HOK 85,000.00 2,720.00
Jumlah 60,220.00

Jumlah Total 60,220.00


Dibulatkan

B-05 1 m3 GALIAN TANAH CADAS SEDALAM 1 METER


Pekerja 1.5000 HOK 57,500.00 86,250.00
Mandor 0.0600 HOK 85,000.00 5,100.00
Jumlah 91,350.00

Jumlah Total 91,350.00


Dibulatkan

B-03 1 m3 GALIAN TANAH LUMPUR SEDALAM 1 METER


Pekerja 1.2000 HOK 57,500.00 69,000.00
Mandor 0.0450 HOK 85,000.00 3,825.00
Jumlah 72,825.00

Jumlah Total 72,825.00


Dibulatkan

B-04 1 m2 PEKERJAAN STRIPPING SETINGGI 1 METER


Pekerja 0.0500 HOK 57,500.00 2,875.00
Mandor 0.0050 HOK 85,000.00 425.00
Jumlah 3,300.00

Jumlah Total 3,300.00


Dibulatkan

B-05 1 m3 PEMBUANGAN TANAH SEJAUH 150 METER


Pekerja 0.5160 HOK 57,500.00 29,670.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 33,920.00

Jumlah Total 33,920.00


Dibulatkan

B-05 1 m3 PEMBUANGAN TANAH SEJAUH 30 METER


Pekerja 0.3300 HOK 57,500.00 18,975.00
Mandor 0.0100 HOK 85,000.00 850.00
Jumlah 19,825.00

Jumlah Total 19,825.00


Dibulatkan

B-06 1 m3 URUGAN KEMBALI


Pekerja 0.5000 HOK 57,500.00 28,750.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 33,000.00

Jumlah Total 33,000.00


Dibulatkan

B-07 1 m3 PEMADATAN TANAH (PER 20 CM)


Pekerja 0.5000 HOK 57,500.00 28,750.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 33,000.00

Jumlah Total 33,000.00


Dibulatkan

B-08 1 m3 URUGAN TANAH DIPADATKAN


(B-06+B-07)
B-09 1 m3 URUGAN TANAH BELI DARI LUAR (DIPADATKAN)
Tanah Urug 1.2000 m3 90,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Mandor 0.0100 HOK 85,000.00 850.00
Jumlah 18,100.00

Jumlah Total 18,100.00


Dibulatkan

B-10 1 m3 URUGAN PASIR


Pasir urug 1.2000 m3 86,500.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Mandor 0.0100 HOK 85,000.00 850.00
Jumlah 18,100.00

Jumlah Total 18,100.00


Dibulatkan

B-11 1 m3 PEMASANGAN LAPISAN IJUK


Ijuk 6.0000 m3 15,000.00
Pekerja 0.1500 HOK 57,500.00 8,625.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 9,900.00

Jumlah Total 9,900.00


Dibulatkan

B-12 1 m3 URUGAN BERANGKAL (DIPADATKAN)


Berangkal 1.2000 m3 90,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Mandor 0.0100 HOK 85,000.00 850.00
Jumlah 18,100.00

Jumlah Total 18,100.00


Dibulatkan

B-12 1 m3 URUGAN SIRTU (DIPADATKAN)


Sirtu 1.2000 m3 109,000.00
Pekerja 0.2500 HOK 57,500.00 14,375.00
Mandor 0.0250 HOK 85,000.00 2,125.00
Jumlah 16,500.00

Jumlah Total 16,500.00


Dibulatkan

C PEKERJAAN PONDASI

C-01 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 3 Ps


Batu belah 15/20 cm 1.2000 m3 100,000.00
Semen PC (50 kg) 4.0400 Zak 67,000.00
Pasir pasang kali 0.4850 m3 132,000.00
Pekerja 1.5000 HOK 57,500.00 86,250.00
Tukang batu 0.7500 HOK 75,000.00 56,250.00
Kepala tukang 0.0750 HOK 85,000.00 6,375.00
Mandor 0.0750 HOK 85,000.00 6,375.00
Jumlah 155,250.00

Jumlah Total 155,250.00


Dibulatkan

C-02 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 4 Ps


Batu belah 15/20 cm 1.2000 m3 100,000.00
Semen PC (50 kg) 3.2600 Zak 67,000.00
Pasir pasang kali 0.5200 m3 132,000.00
Pekerja 1.5000 HOK 57,500.00 86,250.00
Tukang batu 0.7500 HOK 75,000.00 56,250.00
Kepala tukang 0.0750 HOK 85,000.00 6,375.00
Mandor 0.0750 HOK 85,000.00 6,375.00
Jumlah 155,250.00

Jumlah Total 155,250.00


Dibulatkan

C-03 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 5 Ps


Batu belah 15/20 cm 1.2000 m3 100,000.00
Semen PC (50 kg) 2.7200 Zak 67,000.00
Pasir pasang kali 0.5440 m3 132,000.00
Pekerja 1.5000 HOK 57,500.00 86,250.00
Tukang batu 0.7500 HOK 75,000.00 56,250.00
Kepala tukang 0.0750 HOK 85,000.00 6,375.00
Mandor 0.0750 HOK 85,000.00 6,375.00
Jumlah 155,250.00

Jumlah Total 155,250.00


Dibulatkan

C-04 1 m3 PASANGAN PONDASI BATU KOSONG (AANSTAMPING)


Batu belah 15/20 cm 1.2000 m3 100,000.00
Pasir urug 0.4320 m3 86,500.00
Pekerja 0.7800 HOK 57,500.00 44,850.00
Tukang batu 0.3900 HOK 75,000.00 29,250.00
Kepala tukang 0.0390 HOK 85,000.00 3,315.00
Mandor 0.0390 HOK 85,000.00 3,315.00
Jumlah 80,730.00

Jumlah Total 80,730.00


Dibulatkan

C-04 1 m3 PASANGAN PONDASI SIKLOP (60% BETON CAMPURAN 1 : 2 : 3 DAN 40% BATU BELAH)
Batu belah 15/20 cm 0.4800 m3 100,000.00
Semen Portland (PC) 3.8800 Zak 67,000.00
Pasir Beton 0.3120 m3 175,000.00
Kerikil 0.4680 m3 209,500.00
Besi Beton 126.0000 kg 9,000.00
Kawat Beton 1.8000 kg 17,500.00
Pekerja 3.4000 HOK 57,500.00 195,500.00
Tukang batu 0.8500 HOK 75,000.00 63,750.00
Kepala tukang 0.0850 HOK 85,000.00 7,225.00
Mandor 0.1700 HOK 85,000.00 14,450.00
Jumlah 280,925.00

Jumlah Total 280,925.00


Dibulatkan

C-05 1 m3 PASANGAN PONDASI SUMURAN DIAMETER 100 CM


Batu belah 15/20 cm 0.4600 m3 100,000.00
Semen Portland (PC) 3.8800 Zak 67,000.00
Pasir Beton 0.3120 m3 175,000.00
Kerikil 0.4680 m3 209,500.00
Pekerja 2.4000 HOK 57,500.00 138,000.00
Tukang batu 0.8000 HOK 75,000.00 60,000.00
Kepala tukang 0.0800 HOK 85,000.00 6,800.00
Mandor 0.1190 HOK 85,000.00 10,115.00
Jumlah 214,915.00

Jumlah Total 214,915.00


Dibulatkan

D PEKERJAAN DINDING

D-01 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 2 Ps


Bata merah ( 5x11x22 ) cm 70.0000 Bh 700.00
Semen PC (50 kg) 0.3790 Zak 67,000.00
Pasir pasang 0.0380 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 26,875.00

Jumlah Total 26,875.00


Dibulatkan

D-01 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 3 Ps


Bata merah ( 5x11x22 ) cm 70.0000 Bh 700.00
Semen PC (50 kg) 0.2874 Zak 67,000.00
Pasir pasang 0.0380 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 26,875.00

Jumlah Total 26,875.00


Dibulatkan
D-01 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 4 Ps
Bata merah ( 5x11x22 ) cm 70.0000 Bh 700.00
Semen PC (50 kg) 0.2300 Zak 67,000.00
Pasir pasang 0.0430 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 26,875.00

Jumlah Total 26,875.00


Dibulatkan

D-02 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 Ps


Bata merah ( 5x11x22 ) cm 70.0000 Bh 700.00
Semen PC (50 kg) 0.1936 Zak 67,000.00
Pasir pasang 0.0450 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 26,875.00

Jumlah Total 26,875.00


Dibulatkan

D-02a 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 Ps (LANTAI II)


Bata merah ( 5x11x22 ) cm 70.0000 Bh 700.00
Semen PC (50 kg) 0.1936 Zak 67,000.00
Pasir pasang 0.0450 m3 132,000.00
Pekerja 0.3200 HOK 57,500.00 18,400.00
Tukang batu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Steager Werk 0.0250 Ls 67,911.20 1,697.78
Jumlah 29,722.78

Jumlah Total 29,722.78


Dibulatkan

D-03' 1 m2 PASANGAN BATAKO BESAR (8X20X30), 1 PC : 5 Ps


Batako ( 8x20x30 ) cm 16.6000 Bh 3,700.00
Semen PC (50 kg) 0.1936 Zak 67,000.00
Pasir pasang 0.0450 m3 132,000.00
Pekerja 0.3200 HOK 57,500.00 18,400.00
Tukang batu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0150 HOKK 85,000.00 1,275.00
Jumlah 28,025.00

Jumlah Total 28,025.00


Dibulatkan

D-04 1 m2 PASANGAN DINDING ROSTER /TERAWANG (12X11X24) cm


Roster /Terawang (12x11x24) cm 30.0000 Bh 6,000.00
Semen PC (50 kg) 0.2200 Zak 67,000.00
Pasir pasang 0.0350 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 26,875.00

Jumlah Total 26,875.00


Dibulatkan

D-05 1 m2 PASANGAN BATU TEMPEL


Batu Tempel 1.1000 m2 138,500.00
Semen PC (50 kg) 0.2350 zak 67,000.00
Pasir Pasang 0.0350 m3 132,000.00
Pekerja 0.7000 HOK 57,500.00 40,250.00
Tukang batu 0.3500 HOK 75,000.00 26,250.00
Kepala tukang 0.0350 HOK 85,000.00 2,975.00
Mandor 0.0350 HOK 85,000.00 2,975.00
Jumlah 72,450.00

Jumlah Total 72,450.00


Dibulatkan

E PEKERJAAN PLESTERAN

E-01 1 m2 PLESTERAN 1 PC : 2 Ps, TEBAL 15 mm


Semen PC (50 kg) 0.2045 Zak 67,000.00
Pasir pasang 0.0200 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 31,050.00

Jumlah Total 31,050.00


Dibulatkan

E-02 1 m2 PLESTERAN 1 PC : 3 Ps, TEBAL 15 mm


Semen PC (50 kg) 0.1555 Zak 67,000.00
Pasir pasang 0.0230 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 31,050.00

Jumlah Total 31,050.00


Dibulatkan

E-02 1 m2 PLESTERAN 1 PC : 4 Ps, TEBAL 15 mm


Semen PC (50 kg) 0.1248 Zak 67,000.00
Pasir pasang 0.0240 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 31,050.00
Keuntungan 10% 3,105.00
Jumlah Total 34,155.00
Dibulatkan

E-03 1 m2 PLESTERAN 1 PC : 5 Ps, TEBAL 15 mm


Semen PC (50 kg) 0.1037 Zak 67,000.00
Pasir pasang 0.0260 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 31,050.00

Jumlah Total 31,050.00


Dibulatkan

E-03a 1 m2 PLESTERAN 1 PC : 5 Ps, TEBAL 15 mm (LANTAI 2)


Semen PC (50 kg) 0.1037 Zak 67,000.00
Pasir pasang 0.0260 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Steager Werk 0.0250 Ls 10,378.56 259.46
Jumlah 31,309.46

Jumlah Total 31,309.46


Dibulatkan

E-03a 1 m2 PLESTERAN BETON 1 PC : 2 Ps, TEBAL 15 mm


Semen Portland 0.2045 Zak 67,000.00
Pasir pasang 0.0200 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah harga 31,050.00

Jumlah total 31,050.00


Dibulatkan

E-04 1 m2 PLESTERAN BETON 1 PC : 3 Ps, TEBAL 15 mm


Semen PC (50 kg) 0.1555 Zak 67,000.00
Pasir pasang 0.0230 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 31,050.00
Keuntungan 10% 3,105.00
Jumlah Total 34,155.00
Dibulatkan

E-05 1 m2 ACIAN PLESTERAN


Semen PC (50 kg) 0.0650 Zak 67,000.00
Pekerja 0.2000 HOK 57,500.00 11,500.00
Tukang batu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0100 HOK 85,000.00 850.00
Jumlah 20,700.00

Jumlah Total 20,700.00


Dibulatkan

E-05a 1 m2 ACIAN PLESTERAN (A077) (LANTAI II


Semen PC (50 kg) 0.0650 Zak 67,000.00
Pekerja 0.2000 HOK 57,500.00 11,500.00
Tukang batu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0100 HOK 85,000.00 850.00
Steager Werk 0.0250 Ls 4,355.00 108.88
Jumlah 20,808.88

Jumlah Total 20,808.88


Dibulatkan

E-06 1 m2 PLESTERAN CIPRAT 1 PC : 2 Ps


Semen Portland 0.0864 kg 67,000.00
Pasir pasang 0.0060 m3 132,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah harga 9,625.00
Keuntungan 10% 962.50
Jumlah total 10,587.50
Dibulatkan

E-07 1 m3 PASANGAN SIARAN BATA 1 : 2


Semen PC (50 Kg) 0.0622 zak 67,000.00
Pekerja 0.1500 HOK 57,500.00 8,625.00
Tukang 0.0750 HOK 75,000.00 5,625.00
Kepala Tukang 0.0080 HOK 85,000.00 680.00
Mandor 0.0080 HOK 85,000.00 680.00
Jumlah 15,610.00

Jumlah Total 15,610.00


Dibulatkan

E-07 1 m3 PASANGAN SIARAN BATU 1 : 2


Pasir Pasang Kali 0.0120 HOK 132,000.00
Semen PC (50 Kg) 0.1268 zak 67,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang 0.1500 HOK 75,000.00 11,250.00
Kepala Tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 31,050.00

Jumlah Total 31,050.00


Dibulatkan

F PEKERJAAN KAYU

F-01 1 m3 PASANG KUSEN PINTU DAN JENDELA KAYU KELAS I


Kayu kamper, balok 1.1000 m3 3,796,877.70
Paku 1.2500 kg 14,500.00
Lem Putih ( FOX) 1.0000 kg 33,000.00
Pekerja 7.0000 HOK 57,500.00 402,500.00
Tukang kayu 21.0000 HOK 65,000.00 1,365,000.00
Kepala tukang 2.1000 HOK 85,000.00 178,500.00
Mandor 0.3500 HOK 85,000.00 29,750.00
Jumlah 1,975,750.00

Jumlah Total 1,975,750.00


Dibulatkan

F-02 1 m3 PASANG KUSEN PINTU DAN JENDELA KAYU GUNUNG KELAS II


Kayu Gunung Kls II, balok 1.2000 m3 3,000,000.00
Paku 1.2500 kg 14,500.00
Lem Putih ( FOX) 1.0000 kg 33,000.00
Pekerja 6.0000 HOK 57,500.00 345,000.00
Tukang kayu terampil 18.0000 HOK 75,000.00 1,350,000.00
Kepala tukang 1.8000 HOK 85,000.00 153,000.00
Mandor 0.3000 HOK 85,000.00 25,500.00
Jumlah 1,873,500.00

Jumlah Total 1,873,500.00


Dibulatkan

F-03 1 m2 PASANG PINTU DAN JENDELA JALUSI KAYU KAMPER


Kayu kamper, papan 0.0640 m3 0.00
Pekerja 1.0000 HOK 57,500.00 57,500.00
Tukang kayu 3.0000 HOK 75,000.00 225,000.00
Kepala tukang 0.3000 HOK 85,000.00 25,500.00
Mandor 0.5000 HOK 85,000.00 42,500.00
Jumlah 350,500.00
Jumlah Total 350,500.00
Dibulatkan

F-04 1 m2 PASANG PINTU PANEL KAYU KAMPER


Kayu kamper, papan 0.0400 m3 0.00
Pekerja 1.0000 HOK 57,500.00 57,500.00
Tukang kayu 2.5000 HOK 75,000.00 187,500.00
Kepala tukang 0.2500 HOK 85,000.00 21,250.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 270,500.00

Jumlah Total 270,500.00


Dibulatkan

F-05 1 m2 PASANG PINTU PANEL KAYU GUNUNG KELAS II


Kayu Gunung Kls II, papan 0.0400 m3 3,250,000.00
Lem Putih ( FOX) 0.5000 kg 33,000.00
Pekerja 1.0000 HOK 57,500.00 57,500.00
Tukang kayu trampil 3.0000 HOK 75,000.00 225,000.00
Kepala tukang 0.3000 HOK 85,000.00 25,500.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 312,250.00

Jumlah Total 312,250.00


Dibulatkan

F-06 1 m2 PASANG DAUN PINTU PANIL + KACA 5 MM KAYU GUNUNG KLAS II KUAT
Kayu Gunung Kls II, papan 0.0240 m3 3,000,000.00
Lem Putih 0.5000 kg 33,000.00
List Profil 0.0000 m1 4,500.00
Kaca 5 mm 0.3500 m2 85,000.00
Pekerja 0.8000 HOK 57,500.00 46,000.00
Tukang kayu 2.4000 HOK 75,000.00 180,000.00
Kepala tukang 0.2400 HOK 85,000.00 20,400.00
Mandor 0.0400 HOK 85,000.00 3,400.00
Jumlah 249,800.00

Jumlah Total 249,800.00


Dibulatkan

F-06a 1 m2 PASANG DAUN PINTU PANIL LAPIS ALUMUNIUM KM/WC KAYU GUNUNG KLAS II KUAT
Kayu Kayu Gunung 0.0400 m3 3,000,000.00
Lem Putih 0.5000 kg 33,000.00
Plat Alumunium 0,3 mm 1.8000 m2 44,500.00
Pekerja 1.0000 HOK 57,500.00 57,500.00
Tukang kayu Terampil 3.0000 HOK 75,000.00 225,000.00
Kepala tukang 0.3000 HOK 85,000.00 25,500.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 312,250.00

Jumlah Total 312,250.00


Dibulatkan

F-07 1 m2 JENDELA KACA KAYU GUNUNG KELAS II (Tanpa Kaca)


Rangka Kayu Gunung Klas II 0.0240 m3 3,250,000.00
Lem Putih ( FOX ) 0.3000 kg 33,000.00
List Kayu Gunung Klas II 4.0000 m' 4,500.00
Pekerja 0.8000 HOK 57,500.00 46,000.00
Tukang kayu Terampil 2.4000 HOK 75,000.00 180,000.00
Kepala tukang 0.0240 HOK 85,000.00 2,040.00
Mandor 0.0400 HOK 85,000.00 3,400.00
Jumlah 231,440.00

Jumlah Total 231,440.00


Dibulatkan

F-07 1 m2 PASANG JALUSI KUSEN, KAYU KLS II KUAT


Rangka Papan Kayu Gunung Klas II 0.0600 m3 3,250,000.00
Paku 0.1500 kg 14,500.00
List Kayu Gunung Klas II 4.0000 m' 4,500.00
Pekerja 0.6700 HOK 57,500.00 38,525.00
Tukang kayu Terampil 2.0000 HOK 75,000.00 150,000.00
Kepala tukang 0.2000 HOK 85,000.00 17,000.00
Mandor 0.3350 HOK 85,000.00 28,475.00
Jumlah 234,000.00

Jumlah Total 234,000.00


Dibulatkan

F-08 1 m2 DINDING PARTISI TRIPLEK 4 MM + RANGKA KAYU GUNUNG KELAS II


Kayu Gunung Kls II, Balok 5/10 0.0250 m3 3,000,000.00
Paku 2" - 5" 0.0300 m3 4,500.00
Lem Kayu 0.3000 kg 53,000.00
Triplek 4 mm 120 x 240 cm 0.7143 m2 62,000.00
Pekerja 0.8000 HOK 57,500.00 46,000.00
Tukang kayu 2.4000 HOK 75,000.00 180,000.00
Kepala tukang 0.2400 HOK 85,000.00 20,400.00
Mandor 0.0400 HOK 85,000.00 3,400.00
Jumlah 249,800.00

Jumlah Total 249,800.00


Dibulatkan

F-08 1 m2 DINDING PARTISI GRC 5 MM + RANGKA KAYU GUNUNG KELAS II


Kayu Gunung Kls II, Balok 5/10 0.0250 m3 3,000,000.00
Paku 2" - 5" 0.0300 m3 4,500.00
Lem Kayu 0.3000 kg 53,000.00
GRC 5 mm 120 x 240 cm 0.7143 m2 23,263.89
Pekerja 0.8000 HOK 57,500.00 46,000.00
Tukang kayu 2.4000 HOK 75,000.00 180,000.00
Kepala tukang 0.2400 HOK 85,000.00 20,400.00
Mandor 0.0400 HOK 85,000.00 3,400.00
Jumlah 249,800.00
Jumlah Total 249,800.00
Dibulatkan

F-09 1 m3 PASANG KONSTRUKSI KUDA-KUDA KAYU KAMPER


Kayu kamper, balok 1.1000 m3 11,296,766.25
Besi strip 15.0000 Kg 19,000.00
Paku biasa 2"-5" 0.8000 Kg 14,500.00
Pekerja 4.0000 HOK 57,500.00 230,000.00
Tukang kayu 12.0000 HOK 75,000.00 900,000.00
Kepala tukang 1.2000 HOK 85,000.00 102,000.00
Mandor 0.2000 HOK 85,000.00 17,000.00
Jumlah 1,249,000.00

Jumlah Total 1,249,000.00


Dibulatkan

F-10 1 m3 PASANG KONSTRUKSI KUDA-KUDA KAYU BORNEO


Kayu borneo, balok 1.1000 m3 5,857,582.50
Besi strip 15.0000 Kg 19,000.00
Paku biasa 2"-5" 0.8000 Kg 14,500.00
Pekerja 4.0000 HOK 57,500.00 230,000.00
Tukang kayu 12.0000 HOK 75,000.00 900,000.00
Kepala tukang 1.2000 HOK 85,000.00 102,000.00
Mandor 0.2000 HOK 85,000.00 17,000.00
Jumlah 1,249,000.00

Jumlah Total 1,249,000.00


Dibulatkan

F-11 1 m3 PASANG KONSTRUKSI KUDA-KUDA KAYU GUNUNG KELAS II


Kayu Gunung Kls II, balok 1.1000 m3 3,000,000.00
Besi Strip Tebal 5 mm 15.0000 Kg 14,400.00
Paku 8 s.d 12 5.6000 Kg 14,500.00
Pekerja 4.0000 HOK 57,500.00 230,000.00
Tukang kayu 12.0000 HOK 75,000.00 900,000.00
Kepala tukang 1.2000 HOK 85,000.00 102,000.00
Mandor 0.2000 HOK 85,000.00 17,000.00
Jumlah 1,249,000.00

Jumlah Total 1,249,000.00


Dibulatkan

F-12 1 m2 PASANG KASO + RENG GENTENG MURANDO KAYU KAMPER


Kayu 5/7 + 2/3 Kamper 0.0129 m3 11,296,766.25
Paku biasa 2"-5" 0.1500 Kg 18,000.00
Pekerja 0.1000 HOK 57,500.00 5,750.00
Tukang kayu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 18,350.00
Jumlah Total 18,350.00
Dibulatkan

F-13 1 m2 PASANG KASO + RENG GENTENG MURANDO KAYU BORNEO


Kayu 5/7 + 2/3 Borneo 0.0129 m3 5,857,582.50
Paku biasa 2"-5" 0.1500 Kg 18,000.00
Pekerja 0.1000 HOK 57,500.00 5,750.00
Tukang kayu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 18,350.00

Jumlah Total 18,350.00


Dibulatkan

F-11 1 m3 PASANG KONSTRUKSI KUDA-KUDA KAYU GUNUNG KELAS II (EXPOSE)


Kayu Gunung Kls II, balok 1.2000 m3 3,000,000.00
Besi Strip Tebal 5 mm 15.0000 Kg 14,400.00
Paku 8 s.d 12 5.6000 Kg 14,500.00
Pekerja 6.7000 HOK 57,500.00 385,250.00
Tukang kayu 20.1000 HOK 75,000.00 1,507,500.00
Kepala tukang 2.0100 HOK 85,000.00 170,850.00
Mandor 0.3350 HOK 85,000.00 28,475.00
Jumlah 2,092,075.00

Jumlah Total 2,092,075.00


Dibulatkan

F-11A 1 m3 PASANG KONSTRUKSI KUDA-KUDA KAYU LAMA


Paku 8 s.d 12 5.6000 Kg 14,500.00
Pekerja 4.0000 HOK 57,500.00 230,000.00
Tukang kayu 12.0000 HOK 75,000.00 900,000.00
Kepala tukang 1.2000 HOK 85,000.00 102,000.00
Mandor 0.2000 HOK 85,000.00 17,000.00
Jumlah 1,249,000.00

Jumlah Total 1,249,000.00


Dibulatkan

F-11 1 m3 PASANG KONSTRUKSI GORDING KAYU GUNUNG KELAS II


Kayu Gunung Kls II, balok 1.1000 m3 3,000,000.00
Besi Strip Tebal 5 mm 15.0000 Kg 14,400.00
Paku 8 s.d 12 3.0000 Kg 14,500.00
Pekerja 6.7000 HOK 57,500.00 385,250.00
Tukang kayu 20.1000 HOK 75,000.00 1,507,500.00
Kepala tukang 2.0100 HOK 85,000.00 170,850.00
Mandor 0.3350 HOK 85,000.00 28,475.00
Jumlah 2,092,075.00

Jumlah Total 2,092,075.00


Dibulatkan
F-14 1 m2 PASANG KASO + RENG GENTENG KODOK/ PALENTONG KAYU GUNUNG KELAS II
Kayu 5/7 + 2/3 Gunung Kls II 0.0140 m3 3,000,000.00
Reng 6.0000 m1 3,500.00
Paku biasa 5"-10" 0.1500 Kg 14,500.00
Pekerja 0.1000 HOK 57,500.00 5,750.00
Tukang kayu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 18,350.00

Jumlah Total 18,350.00


Dibulatkan

F-14 1 m2 PASANG KASO + RENG GENTENG BETON KAYU GUNUNG KELAS II


Kayu 5/7 + 2/3 Gunung Kls II 0.0140 m3 3,000,000.00
Reng 6.0000 m1 3,500.00
Paku biasa 5"-10" 0.2500 Kg 14,500.00
Pekerja 0.1000 HOK 57,500.00 5,750.00
Tukang kayu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 18,350.00

Jumlah Total 18,350.00


Dibulatkan

F-15 1 m2 PASANG RANGKA LANGIT-LANGIT ( 100X100 ) cm, KAYU KAMPER


Kayu kamper, balok 0.0120 m3 11,296,766.25
Paku biasa 2"-5" 0.1000 Kg 14,500.00
Pekerja 0.1500 HOK 57,500.00 8,625.00
Tukang kayu 0.2500 HOK 75,000.00 18,750.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.0750 HOK 85,000.00 6,375.00
Jumlah 35,875.00

Jumlah Total 35,875.00


Dibulatkan

F-16 1 m2 PASANG RANGKA LANGIT-LANGIT ( 100x100 ) cm, KAYU BORNEO


Kayu borneo, balok 0.0120 m3 0.00
Paku biasa 2"-5" 0.1000 Kg 14,500.00
Pekerja 0.1500 HOK 57,500.00 8,625.00
Tukang kayu 0.2500 HOK 75,000.00 18,750.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.0750 HOK 85,000.00 6,375.00
Jumlah 35,875.00

Jumlah Total 35,875.00


Dibulatkan

F-17 1 m2 PASANG RANGKA LANGIT-LANGIT ( 100x100 ) cm, KAYU GUNUNG KELAS II


Kayu Gunung Kls II, balok 0.0120 m3 3,000,000.00
Paku biasa 2"-5" 0.1000 Kg 14,500.00
Pekerja 0.1500 HOK 57,500.00 8,625.00
Tukang kayu 0.2500 HOK 75,000.00 18,750.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.0750 HOK 85,000.00 6,375.00
Jumlah 35,875.00

