TUGAS BESAR PONDASI DALAM

Setelah di export ke microsoft excel maka kita akan mencari nilai maksimum
dari nilai yang didapat.
Sehingga setelah semua diexport didapat nilai maksimum F3 (beban
aksial/rekasi gaya vertikal), M1 (momen searah sumbu Y) dan M2 (momen
searah sumbu X) untuk 10 titik pondasi yaitu :

Tabel 2.4. Nilai F3, M1 dan M2


Joint OutputCase CaseType StepType F3 M1 M2
Text Text Text Text KN KN.m KN.m
P1 TOTAL Combination Max 1472,6296 33,9239 60,8754
P2 TOTAL Combination Max 1490,2104 28,3900 40,6162
P3 TOTAL Combination Max 1472,7050 12,2891 59,9119
P4 TOTAL Combination Max 1464,5904 12,0143 42,9596
P5 TOTAL Combination Max 1601,8310 -8,4554 1,8507
P6 TOTAL Combination Max 1470,5120 6,0743 2,4701
P7 TOTAL Combination Max 1388,4820 -4,1251 -4,0776
P8 TOTAL Combination Max 1459,2474 11,4445 52,5020
P9 TOTAL Combination Max 1397,4984 9,5452 15,4691
P10 TOTAL Combination Max 1282,2160 26,1196 53,2078
P11 TOTAL Combination Max 1295,5668 24,4504 36,5664
P12 TOTAL Combination Max 1388,8536 26,8878 41,6407
P13 TOTAL Combination Max 1334,3876 16,9721 45,0022
P14 TOTAL Combination Max 1306,7690 10,1134 50,1620
P15 TOTAL Combination Max 1304,1530 11,9185 50,5176
P16 TOTAL Combination Max 1318,7083 10,5604 41,1386
P17 TOTAL Combination Max 1469,3050 26,1699 80,8138
P18 TOTAL Combination Max 1552,7760 11,3500 48,0222
P19 TOTAL Combination Max 1577,8872 14,8208 61,8171
P20 TOTAL Combination Max 1559,9508 15,1496 55,0940
P21 TOTAL Combination Max 1473,6228 35,9310 74,4798
P22 TOTAL Combination Max 1543,6134 38,6869 34,7801
P23 TOTAL Combination Max 1390,8624 34,0066 56,9836
P24 TOTAL Combination Max 1390,6370 22,0736 54,5374

RESTI AYU PURWANTI(G1B019014) 1


TUGAS BESAR PONDASI DALAM

BAB III
PONDASI DALAM

3.1 Penyelidikan Tanah


Penyelidikan tanah memberikan masukan penting dalam rencana konstruksi,
terutama dalam perencanaan pondasi bangunan. Tujuan penyelidikan tanah dalam
perencanaan pondasi adalah untuk mendapatkan data parameter yang diperlukan
untuk analisis desain dan daya dukung pondasi (Bowles, 1982).
Jenis-jenis tanah tertentu sangat mudah sekali terganggu oleh pengaruh
pengambilan contohnya di dalam tanah. Untuk menanggulangi hal tersebut, sering
dilakukan beberapa pengujian di lapangan secara langsung. Pengujian di lapangan
sangat berguna untuk mengetahui karakteristik tanah dalam mendukung beban
pondasi dengan tidak dipengaruhi oleh kerusakan contoh tanah akibat operasi
pengeboran dan penanganan contoh (Hardiyatmo, 2010).

3.2 Cone Penetration Test (CPT)


Sondir (CPT) dilakukan dengan melakukan penetrasi oleh batang konus pada
tanah yang diuji. Dari pengujian sondir ini diperoleh nilai tahanan yang terjadi pada
batang konus ini. Hasil pengujian ini selanjutnya dianalisis sehingga diperoleh nilai
daya dukung pada suatu lokasi atau lapisan tanah. Pengujian sondir ini banyak
dilakukan karena pelaksanaannya mudah karena dapat dilakukan dengan alat
manual (Dharmayasa, 2017; Robertson, 2009). Uji sondir atau dikenal dengan uji
penetrasi kerucut statis merupakan suatu pengujian yang digunakan untuk
menghitung kapasitas dukung tanah. Nilai-nilai tahanan kerucut statis atau
hambatan konus (qc) yang diperoleh dari pengujian dapat langsung dikorelasikan
dengan kapasitas dukung tanah (Hardiyatmo, 2002).
Uji sondir terbagi menjadi 2 jenis yaitu sondir berat dan sondir ringan. Sondir
berat memiliki kapasitas mesin maksimal 10 ton, dan akan berhenti apabila
pembacaan konus mencapai 500-600 kg/cm2dengan kedalaman maksimal 50
m.Sondir ringan memiliki kapasitas mesin 2 ton. Uji sondir akan berhenti apabila
tekanan manometer 3 kali berturut turut melebihi 250 kg/cm2dan pada kedalaman
30 meter.

RESTI AYU PURWANTI(G1B019014) 2


TUGAS BESAR PONDASI DALAM

Gambar 3.1Sondir Ringan dan Penetrasi konus(SNI 2827 2008).

3.2.1. Penentuan Perlapisan Tanah Menggunkaan Data Sondir


Data sondir memperoleh data qc/pa dan perhitungan memperoleh nilai FR,
nilai qc/pa dan FR dapat menentukan jenis tanah melalui data sondir. Perhitungan
dilakukan agar mengetahui kondisi tanah.Berikut adalah tahapan dalam mengolah
data CPT (Cone Penetration Test).
1. Pembacaan Grafik Sondir
Pembacaan grafik sondir dilakukan pada setiap kedalaman 0,2 meter.
Pembacaan grafik sondir meliputi nilai tekanan konus (qc) dan tahanan
gesek (fs). Kemudian mengubah satuan nilai tekanan konus (qc) dan
tahanan gesek (fs) dari kg/cm2 menjadi kPa dengan cara mengalikannya
dengan nilai 98,1.
2. Menggambarkan Profil Tanah
Penggambaran profil tanah bertujuan untuk mengetahui jenis tanah pada
perencanaan pondasi yang akan dilakukan. Berikut adalah tahapan dalam
menggambarkan profil tanah menggunakan data sondir.
a. Menghitung nilai friction ratio (fr)
Rumus :
fs
FR= ×100 %
qc
(3.1)

RESTI AYU PURWANTI(G1B019014) 3


TUGAS BESAR PONDASI DALAM

( )
fs
b. Menghitung nilai cone resistance q c
c. Pembacaan zona tanah
Dilakukan dengan cara menarik garis tegak lurus nilai fr serta menarik
garis horizontal pada nilai qc/pa. Perpotongan antara kedua garis
menentukan zona tanah pada kedalaman tersebut. Hubungan antara fr
dan qc/pa dapat dilihat pada gambar 1.1. Setiap zona tersebut
mendefinisikan tiap – tiap jenis tanah.

Gambar 3.2Non-normalized CPT Soil Behavior Type (SBT) chart


(Robertson et al. 1986, Updatedby Robertson,2010)
Tabel 3.1 SoilBehaviorType

RESTI AYU PURWANTI(G1B019014) 4


TUGAS BESAR PONDASI DALAM

sumber: Robertson et al., 1986,updated by Robertson, 2010


Tabel 3.2Soil behavior type ratio

sumber: Robertson et al., 1986,updated by Robertson, 2010

qc
Pa
Ratio=
N 60 (3.2)
3.2.2. Nilai Parameter Tanah
1. Berat isi tanah

γ
γw [ ( )]
=0 , 27 [ log Rf ] +0 , 6 log
qc
Pa
+1 ,236
(3.3)
dimana :
Rf = friction Ratio= (Fs/qc)100%
γw = berat jenis air satuan sama dengan γ
Pa = tekanan atmosfir dengan satuan sama dengan qc
2. Tekanan overburden
P 0 '=γ×d (3.4)
dimana :
p0’ = tekanan overburden
γ = berat jenis tanah
d = kedalam perlapisan tanah
3. Sudut gesek dalam (ɸ)

RESTI AYU PURWANTI(G1B019014) 5


TUGAS BESAR PONDASI DALAM

Tan φ=
1
2 ,68 [ ( ) ]
log
qc
P 0'
+0 , 29
(3.5)
4. Kohesi Tanah (Cu)
qc
Cu=
20 (kg/cm2) (3.6)
3.2.3. Analisa Daya Dukung Tiang Bor
Tiang bor yang menahan beban tekan :
Q ult =Q b +Q s−W p (3.7)
Tiang bor yang menahan beban tarik :
Q ult =Q b +Q s +W p (3.8)
Dimana :
Qult = kapasitas dukung tiang bor (kN)
Qb = tahanan ujung ultimit (kN)
Qs = tahanan gesek ultimit (kN)
Wp = berat tiang bor(kN)

Q b =A b ×f b (3.9)
Dimana :
Qb = tahanan ujung ultimit (kN)
Ab = luas penampang tiang bor (m2)
fb = tahanan ujung netto (kPa)

Rumus fb yang dikemukkan oleh O’Neil dan Reese (1989) adalah sebagai berikut :
a. Tanah Granuler
qc
Fb=2 , 4× 100≤4500
4 kPa
(3.10)
b. Tanah Kohesif
Fb=Cu×Nc '
(3.11)

( (
Nc ' =6+ 1+ 0 ,
2× L
d ))≤ 9 (3.12)

RESTI AYU PURWANTI(G1B019014) 6


TUGAS BESAR PONDASI DALAM

Rumus Tahanan gesek ultimit adalah sebagai berikut :


Q s =A s ×f s
(3.13)

Dimana :
As = luas penampang tiang bor (m2)
fs = tahanan ujung netto (kPa)

Rumus fs yang dikemukkan oleh O’Neil dan Reese (1989) adalah sebagai berikut :
a. Tanah Granuler

(
F s=P 0 '× 1,5−0,135
√) z
dr (3.14)
Dimana :
po’ = tekanan overburden
z = kedalaman ditengah lapisan tanah(m)
z = lebar referensi(300 mm)
b. Tanah Kohesif
F s=α×Cu (3.15)
Dengan
α = 0,55 jika Cu/σr≤ 1,5
atau
α = 0,55-0,1(Cu/σr-1,5) jika 1,5 <Cu/σr< 2,5

3.3 Pondasi
3.3.1 Pondasi dangkal
Pondasi dangkal disebut juga pondasi langsung, pondasi ini digunakan apabila
lapisan tanah pada dasar pondasi yang mampu mendukung beban yang dilimpahkan
terletak tidak dalam (berada relatif dekat dengan permukaan tanah).
3.3.2 Pondasi dalam

RESTI AYU PURWANTI(G1B019014) 7


TUGAS BESAR PONDASI DALAM

Pondasi dalam adalah pondasi yang ditanam didalam tanah dengan kedalaman
tertentu yang berfungsi meneruskan beban bangunan kedasar tanah. Pondasi dalam
biasanya dipasang pada kedalaman lebih dari 3 m di bawah elevasi permukaan
tanah.Pondasi dalam dapat digunakan untuk mentransfer beban ke lapisan yang
lebih dalam untuk mencapai kedalam yang tertentu sampai didapat jenis tanah yang
mendukung daya beban strutur bangunan sehingga jenis tanah yang tidak cocok di
permukaan tidak mempengaruhi struktur bangunan. Berikut adalah tata cara
perhitungan Pondasi:
1. Rencana Pondasi
Terdapat dua jenis pondasi dalam yaitu pondasi tiang tunggal dan pondasi
tiang grup. Lalu dalam menentukan apakah kita menggunakan pondasi
tiang tunggal atau pondasi tiang grup dapat dilihat dari beban vertikal
kolom yang dibandingkan dengan kapasitas dukung tiang tunggal pada
setiap diameternya.

