Adhi Karya
Adhi Karya
PV ANGSURAN = PV
(1-(1+i)^-n)
= ###
0.25098183707398
= 28,125,541,203.68
Value Of Bond
YTM
0.0975
Xi
* 0.024375
Nilai Obligasi
289,600,000,000.00
268,533,458,796.32
246,953,420,650.80
224,847,369,075.48
202,202,482,493.01
179,005,626,800.10
155,243,347,749.67
130,901,863,147.38
105,967,054,857.92
80,424,460,616.40
54,259,265,640.24
27,456,294,036.54
- 0.00