Anda di halaman 1dari 3

Penentuan Penetrasi Maksimal Pembangkit EBT Intermiten pada Setiap Subsistem Jawa-Bali

66 Dr. Ir., DEA


Febian Melwa Reksa Aditya, Lesnanto Multa Putranto, S.T., M.Eng, Ph.D; Sasongko Pramono H, Prof.
Universitas Gadjah Mada, 2019 | Diunduh dari http://etd.repository.ugm.ac.id/

DAFTAR PUSTAKA

[1] UNFCCC. Conference of the Parties (COP), “Paris Agreement,” Adopt. Paris Agreement.
Propos. by Pres., vol. 21932, no. December, p. 32, 2015.

[2] United Nations, “United Nations Treaty Collection,” 2015. [Online]. Available:
https://treaties.un.org/pages/ViewDetails.aspx?src=TREATY&mtdsg_no=XXVII-7-
d&chapter=27&clang=_en. [Accessed: 24-Mar-2019].

[3] Kementerian Energi dan Sumber Daya Mineral, Kajian Penggunaan Faktor Emisi Lokal
(Tier 2) dalam Kajian Inventarisasi GRK Sektor Energi, Cetakan Pe. Jakarta: Pusat Data
dan Teknologi Informasi, Kementerian Energi dan Sumber Daya Mineral, 2017.

[4] Pemerintah Republik Indonesia, Peraturan Pemerintah Republik Indonesia Nomor 79


Tahun 2014 Tentang Kebijakan Energi Nasional. Jakarta, Indonesia, 2014, p. 8.

[5] Tim Komunikasi Kementerian Energi dan Sumber Daya Mineral, “Capaian Sub Sektor
Ketenagalistrikan dan EBTKE Tahun 2017,” 2018. [Online]. Available:
https://www.esdm.go.id/en/media-center/arsip-berita/capaian-2017-dan-outlook-2018-
subsektor-ketenagalistrikan-dan-ebtke-. [Accessed: 24-Mar-2019].

[6] Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi, “Statistik EBTKE
2016,” 2016.

[7] E. Y. Pramono and S. Isnandar, “Criteria for Integration of Intermittent Renewable Energy
to the Java Bali Grid,” Int. Conf. High Volt. Eng. Power Syst. ICHVEPS 2017 - Proceeding,
pp. 91–94, 2017.

[8] M. Huber, D. Dimkova, and T. Hamacher, “Integration of Wind and Solar Power in Europe:
Assessment of Flexibility Requirements,” Energy, vol. 69, pp. 236–246, 2014.

[9] Kementerian Energi dan Sumber Daya Mineral, Rencana Usaha Penyediaan Tenaga Listrik
Tahun 2019-2028. Jakarta: Kementerian Energi dan Sumber Daya Mineral, 2019.

[10] PT PLN (Persero) Pusat Pengatur Beban, Evaluasi Operasi Sistem Jawa Bali 2017. Jakarta:
PT PLN (Persero) Pusat Pengatur Beban, 2018.

[11] California Independent System Operator, “What the duck curve tells us about managing a
green grid,” CommPR, pp. 1–4, 2013.
Penentuan Penetrasi Maksimal Pembangkit EBT Intermiten pada Setiap Subsistem Jawa-Bali
67 Dr. Ir., DEA
Febian Melwa Reksa Aditya, Lesnanto Multa Putranto, S.T., M.Eng, Ph.D; Sasongko Pramono H, Prof.
Universitas Gadjah Mada, 2019 | Diunduh dari http://etd.repository.ugm.ac.id/

[12] Sarjiya et al., “Wind and Solar Power Plant Modelling and its Impact to the Jawa-Bali
Power Grid,” Asia-Pacific Power Energy Eng. Conf. APPEEC, vol. 2018-Octob, pp. 274–
279, 2018.

[13] M. Rosyied, “Evaluasi Penetrasi Pembangkit Energi Baru Terbarukan Intermittent pada
Sistem Kelistrikan Jawa-Bali,” Universitas Gadjah Mada, Yogyakarta, Indonesia, 2018.

[14] Kementerian Energi dan Sumber Daya Mineral, Peraturan Menteri Energi dan Sumber
Daya Mineral Nomor 03 Tahun 2007 Tentang Aturan Jaringan Sistem Tenaga Listrik Jawa-
Madura-Bali. Indonesia, 2007.

[15] A. Feldmuller, “Flexibility of Coal and Gas Fired Power Plants,” Advanced Power Plant
Flexibility Campaign, Paris, Sep-2017.

[16] C. Henderson, “Coal-Fired Power Plants – Flexibility Options and Challenges,” 2016, no.
October, p. 32.

[17] Agora Energiewende, “Agora Energiewende (2017): Flexibility in Thermal Power Plants –
With a Focus on Existing Coal-Fired Power Plants,” Berlin, 2017.

[18] D. Streng, “The Role of run-of-river hydropower dispatchability in power system


flexibility,” Universiteit Utrecht, 2018.

[19] Cambridge University Press, “INTERMITTENT | meaning in the Cambridge English


Dictionary.” [Online]. Available:
https://dictionary.cambridge.org/dictionary/english/intermittent. [Accessed: 11-Apr-2019].

[20] Siemens, “Renewable Energy: Solar Thermal Power,” Munich, 2010.

[21] W. K. Shinwari, F. Ali, and A. H. Nayyar, “Electric Power Generation from Solar
Photovoltaic Technology: Is It Marketable in Pakistan?,” Pak. Dev. Rev., vol. 43, no. 3, pp.
267–294, 2004.

[22] J. E. Gray, “Wind Power Today & Tomorrow,” Electron. Power, vol. 20, no. 2, p. 75, 2010.

[23] V. Christensen, “Power Curve for Wind Turbines,” WIT Trans. State Art Sci. Eng., vol. 44,
pp. 1755–8336, 2010.

[24] J. Cochran et al., “Flexibility in 21st Century Power Systems.” Clean Energy Ministerial,
2014.

[25] The MathWorks, “System Requirements - Release 2017b,” 2017. [Online]. Available:
Penentuan Penetrasi Maksimal Pembangkit EBT Intermiten pada Setiap Subsistem Jawa-Bali
68 Dr. Ir., DEA
Febian Melwa Reksa Aditya, Lesnanto Multa Putranto, S.T., M.Eng, Ph.D; Sasongko Pramono H, Prof.
Universitas Gadjah Mada, 2019 | Diunduh dari http://etd.repository.ugm.ac.id/

https://www.mathworks.com/content/dam/mathworks/mathworks-dot-
com/support/sysreq/files/SystemRequirements-Release2017b_Windows.pdf. [Accessed:
31-Mar-2019].

[26] M. Zoppi, M. Tipaldi, and A. Di Cerbo, “Cross-Model Verification of The Eelectrical


Power Subsystem in Space Projects,” Meas. J. Int. Meas. Confed., vol. 122, no. January,
pp. 473–483, 2018.

[27] Badan Meteorologi Klimatologi dan Geofisika (BMKG), “BMKG | AWS Rekayasa.”
[Online]. Available: http://202.90.199.132/aws-new/. [Accessed: 06-Apr-2019].

[28] G. Papaefthymiou, E. Haesen, and T. Sach, “Power System Flexibility Tracker: Indicators
to Track Flexibility Progress Towards High-RES Systems,” Renew. Energy, vol. 127, pp.
1026–1035, 2018.

Anda mungkin juga menyukai