Gambar 3.3 Distribusi Beban Pondasi


(Sumber : Pondasi 2, Lindung zalbuin mase 2019)

Beban bekerja melalui pusat kelompok tiang (O), beban P melalui O maka:
p
P=
n (3.16)
Keterangan :
n = jumlah pondasi
P = beban vertical sentris
p = beban tiang tunggal

RESTI AYU PURWANTI(G1B019014) 8


TUGAS BESAR PONDASI DALAM

Jarak antar tiang dapat dihitung dengan ketentuan sebagai berikut:


a. Jika ujung tiang tidak mencapai tanah keras
s ≥ 2 x (diameter tiang)
s ≥ 2 x (diagonal tiang)
b. Jika ujung tiang mencapai tanah keras
s ≥ 2 x (diameter tiang) + 30 cm
s ≥ 2 x (diagonal tiang) + 30 cm
2. Distribusi Beban Pondasi
Distribusi beban tiang bertujuan untuk mencari beban maksimum yang
dihasilkan dari pondasi grup yang akan dibandingkan dengan kapasitas daya
dukung tiang pada data tanah sehingga akan diketahui aman atau tidak
pondasi tersebut untuk menahan beban tersebut, berikut langkah-langkah
yang dilakukan:
a. Pindahkan nomor pondasi beserta beban vertical, Mx dan My dari setiap
nomor pondasi ke tabel baru
b. Mencari nilai xi, dan y untuk pondasi 1 baris dengan cara jika tinjauan
adalah posisi tengah maka nilai xi dapat dicari dengan rumus (jumlah
pondasi) xi = (jumlah baris x jarak pondasi 1 ke tinjauan) + (jumlah
baris x jarak pondasi 2 ke tinjauan) untuk yi nilai nya tidak ada karena
pondasi hanya 1 baris
c. Mencari nilai xi, dan y untuk pondasi lbih dari 1 baris dengan cara jika
tinjauan adalah posisi tengah maka nilai xi dapat dicari dengan rumus
(jumlah pondasi) xi = (jumlah baris x jarak pondasi 1 ke tinjauan) +
(jumlah baris x jarak pondasi 2 ke tinjauan) untuk yi perhitungan nya
sama seperti mencari xi
d. Tiang tarik adalah tiang dengan xi dan yi dengan nilai (-) sedangkan
tiang tekan adalah tiang dengan nilai xi dan yi nya bernilai (+)
e. Mencari nilai kuadarat jarak x (Ʃx²) dengan cara mengkuadrat milai xi
tarik dan xi tekan lalu dijumlahkan
f. Mencari nilai beban (Qi) untuk tiang tarik dan tiang tekan dengan
rumus:
Q Mi . xi Mi . yi
Qi= + +
n ∑ x2 ∑ y2
(3.17)

RESTI AYU PURWANTI(G1B019014) 9


TUGAS BESAR PONDASI DALAM

Gambar 3.4 Gaya dalam pondasi


(Sumber : Pondasi 2, Lindung zalbuin mase 2019)

Gambar 3.5 Gaya dalam pondasi


(Sumber : Pondasi 2, Lindung zalbuin mase 2019)

RESTI AYU PURWANTI(G1B019014) 10


TUGAS BESAR PONDASI DALAM

Gambar 3.6 Susunan Kelompok tiang dalam pelat penutup tiang


(sumber : Hardiyatmo, Hary C, 2011)

Lalu memilih nilai yang paling tinggi antara tiang tarik dan tiang tekan
sehingga nanti akan dibandingkan dengan kapasitas 1 tiang tunggal dan
dapat diketahui keamanannya.
3.4 Penurunan Tiang Tunggal
Persamaan penurunan tiang tunggal di kemukakan oleh Poulos dan Davis
(1980) adalah sebagai berikut :
Q×I
S=
Es×d (2.16)
Dengan
I=I 0 ×R k ×R h ×R μ (2.17)
Dimana :
S = penurunan kepala tiang
Q = beban yang bekerja
I0 = faktor pengaruh turunan untuk tiang yang tidak mudah mampat dalam
massa semi tak terhingga
Rk = faktor koreksi kemudah-mampatan (kompresibilitas) tiang
Rh = faktor koreksi untuk ketebalan lapisan yang terletak pada tanah keras
Rμ = faktor koreksi angka poisson

RESTI AYU PURWANTI(G1B019014) 11


TUGAS BESAR PONDASI DALAM

Gambar 2.3 Faktor Pengaruh I0(Poulus dan Davis, 1980)

Gambar 2.4 Faktor koreksi Rk (Poulus dan Davis, 1980)

RESTI AYU PURWANTI(G1B019014) 12


TUGAS BESAR PONDASI DALAM

Gambar 2.5 Faktor koreksi Rh (Poulus dan Davis, 1980)

RESTI AYU PURWANTI(G1B019014) 13


TUGAS BESAR PONDASI DALAM

Gambar 2.6 Faktor koreksi Rμ (Poulus dan Davis, 1980)

Tabel 2.3Poisson’s ratio, µs (Schmertmann, 1970)


Modulus of elasticity, Es
Type of soil
(MN/m2) Poisson’s ratio,µs
Loose Sand 10.5 – 24.0 0.20 – 0.40
Medium dense sand 17.25 – 27.60 0.25 – 0.40
Dense sand 34.50 – 55.20 0.30 – 0.45
Silty sand 10.35 – 17.25 0.20 – 0.40
Sand and gravel 69.00 – 172.50 0.15 – 0.35
Soft clay 4.1 – 20.7
Medium clay 20.7 – 41.4 0.20 – 0.50
Stiff clay 41.4 – 96.6
Sumber : Schmertmann, 1970

RESTI AYU PURWANTI(G1B019014) 14


TUGAS BESAR PONDASI DALAM

3.5 Penurunan Tiang Kelompok


Menurut Poulos dan Davis 1980, syarat maksimum penurunan tiang pancang
yang diizinkan yaitu :
Stotal ≤ Sizin
Sizin= 10% . D
Dimana, D = Diameter Tiang
Berikut adalah tahapan dalam menghitung settlement untuk tiang grup.
a. Menghitung Q (kN)
b. Menentukan diamater (d)
c. Menghitung jarak minimum antar tiang (s)
 Ujung tiang tidak mencapai tanah keras
s≥2×D (3.18)
 Ujung tiang mencapai tanah keras
s≥2 D+0 ,3 (3.19)

Gambar 3.7 Konfigurasi Tiang dalam Grup


(sumber : Hardiyatmo, Hary C, 2011)

RESTI AYU PURWANTI(G1B019014) 15


TUGAS BESAR PONDASI DALAM

d. Menghitung lebar kelompok tiang (B)


B=s+ D+ 0 ,3 (3.20)
e. Menghitung Pmaks yang diterima oleh tiang

Pmaks=
∑ Pu ± My . xmaks ± Mx. ymaks
n nx . ∑ x 2 ny . ∑ y 2 (3.21)
Dimana :
Pmaks = Beban maksimum yang diterima oleh tiang (ton)
Pu = Jumlah total beban
n = Jumlah tiang dalam grup
Mx, My= Momen pada arah x dan y
x maks = Absis terjauh tiang pancang terhadap titik berat kelompok tiang
y maks = Ordinat terjauh tiang pancang terhadap titik berat kelompok tiang
Nx = BanyakNya tiang dalan satu baris arah sumbu x
Ny = BanyakNya tiang dalan satu baris arah sumbu y

Gambar 3.8 gaya dalam pada pondasi


Sumber : Pondasi 2, Mase, Lindung zalbuin 2019

Menghitung penurunan tiang tuggal pada intensitas beban yang sama (S)
Q.I
S=
Es . d (3.22)

f. Menghitung penurunan kelompok tiang (Sg)

RESTI AYU PURWANTI(G1B019014) 16


TUGAS BESAR PONDASI DALAM

2
S g ( 4 B+3 )
=
S ( B+4 )2
(3.23)

3.6 Penulangan Pondasi


3.6.1 Menghitung Mmax
a. Menghitung nilai Hu
1
γ dL3 K p
H u= 2
e+ L (3.24)
b. Menghitung nilai f

f =0 , 82
√ Hu
d×K p ×γ (3.25)
c. Menghitung Mmax

Mmaks=Hu e + ( 2f
3 ) (3.26)

3.6.2 Penulangan Pile


Berikut adalah tahapan dalam menghitung penulanganpondasi bore pile.
 Tulangan Utama Pondasi
a. Menghitung P (kN)
b. Menentukan diamater (d)
c. Menentukan Mmax (t.m)
d. Menentukan factor ultimit (ф)
e. Menentukan Pu (N)
Pu=φ×P×10000 (3.27)
f. Menentukan Mu (Nmm)
Mu=φ×M max×10000000 (3.28)
g. Luas Tulangan (Ag)
1
Ag= ×π ×d 2
4 (3.29)
h. As Pakai

RESTI AYU PURWANTI(G1B019014) 17


TUGAS BESAR PONDASI DALAM

As= ρ× Ag (3.30)
Dengan, ρ ambil yang memenuhi antara ρmaksdan ρmin
φ×0 ,85×f ' c 600
ρ b= ×
fy 600+f y (3.31)
ρ maks=0,75×ρ b (3.32)

ρ min= 1 , 4
fy (3.33)
i. Jumlah Tulangan yang di pakai
As pakai
n=
As tulangan
(3.34)

 Tulangan Sengkang
Dipakai tulangan sengkang spiral. Sumber : SNI 2847:2013 pasal
7.10.4. Spiral harus terdiri dari batang tulangan atau kawat menerus
yang berspasi sama dari ukuran yang sedemikian dan digabungkan
sedemikian rupa yang mengizinkan penanganan dan penempatan tanpa
penyimpangan dari dimensi yang dirancang. Pada ketentuan di SNI
2847 2013 berisi:
1) Untuk kontruksi cor di tempat, ukuran spiral tidak boleh kurang dari
diameter 10 mm.
2) Spasi bersih antar spiral tidak boleh melebihi 75 mm, atau tidak
kurang dari 25 mm.
3.6.3 Penulangan Pile Cap
Berikut adalah tahapan dalam menghitung penulangan pile cap :
 Tulangan Utama Pile Cap
a. Menentukan tebal pile cap
Ketebalan minimum pile cap ditentukan sebesar 300 mm sesuai SNI
2847:2013 pasal 15.7.tahapan penulangan adalah sebagai berikut :
b. Menentukan lebar pile cap

RESTI AYU PURWANTI(G1B019014) 18


TUGAS BESAR PONDASI DALAM

Gambar 3.9 Susunan Kelompok tiang dalam pelat penutup tiang


(Hardiyatmo, Hary C, 2011)
Lebar pile cap di tentukan berdasarkan jumlah tiang dan diameter
tiang yang digunakan.
c. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( L−b )
C=
2 (3.35)
Dimana :
L = lebar pile cap (m) jika di tinjau x, maka gunakan Ly, dan
sebaliknya
b = dimensi kolom (m) jika di tinjau x, maka gunakan by,
dan sebaliknya
d. Menentukan jarak tiang terhadap sisi kolom (e)
e=C−a (3.36)
Dimana :
a = jarak dari tengah tiang ke tepi luar pile cap (m)

e. Menentukan berat beton (W1) dan berat tanah (W2)

RESTI AYU PURWANTI(G1B019014) 19


TUGAS BESAR PONDASI DALAM

W 1=C×L×h×γ c (3.37)
W 1=C×L×z×γ s (3.38)
Dimana :
L = lebar pile cap (m) jika di tinjau x, maka gunakan Lx, dan
sebaliknya
h = tebal pile cap (m)
z = tebal tanah diatas pile cap (m)
γc = berat volume beton = 24 kN/m3
γs = berat volume tanah (kN/m3)
f. Menentukan momen yang terjadi pada pile cap (Mu)
W 1×C W 2×C
M ux =Pu maks×e− −
2 2 (3.39)
Dimana :
Pumaks= Beban maksimum berdasarkan pers. 2.21
g. Menentukan jarak pusat tulangan terhadap sisis luar beton (d’)
1
d ' =S + P + D
2 (3.40)
h. Menentukan rasio tulangan (ρ)

