PERHITUNGAN ABUTMENT

III. 1. PERHITUNGAN ABUTMENT


I. Analisa Pembebanan 2572
1. Elemen bangunan atas/Beban mati super struktur (DL)
~ Berat gelagar induk = 5 . ( 0,257 . 13 . 2500 ) = 41795 kg
~ Berat trotoar = 2 . ( 0,2 . 1. 13 . 2400 ) = 12480 kg
~ Berat lantai kendaraan = 0,2 . 8. 13 . 2400 = 49920 kg
~ Berat lapisan aspal = 0,05 . 8. 13 . 2200 = 11440 kg
~ Berat air hujan = 0,05 . 8. 13 . 1000 = 5200 kg
Total = 120835 kg
Untuk satu abutment = 60417,5 kg
Jadi PND = 60,4175 ton

2. Beban hidup (LL)


~ Beban garis P = 12 ton/jalur
7 m
100%P
50%P

8,0 m

12
P = = 4,364 t/m
2,75

~ Beban jalur

1,1
q = 2,2 - .( L - 30 )
60

1,1
= 2,2 - .( 13 - 30 )
60

q = 2,2 t/m2

PNH = (q . 5,5) . 100% + (q . 1,5) . 50% . 0,5 . L + (P . 5,5) . 100% + (P . 1,5) . 50%

= 116,6477 ton Untuk satu abutment = 58,32386 ton


3. Perhitungan Berat Konstruksi
a. Abutmen
0,2 0,2 1,6 m

0,65 m
I

II 0,9 m

III 0,4 m

IV V 0,4 m
0,7 m

8 m

VI
4,85 m

VII VIII 0,3 m

IX 0,5 m
1,45 0,6 1,45

Menentukan lokasi titik berat abutment


Luas (F) Jarak xa Jarak ya
Bagian 2 Berat (t) Mx My
m (m) (m)
I 0,13 3,432 2,45 7,675 8,4084 26,3406
II 0,36 9,504 2,55 6,9 24,2352 65,5776
III 0,8 21,12 1,75 6,25 36,96 132
IV 0,14 3,696 2,283333 5,916667 8,4392 21,868
V 0,14 3,696 1,216667 5,916667 4,4968 21,868
VI 3,33 87,912 1,75 3,275 153,846 287,9118
VII 0,2175 5,742 2,533333 0,6 14,5464 3,4452
VIII 0,2175 5,742 0,966667 0,6 5,5506 3,4452
IX 1,75 46,2 1,75 0,25 80,85 11,55
187,044 337,3326 574,0064

Mx 337,3326 Torsi M = G . Xo = 187,044 . 0,053493


Xca = = = 1,803493 m
G 187,044 = 10,0056 tm

My 574,0064
Yca = = = 3,068831 m
G 187,044
b. Sayap
2,7 m 0,2 0,6

0,65 m I

0,9 m
0,9 m
II
0,4 m

0,4 m III
IV

1,05 m V

VI
3,80 VII

0,3 m 1,75 VIII


0,5 m
1,45 0,6 1,45

Luas (F) Jarak Xo Jarak Yo


Bagian 2 Berat (t) Mx My
m (m) (m)
I 1,755 2,5272 2,15 7,675 5,43348 19,39626
II 3,25 4,68 2,25 6,7 10,53 31,356
III 1 1,44 2,25 5,85 3,24 8,424
IV 0,14 0,2016 0,766667 5,783333 0,15456 1,16592
V 3,36 4,8384 3,5 5,125 16,9344 24,7968
VI 3,325 4,788 2,333333 3,333333 11,172 15,96
VII 5,51 7,9344 1,025 2,7 8,13276 21,42288
VIII 0,2175 0,3132 1,266667 0,7 0,39672 0,21924
26,7228 55,99392 122,7411

