Anda di halaman 1dari 2

1 UPAH PEKERJA

NO JENIS PEKERJA KODE SATUAN HARGA RP

1 PEKERJA L.01 Hr 81,000.00


2 TUKANG GALI L.02 Hr 83,000.00
3 TUKANG BATU L.02 Hr 89,000.00
4 TUKANG KAYU L.02 Hr 89,000.00
5 TUKANG BESI L.02 Hr 89,000.00
6 TUKANG CAT L.02 Hr 89,000.00
7 TUKANG PIPA L.02 Hr 89,000.00
8 TUKANG LAS L.02 Hr 89,000.00
9 TUKANG PENGANYAMAN L.02 Hr 89,000.00
10 KEPALA TUKANG L.03 Hr 95,000.00
11 MANDOR L.04 Hr 99,000.00
12 MEKANIK L.07 Hr 89,000.00
13 OPERATOR ALAT BERAT L.08 Hr 89,000.00
14 PEMBANTU OPERATOR L.09 Hr 85,000.00
15 SUPIR L.10 Hr 89,000.00
16 PENJAGA MALAM L.12 Hr 81,000.00
II BAHAN

HARGA RP
NO SATUAN HARGA PER KG
I BAHAN TAMBANG

Anda mungkin juga menyukai