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y ) (3.41)
Dengan
( f ' c −28 )
β 1=0 , 85−0 ,05×
7 (3.42)
i. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c (3.43)

M n= Mu
φ (3.44)
Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur
Mu
R n=
φ bd (3.45)

RESTI AYU PURWANTI(G1B019014) 20


TUGAS BESAR PONDASI DALAM

Periksa
Rn < Rmaks lanjutkan perhitungan tulangan
j. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ] (3.46)
ρ maks=0,75×ρ b (3.47)

ρ min= 1 , 4
fy (3.48)
k. Menentukan As perlu (mm2)
As perlu=ρ×b×d (3.49)
h. Jaraktulangan yang diperlukan
πD 2 b
s=
4 As (3.50)
i. Panjang penyaluran berdasar kan SNI 2847 2013

ldh=( 0 , 24 ψ efy / λ √ f ' c ) /db (3.51)


ldh> 8 db atau 150 mm
dimana :
Ψe = 1,2
λ = 0,75

Gambar 3.10Detail batang tulangan berkait untuk penyaluran kait standar


Sumber : (SNI 2847 2013)

RESTI AYU PURWANTI(G1B019014) 21


TUGAS BESAR PONDASI DALAM

 Tulangan Geser Pile Cap


1. Menentukan Vu (kN)
2. Menentukan Tebal Pile Cap (h)
3. Perhitungan Tinggi Efektif
dx = h- selimut beton
b
βc=
h

bo = 2 ((b+d ) + (h+d ))

4. Mencari nilai Vc terkecil dari Vc1, Vc2, Vc3

Vc 1= 0,17 ( 1+2βc ) λ √ fc ' .bo . d (3.52)

Vc 2= 0,083 ( )
αs . d
bo
λ √ fc ' .bo . d
(3.53)

Vc3= 0,33 λ √ fc' .bo . d (3.54)

5. Mencari Vn
Vn = Φ Vc (3.55)
6. Jika Vn > Vu , perhitungan selesai. Pile cap tidak memerlukan
tulangan geser.
3.7 Data Pondasi
Pembangunan rumah sakit ini menggunakan spesifikasi pondasi dalam
sebagai berikut :
Bahan : Beton
Modulus elastisitas : 4700√ fc ' MPa
Berat Jenis : 2400 kg/m3 atau 24kN/m3
Bentuk pondasi : Grup

RESTI AYU PURWANTI(G1B019014) 22


TUGAS BESAR PONDASI DALAM

3.7.1 Sondir 4
Kondisi perlapisan tanah di lokasi Perencanaan Sekolah Yogayakarta pada
sondir 4 yaitu Sands: clean sands to silty sands. Kedalaman tanah keras terletak
pada kedalaman 12 meter dengan qc sebesar 170 kg/cm2. Grafik interpretasi
perlapisan tanah dapat dilihat pada Gambar 3.11.Perhitungan penyelidikan tanah
lebih lengkap pada Lampiran Tabel 1.

Gambar 3.11 Interpretasi Perlapisan Tanah

RESTI AYU PURWANTI(G1B019014) 23


TUGAS BESAR PONDASI DALAM

3.7.2 Sondir 3
Kondisi perlapisan tanah di lokasi Perencanaan Sekolah Yogyakarta pada
sondir 3yaitu Very stiff sand to clayey sand. Kedalaman tanah keras terletak pada
kedalaman 13 meter dengan qc sebesar 360 kg/cm2. Grafik interpretasi perlapisan
tanah dapat dilihat pada Gambar 3.12.Perhitungan penyelidikan tanah lebih lengkap
pada Lampiran Tabel 2.

Gambar 3.12 Interpretasi Perlapisan Tanah

RESTI AYU PURWANTI(G1B019014) 24


TUGAS BESAR PONDASI DALAM

3.7.3 Sondir 1
Kondisi perlapisan tanah di lokasi Perencanaan Sekolah Yogyakarta pada
sondir 1 yaitu Sands: clean sands to silty sands. Kedalaman tanah keras terletak
pada kedalaman 14 meter dengan qc sebesar 150 kg/cm2. Grafik interpretasi
perlapisan tanah dapat dilihat pada Gambar 3.11.Perhitungan penyelidikan tanah
lebih lengkap pada Lampiran Tabel 3.

Gambar 3.11 Interpretasi Perlapisan Tanah


3.8 Analisa SAP 2000
Analisa struktur yang digunakan adalah dengan menggunakan software SAP
2000 untuk mempermudah dalam proses perhitungan. Hasil yang diperoleh untuk
perhitungan lanjutan ke analisa pondasi adalah beban maksimum (F 3) untuk masing
– masing pondasi serta momen arah x (M1 = Mx) dan momen arah y (M2 = My)
yaitu tabel joint reactions .

RESTI AYU PURWANTI(G1B019014) 25


TUGAS BESAR PONDASI DALAM

Tabel 3.3.2 Joint Reaction Sondir 4


Joint OutputCase CaseType StepType F3 M1 M2
Text Text Text Text KN KN.m KN.m
P1 COMB5 Combination Max 1397,4984 9,5452 15,4691
P2 COMB6 Combination Max 1282,2160 26,1196 53,2078
P3 COMB5 Combination Max 1295,5668 24,4504 36,5664
P4 COMB6 Combination Max 1388,8536 26,8878 41,6407
P25 COMB5 Combination Max 1334,3876 16,9721 45,0022
P26 COMB6 Combination Max 1306,7690 10,1134 50,1620
P27 COMB5 Combination Max 1304,1530 11,9185 50,5176
P8 COMB6 Combination Max 1318,7083 10,5604 41,1386

Tabel 3.3.3 Joint Reaction Sondir 3


Joint OutputCase CaseType StepType F3 M1 M2
Text Text Text Text KN KN.m KN.m
P9 COMB6 Combination Max 1472,6296 33,9239 60,8754
P10 COMB5 Combination Max 1490,2104 28,3900 40,6162
P11 COMB6 Combination Max 1472,7050 12,2891 59,9119
P12 COMB5 Combination Max 1464,5904 12,0143 42,9596
P13 COMB6 Combination Max 1601,8310 -8,4554 1,8507
P14 COMB5 Combination Max 1470,5120 6,0743 2,4701
P15 COMB6 Combination Max 1388,4820 -4,1251 -4,0776
P16 COMB5 Combination Max 1459,2474 11,4445 52,5020

Tabel 3.3.1Joint Reaction Sondir 1


Joint OutputCase CaseType StepType F3 M1 M2
Text Text Text Text KN KN.m KN.m
Combinatio 1469,3050 26,1699 80,8138
P17 COMB6 Max
n
Combinatio 1552,7760 11,3500 48,0222
P18 COMB6 Max
n
Combinatio 1577,8872 14,8208 61,8171
P19 COMB5 Max
n
Combinatio 1559,9508 15,1496 55,0940
P20 COMB5 Max
n
Combinatio 1473,6228 35,9310 74,4798
P21 COMB5 Max
n
Combinatio 1543,6134 38,6869 34,7801
P22 COMB6 Max
n

RESTI AYU PURWANTI(G1B019014) 26


TUGAS BESAR PONDASI DALAM

Combinatio 1390,8624 34,0066 56,9836


P23 COMB6 Max
n
Combinatio 1390,6370 22,0736 54,5374
P24 COMB6 Max
n

3.9 Kapasitas Dukung Pondasi


Analisa perhitungan untuk menghitung kapasitas dukung pondasi berdasarkan
persamaan pondasi tiang bor metode I’Neil dan Reese. Pondasi direncanakan
dengan kedalaman 12m, 13 m, 14 m dengan diameter 0,4mdengan tujuan agar tidak
banyak variasi dalam ukuran untuk perencanaan. Faktor keamanan menggunakan 3.
Tabel 3.5 Kapasitas Daya Dukung Tiang Bor Grup Bagian Kiri (Sondir 4)
Diameter (m)
No Parameter
Jenis Tanah Thickness 0,3 0,4
Lapisan
L/d 40 30
As 0,565 0,754
1 Lempung 0,60 fs 19,559 19,559
Qs 11,060 14,747
As 1,885 2,513
2 Lempung 2,00 fs 56,383 56,383
Qs 106,279 141,706
As 4,524 6,032
3 Pasir 4,80 fs 80,369 86,722
Qs 363,582 523,097
As 3,393 4,524
4 Pasir 3,60 fs 157,147 185,782
Qs 533,188 840,456
Ab 0,071 0,126
Sands: clean
Tahanan
sands to silty fb 4500 4500
Ujung
sands
Qb 318,086 565,487
Wp 20,358 36,191
Qult 1311,839 2049,301
Qall 437,280 683,100

RESTI AYU PURWANTI(G1B019014) 27


TUGAS BESAR PONDASI DALAM

Tabel 3.6 Kapasitas Daya Dukung Tiang Bor Grup Bagian Tengah (Sondir 3)
Diameter (m)
Parameter
No Lapisan Jenis Tanah Thickness 0,3 0,4
L/d 37 28
As 9,61 12,818
1 Lempung 10,20 fs 54,63 54,629
Qs 525,17 700,224
Ab 0,94 1,257
2 Pasir 1,00 fb 77,36 89,402
Qb 72,91 112,346
As 1,70 2,262
3 Pasir 1,80 fs 164,05 228,527
Qs 278,30 516,916
Ab 0,07 0,126
Sands: clean
Tahanan
sands to silty fb 4500,00 4500,000
Ujung
sands
Qb 318,09 565,487

Wp 18,66 33,175
Qult 1175,80 1861,797
Qall 391,93 620,599

RESTI AYU PURWANTI(G1B019014) 28


TUGAS BESAR PONDASI DALAM

Tabel 3.4 Kapasitas Daya Dukung Tiang Bor Grup Bagian Kanan (Sondir 1)
Diameter (m)
No Thicknes Parameter
Jenis Tanah 0,30
Lapisan s
L/d 46,667
As 1,885
1 Lempung 2,00 fs 24,035
Qs 45,304
As 2,073
2 Lempung 2,20 fs 51,257
Qs 106,279
As 3,770
3 Pasir 4,00 fs 87,075
Qs 328,266
As 2,262
4 Pasir 2,40 fs 149,380
Qs 337,889
As 2,262
5 Pasir 2,40 fs 253,064
Qs 572,418
As 0,942
6 Pasir 1,00 fs 326,512
Qs 307,730
Sands: clean Ab 0,071
Tahanan
sands to silty fb 4500,000
Ujung
sands Qb 318,086
Wp 23,750
Qult 1992,222
Qall 664,074

RESTI AYU PURWANTI(G1B019014) 29


TUGAS BESAR PONDASI DALAM

3.10 Beban Rencana Pondasi


Perhitungan beban rencana menggunakan beban podasi yang didapat pada
perhitungan SAP 2000 dan menentukan jenis pondasi tunggal atau grub
berdasarkan kapastitas dukung.