Torsi Mx = 55,99392 tm

122,7411
y = = 4,593 m
26,7228
c. Berat tanah
0,2 0,2 0,6

0,65 m I

1,3 m II

0,4 m III
IV
0,7 m

4,85 m V

0,3 m VI
0,5 m
1,45 0,6 1,45

Menentukan lokasi titik berat abutment


Luas (F) Jarak Xo Jarak Yo
Bagian 2 Berat (t) Mx My
m (m) (m)
I 0,6175 11,5596 1,275 7,675 14,73849 88,71993
II 0,975 18,252 1,375 6,7 25,0965 122,2884
III 0,3 5,616 1,375 5,85 7,722 32,8536
IV 0,14 2,6208 0,766667 5,783333 2,00928 15,15696
V 7,0325 131,6484 1,025 3,225 134,9396 424,5661
VI 0,2175 4,0716 1,266667 0,7 5,15736 2,85012
173,7684 189,6632 686,4351

Torsi Mx = 189,6632 tm

686,4351
y = = 3,95 m
173,7684
4. Tekanan Tanah Normal
- Berat jenis tanah = 1,8 ton/m3
0
- Sudut geser dalam tanah j = 29
- Koefisien tekanan tanah
Ka = tan2 (45 - f/2) = 0,35
2
Kp = tan (45 + f/2) = 2,88
- Beban merata dibelakang abutment diperhitungkan senilai dengan muatan tanah setinggi
60 cm (PPPJJR, hal 13)
q = gt . h = 1,8 . 0,6 = 1,08 tm/m2

Diagram tekanan tanah


q = 1,08 tm/m2

3,8

Pa1

Pa2

1,7

~ Tekanan tanah aktif


Pa1 = q . H . Ka . L
= 1,08 . 8 . 0,35 . 8
= 23,98 ton

Pa2 = 1/2 gt . H2 . Ka . L
2
= 1/2 . 1,8 . 8 . 0,35 . 8
= 159,9 ton

Pa total = 183,9 ton

SMPa = Pa1 (1/2 H) + Pa2 (1/3 H)


= 23,98 . 4 + 159,9 . 2,667
= 522,3 tm
~ Tekanan tanah Pasif
Pp = 1/2 gt . H2 . Kp . L
2
= 1/2 . 1,8 . 1,70 . 2,88 . 8
= 59,97 ton

SMPp = Pp (1/3) H = 33,98

~ Tekanan tanah pada saat gempa bumi


Koef. Tekanan tanah
0
Data tanah : f = 29
Eh Dimana Eh = 0,1, Ev = 0
fo = Arc tan
L - Ev
0
fo = 5,7106
- Aktif
KEA = cos2 (f - fo) = 0,843678152
2 sin f . sin (f - fo) 2 0,191682 2
cos fo 1 + 0,990099 . 1 +
cos fo 0,995037

= 0,843678152
0,990099 . 2,070449

= 0,411561

- Pasif
KEP= cos2 (f - fo) = 0,843678152
sin f . sin (f - fo) 0,191682
cos2 fo 1 - 2
0,990099 . 1 - 2
cos fo 0,995037

= 0,843678152
0,990099 . 0,314827

= 2,706612

Koef. Tekanan tanah akibat gempa


- Aktif
PEA1 = q . H . KEA . L = 1,08 . 8 . 0,412 . 8= 28,45 t

2
PEA2 = 1/2 gt . H . KEA . L = 1/2 . 1,8 . 8 . 0,412 . 8= 189,6471 t

PEA tot = 218,0942 t


SMPEA = PEA1 (1/2 H) + PEA2 (1/3 H)
= 28,45 . 4 + 189,6 . 2,667
= 619,5 tm

- Pasif
PEp = 1/2 gt . H2 . KEp . L
2
= 1/2 . 1,8 . 1,70 . 2,71 . 8
= 56,32 ton

SMPa = Pp (1/3) H = 31,91 tm

5. Beban Angin
1. Beban angin tegak lurus
(50% . (30% + 50%) . (L - 5) - H . 150 + 100% . L . 2 . 150)
Ar =
2

Dimana : L = 13 m
H = 3,55 m
Ar = -2214,65 t

2. Beban angin arah memanjang


Al = 2 ( 6 + 2 . 0,5) . 150
= 2,1 ton

Menurut ketentuan gaya angin yang dipilih adalah arah memanjang Al = 2,1 t setinggi
H = 5,5 m
MAl = 2,1 . 5,5 = 11,55 tm