Jumlah Total 35,875.00


Dibulatkan
F-18 1 m' PASANG LISTPLANK UKURAN (3x25 ) cm, KAYU KAMPER
Kayu kamper, papan 0.0075 m3 0.00
Paku biasa 2"-5" 0.0600 Kg 14,500.00
Pekerja 0.1000 HOK 57,500.00 5,750.00
Tukang kayu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 18,350.00

Jumlah Total 18,350.00


Dibulatkan

F-19 1 m' PASANG LISTPLANK UKURAN (3x25 ) cm, KAYU BORNEO


Kayu borneo, papan 0.0075 m3 5,857,582.50
Paku biasa 2"-5" 0.0600 Kg 14,500.00
Pekerja 0.1000 HOK 57,500.00 5,750.00
Tukang kayu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 18,350.00

Jumlah Total 18,350.00


Dibulatkan

F-14A 1 m2 PASANG KASO + RENG GENTENG MURANDO KAYU LAMA


Paku biasa 2"-5" 0.1500 Kg 14,500.00
Pekerja 1/2 trampil 0.1000 HOK 57,500.00 5,750.00
Tukang kayu 1/2 trampil 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 18,350.00

Jumlah Total 18,350.00


Dibulatkan

F-20 1 m' PASANG LISTPLANK UKURAN 3/20 cm, KAYU GUNUNG KELAS II
Kayu Gunung Kls II, papan 0.0108 m3 3,250,000.00
Paku biasa 5"-7" 0.1000 Kg 14,500.00
Pekerja 0.1000 HOK 57,500.00 5,750.00
Tukang kayu 0.2000 HOK 65,000.00 13,000.00
Kepala tukang 0.0200 HOK 85,000.00 1,700.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 24,700.00
Jumlah Total 24,700.00
Dibulatkan

F-20 1 m' PASANG LISTPLANK UKURAN 3/30 cm, KAYU GUNUNG KELAS II
Kayu Gunung Kls II, papan 0.0110 m3 3,250,000.00
Paku biasa 5"-7" 0.0500 Kg 14,500.00
Pekerja 0.1000 HOK 57,500.00 5,750.00
Tukang kayu 0.2000 HOK 65,000.00 13,000.00
Kepala tukang 0.0200 HOK 85,000.00 1,700.00
Mandor 0.0500 HOK 85,000.00 4,250.00
Jumlah 24,700.00

Jumlah Total 24,700.00


Dibulatkan

F-21 1 m' PASANG LIST PLAFOND KAYU PROFIL


Kayu profil 1.0500 m' 4,500.00
Paku 0.0100 kg 14,500.00
Pekerja 0.0500 HOK 57,500.00 2,875.00
Tukang kayu 0.0500 HOK 65,000.00 3,250.00
Kepala tukang 0.0050 HOK 85,000.00 425.00
Mandor 0.0030 HOK 85,000.00 255.00
Jumlah 6,805.00

Jumlah Total 6,805.00


Dibulatkan

F-22 1 m' PASANG LIST PLAFOND GYPSUM


List Gypsun 9 mm 1.0500 m' 11,000.00
Paku 0.0100 kg 14,500.00
Pekerja 0.0500 HOK 57,500.00 2,875.00
Tukang kayu 0.0500 HOK 65,000.00 3,250.00
Kepala tukang 0.0050 HOK 85,000.00 425.00
Mandor 0.0030 HOK 85,000.00 255.00
Jumlah 6,805.00

Jumlah Total 6,805.00


Dibulatkan

F-23 1 m2 PEK.JALUSI ATAP KAYU GUNUNG KLAS III KUAT


Papan 2/10 0.0800 m3 1,600,000.00
Paku 0.1500 kg 14,500.00
Pekerja trampil 0.6700 HOK 57,500.00 38,525.00
Tukang kayu 1/2 trampil 2.0000 HOK 65,000.00 130,000.00
Kepala tukang 0.2000 HOK 85,000.00 17,000.00
Mandor 0.3350 HOK 85,000.00 28,475.00
Jumlah 214,000.00

Jumlah Total 214,000.00


Dibulatkan
G PEKERJAAN BETON

G-01 1 m3 MEMBUAT BETON TUMBUK, 1 PC : 2 Ps : 3 Kr


Semen PC (50 kg) 4.9400 Zak 67,000.00
Pasir beton 0.5200 m3 175,000.00
Koral beton 0.7800 m3 123,000.00
Pekerja 1.6500 HOK 57,500.00 94,875.00
Tukang batu 0.2500 HOK 75,000.00 18,750.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.0800 HOK 85,000.00 6,800.00
Jumlah 122,550.00

Jumlah Total 122,550.00


Dibulatkan

G-02 1 m3 MEMBUAT BETON TUMBUK, 1 PC : 3 Ps : 5 Kr


Semen PC (50 kg) 4.3600 Zak 67,000.00
Pasir beton 0.5200 m3 175,000.00
Koral beton 0.8700 m3 155,000.00
Pekerja 1.6500 HOK 57,500.00 94,875.00
Tukang batu 0.2500 HOK 75,000.00 18,750.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.0800 HOK 85,000.00 6,800.00
Jumlah 122,550.00

Jumlah Total 122,550.00


Dibulatkan

G-03 1 m2 MEMBUAT LANTAI KERJA BETON TUMBUK TEBAL 5 cm, 1 PC : 3 Ps : 5 Kr


Semen PC (50 kg) 0.2000 Zak 67,000.00
Pasir beton 0.0260 m3 175,000.00
Split 2/3 0.0440 m3 155,000.00
Pekerja 1.1500 HOK 57,500.00 66,125.00
Tukang batu 0.0200 HOK 75,000.00 1,500.00
Kepala tukang 0.0020 HOK 85,000.00 170.00
Mandor 0.0060 HOK 85,000.00 510.00
Jumlah 68,305.00

Jumlah Total 68,305.00


Dibulatkan

G-02 1 m3 MEMBUAT BETON DENGAN MUTU K-100


Semen PC (50 kg) 4.6000 Zak 67,000.00
Pasir beton 0.6207 m3 175,000.00
Split 2/3 0.7400 m3 138,500.00
Pekerja 1.6500 HOK 57,500.00 94,875.00
Tukang batu 0.2750 HOK 75,000.00 20,625.00
Kepala tukang 0.0280 HOK 85,000.00 2,380.00
Mandor 0.0830 HOK 85,000.00 7,055.00
Jumlah 124,935.00

Jumlah Total 124,935.00


Dibulatkan

G-02 1 m3 MEMBUAT BETON DENGAN MUTU K-125


Semen PC (50 kg) 5.5200 Zak 67,000.00
Pasir beton 0.5914 m3 175,000.00
Split 2/3 0.7496 m3 138,500.00
Pekerja 1.6500 HOK 57,500.00 94,875.00
Tukang batu 0.2750 HOK 75,000.00 20,625.00
Kepala tukang 0.0280 HOK 85,000.00 2,380.00
Mandor 0.0830 HOK 85,000.00 7,055.00
Jumlah 124,935.00

Jumlah Total 124,935.00


Dibulatkan

G-02 1 m3 MEMBUAT BETON DENGAN MUTU K-150


Semen PC (50 kg) 5.9800 Zak 67,000.00
Pasir beton 0.5707 m3 175,000.00
Split 2/3 0.7533 m3 138,500.00
Pekerja 1.6500 HOK 57,500.00 94,875.00
Tukang batu 0.2750 HOK 75,000.00 20,625.00
Kepala tukang 0.0280 HOK 85,000.00 2,380.00
Mandor 0.0830 HOK 85,000.00 7,055.00
Jumlah 124,935.00

Jumlah Total 124,935.00


Dibulatkan

G-03 1 m3 MEMBUAT BETON DENGAN MUTU K-175


Semen PC (50 kg) 6.5600 Zak 67,000.00
Pasir beton 0.5571 m3 175,000.00
Split 2/3 0.7622 m3 155,000.00
Pekerja 1.6500 HOK 57,500.00 94,875.00
Tukang batu 0.2500 HOK 75,000.00 18,750.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.0800 HOK 85,000.00 6,800.00
Jumlah 122,550.00

Jumlah Total 122,550.00


Dibulatkan

G-04 1 m3 MEMBUAT BETON DENGAN MUTU K-200


Semen PC (50 kg) 7.0400 Zak 67,000.00
Pasir beton 0.5221 m3 175,000.00
Split 2/3 0.7637 m3 155,000.00
Pekerja 1.6500 HOK 57,500.00 94,875.00
Tukang batu 0.2500 HOK 75,000.00 18,750.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.0800 HOK 85,000.00 6,800.00
Jumlah 122,550.00

Jumlah Total 122,550.00


Dibulatkan

G-04 1 m3 MEMBUAT BETON DENGAN MUTU K-225


Semen PC (50 kg) 7.4200 Zak 67,000.00
Pasir beton 0.4986 m3 175,000.00
Split 2/3 0.7756 m3 155,000.00
Pekerja 1.6500 HOK 57,500.00 94,875.00
Tukang batu 0.2750 HOK 75,000.00 20,625.00
Kepala tukang 0.0280 HOK 85,000.00 2,380.00
Mandor 0.0830 HOK 85,000.00 7,055.00
Jumlah 124,935.00

Jumlah Total 124,935.00


Dibulatkan

G-05 1 m3 MEMBUAT BETON DENGAN MUTU K-250


Semen PC (50 kg) 7.6800 Zak 67,000.00
Pasir beton 0.4943 m3 175,000.00
Split 2/3 0.7696 m3 155,000.00
Pekerja 1.6500 HOK 57,500.00 94,875.00
Tukang batu 0.2750 HOK 75,000.00 20,625.00
Kepala tukang 0.0280 HOK 85,000.00 2,380.00
Mandor 0.0830 HOK 85,000.00 7,055.00
Jumlah 124,935.00

Jumlah Total 124,935.00


Dibulatkan

G-06 1 m3 MEMBUAT BETON DENGAN MUTU K 275


Semen PC (50 kg) 8.1200 Zak 67,000.00
Pasir beton 0.4886 m3 175,000.00
Split 2/3 0.7600 m3 155,000.00
Pekerja 1.6500 HOK 57,500.00 94,875.00
Tukang batu 0.2750 HOK 75,000.00 20,625.00
Kepala tukang 0.0280 HOK 85,000.00 2,380.00
Mandor 0.0830 HOK 85,000.00 7,055.00
Jumlah 124,935.00

Jumlah Total 124,935.00


Dibulatkan

G-06 1 m3 MEMBUAT BETON DENGAN MUTU K 300


Semen PC (50 kg) 8.2600 Zak 67,000.00
Pasir beton 0.4864 m3 175,000.00
Split 2/3 0.7563 m3 155,000.00
Pekerja 1.6500 HOK 57,500.00 94,875.00
Tukang batu 0.2750 HOK 75,000.00 20,625.00
Kepala tukang 0.0280 HOK 85,000.00 2,380.00
Mandor 0.0830 HOK 85,000.00 7,055.00
Jumlah 124,935.00

Jumlah Total 124,935.00


Dibulatkan

G-06 1 m3 MEMBUAT BETON BERTULANG K-225 (Ready Mix ) + Slang


Campuran Beton Readymixed 1.0200 m3 829,536.11
Pompa dan Conveyor Beton (sewa/hari) 0.1200 ls 2,500,000.00
Pekerja 1.0000 HOK 57,500.00 57,500.00
Tukang batu 0.2500 HOK 75,000.00 18,750.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.1000 HOK 85,000.00 8,500.00
Jumlah 86,875.00

Jumlah Total 86,875.00


Dibulatkan

G-06 1 m3 MEMBUAT BETON BERTULANG K-250 (Ready Mix ) + Slang


Campuran Beton Readymixed 1.0200 m3 845,287.59
Pompa dan Conveyor Beton (sewa/hari) 0.1200 ls 2,500,000.00
Pekerja 1.0000 HOK 57,500.00 57,500.00
Tukang batu 0.2500 HOK 75,000.00 18,750.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.1000 HOK 85,000.00 8,500.00
Jumlah 86,875.00

Jumlah Total 86,875.00


Dibulatkan

G-06 1 m3 MEMBUAT BETON BERTULANG K-275 (Ready Mix ) + Slang


Campuran Beton Readymixed 1.0200 m3 872,275.00
Pompa dan Conveyor Beton (sewa/hari) 0.1200 ls 2,500,000.00
Pekerja 1.0000 HOK 57,500.00 57,500.00
Tukang batu 0.2500 HOK 75,000.00 18,750.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.1000 HOK 85,000.00 8,500.00
Jumlah 86,875.00

Jumlah Total 86,875.00


Dibulatkan

G-05 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR


Besi beton ( polos /ulir ) 1.0500 Kg 9,000.00
Kawat beton 0.0150 Kg 17,500.00
Pekerja 0.0070 HOK 57,500.00 402.50
Tukang besi 0.0070 HOK 75,000.00 525.00
Kepala tukang 0.0007 HOK 85,000.00 59.50
Mandor 0.0007 HOK 85,000.00 59.50
Jumlah 1,046.50

Jumlah Total 1,046.50


Dibulatkan

G-04 100 Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR


Besi beton ( polos /ulir ) 105.0000 Kg 9,000.00
Kawat beton 1.5000 Kg 17,500.00
Pekerja 0.7000 HOK 57,500.00 40,250.00
Tukang besi 0.7000 HOK 75,000.00 52,500.00
Kepala tukang 0.0700 HOK 85,000.00 5,950.00
Mandor 0.0700 HOK 85,000.00 5,950.00
Jumlah 104,650.00

Jumlah Total 104,650.00


Dibulatkan

G-04 1 Kg PEMBESIAN WIREMESH


Wiremesh 1.0200 Kg 52,500.00
Kawat beton 0.0500 Kg 17,500.00
Pekerja 0.0250 HOK 57,500.00 1,437.50
Tukang besi 0.0250 HOK 75,000.00 1,875.00
Kepala tukang 0.0025 HOK 85,000.00 212.50
Mandor 0.0025 HOK 85,000.00 212.50
Jumlah 3,737.50

Jumlah Total 3,737.50


Dibulatkan

G-06 1 m2 PASANG BEKISTING UNTUK PONDASI


Kayu Albasiah 0.0400 m3 1,600,000.00
Paku biasa 2'-5" 0.3000 Kg 14,500.00
Minyak bekisting 0.1000 Ltr 14,200.00
Pekerja 0.5200 HOK 57,500.00 29,900.00
Tukang kayu 0.2600 HOK 65,000.00 16,900.00
Kepala tukang 0.0260 HOK 85,000.00 2,210.00
Mandor 0.0260 HOK 85,000.00 2,210.00
Jumlah 51,220.00

Jumlah Total 51,220.00


Dibulatkan

G-07 1 m2 PASANG BEKISTING UNTUK SLOOF


Kayu Albasiah 0.0450 m3 1,600,000.00
Paku biasa 2'-5" 0.3000 Kg 14,500.00
Minyak bekisting 0.1000 Ltr 14,200.00
Pekerja 0.2000 HOK 57,500.00 11,500.00
Tukang kayu 0.2600 HOK 75,000.00 19,500.00
Kepala tukang 0.0260 HOK 85,000.00 2,210.00
Mandor 0.0260 HOK 85,000.00 2,210.00
Jumlah 35,420.00

Jumlah Total 35,420.00


Dibulatkan

G-08 1 m2 PASANG BEKISTING UNTUK KOLOM (PAPAN) (2 KALI PAKAI)


Kayu 0.0200 m3 1,600,000.00
Paku biasa 2'-5" 0.2000 Kg 14,500.00
Minyak bekisting 0.2000 Ltr 14,200.00
Balok kayu 0.0075 m3 1,600,000.00
Papan Albasia 0.0100 m3 1,600,000.00
Bambu Batang dia 7cm 1.0000 Btg 8,000.00
Pekerja 0.6600 HOK 57,500.00 37,950.00
Tukang kayu 0.3300 HOK 75,000.00 24,750.00
Kepala tukang 0.0330 HOK 85,000.00 2,805.00
Mandor 0.0330 HOK 85,000.00 2,805.00
Jumlah 68,310.00

Jumlah Total 68,310.00


Dibulatkan

G-09 1 m2 PASANG BEKISTING UNTUK KOLOM (PAPAN) (1 KALI PAKAI)


Kayu 0.0400 m3 1,600,000.00
Paku biasa 2'-5" 0.4000 Kg 14,500.00
Minyak bekisting 0.2000 Ltr 14,200.00
Balok kayu 0.0150 m3 1,600,000.00
Papan Albasia 0.0200 m3 1,600,000.00
Bambu Batang dia 7cm 2.0000 Btg 8,000.00
Pekerja 0.6600 HOK 57,500.00 37,950.00
Tukang kayu 0.3300 HOK 75,000.00 24,750.00
Kepala tukang 0.0330 HOK 85,000.00 2,805.00
Mandor 0.0330 HOK 85,000.00 2,805.00
Jumlah 68,310.00

Jumlah Total 68,310.00


Dibulatkan

G-07 1 m2 PASANG BEKISTING UNTUK KOLOM (MULTIPLEX)


Kayu 0.0400 m3 1,600,000.00
Paku biasa 2'-5" 0.4000 Kg 14,500.00
Minyak bekisting 0.2000 Ltr 14,200.00
Balok kayu 0.0150 m3 1,600,000.00
Multiplex 9 mm 0.3500 m3 120,000.00
Bambu Batang dia 7cm 2.0000 Btg 8,000.00
Pekerja 0.6600 HOK 57,500.00 37,950.00
Tukang kayu 0.3300 HOK 75,000.00 24,750.00
Kepala tukang 0.0330 HOK 85,000.00 2,805.00
Mandor 0.0330 HOK 85,000.00 2,805.00
Jumlah 68,310.00

Jumlah Total 68,310.00


Dibulatkan

G-10 1 m2 PASANG BEKISTING UNTUK BALOK (PAPAN)


Kayu 0.0400 m3 1,600,000.00
Paku biasa 2'-5" 0.4000 Kg 14,500.00
Minyak bekisting 0.2000 Ltr 14,200.00
Balok Kayu 0.0180 m3 1,600,000.00
Papan Albasia 0.0200 m3 1,600,000.00
Bambu Batang Ø 7 cm 2.0000 Btg 8,000.00
Pekerja 0.6600 HOK 57,500.00 37,950.00
Tukang kayu 0.3300 HOK 75,000.00 24,750.00
Kepala tukang 0.0330 HOK 85,000.00 2,805.00
Mandor 0.0330 HOK 85,000.00 2,805.00
Jumlah 68,310.00

Jumlah Total 68,310.00


Dibulatkan

G-08 1 m2 PASANG BEKISTING UNTUK BALOK (MULTIPLEX)


Kayu 0.0400 m3 1,600,000.00
Paku biasa 2'-5" 0.4000 Kg 14,500.00
Minyak bekisting 0.2000 Ltr 14,200.00
Balok Kayu 0.0180 m3 1,600,000.00
Multiplex 0.3500 m3 120,000.00
Bambu Batang Ø 7 cm 2.0000 Btg 8,000.00
Pekerja 0.6600 HOK 57,500.00 37,950.00
Tukang kayu 0.3300 HOK 75,000.00 24,750.00
Kepala tukang 0.0330 HOK 85,000.00 2,805.00
Mandor 0.0330 HOK 85,000.00 2,805.00
Jumlah 68,310.00

Jumlah Total 68,310.00


Dibulatkan

G-11 1 m2 PASANG BEKISTING UNTUK LANTAI (PAPAN)


Kayu 0.0400 m3 1,600,000.00
Paku biasa 2'-5" 0.4000 Kg 14,500.00
Minyak bekisting 0.2000 Ltr 14,200.00
Balok Kayu 0.0150 m3 1,600,000.00
Papan Albasia 0.0200 m3 1,600,000.00
Bambu Batang Ø 7 cm 6.0000 Btg 8,000.00
Pekerja 0.6600 HOK 57,500.00 37,950.00
Tukang batu 0.3300 HOK 75,000.00 24,750.00
Kepala tukang 0.0330 HOK 85,000.00 2,805.00
Mandor 0.0330 HOK 85,000.00 2,805.00
Jumlah 68,310.00

Jumlah Total 68,310.00


Dibulatkan

G-09 1 m2 PASANG BEKISTING UNTUK LANTAI (MULTIPLEX)


Kayu 0.0400 m3 1,600,000.00
Paku biasa 2'-5" 0.4000 Kg 14,500.00
Minyak bekisting 0.2000 Ltr 14,200.00
Balok Kayu 0.0150 m3 1,600,000.00
Multiplex 0.3500 m3 120,000.00
Bambu Batang Ø 7 cm 6.0000 Btg 8,000.00
Pekerja 0.6600 HOK 57,500.00 37,950.00
Tukang batu 0.3300 HOK 75,000.00 24,750.00
Kepala tukang 0.0330 HOK 85,000.00 2,805.00
Mandor 0.0330 HOK 85,000.00 2,805.00
Jumlah 68,310.00
Jumlah Total 68,310.00
Dibulatkan

G-12 1 m2 PASANG BEKISTING UNTUK DINDING (PAPAN)


Kayu 0.0300 m3 1,600,000.00
Paku biasa 2'-5" 0.4000 Kg 14,500.00
Minyak bekisting 0.2000 Ltr 14,200.00
Balok Kayu 0.0200 m3 1,600,000.00
Papan Albasia 0.0200 m3 1,600,000.00
Bambu Batang Ø 7 cm 3.0000 Btg 8,000.00
Formtie /spacer /penjaga jarak bekisting 4.0000 Bh 2,700.00
Pekerja 0.6600 HOK 57,500.00 37,950.00
Tukang batu 0.3300 HOK 75,000.00 24,750.00
Kepala tukang 0.0330 HOK 85,000.00 2,805.00
Mandor 0.0330 HOK 85,000.00 2,805.00
Jumlah 68,310.00

Jumlah Total 68,310.00


Dibulatkan

G-10 1 m2 PASANG BEKISTING UNTUK DINDING (MULTIPLEX)


Kayu 0.0300 m3 1,600,000.00
Paku biasa 2'-5" 0.4000 Kg 14,500.00
Minyak bekisting 0.2000 Ltr 14,200.00
Balok Kayu 0.0200 m3 1,600,000.00
Multiplex 0.3500 m3 120,000.00
Bambu Batang Ø 7 cm 3.0000 Btg 8,000.00
Formtie /spacer /penjaga jarak bekisting 4.0000 Bh 2,700.00
Pekerja 0.6600 HOK 57,500.00 37,950.00
Tukang batu 0.3300 HOK 75,000.00 24,750.00
Kepala tukang 0.0330 HOK 85,000.00 2,805.00
Mandor 0.0330 HOK 85,000.00 2,805.00
Jumlah 68,310.00

Jumlah Total 68,310.00


Dibulatkan

G-13 1 m2 PASANG BEKISTING UNTUK TANGGA (PAPAN)


Kayu 0.0300 m3 1,600,000.00
Paku biasa 2'-5" 0.4000 Kg 14,500.00
Minyak bekisting 0.1500 Ltr 14,200.00
Balok Kayu 0.0150 m3 1,600,000.00
Papan Albasiah 0.0200 m3 1,600,000.00
Bambu Batang Ø 7 cm 2.0000 Btg 8,000.00
Pekerja 0.6600 HOK 57,500.00 37,950.00
Tukang batu 0.3300 HOK 75,000.00 24,750.00
Kepala tukang 0.0330 HOK 85,000.00 2,805.00
Mandor 0.0330 HOK 85,000.00 2,805.00
Jumlah 68,310.00

Jumlah Total 68,310.00


Dibulatkan

G-10 1 m2 PASANG BEKISTING UNTUK TANGGA (MULTIPLEX)


Kayu 0.0300 m3 1,600,000.00
Paku biasa 2'-5" 0.4000 Kg 14,500.00
Minyak bekisting 0.1500 Ltr 14,200.00
Balok Kayu 0.0150 m3 1,600,000.00
Papan Albasia 0.0200 m3 1,600,000.00
Bambu Batang Ø 7 cm 2.0000 Btg 8,000.00
Pekerja 0.6600 HOK 57,500.00 37,950.00
Tukang batu 0.3300 HOK 75,000.00 24,750.00
Kepala tukang 0.0330 HOK 85,000.00 2,805.00
Mandor 0.0330 HOK 85,000.00 2,805.00
Jumlah 68,310.00

Jumlah Total 68,310.00


Dibulatkan

G-14 1 m3 MEMBUAT PONDASI BETON BERTULANG T= 15 CM + Bekisting


Besi beton + Kawat Pengikat 198.5130 kg 10,700.00
Bekistung 2.5000 m2 120,900.00
Cor Beton K-225 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-11 1 m3 MEMBUAT PONDASI BETON BERTULANG T= 20 CM + Bekisting


Besi beton + Kawat Pengikat 158.8104 kg 10,700.00
Bekistung 2.6667 m2 120,900.00
Cor Beton K-175 1.0000 m3 777,700.00
Jumlah
Jumlah Total
Dibulatkan

G-15 1 m3 MEMBUAT PONDASI BETON BERTULANG T= 25 CM + Bekisting K225


Besi beton + Kawat Pengikat 174.1621 kg 10,700.00
Bekisting 2.0000 m2 120,900.00
Cor Beton K-225 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-13 1 m3 MEMBUAT PONDASI BETON BERTULANG T= 30 CM + Bekisting K 225


Besi beton + Kawat Pengikat 107.7642 kg 10,700.00
Bekistung 1.6667 m2 120,900.00
Cor Beton K-225 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-14 1 m3 MEMBUAT PONDASI STRAUS PILE


Galian Ø 30 3.3000 m3 55,500.00
Besi Beton + Pengikat 118.6670 kg 10,700.00
Beton K-225 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-15 1 m3 MEMBUAT PONDASI CYCLOF + 40 % BATU BELAH


Batu Belah 0.4800 m3 100,000.00
Beton 1 : 2 : 3 0.6000 m3 640,470.00
Upah Kerja 0.0400 lot 432,282.00
Jumlah
Jumlah Total
Dibulatkan

G-16 1 m3 MEMBUAT SLOOF 20/35 BETON BERTULANG + Bekisting (S0)


Besi Beton + Kawat Pengikat 223.1519 kg 10,700.00
Bekisting 10.0000 m2 113,100.00
Cor Beton K-175 1.0000 m3 777,700.00
Jumlah
Jumlah Total
Dibulatkan

G-16 1 m3 MEMBUAT SLOOF 20/30 BETON BERTULANG + Bekisting (S1)


Besi Beton + Kawat Pengikat 84.4235 kg 10,700.00
Bekisting 10.0000 m2 113,100.00
Cor Beton K-225 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-16 1 m3 MEMBUAT SLOOF 20/25 BETON BERTULANG + Bekisting (S2)


Besi Beton + Kawat Pengikat 237.1832 kg 10,700.00
Bekisting 10.0000 m2 113,100.00
Cor Beton K-175 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-16 1 m3 MEMBUAT SLOOF 20/25 BETON BERTULANG + Bekisting (S3)


Besi Beton + Kawat Pengikat 154.3256 kg 10,700.00
Bekisting 10.0000 m2 113,100.00
Cor Beton K-175 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-16 1 m3 MEMBUAT SLOOF 15/25 BETON BERTULANG + Bekisting (S4)


Besi Beton + Kawat Pengikat 197.7009 kg 10,700.00
Bekisting 13.3333 m2 113,100.00
Cor Beton K-175 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-17 1 m3 MEMBUAT SLOOF 15/20 BETON BERTULANG + Bekisting (S2)


Besi Beton + Kawat Pengikat 115.6636 kg 10,700.00
Bekisting 13.3333 m2 113,100.00
Cor Beton K-225 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-10 1 m3 STOOT WERK