3.10.1 Beban Rencana PondasiSondir 4


Tabel 3.7Beban Rencana Pondasi Sondir 4
Jarak
Min
No Bentuk Jumlah Beban 1 Diamete Kapasitas 1
Beban Anta
Pondasi Tiang Tiang Tiang r Tiang
r
Tiang
1397,49
P1 Grup 3 465,833 0,4 620,599 1,1
8
1282,21
P2 Grup 3 427,405 0,4 620,599 1,1
6
1295,56
P3 Grup 3 431,856 0,4 620,599 1,1
7
1388,85
P4 Grup 3 462,951 0,4 620,599 1,1
4
1334,38
P5 Grup 3 444,796 0,4 620,599 1,1
8
1306,76
P6 Grup 3 435,590 0,4 620,599 1,1
9
1304,15
P7 Grup 3 434,718 0,4 620,599 1,1
3
1318,70
P8 Grup 3 439,569 0,4 620,599 1,1
8

 Pondasi Tipe 1 (P1)


Diameter (D) : 0,4 m
Kedalaman (L) : 11 m
Beban (Q) : 1397,468 kN (dari tabel Joint Reactions SAP2000)
Qall : 620,599 kN
Jumlah tiang (n) : Q/Qall = 1397,468/620,599 = 2,25≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n =1397,468/3 = 465,833 kN

RESTI AYU PURWANTI(G1B019014) 30


TUGAS BESAR PONDASI DALAM

Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 2 (P2)


Diameter (D) : 0,4 m
Kedalaman (L) : 11 m
Beban (Q) : 1282,216 kN (dari tabel Joint Reactions SAP2000)
Qall : 620,599 kN
Jumlah tiang (n) : Q/Qall = 1282,216/620,599= 2,07≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n =1282,216/3 = 427,405 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 3 (P3)


Diameter (D) : 0,4 m
Kedalaman (L) : 11 m
Beban (Q) : 1295,567 kN (dari tabel Joint Reactions SAP2000)
Qall : 620,599 kN
Jumlah tiang (n) : Q/Qall = 1295,567 /620,599 = 2,09≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n =1295,567/3 = 431,856 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 4 (P4)


Diameter (D) : 0,4 m
Kedalaman (L) : 11 m
Beban (Q) : 1388,854 kN (dari tabel Joint Reactions SAP2000)
Qall : 620,599 kN
Jumlah tiang (n) : Q/Qall = 1388,854/620,599= 2,23≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n =1388,854/3 = 462,951kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 5 (P5)


Diameter (D) : 0,4 m
Kedalaman (L) : 11 m

RESTI AYU PURWANTI(G1B019014) 31


TUGAS BESAR PONDASI DALAM

Beban (Q) : 1334,388 kN (dari tabel Joint Reactions SAP2000)


Qall : 620,599 kN
Jumlah tiang (n) : Q/Qall = 1334,388/620,599= 2,15≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n =1334,488/3 = 444,796 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 6 (P6)


Diameter (D) : 0,4 m
Kedalaman (L) : 11 m
Beban (Q) : 1306,769 kN (dari tabel Joint Reactions SAP2000)
Qall : 620,599 kN
Jumlah tiang (n) : Q/Qall = 1306,769/620,599= 2,10≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n =1309,769/3 = 435,590 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 7 (P7)


Diameter (D) : 0,4 m
Kedalaman (L) : 11 m
Beban (Q) : 1304,153 kN (dari tabel Joint Reactions SAP2000)
Qall : 620,599 kN
Jumlah tiang (n) : Q/Qall = 1304,153/620,599= 2,10≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n =1304,153/3 = 439,569 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 8 (P8)


Diameter (D) : 0,4 m
Kedalaman (L) : 11 m
Beban (Q) : 1318,708 kN (dari tabel Joint Reactions SAP2000)
Qall : 620,599 kN
Jumlah tiang (n) : Q/Qall = 1318,708/620,599 = 2,12≈ 3 buah
Bentuk tiang : Grup

RESTI AYU PURWANTI(G1B019014) 32


TUGAS BESAR PONDASI DALAM

Beban 1 tiang : Q/n =1318,708/3 = 439,569 kN


Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

3.10.2 Beban Rencana Pondasi Sondir 3


Jarak
Min
No Bentuk Jumlah Beban 1 Diamete Kapasitas 1
Beban Anta
Pondasi Tiang Tiang Tiang r Tiang
r
Tiang
1472,63
P9 Grup 3 490,877 0,4 683,100 1,1
0
1490,21
P10 Grup 3 496,737 0,4 683,100 1,1
0
1472,70
P11 Grup 3 490,902 0,4 683,100 1,1
5
1464,59
P12 Grup 3 488,197 0,4 683,100 1,1
0
1601,83
P13 Grup 3 533,944 0,4 683,100 1,1
1
1470,51
P14 Grup 3 490,171 0,4 683,100 1,1
2
1388,48
P15 Grup 3 462,827 0,4 683,100 1,1
2
1459,24
P16 Grup 3 486,416 0,4 683,100 1,1
7

 Pondasi Tipe 9 (P9)


Diameter (D) : 0,4 m
Kedalaman (L) : 12 m
Beban (Q) : 1472,630 kN (dari tabel Joint Reactions SAP2000)
Qall : 683,100 kN

RESTI AYU PURWANTI(G1B019014) 33


TUGAS BESAR PONDASI DALAM

Jumlah tiang (n) : Q/Qall = 1472,630/683,100 = 2,15≈ 2 buah


Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1472,630/3 = 490,877 kN
Jarak antar tiang (s) : 3 x D + 0,3 = 3 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 10 (P10)


Diameter (D) : 0,4 m
Kedalaman (L) : 12 m
Beban (Q) : 1490,210 kN (dari tabel Joint Reactions SAP2000)
Qall : 683,100 kN
Jumlah tiang (n) : Q/Qall = 1490,210/683,100 = 2,18≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1490,210 /3 = 469,737 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 11 (P11)


Diameter (D) : 0,4 m
Kedalaman (L) : 12 m
Beban (Q) : 1472,705 kN (dari tabel Joint Reactions SAP2000)
Qall : 683,100 kN
Jumlah tiang (n) : Q/Qall = 1472,705/683,100 = 2,15≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1472,705 /3 = 490,902 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 12 (P12)


Diameter (D) : 0,4 m
Kedalaman (L) : 12 m
Beban (Q) : 1464,590 kN (dari tabel Joint Reactions SAP2000)
Qall : 683,100 kN
Jumlah tiang (n) : Q/Qall = 1464,590/683,100= 2,14≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1464,590/3 = 488,197 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

RESTI AYU PURWANTI(G1B019014) 34


TUGAS BESAR PONDASI DALAM

 Pondasi Tipe 13 (P13)


Diameter (D) : 0,4 m
Kedalaman (L) : 12 m
Beban (Q) : 1601,831 kN (dari tabel Joint Reactions SAP2000)
Qall : 683,100 kN
Jumlah tiang (n) : Q/Qall = 1601,831/683,100= 2,34≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1601,831/3 = 533,944 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 14 (P14)


Diameter (D) : 0,4 m
Kedalaman (L) : 12 m
Beban (Q) : 1470,512 kN (dari tabel Joint Reactions SAP2000)
Qall : 683,100 kN
Jumlah tiang (n) : Q/Qall = 1470,512/683,100 = 2,15≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1470,512/3 = 490,171 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 15 (P15)


Diameter (D) : 0,4 m
Kedalaman (L) : 12 m
Beban (Q) : 1388,482 kN (dari tabel Joint Reactions SAP2000)
Qall :683,100 kN
Jumlah tiang (n) : Q/Qall = 1388,482/683,100= 2,03≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1388,482/3 = 462,827 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

 Pondasi Tipe 16 (P16)


Diameter (D) : 0,4 m
Kedalaman (L) : 12 m
Beban (Q) : 1459,247 kN (dari tabel Joint Reactions SAP2000)

RESTI AYU PURWANTI(G1B019014) 35


TUGAS BESAR PONDASI DALAM

Qall : 683,100 kN
Jumlah tiang (n) : Q/Qall = 1459,247/683,100 = 2,14≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1459,247/3 = 486,416 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,4 + 0,3 = 1,1 m

3.10.3 Beban Rencana PondasiSondir 1


Jarak
Min
No Bentuk Jumlah Beban 1 Diamete Kapasitas 1
Beban Anta
Pondasi Tiang Tiang Tiang r Tiang
r
Tiang
1469,30
P17 Grup 3 489,768 0,3 664,074 0,9
5
1552,77
P18 Grup 3 517,592 0,3 664,074 0,9
6
1577,88
P19 Grup 3 525,962 0,3 664,074 0,9
7
1559,95
P20 Grup 3 519,984 0,3 664,074 0,9
1
1473,62
P21 Grup 3 491,208 0,3 664,074 0,9
3
1543,61
P22 Grup 3 514,538 0,3 664,074 0,9
3
1390,86
P23 Grup 3 463,621 0,3 664,074 0,9
2
1390,63
P24 Grup 3 463,546 0,3 664,074 0,9
7

 Pondasi Tipe 17 (P17)


Diameter (D) : 0,3 m

RESTI AYU PURWANTI(G1B019014) 36


TUGAS BESAR PONDASI DALAM

Kedalaman (L) : 14 m
Beban (Q) : 1469,305 kN (dari tabelJoint Reactions SAP2000)
Qall : 664,074 kN
Jumlah tiang (n) : Q/Qall = 1469,305/664,074 = 2,21≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1469,074/3 = 489,768 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 3 x 0,3 + 0,3 = 0,9 m

 Pondasi Tipe 18 (P18)


Diameter (D) : 0,3 m
Kedalaman (L) : 14 m
Beban (Q) : 1552,776 kN (dari tabel Joint Reactions SAP2000)
Qall : 664,074 kN
Jumlah tiang (n) : Q/Qall = 1552,776/664,074 = 2,34≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1552,776/3 = 517,592kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,3 + 0,3 = 0,9 m

 Pondasi Tipe 19 (P19)


Diameter (D) : 0,3 m
Kedalaman (L) : 14 m
Beban (Q) : 1577,887 kN (dari tabel Joint Reactions SAP2000)
Qall : 664,074 kN
Jumlah tiang (n) : Q/Qall = 1577,887/664,074 = 2,38≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1577,887/3 = 525,962 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 2 x 0,3 + 0,3 = 0,9 m

 Pondasi Tipe 20 (P20)


Diameter (D) : 0,3 m
Kedalaman (L) : 14 m
Beban (Q) : 1559,951 kN (dari tabel Joint Reactions SAP2000)
Qall : 664,074kN
Jumlah tiang (n) : Q/Qall = 1552,368/664,074= 2,35≈ 3 buah

RESTI AYU PURWANTI(G1B019014) 37


TUGAS BESAR PONDASI DALAM

Bentuk tiang : Grup


Beban 1 tiang : Q/n = 1552,368/3 = 519,982 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 3 x 0,3 + 0,3 = 0,9 m

 Pondasi Tipe 21 (P21)


Diameter (D) : 0,3 m
Kedalaman (L) : 14 m
Beban (Q) :1473,623 kN (dari tabel Joint Reactions SAP2000)
Qall : 664,074kN
Jumlah tiang (n) : Q/Qall = 1473,623/664,074= 2,22≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1473,623/3 = 514,538 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 3 x 0,3 + 0,3 = 0,9 m

 Pondasi Tipe 22 (P22)


Diameter (D) : 0,3 m
Kedalaman (L) : 14 m
Beban (Q) : 1543,613 kN (dari tabel Joint Reactions SAP2000)
Qall : 664,074kN
Jumlah tiang (n) : Q/Qall = 1660,728/664,074= 1,56≈ 2 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1660,728/3 = 830,364 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 3 x 0,3 + 0,3 = 0,9 m

 Pondasi Tipe 23 (P23)


Diameter (D) : 0,3 m
Kedalaman (L) : 14 m
Beban (Q) : 1390,637kN (dari tabel Joint Reactions SAP2000)
Qall : 664,074 kN
Jumlah tiang (n) : Q/Qall = 1390,074/664,074= 2,09≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1390,074/3 = 463,621 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 3 x 0,3 + 0,3 = 0,9 m