6. Gaya Gesek Tumpuan (Gg) bekerja pada ketinggian H = 6,45 m

Gg = 0,15 . Beban mati


= 0,15 . 60,4175 = 9,062625 t

MGg = 9,062625 . 6,45 = 58,45393 tm

7. Gaya gempa horisontal eqivalent akibat gempa (Gh)


Koef. Gempa horisontal (Kh)
Kh = Kr . f . p . b

0,3 Mp + Ma
Tg = 2p . h3
3 EI . g

Dimana : Mp = 187,044
Ma = 60,4175
E = 6400 sb = 6400 225 = 960000 t/m2
3
I = 1/12 . 3,5 . 8 = 149,3333 m4
g = 9,8 m/det2
h = 8 m

0,3 . 187,044 + 60,4175 3


Tg = 2p . 8
3 . 960000 . 149,3333 . 9,8

= 0,534641 Zone IV diperoleh Kr = 0,05


Beban mati struktur yang ditinjau
1. Beban mati diatas struktur (M = 60,4175 tm)
Gh1 = 0,1 . 60,4175 = 6,04175 t
MGh1 = 6,04175 . 8 = 48,334 t

2. Akibat beban mati abutment (M = 187,044 tm)


Hg1 = 3,068831 m
Gh2 = 0,1 . 187,044 = 18,7044 t
MGh2 = 18,7044 . 3,069 = 57,40064 t

3. Akibat beban mati sayap (M = 26,7228 tm)


Hg3 = 4,593123 m
Gh3 = 0,1 . 26,7228 = 2,67228 t
MGh3 = 2,67228 . 4,593 = 12,27411 t

Sehingga SGh = 27,41843


SMGh = 118,0088

8. Beban rem (Rm) bekerja setinggi H = 5,35 + 1,2 = 6,55 m

Rm = 5% dari beban mati total


= 5% . 58,32386
= 2,916193 t

MRm = 2,916193 . 6,55


= 19,10107 tm

9. Beban merata permukaan


Q = 1,08 . 27,5 = 29,7 tm Plat injak (5,6/2 . 2,4) = 6,72 t
M = 29,7 . 2,25 = 66,825 tm
Rekapitulasi Gaya pada Abutment
Vertikal Horisontal
No. Gaya pada abutment Simbol Mx My
V (ton) H (ton)
I.
a. Beban mati 60,4175
b. Beban hidup 58,32386
c. Gaya rem Rm -2,91619318 -19,10106534
d. Gaya gesek Gg -9,062625 -58,45393125
e. Beban angin A -2,1 -11,55
f. Beban gempa Gh -27,41843 -118,00875
g. Beban merata q 29,7
h. Plat injak 6,72 66,825

II. Bangunan bawah


a. Berat abutment 187,044 10,0056
b. Berat sayap 26,7228 55,99392
c. Berat tanah 173,7684 189,66324

III. Tekanan tanah T


a. Keadaan normal Ta -123,898573 -488,3101233
1. Aktif Taa -183,868479 -522,2930699
2. Pasif Tap 59,96990587 33,98294666
b. Keadaan gempa Tg -161,774987 -587,5996506
1. Aktif Tga -218,094161 -619,5138495
2. Pasif Tgp 56,31917446 31,91419886

Mmv = 322,4878 t
Mv = 484,3727

KOMBINASI PEMBEBANAN
1. KOMBINASI I
Muatan V (ton) H (ton) MV ton.m MH (ton.m)
M 484,3727 322,48776
H 58,32386364
Ta -123,898573 -488,310123
Tu
100% 542,6965636 -123,898573 322,48776 -488,310123
100% 542,6965636 -123,898573 322,48776 -488,310123

2. KOMBINASI II
Muatan V (ton) H (ton) MV ton.m MH (ton.m)
M 484,3727 322,48776
Ta -123,898573 -488,310123
Gg -9,062625 -58,4539313
A -2,1 -11,55
125% 484,3727 -135,061198 322,48776 -558,314055
100% 387,49816 -108,048958 257,990208 -446,651244