Kayu Stoot (dinding 2xpakai) 50% 9.0000 btg 20,212.50
Papan Terentang ( 2 x ) 0.0160 m3 1,600,000.00
Paku 0.5000 Kg 14,500.00
Pekerja 0.1500 HOK 57,500.00 8,625.00
Tukang Kayu 1/2 Terampil 0.2000 HOK 65,000.00 13,000.00
Kepala Tukang Kayu 0.2000 HOK 85,000.00 17,000.00
Mandor 0.0170 HOK 85,000.00 1,445.00
Jumlah 40,070.00

Jumlah Total 40,070.00


Dibulatkan

G-18 1 m3 MEMBUAT LISTPLANK BETON 10/60 BERTULANG + Bekisting( (LP)


Besi Beton + Pengikat 142.9622 Kg 10,700.00
Begisting 11.6667 m2 139,772.73
Cor Beton K-175 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-19 1 m3 MEMBUAT BETON SIRIF PROFIL BERTULANG T = 6 CM + Bekisting


Besi Beton + Pengikat 71.8099 Kg 10,700.00
Begisting 16.6667 m2 139,772.73
Cor Beton K-175 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-20 1 m3 MEMBUAT BETON SIRIF PROFIL BERTULANG T = 8 CM + Bekisting


Besi Beton + Pengikat 55.0411 Kg 10,700.00
Begisting 12.5000 m2 139,772.73
Cor Beton 1 : 2 : 3 1.0000 m3 640,470.00
Jumlah
Jumlah Total
Dibulatkan

G-13 1 m3 MEMBUAT KOLOM BETON PRAKTIS 12/12 BERTULANG + Bekisting (KP)


Besi Beton + Pengikat 146.6558 Kg 10,700.00
Begisting 13.3333 m2 110,050.00
Cor Beton K-175 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-21 1 m3 MEMBUAT KOLOM BETON PRAKTIS 12/15 BERTULANG + Bekisting (KP)


Besi Beton + Pengikat 269.5429 Kg 10,700.00
Begisting 8.3333 m2 110,050.00
Cor Beton 1 : 2 : 3 1.0000 m3 640,470.00
Jumlah
Jumlah Total
Dibulatkan

G-22 1 m3 MEMBUAT KOLOM BETON PRAKTIS 12/15 BERTULANG + Bekisting (KP1)


Besi Beton + Pengikat 159.9795 Kg 10,700.00
Begisting 16.6667 m2 110,050.00
Cor Beton 1 : 2 : 3 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-11 1 m3 MEMBUAT KOLOM STRUKTUR BETON BERTULANG 20/20 (+ Bekisting) (K4)


Besi Beton + Pengikat 129.6130 Kg 10,700.00
Begisting 10.0000 m2 110,050.00
Cor Beton K-225 1.0000 m3 829,500.00
Stoot Werk 1.6667 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-23 1 m3 MEMBUAT KOLOM STRUKTUR BETON BERTULANG 30/30 (+ Bekisting) (K1)


Besi Beton + Pengikat 75.3116 Kg 10,700.00
Begisting 6.6667 m2 110,050.00
Cor Beton K-225 1.0000 m3 829,500.00
Stoot Werk 1.6667 m2 3,866,000.00
Jumlah
Jumlah Total
Dibulatkan

G-24 1 m3 MEMBUAT KOLOM STRUKTUR BETON BERTULANG 20/30 (+ Bekisting) (Frame List Kusen)
Besi Beton + Pengikat 123.8918 Kg 10,700.00
Begisting 8.3333 m2 110,050.00
Cor Beton K-225 1.0000 m3 829,500.00
Stoot Werk 1.6667 m2 4,637,712.00
Jumlah
Jumlah Total
Dibulatkan

G-25 1 m3 MEMBUAT KOLOM STRUKTUR BETON BERTULANG 20/25 (+ Bekisting) (K2)


Besi Beton + Pengikat 92.0607 Kg 10,700.00
Begisting 9.0000 m2 110,050.00
Cor Beton K-225 1.0000 m3 829,500.00
Stoot Werk 1.6667 m2 5,437,988.00
Jumlah
Jumlah Total
Dibulatkan

G-12 1 m3 MEMBUAT KOLOM BETON STRUKTUR 15/20 BERTULANG + Bekisting (K2)


Besi Beton + Pengikat 151.8316 Kg 10,700.00
Begisting 11.6667 m2 110,050.00
Cor Beton K-225 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-12 1 m3 MEMBUAT KOLOM BETON STRUKTUR 15/25 BERTULANG + Bekisting


Besi Beton + Pengikat 185.0667 Kg 10,700.00
Begisting 10.6667 m2 110,050.00
Cor Beton K-175 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-25 1 m3 MEMBUAT KOLOM BETON STRUKTUR 25/35 BERTULANG + Bekisting (K2)


Besi Beton + Pengikat 144.9143 Kg 10,700.00
Begisting 13.7143 m2 110,050.00
Cor Beton K-175 1.0000 m3 829,500.00
Stoot Werk 1.0417 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-13 1 m3 MEMBUAT KOLOM STRUKTUR BETON BERTULANG 15/15 (+ Bekisting)


Besi Beton + Pengikat 146.6558 Kg 10,700.00
Begisting 13.3333 m2 110,050.00
Cor Beton K-175 1.0000 m3 829,500.00
Stoot Werk 1.0417 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-25 1 m3 MEMBUAT KOLOM STRUKTUR BETON BERTULANG 15/35 (+ Bekisting) (K L)


Besi Beton + Pengikat 141.1556 Kg 10,700.00
Begisting 8.6667 m2 110,050.00
Cor Beton K-175 1.0000 m3 829,500.00
Stoot Werk 1.0417 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-26 1 m3 MEMBUAT KOLOM STRUKTUR BETON BERTULANG 20/40 (+ Bekisting) (K3 L)


Besi Beton + Pengikat 153.2866 Kg 10,700.00
Begisting 7.5000 m2 110,050.00
Cor Beton K-225 1.0000 m3 829,500.00
Stoot Werk 1.0417 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-29 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 25/50 (+ Bekisting) (B0)


Besi Beton + Pengikat 174.1009 Kg 10,700.00
Begisting 10.0000 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 1.7778 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-27 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 20/30 (+ Bekisting) (B1)


Besi Beton + Pengikat 255.3022 Kg 10,700.00
Begisting 13.3333 m2 153,750.00
Cor Beton K-225 1.0000 M3 829,500.00
Stoot Werk 1.7857 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-31 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 20/35 (+ Bekisting)


Besi Beton + Pengikat 200.6056 Kg 10,700.00
Begisting 12.8571 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 2.0833 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-28 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 20/30 (+ Bekisting) (B2)


Besi Beton + Pengikat 84.4235 Kg 10,700.00
Begisting 13.3333 m2 153,750.00
Cor Beton K-225 1.0000 M3 829,500.00
Stoot Werk 2.0833 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-33 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 20/25 (+ Bekisting) (B4)


Besi Beton + Pengikat 205.6184 Kg 10,700.00
Begisting 14.0000 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 2.5000 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-33 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 20/45 (+ Bekisting) (B5)


Besi Beton + Pengikat 180.2847 Kg 10,700.00
Begisting 12.2222 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 2.5000 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-33 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 20/35 (+ Bekisting) (B6)


Besi Beton + Pengikat 131.5576 Kg 10,700.00
Begisting 12.8571 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 2.5000 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-33 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 20/25 (+ Bekisting) (B7)


Besi Beton + Pengikat 136.5704 Kg 10,700.00
Begisting 14.0000 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 2.5000 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-33 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 20/25 (+ Bekisting) (B8)


Besi Beton + Pengikat 154.3256 Kg 10,700.00
Begisting 14.0000 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 2.5000 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-29 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 15/25 (+ Bekisting) (B3)


Besi Beton + Pengikat 174.0273 Kg 10,700.00
Begisting 17.3333 m2 153,750.00
Cor Beton K-225 1.0000 M3 829,500.00
Stoot Werk 3.0000 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-30 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 20/45 (+ Bekisting) (B4)


Besi Beton + Pengikat 180.2847 Kg 10,700.00
Begisting 12.2222 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 3.7500 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-36 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 15/30 (+ Bekisting) (Ba1)


Besi Beton + Pengikat 151.7449 Kg 10,700.00
Begisting 16.6667 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 2.5000 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-36 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 15/25 (+ Bekisting) (Ba)


Besi Beton + Pengikat 174.0273 Kg 10,700.00
Begisting 17.3333 m2 153,750.00
Cor Beton K-225 1.0000 M3 829,500.00
Stoot Werk 2.5000 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-36 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 15/20 (+ Bekisting) (Ba3)


Besi Beton + Pengikat 207.4509 Kg 10,700.00
Begisting 18.3333 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 2.5000 m2 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-37 1 m3 MEMBUAT BALOK STRUKTUR BETON BERTULANG 15/45 (+ Bekisting) (BAL)


Besi Beton + Pengikat 113.3333 Kg 10,700.00
Begisting 7.7778 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 1.6667 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-18 1 m3 MEMBUAT BALOK LINTEL BETON BERTULANG 12/12 (+ Bekisting) (BL)


Besi Beton + Pengikat 263.8889 Kg 10,700.00
Begisting 12.5000 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 3.6458 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-31 1 m3 MEMBUAT BALOK BORDES 15/25 BETON BERTULANG (+ Bekisting)


Besi Beton + Pengikat 266.0913 Kg 10,700.00
Begisting 17.3333 m2 153,750.00
Cor Beton K-225 1.0000 M3 829,500.00
Stoot Werk 1.1667 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan
G-20 1 m3 MEMBUAT BALOK 12/20 BETON BERTULANG (+ Bekisting) (B2)
Besi Beton + Pengikat 293.6111 Kg 10,700.00
Begisting 4.1667 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 2.1875 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-21 1 m3 MEMBUAT BALOK 12/40 BETON BERTULANG (+ Bekisting) (B3)


Besi Beton + Pengikat 158.8889 Kg 10,700.00
Begisting 10.6250 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 2.3333 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-22 1 m3 MEMBUAT BALOK 30/60 BETON BERTULANG (+ Bekisting) (B4)


Besi Beton + Pengikat 75.1596 Kg 10,700.00
Begisting 8.3333 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 0.8333 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-39 1 m3 MEMBUAT BALOK LINTEL BETON BERTULANG 10/15 (+ Bekisting) (BL)


Besi Beton + Pengikat 239.1111 Kg 10,700.00
Begisting 13.3333 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 3.5000 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-32 1 m3 MEMBUAT BALOK LINTEL BETON BERTULANG 12/15 (+ Bekisting) (BL1)


Besi Beton + Pengikat 193.5536 Kg 10,700.00
Begisting 11.6667 m2 153,750.00
Cor Beton 1 : 2 : 3 1.0000 M3 640,470.00
Stoot Werk 3.5000 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-33 1 m3 MEMBUAT BALOK LINTEL BETON BERTULANG 10/12 (+ Bekisting) (BL2)


Besi Beton + Pengikat 270.6024 Kg 10,700.00
Begisting 14.1667 m2 153,750.00
Cor Beton 1 : 2 : 3 1.0000 M3 640,470.00
Stoot Werk 3.5000 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-23 1 m3 MEMBUAT BALOK LINTEL BETON BERTULANG 12/20 (+ Bekisting) (BL)


Besi Beton + Pengikat 174.4444 Kg 10,700.00
Begisting 10.0000 m2 153,750.00
Cor Beton K-175 1.0000 M3 829,500.00
Stoot Werk 1.7500 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-40 1 m3 MEMBUAT RING BALOK 15/25 BETON BERTULANG (+ Bekisting) (RB2)


Besi Beton + Pengikat 197.7009 Kg 10,700.00
Begisting 13.3333 m2 153,750.00
Cor Beton K-175 1.0000 m3 829,500.00
Jumlah
Jumlah Total
Dibulatkan

G-34 1 m3 MEMBUAT RING BALOK 15/20 BETON BERTULANG (+ Bekisting) (RB)


Besi Beton + Pengikat 115.6636 Kg 10,700.00
Begisting 13.3333 m2 153,750.00
Cor Beton 1 : 2 : 3 1.0000 m3 640,470.00
Jumlah
Jumlah Total
Dibulatkan

G-14 1 m3 MEMBUAT PLAT BETON T = 6 CM Bekisting


Besi Beton + Pengikat 81.2794 Kg 10,700.00
Begisting 16.6667 m2 153,750.00
Cor Beton K-175 1.0000 m3 640,470.00
Jumlah
Jumlah Total
Dibulatkan

G-35 1 m3 MEMBUAT PLAT BETON T = 8 CM Bekisting


Besi Beton + Pengikat 62.1432 kg 10,700.00
Begisting 12.5000 m2 180,950.00
Cor Beton K-225 1.0000 m3 829,500.00
Stoot Werk 3.1250 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-36 1 m3 MEMBUAT PLAT BETON T = 10 CM Bekisting


Besi Beton + Pengikat 50.6615 kg 10,700.00
Begisting 10.0000 m2 180,950.00
Cor Beton K-225 1.0000 m3 829,500.00
Stoot Werk 2.5000 m2 254,800.00
Jumlah
Jumlah Total
Dibulatkan

G-37 1 m3 MEMBUAT PLAT BETON T = 12 CM Bekisting


Besi Beton + Pengikat 78.8462 kg 10,700.00
Begisting 8.3333 m2 164,500.00
Cor Beton K-225 1.0000 m3 829,500.00
Stoot Werk 2.0833 m2 254,800.00
Jumlah

Jumlah Total
Dibulatkan

G-38 1 m3 MEMBUAT PLAT BETON T = 15 CM Bekisting


Besi Beton + Pengikat 64.8131 kg 10,700.00
Begisting 6.6667 m2 164,500.00
Cor Beton K-225 1.0000 m3 829,500.00
Stoot Werk 2.0833 m2 0.00
Jumlah
Keuntungan
Jumlah Total
Dibulatkan

G-30 1 m3 MEMBUAT TIANG PANCANG PRESTRESSED BETON


Semen PC (50 kg) 8.8000 Zak
Pasir beton 0.5000 m3
Koral beton 0.8000 m3
Rapidrant 2.4600 Gal
Pekerja 1.6500 HOK 0.00
Tukang batu 0.2500 HOK 0.00
Kepala tukang 0.0250 HOK 0.00
Mandor 0.0800 HOK 0.00
Total 0.00
Total Harga

G-31 1 m3 MEMBUAT BETON DENGAN PUZZDITH -100XR


Semen PC (50 kg) 6.7200 Zak
Pasir beton 0.5400 m3
Koral beton 0.8100 m3
Puzzdith -100XR 1.0000 Ltr
Pekerja 1.6500 HOK 0.00
Tukang batu 0.2500 HOK 0.00
Kepala tukang 0.0250 HOK 0.00
Mandor 0.0800 HOK 0.00
Total 0.00
Total Harga

G-32 1 m3 MEMBUAT BETON KEDAP AIR DENGAN STROROX -100


Semen PC (50 kg) 8.0000 Zak
Pasir beton 0.4800 m3
Koral beton 0.8000 m3
Strorox -100 1.2000 Kg
Pekerja 2.0000 HOK 0.00
Tukang batu 0.3500 HOK 0.00
Kepala tukang 0.0350 HOK 0.00
Mandor 1.0000 HOK 0.00
Total 0.00
Total Harga

G-33 1 Kg JARING KAWAT BAJA


Besi jaring kawat baja 1.0200 Kg
Kawat beton 0.8050 Kg
Pekerja 0.0250 HOK 0.00
Tukang besi 0.0250 HOK 0.00
Kepala tukang 0.0025 HOK 0.00
Mandor 0.0015 HOK 0.00
Total 0.00
Total Harga

G-34 1 m' MEMASANG PVC WATERSTOP LEBAR 150mm


Waterstop Lebar 150mm 1.0500 m'
Pekerja 0.0500 HOK 0.00
Tukang batu 0.0300 HOK 0.00
Kepala tukang 0.0030 HOK 0.00
Mandor 0.0020 HOK 0.00
Total 0.00
Total Harga

G-35 1 m' MEMASANG PVC WATERSTOP LEBAR 200mm


Waterstop Lebar 200mm 1.0500 m'
Pekerja 0.0500 HOK 0.00
Tukang batu 0.0350 HOK 0.00
Kepala tukang 0.0035 HOK 0.00
Mandor 0.0020 HOK 0.00
Total 0.00
Total Harga

G-36 1 m' MEMASANG PVC WATERSTOP LEBAR 230mm, /250mm, /300mm, /320mm
Waterstop (230, /250, /300, /320) mm 1.0500 m'
Pekerja 0.5500 HOK 0.00
Tukang batu 0.0350 HOK 0.00
Mandor 0.0030 HOK 0.00
Total 0.00
Total Harga

H PEKERJAAN PENUTUP ATAP

H-01 1 m2 PASANG ATAP GENTENG MORANDO GLATSUR 18 BH/M2


Genteng Morando Glatsur 18.0000 Bh 4,200.00
Pekerja 0.1500 HOK 57,500.00 8,625.00
Tukang kayu 0.0600 HOK 75,000.00 4,500.00
Kepala tukang 0.0060 HOK 85,000.00 510.00
Mandor 0.0080 HOK 85,000.00 680.00
Jumlah 14,315.00
Jumlah Total 14,315.00
Dibulatkan

H-02 1 m2 PASANG ATAP GENTENG MORANDO NATURAL 18 BH/M2


Genteng Morando Natural 18.0000 Bh 2,700.00
Pekerja 0.1500 HOK 57,500.00 8,625.00
Tukang kayu 0.0600 HOK 75,000.00 4,500.00
Kepala tukang 0.0060 HOK 85,000.00 510.00
Mandor 0.0080 HOK 85,000.00 680.00
Jumlah 14,315.00

Jumlah Total 14,315.00


Dibulatkan

H-02A 1 m2 PASANG ATAP GENTENG LAMA


Pekerja 0.1500 HOK 57,500.00 8,625.00
Tukang kayu 0.0600 HOK 75,000.00 4,500.00
Kepala tukang 0.0060 HOK 85,000.00 510.00
Mandor 0.0080 HOK 85,000.00 680.00
Jumlah 14,315.00

Jumlah Total 14,315.00


Dibulatkan

H-03 1 m2 PASANG ATAP GENTENG BETON NATURAL 18 BH/M2


Genteng Beton Natural 11.0000 Bh 11,000.00
Paku Biasa 2" - 5" 0.0300 Kg 14,500.00
Pekerja 0.2000 HOK 57,500.00 11,500.00
Tukang kayu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0100 HOK 85,000.00 850.00
Jumlah 20,700.00

Jumlah Total 20,700.00


Dibulatkan

H-04 1 m2 PASANG ATAP GENTENG PALENTONG Ex JATIWANGI


Genteng Palentong ex Jatiwangi 25.0000 Bh 2,000.00
Pekerja 0.1500 HOK 57,500.00 8,625.00
Tukang kayu 0.0750 HOK 75,000.00 5,625.00
Kepala tukang 0.0075 HOK 85,000.00 637.50
Mandor 0.0080 HOK 85,000.00 680.00
Jumlah 15,567.50

Jumlah Total 15,567.50


Dibulatkan

H-04 1 m2 PASANG ATAP GENTENG PALENTONG BESAR/ SUPER


Genteng Palentong Besar 12.0000 Bh 3,000.00
Pekerja 0.1500 HOK 57,500.00 8,625.00
Tukang kayu 0.0750 HOK 75,000.00 5,625.00
Kepala tukang 0.0075 HOK 85,000.00 637.50
Mandor 0.0080 HOK 85,000.00 680.00
Jumlah 15,567.50

Jumlah Total 15,567.50


Dibulatkan

H-05 1 m' PASANG BUBUNG GENTENG MORANDO


Genteng Bubung Morando 5.0000 Bh 4,200.00
Semen PC (50 kg) 0.1600 Zak 67,000.00
Pasir pasang 0.0320 m3 132,000.00
Pekerja 0.4000 HOK 57,500.00 23,000.00
Tukang kayu 0.2000 HOK 75,000.00 15,000.00
Kepala tukang 0.0200 HOK 85,000.00 1,700.00
Mandor 0.0020 HOK 85,000.00 170.00
Jumlah 39,870.00

Jumlah Total 39,870.00


Dibulatkan

H-06 1 m' PASANG BUBUNG GENTENG BETON


Genteng Bubung Beton 5.0000 Bh 11,000.00
Semen PC (50 kg) 0.1600 Zak 67,000.00
Pasir pasang 0.0320 m3 132,000.00
Pekerja 0.4000 HOK 57,500.00 23,000.00
Tukang kayu 0.2000 HOK 75,000.00 15,000.00
Kepala tukang 0.0200 HOK 85,000.00 1,700.00
Mandor 0.0020 HOK 85,000.00 170.00
Jumlah 39,870.00

Jumlah Total
Dibulatkan

H-14 1 m2 PASANG ATAP ALUMINIUM


Atap alluminium gelombang tebal 0.55 1.0500 m2
Paku hak panjang 15cm 0.0200 Kg
Pekerja 0.1500 HOK 0.00
Tukang kayu 0.7500 HOK 0.00
Kepala tukang 0.0080 HOK 0.00
Mandor 0.0060 HOK 0.00
Total 0.00
Total Harga

H-15 1 m2 PASANG NOK ALLUMINIUM


Nok standar 40 cm18, swg 22 1.2000 m2
Paku hak panjang 15cm 0.0400 Kg
Pekerja 0.1000 HOK 0.00
Tukang kayu 1.0000 HOK 0.00
Kepala tukang 0.0100 HOK 0.00
Mandor 0.0100 HOK 0.00
Total 0.00
Total Harga
H-16 1 m2 PASANG ALLUMINIUM FOIL /SISALATION
Alluminiumfoil /sisalation 1.0500 m2
Pekerja 0.1500 HOK 0.00
Tukang kayu 0.0500 HOK 0.00
Kepala tukang 0.0050 HOK 0.00
Mandor 0.0080 HOK 0.00
Total 0.00
Total Harga

H-17 1 m' PASANG NOK PATEN 0.92 m


Nok paten 1.2000 Lbr
Paku skrup 3.5" 6.0000 Kg
Pekerja 0.0840 HOK 0.00
Tukang kayu 0.1250 HOK 0.00
Kepala tukang 0.0130 HOK 0.00
Mandor 0.0040 HOK 0.00
Total 0.00
Total Harga

H-18 1 m' PASANG NOK STEL RATA 0.92 m


Nok stel rata 1.1000 Lbr
Paku skrup 3.5" 6.0000 Kg
Pekerja 0.1000 HOK 0.00
Tukang kayu 0.1500 HOK 0.00
Kepala tukang 0.0130 HOK 0.00
Mandor 0.0040 HOK 0.00
Total 0.00
Total Harga

H-19 1 m2 PASANG ATAP GENTENG METAL


Genteng metal 1.0200 Lbr
Paku biasa 2"-5" 0.2000 Kg
Pekerja 0.2000 HOK 0.00
Tukang kayu 0.1000 HOK 0.00
Kepala tukang 0.0100 HOK 0.00
Mandor 0.0010 HOK 0.00
Total 0.00
Total Harga

H-20 1 m' PASANG NOK GENTENG METAL


Nok genteng decra bond 1.1000 bh
Paku biasa 1/2"-1" 0.0500 Kg
Pekerja 0.2500 HOK 0.00
Tukang kayu 0.1500 HOK 0.00
Kepala tukang 0.0150 HOK 0.00
Mandor 0.0130 HOK 0.00
Total 0.00
Total Harga

H-07 1 m' PASANG BUBUNG GENTENG PALENTONG KECIL


Genteng Bubung Palentong 5.0000 Bh 4,700.00
Semen PC (50 kg) 0.1600 Zak 67,000.00
Pasir pasang 0.0320 m3 132,000.00
Pekerja 0.4000 HOK 57,500.00 23,000.00
Tukang kayu 0.2000 HOK 75,000.00 15,000.00
Kepala tukang 0.0200 HOK 85,000.00 1,700.00
Mandor 0.0020 HOK 85,000.00 170.00
Jumlah 39,870.00

Jumlah Total 39,870.00


Dibulatkan

H-07 1 m' PASANG BUBUNG GENTENG PALENTONG BESAR


Genteng Bubung Palentong Besar 4.0000 Bh 4,700.00
Semen PC (50 kg) 0.1600 Zak 67,000.00
Pasir pasang 0.0320 m3 132,000.00
Pekerja 0.4000 HOK 57,500.00 23,000.00
Tukang kayu 0.2000 HOK 75,000.00 15,000.00
Kepala tukang 0.0200 HOK 85,000.00 1,700.00
Mandor 0.0020 HOK 85,000.00 170.00
Jumlah 39,870.00

Jumlah Total 39,870.00


Dibulatkan

H-08 1 m2 PASANG ATAP GENTENG METAL PASIR


Genteng metal 1.0200 Lbr 95,000.00
Paku biasa 2"-5" 0.2000 Kg 14,500.00
Pekerja 0.2000 HOK 57,500.00 11,500.00
Tukang kayu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0010 HOK 85,000.00 85.00
Jumlah 19,935.00

Jumlah Total 19,935.00


Dibulatkan

H-09 1 m' PASANG NOK GENTENG METAL PASIR


Nok genteng decra bond 1.1000 bh 65,000.00
Paku biasa 1/2"-1" 0.0500 Kg 14,500.00
Pekerja 0.2500 HOK 57,500.00 14,375.00
Tukang kayu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.0130 HOK 85,000.00 1,105.00
Jumlah 28,005.00

Jumlah Total 28,005.00


Dibulatkan

I PEKERJAAN LANGIT-LANGIT

I-01 1 m2 LANGIT-LANGIT ASBES (1.00X1.00 ) m, TEBAL 5 mm


Plat asbes 5mm 1.1000 Lbr 10,000.00
Paku 0.0100 Kg 14,500.00
Pekerja 0.0300 HOK 57,500.00 1,725.00
Tukang kayu 0.0700 HOK 75,000.00 5,250.00
Kepala tukang 0.0070 HOK 85,000.00 595.00
Mandor 0.0015 HOK 85,000.00 127.50
Jumlah 7,697.50

Jumlah Total 7,697.50


Dibulatkan

I-02 1 m' LIST LANGIT-LANGIT KAYU PROFIL


List kayu profil 1.1000 m' 4,500.00
Paku 0.0100 Kg 14,500.00
Pekerja 0.0500 HOK 57,500.00 2,875.00
Tukang kayu 0.0500 HOK 75,000.00 3,750.00
Kepala tukang 0.0050 HOK 85,000.00 425.00
Mandor 0.0030 HOK 85,000.00 255.00
Jumlah 7,305.00

Jumlah Total 7,305.00


Dibulatkan

I-01 1 m2 LANGIT-LANGIT ETERNITE (100 X 100 ) Cm, RANGKA KAYU GUNUNG KLAS II KUAT
Kayu Gunung Klas II 5/7 0.0120 m3 3,000,000.00
Paku biasa 0.0600 Kg 14,500.00
Eternit 1.1000 Lbr 10,000.00
Pekerja 0.1800 HOK 57,500.00 10,350.00
Tukang kayu 0.3200 HOK 75,000.00 24,000.00
Kepala tukang 0.0320 HOK 85,000.00 2,720.00
Mandor 0.0090 HOK 85,000.00 765.00
Jumlah 37,835.00

Jumlah Total 37,835.00


Dibulatkan

I-02 1 m2 LANGIT-LANGIT KALSIBOARD (1.20X2.40 ) Cm, RANGKA KAYU BORNEO


Kayu borneo, balok 0.0120 m3 5,857,582.50
Paku biasa 0.0600 Kg 14,500.00
Kalsiboard 0.3820 Lbr 55,000.00
Pekerja 0.1800 HOK 57,500.00 10,350.00
Tukang kayu 0.3200 HOK 75,000.00 24,000.00
Kepala tukang 0.0320 HOK 85,000.00 2,720.00
Mandor 0.0090 HOK 85,000.00 765.00
Jumlah 37,835.00

Jumlah Total 37,835.00


Dibulatkan

I-02 1 m2 LANGIT-LANGIT GRC (1.20X2.40 ) Cm, RANGKA KAYU GUNUNG KELAS II


Kayu Gunung Kls II, balok 0.0120 m3 3,000,000.00
Paku biasa 0.0600 Kg 14,500.00
GRC 0.3819 Lbr 67,000.00
Pekerja 0.1800 HOK 57,500.00 10,350.00
Tukang kayu 0.3200 HOK 75,000.00 24,000.00
Kepala tukang 0.0320 HOK 85,000.00 2,720.00
Mandor 0.0090 HOK 85,000.00 765.00
Jumlah 37,835.00