 Pondasi Tipe 24 (P24)

RESTI AYU PURWANTI(G1B019014) 38


TUGAS BESAR PONDASI DALAM

Diameter (D) : 0,3 m


Kedalaman (L) : 14 m
Beban (Q) : 1390,637 kN (dari tabel Joint Reactions SAP2000)
Qall : 664,074 kN
Jumlah tiang (n) : Q/Qall = 1390,637/664,074 = 2,09≈ 3 buah
Bentuk tiang : Grup
Beban 1 tiang : Q/n = 1390,637/3 = 463,546 kN
Jarak antar tiang (s) : 2 x D + 0,3 = 3 x 0,3 + 0,3 = 0,9 m

3.11 Distribusi Beban Tiang


3.11.1 Distribusi Beban Tiang Pada Sondir 4
Kapasitas
No Keteranga
Q (kN) Mx My Qi 1 Qi 2 Qi 3 Qi maks Daya
pondasi n
Dukung
1472,63 33,92 411,90 514,50
P1 60,875
0 4 522,586 3 9 522,586 683,100 Aman
1490,21 28,39 440,03 516,51
P2 40,616
0 0 513,884 6 4 516,514 683,100 Aman
1472,70 12,28 427,87 499,46
P3 59,912
5 9 536,806 5 3 536,806 683,100 Aman
1464,59 12,01 440,77 496,56
P4 42,960
0 4 518,882 3 6 518,882 683,100 Aman
1601,83 538,15 528,05
P5 -8,455 1,851
1 541,516 1 3 541,516 683,100 Aman
1470,51 483,69 494,40
P6 6,074 2,470
2 488,185 4 2 494,402 683,100 Aman
1388,48 469,40 459,95
P7 -4,125 -4,078
2 461,994 8 4 469,408 683,100 Aman
1459,24 11,44 430,71 494,38
P8 52,502
7 5 526,172 4 8 526,172 683,100 Aman

RESTI AYU PURWANTI(G1B019014) 39


TUGAS BESAR PONDASI DALAM

Tabel Perhitungan Eksentrisitas pada Pondasi Sondir 3 untuk jumlah tiang 3 buah
Tiang x y x2 y2
1 0,55 -0,48 0,3025 0,2290
2 -0,55 -0,48 0,3025 0,2290
3 0,00 0,48 0,0000 0,2290
Σx2 0,605
Σy2 0,687

Gambar 6.2 Distribusi Tiang Grup jumlah 3 tiang

Diketahui :
Titik O pile cap berada di tengah bentang, sehingga :
Jarak antar tiang (s) = 1100 mm
s 1100
Nilai eksentrisitas (x) terhadap titik O = = = 550 mm
2 2
Selanjutnya nilai x2 dan lainnya terlihat seperti pada tabel perhitungan
eksentrisitas pondasi pada Sondir 3.

 Perhitungan Pondasi No. 1 Diketahui :


Q = 1472,630 kN
My = 60,875kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)

RESTI AYU PURWANTI(G1B019014) 40


TUGAS BESAR PONDASI DALAM

Akibat nilai V sentris terhadap titik O, maka tiang


menahan beban sama besar, maka
Q/n = 1472,630/3 = 490,877kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1472,630 60,875(0 , 55) 33,924(−0 , 48)


= + +
3 0,605 0,687
=522,586kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1472,630 60,875(−0 , 55) 33,924(−0 , 48)


= + +
3 0,605 0,687
=411,930kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1472,630 60,875(0) 33,924(0 , 48)


= + +
3 0,605 0,687
=514,509kN

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 490,877+ 522,586
= 1013,462kN
∑P2 = P + Q2
= 490,877+ 411,903

RESTI AYU PURWANTI(G1B019014) 41


TUGAS BESAR PONDASI DALAM

= 902,780 kN

∑P3 = P + Q3
= 490,877 + 514,509
= 1005,385 kN

 Perhitungan Pondasi No. 2 Diketahui :


Q = 1490,210 kN
My = 40,616kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1490,210/3 = 496,737kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1490,210 40,616 (0 ,55) 28,390(−0 , 48)


= + +
3 0,605 0,687
=513,884 kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1490,210 40,616 (−0 , 55) 28,390(−0 , 48)


= + +
3 0,605 0,687
=440,036kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

RESTI AYU PURWANTI(G1B019014) 42


TUGAS BESAR PONDASI DALAM

1490,210 40,616 (0) 28,390(0 , 48)


= + +
3 0,605 0,687
=516,514kN

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 496,737+ 513,884
= 1010,620kN
∑P2 = P + Q2
= 496,737+ 440,036
= 926,773 kN

∑P3 = P + Q3
= 496,737+ 516,514
= 1013,251 kN

 Perhitungan Pondasi No. 3 Diketahui :


Q = 1472,705 kN
My = 59,912kN.m
Mx = 12,289 kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)

RESTI AYU PURWANTI(G1B019014) 43


TUGAS BESAR PONDASI DALAM

Akibat nilai V sentris terhadap titik O, maka tiang


menahan beban sama besar, maka
Q/n = 1472,705/3 = 490,902 kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1472,705 59,912(0 , 55) 12,289(−0 , 48)


= + +
3 0,605 0,687
=536,809 kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1472,705 59,912(−0 , 55) 12,289(−0 , 48)


= + +
3 0,605 0,687
=427,875kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1472,705 59,912(0) 12,289(0 , 48)


= + +
3 0,605 0,687
=499,463kN

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 490,902 + 486,495
= 1027,708kN
∑P2 = P + Q2
= 490,902+ 427,875
= 918,777kN

∑P3 = P + Q3

RESTI AYU PURWANTI(G1B019014) 44


TUGAS BESAR PONDASI DALAM

= 490,902+ 499,463
= 990,364 kN

 Perhitungan Pondasi No. 4 Diketahui :


Q = 1464,590 kN
My = 42,960kN.m

Jum Jumlah tiang pondasi (n) = 3 tiang


Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1464,590/3 = 488,197kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1464,590 42,960(0 ,55) 12,014(−0 , 48)


= + +
3 0,605 0,687
=518,882 kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1464,590 42,960(−0 ,55) 12,014(−0 , 48)


= + +
3 0,605 0,687
=440,773kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1464,590 69,088(0) 80,276(0 , 48)


= + +
3 0,605 0,687

RESTI AYU PURWANTI(G1B019014) 45


TUGAS BESAR PONDASI DALAM

=496,566kN

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 488,197+ 518,882
= 1007,078kN
∑P2 = P + Q2
= 488,197+ 440,773
= 928,970 kN

∑P3 = P + Q3
= 488,197+ 496,566
= 984,763 kN

 Perhitungan Pondasi No. 5 Diketahui :


Q = 1601,831 kN
My = 1,851kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1601,831/3 = 533,944 kN

 Mencari nilai Q1 dan Q2 akibat momen

RESTI AYU PURWANTI(G1B019014) 46


TUGAS BESAR PONDASI DALAM

Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1601,831 1,851(0 , 55) −8,455(0 , 48)


= + +
3 0,605 0,687
=541,516kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1601,831 1,851(−0 , 55) −8,455(0 , 48)


= + +
3 0,605 0,687
=538,515kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1601,831 1,851(0) −8,455(−0 , 48)


= + +
3 0,605 0,687
=528,053 kN

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 533,944+ 541,516
= 1075,460kN
∑P2 = P + Q2
= 533,944+ 538,515
= 1072,095kN

∑P3 = P + Q3
= 533,944+ 528,053
= 1061,997kN

RESTI AYU PURWANTI(G1B019014) 47


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 6 Diketahui :


Q = 1470,512 kN
My = 2,470kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1470,512/3 = 490,171kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1470,512 2,470(0 , 55) 6,074(−0 , 48)


= + +
3 0,605 0,687
=488,185 kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1470,512 2,470(−0 , 55) 6,074(−0 , 48)


= + +
3 0,605 0,687
=483,694 kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1470,512 2,470(0) 6,074(0 , 48)


= + +
3 0,605 0,687
=494,402kN

RESTI AYU PURWANTI(G1B019014) 48


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 490,171+ 488,185
= 978,355kN
∑P2 = P + Q2
= 490,171+ 483,694
= 973,864 kN

∑P3 = P + Q3
= 490,171+ 494,402
= 984,573 kN

RESTI AYU PURWANTI(G1B019014) 49


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 7 Diketahui :


Q = 1388,482 kN
My = -4,078kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1388,482/3 = 462,827kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1388,482 −4,078( 0 ,55) −4,125(−0 , 48)


= + +
3 0,605 0,687
=461,994 kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1388,482 −4,078(−0 ,55) −4,125(−0 , 48)


= + +
3 0,605 0,687
=469,408kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1388,482 −4,078( 0) −4,125( 0 , 48)


= + +
3 0,605 0,687
=459,954kN

RESTI AYU PURWANTI(G1B019014) 50


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 462,827+ 461,994
= 924,821kN
∑P2 = P + Q2
= 462,827+ 469,408
= 923,235 kN

∑P3 = P + Q3
= 462,827+ 459,954
= 922,781 kN

RESTI AYU PURWANTI(G1B019014) 51


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 8 Diketahui :


Q = 1459,247kN
My = 52,502kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1459,247/3 = 486,416kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1459,247 52,502(0 , 55) 11,445(−0 , 48)


= + +
3 0,605 0,687
=526,172 kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1459,247 52,502(−0 , 55) 11,445(−0 , 48)


= + +
3 0,605 0,687
=430,714kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1459,247 52,502(0) 11,445(0 , 48)


= + +
3 0,605 0,687
=494,388kN

RESTI AYU PURWANTI(G1B019014) 52


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 486,416+ 526,172
= 1012,588kN
∑P2 = P + Q2
= 486,416+ 430,714
= 917,130 kN

∑P3 = P + Q3
= 486,416+ 494,388
= 980,804 kN

RESTI AYU PURWANTI(G1B019014) 53


TUGAS BESAR PONDASI DALAM

3.11.2 Distribusi Beban Tiang Pada Sondir 3


Kapasitas
No Qi Keteranga
Q (kN) Mx My Qi 1 Qi 2 Qi3 Daya
pondasi maks n
Dukung
1397,49 486,54 458,41 459,18
P9 9,5452 15,469 486,545 620,599 Aman
8 5 9 3
1282,21 26,119 493,97 397,23 409,21
P10 53,208 493,972 620,599 Aman
6 6 2 0 0
1295,56 24,450 482,13 415,64 414,82
P11 36,566 482,130 620,599 Aman
7 4 0 6 3
1388,85 26,887 519,53 443,82 444,22
P12 41,641 519,537 620,599 Aman
4 8 7 7 1
1334,38 16,972 497,53 415,70 432,97
P13 45,002 497,530 620,599 Aman
8 1 0 8 3
1306,76 10,113 488,23 397,03 428,54
P14 50,162 488,237 620,599 Aman
9 4 7 3 4
1304,15 11,918 488,94 397,09 426,41
P15 50,518 488,945 620,599 Aman
3 5 5 5 5
1318,70 10,560 484,32 397,09 432,21
P16 41,139 484,325 620,599 Aman
8 4 5 5 3

Tabel Perhitungan Eksentrisitas pada Pondasi Sondir 3 untuk jumlah tiang 3 buah
Tiang x Y x2 y2
1 0,55 -0,48 0,3025 0,2290
2 -0,55 -0,48 0,3025 0,2290
3 0,00 0,48 0,0000 0,2290
Σx2 0,61
Σy2 0,69

Gambar 6.2 Distribusi Tiang Grup jumlah 3 tiang

Diketahui :
Titik O pile cap berada di tengah bentang, sehingga :
Jarak antar tiang (s) = 1100 mm
s 1100
Nilai eksentrisitas (x) terhadap titik O = = = 550 mm
2 2

RESTI AYU PURWANTI(G1B019014) 54


TUGAS BESAR PONDASI DALAM

Selanjutnya nilai x2 dan lainnya terlihat seperti pada tabel perhitungan


eksentrisitas pondasi pada Sondir 4.