3. KOMBINASI III
Muatan V (ton) H (ton) MV ton.m MH (ton.m)
M 542,6965636 -123,898573 322,48776 -488,310123
Rm -2,91619318 -19,1010653
Gg -9,062625 -58,4539313
A -2,1 -11,55
140% 542,6965636 -137,977391 322,48776 -577,41512
100% 387,6404026 -98,5552793 230,3484 -412,439371

4. KOMBINASI IV
Muatan V (ton) H (ton) MV ton.m MH (ton.m)
M 484,3727 322,48776
Gh -27,41843 -118,00875
Tag -161,774987 -587,599651
150% 484,3727 -189,193417 322,48776 -705,608401
100% 322,9151333 -126,128945 -470,4056

Dari tabel diatas diperoleh kombinasi maksimum


Vertikal = 542,6966 t
Horisontal = 126,1289 t
Mv = 322,4878 tm
Mh = 470,4056 tm
II. Penulangan Abutment

0,2 0,2 0,6

0,65 m

1,3 m

0,4 m

4,85 m

I III II I

0,3 m VI
0,5 m
1,45 0,6 1,45

III II
I. Potongan I - I

q = 1,08 tm/m2

II

III
IV V

7,20 m
Pa1
VI

Pa2

I I

Diketahui :
Ls = 8m

Pa1 = q . H . Ka . L Pa2 = 1/2 gt . H2 . Ka . L


2
= 1,08 . 7,20 . 0,35 . 8 = 1/2 . 1,8 . 7,20 . 0,35 . 8
= 21,58 ton = 129,5 ton

Pa total = 151,1 t

Lengan tekanan tanah (y) dan momen (M)


y1 = 3,6 m M1 = Pa1 . Y1 = 21,58 . 3,6 = 77,70442 tm
y2 = 2,4 m M2 = Pa2 . Y2 = 129,5 . 2,4 = 310,8177 tm

SM = M1 + M2 = 388,5221 tm

SM 388,5221
y= = = 2,571 m
SP 151,0919
Tabel perhitungan gaya geser dan momen
Jarak Jarak V H Mx = H . y. My = V . x.
Beban
x (m) y (m) (ton) (ton) tm tm
Bangunan atas
a. Beban mati 0 0 60,4175 0 0
b. Beban hidup 0 0 58,32386 0 0
c. Gaya rem Rm - 6,55 2,916193 19,10106534 -
d. Gaya gesek Gg - 6,55 9,062625 59,36019375 -
e. Beban angin A - 6,55 2,1 13,755 -
f. Beban gempa Gh - 6,55 27,41843 179,5907165 -
g. Beban merata q 1,35 - 29,7 40,095
h. Plat injak 1 - 6,72 6,72

Bangunan bawah
a. Berat abutment
I 2,45 6,875 3,432 - - 8,4084
II 2,55 6,1 9,504 - - 24,2352
III 1,75 5,45 21,12 - - 36,96
IV 2,283333 5,116667 3,696 - - 8,4392
V 1,216667 5,116667 3,696 - - 4,4968
VI 1,75 2,625 87,912 - - 153,846
b. Tekanan tanah
Pa1 - 3,6 21,58456 77,704
Pa2 - 2,4 129,5074 310,818
284,5214 192,5892 660,329 283,201

Dari perhitungan diatas diperoleh :


Gaya geser = 284,5214 ton
Momen = 377,128 ton m
Normal = 192,589 ton

- Mutu baja (fy) = 300 N/mm2


- Mutu beton (f'c) = 22,35 N/mm2

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

2
3000 3771284654
AS2 - 3000 . 960 . AS. + = 0
1,7 223,5 1000 0,8

23,68732728 AS2 - 2880000 AS. + 4714105817 = 0


Dengan rumus ABC diperoleh : AS. = 1659,49 mm2 /meter
Dipilih tulangan= f 25 - 10 = 4908,7 mm2
2
Tulangan tekan AS' = 0,25 . AS = 414,9 cm
Dipilih tulangan= f 12 - 20 = 565,5 mm2