Jumlah Total 37,835.00


Dibulatkan

I-03 1 m2 LANGIT-LANGIT MULTIFLEK (1.20X2.40 ) Cm 4 mm, RANGKA KAYU GUNUNG KELAS III
Kayu Gunung Kls III, balok 0.0120 m3 1,600,000.00
Paku biasa 0.0600 Kg 14,500.00
Multiflek 4 mm 0.3819 Lbr 75,000.00
Pekerja 0.1800 HOK 57,500.00 10,350.00
Tukang kayu 0.3200 HOK 75,000.00 24,000.00
Kepala tukang 0.0320 HOK 85,000.00 2,720.00
Mandor 0.0090 HOK 85,000.00 765.00
Jumlah 37,835.00

Jumlah Total 37,835.00


Dibulatkan

I-03A 1 m2 LANGIT-LANGIT GRC (1.20X2.40 ) Cm, RANGKA KAYU LAMA


Paku biasa 0.0600 Kg 14,500.00
GRC 0.3819 Lbr 75,000.00
Pekerja 0.1800 HOK 57,500.00 10,350.00
Tukang kayu 0.3200 HOK 75,000.00 24,000.00
Kepala tukang 0.0320 HOK 85,000.00 2,720.00
Mandor 0.0090 HOK 85,000.00 765.00
Jumlah 37,835.00

Jumlah Total 37,835.00


Dibulatkan

I-04 1 m2 LANGIT-LANGIT ETERNITE (100 X 100 ) Cm, RANGKA KAYU GUNUNG KLAS III
Kayu Gunung Klas II 5/7 0.0120 m3 1,600,000.00
Paku biasa 0.0600 Kg 14,500.00
Eternit 1.1000 Lbr 10,000.00
Pekerja 0.1800 HOK 57,500.00 10,350.00
Tukang kayu 0.3200 HOK 75,000.00 24,000.00
Kepala tukang 0.0320 HOK 85,000.00 2,720.00
Mandor 0.0090 HOK 85,000.00 765.00
Jumlah 37,835.00

Jumlah Total 37,835.00


Dibulatkan

I-05 1 m2 LANGIT-LANGIT GRC (1.20X2.40 ) Cm, RANGKA BESI HOLLO 20.40 dan 40.40
Besi Hollo 20.40 0.4167 btg 16,500.00
Besi Hollo 40.40 0.4167 btg 23,500.00
Skrup 24.0000 bh 1,000.00
Gantungan Dari Kawat 1 mm 1.8000 m1 1,500.00
GRC 0.3819 Lbr 67,000.00
Pekerja 0.1800 HOK 57,500.00 10,350.00
Tukang besi 0.3200 HOK 65,000.00 20,800.00
Kepala tukang 0.0320 HOK 85,000.00 2,720.00
Mandor 0.0090 HOK 85,000.00 765.00
Jumlah 34,635.00

Jumlah Total 34,635.00


Dibulatkan

J PEKERJAAN SANITASI

J-01 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


Kloset jongkok porselin 1.0000 Bh 233,500.00
Semen PC (50 kg) 0.1200 Zak 67,000.00
Pasir pasang 0.0100 m3 132,000.00
Pekerja 1.0000 HOK 57,500.00 57,500.00
Tukang batu 1.5000 HOK 75,000.00 112,500.00
Kepala tukang 0.1500 HOK 85,000.00 12,750.00
Mandor 0.1600 HOK 85,000.00 13,600.00
Jumlah 196,350.00

Jumlah Total 196,350.00


Dibulatkan

J-02 MEMASANG 1 BUAH KLOSET DUDUK PORSELIN


Kloset Duduk porselin 1.0000 Bh 2,100,000.00
Perlengkapan 6% x harga closet 6.0% closet 2,100,000.00
Pekerja 3.3000 HOK 57,500.00 189,750.00
Tukang batu 1.1000 HOK 75,000.00 82,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.1600 HOK 85,000.00 13,600.00
Jumlah 286,700.00

Jumlah Total 286,700.00


Dibulatkan

J-03 MEMASANG 1 BUAH WASTAFEL


Wastafel 1.2000 Bh 390,000.00
Semen PC (50 kg) 0.1200 zak 67,000.00
Pasir pasang 0.0100 m3 132,000.00
Perlengkapan 12.0% wastafel 390,000.00
Pekerja 1.2000 HOK 57,500.00 69,000.00
Tukang batu 1.4500 HOK 75,000.00 108,750.00
Kepala tukang 0.1500 HOK 85,000.00 12,750.00
Mandor 0.0600 HOK 85,000.00 5,100.00
Jumlah 195,600.00

Jumlah Total 195,600.00


Dibulatkan

J-04 MEMASANG 1 BUAH BAK MANDI FIBREGLASS 0,30M3


Bak fibreglass 1.0000 Bh 285,000.00
Perlengkapan 12.0% Hrg Bak 285,000.00
Pekerja 0.3000 HOK 57,500.00 17,250.00
Tukang batu 0.4500 HOK 75,000.00 33,750.00
Kepala tukang 0.0450 HOK 85,000.00 3,825.00
Mandor 0.0150 HOK 85,000.00 1,275.00
Jumlah 56,100.00

Jumlah Total 56,100.00


Dibulatkan

J-04 MEMASANG 1 METER PIPA BETON, Ø 15-20 CM


Pipa beton 1.1000 bh 47,500.00
Batu bata 5x11x22 15.6250 bh 700.00
Semen PC (50 kg) 0.0784 Zak 67,000.00
Pasir Pasang 0.0560 m3 132,000.00
Pasir Urug 0.0240 m3 86,500.00
Pekerja 0.1400 HOK 57,500.00 8,050.00
Tukang batu 0.0700 HOK 75,000.00 5,250.00
Kepala tukang 0.0070 HOK 85,000.00 595.00
Mandor 0.0070 HOK 85,000.00 595.00
Jumlah 14,490.00

Jumlah Total 14,490.00


Dibulatkan

J-05 MEMASANG 1 METER PIPA BETON, Ø 30 - 100 CM


Pipa beton 1.1000 bh 65,000.00
Batu bata ( 5x11x22 ) 31.8287 bh 700.00
Semen PC (50 kg) 0.2060 Zak 67,000.00
Pasir Pasang 0.0610 m3 132,000.00
Pasir Urug 0.0690 m3 86,500.00
Pekerja 0.3800 HOK 57,500.00 21,850.00
Tukang batu 0.1900 HOK 75,000.00 14,250.00
Kepala tukang 0.0190 HOK 85,000.00 1,615.00
Mandor 0.0190 HOK 85,000.00 1,615.00
Jumlah 39,330.00

Jumlah Total 39,330.00


Dibulatkan

J-06 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (45X45) CM


Batu bata ( 5x11x22 ) 70.0000 bh 700.00
Semen PC (50 kg) 1.5400 Zak 67,000.00
Pasir Pasang 0.1300 m3 132,000.00
Batu kerikil 0.0200 m3 155,000.00
Besi beton 2.6000 Kg 9,000.00
Pasir beton 0.0900 m3 175,000.00
Pekerja 3.2000 HOK 57,500.00 184,000.00
Tukang batu 1.1500 HOK 75,000.00 86,250.00
Kepala tukang 0.0110 HOK 85,000.00 935.00
Mandor 0.0160 HOK 85,000.00 1,360.00
Jumlah 272,545.00
Jumlah Total 272,545.00
Dibulatkan

J-05 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (45X45) CM TANPA TUTUP
Batu bata 0.9600 m2 94,700.00
Plesteran 1 : 5 1.1200 m2 41,400.00
Acian 1 : 5 1.1200 m2 25,000.00
Galian Tanah 0.1500 m3 45,200.00 6,780.00
Jumlah 6,780.00
Jumlah Total 6,780.00
Dibulatkan

J-08 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (60x60) CM


Batu bata ( 5x11x22 ) 123.0000 bh 700.00
Semen PC (50 kg) 2.2800 Zak 67,000.00
Pasir Pasang 0.1840 m3 132,000.00
Batu kerikil 0.0330 m3 153,000.00
Besi beton 4.8500 Kg 9,000.00
Pasir beton 0.1200 m3 175,000.00
Pekerja 3.2000 HOK 57,500.00 184,000.00
Tukang batu 1.1500 HOK 75,000.00 86,250.00
Kepala tukang 0.0110 HOK 85,000.00 935.00
Mandor 0.0160 HOK 85,000.00 1,360.00
Jumlah 272,545.00

Jumlah Total 272,545.00


Dibulatkan

J-06 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (60X60) CM TANPA TUTUP
Batu bata 1.4400 m2 94,700.00
Plesteran 1 : 5 1.3200 m2 41,400.00
Acian 1 : 5 1.3200 m2 25,000.00
Galian Tanah 0.2940 m3 45,200.00 13,288.80
Jumlah 13,288.80
Jumlah Total
Dibulatkan

J-07 MEMASANG 1 METER PIPA PVC TIPE AW Ø 1/2"


Pipa PVC 1.2000 m' 3,750.00
Perlengkapan 35.0% Hrg-pipa 3,750.00
Pekerja 0.0360 HOK 57,500.00 2,070.00
Tukang batu 0.0600 HOK 75,000.00 4,500.00
Kepala tukang 0.0060 HOK 85,000.00 510.00
Mandor 0.0020 HOK 85,000.00 170.00
Jumlah 7,250.00

Jumlah Total 7,250.00


Dibulatkan

J-08 MEMASANG 1 METER PIPA PVC TIPE AW Ø 3/4"


Pipa PVC 1.2000 m' 5,000.00
Perlengkapan 35.0% Hrg-pipa 5,000.00
Pekerja 0.0360 HOK 57,500.00 2,070.00
Tukang batu 0.0600 HOK 75,000.00 4,500.00
Kepala tukang 0.0060 HOK 85,000.00 510.00
Mandor 0.0020 HOK 85,000.00 170.00
Jumlah 7,250.00

Jumlah Total 7,250.00


Dibulatkan

J-09 MEMASANG 1 METER PIPA PVC TIPE AW Ø 1"


Pipa PVC 1.2000 m' 7,500.00
Perlengkapan 35.0% Hrg-pipa 7,500.00
Pekerja 0.0360 HOK 57,500.00 2,070.00
Tukang batu 0.0600 HOK 75,000.00 4,500.00
Kepala tukang 0.0060 HOK 85,000.00 510.00
Mandor 0.0020 HOK 85,000.00 170.00
Jumlah 7,250.00

Jumlah Total 7,250.00


Dibulatkan

J-10 MEMASANG 1 METER PIPA PVC TIPE AW Ø 1 1/2"


Pipa PVC 1.2000 m' 10,625.00
Perlengkapan 35.0% Hrg-pipa 10,625.00
Pekerja 0.0540 HOK 57,500.00 3,105.00
Tukang batu 0.0900 HOK 75,000.00 6,750.00
Kepala tukang 0.0090 HOK 85,000.00 765.00
Mandor 0.0030 HOK 85,000.00 255.00
Jumlah 10,875.00

Jumlah Total 10,875.00


Dibulatkan

J-11 MEMASANG 1 METER PIPA PVC TIPE AW Ø 2"


Pipa PVC 1.2000 m' 18,500.00
Perlengkapan 35.0% Hrg-pipa 18,500.00
Pekerja 0.0540 HOK 57,500.00 3,105.00
Tukang batu 0.0900 HOK 75,000.00 6,750.00
Kepala tukang 0.0090 HOK 85,000.00 765.00
Mandor 0.0030 HOK 85,000.00 255.00
Jumlah 10,875.00

Jumlah Total 10,875.00


Dibulatkan

J-12 MEMASANG 1 METER PIPA PVC TIPE AW Ø 2 1/2"


Pipa PVC 1.2000 m' 21,250.00
Perlengkapan 35.0% Hrg-pipa 21,250.00
Pekerja 0.0810 HOK 57,500.00 4,657.50
Tukang batu 0.1350 HOK 75,000.00 10,125.00
Kepala tukang 0.0135 HOK 85,000.00 1,147.50
Mandor 0.0040 HOK 85,000.00 340.00
Jumlah 16,270.00

Jumlah Total 16,270.00


Dibulatkan

J-13 MEMASANG 1 METER PIPA PVC TIPE AW Ø 3"


Pipa PVC 1.2000 m' 31,250.00
Perlengkapan 35.0% Hrg-pipa 31,250.00
Pekerja 0.0810 HOK 57,500.00 4,657.50
Tukang batu 0.1350 HOK 75,000.00 10,125.00
Kepala tukang 0.0135 HOK 85,000.00 1,147.50
Mandor 0.0040 HOK 85,000.00 340.00
Jumlah 16,270.00

Jumlah Total 16,270.00


Dibulatkan

J-14 MEMASANG 1 METER PIPA PVC TIPE AW Ø 4"


Pipa PVC 1.2000 m' 43,125.00
Perlengkapan 35.0% Hrg-pipa 43,125.00
Pekerja 0.0810 HOK 57,500.00 4,657.50
Tukang batu 0.1350 HOK 75,000.00 10,125.00
Kepala tukang 0.0135 HOK 85,000.00 1,147.50
Mandor 0.0040 HOK 85,000.00 340.00
Jumlah 16,270.00

Jumlah Total 16,270.00


Dibulatkan

J-18 MEMASANG 1 BUAH BAK CUCI PIRING STAINLESS-STEEL


Bak cuci stainles steel 1.0000 Bh 719,700.00
Water drain + asesories 1.0000 Set 131,200.00
Pekerja 0.0300 HOK 57,500.00 1,725.00
Tukang batu 0.3000 HOK 75,000.00 22,500.00
Kepala tukang 0.0300 HOK 85,000.00 2,550.00
Mandor 0.0015 HOK 85,000.00 127.50
Jumlah 26,902.50

Jumlah Total 26,902.50


Dibulatkan

J-15 MEMASANG 1 BUAH KRAN Ø 1/2" ATAU Ø 3/4"


Kran air 1.0000 Bh 63,000.00
Seal tape 0.0250 Set 4,000.00
Pekerja 0.0100 HOK 57,500.00 575.00
Tukang batu 0.4000 HOK 75,000.00 30,000.00
Kepala tukang 0.0400 HOK 85,000.00 3,400.00
Mandor 0.0050 HOK 85,000.00 425.00
Jumlah 34,400.00
Jumlah Total 34,400.00
Dibulatkan

J-16 MEMASANG 1 BUAH FLOOR DRAIN


Floor drain 1.0000 Bh 25,000.00
Pekerja 0.0100 HOK 57,500.00 575.00
Tukang batu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0050 HOK 85,000.00 425.00
Jumlah 9,350.00

Jumlah Total 9,350.00


Dibulatkan

J-17 1 M' SALURAN GRAFEL BETON 1/2 Ø 20 cm + PASANGAN (A137)


Galian Tanah 0.1500 m3 45,200.00
Grafel beton Ø 20 cm 1.0000 Bh 30,000.00
Pasangan bata + Plesteran 1 : 3 1.0000 m2 144,651.00
Upah kerja 0.3500 Ls 181,431.00 63,500.85
Jumlah 63,500.85

Jumlah Total 63,500.85


Dibulatkan

J-18 1 M' SALURAN GRAFEL BETON 1/2 Ø 30 cm + PASANGAN (A138)


Galian Tanah 0.2000 m3 45,200.00
Grafel beton Ø 30 cm 1.0000 Bh 40,000.00
Pasangan bata + Plesteran 1 : 3 1.0000 m 144,651.00
Upah kerja 0.3500 Ls 181,431.00 63,500.85
Jumlah 63,500.85

Jumlah Total 63,500.85


Dibulatkan

J-17a 1 M' GORONG-GORONG BUIS BETON Ø 20 cm + PASANGAN (A137)


Galian Tanah 0.2500 m3 45,200.00
Buis Beton Ø 20 cm 1.0000 Bh 47,500.00
Pasangan bata + Plesteran 1 : 3 1.0000 m2 144,651.00
Upah kerja 0.3500 Ls 181,431.00 63,500.85
Jumlah 63,500.85

Jumlah Total 63,500.85


Dibulatkan

J-19 1 UNIT SEPTICTANK 2.5 x 1.5 X 2 m (TYPE BESAR) + REMBESAN (A080)


Galian Tanah 7.5000 m3 45,200.00
Pasir urug 0.3570 m3 121,900.00
Lantai kerja 1 : 3 : 5 3.7500 m3 640,500.00
Pasangan bata + Plesteran 1 : 3 25.0000 m2 144,651.00
Plat beton penutup + balok 0.5000 m3 3,989,877.79
Pipa PVC 4" AW + sambungan 9.0000 m' 43,125.00
Pipa GIF 2" 2.0000 m' 218,000.00
Galian tanah untuk rembesan 5.6250 m3 45,200.00
Pasangan ijuk 9.0000 kg 15,000.00
Urugan kerikil 3.5 cm 1.7500 m3 109,000.00
Pipa PVC 4" AW berlobang 6.0000 m' 43,125.00
Urugan kembali perataan tanah 1.8750 m3 33,000.00
Tambahan upah kerja 0.0850 Ls 36,000.00 3,060.00
Jumlah 3,060.00

Jumlah Total 3,060.00


Dibulatkan

J-20 1 UNIT SEPTICTANK 1.5 x 1.0 X 1.5 m (TYPE KECIL) + REMBESAN (A082)
Galian Tanah 2.2500 m3 45,200.00
Pasir urug 0.1071 m3 121,900.00
Lantai kerja 1 : 3 : 5 1.1250 m3 640,500.00
Pasangan bata + Plesteran 1 : 3 7.5000 m2 144,651.00
Plat beton penutup + balok 0.1500 m3 3,989,877.79
Pipa PVC 4" AW + sambungan 9.0000 m' 43,125.00
Pipa GIF 2" 0.6000 m' 218,000.00
Galian tanah untuk rembesan 1.6875 m3 45,200.00
Pasangan ijuk 2.7000 kg 15,000.00
Urugan kerikil 3.5 cm 0.5250 m3 109,000.00
Pipa PVC 4" AW berlobang 9.0000 m' 43,125.00
Urugan kembali perataan tanah 0.5625 m3 33,000.00
Tambahan upah kerja 0.0850 Ls 36,000.00 3,060.00
Jumlah 3,060.00

Jumlah Total 3,060.00


Dibulatkan

J-21 1 UNIT PEK. SEPTICKTANK BUIS BETON Ø 80 CM + RESAPAN


Galian 2.4120 m3 45,200.00 109,022.40
Buis Beton Ø 80 cm 4.0000 m1 178,000.00
Plat Penutup T = 8 cm 0.1700 m3 640,500.00
Beton Tumbuk 1 : 3 : 5 0.1240 m3 640,500.00
Pipa GIV Ø 1/2" 1.5000 m1 218,000.00
Pasangan Bata 1 : 3 2.3450 m2 100,146.80
Plesteran 1 : 3 4.6900 m2 44,505.84
Split pecah mesin 2/3 0.3560 m3 155,000.00
Injuk 8.0000 kg 15,000.00
Upah Kerja 0.0500 lot 109,022.40 5,451.12
Jumlah 114,473.52

Jumlah Total 114,473.52


Dibulatkan

K PEKERJAAN BESI DAN ALUMINIUM

K-01 1 m' PASANG TALANG DATAR, SENG BJLS 28


Seng plat 3' x 6' BJLS 28 1.0500 Lbr 30,000.00
Paku biasa 1/2" - 1" 0.0100 Kg 14,500.00
Besi Strip 0.5000 Kg 9,000.00
Pekerja 0.1500 HOK 57,500.00 8,625.00
Tukang kayu 0.3000 HOK 75,000.00 22,500.00
Kepala tukang 0.0300 HOK 85,000.00 2,550.00
Mandor 0.00800 HOK 85,000.00 680.00
Jumlah 34,355.00

Jumlah Total 34,355.00


Dibulatkan

K-02 1 m' PASANG TALANG MIRING, ZINK ALUM


Plat Aluunium 1.0500 Lbr 52,900.00
Paku biasa 1/2" - 1" 0.0150 Kg 14,500.00
Kayu 0.0190 m3 3,000,000.00
Pekerja 0.2000 HOK 57,500.00 11,500.00
Tukang kayu 0.2000 HOK 75,000.00 15,000.00
Kepala tukang 0.0200 HOK 85,000.00 1,700.00
Mandor 0.00100 HOK 85,000.00 85.00
Jumlah 28,285.00

Jumlah Total 28,285.00


Dibulatkan

K-03 1 m' PASANG TALANG 1/2 LINGKARAN Ø10 cm, SENG BJLS 28
Seng plat 3' x 6' BJLS 28 0.3000 Lbr 52,900.00
Paku biasa 1/2" - 1" 0.1000 Kg 14,500.00
Kayu papan Kls II (Kayu gunung) 0.0190 m3 3,000,000.00
Besi strip 0.5000 Kg 19,000.00
Pekerja 0.1500 HOK 57,500.00 8,625.00
Tukang kayu 0.2500 HOK 75,000.00 18,750.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.00125 HOK 85,000.00 106.25
Jumlah 29,606.25

Jumlah Total 29,606.25


Dibulatkan

K-08 1 m2 PASANG PINTU GULUNG BESI


Pintu gulung besi 1.0000 m2
Pekerja 1.2000 HOK 0.00
Tukang besi konstruksi 1.2000 HOK 0.00
Kepala tukang 0.1200 HOK 0.00
Mandor 0.0060 HOK 0.00
Total 0.00
Total Harga

K-09 1 m2 PASANG PINTU LIPAT


Pintu lipat 1.0000 m2
Pekerja 1.0500 HOK 0.00
Tukang besi konstruksi 1.0500 HOK 0.00
Kepala tukang 0.1050 HOK 0.00
Mandor 0.0052 HOK 0.00
Total 0.00
Total Harga

K-10 1 m2 PASANG PINTU SUNSCREEN ALLUMINIUM


Sunscreen alluminium 1.0000 m2
Pekerja 0.0800 HOK 0.00
Tukang besi konstruksi 0.8000 HOK 0.00
Kepala tukang 0.0800 HOK 0.00
Mandor 0.0040 HOK 0.00
Total 0.00
Total Harga

K-11 1 m2 PASANG ROLLING DOOR


Rolling door 1.0000 m2
Pekerja 1.5000 HOK 0.00
Tukang besi konstruksi 1.0500 HOK 0.00
Kepala tukang 0.1050 HOK 0.00
Mandor 0.0052 HOK 0.00
Total 0.00
Total Harga

K-12 1 m2 PASANG PINTU ALLUMINIUM


Pintu alluminium 1.0000 m2
Pekerja 1.0500 HOK 0.00
Tukang besi konstruksi 1.0500 HOK 0.00
Kepala tukang 0.1050 HOK 0.00
Mandor 0.0052 HOK 0.00
Total 0.00
Total Harga

K-13 1 m2 PASANG VENETIONS BLINDS


Venetions blinds 1.0000 m2
Pekerja 0.3500 HOK 0.00
Tukang kayu 0.3500 HOK 0.00
Kepala tukang 0.0350 HOK 0.00
Mandor 0.00175 HOK 0.00
Total 0.00
Total Harga

K-14 1 m2 PASANG VERTICAL BLINDS


Vertical blinds 1.0000 m2
Pekerja 0.3500 HOK 0.00
Tukang besi konstruksi 0.3500 HOK 0.00
Kepala tukang 0.0350 HOK 0.00
Mandor 0.00175 HOK 0.00
Total 0.00
Total Harga

K-15 1 m2 PASANG KAWAT HARMONIKA


Kawat harmonika 1.1000 m2
Paku biasa 1/2" - 1" 0.0200 Kg
Kayu papan kamper 0.0018 m3
Pekerja 0.1000 HOK 0.00
Tukang kayu 0.1000 HOK 0.00
Kepala tukang 0.0100 HOK 0.00
Mandor 0.0005 HOK 0.00
Total 0.00
Total Harga

K-16 1 m2 PASANG KAWAT KASSA


Kawat kassa 1.1000 m2
Paku biasa 1/2" - 1" 0.0200 Kg
Kayu papan kamper 0.0018 m3
Pekerja 0.1000 HOK 0.00
Tukang kayu 0.1000 HOK 0.00
Kepala tukang 0.0100 HOK 0.00
Mandor 0.0005 HOK 0.00
Total 0.00
Total Harga

K-17 1 m2 PASANG KAWAT BURUNG


Kawat burung 1.1000 m2
Paku biasa 1/2" - 1" 0.0200 Kg
Kayu papan kamper 0.0018 m3
Pekerja 0.1000 HOK 0.00
Tukang kayu 0.1000 HOK 0.00
Kepala tukang 0.0100 HOK 0.00
Mandor 0.0005 HOK 0.00
Total 0.00
Total Harga

L PEKERJAAN KUNCI DAN KACA

L-01 1 BUAH PASANG KUNCI TANAM ANTIK


Kunci tanam Antik 1.0000 bh 0.00
Pekerja 0.0600 HOK 57,500.00 3,450.00
Tukang kayu 0.6000 HOK 75,000.00 45,000.00
Kepala tukang 0.0600 HOK 85,000.00 5,100.00
Mandor 0.0030 HOK 85,000.00 255.00
Jumlah 53,805.00

Jumlah Total 53,805.00


Dibulatkan

L-01 1 BUAH PASANG KUNCI TANAM BIASA


Kunci tanam 1.0000 bh 221,300.00
Pekerja 0.0100 HOK 57,500.00 575.00
Tukang kayu 0.5000 HOK 75,000.00 37,500.00
Kepala tukang 0.0500 HOK 85,000.00 4,250.00
Mandor 0.0050 HOK 85,000.00 425.00
Jumlah 42,750.00

Jumlah Total 42,750.00


Dibulatkan
L-02 1 BUAH PASANG KUNCI SILINDER
Kunci silinder 1.0000 bh 0.00
Pekerja 0.0050 HOK 57,500.00 287.50
Tukang kayu 0.5000 HOK 75,000.00 37,500.00
Kepala tukang 0.0500 HOK 85,000.00 4,250.00
Mandor 0.00300 HOK 85,000.00 255.00
Jumlah 42,292.50

Jumlah Total 42,292.50


Dibulatkan

L-02 1 BUAH PASANG KUNCI TANAM KAMAR MANDI


Kunci Tanam Kamar Mandi 1.0000 bh 63,500.00
Pekerja 0.0050 HOK 57,500.00 287.50
Tukang kayu 0.5000 HOK 75,000.00 37,500.00
Kepala tukang 0.0500 HOK 85,000.00 4,250.00
Mandor 0.00300 HOK 85,000.00 255.00
Jumlah 42,292.50

Jumlah Total 42,292.50


Dibulatkan

L-03 1 BUAH PASANG ENGSEL PINTU


Engsel pintu 1.0000 bh 40,000.00
Pekerja 0.0150 HOK 57,500.00 862.50
Tukang kayu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.00080 HOK 85,000.00 68.00
Jumlah 13,455.50

Jumlah Total 13,455.50


Dibulatkan

L-04 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU


Engsel jendela 1.0000 bh 40,500.00
Pekerja 0.0100 HOK 57,500.00 575.00
Tukang kayu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0005 HOK 85,000.00 42.50
Jumlah 8,967.50

Jumlah Total 8,967.50


Dibulatkan

L-05 1 BUAH PASANG KUNCI SELOT JENDELA


Selot jendela 1.0000 bh 23,000.00
Pekerja 0.0200 HOK 57,500.00 1,150.00
Tukang kayu 0.2000 HOK 75,000.00 15,000.00
Kepala tukang 0.0200 HOK 85,000.00 1,700.00
Mandor 0.0010 HOK 85,000.00 85.00
Jumlah 17,935.00
Jumlah Total 17,935.00
Dibulatkan

L-06 1 BUAH PASANG KUNCI SELOT PINTU


Engsel jendela 1.0000 bh 29,000.00
Pekerja 0.0200 HOK 57,500.00 1,150.00
Tukang kayu 0.2000 HOK 75,000.00 15,000.00
Kepala tukang 0.0200 HOK 85,000.00 1,700.00
Mandor 0.0010 HOK 85,000.00 85.00
Jumlah 17,935.00