 Perhitungan Pondasi No. 9 Diketahui :


Q = 1397,498 kN
My = 15,469kN.m
Mx = 9,5452 kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1397,498/3 = 465,833kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1397,498 15,469(0 , 55) 9,5452(−0 , 48)


= + +
3 0,605 0,687
=486,545kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1397,498 15,469(−0 , 55) 9,5452(−0 , 48)


= + +
3 0,605 0,687
=458,419kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1397,498 15,469(0) 9,5452(0 , 48)


= + +
3 0,605 0,687

RESTI AYU PURWANTI(G1B019014) 55


TUGAS BESAR PONDASI DALAM

=459,183kN

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 465,833+ 486,545
= 952,378kN
∑P2 = P + Q2
= 465,833+ 458,419
= 924,252 kN

∑P3 = P + Q3
= 465,833+ 459,183
= 925,016 kN

 Perhitungan Pondasi No. 10 Diketahui :


Q = 1282,216 kN
My = 53,208kN.m
Mx = 26,120kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1282,216/3 = 427,405kN

 Mencari nilai Q1 dan Q2 akibat momen

RESTI AYU PURWANTI(G1B019014) 56


TUGAS BESAR PONDASI DALAM

Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1282,216 53,208(0 , 55) 26,120(−0 , 48)


= + +
3 0,605 0,687
=493,972kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1282,216 53,208(−0 , 55) 26,120(−0 , 48)


= + +
3 0,605 0,687
=397,230kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1282,216 53,208(0) 26,120(0 , 48)


= + +
3 0,605 0,687
=409,210kN

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 427,405+ 493,972
= 921,377kN
∑P2 = P + Q2
= 427,405+ 397,230
= 824,635 kN

∑P3 = P + Q3
= 427,405+ 409,210
= 836,615 kN

 Perhitungan Pondasi No. 11 Diketahui :

RESTI AYU PURWANTI(G1B019014) 57


TUGAS BESAR PONDASI DALAM

Q = 1295,567 kN
My = 36,566kN.m
Mx = 24,450 kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1295,567/3 = 431,856kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1295,567 36,566(0 , 55) 24,450(−0 , 48)


= + +
3 0,605 0,687
=482,130kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1295,567 36,566(−0 , 55) 24,450(−0 , 48)


= + +
3 0,605 0,687
=415,646kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1295,567 36,566(0) 24,450(0 , 48)


= + +
3 0,605 0,687
=414,823kN

RESTI AYU PURWANTI(G1B019014) 58


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 431,856+ 482,130
= 913,986kN
∑P2 = P + Q2
= 431,856+ 397,230
= 847,502 kN

∑P3 = P + Q3
= 431,856+ 414,823
= 846,679 kN

 Perhitungan Pondasi No. 12 Diketahui :


Q = 1388,854 kN
My = 41,641kN.m
Mx = 26,88 kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1388,854/3 = 462,951kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

RESTI AYU PURWANTI(G1B019014) 59


TUGAS BESAR PONDASI DALAM

1388,854 41,641(0 , 55) 26,888(−0 , 48)


= + +
3 0,605 0,687
=519,537kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1388,854 41,641(−0 ,55) 26,888(−0 , 48)


= + +
3 0,605 0,687
=443,827kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1388,854 41,641(0) 26,888(0 , 48)


= + +
3 0,605 0,687
=444,221kN

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 462,951+ 519,537
= 982,488kN
∑P2 = P + Q2
= 462,951+ 443,827
= 906,778kN

∑P3 = P + Q3
= 462,951+ 444,221
= 907,172kN

RESTI AYU PURWANTI(G1B019014) 60


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 13 Diketahui :


Q = 1334,388 kN
My = 45,002 kN.m
Mx = 16,972 kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1334,388/3 = 444,796kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1334,388 45,002(0 , 55) 16,972(−0 , 48)


= + +
3 0,605 0,687
=497,530kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1334,388 45,002(−0 ,55) 16,972(−0 , 48)


= + +
3 0,605 0,687
=415,708kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1334,388 45,002(0) 16,972(0 , 48)


= + +
3 0,605 0,687
=432,973kN

RESTI AYU PURWANTI(G1B019014) 61


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 444,796+ 497,530
= 942,236kN
∑P2 = P + Q2
= 444,796+ 415,708
= 860,504 kN

∑P3 = P + Q3
= 444,796+ 432,973
= 877,769 kN

RESTI AYU PURWANTI(G1B019014) 62


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 14 Diketahui :


Q = 1306,769 kN
My = 50,162kN.m
Mx = 10,113 kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1306,769/3 = 435,590kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1306,769 50,162(0 , 55) 10,113(0 , 48)


= + +
3 0,605 0,687
=488,237kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1306,769 50,162(−0 , 55) 10,113(0 , 48)


= + +
3 0,605 0,687
=397,033kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1800,881 50,162(0) 10,113(−0 , 48)


= + +
2 0,605 0,687
=428,237kN

RESTI AYU PURWANTI(G1B019014) 63


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 435,590+ 488,237
= 923,826kN
∑P2 = P + Q2
= 435,590+ 397,033
= 832,623kN

∑P3 = P + Q3
= 435,590+ 428,544
= 864,134 kN

 Perhitungan Pondasi No. 15 Diketahui :


Q = 1304,153 kN
My = 50,518 kN.m
Mx = 11,919 kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka

RESTI AYU PURWANTI(G1B019014) 64


TUGAS BESAR PONDASI DALAM

Q/n = 1304,153/3 = 434,718kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1304,153 50,518(0 , 55) 11,919(−0 , 48)


= + +
3 0,605 0,687
=488,945kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1304,153 50,518(−0 , 55) 11,919(−0 , 48)


= + +
3 0,605 0,687
=397,095kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1304,153 50,518(0) 11,919(0 , 48)


= + +
3 0,605 0,687
=426,415kN

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 434,718+ 488,945
= 923,663kN
∑P2 = P + Q2
= 434,718+ 397,095
= 831,813 kN

∑P3 = P + Q3
= 434,718+ 426,415
= 861,133 kN

RESTI AYU PURWANTI(G1B019014) 65


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 16 Diketahui :


Q = 1318,708 kN
My = 41,139kN.m
Mx = 10,569 kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1318,708/3 = 439,569kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1318,708 41,139(0 ,55) 10,560(−0 , 48)


= + +
3 0,605 0,687
=484,325kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1318,708 41,139(−0 ,55) 10,560(−0 , 48)


= + +
3 0,605 0,687
=397,095kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1318,708 41,139(0) 10,560(0 , 48)


= + +
3 0,605 0,687
=432,213kN

RESTI AYU PURWANTI(G1B019014) 66


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 439,569+ 484,325
= 923,894kN
∑P2 = P + Q2
= 439,569+ 397,095
= 871,782 kN

∑P3 = P + Q3
= 439,569+ 432,213
= 836,665 kN

RESTI AYU PURWANTI(G1B019014) 67


TUGAS BESAR PONDASI DALAM

3.11.3 Distribusi Beban Tiang Pada Sondir 1


Kapasitas
No Qi Keteranga
Q (kN) Mx My Qi 1 Qi 2 Daya
pondasi maks n
Dukung
1469,30 26,17 601,84 422,25
P17
5 0 80,814 3 7 467,487 601,843 664,074
1552,77 11,35 580,61 473,89
P18
6 0 48,022 4 8 507,928 580,614 664,074
1577,88 14,82 607,26 469,89
P19
7 1 61,817 7 6 513,344 607,267 664,074
1559,95 15,15 594,09 471,66
P20
1 0 55,094 8 7 507,085 594,098 664,074
1473,62 35,93 604,55 439,04
P21
3 1 74,480 6 5 460,615 604,556 664,074
1543,61 38,68 586,12 508,83
P22
3 7 34,780 1 2 481,599 586,121 664,074
1390,86 34,00 555,89 429,26
P23
2 7 56,984 0 0 434,667 555,890 664,074
1390,63 22,07 542,93 421,74
P24
7 4 54,537 7 3 444,752 542,937 664,074

Tabel Perhitungan Eksentrisitas pada Pondasi Sondir 1 untuk jumlah tiang 3 buah
Tiang x y x2 y2
1 0,55 -0,48 0,3025 0,2290
2 -0,55 -0,48 0,3025 0,2290
3 0,00 0,48 0,0000 0,2290
Σx2 0,605
Σy2 0,687

Gambar 6.2 Distribusi Tiang Grup jumlah 3 tiang

Diketahui :
Titik O pile cap berada di tengah bentang, sehingga :
Jarak antar tiang (s) = 1100 mm

RESTI AYU PURWANTI(G1B019014) 68


TUGAS BESAR PONDASI DALAM

s 1100
Nilai eksentrisitas (x) terhadap titik O = = = 550 mm
2 2
Selanjutnya nilai x2 dan lainnya terlihat seperti pada tabel perhitungan
eksentrisitas pondasi pada Sondir 1.

 Perhitungan Pondasi No. 17 Diketahui :


Q = 1469,305 kN
My = 80,814kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1469,305/3 = 489,768
kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1469,305 80,814(0 , 45) 26,170(0 , 39)


= + +
3 0,410 0,460
=601,843 kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1469,305 80,814(−0 , 45) 26,170(0 , 39)


= + +
3 0,410 0,460
=422,257kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1469,305 80,814(0) 26,170(−0 , 39)


= + +
3 0,410 0,460

RESTI AYU PURWANTI(G1B019014) 69


TUGAS BESAR PONDASI DALAM

=467,487kN

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 489,768+ 601,843
= 1091,612kN
∑P2 = P + Q2
= 489,768+ 422,257
= 915,025 kN

∑P3 = P + Q3
= 489,768+ 467,487
= 957,255 kN

RESTI AYU PURWANTI(G1B019014) 70


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 18 Diketahui :


Q = 1552,776 kN
My = 48,022kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1552,776/3 = 517,592
kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1552,776 48,022(0 , 45) 11,350(0 ,39)


= + +
3 0,410 0,460
=580,614kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1552,776 48,022(−0 , 45) 11,350(0 ,39)


= + +
3 0,410 0,460
=473,898 kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1552,776 48,022(0) 11,350(−0 ,39)


= + +
3 0,410 0,460
=507,928kN

RESTI AYU PURWANTI(G1B019014) 71


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 517,592 + 580,614
= 1098,206 kN
∑P2 = P + Q2
= 517,592 + 473,898
=991,490 kN

∑P3 = P + Q3
= 517,592 + 507,928
=1025,520 kN

RESTI AYU PURWANTI(G1B019014) 72


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 19 Diketahui :


Q = 1557,887 kN
My = 61,817kN.m
Mx = 14,821
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1557,887/3 = 525,962 kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1577,887 61,817(0 , 45) 14,821(0 , 39)


= + +
3 0,410 0,460
=607,267 kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1577,887 61,817(−0 , 45) 14,821(0 , 39)


= + +
3 0,410 0,460
=469,896 kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1577,887 61,817(0) 14,821(−0 , 39)


= + +
3 0,410 0,460
=513,344kN

RESTI AYU PURWANTI(G1B019014) 73


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 525,962 + 607,267
=1133,229 kN
∑P2 = P + Q2
= 525,962 + 469,896
=995,858 kN

∑P3 = P + Q3
= 525,962 + 513,344
=1039,306 kN

RESTI AYU PURWANTI(G1B019014) 74


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 20 Diketahui :