Kontrol

1,4 1,4
rmin = = = 0,004667
fy 300

As. 4908,74
rada = = = 0,005113 Ok !!!
b. d 1000 . 960

0,85 . f'c 600 0,85 . f'c22,35 600


rmaks = 0,75 . b1 . = 0,75 0,85
fy 600 + fy 300 600 + 300

= 0,026913 Ok !!!
II. Potongan II - II

II I
1,7
0,3 1 II
Pp
0,5 2
1,45 0,6 1,45

II

Tabel perhitungan gaya geser dan momen


Beban Berat G (ton) Jarak x (m) Jarak y (m) Mx = G . y. My = G . x.
Berat tanah
I 25,839 1,025 - - 26,485
II 4,3065 1,2667 - - 5,455
Berat abutment -
1 5,742 0,7833 - - 4,498
2 19,14 1,025 - - 19,619
Pp 59,96990587 - 0,56667 33,983 -
33,983 56,056

Dari perhitungan diatas diperoleh :


Momen = 22,073 ton m

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

2
3000 220733283,4
AS2 - 3000 . 500 . AS. + = 0
1,7 223,5 1000 0,8

23,68732728 AS2 - 1500000 AS. + 275916604,3 = 0

184,48 2
Dengan rumus ABC diperoleh : AS. = mm /meter
Dipilih tulangan= f 25 - 20 = 2454,4 mm2
2
Tulangan tekan AS' = 0,25 . AS = 46,12 cm
Dipilih tulangan= f 12 - 20 = 565,5 mm2
Kontrol

1,4 1,4
rmin = = = 0,004667
fy 300

As. 2454,37
rada = = = 0,004909 Ok !!!
b. d 1000 . 500

0,85 . f'c 600 0,85 . f'c22,35 600


rmaks = 0,75 . b1 . = 0,75 0,85
fy 600 + fy 300 600 + 300

= 0,026913 Ok !!!

III. Potongan III - III


2,7 m 0,2 0,6

0,65 m I

0,9 m
II
0,4 m

0,4 m III
IV

1,05 m V

VI
3,80 VII

0,3 m 1,75 VIII IX


0,5 m X
1,45 0,6 1,45
Tabel perhitungan gaya geser dan momen
Beban Berat G (ton) Jarak x (m) Jarak y (m) Mx = G . y. My = G . x.
Beban merata
Berat sayap
I 2,5272 2,1500 - - 5,433
II 4,68 2,2500 - - 10,530
III 1,44 2,2500 - - 3,240
IV 0,2016 0,7667 - - 0,155
V 4,8384 3,5000 - - 16,934
VI 4,788 2,3333 - - 11,172
VII 7,9344 1,0250 - - 8,133
VIII 0,3132 1,2667 - - 0,397
Berat Tanah
I 34,749 2,1500 74,710
II 64,35 2,2500 144,788
III 19,8 2,2500 44,550
IV 2,772 0,7667 2,125
V 66,528 3,5000 232,848
VI 65,835 2,3333 153,615
VII 109,098 1,0250 111,825
VIII 4,3065 1,2667 5,455
Berat Abutment
IX 5,742 0,7833 4,498
X 19,14 1,0250 19,619
Pa1 23,98284505 - 4,0000 95,931
Pa2 159,8856337 - 2,6667 426,362
522,293 850,027

Dari perhitungan diatas diperoleh :


Momen = 327,734 ton m

fy2 Mu
AS2 - fy . d. AS. + = 0
1,7 . fc' .b f

2
3000 3277336501
AS2 - 3000 . 500 . AS. + = 0
1,7 223,5 1000 0,8

23,68732728 AS2 - 1500000 AS. + 4096670626 = 0

Dengan rumus ABC diperoleh : AS. = 2860,31 mm2 /meter


Dipilih tulangan= f 25 - 12,5 = 3927,0 mm2
2
Tulangan tekan AS' = 0,25 . AS = 715,1 cm
Dipilih tulangan= f 16 - 20 = 1005,3 mm2
Kontrol

1,4 1,4
rmin = = = 0,004667
fy 300

As. 3926,99
rada = = = 0,007854 Ok !!!
b. d 1000 . 500

0,85 . f'c 600 0,85 . f'c22,35 600


rmaks = 0,75 . b1 . = 0,75 0,85
fy 600 + fy 300 600 + 300

= 0,026913 Ok !!!
1208
m

m
300
300
300

Anda mungkin juga menyukai