Jumlah Total 17,935.00


Dibulatkan

L-07 1 BUAH PASANG HAK ANGIN KAIT


Kait angin 1.0000 bh 28,500.00
Pekerja 0.0150 HOK 57,500.00 862.50
Tukang kayu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.00800 HOK 85,000.00 680.00
Jumlah 14,067.50

Jumlah Total 14,067.50


Dibulatkan

L-07 1 BUAH PASANG HAK ANGIN GESER


Hak angin geser 1.0000 bh 40,000.00
Pekerja 0.0150 HOK 57,500.00 862.50
Tukang kayu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.00800 HOK 85,000.00 680.00
Jumlah 14,067.50

Jumlah Total 14,067.50


Dibulatkan

L-07 1 BUAH PASANG REL PINTU DORONG


Rel Pintu Dorong 1.0000 bh 0.00
Pekerja 0.0600 HOK 57,500.00 3,450.00
Tukang kayu 0.6000 HOK 75,000.00 45,000.00
Kepala tukang 0.0600 HOK 85,000.00 5,100.00
Mandor 0.00300 HOK 85,000.00 255.00
Jumlah 53,805.00

Jumlah Total 53,805.00


Dibulatkan

L-08 1 m2 BUAH PASANG KACA TEBAL 3 mm


Kaca 1.1000 bh 65,000.00
Pekerja 0.0150 HOK 57,500.00 862.50
Tukang kayu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.00080 HOK 85,000.00 68.00
Jumlah 13,455.50

Jumlah Total 13,455.50


Dibulatkan

L-12 1 m2 BUAH PASANG KACA TEBAL 5 mm


Kaca 1.1000 bh 85,000.00
Pekerja 0.0150 HOK 57,500.00 862.50
Tukang kayu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.00080 HOK 85,000.00 68.00
Jumlah 13,455.50

Jumlah Total 13,455.50


Dibulatkan

L-13 1 m2 BUAH PASANG KACA TEBAL 8 mm


Kaca polos 1.1000 bh 130,000.00
Pekerja 0.0170 HOK 57,500.00 977.50
Tukang kayu 0.1700 HOK 75,000.00 12,750.00
Kepala tukang 0.0170 HOK 85,000.00 1,445.00
Mandor 0.00090 HOK 85,000.00 76.50
Jumlah 15,249.00

Jumlah Total 15,249.00


Dibulatkan

L-14 1 m2 BUAH PASANG KACA CERMIN TEBAL 3 mm


Kaca cermin 1.1000 bh 0.00
Pekerja 0.0150 HOK 57,500.00 862.50
Tukang kayu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.00075 HOK 85,000.00 63.75
Jumlah 13,451.25

Jumlah Total 13,451.25


Dibulatkan

L-16 1 m2 BUAH PASANG KACA WIREGLASS TEBAL 5 mm


Kaca wireglass 1.1000 bh
Pekerja 0.0150 HOK 57,500.00 862.50
Tukang kayu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.00075 HOK 85,000.00 63.75
Jumlah 13,451.25

Jumlah Total 13,451.25


Dibulatkan

L-17 1 m2 BUAH PASANG KACA PATRI TEBAL 5 mm


Kaca wireglass 1.1000 bh
Pekerja 0.0150 HOK 57,500.00 862.50
Tukang kayu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.00075 HOK 85,000.00 63.75
Jumlah 13,451.25

Jumlah Total 13,451.25


Dibulatkan

L-18 1 BUAH PASANG SPRING KNIP


Spring knip 1.0000 bh
Pekerja 0.0150 HOK 57,500.00 862.50
Tukang kayu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.00075 HOK 85,000.00 63.75
Jumlah 13,451.25

Jumlah Total 13,451.25


Dibulatkan

L-19 1 BUAH PASANG DOOR CLOSER


Door closer 1.0000 bh
Pekerja 0.0500 HOK 57,500.00 2,875.00
Tukang kayu 0.5000 HOK 75,000.00 37,500.00
Kepala tukang 0.0500 HOK 85,000.00 4,250.00
Mandor 0.00250 HOK 85,000.00 212.50
Jumlah 44,837.50

Jumlah Total 44,837.50


Dibulatkan

L-20 1 BUAH PASANG PEGANGAN PINTU /DOOR HOKLDER


Door HOKlder 1.0000 bh
Pekerja 0.0500 HOK 57,500.00 2,875.00
Tukang kayu 0.5000 HOK 75,000.00 37,500.00
Kepala tukang 0.0500 HOK 85,000.00 4,250.00
Mandor 0.0025 HOK 85,000.00 212.50
Jumlah 44,837.50

Jumlah Total 44,837.50


Dibulatkan

L-21 1 BUAH PASANG DOOR STOP


Door stop 1.0000 bh
Pekerja 0.0100 HOK 57,500.00 575.00
Tukang kayu 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0005 HOK 85,000.00 42.50
Jumlah 8,967.50

Jumlah Total 8,967.50


Dibulatkan
L-22 1 BUAH PASANG REL PINTU DORONG
Rel pintu dorong 1.0000 bh
Pekerja 0.0600 HOK 57,500.00 3,450.00
Tukang kayu 0.6000 HOK 75,000.00 45,000.00
Kepala tukang 0.0600 HOK 85,000.00 5,100.00
Mandor 0.0030 HOK 85,000.00 255.00
Jumlah 53,805.00

Jumlah Total 53,805.00


Dibulatkan

L-23 1 m2 BUAH PASANG KACA BURAM TEBAL 12 mm


Kaca buram 1.1000 bh
Sealent 0.0500 Kg
Pekerja 0.0250 HOK 57,500.00 1,437.50
Tukang kayu 0.2500 HOK 75,000.00 18,750.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.00125 HOK 85,000.00 106.25
Jumlah 22,418.75

Jumlah Total 22,418.75


Dibulatkan

L-09A 1 m2 BUAH PASANG KACA TEBAL 5 mm LAMA


Pekerja 0.0150 HOK 57,500.00 862.50
Tukang kayu 0.1500 HOK 75,000.00 11,250.00
Kepala tukang 0.0150 HOK 85,000.00 1,275.00
Mandor 0.00075 HOK 85,000.00 63.75
Jumlah 13,451.25

Jumlah Total 13,451.25


Dibulatkan

M PEKERJAAN PENUTUP LANTAI DAN DINDING

M-01 1 m2 PASANG LANTAI KERAMIK 20X20 cm


Ubin keramik 20x20 cm 26.5000 bh 2,696.00
Semen PC (50 kg) 0.2080 Zak 67,000.00
Pasir pasang 0.0450 m3 132,000.00
Semen warna 1.6200 Kg 11,500.00
Pekerja 0.7000 HOK 57,500.00 40,250.00
Tukang batu 0.3500 HOK 75,000.00 26,250.00
Kepala tukang 0.0350 HOK 85,000.00 2,975.00
Mandor 0.0350 HOK 85,000.00 2,975.00
Jumlah 72,450.00

Jumlah Total 72,450.00


Dibulatkan

M-02 1 m2 PASANG LANTAI KERAMIK 20X20 cm, WARNA (Anti Selip)


Ubin keramik 20x20 cm, anti selip 26.5000 bh 2,948.00
Semen PC (50 kg) 0.2080 Zak 67,000.00
Pasir pasang 0.0450 m3 132,000.00
Semen warna 1.6200 Kg 11,500.00
Pekerja 0.7000 HOK 57,500.00 40,250.00
Tukang batu 0.3500 HOK 75,000.00 26,250.00
Kepala tukang 0.0350 HOK 85,000.00 2,975.00
Mandor 0.0350 HOK 85,000.00 2,975.00
Jumlah 72,450.00

Jumlah Total 72,450.00


Dibulatkan

M-03 1 m2 PASANG LANTAI KERAMIK 30X30 cm PUTIH POLOS


Ubin keramik 30x30 cm 11.8700 bh 4,363.64
Semen PC (50 kg) 0.2000 Zak 67,000.00
Pasir pasang 0.0450 m3 132,000.00
Semen warna 1.5000 Kg 11,500.00
Pekerja 0.2600 HOK 57,500.00 14,950.00
Tukang batu 0.1300 HOK 75,000.00 9,750.00
Kepala tukang 0.0130 HOK 85,000.00 1,105.00
Mandor 0.0130 HOK 85,000.00 1,105.00
Jumlah 26,910.00

Jumlah Total 26,910.00


Dibulatkan

M-03 1 m2 PASANG LANTAI KERAMIK 30X30 cm PUTIH WARNA


Ubin keramik 30x30 cm 11.8700 bh 4,545.45
Semen PC (50 kg) 0.2000 Zak 67,000.00
Pasir pasang 0.0450 m3 132,000.00
Semen warna 1.5000 Kg 11,500.00
Pekerja 0.2600 HOK 57,500.00 14,950.00
Tukang batu 0.1300 HOK 75,000.00 9,750.00
Kepala tukang 0.0130 HOK 85,000.00 1,105.00
Mandor 0.0130 HOK 85,000.00 1,105.00
Jumlah 26,910.00

Jumlah Total 26,910.00


Dibulatkan

M-03A 1 m2 PASANG LANTAI KERAMIK 30X30 cm ANTI SLIP PUTIH CORAK


Ubin keramik 30x30 cm 11.8700 bh 4,545.45
Semen PC (50 kg) 0.2000 Zak 67,000.00
Pasir pasang 0.0450 m3 132,000.00
Semen warna 1.5000 Kg 11,500.00
Pekerja terampil 0.2600 HOK 57,500.00 14,950.00
Tukang batu trampil 0.1300 HOK 75,000.00 9,750.00
Kepala tukang 0.0130 HOK 85,000.00 1,105.00
Mandor 0.0130 HOK 85,000.00 1,105.00
Jumlah 26,910.00

Jumlah Total 26,910.00


Dibulatkan

M-04 1 m2 PASANG LANTAI KERAMIK 40 x 40 cm PUTIH


Ubin keramik 40x40 cm 6.6300 bh 8,480.00
Semen PC (50 kg) 0.1960 Zak 67,000.00
Pasir pasang 0.0450 m3 132,000.00
Semen warna 1.3000 Kg 11,500.00
Pekerja 0.2500 HOK 57,500.00 14,375.00
Tukang batu 0.1250 HOK 75,000.00 9,375.00
Kepala tukang 0.0130 HOK 85,000.00 1,105.00
Mandor 0.0130 HOK 85,000.00 1,105.00
Jumlah 25,960.00

Jumlah Total 25,960.00


Dibulatkan

M-04a 1 m2 PASANG LANTAI KERAMIK 40 x 40 cm Anti Slip


Ubin keramik 40x40 cm (Anti Slip) 6.6300 bh 8,800.00
Semen PC (50 kg) 0.1960 Zak 67,000.00
Pasir pasang 0.0450 m3 132,000.00
Semen warna 1.3000 Kg 11,500.00
Pekerja 0.2500 HOK 57,500.00 14,375.00
Tukang batu 0.1250 HOK 75,000.00 9,375.00
Kepala tukang 0.0130 HOK 85,000.00 1,105.00
Mandor 0.0130 HOK 85,000.00 1,105.00
Jumlah 25,960.00

Jumlah Total 25,960.00


Dibulatkan

M-04 1 m2 PASANG LANTAI GRANIT 60 x 60 cm


Ubin Granit 60x60 cm 3.1000 bh 55,935.48
Semen PC (50 kg) 0.1920 Zak 67,000.00
Pasir pasang 0.0450 m3 132,000.00
Semen warna 1.5000 Kg 11,500.00
Pekerja 0.2400 HOK 57,500.00 13,800.00
Tukang batu 0.1200 HOK 75,000.00 9,000.00
Kepala tukang 0.0120 HOK 85,000.00 1,020.00
Mandor 0.0120 HOK 85,000.00 1,020.00
Jumlah 24,840.00

Jumlah Total 24,840.00


Dibulatkan

M-05 1 m2 PASANG DINDING KERAMIK 20X25 cm


Ubin keramik 20x25 cm 20.0000 bh 3,000.00
Semen PC (50 kg) 0.2276 Zak 67,000.00
Pasir pasang 0.0420 m3 132,000.00
Semen warna 1.5000 Kg 11,500.00
Pekerja Trampil 0.6200 HOK 57,500.00 35,650.00
Tukang batu Trampil 0.6200 HOK 75,000.00 46,500.00
Kepala tukang 0.0350 HOK 85,000.00 2,975.00
Mandor 0.0300 HOK 85,000.00 2,550.00
Jumlah 87,675.00

Jumlah Total 87,675.00


Dibulatkan

M-05 1 m2 PASANG LANTAI KERAMIK 30X30 cm ANTI SELIP


Ubin keramik 30x30 cm anti selip 11.8700 bh 2,400.00
Semen PC (50 kg) 0.2000 Zak 67,000.00
Pasir pasang 0.0450 m3 132,000.00
Semen warna 1.5000 Kg 11,500.00
Pekerja trampil 0.2600 HOK 57,500.00 14,950.00
Tukang batu trampil 0.1300 HOK 75,000.00 9,750.00
Kepala tukang 0.0130 HOK 85,000.00 1,105.00
Mandor 0.0130 HOK 85,000.00 1,105.00
Jumlah 26,910.00

Jumlah Total 26,910.00


Dibulatkan

M-06 1 m2 PASANG LANTAI FLOOR BERIKUT ACIAN


Semen 0.1150 zak 67,000.00
Pasir pasang 0.0700 m3 132,000.00
Pekerja 0.2000 HOK 57,500.00 11,500.00
Tukang batu trampil 0.1000 HOK 75,000.00 7,500.00
Kepala tukang 0.0100 HOK 85,000.00 850.00
Mandor 0.0050 HOK 85,000.00 425.00
Jumlah 20,275.00

Jumlah Total 20,275.00


Dibulatkan

M-07 1 m2 PASANG PAVING BLOCK 6 cm, WARNA (A139)


Paving block 6 cm, warna 1.0100 m2 70,500.00
Pasir pasang kali 0.1000 m3 132,000.00
Pekerja 0.2500 HOK 57,500.00 14,375.00
Tukang batu 0.5000 HOK 75,000.00 37,500.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.0030 HOK 85,000.00 255.00
Peralatan 1.0000 Ls 3,000.00 3,000.00
Jumlah 57,255.00

Jumlah Total 57,255.00


Dibulatkan

M-08 1 m2 PASANG PAVING BLOCK 6 cm, NATURAL (A141)


Paving block 6 cm, Natural 1.0100 m2 61,500.00
Pasir pasang kali 0.1000 m3 132,000.00
Pekerja 0.2500 HOK 57,500.00 14,375.00
Tukang batu 0.5000 HOK 75,000.00 37,500.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.0030 HOK 85,000.00 255.00
Peralatan 1.0000 Ls 3,000.00 3,000.00
Jumlah 57,255.00

Jumlah Total 57,255.00


Dibulatkan

M-09 1 m2 PASANG PAVING BLOCK 8 cm, WARNA (A140)


Paving block 8 cm, warna 1.0100 m2 87,500.00
Pasir pasang kali 0.1000 m3 132,000.00
Pekerja 0.2500 HOK 57,500.00 14,375.00
Tukang batu 0.5000 HOK 75,000.00 37,500.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.0030 HOK 85,000.00 255.00
Peralatan 1.0000 Ls 3,000.00 3,000.00
Jumlah 57,255.00

Jumlah Total 57,255.00


Dibulatkan

M-10 1 m2 PASANG PAVING BLOCK 8 cm, NATURAL (A142)


Paving block 8 cm, NATURAL 1.0100 m2 78,500.00
Pasir pasang kali 0.1000 m3 132,000.00
Pekerja 0.2500 HOK 57,500.00 14,375.00
Tukang batu 0.5000 HOK 75,000.00 37,500.00
Kepala tukang 0.0250 HOK 85,000.00 2,125.00
Mandor 0.0030 HOK 85,000.00 255.00
Peralatan 1.0000 Ls 3,000.00 3,000.00
Jumlah 57,255.00

Jumlah Total 57,255.00


Dibulatkan

M- 1 m2 PLINT KAYU 2X10 cm


Kayu jati, papan 0.0024 m2
Paku skrup 3.5" 0.0500 Kg
Pekerja 0.1200 HOK 0.00
Tukang kayu 0.1200 HOK 0.00
Kepala tukang 0.0120 HOK 0.00
Mandor 0.0060 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG LANTAI UBIN TERALUX KERANG UKURAN 40X40 cm


Ubin teralux kerang 40x40 cm 6.2500 bh
Semen PC (50 kg) 0.1760 Zak
Pasir pasang 0.0215 m3
Semen warna 1.3000 Kg
Pekerja 0.2500 HOK 0.00
Tukang batu 0.1200 HOK 0.00
Kepala tukang 0.0120 HOK 0.00
Mandor 0.0125 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 40X40 cm


Ubin teralux marmer 40x40 cm 6.2500 bh
Semen PC (50 kg) 0.1760 Zak
Pasir pasang 0.0215 m3
Semen warna 1.3000 Kg
Pekerja 0.6720 HOK 0.00
Tukang batu 0.2240 HOK 0.00
Kepala tukang 0.0220 HOK 0.00
Mandor 0.0340 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG LANTAI UBIN TERALUX MARMER UKURAN 60X60 cm


Ubin teralux mamer 60x60 cm 5.6000 bh
Semen PC (50 kg) 0.1638 Zak
Pasir pasang 0.0450 m3
Semen warna 1.0000 Kg
Pekerja 0.2500 HOK 0.00
Tukang batu 0.1200 HOK 0.00
Kepala tukang 0.0120 HOK 0.00
Mandor 0.0125 HOK 0.00
Total 0.00

Total Harga

M- 1 m' PASANG PLINT UBIN PC WARNA UKURAN 10X30 cm


Plint ubin warna 10x30 cm 3.3300 bh
Semen PC (50 kg) 0.0330 zak
Pasir pasang 0.0032 m3
Semen warna 0.1000 Kg
Pekerja 0.0600 HOK 0.00
Tukang batu 0.0300 HOK 0.00
Kepala tukang 0.0030 HOK 0.00
Mandor 0.0030 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m' PASANG PLINT UBIN GRANITO UKURAN 10X30 cm


Plint ubin granito 10x30 cm 3.3300 bh
Semen PC (50 kg) 0.0330 Zak
Pasir pasang 0.0032 m3
Semen warna 0.1000 Kg
Pekerja 0.9000 HOK 0.00
Tukang batu 0.0900 HOK 0.00
Kepala tukang 0.0090 HOK 0.00
Mandor 0.0045 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m' PASANG PLINT UBIN GRANITO UKURAN 10X40 cm

Plint ubin granito 10x40 cm 2.6500 bh


Semen PC (50 kg) 0.0240 Zak
Pasir pasang 0.0030 m3
Semen warna 0.1000 Kg
Pekerja 0.9000 HOK 0.00
Tukang batu 0.0900 HOK 0.00
Kepala tukang 0.0090 HOK 0.00
Mandor 0.0045 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m' PASANG PLINT UBIN TERALUX MARMER UKURAN 10X40 cm


Plint ubin teralux marmer 10x40 cm 2.5000 bh
Semen PC (50 kg) 0.0330 Zak
Pasir pasang 0.0032 m3
Semen warna 0.1000 Kg
Pekerja 0.9000 HOK 0.00
Tukang batu 0.0900 HOK 0.00
Kepala tukang 0.0090 HOK 0.00
Mandor 0.0045 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m' PASANG PLINT UBIN TERALUX MARMER UKURAN 10X60 cm


Plint ubin teralux marmer 10x60 cm 1.7000 bh
Semen PC (50 kg) 0.0330 Zak
Pasir pasang 0.0032 m3
Semen warna 0.1000 Kg
Pekerja 0.9000 HOK 0.00
Tukang batu 0.0900 HOK 0.00
Kepala tukang 0.0090 HOK 0.00
Mandor 0.0045 HOK 0.00
Jumlah 0.00
Jumlah Total 0.00
Dibulatkan

M- 1 m2 PASANG TERASO COR DI TEMPAT


Bahan terso cor 0.0036 m3
Pekerja 0.9000 HOK 0.00
Tukang batu 0.0900 HOK 0.00
Kepala tukang 0.0090 HOK 0.00
Mandor 0.0045 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG UBIN TAHAN ASAM


Ubin tahan asam 1.0500 m2
Semen tahan asam 0.2828 Zak
Pasir pasang 0.0400 m3
Pekerja 0.2700 HOK 0.00
Tukang batu 0.1500 HOK 0.00
Kepala tukang 0.0150 HOK 0.00
Mandor 0.0135 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG DINDING PORSELIN 11X11 cm, PUTIH


Porselin 11x11 cm 83.0000 bh
Semen PC (50 kg) 0.1860 Zak
Pasir pasang 0.0180 m3
Semen warna 1.5000 Kg
Pekerja 0.6200 HOK 0.00
Tukang batu 0.5000 HOK 0.00
Kepala tukang 0.0500 HOK 0.00
Mandor 0.0300 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG LANTAI MOSAIK 30X30 cm ex LOKAL


Mosaik 30x30 cm 12.0000 bh
Semen PC (50 kg) 0.2830 Zak
Pasir pasang 0.0390 m3
Semen warna 2.0000 Kg
Pekerja 0.6200 HOK 0.00
Tukang batu 0.3500 HOK 0.00
Kepala tukang 0.0350 HOK 0.00
Mandor 0.0300 HOK 0.00
Jumlah 0.00
Jumlah Total 0.00
Dibulatkan

M- 1 m2 PASANG LANTAI MARMER


Marmer 1.0520 bh
Semen PC (50 kg) 0.2830 Zak
Pasir pasang 0.0390 m3
Semen warna 2.0000 Kg
Pekerja 0.6200 HOK 0.00
Tukang batu 0.3500 HOK 0.00
Kepala tukang 0.0350 HOK 0.00
Mandor 0.0300 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG LANTAI KARPET


Carpet 1.0500 m2
Lem vinyil 0.3500 Kg
Pekerja 0.1700 HOK 0.00
Tukang batu 0.1700 HOK 0.00
Kepala tukang 0.0170 HOK 0.00
Mandor 0.0085 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG LANTAI KARPET 100% WOOL


Feltex carpet 100% wool T-21 1.0500 m2
Lem vinyil 0.3500 Kg
Pekerja 0.1700 HOK 0.00
Tukang batu 0.1700 HOK 0.00
Kepala tukang 0.0170 HOK 0.00
Mandor 0.0085 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG LANTAI KARPET 80% WOOL, 20% NYLON


Carpet 80% wool, 20% nylon 1.0500 m2
Lem vinyil 0.3500 Kg
Pekerja 0.1700 HOK 0.00
Tukang batu 0.1700 HOK 0.00
Kepala tukang 0.0170 HOK 0.00
Mandor 0.0085 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG UNDERLYER, TEBAL 6 mm


Underlyer tebal 6 mm /rubber corrugated 1.0500 m2
Pekerja 0.1200 HOK 0.00
Tukang batu 0.1200 HOK 0.00
Kepala tukang 0.0120 HOK 0.00
Mandor 0.0060 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG LANTAI PARQUET JATI


Parquet jati 1.0500 m2
Lem vinyil 0.6000 Kg
Pekerja 0.6500 HOK 0.00
Tukang batu 0.3500 HOK 0.00
Kepala tukang 0.0350 HOK 0.00
Mandor 0.0325 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG GYMFLOOR
Gymfloor 1.0500 m2
Lem vinyil 0.6000 Kg
Pekerja 0.6500 HOK 0.00
Tukang batu 0.3500 HOK 0.00
Kepala tukang 0.0350 HOK 0.00
Mandor 0.0325 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG DINDING PORSELIN 10X20 cm, WARNA


Porselin 10x20 cm, warna 50.0000 bh
Semen PC (50 kg) 0.1860 zak
Pasir pasang 0.0180 m3
Semen warna 1.5000 Kg
Pekerja 0.6000 HOK 0.00
Tukang batu 0.4500 HOK 0.00
Kepala tukang 0.0450 HOK 0.00
Mandor 0.0300 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan
M- 1 m2 PASANG DINDING PORSELIN 20X20 cm, WARNA
Porselin 20x20 cm, warna 25.0000 bh
Semen PC (50 kg) 0.1860 Zak
Pasir pasang 0.0180 m3
Semen warna 1.5000 Kg
Pekerja 0.6000 HOK 0.00
Tukang batu 0.4500 HOK 0.00
Kepala tukang 0.0450 HOK 0.00
Mandor 0.0300 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG DINDING KERAMIK ARTISTIK 5X20 cm


Keramik artistik 5x20 cm 100.0000 bh
Semen PC (50 kg) 0.1860 Zak
Pasir pasang 0.0180 m3
Semen warna 1.5000 Kg
Pekerja 0.6000 HOK 0.00
Tukang batu 0.4500 HOK 0.00
Kepala tukang 0.0450 HOK 0.00
Mandor 0.0300 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m' PASANG PLINT KERAMIK ARTISTIK UKURAN 5X20 cm


Plint keramik artistik 5x20 cm 5.0000 bh
Semen PC (50 kg) 0.0170 zak
Pasir pasang 0.0022 m3
Semen warna 0.0800 Kg
Pekerja 0.0900 HOK 0.00
Tukang batu 0.0900 HOK 0.00
Kepala tukang 0.0090 HOK 0.00
Mandor 0.0045 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m' INTERNAL COVE ARTISTIK ( 5X5X20 ) cm


Internal cove ( 5x5x20 ) cm 10.0000 bh
Semen PC (50 kg) 0.0283 Zak
Pasir pasang 0.0390 m3
Semen warna 1.2000 Kg
Pekerja 0.7500 HOK 0.00
Tukang batu 0.4500 HOK 0.00
Kepala tukang 0.0450 HOK 0.00
Mandor 0.0375 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m' PASANG PLINT VINYIL TANPA ADUKAN


Lt vinyil karet 30x30 Kwl-I 3.5000 bh
Lem vinyil 0.0800 Kg
Pekerja 0.0800 HOK 0.00
Tukang batu 0.0800 HOK 0.00
Kepala tukang 0.0080 HOK 0.00
Mandor 0.0040 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG DINDING MARMER


Marmer 1.0200 m2
Paku pancing 60x230 2.0000 bh
Semen PC (50 kg) 0.2488 Zak
Pasir pasang 0.0250 m3
Semen warna 1.5000 Kg
Pekerja 0.7200 HOK 0.00
Tukang batu 0.6500 HOK 0.00
Kepala tukang 0.0650 HOK 0.00
Mandor 0.0350 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG DINDING BATA PELAPIS 7X3X24 cm


Bata pelapis dinding 60.0000 bh
Semen PC (50 kg) 0.2488 Zak
Pasir pasang 0.0250 m3
Pekerja 0.6500 HOK 0.00
Tukang batu 0.5000 HOK 0.00
Kepala tukang 0.0500 HOK 0.00
Mandor 0.0300 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG DINDING BATA KLINKER 5X5X24 cm


Bata pelapis klinker 80.0000 bh
Semen PC (50 kg) 0.2488 Zak
Pasir pasang 0.0250 m3
Pekerja 0.6200 HOK 0.00
Tukang batu 0.3500 HOK 0.00
Kepala tukang 0.0350 HOK 0.00
Mandor 0.0300 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG DINDING BATU PAROS


Batu paros 1.0500 m2
Semen PC (50 kg) 0.2350 Zak
Pasir pasang 0.0350 m3
Pekerja 0.6200 HOK 0.00
Tukang batu 0.3500 HOK 0.00
Kepala tukang 0.0350 HOK 0.00
Mandor 0.0300 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG LANTAI VINYL KARET 30X30 cm, Kw-I


Vinyil karet 30x30 cm Kw-I 11.0500 bh
Lem vinyl 0.3500 Kg
Pekerja 0.1500 HOK 0.00
Tukang batu 0.1500 HOK 0.00
Kepala tukang 0.0150 HOK 0.00
Mandor 0.0075 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG LANTAI VINYL KARET 30X30 cm, Kw-II