Q = 1559,951kN
My = 55,094kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1559,951 /3 = 519,984 kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1559,951 55,094(0 , 45) 15,150(0 , 39)


= + +
3 0,410 0,460
=594,098 kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1559,951 55,094(−0 , 45) 15,150(0 , 39)


= + +
3 0,410 0,460
=471,667 kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1559,951 55,094(0) 15,150(−0 , 39)


= + +
3 0,410 0,460
=507,085kN

RESTI AYU PURWANTI(G1B019014) 75


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 519,984+ 594,098
=1114,082kN
∑P2 = P + Q2
= 519,984 + 471,667
=991,650 kN

∑P2 = P + Q3
= 519,984 + 507,085
=1027,068 kN

RESTI AYU PURWANTI(G1B019014) 76


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 21 Diketahui :


Q = 1473,623kN
My = 74,480kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1473,623/3 = 491,208 kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1473,623 74,480(0 , 45) 35,931(0 , 39)


= + +
3 0,410 0,460
=604,556 kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1473,623 74,480(−0 , 45) 15,150(0 , 39)


= + +
3 0,410 0,460
=439,045 kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1559,951 74,480(0) 15,150(−0 , 39)


= + +
3 0,410 0,460
=460,651kN

RESTI AYU PURWANTI(G1B019014) 77


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 491,208 + 604,556
=1095,763 kN
∑P2 = P + Q2
= 491,208 + 439,045
=930,252 kN
∑P3 = P + Q3
= 491,208 + 460,615
=951,823 kN

RESTI AYU PURWANTI(G1B019014) 78


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 22 Diketahui :


Q = 1543,613kN
My = 34,780kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1543,613/3 = 514,538 kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1543,613 34,780(0 , 45) 34,687(0 , 39)


= + +
3 0,410 0,460
=586,121kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1543,613 34,780(−0 , 45) 34,687(0 , 39)


= + +
3 0,410 0,460
=508,832kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1543,613 34,780(0) 34,687(−0 , 39)


= + +
3 0,410 0,460
=481,599kN

RESTI AYU PURWANTI(G1B019014) 79


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 514,538 + 586,121
=1100,659kN
∑P2 = P + Q2
= 514,538+ 508,832
=1023,370kN
∑P3 = P + Q3
= 514,538+ 481,599
=996,137kN

RESTI AYU PURWANTI(G1B019014) 80


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 23 Diketahui :


Q = 1390,862kN
My = 56,984kN.m
Jum Jumlah tiang pondasi (n) = 3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1390,637/3 = 463,621 kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1390,862 56,984(0 , 45) 34,007(0 , 39)


= + +
3 0,410 0,460
=555,890kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1390,862 56,984(−0 , 45) 34,007(0 , 39)


= + +
3 0,410 0,460
=429,260kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1390,862 56,984(0) 34,007(−0 , 39)


= + +
3 0,410 0,460
=434,667kN

RESTI AYU PURWANTI(G1B019014) 81


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 463,621 + 555,890
=1019,511 kN
∑P2 = P + Q2
= 463,621+ 429,260
=892,881 kN
∑P2 = P + Q3
= 463,621+ 434,667
=898,287 kN

RESTI AYU PURWANTI(G1B019014) 82


TUGAS BESAR PONDASI DALAM

 Perhitungan Pondasi No. 24 Diketahui :


Q = 1390,637 kN
My = 54,537kN.m
Jum Jumlah tiang pondasi (n) =3 tiang
Jarak antar tiang (s) = 1100mm
Lebar pile cap = s + d + 300
= 1100 + 400 + 300
= 1800 mm
 Mencari nilai P (Beban 1 tiang)
Akibat nilai V sentris terhadap titik O, maka tiang
menahan beban sama besar, maka
Q/n = 1390,637/3 = 463,546 kN

 Mencari nilai Q1 dan Q2 akibat momen


Q M y x1 M x y1
Q1= + +
n ∑ x2 ∑ y2

1390,637 54,537(0 , 45) 22,074(0 ,39)


= + +
3 0,410 0,460
=542,937kN
Q M y x2 M x y2
Q2= + +
n ∑ x2 ∑ y2

1390,637 54,537(−0 , 45) 22,074(0 ,39)


= + +
3 0,410 0,460
=421,743kN
Q M y x3 M x y3
Q3= + +
n ∑ x2 ∑ y2

1390,637 54,537(0) 22,074(−0 ,39)


= + +
3 0,410 0,460
=444,752kN

RESTI AYU PURWANTI(G1B019014) 83


TUGAS BESAR PONDASI DALAM

 Mencari nilai ∑P1 & ∑P2 (Nilai total perlawanan


tiang)
∑P1 = P + Q1
= 463,546+ 542,937
=1006,482 kN
∑P2 = P + Q2
= 463,546+ 421,743
=885,288 kN
∑P3 = P + Q3
= 463,546 + 444,752
=908,297 kN

3.13Penurunan Tiang Grup


Penurunan tiang grup dapat dicari dengan rumus persamaan (15). Penurunan
tiang grup dapat dilihat pada tabel 6.9 sebagai berikut:
3.13.1 Penurunan Tiang Grup Sondir 4
No Keteranga
Q (kN) d (m) s (m) B (m) S (m) Sg (m) Sg (mm) Sg (inch)
Pondasi n
1472,63 0,0057
P1 0,4 1,1 1,8 0,01791 17,9078 0,7050 Aman
0 9
1490,21 0,0058
P2 0,4 1,1 1,8 0,01812 18,1216 0,7134 Aman
0 6
1472,70 0,0057
P3 0,4 1,1 1,8 0,01791 17,9087 0,7051 Aman
5 9
1464,59 0,0057
P4 0,4 1,1 1,8 0,01781 17,8100 0,7012 Aman
0 6
1601,83 0,0063
P5 0,4 1,1 1,8 0,01948 19,4789 0,7669 Aman
1 0
1470,51 0,0057
P6 0,4 1,1 1,8 0,01788 17,8820 0,7040 Aman
2 8
1388,48 0,0054
P7 0,4 1,1 1,8 0,01688 16,8845 0,6647 Aman
2 6
1459,24 0,0057
P8 0,4 1,1 1,8 0,01775 17,7450 0,6986 Aman
7 4

 Pondasi No. 1

RESTI AYU PURWANTI(G1B019014) 84


TUGAS BESAR PONDASI DALAM

Q = 1472,630 kN
D = 0,4 m
L = 12 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 55,2 MPa = 55200 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,067 (dari Gambar 2.3)
Rk = 1,14 (dari Gambar 2.4)
Rh = 0,37 (dari Gambar 2.5)
Rμ = 0,96 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 504
Es pasir 55 , 2
I = I 0 R k R h R μ = 0,067 x 1,14 x 0,37 x 0,96 = 0,0271
QI 1472,630 x 0,0271
S = = = 0,00579 m = 0,2280 inch
Es D 55200 x 0 , 4
2 2
S (4 B+3) 0,00579(4 x 1 , 8+3)
Sg = 2 = = 0,01791 m = 0,7050inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 2
Q = 1490,210 kN
D = 0,4 m
L = 12 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 55,2 MPa = 55200 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,067 (dari Gambar 2.3)
Rk = 1,14 (dari Gambar 2.4)
Rh = 0,37 (dari Gambar 2.5)
Rμ = 0,96 (dari Gambar 2.6)

RESTI AYU PURWANTI(G1B019014) 85


TUGAS BESAR PONDASI DALAM

Es beton 27805,575
Nilai K = = = 504
Es pasir 55 , 2
I = I 0 R k R h R μ = 0,067 x 1,14 x 0,37 x 0,96 = 0,0271
QI 1490,210 x 0,0271
S = = = 0,00586 m = 0,2307 inch
Es D 55200 x 0 , 4
2 2
S (4 B+3) 0,00586(4 x 1 , 8+3)
Sg = 2 = = 0,00181 m = 0,7134 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 3
Q = 1472,705kN
D = 0,4 m
L = 12 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 55,2 MPa = 55200 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,067 (dari Gambar 2.3)
Rk = 1,14 (dari Gambar 2.4)
Rh = 0,37 (dari Gambar 2.5)
Rμ = 0,96 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 504
Es pasir 55 , 2
I = I 0 R k R h R μ = 0,067 x 1,14 x 0,37 x 0,96 = 0,0271
QI 1472,705 x 0,0271
S = = = 0,00579 m = 0,2280 inch
Es D 55200 x 0 , 4
2 2
S (4 B+3) 0,00579(4 x 1 , 8+3)
Sg = 2 = = 0,01791 m = 0,7051 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 4
Q = 1464,590 kN
D = 0,4 m

RESTI AYU PURWANTI(G1B019014) 86


TUGAS BESAR PONDASI DALAM

L = 12 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 55,2 MPa = 55200 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,067 (dari Gambar 2.3)
Rk = 1,14 (dari Gambar 2.4)
Rh = 0,37 (dari Gambar 2.5)
Rμ = 0,96 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 504
Es pasir 55 , 2
I = I 0 R k R h R μ = 0,067 x 1,14 x 0,37 x 0,96 = 0,0271
QI 1464,590 x 0,0271
S = = = 0,00576 m = 0,2267 inch
Es D 55200 x 0 , 4
2 2
S (4 B+3) 0,00576(4 x 1 , 8+3)
Sg = 2 = = 0,01781 m = 0,7012 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.

 Pondasi No. 5
Q = 1601,831 kN
D = 0,4 m
L = 12 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 55,2 MPa = 55200 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,067 (dari Gambar 2.3)
Rk = 1,14 (dari Gambar 2.4)
Rh = 0,37 (dari Gambar 2.5)
Rμ = 0,96 (dari Gambar 2.6)

RESTI AYU PURWANTI(G1B019014) 87


TUGAS BESAR PONDASI DALAM

Es beton 27805,575
Nilai K = = = 504
Es pasir 55 , 2
I = I 0 R k R h R μ = 0,067 x 1,14 x 0,37 x 0,96 = 0,0271
QI 1601,831 x 0,0271
S = = = 0,00630 m = 0,2480 inch
Es D 55200 x 0 , 4
2 2
S (4 B+3) 0,00630(4 x 1 , 8+3)
Sg = 2 = = 0,01948 m = 0,7669 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 6
Q = 1470,512 kN
D = 0,4 m
L = 13 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 55,2 MPa = 55200 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,067 (dari Gambar 2.3)
Rk = 1,14 (dari Gambar 2.4)
Rh = 0,37 (dari Gambar 2.5)
Rμ = 0,96 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 504
Es pasir 55 , 2
I = I 0 R k R h R μ = 0,067 x 1,14 x 0,37 x 0,96 = 0,0271
QI 1470,512 x 0,0271
S = = = 0,00578 m = 0,2276 inch
Es D 55200 x 0 , 4
2 2
S (4 B+3) 0,00578(4 x 1 , 8+3)
Sg = 2 = = 0,01788 m = 0,7040 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 7
Q = 1388,482 kN
D = 0,4 m

RESTI AYU PURWANTI(G1B019014) 88


TUGAS BESAR PONDASI DALAM

L = 12 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 55,2 MPa = 55200 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,067 (dari Gambar 2.3)
Rk = 1,14 (dari Gambar 2.4)
Rh = 0,37 (dari Gambar 2.5)
Rμ = 0,96 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 504
Es pasir 55 , 2
I = I 0 R k R h R μ = 0,067 x 1,14 x 0,37 x 0,96 = 0,0271
QI 1388,482 x 0,0271
S = = = 0,00546 m = 0,2149 inch
Es D 55200 x 0 , 4
2 2
S (4 B+3) 0,00546(4 x 1 , 8+3)
Sg = 2 = = 0,01688 m = 0,6647 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.

