101,292,202
NAMA PEKERJAAN PERBAIKAN PLASA TELKOM NON DIGITAL TW-I TAHUN 2021
LOKASI PEKERJAAWITEL KEDIRI, Jl. Hayam Wuruk No. 45 - 47, Kediri
TAHUN PEKERJAAN2021
PART_NUMBER DESKRIPSI SATUAN PK_MTU UNIT_PRICE_MATERIALS UNIT_PRICE_SERVICES QTY TOTAL HARGA
ITM0001 PEKERJAAN INTERIOR
ITM0002 - Pengecatan dinding ruang layanan solution room dan back office m2 RP. 20,184 12,167 418.90
ITM0004 - Penggantian Backdrop dibelakang CSR yg sudah kusam dengan pudar Acryli titik RP. 6,336,000 1,900,800 1.00 8,236,800
ITM0005 - Penambahan Lampu Penerangan + instalasi titik RP. 96,000 20,000 10.00 1,160,000
ITM0001 - Pengecatan Furnitur (Duco) m2 RP. 89,230 98,780 18.53 3,483,825
ITM0002 - Rekondisi Meja CSR bh RP. 299,746 96,658 4.00 1,585,617
ITM0004 Penggantian Keramik Plasa
ITM0005 - Pekerjaan bongkar Keramik m2 RP. - 21,480 208.00 4,467,840
ITM0001 - Pekerjaan Pasang lantai 60x60 m2 RP. 186,000 46,500 208.00 48,360,000
ITM0002 Instalasi Listrik
ITM0004 Pasang Sakelar titik RP. 40,480 12,600 10.00 530,800
ITM0005 Pasang Stopkontak titik RP. 47,872 12,600 10.00 604,720
ITM0001 PEKERJAAN EXTERIOR -
ITM0002 Pengecatan luar gedung Plasa -
ITM0004 - Pekerjaan Pengecatan Dinding m2 RP. 20,184 12,167 52.00
ITM0005 - Pekerjaan Pengecatan Listplank m2 RP. 20,184 12,167 56.00
ITM0001 Pekerjaan Exterior Lain -
ITM0002 Perbaikan pintu Utama plasa (Floor Hinge dan slot kunci) bh RP. 2,060,000 309,000 2.00 4,738,000
ITM0004 Penggantian Sticker Sanblast m2 RP. 60,019 38,743 20.00 1,975,242
ITM0005 Perbaikan signage dan penggantian LED Acrilyc ls RP. 14,976,000 3,692,800 1.00 18,668,800
ITM0001 Perbaikan NeonBox PylonSign bh RP. 4,593,680 1,378,104 1.00 5,971,784
ITM0002 Pekerjaan sanitasi -
ITM0004 - Perbaikan saluran air bersih m RP. 37,188 12,047 30.00 1,477,057
ITM0005 - Pasang wastafel bh RP. 464,600 139,380 1.00 603,980
ITM0001 - Pasang Cermin bh RP. 304,000 60,800 1.00 364,800
PEKERJAAN RELOKASI
Kabel LAN meter RP. 6,000 2,100 100.00 810,000
Hub TpLink 8port pcs RP. 385,000 134,750 1.00 519,750
AP Tp Link pcs RP. 325,000 113,750 1.00 438,750
Rj45 1box box RP. 100,000 35,000 1.00 135,000
Kabel 3x1,5 roll RP. 525,000 183,750 1.00 708,750
Stop Kontak pcs RP. 27,500 9,625 5.00 185,625
Stecker Broco pcs RP. 10,000 3,500 5.00 67,500
Kabel Duck pcs RP. 20,000 7,000 20.00 540,000
Isolasi 3m pcs RP. 10,000 3,500 2.00 27,000
Relokasi Plasa ls 1.00
Perbaikan Partisi m2 107,800 86,026 40.00 7,753,029
Plamir partisi m2 6,127 37,739 40.00 1,754,652
Pengecatan partisi m2 17,576 15,209 63.33 2,076,357
Perbaikan Gawangan m2 178,773 77,468 7.92 2,029,434
RP. 119,275,114
119,275,114
100.00% 87.76%