Vinyil karet 30x30 cm Kw-II 11.0500 bh
Lem vinyl 0.3500 Kg
Pekerja 0.1500 HOK 0.00
Tukang batu 0.1500 HOK 0.00
Kepala tukang 0.0150 HOK 0.00
Mandor 0.0075 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG LANTAI VINYL ASBES 30X30 cm


Vinyil asbes 30x30 cm 11.0500 bh
Lem vinyl 0.3500 Kg
Pekerja 0.1500 HOK 0.00
Tukang batu 0.1500 HOK 0.00
Kepala tukang 0.0150 HOK 0.00
Mandor 0.0075 HOK 0.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

M- 1 m2 PASANG LANTAI VINYL MOTIF KEMBANG 30X30 cm


Vinyil motif kembang ex DN 30x30 cm 11.0500 bh
Lem vinyl 0.3500 Kg
Pekerja 0.1500 HOK 14,375.00
Tukang batu 0.1500 HOK 37,500.00
Kepala tukang 0.0150 HOK 2,125.00
Mandor 0.0075 HOK 255.00
Jumlah 54,255.00

Jumlah Total 54,255.00


Dibulatkan

N PEKERJAAN PENGECATAN

N-01 1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
Cat meni 0.2000 Kg 28,000.00
Plamir 0.1500 Kg 22,000.00
Cat dasar 0.1700 Kg 52,500.00
Cat Penutup ( 2 kali ) 0.2600 Kg 52,500.00
Kwas 0.0100 bh 10,000.00
Pengencer (Terpentin) 0.0300 ltr 25,000.00
Ampelas 0.2000 lbr 3,500.00
Pekerja 0.0700 HOK 57,500.00 4,025.00
Tukang cat 0.0090 HOK 75,000.00 675.00
Kepala tukang 0.0060 HOK 85,000.00 510.00
Mandor 0.0030 HOK 85,000.00 255.00
Jumlah 5,465.00

Jumlah Total 5,465.00


Dibulatkan

N-01 1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 3 Lapis Cat Penutup)
Cat meni 0.2000 Kg 28,000.00
Plamir 0.1500 Kg 22,000.00
Cat dasar 0.1700 Kg 52,500.00
Cat Penutup ( 3 kali ) 0.3500 Kg 52,500.00
Kwas 0.0100 bh 10,000.00
Pengencer (Terpentin) 0.0300 ltr 25,000.00
Ampelas 0.2000 lbr 3,500.00
Pekerja 0.0700 HOK 3,500.00 245.00
Tukang cat 0.1050 HOK 75,000.00 7,875.00
Kepala tukang 0.0040 HOK 85,000.00 340.00
Mandor 0.0030 HOK 85,000.00 255.00
Jumlah 8,715.00

Jumlah Total 8,715.00


Dibulatkan
N-01A 1 m2 PENGECATAN BIDANG KAYU LAMA
Plamir 0.1500 Kg 22,000.00
Cat dasar 0.1700 Kg 52,500.00
Cat Penutup 0.1700 Kg 52,500.00
Pekerja 0.0700 HOK 57,500.00 4,025.00
Tukang cat 0.0750 HOK 75,000.00 5,625.00
Kepala tukang 0.0075 HOK 85,000.00 637.50
Mandor 0.0025 HOK 85,000.00 212.50
Jumlah 10,500.00

Jumlah Total 10,500.00


Dibulatkan

N-04 1 m2 PELABURAN BIDANG KAYU DENGAN POLITUR


Plitur 0.1500 Ltr 33,000.00
Plitur jadi 0.3720 Ltr 45,000.00
Ampelas 2.0000 Lbr 3,500.00
Pekerja 0.0400 HOK 57,500.00 2,300.00
Tukang cat 0.0600 HOK 75,000.00 4,500.00
Kepala tukang 0.0160 HOK 85,000.00 1,360.00
Mandor 0.0030 HOK 85,000.00 255.00
Jumlah 8,415.00

Jumlah Total 8,415.00


Dibulatkan

N-05 1 m2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER


Residu atau ter 0.3500 Ltr 11,000.00
Pekerja 0.1000 HOK 3,500.00 350.00
Mandor 0.0060 HOK 85,000.00 510.00
Jumlah 860.00

Jumlah Total 860.00


Dibulatkan

N-06 1 m2 PENGECATAN BIDANG TEMBOK BARU


(1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup) (setara Sanlex)
Plamir 0.1000 Kg 30,000.00
Cat dasar 0.1000 Kg 14,000.00
Cat Penutup ( 2 kali ) 0.2600 Kg 22,000.00
Pekerja 0.0200 HOK 3,500.00 70.00
Tukang cat 0.0630 HOK 75,000.00 4,725.00
Kepala tukang 0.0063 HOK 85,000.00 535.50
Mandor 0.0030 HOK 85,000.00 255.00
Jumlah 5,585.50

Jumlah Total 5,585.50


Dibulatkan

N-07 1 m2 PENGECATAN BIDANG TEMBOK BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup) Setara Metroli
Plamir 0.1000 Kg 30,000.00
Cat dasar 0.1000 Kg 14,000.00
Cat Penutup ( 2 kali ) 0.2600 Kg 24,400.00
Pekerja 0.0200 HOK 3,500.00 70.00
Tukang cat 0.0630 HOK 75,000.00 4,725.00
Kepala tukang 0.0063 HOK 85,000.00 535.50
Mandor 0.0025 HOK 85,000.00 212.50
Jumlah 5,543.00

Jumlah Total 5,543.00


Dibulatkan

N-07a 1 m2 PENGECATAN BIDANG TEMBOK BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup) (LANTAI 2)
Plamir 0.1000 Kg 30,000.00
Cat dasar 0.1000 Kg 14,000.00
Cat Penutup ( 2 kali ) 0.2600 Kg 24,400.00
Pekerja 0.0200 HOK 3,500.00 70.00
Tukang cat 0.0630 HOK 75,000.00 4,725.00
Kepala tukang 0.0063 HOK 85,000.00 535.50
Mandor 0.0025 HOK 85,000.00 212.50
Steager Werk 0.0450 Lot 10,744.00 483.48
Jumlah 6,026.48

Jumlah Total 6,026.48


Dibulatkan

N-08 1 m2 PENGECATAN BIDANG TEMBOK LAMA ( 1 Lapis Cat dasar; 2 Lapis Cat Penutup )
Cat dasar 0.1200 Kg 14,000.00
Cat Penutup ( 2 kali ) 0.1800 Kg 22,000.00
Pekerja 0.0280 HOK 3,500.00 98.00
Tukang cat 0.0420 HOK 75,000.00 3,150.00
Kepala tukang 0.0042 HOK 85,000.00 357.00
Mandor 0.0025 HOK 85,000.00 212.50
Jumlah 3,817.50

Jumlah Total 3,817.50


Dibulatkan

N-09 1 m2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI


Meni besi 0.1000 Kg 52,500.00
Kuas 0.0100 Bh 10,000.00
Pekerja 0.0200 HOK 3,500.00 70.00
Tukang cat 0.2000 HOK 75,000.00 15,000.00
Kepala tukang 0.0200 HOK 85,000.00 1,700.00
Mandor 0.0100 HOK 85,000.00 850.00
Jumlah 17,620.00

Jumlah Total 17,620.00


Dibulatkan

N-10 1 m2 PENGECATAN PLAFOND


Plamir Tembok 0.1600 Kg 30,000.00
Cat Penutup ( 2 kali ) 0.2000 Kg 22,000.00
Roll Cat 0.0100 bh 26,000.00

Ampelas 0.5000 lbr 3,500.00


Pekerja 1/2 Terampil 0.1040 HOK 62,500.00 6,500.00
Tukang cat 1/2 Terampil 0.1820 HOK 65,000.00 11,830.00
Kepala tukang 0.0195 HOK 85,000.00 1,657.50
Mandor 0.0100 HOK 85,000.00 850.00
Jumlah 20,837.50

Jumlah Total 20,837.50


Dibulatkan

N-11 1 m2 PENGECATAN BATU TEMPEL BARU (1 Lapis Cat dasar; 2 Lapis Cat Penutup)
Cat Penutup ( 2 kali ) 0.2600 Kg 82,100.00
Pekerja 0.0200 HOK 3,500.00 70.00
Tukang cat 0.0630 HOK 75,000.00 4,725.00
Kepala tukang 0.0063 HOK 85,000.00 535.50
Mandor 0.0025 HOK 85,000.00 212.50
Jumlah 5,543.00

Jumlah Total 5,543.00


Dibulatkan

N-10 1 m2 PENGECATAN GENTENG BARU (1 Lapis Cat dasar; 2 Lapis Cat Penutup)
Cat Penutup ( 2 kali ) 0.2600 Kg 40,000.00
Pekerja 0.0400 HOK 3,500.00 140.00
Tukang cat 0.1200 HOK 75,000.00 9,000.00
Kepala tukang 0.0126 HOK 85,000.00 1,071.00
Mandor 0.0050 HOK 85,000.00 425.00
Jumlah 10,636.00

Jumlah Total 10,636.00


Dibulatkan

O PEKERJAAN KUSEN PINTU ALUMUNIUM

O-01 1 BH PEKERJAAN PINTU ALUMUNIUM TYPE P1


BAHAN + TENAGA
Kusen Alumunium 4" 20.5000 M¹ 87,500.00
Rangka Daun Pintu Almunium 0.0000 M¹ 65,000.00
Rangka Daun Jendela Almunium 0.0000 M¹ 65,000.00
List Almunium 0.0000 M¹ 1,000.00
Kaca Tempered 12 mm 3.0000 M¹ 714,000.00
Kaca Polos 5 mm 3.6610 M¹ 90,000.00
Frame Stainles 3.0000 M¹ 1,700,000.00
Expagnolet 0.0000 BH 247,500.00
Karet 26.4600 M¹ 5,000.00
Engsel Pintu Dorma 1.0000 PS 1,680,000.00
Engsel Jendela 0.0000 BH 40,500.00
Handle Pintu 4.0000 BH 240,000.00
Kunci 1.0000 PS 175,000.00
Slot Tanam 0.0000 PS 59,200.00
Rambuncis (Slot Jendela) 0.0000 BH 12,500.00
Hak Angi Kait 0.0000 BH 28,500.00
lem Silicon 1.0000 TB 37,000.00
Frame Lis Beton 20/30 0.3540 m³ 3,072,226.00
Pas. Granit untuk Frame beton 5.9000 m² 173,400.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-02 1 BH PEKERJAAN PINTU ALUMUNIUM TYPE P1a


BAHAN + TENAGA
Kusen Alumunium 4" 10.0000 M¹ 87,500.00
Rangka Daun Pintu Almunium 12.4800 M¹ 65,000.00
Rangka Daun Jendela Almunium 3.8400 M¹ 65,000.00
List Almunium 9.4000 M¹ 1,000.00
Kaca Polos 5 mm 2.3890 M¹ 90,000.00
Expagnolet 0.0000 BH 247,500.00
Karet 17.0000 M¹ 5,000.00
Engsel Pintu 4.0000 Psg 36,600.00
Engsel Jendela 4.0000 BH 40,500.00
Handle Pintu 4.0000 BH 240,000.00
Kunci 1.0000 PS 175,000.00
Slot Tanam 0.0000 PS 59,200.00
Rambuncis (Slot Jendela) 2.0000 BH 12,500.00
Hak Angi Kait 4.0000 BH 28,500.00
lem Silicon 1.5000 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-03 1 BH PEKERJAAN PINTU ALUMUNIUM TYPE P2


BAHAN + TENAGA
Kusen Alumunium 4" 9.4000 M¹ 87,500.00
Rangka Daun Pintu Almunium 11.6800 M¹ 65,000.00
Rangka Daun Jendela Almunium 3.4400 M¹ 65,000.00
List Almunium 9.2000 M¹ 1,000.00
Kaca Polos 5 mm 1.9750 M¹ 90,000.00
Expagnolet 0.0000 BH 247,500.00
Karet 15.4000 M¹ 5,000.00
Engsel Pintu 6.0000 BH 36,600.00
Engsel Jendela 4.0000 BH 40,500.00
Handle Pintu 4.0000 BH 240,000.00
Kunci 1.0000 PS 175,000.00
Slot Tanam 2.0000 PS 59,200.00
Rambuncis (Slot Jendela) 2.0000 BH 12,500.00
Hak Angi Kait 4.0000 BH 28,500.00
lem Silicon 1.0000 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-04 1 BH PEKERJAAN PINTU ALUMUNIUM TYPE P3


BAHAN + TENAGA
Kusen Alumunium 4" 7.5000 M¹ 87,500.00
Rangka Daun Pintu Almunium 6.1640 M¹ 65,000.00
Rangka Daun Jendela Almunium 2.4000 M¹ 65,000.00
List Almunium 7.2000 M¹ 1,000.00
Kaca Polos 5 mm 1.4020 M¹ 90,000.00
Kaca Es 5 mm 0.0000 M¹ 99,500.00
Floor Hinges 0.0000 BH 247,500.00
Karet 9.5400 M¹ 5,000.00
Engsel Pintu 3.0000 BH 36,600.00
Engsel Jendela 2.0000 BH 40,500.00
Handle Pintu 2.0000 BH 240,000.00
Kunci 1.0000 PS 175,000.00
Expagnolet 0.0000 PS 247,500.00
Slot Tanam 1.0000 PS 59,200.00
Rambuncis 1.0000 BH 12,500.00
lem Silicon 1.0000 TB 37,000.00
Jumlah

Jumlah Total
Dibulatkan

O-04 1 BH PEKERJAAN PINTU ALUMUNIUM TYPE P4


BAHAN + TENAGA
Kusen Alumunium 4" 5.3000 M¹ 87,500.00
Rangka Daun Pintu Almunium 6.1640 M¹ 65,000.00
Rangka Daun Jendela Almunium 0.0000 M¹ 65,000.00
List Almunium 5.0000 M¹ 1,000.00
Kaca Polos 5 mm 0.8020 M¹ 90,000.00
Kaca Es 5 mm 0.0000 M¹ 99,500.00
Floor Hinges 0.0000 BH 247,500.00
Karet 7.3400 M¹ 5,000.00
Engsel Pintu 3.0000 BH 36,600.00
Engsel Jendela 0.0000 BH 40,500.00
Handle Pintu 2.0000 BH 240,000.00
Kunci 1.0000 PS 175,000.00
Expagnolet 0.0000 PS 247,500.00
Slot Tanam 1.0000 PS 59,200.00
Rambuncis 0.0000 BH 12,500.00
lem Silicon 0.7500 TB 37,000.00
Jumlah

Jumlah Total
Dibulatkan

O-05 1 BH PEKERJAAN PINTU ALUMUNIUM TYPE KP


BAHAN + TENAGA
Kusen Alumunium 4" 0.0000 M¹ 87,500.00
Rangka Daun Pintu Almunium 0.0000 M¹ 65,000.00
Rangka Daun Jendela Almunium 0.0000 M¹ 65,000.00
Alumunium U 10.10 mm 0.0000 M¹ 26,000.00
List Almunium 0.0000 M¹ 1,000.00
Kaca Polos 5 mm 0.0000 M² 90,000.00
Floor Hinges 0.0000 BH 247,500.00
Kaca Ryben 12 mm 0.0000 M² 429,200.00
Karet 0.0000 M¹ 5,000.00
Engsel Pintu 0.0000 M¹ 1,680,000.00
Engsel Casement 0.0000 BH 40,500.00
Handle Pintu 0.0000 BH 240,000.00
Engsel Pintu Dorma 0.0000 PS 1,680,000.00
Kunci 0.0000 PS 175,000.00
Slot Pintu 0.0000 BH 29,000.00
Slot Tanam 0.0000 PS 59,200.00
Rambuncis 0.0000 BH 12,500.00
lem Silicon 0.0000 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-04 1 BH PEKERJAAN PINTU ALUMUNIUM TYPE P 1


BAHAN + TENAGA
Kusen Alumunium 4" 0.0000 M¹ 87,500.00
Rangka Daun Pintu Almunium 0.0000 M¹ 65,000.00
Rangka Daun Jendela Almunium 0.0000 M¹ 65,000.00
List Almunium 0.0000 M¹ 1,000.00
Kaca Polos 5 mm 0.0000 M² 90,000.00
Floor Hinges 0.0000 BH 247,500.00
Kaca Polos 3 mm 0.0000 M² 65,000.00
Karet 0.0000 M¹ 5,000.00
Engsel Pintu 0.0000 BH 1,680,000.00
Engsel Casement 0.0000 BH 40,500.00
Handle Pintu 0.0000 BH 240,000.00
Kunci 0.0000 PS 175,000.00
Slot Tanam 0.0000 PS 59,200.00
Rambuncis 0.0000 BH 12,500.00
lem Silicon 0.0000 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-05 1 BH PEKERJAAN PINTU ALUMUNIUM TYPE P 2


BAHAN + TENAGA
Kusen Alumunium 4" 0.0000 M¹ 87,500.00
Rangka Daun Pintu Almunium 0.0000 M¹ 65,000.00
Rangka Daun Jendela Almunium 0.0000 M¹ 65,000.00
List Almunium 0.0000 M¹ 1,000.00
Kaca Polos 5 mm 0.0000 M¹ 90,000.00
Floor Hinges 0.0000 BH 247,500.00
Kaca Polos 3 mm 0.0000 M² 65,000.00
Karet 0.0000 M¹ 5,000.00
Engsel Pintu 0.0000 BH 1,680,000.00
Engsel Casement 0.0000 BH 40,500.00
Handle Pintu 0.0000 BH 240,000.00
Kunci 0.0000 PS 175,000.00
Rambuncis 0.0000 BH 12,500.00
lem Silicon 0.0000 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-04 1 BH PEKERJAAN PINTU ALUMUNIUM TYPE P 4


BAHAN + TENAGA
Kusen Alumunium 4" 0.0000 M¹ 87,500.00
Rangka Daun Pintu Almunium 0.0000 M¹ 65,000.00
Rangka Daun Jendela Almunium 0.0000 M¹ 65,000.00
List Almunium 0.0000 M¹ 1,000.00
Kaca Polos 5 mm 0.0000 M¹ 90,000.00
Floor Hinges 0.0000 BH 247,500.00
Kaca Polos 3 mm 0.0000 M² 65,000.00
Karet 0.0000 M¹ 5,000.00
Engsel Pintu 0.0000 BH 1,680,000.00
Engsel Casement 0.0000 BH 40,500.00
Handle Pintu 0.0000 BH 240,000.00
Kunci 0.0000 PS 175,000.00
Rambuncis 0.0000 BH 12,500.00
lem Silicon 0.0000 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-05 1 BH PEKERJAAN PINTU ALUMUNIUM TYPE P 5 (KM/ WC)


BAHAN + TENAGA
Kusen Alumunium 4" 6.4000 M¹ 87,500.00
Rangka Daun Pintu Almunium 5.4000 M¹ 65,000.00
Panil Daun Alumunium 1.0900 M² 65,000.00
Rangka Daun Jendela Almunium 0.0000 M¹ 65,000.00
List Almunium 4.7000 M¹ 1,000.00
Kaca Polos 5 mm 0.3380 M¹ 90,000.00
Floor Hinges 0.0000 BH 247,500.00
Karet 2.3400 M¹ 5,000.00
Rel Marathon 0.0000 Unit 0.00
Engsel Casement 0.0000 BH 40,500.00
Engsel Pintu 3.0000 BH 1,680,000.00
Handle Pintu 2.0000 BH 240,000.00
Kunci 1.0000 PS 175,000.00
Rambuncis (Slot Jendela) 0.0000 BH 12,500.00
lem Silicon 0.7500 TB 37,000.00
Jumlah 0.00
Jumlah Total 0.00
Dibulatkan

O-04 1 BH PEKERJAAN PINTU ALUMUNIUM TYPE GESER


BAHAN + TENAGA
Kusen Alumunium 4" 0.0000 M¹ 87,500.00
Rangka Daun Pintu Almunium 0.0000 M¹ 65,000.00
Rangka Daun Jendela Almunium 0.0000 M¹ 65,000.00
List Almunium 0.0000 M¹ 1,000.00
Kaca Polos Es 5 mm 0.0000 M¹ 99,500.00
Kaca Polos 5 mm 0.0000 M¹ 90,000.00
Floor Hinges 0.0000 BH 247,500.00
Karet 0.0000 M¹ 5,000.00
Engsel Pintu 0.0000 BH 1,680,000.00
Engsel Casement 0.0000 BH 40,500.00
Handle Pintu 0.0000 BH 240,000.00
Kunci 0.0000 PS 175,000.00
Slot Pintu 0.0000 BH 29,000.00
Rel Henderseon Lengkap 0.0000 BH 477,600.00
Rambuncis 0.0000 BH 12,500.00
lem Silicon 0.0000 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-06 1 BH PEKERJAAN JENDELA ALUMUNIUM TYPE J1


BAHAN + TENAGA
Kusen Alumunium 4" 14.3200 M¹ 87,500.00
Daun Jendela 15.4800 M¹ 65,000.00
List Almunium 16.6800 M¹ 1,000.00
Engsel Jendela 12.0000 BH 40,500.00
Rambuncis ( Slot Jendela) 6.0000 BH 12,500.00
Hak Angin Kait 12.0000 BH 28,500.00
Kaca 5 mm 2.2150 BH 90,000.00
Karet 13.2000 M¹ 5,000.00
lem Silicon 0.8500 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-07 1 BH PEKERJAAN JENDELA ALUMUNIUM TYPE J2


BAHAN + TENAGA
Kusen Alumunium 4" 10.1400 M¹ 87,500.00
Daun Jendela 11.1200 M¹ 65,000.00
List Almunium 11.1200 M¹ 1,000.00
Engsel Jendela 8.0000 BH 40,500.00
Rambuncis (Slot Jendela) 4.0000 BH 12,500.00
Hak Angin Kait 8.0000 BH 28,500.00
Kaca 5 mm 1.4770 BH 90,000.00
Karet 9.8400 M¹ 5,000.00
lem Silicon 0.7000 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-08 1 BH PEKERJAAN JENDELA ALUMUNIUM TYPE J3


BAHAN + TENAGA
Kusen Alumunium 4" 5.3800 M¹ 87,500.00
Daun Jendela 0.0000 M¹ 65,000.00
List Almunium 0.0000 M¹ 1,000.00
Engsel Jendela 0.0000 PS 40,500.00
Rambuncis (Slot Jendela) 0.0000 BH 12,500.00
Hak Angin Kait 0.0000 BH 28,500.00
Kaca 5 mm 0.9510 BH 90,000.00
Karet 3.9600 M¹ 5,000.00
lem Silicon 0.5000 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-07 1 BH PEKERJAAN JENDELA ALUMUNIUM TYPE J4


BAHAN + TENAGA
Kusen Alumunium 4" 9.6400 M¹ 87,500.00
Daun Jendela 10.6200 M¹ 65,000.00
List Almunium 10.6200 M¹ 1,000.00
Engsel Jendela 8.0000 BH 40,500.00
Rambuncis (Slot Jendela) 4.0000 BH 12,500.00
Hak Angin Kait 8.0000 BH 28,500.00
Kaca 5 mm 0.9770 BH 90,000.00
Karet 9.3400 M¹ 5,000.00
lem Silicon 0.6000 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-09 1 BH PEKERJAAN BOUVENLIHT ALUMUNIUM TYPE BV1


BAHAN + TENAGA
Kusen Alumunium 4" 2.2000 M¹ 87,500.00
Daun Bauvenlight' 1.8000 M¹ 65,000.00
List Almunium 1.8000 M¹ 1,000.00
Engsel Jendela 2.0000 BH 40,500.00
Rambuncis 1.0000 BH 12,500.00
Kaca 5 mm 0.1660 BH 90,000.00
Karet 1.6800 M¹ 5,000.00
lem Silicon 0.6000 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan
O-10 1 BH PEKERJAAN BOUVENLIHT ALUMUNIUM TYPE BV2
BAHAN + TENAGA
Kusen Alumunium 4" 3.9000 M¹ 87,500.00
Daun Bauvenlight' 3.6000 M¹ 65,000.00
List Almunium 3.6000 M¹ 1,000.00
Engsel Jendela 2.0000 BH 40,500.00
Rambuncis 2.0000 BH 12,500.00
Kaca 5 mm 0.3330 BH 90,000.00
Karet 3.3600 M¹ 5,000.00
lem Silicon 0.6500 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-11 1 BH PEKERJAAN BOUVENLIHT ALUMUNIUM TYPE BV3


BAHAN + TENAGA
Kusen Alumunium 4" 3.8000 M¹ 87,500.00
Daun Bauvenlight' 3.6000 M¹ 65,000.00
List Almunium 3.6000 M¹ 1,000.00
Engsel Jendela 1.0000 BH 40,500.00
Rambuncis 2.0000 BH 12,500.00
Kaca 5 mm 0.3224 BH 90,000.00
Karet 3.6000 M¹ 5,000.00
lem Silicon 0.2500 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

O-12 1 BH PEKERJAAN BOUVENLIHT ALUMUNIUM TYPE BV4


BAHAN + TENAGA
Kusen Alumunium 4" 0.0000 M¹ 87,500.00
Daun Bauvenlight' 0.0000 M¹ 65,000.00
List Almunium 0.0000 M¹ 1,000.00
Engsel Casement 0.0000 PS 40,500.00
Rambuncis 0.0000 BH 12,500.00
Kaca 5 mm 0.0000 BH 90,000.00
Karet 0.0000 M¹ 5,000.00
lem Silicon 0.0000 TB 37,000.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

P PEKERJAAN ASPAL

P-01 1 M2 AMPARAN BATU PECAH MESIN 5/7 T = 10 CM


- Batu Pecah mesin 5/7 0.1200 m3 130,000.00
- Pekerja Trampil (gali+urug+ampar) 0.1100 org 70,000.00 7,700.00
- Peralatan 0.3200 lot 23,300.00
Jumlah 7,700.00

Jumlah Total 7,700.00


Dibulatkan

P-02 1 M2 AMPARAN BATU PECAH MESIN 2/3 T = 5 CM


- Batu Pecah mesin 2/3 0.0600 m3 155,000.00
- Pekerja Trampil (gali+urug+ampar) 0.0800 org 70,000.00 5,600.00
- Peralatan 0.5000 lot 14,900.00
Jumlah 5,600.00

Jumlah Total 5,600.00


Dibulatkan

P-03 1 M2 LAPISAN PENGISI / PENUTUP


- Batu Pecah mesin 1/2 0.0120 m3 178,000.00
- Pasir beton 0.0100 m3 175,000.00
- Pekerja Trampil (gali+urug+ampar) 0.0500 org 70,000.00 3,500.00
- Peralatan 0.9500 lot 7,386.00
Jumlah 3,500.00

Jumlah Total 3,500.00


Dibulatkan

P-04 1 M2 PENGASPALAN MANUAL


- Batu abu/Pasir Beton 0.0050 m3 175,000.00
- Aspal 4.0000 kg 9,500.00
- Kayu Bakar 0.0300 m3 165,000.00
- Pekerja Terampil 0.0600 org 70,000.00 4,200.00
- Peralatan 0.1800 lot 48,025.00
Jumlah 4,200.00

Jumlah Total 4,200.00


Dibulatkan

P-05 1 M2 KONSTRUKSI PENETRASI LENGKAP


- Amparan 5/7 T = 10 cm, digilas 1.0000 m2 30,756.00
- Amparan 2/3 T = 5 cm digilas 1.0000 m2 22,350.00
- Lapisan Pengisi 1.0000 m2 14,402.00
- Lapisan Aspal 1.0000 m2 56,669.00
Jumlah 0.00

Jumlah Total 0.00


Dibulatkan

P-06 1 M2 HOTMIX TANGAN T = 3 CM JADI


- Abu Batu screen 0.045 m3 175,000.00
- Aspal Panas 5.000 kg 9,500.00
- Kayu Bakar 0.080 m3 165,000.00
- Pekerja 1/2 Trampil 0.080 org 62,500.00 5,000.00
- Pekerja Trampil 0.030 org 70,000.00 2,100.00
- mandor 0.030 org 85,000.00 2,550.00
- Peralatan 0.100 lot 68,575.00
Jumlah 9,650.00

