Anda di halaman 1dari 3

SAFETY PRAKTIS

KELOMPOK 7

Eki Lawa 21020069

Reza Isnawan Fachrullah 21020060

Asril 21020087

Alif Furqan 21020058

Muhammad Ishak 21020049

FIRE AND SAFETY B 21

ASPEK YANG DI
ANALISA GAMBAR 1 GAMBAR 2
Perbaikan atau perawatan instalasi
PEKERJAAN pada mesin Perbaikan kabel listrik
Safety Helmet, Safety Insulation Safety Helmet, Safety Insulation
Gloves, Safety Glasses/Goggles, Gloves, Safety Glasses/Goggles,
APD YANG HARUS Face Sheild, Electrician Safety Electrician Safety Shoes,
DIKENAKAN Shoes, Insulation Mat, Wearpack/Fire Suit, Full Body
Wearpack/Fire Suit Harnes
APA PEKERJA
SUDAH
MENGENAKAN APD Tidak Tidak
SESUAI PADA
GAMBAR?
Safety Helmet, Safety Insulation
Safety Insulation Gloves, Safety
Gloves, Safety Glasses/Goggles,
APD YANG TIDAK Glasses/Goggles, Face Sheild,
Electrician Safety Shoes,
DIKENAKAN Electrician Safety Shoes, Insulation
Wearpack/Fire Suit, Full Body
Mat, Wearpack/Fire Suit
Harnes
DAMPAK YANG
DAPAT
DIAKIBATKAN Electrical shock, electrical burns, Electrical shock, electrical burns,
AKIBAT electrical injury, death, fire, loss of electrical injury, death, fire, loss of
PENGGUNAAN APD muscle control muscle control
TIDAK LENGKAP /
SESUAI
- Cek peralatan dan APD
apakah sudah sesuai
- Cek power point, three pin - Cek peralatan dan APD
plug dalam keadaan bagus apakah sudah sesuai
- Menutup erlengkapan - Memakai ELCB
CARA KERJA AMAN listrik dengan - Menggunakan full body
panel/switchgear harness
- Gunakan equipment - Menggunakan tangga
bertegangan rendah
- Gunakan peralatan ELCB
jika menggunakan 230 v
PENGAPLIKASIAN
GAMBAR 1 GAMBAR 2
SERTIFIKASI
SEBELUM SERTIFIKASI
(ALAT,SDM(KEAHLIAN),
KESEHATAN( MCU)) (ALAT,SDM(KEAHLIAN), KESEHATAN(
MCU))
SEBELUM
SEBELUM
CHECK EQUIPMENT/TOOL YANG
AKAN DIGUNAKAN CHECK EQUIPMENT/TOOL YANG AKAN
DIGUNAKAN
CHECK KESIAPAN APD/PPE YANG
DIGUNAKAN PERSIAPKAN BODYHARNESS DAN
TANGGA
STANDAR OPERATIONAL
PROCEDUR(SOP) CHECK KESIAPAN APD/PPE YANG
DIGUNAKAN
JSA/HIRADC DIBUAT
STANDAR OPERATIONAL
PERMIT TO WORK(PTW) ISOLASI PROCEDUR(SOP)
ENERGI (GUNAKAN LOTO, ETC)
JSA/HIRADC DIBUAT
PASANG BARIER/SIGN DI SEKITAR
WILAYAH KERJA PERMIT TO WORK(PTW) ISOLASI
ENERGI (GUNAKAN LOTO,KETINGGIAN
DIDAMPINGI PENGAWAS(SPV & ETC)
HSE OFFICER)
PASANG BARIER/SIGN DI SEKITAR
TOOLBOX MEETING WILAYAH KERJA

DIDAMPINGI PENGAWAS(SPV & HSE


OFFICER)

TOOLBOX MEETING
GUNAKAN APD YANG SESUAI GUNAKAN APD YANG SESUAI

SAAT CHECK APAKAH ARUS MASIH PASANG TANGGA DAN BODYHARNESS


ADA(TEST PEN, VOLT METER, ETC)
CATAT KONDISI / HAL YANG CHECK APAKAH ARUS MASIH
DIPEROLEH ADA(TEST PEN, VOLT METER, ETC)
CATAT KONDISI / HAL YANG
LAPORKAN KEPADA SPV/ATASAN DIPEROLEH
MENGENAI DATA YANG
DIPEROLEH LAPORKAN KEPADA SPV/ATASAN
MENGENAI DATA YANG DIPEROLEH

SESUDAH
SIMPAN HASIL YANG DIPEROLEH SIMPAN HASIL YANG DIPEROLEH

LAKUKAN HIGYENE(BERESKAN LAKUKAN HIGYENE(BERESKAN

PERALATAN, BERSIHKAN AREA PERALATAN, BERSIHKAN AREA KERJA)


KERJA) SAMPAIKAN HASIL PADA SAMPAIKAN HASIL PADA SAFETY
SAFETY
MEETING
MEETING
RECORD DAN SIMPAN HASIL SAFETY
RECORD DAN SIMPAN HASIL MEETING YANG DITANDATANGANI
SAFETY MEETING YANG DIREKTUR
DITANDATANGANI DIREKTUR
JADIKAN BAHAN EVALUASI DENGAN
JADIKAN BAHAN EVALUASI
DENGAN HASIL PEMERIKSAAN KEDEPAN

HASIL PEMERIKSAAN KEDEPAN


LAMPIRAN :

Anda mungkin juga menyukai