Jumlah Total 9,650.00


Dibulatkan
AN

HARGA HARGA SATUAN


BAHAN PEKERJAAN
(Rp) (Rp)
g = ( cxe ) h

i=2 METER
113,203.13
36,000.00
3,350.00
875.00
1,107.00
115,200.00
870.00
12,600.00

283,205.13

283,205.13 328,105.13
328,105.00

16,000.00
551.00

16,551.00

16,551.00 19,116.41
19,100.00

192,000.00
290.00
11,200.00
5,750.00
7,500.00
850.00

217,590.00

217,590.00 218,015.00
218,015.00

288,000.00 ACAN
12,325.00
20,900.00
46,900.00
19,800.00
7,500.00
2,600.00
885.00
3,180.00

12 8,362,080.00
402,090.00

402,090.00 696,840.00
696,840.00

336,000.00
4,350.00
14,070.00
3,960.00
45,000.00

403,380.00

403,380.00 632,130.00
632,130.00

10,000.00
10,000.00

10,000.00
2,500.00

12,500.00
12,500.00 241,250.00
241,250.00

45,250.00
45,200.00

55,575.00
55,500.00

66,070.00
66,070.00

19,550.00
19,550.00

60,220.00
60,220.00

91,350.00
91,350.00

72,825.00
72,825.00

3,300.00
3,300.00

33,920.00
33,920.00

19,825.00
19,825.00

33,000.00
33,000.00

33,000.00
33,000.00

66,000.00
108,000.00

108,000.00

108,000.00 126,100.00
126,100.00

103,800.00

103,800.00

103,800.00 121,900.00
121,900.00

90,000.00

90,000.00

90,000.00 99,900.00
99,900.00

108,000.00

108,000.00

108,000.00 126,100.00
126,100.00

130,800.00

130,800.00

130,800.00 147,300.00
147,300.00

120,000.00
270,680.00
64,020.00
454,700.00

454,700.00 609,950.00
609,950.00

120,000.00
218,420.00
68,640.00

407,060.00

407,060.00 562,310.00
562,310.00

120,000.00
182,240.00
71,808.00

374,048.00

374,048.00 529,298.00
529,200.00

120,000.00
37,368.00

157,368.00

157,368.00 238,098.00
238,000.00

ATU BELAH)
48,000.00
259,960.00
54,600.00
98,046.00
1,134,000.00
31,500.00

1,626,106.00

1,626,106.00 1,907,031.00
1,907,031.00

46,000.00
259,960.00
54,600.00
98,046.00

458,606.00

458,606.00 673,521.00
673,521.00

49,000.00
25,393.00
5,016.00

79,409.00

79,409.00 106,284.00
106,284.00

49,000.00
19,255.80
5,016.00

73,271.80

73,271.80 100,146.80
100,146.00
49,000.00
15,410.00
5,676.00

70,086.00

70,086.00 96,961.00
96,961.00

49,000.00
12,971.20
5,940.00

67,911.20

67,911.20 94,786.20
94,700.00

49,000.00
12,971.20
5,940.00

67,911.20

67,911.20 97,633.98
97,633.00

61,420.00 ACAN
12,971.20
5,940.00

80,331.20

80,331.20 108,356.20
108,356.00

180,000.00
14,740.00
4,620.00

199,360.00

199,360.00 226,235.00
226,235.00

152,350.00
15,745.00
4,620.00

172,715.00

172,715.00 245,165.00
245,165.00

13,700.16
2,640.00

16,340.16

16,340.16 47,390.16
47,390.00

10,419.84
3,036.00 0.0115
0.0575

13,455.84

13,455.84 44,505.84
44,505.00

8,361.60
3,168.00 0.012
0.06

11,529.60
1,152.96
12,682.56 46,837.56
46,837.00

6,946.56
3,432.00

10,378.56

10,378.56 41,428.56
41,400.00

6,946.56
3,432.00

10,378.56

10,378.56 41,688.02
41,688.00

13,700.16
2,640.00

16,340.16

16,340.16 47,390.16
47,390.00
10,419.84
3,036.00

13,455.84
1,345.58
14,801.42 48,956.42
48,956.00

4,355.00

4,355.00

4,355.00 25,055.00
25,000.00

4,355.00

4,355.00

4,355.00 25,163.88
25,163.00

5,788.80
792.00

6,580.80
658.08
7,238.88 17,826.38
17,826.00

4,164.72
4,164.72

4,164.72 19,774.72
19,774.00

1,584.00
8,495.60

10,079.60

10,079.60 41,129.60
41,129.00

4,176,565.47
18,125.00
33,000.00

4,227,690.47

4,227,690.47 6,203,440.47
6,203,440.00

3,600,000.00
18,125.00
33,000.00

3,651,125.00

3,651,125.00 5,524,625.00
5,524,600.00

0.00

0.00
0.00 350,500.00
350,500.00

0.00

0.00

0.00 270,500.00
270,500.00

130,000.00
16,500.00

146,500.00

146,500.00 458,750.00
458,700.00

72,000.00
16,500.00 Koef
0.00 4 m1
29,750.00

118,250.00

118,250.00 368,050.00
368,050.00

KLAS II KUAT
120,000.00
16,500.00
80,100.00

216,600.00

216,600.00 528,850.00
528,850.00

78,000.00
9,900.00
0.00

87,900.00

87,900.00 319,340.00
319,300.00

195,000.00
2,175.00
0.00

197,175.00

197,175.00 431,175.00
431,175.00

75,000.00
135.00
15,900.00
44,285.71 2.88

135,320.71

135,320.71 385,120.71
385,120.00

75,000.00
135.00
15,900.00
16,617.06 2.88

107,652.06
107,652.06 357,452.06
357,400.00

12,426,442.88
285,000.00
11,600.00

12,723,042.88

12,723,042.88

6,443,340.75
285,000.00
11,600.00

6,739,940.75

6,739,940.75

3,300,000.00
216,000.00
81,200.00

3,597,200.00

3,597,200.00 4,846,200.00
4,846,200.00

145,728.28
2,700.00

148,428.28
148,428.28

75,562.81
2,700.00

78,262.81

78,262.81

3,600,000.00
216,000.00
81,200.00

3,897,200.00

3,897,200.00 5,989,275.00
5,989,275.00

81,200.00

11,772,800.00

11,772,800.00 13,021,800.00
13,021,800.00

3,300,000.00
216,000.00
43,500.00

3,559,500.00

3,559,500.00 5,651,575.00
5,651,575.00
42,000.00 0.0105
21,000.00
2,175.00 0.0018
0.0123

65,175.00

65,175.00 83,525.00
83,500.00

42,000.00 0.0105
21,000.00
3,625.00 0.0018
0.0123

66,625.00

66,625.00 84,975.00
84,975.00

135,561.20
1,450.00

137,011.20

137,011.20

0.00
1,450.00

1,450.00

1,450.00

36,000.00
1,450.00 67000

37,450.00

37,450.00 73,325.00
73,300.00

0.00
870.00

870.00

870.00 19,220.00

43,931.87
870.00

44,801.87

44,801.87 63,151.87
63,151.87

2,175.00 0.0018
#REF!

2,175.00

2,175.00 20,525.00
20,525.00

35,100.00
1,450.00

36,550.00
36,550.00 61,250.00
61,250.00

35,750.00
725.00

36,475.00

36,475.00 61,175.00
61,100.00

4,725.00
145.00

4,870.00

4,870.00 11,675.00
11,600.00

11,550.00

11,550.00

11,550.00 18,355.00
18,300.00

128,000.00
2,175.00

130,175.00

130,175.00 344,175.00
344,100.00
330,980.00 4.3600
91,000.00 0.5200
95,940.00 0.8700
1.6500
0.2500
0.0250
0.0800
517,920.00

517,920.00 640,470.00
640,470.00

292,120.00 4.3600
91,000.00 0.5200
134,850.00 0.8700
1.6500
0.2500
0.0250
0.0800
517,970.00

517,970.00 640,520.00
640,500.00

13,400.00
4,550.00
6,820.00

24,770.00

24,770.00 93,075.00
93,000.00

308,200.00 BJ
108,625.00 1400
102,490.00 1350

519,315.00

519,315.00 644,250.00
644,250.00

369,840.00 BJ
103,500.00 1400
103,823.70 1350

577,163.70

577,163.70 702,098.70
702,098.00

400,660.00 BJ
99,875.00 1400
104,336.67 1350

604,871.67

604,871.67 729,806.67
729,806.00

439,520.00 BJ
97,500.00 1400
118,144.44 1350 KOLOM
BETON 777,700.00
BEGISTING
TULANGAN POKOK
RING
655,164.44

655,164.44 777,714.44
777,700.00

471,680.00 BJ
91,375.00 1400
118,374.07 1350

681,429.07

681,429.07 803,979.07
803,979.00

497,140.00
87,250.00
120,211.11

704,601.11 829,536.11

704,601.11 829,536.11
829,500.00

514,560.00
86,500.00
119,292.59

720,352.59 845,287.59

720,352.59 845,287.59
845,287.00

544,040.00
85,500.00
117,800.00

747,340.00 872,275.00

747,340.00 872,275.00
872,275.00

553,420.00
85,125.00
117,225.93

755,770.93

755,770.93 880,705.93
880,705.00

846,126.83
300,000.00

1,146,126.83

1,146,126.83 1,233,001.83
1,233,001.00

862,193.34
300,000.00 2500000 ditulis

1,162,193.34

1,162,193.34 1,249,068.34
1,249,068.00

889,720.50
300,000.00 2500000 ditulis

1,189,720.50

1,189,720.50 1,276,595.50
1,276,595.00

9,450.00
262.50

9,712.50

9,712.50 10,759.00
10,700.00

945,000.00
26,250.00

971,250.00

971,250.00 1,075,900.00
1,075,900.00

53,550.00
875.00

54,425.00

54,425.00 58,162.50
58,162.00

64,000.00
4,350.00
1,420.00

69,770.00

69,770.00 120,990.00
120,900.00

72,000.00
4,350.00
1,420.00

77,770.00

77,770.00 113,190.00
113,100.00

0.00 0.0400
2,900.00 0.4000
2,840.00 0.2000
12,000.00 0.0150
16,000.00 0.0200
8,000.00 2.0000

41,740.00

41,740.00 110,050.00
110,050.00

0.00 0.0400
5,800.00 0.4000
2,840.00 0.2000
24,000.00 0.0150
32,000.00 0.0200
16,000.00 2.0000

80,640.00

80,640.00 148,950.00
148,950.00

64,000.00
5,800.00
2,840.00
24,000.00
42,000.00
16,000.00

154,640.00

154,640.00 222,950.00
222,950.00

0.00
5,800.00
2,840.00
28,800.00
32,000.00
16,000.00
85,440.00

85,440.00 153,750.00
153,750.00

64,000.00
5,800.00
2,840.00
28,800.00
42,000.00
16,000.00

159,440.00

159,440.00 227,750.00
227,750.00

0.00
5,800.00
2,840.00
24,000.00
32,000.00
48,000.00

112,640.00

112,640.00 180,950.00
180,950.00

64,000.00
5,800.00
2,840.00
24,000.00
42,000.00
48,000.00

186,640.00
186,640.00 254,950.00
254,950.00

0.00
5,800.00
2,840.00
32,000.00
32,000.00
24,000.00
10,800.00

107,440.00

107,440.00 175,750.00
175,750.00

48,000.00
5,800.00
2,840.00
32,000.00
42,000.00
24,000.00
10,800.00

165,440.00

165,440.00 233,750.00
233,750.00

0.00
5,800.00
2,130.00
24,000.00
32,000.00
16,000.00

79,930.00

79,930.00 148,240.00
148,240.00

48,000.00
5,800.00
2,130.00
24,000.00
32,000.00
16,000.00

127,930.00

127,930.00 196,240.00
196,240.00

2,124,089.10 kolom 100/100


302,250.00 5
829,500.00 120
3,255,839.10 -
3,255,839.10
3,255,839.00

1,699,271.28 kolom 100/100


322,400.00 5
777,700.00 120
2,799,371.28 707,000.00
2,799,371.28
2,799,371.00

4.9382716049
1,863,534.17 kolom 100/100 0.2025
241,800.00 4.93827160494 43.2
829,500.00 118.518518519 189.44
2,934,834.17
2,934,834.17
2,934,834.00

1,153,076.94 kolom 140/0,9 2.6455026455


201,500.00 2.6455026455 0.378
829,500.00 63.4920634921 69.2
2,184,076.94 162.56507937
2,184,076.94
2,184,000.00

12.5
183,150.00
1,269,736.90 11.111111111111
829,500.00 133.33333333333 #REF!
2,282,386.90 #REF!
2,282,386.90
2,282,386.00

12.5
48,000.00
384,282.00 11.111111111111
17,291.28 133.33333333333 #REF!
449,573.28 #REF!
449,573.28
449,573.00

2,387,724.93
1,131,000.00 20/35 ring
777,700.00 14.286 95.238
4,296,424.93 Besi 16 mm 114.286 104.762
4,296,424.93 180.571 41.905
4,296,424.00 222.476

903,331.56
1,131,000.00 20/35 ring
829,500.00 14.286 95.238
2,863,831.56 Besi 16 mm 114.286 104.762
2,863,831.56 180.571 41.905
2,863,800.00 222.476

2,537,859.90
1,131,000.00 20/35 ring
829,500.00 14.286 95.238
4,498,359.90 Besi 16 mm 114.286 104.762
4,498,359.90 180.571 41.905
4,498,359.00 222.476

1,651,283.58
1,131,000.00 20/35 ring
829,500.00 14.286 95.238
3,611,783.58 Besi 16 mm 114.286 104.762
3,611,783.58 180.571 41.905
3,611,783.00 222.476

2,115,399.24
1,508,000.00 20/35 ring
829,500.00 14.286 95.238
4,452,899.24 Besi 16 mm 114.286 104.762
4,452,899.24 180.571 41.905
4,452,899.00 222.476

1,237,600.73
1,508,000.00 15/20 ring
829,500.00 33.333 222.222
3,575,100.73 Besi 12 mm 133.333 155.556
3,575,100.73 84.000 49.778
3,575,100.00 133.778

181,912.50
25,600.00
7,250.00

214,762.50

214,762.50 254,832.50
254,800.00

10/60 ring
1,529,695.97 16.667
1,630,681.82 Besi 8 mm 83.333 -
829,500.00 26.667 -
3,989,877.79
3,989,877.79
3,989,800.00

6/50 ring
768,366.14 25.000
2,329,545.45 Besi 6 mm 60.938 -
829,500.00 24.375 -
3,927,411.60 24.375
3,927,411.60
3,927,411.00 12/12 ring

6/50 ring
588,939.98 25.000
1,747,159.09 Besi 6 mm 60.938 -
640,470.00 24.375 -
2,976,569.07 24.375
2,976,569.07
2,976,569.00 12/12 ring

69.444 347.222
1,569,216.63 Besi 12 mm 277.778 166.667
1,467,333.33 247.222 53.333
829,500.00 300.556
3,866,049.97
3,866,049.97
3,866,049.00

69.444 347.222
2,884,109.39 Besi 12 mm 277.778 166.667
917,083.33 247.222 53.333
640,470.00 300.556
4,441,662.72
4,441,662.72
4,441,662.00

69.444 347.222
1,711,780.29 Besi 12 mm 277.778 166.667
1,834,166.67 247.222 53.333
829,500.00 300.556
4,375,446.96
4,375,446.96
4,375,446.00

1,386,858.67 20/20 ring


1,100,500.00 25.000 166.67
829,500.00 besi Q12 150.000 133.33
0.00 94.500 42.67
3,316,858.67 133.500 53.33
3,316,858.67
3,316,858.00

805,834.55 20/20 ring


733,666.67 25.000 166.67
829,500.00 besi Q12 150.000 133.33
0.00 94.500 42.67
2,369,001.21 133.500 53.33
2,369,001.21
2,369,000.00

me List Kusen)
1,325,642.69 20/20 ring
917,083.33 25.000 166.67
829,500.00 besi Q12 150.000 133.33
0.00 94.500 42.67
3,072,226.02 133.500 53.33
3,072,226.02
3,072,226.00

985,049.62 20/20 ring


990,450.00 25.000 166.67
829,500.00 besi Q12 150.000 133.33
0.00 94.500 42.67
2,804,999.62 133.500 53.33
2,804,999.62
2,804,900.00

33.333 166.667
1,624,598.33 Besi 12 mm 133.333 116.667
1,283,916.67 84.000 37.333
829,500.00 121.333
3,738,015.00
3,738,015.00
3,738,000.00
15/25
26.667 133.333
1,980,213.33 Besi 12 mm 160.000 106.667
1,173,866.67 142.400 42.667
829,500.00 185.067
3,983,580.00
3,983,580.00
3,983,580.00

11.429 76.190
1,550,582.86 Besi 16 mm 68.571 91.429
1,509,257.14 108.343 36.571
829,500.00 144.914
0.00 128.974
3,889,340.00
3,889,340.00
3,889,340.00

1,569,216.63 15/15 ring


1,467,333.33 44.444 296.30
829,500.00 besi Q12 177.778 177.78
0.00 112.000 56.89
3,866,049.97 168.889
3,866,049.97
3,866,000.00

13.333 88.89
1,510,364.44 besi Q12 106.667 115.56
953,766.67 94.933 46.22
829,500.00 141.156
0.00
3,293,631.11
3,293,631.11
3,293,631.00

13.333 88.89
1,640,166.19 besi Q12 106.667 115.56
825,375.00 94.933 46.22
829,500.00 141.156
0.00
3,295,041.19
3,295,041.19
3,295,041.00

Ø 16 Ø 12
1,862,879.79 8.889
1,537,500.00 besi Ø12 & 16 97.778 17.778
829,500.00 154.489 15.822
0.00 203.496
4,229,879.79
4,229,879.79
4,229,879.00

20/35
2,731,733.97 14.286 95.24
2,050,000.00 besi Q16 114.286 104.76
829,500.00 180.571 41.90
0.00 222.476
5,611,233.97
5,611,233.97
5,611,233.00

20/30
2,146,479.68 16.667 111.11
1,976,785.71 besi Q16 116.667 111.11
829,500.00 184.333 44.44
0.00 228.778
4,952,765.39
4,952,765.39
4,952,765.00

20/30
903,331.56 16.667 111.11
2,050,000.00 besi Q16 100.000 111.11
829,500.00 158.000 44.44
0.00 202.444
3,782,831.56
3,782,831.56
3,782,800.00

20/25
2,200,116.54 20.000 133.33
2,152,500.00 besi Q12 120.000 120.00
829,500.00 106.800 48.00
0.00 154.800
5,182,116.54
5,182,116.54
5,182,116.00

20/25
1,929,046.22 20.000 133.33
1,879,166.67 besi Q12 120.000 120.00
829,500.00 106.800 48.00
0.00 154.800
4,637,712.89
4,637,712.89
4,637,712.00

20/25
1,407,666.08 20.000 133.33
1,976,785.71 besi Q12 120.000 120.00
829,500.00 106.800 48.00
0.00 154.800
4,213,951.79
4,213,951.79
4,213,951.00

20/25
1,461,302.94 20.000 133.33
2,152,500.00 besi Q12 120.000 120.00
829,500.00 106.800 48.00
0.00 154.800
4,443,302.94
4,443,302.94
4,443,302.00

20/25
1,651,283.58 20.000 133.33
2,152,500.00 besi Q12 120.000 120.00
829,500.00 106.800 48.00
0.00 154.800
4,633,283.58
4,633,283.58
4,633,283.00

15/25
1,862,091.72 26.667 177.78
2,665,000.00 besi Q12 133.333 142.22
829,500.00 118.667 56.89
0.00 175.556
5,356,591.72
5,356,591.72
5,356,591.00

15/20
1,929,046.22 33.333 222.22
1,879,166.67 besi Q12 166.667 155.56
829,500.00 148.333 62.22
0.00 210.556
4,637,712.89
4,637,712.89
4,637,712.00

15/25
1,623,669.93 22.222 148.15
2,562,500.00 besi Q12 111.111 133.33
829,500.00 98.889 53.33
0.00 152.222
5,015,669.93
5,015,669.93
5,015,669.00

15/25
1,862,091.72 22.222 148.15
2,665,000.00 besi Q12 111.111 133.33
829,500.00 98.889 53.33
0.00 152.222
5,356,591.72
5,356,591.72
5,356,591.00

15/25
2,219,724.42 22.222 148.15
2,818,750.00 besi Q12 111.111 133.33
829,500.00 98.889 53.33
0.00 152.222
5,867,974.42
5,867,974.42
5,867,974.00

15/45
1,212,666.67 14.815
1,195,833.33 besi Q12 74.074 29.630
829,500.00 65.926 18.370
424,666.67 113.333
3,662,666.67
3,662,666.67
3,662,666.00

12/12
2,823,611.11 69.444 462.96
1,921,875.00 besi Q10 277.778 222.22
829,500.00 175.000 88.89
928,958.33 263.889
6,503,944.44
6,503,944.44
6,503,944.00

15/25
2,847,176.52 26.667 177.778
2,665,000.00 besi Q12 133.333 142.222
829,500.00 84.000 56.889
0.00 140.889
6,341,676.52
6,341,676.52
6,341,676.00
12/20 81.500
3,141,638.89 41.667 277.778
640,625.00 besi Q12 250.000 177.778
829,500.00 222.500 71.111
557,375.00 293.611
5,169,138.89
5,169,138.89
5,169,138.00

12/40 81.500
1,700,111.11 20.833 20.833
1,633,593.75 besi Q12 83.333 41.667
829,500.00 74.167 25.833
594,533.33 158.889
4,757,738.19
4,757,738.19
4,757,738.00

12/40
804,207.40 20.833 138.889
1,281,250.00 besi Q12 83.333 102.778
829,500.00 74.167 41.111
212,333.33 115.278
3,127,290.73
3,127,290.73
3,127,200.00

10/15
2,558,488.89 66.667 444.44
2,050,000.00 besi Q10 266.667 222.22
829,500.00 168.000 71.11
0.00 239.111
5,437,988.89
5,437,988.89
5,437,988.00

10/15
2,071,023.52 66.667 444.44
1,793,750.00 besi Q10 266.667 222.22
640,470.00 168.000 71.11
0.00 239.111
4,505,243.52
4,505,243.52
4,505,243.00

10/15
2,895,445.68 66.667 444.44
2,178,125.00 besi Q10 266.667 222.22
640,470.00 168.000 71.11
0.00 239.111
5,714,040.68
5,714,040.68
5,714,040.00

12/20
1,866,555.56 41.667 277.778
1,537,500.00 besi Q10 166.667 177.778
829,500.00 103.333 71.111
445,900.00 174.444
4,679,455.56
4,679,455.56
4,679,455.00

33.333 222.222
2,115,399.24 Besi 12 mm 233.333 164.444
2,050,000.00 207.667 52.622
829,500.00 260.289
4,994,899.24
4,994,899.24
4,994,899.00
12/20
33.333 222.222
1,237,600.73 Besi 10 mm 133.333 155.556
2,050,000.00 84.000 49.778
640,470.00 133.778
3,928,070.73
3,928,070.73
3,928,000.00

33.333 222.222
869,689.15 Besi 10 mm 133.333 155.556
2,562,500.00 84.000 49.778
640,470.00 133.778
4,072,659.15
4,072,659.15
4,072,659.00

12.500
664,932.24
2,261,875.00 besi8 12.500 175.000
829,500.00 0.65328 70.000
0.00
3,756,307.24
3,756,307.24
3,756,307.00

10.000
542,078.09
1,809,500.00 besi8 140.000
829,500.00 0.65328 10.000 86.800
0.00
3,181,078.09
3,181,078.09
3,181,078.00

4.17 8.33
843,654.77 233.33
1,370,833.33 besi12 93.33
829,500.00 8.3333333333333
0.00 - -
3,043,988.10

3,043,988.10
3,043,900.00

4.17 8.33
693,499.70 233.33
1,096,666.67 besi12 93.33
829,500.00 8.3333333333333
0.00 - -
2,619,666.37

2,619,666.37
2,619,666.00

0.00
0.00
0.00
0.00

0.00
-

0.00
0.00
0.00
0.00

0.00
-

0.00
0.00
0.00
0.00
0.00
-

0.00
0.00

0.00
-

0.00

0.00
-

0.00

0.00
-

0.00

0.00
-

75,600.00

75,600.00
75,600.00 89,915.00
89,915.00

48,600.00

48,600.00

48,600.00 62,915.00
62,900.00

14,315.00
14,300.00

121,000.00
435.00

121,435.00

121,435.00 142,135.00
142,135.00

50,000.00

50,000.00

50,000.00 65,567.50
65,500.00

36,000.00
36,000.00

36,000.00 51,567.50
51,567.00

21,000.00
10,720.00
4,224.00

35,944.00

35,944.00 75,814.00
75,800.00

55,000.00
10,720.00
4,224.00

69,944.00

109,814.00
109,814.00

0.00
0.00

0.00
-

0.00
0.00

0.00
-
0.00

0.00
-

0.00
0.00

0.00
-

0.00
0.00

0.00
-

0.00
0.00

0.00
-

0.00
0.00

0.00
-

23,500.00
10,720.00
4,224.00

38,444.00

38,444.00 78,314.00
78,300.00

18,800.00
10,720.00
4,224.00

33,744.00

33,744.00 73,614.00
73,614.00

96,900.00
2,900.00

99,800.00

99,800.00 119,735.00
119,735.00

71,500.00
725.00

72,225.00

72,225.00 100,230.00
100,230.00

11,000.00
145.00
11,145.00

11,145.00 18,842.50
18,842.00

4,950.00
145.00

5,095.00

5,095.00 12,400.00
12,400.00

36,000.00
870.00
11,000.00

47,870.00

47,870.00 85,705.00
85,705.00

70,290.99
870.00
21,010.00 0.3819444444444

92,170.99

92,170.99 130,005.99
130,005.00

36,000.00
870.00
25,590.28
62,460.28

62,460.28 100,295.28
100,200.00

NG KELAS III
19,200.00
870.00
28,645.83

48,715.83

48,715.83 86,550.83
86,500.00

870.00
28,645.83

29,515.83

29,515.83 67,350.83
67,300.00

19,200.00
870.00
11,000.00

31,070.00

31,070.00 68,905.00
68,905.00

6,875.55
9,792.45
24,000.00
2,700.00
25,590.28
68,958.28

68,958.28 103,593.28
103,593.00

233,500.00
8,040.00
1,320.00

242,860.00

242,860.00 439,210.00
439,210.00

2,100,000.00
126,000.00

2,226,000.00

2,226,000.00 2,512,700.00
2,512,700.00

468,000.00
8,040.00
1,320.00
46,800.00

524,160.00

524,160.00 719,760.00
719,700.00

285,000.00
34,200.00

319,200.00

319,200.00 375,300.00
375,300.00

52,250.00
10,937.50
5,252.80
7,392.00
2,076.00

77,908.30

77,908.30 92,398.30
92,398.00

71,500.00
22,280.09
13,802.00
8,052.00
5,968.50

121,602.59

121,602.59 160,932.59
160,932.00

49,000.00
103,180.00
17,160.00
3,100.00
23,400.00
15,750.00

211,590.00
211,590.00 484,135.00
484,135.00

90,912.00 0.96
46,368.00 0.96 0.16 1.12
28,000.00
0.15
165,280.00
165,280.00 172,060.00
172,060.00

86,100.00
152,760.00
24,288.00
5,049.00
43,650.00
21,000.00

332,847.00

332,847.00 605,392.00
605,392.00

136,368.00 1.44
54,648.00 0.96 0.36 1.32
33,000.00
0.294
224,016.00
237,304.80
237,304.00

4,500.00
1,312.50

5,812.50

5,812.50 13,062.50
13,000.00
6,000.00
1,750.00

7,750.00

7,750.00 15,000.00
15,000.00

9,000.00
2,625.00

11,625.00

11,625.00 18,875.00
18,875.00

12,750.00
3,718.75

16,468.75

16,468.75 27,343.75
27,343.00

22,200.00
6,475.00

28,675.00

28,675.00 39,550.00
39,550.00

25,500.00
7,437.50
32,937.50

32,937.50 49,207.50
49,207.00

37,500.00
10,937.50

48,437.50

48,437.50 64,707.50
64,700.00

51,750.00
15,093.75

66,843.75

66,843.75 83,113.75
83,113.00

719,700.00
131,200.00

850,900.00

850,900.00 877,802.50
877,802.00

63,000.00
100.00

63,100.00
63,100.00 97,500.00
97,500.00

25,000.00

25,000.00

25,000.00 34,350.00
34,350.00

6,780.00
30,000.00
144,651.00

181,431.00

181,431.00 244,931.85
244,931.00

9,040.00
40,000.00
144,651.00

193,691.00

193,691.00 257,191.85
257,191.00

11,300.00
47,500.00
144,651.00

203,451.00

203,451.00 266,951.85
266,951.00

339,000.00
43,518.30
2,401,875.00
3,616,275.00
1,994,938.89
388,125.00
436,000.00
254,250.00
135,000.00
190,750.00
258,750.00
61,875.00
36000 ditulis
10,120,357.19

10,120,357.19 10,123,417.19
10,123,417.00

101,700.00
13,055.49
720,562.50
1,084,882.50
598,481.67
388,125.00
130,800.00
76,275.00
40,500.00
57,225.00
388,125.00
18,562.50
36000 ditulis
3,618,294.66

3,618,294.66 3,621,354.66
3,621,354.00

712,000.00
108,885.00 3.14
79,422.00 0.157
327,000.00
234,844.25
208,732.39
55,180.00
120,000.00

1,846,063.64

1,846,063.64 1,960,537.16
1,960,537.00

31,500.00
145.00
4,500.00
36,145.00

36,145.00 70,500.00
70,500.00

55,545.00
217.50
57,000.00

112,762.50

112,762.50 141,047.50
141,047.00

15,870.00
1,450.00
57,000.00

74,320.00

74,320.00 103,926.25
103,926.00

0.00

0.00
-

0.00

0.00
-

0.00

0.00
-

0.00

0.00
-

0.00

0.00
-

0.00

0.00
-

0.00

0.00
-

0.00
0.00
0.00
0.00
-

0.00
0.00
0.00

0.00
-

0.00
0.00
0.00

0.00
-

0.00

0.00

0.00 53,805.00
53,805.00

221,300.00

221,300.00

221,300.00 264,050.00
264,000.00
0.00

0.00

0.00 42,292.50
42,292.00

63,500.00

63,500.00

63,500.00 105,792.50
105,792.00

40,000.00

40,000.00

40,000.00 53,455.50
53,400.00

40,500.00

40,500.00

40,500.00 49,467.50
49,400.00

23,000.00

23,000.00
23,000.00 40,935.00
40,900.00

29,000.00

29,000.00

29,000.00 46,935.00
46,900.00

28,500.00

28,500.00

28,500.00 42,567.50
42,500.00

40,000.00

40,000.00

40,000.00 54,067.50
54,067.00

0.00

0.00

0.00 53,805.00
53,805.00

71,500.00
71,500.00

71,500.00 84,955.50
84,900.00

93,500.00

93,500.00

93,500.00 106,955.50
106,900.00

143,000.00

143,000.00

143,000.00 158,249.00
158,249.00

0.00

0.00

0.00 13,451.25
13,451.00

0.00

0.00

0.00 13,451.25
13,451.00

0.00
0.00

0.00 13,451.25
13,451.00

0.00

0.00

0.00 13,451.25
13,451.00

0.00

0.00

0.00 44,837.50
44,837.00

0.00

0.00

0.00 44,837.50
44,837.00

0.00

0.00

0.00 8,967.50
8,967.00
0.00

0.00

0.00 53,805.00
53,805.00

0.00
0.00

0.00

0.00 22,418.75
22,418.00

13,451.25
13,451.00

71,444.00 26.5 25
13,936.00
5,940.00 94.33962264151
18,630.00 1.06 26.5

109,950.00

109,950.00 182,400.00
182,400.00

78,122.00
13,936.00
5,940.00
18,630.00

116,628.00

116,628.00 189,078.00
189,078.00

51,796.36
13,400.00
5,940.00
17,250.00

88,386.36

88,386.36 115,296.36
115,200.00

53,954.55
13,400.00
5,940.00
17,250.00

90,544.55

90,544.55 117,454.55
117,454.00

53,954.55 11.111111111111
13,400.00
5,940.00
17,250.00

90,544.55

90,544.55 117,454.55
117,454.00

56,222.40 6.250
13,132.00
5,940.00
14,950.00

90,244.40

90,244.40 116,204.40
116,200.00

58,344.00 6.250
13,132.00
5,940.00
14,950.00

92,366.00

92,366.00 118,326.00
118,326.00

173,400.00 2.778
12,864.00
5,940.00
17,250.00

209,454.00

209,454.00 234,294.00
234,294.00

60,000.00 20
15,249.20
5,544.00
17,250.00
98,043.20

98,043.20 185,718.20
185,718.00

28,488.00
13,400.00
5,940.00
17,250.00

65,078.00

65,078.00 91,988.00
91,988.00

7,705.00
9,240.00

16,945.00

16,945.00 37,220.00
37,220.00

71,205.00
13,200.00

84,405.00

84,405.00 141,660.00
141,660.00

62,115.00
13,200.00
3000 Ditulis
75,315.00

75,315.00 132,570.00
132,570.00

88,375.00
13,200.00

3000 Ditulis
101,575.00

101,575.00 158,830.00
158,830.00

79,285.00
13,200.00

3000 Ditulis
92,485.00

92,485.00 149,740.00
149,740.00

0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00
0.00

0.00 -
-

0.00
0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00

0.00

0.00
0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00

0.00
0.00 -
-

0.00

0.00

0.00 -
-

0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00

0.00
0.00 -
-

0.00
0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00

0.00

0.00 -
-

0.00
0.00

0.00

0.00 -
-

0.00
0.00

0.00

0.00 -
-

0.00

0.00

0.00 -
-

0.00
0.00

0.00

0.00 -
-

0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00

0.00

0.00 -
-
0.00
0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00
0.00

0.00 -
-

0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00
0.00

0.00 -
-

0.00
0.00
0.00

0.00

0.00 -
-

0.00
0.00

0.00

0.00 -
-

0.00
0.00

0.00

0.00 -
-

0.00
0.00
0.00

0.00 -
-

0.00
33,000.00

33,000.00

33,000.00 87,255.00
87,255.00

Cat Penutup)
5,600.00
3,300.00
8,925.00
13,650.00
100.00
750.00
700.00

33,025.00

33,025.00 38,490.00
38,400.00

Cat Penutup)
5,600.00
3,300.00
8,925.00
18,375.00
100.00
750.00
700.00

37,750.00

37,750.00 46,465.00
46,400.00
3,300.00
8,925.00
8,925.00

21,150.00

21,150.00 31,650.00
31,650.00

4,950.00
16,740.00
7,000.00

28,690.00

28,690.00 37,105.00
37,105.00

3,850.00

3,850.00

3,850.00 4,710.00
4,700.00

3,000.00
1,400.00
5,720.00

10,120.00

10,120.00 15,705.50
15,700.00

apis Cat Penutup) Setara Metrolite)


3,000.00
1,400.00
6,344.00

10,744.00

10,744.00 16,287.00
16,200.00

apis Cat Penutup) (LANTAI 2)


3,000.00
1,400.00
6,344.00

10,744.00

10,744.00 16,770.48
16,770.00
1 m2 pembuatan tralis besi
Besi dia 10 mm 8
1,680.00 Besi strip 3 cm 2.84
3,960.00 Paku Skrup 12
Pengecatan 0.53
Pengelasan 66

5,640.00

5,640.00 9,457.50
9,400.00

5,250.00
100.00

5,350.00

5,350.00 22,970.00
22,970.00

4,800.00
4,400.00
260.00

1,750.00

11,210.00

11,210.00 32,047.50
32,000.00

21,346.00

21,346.00

21,346.00 26,889.00
26,889.00

10,400.00

10,400.00

10,400.00 21,036.00
21,000.00

1,793,750.00 20.5
0.00
0.00
0.00
2,142,000.00 3
329,490.00 3.661
5,100,000.00 3
0.00
132,300.00 26.46
1,680,000.00 1
0.00
960,000.00 4
175,000.00 1
0.00
0.00
0.00
37,000.00 1
1,087,568.00 0.354 Besi 12. 6 buah cincin 8
1,023,060.00 5.9
14,460,168.00

14,460,168.00 14,460,168.00
14,460,168.00

875,000.00 10
811,200.00 12.48
249,600.00 3.84
9,400.00 9.4
215,010.00 2.389
0.00
85,000.00 17
146,400.00 4
162,000.00 4
960,000.00 4
175,000.00 1
0.00
25,000.00 2
114,000.00 4
55,500.00 1.5
3,883,110.00

3,883,110.00 3,883,110.00
3,883,110.00

822,500.00 9.4
759,200.00 11.68
223,600.00 3.44
9,200.00 9.2
177,750.00 1.975
0.00
77,000.00 15.4
219,600.00 6
162,000.00 4
960,000.00 4
175,000.00 1
118,400.00 2
25,000.00 2
114,000.00 4
37,000.00 1
3,880,250.00

3,880,250.00 3,880,250.00
3,880,250.00

656,250.00 7.5
400,660.00 6.164
156,000.00 2.4
7,200.00 7.2
126,180.00 1.402
0.00
0.00
47,700.00 9.54
109,800.00 3
81,000.00 2
480,000.00 2
175,000.00 1
0.00
59,200.00 1
12,500.00 1
37,000.00 1
2,348,490.00

2,348,490.00 2,348,490.00
2,348,490.00

463,750.00 5.3
400,660.00 6.164
0.00 0
5,000.00 5
72,180.00 0.802
0.00
0.00
36,700.00 7.34
109,800.00 3
0.00 0
480,000.00 2
175,000.00 1
0.00
59,200.00 1
0.00 0
27,750.00 0.75
1,830,040.00

1,830,040.00 1,830,040.00
1,830,040.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00 -
-

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00 -
-

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00 -
-

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00 -
-

560,000.00 6.4
351,000.00 5.4
70,850.00 1.09
0.00
4,700.00 4.7
30,420.00 0.338
0.00
11,700.00 2.34
0.00
0.00
5,040,000.00 3
480,000.00 2
175,000.00 1
0.00
27,750.00 0.75
6,751,420.00
6,751,420.00 6,751,420.00
6,751,420.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00 -
-

1,253,000.00 14.32
1,006,200.00 15.48
16,680.00 16.68
486,000.00 12
75,000.00 6
342,000.00 12 0.36 4.32
199,350.00 2.215
66,000.00 13.2
31,450.00 0.85
3,475,680.00

3,475,680.00 3,475,680.00
3,475,680.00

887,250.00 10.14
722,800.00 11.12
11,120.00 11.12
324,000.00 8
50,000.00 4
228,000.00 8
132,930.00 1.477
49,200.00 9.84
25,900.00 0.7
2,431,200.00

2,431,200.00 2,431,200.00
2,431,200.00

470,750.00 5.38
0.00 0
0.00
0.00
0.00
0.00
85,590.00 0.951
19,800.00 3.96
18,500.00 0.5
594,640.00

594,640.00 594,640.00
594,640.00

843,500.00 9.64
690,300.00 10.62
10,620.00 10.62
324,000.00 8
50,000.00 4
228,000.00 8
87,930.00 0.977
46,700.00 9.34
22,200.00 0.6
2,303,250.00

2,303,250.00 2,303,250.00
2,303,250.00

192,500.00 2.2
117,000.00 1.8
1,800.00 1.8
81,000.00 2
12,500.00 1
14,940.00 0.166
8,400.00 1.68
22,200.00 0.6
450,340.00

450,340.00 450,340.00
450,340.00
341,250.00 3.9
234,000.00 3.6
3,600.00 3.6
81,000.00 2
25,000.00 2
29,970.00 0.333
16,800.00 3.36
24,050.00 0.65
755,670.00

755,670.00 755,670.00
755,670.00

332,500.00 3.8
234,000.00 3.6
3,600.00 3.6
40,500.00 1
25,000.00 2
29,016.00 0.3224
18,000.00 3.6
9,250.00 0.25
691,866.00

691,866.00 691,866.00
691,866.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00 -
-

15,600.00

7,456.00
23,056.00

23,056.00 30,756.00
30,756.00

9,300.00

7,450.00
16,750.00

16,750.00 22,350.00
22,350.00

2,136.00
1,750.00

7,016.70
10,902.70

10,902.70 14,402.70
14,402.00

875.00
38,000.00
4,950.00

8,644.50
52,469.50

52,469.50 56,669.50
56,669.00

30,756.00
22,350.00
14,402.00
56,669.00
124,177.00

124,177.00 124,177.00
124,177.00

7,875.00
47,500.00
13,200.00
6,857.50
75,432.50

75,432.50 85,082.50
85,082.00
9 9
2.4 2.4
43.2

14 9
3.4 2.4
47.6 21.6
bh

bh

Bekisting
10.000

Bekisting
10.000

Bekisting
10.000

Bekisting
10.000

Bekisting
10.000
Bekisting
13.333

Bekisting
11.667

Bekisting
10.000

Bekisting

Bekisting
10.000

Bekisting

16.667 0.54
16.667 0.54

16.667 0.54

stoot werk
10.000 0.20
8.33
1.67

stoot werk
10.000 0.20
8.33
1.67

stoot werk
10.000 0.20
8.33
1.67

stoot werk
10.000 0.20
8.33
1.67
11.667 0.54

10.667 stoot werk 0.80


0.25
8.33
2.08

13.714 0.25
8.33
2.08

stoot werk
13.333 0.25
8.33
2.08

8.667 stoot werk


0.25
8.33 15 20.000 15.000 35 93.333333
2.08

8.667 stoot werk


0.25
8.33 15 20.000 15.000 35 93.333333
2.08
Bekisting stoot werk
59.26 10.222 8.8888889
82.96 0.80
33.19 7.11

Bekisting stoot werk


12.857 14.285714286
0.50
7.14

Bekisting stoot werk


13.333 16.666666667
0.50
8.33

Bekisting stoot werk


13.333 16.666666667
0.50
8.33

Bekisting stoot werk


14.000 20
0.50
10.00

Bekisting stoot werk


14.000 20
0.50
10.00
Bekisting stoot werk
14.000 20
0.50
10.00

Bekisting stoot werk


14.000 20
0.50
10.00

Bekisting stoot werk


14.000 20
0.50
10.00

Bekisting stoot werk


8.667 26.666666667
0.45
12.00

Bekisting stoot werk


9.167 33.333333333
0.45
15.00

Bekisting stoot werk


8.333 22.222222222
0.45
10.00

Bekisting stoot werk


8.333 22.222222222
0.45
10.00

Bekisting stoot werk


8.333 22.222222222
0.45
10.00

Bekisting stoot werk


98.77 7.778 14.814815
118.52 0.45
47.41 6.67

Bekisting stoot werk


12.500 69.444444444
0.42
29.17

stoot werk
10.667 26.667 74 26.667
0.350 0.400
9.333 10.667
74.000
4.167 41.667 74 3.846
0.420 0.700
17.500 2.692 72,680.000 195,676.923

74.000
138.889 10.625 33.333 74 3.846
147.222 0.420 0.700
58.889 14.000 2.692 72,680.000 ###

10.625 5.556 74 3.846


0.900 0.700
5.000 2.692 72,680.000 195,676.923 ###

Bekisting stoot werk


13.333 66.666666667
0.42
28.00

Bekisting stoot werk


13.333 66.666666667
0.42
28.00

Bekisting stoot werk


13.333 66.666666667
0.42
28.00
Bekisting stoot werk
10.000 33.333 74 3.846
0.420 0.700
14.000 2.692 72,680.000 195,676.923

16.667 33.333 3.846


0.420 0.700
14.000 2.692 72,680.000 195,676.923

13.333 33.333 3.846


0.420 0.700
14.000 2.692 72,680.000 195,676.923

13.333 33.333 3.846


0.420 0.700
14.000 2.692 72,680.000 195,676.923

stoot werk
12.500 8.333 72,680.000 605,666.667

bh

stoot werk
10.000 8.333 72,680.000 605,666.667

bh
8.333 8.333 72,680.000 605,666.667

bh

8.333 8.333 72,680.000 605,666.667

bh
5800 46400
9500 26980 0.617 0.000
100 1200 0.000
9000 4770 0.000
2000 132000
211,350.00
BILL OF QUALITY

NAMA PEKERJAAN : MEMBUAT RUMAH TINGGAL 2 LANTAI


LOKASI : TASIKMALAYA
TAHUN : 2022

NO URAIAN PEKERJAAN VOLUME SATUAN

1 2 3 4
LANTAI I
I PEKERJAAN PERSIAPAN
1 Pekerjaan pemasangan bowplank m'
2 Pekerjaan pembersihan lapangan m2

II PEKERJAAN TANAH
1 Galian tanah biasa m3
2 Urugan tanah kembali m3
3 Urugan pasir bawah pondasi m3
4 Urugan pasir bawah lantai m3

III PEKERJAAN PONDASI


1 Pasangan pondasi batu kali m3
2 Pasangan pondasi rolagh m3

IV PEKERJAAN BETON
1 Pasangan pondasi tapak type 1 m3
2 pasangan pondasi tapak type 2 m3
3 kolom praktis 15/15 m3
4 Kolom utama 20/25 m3
5 Ring balk beton 15/20 m3
6 Balok anak 20/25 m3
7 Pekerjaan tangga m3
8 Pekerjaan plat lantai m3

V PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata,1 pc : 4ps m2

VI PEKERJAAN PLESTERAN DAN ACIAN


1 Plesteran m2
2 Acian m2
3 Transram m2
VII PEKERJAAN KAYU
1 Pasangan kusen pintu dan jendela kayu borneo super m2
2 Daun pintu panil kayu kamper m2

VII PEKERJAAN PASANGAN


1 Pasangan kunci tanam biasa bh
2 pasangan kunci tanam kamar mandi bh
3 pasangan engsel pintu bh
4 pasangan engsel angin bh
5 pasangan kunci slot jendela bh
6 pasangan kunci slot pintu bh
7 pasangan kaca tebal 5mm m2
8 pegangan pintu bh
9 pegangan jendela bh

IX PEKERJAAN PENUTUP LANTAI DINDING


1 Pasangan lantai keramik 40x40cm m2
2 Pasangan lantai keramik 20x20cm m2

X PEKERJAAN PENGECETAN
1 Pengecatan interior m2
2 pengecatan eksterior m2
3 pengecatan kusen m2
4 pengecatan plafond m2

XI PEKERJAAN LANGIT-LANGIT
Pemasangan Plafond m2

LANTAI II
I PEKERJAAN BETON
1 kolom praktis 15/15 m3
2 Kolom utama 20/25 m3
3 Ring balk beton 15/20 m3

II PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata,1 pc : 4ps m2

III PEKERJAAN PLESTERAN DAN ACIAN


1 Plesteran m2
2 Acian m2
3 Transram m2

IV PEKERJAAN KAYU
1 Pasangan kusen pintu dan jendela kayu borneo super m2
2 Daun pintu panil kayu kamper m2

V PEKERJAAN PASANGAN
1 Pasangan kunci tanam biasa bh
2 pasangan kunci tanam kamar mandi bh
3 pasangan engsel pintu bh
4 pasangan engsel angin bh
5 pasangan kunci slot jendela bh
6 pasangan kunci slot pintu bh
7 pasangan kaca tebal 5mm m2
8 pegangan pintu bh
9 pegangan jendela bh

VII PEKERJAAN PENUTUP LANTAI DINDING


1 Pasangan lantai keramik 40x40cm m2
2 Pasangan lantai keramik 20x20cm m2

VIII PEKERJAAN PENGECETAN


1 Pengecatan interior m2
2 pengecatan eksterior m2
3 pengecatan kusen m2
4 pengecatan plafond m2

IX PEKERJAAN LANGIT-LANGIT
Pemasangan Plafond m2

XI PEKERJAAN ATAP
1 pasangan konstruksi kuda kuda baja ringan m3
2 pasangan atap genteng m2
3 pasangan bubungan genteng m'
4 pasangan lisplank m'
L OF QUALITY

HARGA SATUAN (RP) JUMLAH HARGA (RP)

5 6

19,100.00 -
10,000.00 - -
-
-
45,200.00 -
33,000.00 -
121,900.00 -
121,900.00 -
- -
-
562,310.00 -
562,310.00 - -
-
-
1,233,001.00 -
1,233,001.00 -
3,866,049.00 -
2,804,900.00 -
3,928,000.00 -
2,804,900.00 -
196,240.00 -
3,043,900.00 -
-
-
96,961.00 -
-
-
46,837.00 -
25,000.00 -
47,390.00 -
-
-
5,524,600.00 -
270,500.00 -
-
-
264,000.00 -
105,792.00 -
49,400.00 -
49,400.00 -
40,900.00 -
46,900.00 -
84,900.00 -
44,837.00 -
40,900.00 -
-
-
116,200.00 -
182,400.00 -
-
-
15,700.00 -
15,700.00 -
46,400.00 -
32,000.00 -
-
-
103,593.00 -
-
-
-
-
3,866,049.00 -
2,804,900.00 -
3,928,000.00 -
-
-
96,961.00 -
-
-
46,837.00 -
25,000.00 -
47,390.00 -
-
-
5,524,600.00 -
270,500.00 -
-
-
264,000.00 -
105,792.00 -
49,400.00 -
49,400.00 -
40,900.00 -
46,900.00 -
84,900.00 -
44,837.00 -
40,900.00 -
-
-
-
116,200.00 -
182,400.00 -
-
-
15,700.00 -
15,700.00 -
46,400.00 -
32,000.00 -
-
-
103,593.00 -
-
-
-
165,000.00 -
89,915.00 -
75,800.00 -
63,151.87 -

JUMLAH TOTAL HARGA -


BIAYA OVERHEAD LAINNYA 10% -
TOTAL JUMLAH HARGA -
DIBULATKAN -
REKAPITULASI

NO JENIS PEKERJAAN

1 PEKERJAAN PERSIAPAN
2 PEKERJAAN TANAH
3 PEKERJAAN PONDASI
4 PEKERJAAN BETON
5 PEKERJAAN DINDING
6 PEKERJAAN KAYU
7 PEKERJAAN PLESTERAN & ACIAN
8 PEKERJAAN PASANGAN
9 PEKERJAAN ATAP
10 PEKERJAAN LANGIT-LANGIT
11 PEKERJAAN PENUTUP LANTAI DAN DINDING
13 PEKERJAAN PENGECATAN

JUMLAH HARGA
BIAYA OVERHEAD LAINNYA 10%
TOTAL JUMLAH HARGA
DIBULATKAN
TULASI

HARGA PEKERJAAN (Rp.)

-
-
-
-
NO URAIAN PEKERJAAN VOLUME SATUAN

LANTAI I
I PEKERJAAN PERSIAPAN
1 Pekerjaan pemasangan bowplank m'
2 Pekerjaan pembersihan lapangan m2

II PEKERJAAN TANAH
1 Galian tanah biasa m3
2 Urugan tanah kembali m3
3 Urugan pasir bawah pondasi m3
4 Urugan pasir bawah lantai m3

III PEKERJAAN PONDASI


1 Pasangan pondasi batu kali m3
2 Pasangan pondasi rolagh m3

IV PEKERJAAN BETON
1 Pasangan pondasi tapak type 1 m3
2 pasangan pondasi tapak type 2 m3
4 kolom praktis 15/15 m3
5 Kolom utama 20/25 m3
9 Ring balk beton 15/20 m3
10 Balok anak 20/25 m3
12 Pekerjaan tangga m3
13 Pekerjaan plat lantai m3

V PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata,1 pc : 4ps m2

VI PEKERJAAN PLESTERAN DAN ACIAN


1 Plesteran m2
2 Acian m2
3 Transram m2

VII PEKERJAAN KAYU


1 Pasangan kusen pintu dan jendela kayu borneo super m2
2 Daun pintu panil kayu kamper m2
VII PEKERJAAN PASANGAN
1 Pasangan kunci tanam biasa bh
2 pasangan kunci tanam kamar mandi bh
3 pasangan engsel pintu bh
4 pasangan engsel angin bh
5 pasangan kunci slot jendela bh
6 pasangan kunci slot pintu bh
7 pasangan kaca tebal 5mm m2
8 pegangan pintu bh
9 pegangan jendela bh

IX PEKERJAAN PENUTUP LANTAI DINDING


1 Pasangan lantai keramik 40x40cm m2
2 Pasangan lantai keramik 20x20cm m2

X PEKERJAAN PENGECETAN
1 Pengecatan interior m2
2 pengecatan eksterior m2
3 pengecatan kusen m2
4 pengecatan plafond m2

XI PEKERJAAN LANGIT-LANGIT
Pemasangan Plafond m2

LANTAI II
I PEKERJAAN BETON
1 kolom praktis 15/15 m3
2 Kolom utama 20/25 m3
3 Ring balk beton 15/20 m3

II PEKERJAAN DINDING
1 Pasangan bata merah tebal 1/2 bata,1 pc : 4ps m2

III PEKERJAAN PLESTERAN DAN ACIAN


1 Plesteran m2
2 Acian m2
3 Transram m2

IV PEKERJAAN KAYU
1 Pasangan kusen pintu dan jendela kayu borneo super m2
2 Daun pintu panil kayu kamper m2

V PEKERJAAN PASANGAN
1 Pasangan kunci tanam biasa bh
2 pasangan kunci tanam kamar mandi bh
3 pasangan engsel pintu bh
4 pasangan engsel angin bh
5 pasangan kunci slot jendela bh
6 pasangan kunci slot pintu bh
7 pasangan kaca tebal 5mm m2
8 pegangan pintu bh
9 pegangan jendela bh

VII PEKERJAAN PENUTUP LANTAI DINDING


1 Pasangan lantai keramik 40x40cm m2
2 Pasangan lantai keramik 20x20cm m2

VIII PEKERJAAN PENGECETAN


1 Pengecatan interior m2
2 pengecatan eksterior m2
3 pengecatan kusen m2
4 pengecatan plafond m2

IX PEKERJAAN LANGIT-LANGIT
Pemasangan Plafond m2

XI PEKERJAAN ATAP
1 pasangan konstruksi kuda kuda baja ringan m3
2 pasangan atap genteng m2
3 pasangan bubungan genteng m'
4 pasangan lisplank m'

JUMLAH
NILAI PEKERJAAN (RP) BOBOT PEK (%)

#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!

#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!

#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0! #DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
0.00 #DIV/0! #DIV/0!
JADWAL PELAKSANAAN PEKERJAAN

NO. JENIS PEKERJAAN I II


1 2 3 4 1
1 PEKERJAAN PERSIAPAN
2 PEKERJAAN TANAH
3 PEKERJAAN PONDASI
4 PEKERJAAN BETON
5 PEKERJAAN DINDING
6 PEKERJAAN KAYU
7 PEKERJAAN PLESTERAN & ACIAN
8 PEKERJAAN PASANGAN
9 PEKERJAAN PENUTUP ATAP
10 PEKERJAAN LANGIT-LANGIT
11 PEKERJAAN PENUTUP LANTAI DAN DINDING
13 PEKERJAAN PENGECETAN
AKSANAAN PEKERJAAN

II III IV
2 3 4 1 2 3 4 1 2 3 4
BOBOT
NO. JENIS PEKERJAAN BULAN KE... I
MINGGGU KE.. 1 2
1 PEKERJAAN PERSIAPAN -
2 PEKERJAAN TANAH -
3 PEKERJAAN PONDASI -
4 PEKERJAAN BETON -
5 PEKERJAAN DINDING
6 PEKERJAAN KAYU
7 PEKERJAAN PLESTERAN & ACIAN
8 PEKERJAAN PASANGAN
9 PEKERJAAN PENUTUP ATAP
10 PEKERJAAN LANGIT-LANGIT
11 PEKERJAAN PENUTUP LANTAI DAN DINDING
13 PEKERJAAN PENGECETAN
Jumlah -
Rencana - -
Rencana komulatif
KURVA S

I II III
3 4 1 2 3 4 1 2 3

- - -
- -
- - -
- -
- -
-

- - - - - - - - -
I IV
4 1 2 3 4

-
- - -
- - -

- - - - -

Anda mungkin juga menyukai