 Pondasi No. 8
Q = 1459,247 kN
D = 0,4 m
L = 12 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 55,2 MPa = 55200 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,067 (dari Gambar 2.3)
Rk = 1,14 (dari Gambar 2.4)
Rh = 0,37 (dari Gambar 2.5)
Rμ = 0,96 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 504
Es pasir 55 , 2

RESTI AYU PURWANTI(G1B019014) 89


TUGAS BESAR PONDASI DALAM

I = I 0 R k R h R μ = 0,067 x 1,14 x 0,37 x 0,96 = 0,0271


QI 1459,247 x 0,0271
S = = = 0,00574 m = 0,2259 inch
Es D 55200 x 0 , 4
2 2
S (4 B+3) 0,00574(4 x 1, 8+3)
Sg = 2 = = 0,01775 m = 0,6986 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.

3.13.2 Penurunan Tiang Grup Sondir 3


No Keteranga
Q (kN) d (m) s (m) B (m) S (m) Sg (m) Sg (mm) Sg (inch)
Pondasi n
1397,49 0,0052
P9 0,4 1,1 1,8 0,0161 16,0698 0,6327 Aman
8 0
1282,21 0,0047
P10 0,4 1,1 1,8 0,0147 14,7442 0,5805 Aman
6 7
1295,56 0,0048
P11 0,4 1,1 1,8 0,0149 14,8977 0,5865 Aman
7 2
1388,85 0,0051
P12 0,4 1,1 1,8 0,0160 15,9704 0,6288 Aman
4 6
1334,38 0,0049
P13 0,4 1,1 1,8 0,0153 15,3441 0,6041 Aman
8 6
1306,76 0,0048
P14 0,4 1,1 1,8 0,0150 15,0265 0,5916 Aman
9 6
1304,15 0,0048
P15 0,4 1,1 1,8 0,0150 14,9964 0,5904 Aman
3 5
1318,70 0,0049
P16 0,4 1,1 1,8 0,0152 15,1638 0,5970 Aman
8 0

 Pondasi No. 9
Q = 1397,498 kN
D = 0,4 m

RESTI AYU PURWANTI(G1B019014) 90


TUGAS BESAR PONDASI DALAM

L = 11 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,058 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,38 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,058 x 1,2 x 0,38 x 0,97 = 0,0257
QI 1397,498 x 0,0257
S = = = 0,00520 m = 0,2046 inch
Es D 17250 x 0 , 4
2 2
S (4 B+3) 0,00520(4 x 1 , 8+3)
Sg = 2 = = 0,0161 m = 0,6327 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.

 Pondasi No. 10
Q = 1282,216 kN
D = 0,4 m
L = 11 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,058 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,38 (dari Gambar 2.5)

RESTI AYU PURWANTI(G1B019014) 91


TUGAS BESAR PONDASI DALAM

Rμ = 0,97 (dari Gambar 2.6)


Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,058 x 1,2 x 0,38 x 0,97 = 0,0257
QI 1282,216 x 0,0257
S = = = 0,00477 m = 0,1877 inch
Es D 17250 x 0 , 4
2 2
S (4 B+3) 0,00447(4 x 1 , 8+3)
Sg = 2 = = 0,0147 m = 0,5805 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 11
Q = 1295,567 kN
D = 0,4 m
L = 11 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,058 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,38 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,058 x 1,2 x 0,38 x 0,97 = 0,0257
QI 1295,567 x 0,0257
S = = = 0,00482 m = 0,1896 inch
Es D 17250 x 0 , 4
2 2
S (4 B+3) 0,00482(4 x 1 , 8+3)
Sg = 2 = = 0,0149 m = 0,5865 inch
(B+ 4) (1 , 8+4 )2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 12
Q = 1388,854 kN

RESTI AYU PURWANTI(G1B019014) 92


TUGAS BESAR PONDASI DALAM

D = 0,4 m
L = 11 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,058 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,38 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,058 x 1,2 x 0,38 x 0,97 = 0,0257
QI 1388,854 x 0,0257
S = = = 0,00516 m = 0,2033 inch
Es D 17250 x 0 , 4
2 2
S (4 B+3) 0,00516(4 x 1 , 8+3)
Sg = 2 = = 0,0153 m = 0,6288 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.

 Pondasi No. 13
Q = 1334,338 kN
D = 0,4 m
L = 11 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,058 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,38 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)

RESTI AYU PURWANTI(G1B019014) 93


TUGAS BESAR PONDASI DALAM

Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,058 x 1,2 x 0,38 x 0,97 = 0,0257
QI 1334,338 x 0,0257
S = = = 0,00496 m = 0,1953 inch
Es D 17250 x 0 , 4
2 2
S (4 B+3) 0,00496(4 x 1 , 8+3)
Sg = 2 = = 0,0153 m = 0,6041 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 14
Q = 1306,769 kN
D = 0,4 m
L = 11 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,058 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,38 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,058 x 1,2 x 0,38 x 0,97 = 0,0257
QI 1306,769 x 0,0257
S = = = 0,00486 m = 0,1913 inch
Es D 17250 x 0 , 4
2 2
S (4 B+3) 0,00486(4 x 1 , 8+3)
Sg = 2 = = 0,0150 m = 0,5916 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 15
Q = 1304,153 kN
D = 0,4 m

RESTI AYU PURWANTI(G1B019014) 94


TUGAS BESAR PONDASI DALAM

L = 11 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,058 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,38 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,058 x 1,2 x 0,38 x 0,97 = 0,0257
QI 1304,153 x 0,0257
S = = = 0,00485 m = 0,1909 inch
Es D 17250 x 0 , 4
2 2
S (4 B+3) 0,00485(4 x 1 , 8+3)
Sg = 2 = = 0,0150 m = 0,5904 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.

 Pondasi No. 16
Q = 1318,708 kN
D = 0,4 m
L = 11 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,058 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,38 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)

RESTI AYU PURWANTI(G1B019014) 95


TUGAS BESAR PONDASI DALAM

Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,058 x 1,2 x 0,38 x 0,97 = 0,0257
QI 1318,708 x 0,0257
S = = = 0,00490 m = 0,1930 inch
Es D 17250 x 0 , 4
2 2
S (4 B+3) 0,00490(4 x 1 , 8+3)
Sg = 2 = = 0,0152 m = 0,5970 inch
(B+ 4) (1 , 8+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.

3.13.3 Penurunan Tiang Grup Sondir 1


No Keteranga
Q (kN) d (m) s (m) B (m) S (m) Sg (m) Sg (mm) Sg (inch)
Pondasi n
1469,30 0,0056
P17 0,3 0,9 1,5 0,0151 15,0617
5 2 0,5930 Aman
1552,77 0,0059
P18 0,3 0,9 1,5 0,0159 15,9173
6 4 0,6267 Aman
1577,88 0,0060
P19 0,3 0,9 1,5 0,0162 16,1748
7 4 0,6368 Aman
1559,95 0,0059
P20 0,3 0,9 1,5 0,0160 15,9909
1 7 0,6296 Aman
1473,62 0,0056
P21 0,3 0,9 1,5 0,0151 15,1060
3 4 0,5947 Aman
1543,61 0,0059
P22 0,3 0,9 1,5 0,0158 15,8234
3 1 0,6230 Aman
1390,86 0,0053
P23 0,3 0,9 1,5 0,0143 14,2576
2 2 0,5613 Aman
1390,63 0,0053
P24 0,3 0,9 1,5 0,0143 14,2553
7 2 0,5612 Aman

 Pondasi No. 17

RESTI AYU PURWANTI(G1B019014) 96


TUGAS BESAR PONDASI DALAM

Q = 1469,305 kN
D = 0,3 m
L = 14 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,046 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,375 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,046 x 1,2 x 0,375 x 0,97 = 0,0198
QI 1469,305 x 0 , 0 198
S = = = 0,0056 m = 0,2215 inch
Es D 17250 0 ,3
2 2
S (4 B+3) 0,0056(4 x 1 , 5+3)
Sg = 2 = = 0,0151 m = 0,5930 inch
(B+ 4) (1 , 5+4 )2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 18
Q = 1552,776 kN
D = 0,3 m
L = 14 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,046 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,375 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)

RESTI AYU PURWANTI(G1B019014) 97


TUGAS BESAR PONDASI DALAM

Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,046 x 1,2 x 0,375 x 0,97 = 0,0198
QI 1156,700 x 0,0198
S = = = 0,0059 m = 0,2340 inch
Es D 17250 0 ,3
2 2
S (4 B+3) 0,0059(4 x 1 , 5+3)
Sg = 2 = = 0,0159m = 0,6267 inch
(B+ 4) (1 , 5+4 )2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 19
Q = 1577,887 kN
D = 0,3 m
L = 14 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,046 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,375 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,046 x 1,2 x 0,375 x 0,97 = 0,0198
QI 1577,887 x 0,0198
S = = = 0,00604 m = 0,2378 inch
Es D 17250 0 , 3
2 2
S (4 B+3) 0,00499(4 x 1 , 5+3)
Sg = 2 = = 0,0162 m = 0,6368 inch
(B+ 4) (1 , 5+4 )2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 20
Q = 1559,951 kN
D = 0,3 m

RESTI AYU PURWANTI(G1B019014) 98


TUGAS BESAR PONDASI DALAM

L = 14 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,046 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,375 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,046 x 1,2 x 0,375 x 0,97 = 0,0198
QI 1559,951 x 0,0198
S = = = 0,00597 m = 0,2351 inch
Es D 17250 0 , 3
2 2
S (4 B+3) 0,00597(4 x 1 , 5+3)
Sg = 2 = = 0,0160 m = 0,6296 inch
(B+ 4) (1 , 5+4 )2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.

 Pondasi No. 21
Q = 1473,623 kN
D = 0,3 m
L = 14 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,046 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,375 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25

RESTI AYU PURWANTI(G1B019014) 99


TUGAS BESAR PONDASI DALAM

I = I 0 R k R h R μ = 0,046 x 1,2 x 0,375 x 0,97 = 0,0198


QI 1473,623 x 0,0198
S = = = 0,00564 m = 0,2221 inch
Es D 17250 0 , 3
2 2
S (4 B+3) 0,00564(4 x 1, 5+3)
Sg = 2 = = 00151 m = 0,5947 inch
(B+ 4) (1 , 5+ 4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 22
Q = 1543,613 kN
D = 0,3 m
L = 14 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,046 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,375 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,046 x 1,2 x 0,375 x 0,97 = 0,0198
QI 1543,613 x 0,0198
S = = = 0,00591 m = 0,2327 inch
Es D 17250 0 , 3
2 2
S (4 B+3) 0,00591(4 x 1 ,5+ 3)
Sg = 2 = = 0,0158 m = 0,6230 inch
(B+ 4) (1 , 5+4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.
 Pondasi No. 23
Q = 1390,862 kN
D = 0,3 m
L = 14 m
fc' = 35 MPa

RESTI AYU PURWANTI(G1B019014) 100


TUGAS BESAR PONDASI DALAM

Es beton = 4700 √ 35 = 27805,575 MPa


Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,046 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,375 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,046 x 1,2 x 0,375 x 0,97 = 0,0198
QI 1390,862 x 0,0198
S = = = 0,00532 m = 0,2096 inch
Es D 17250 0 , 3
2 2
S (4 B+3) 0,00532(4 x 1 ,5+ 3)
Sg = 2 = = 0,0143 m = 0,5613 inch
(B+ 4) (1 , 5+4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.

 Pondasi No. 24
Q = 1390,637 kN
D = 0,3 m
L = 14 m
fc' = 35 MPa
Es beton = 4700 √ 35 = 27805,575 MPa
Es pasir = 17,25 MPa = 17250 kN/m2 (dari Tabel 2.3)
μs = 0,4 (dari Tabel 2.3)
I0= 0,046 (dari Gambar 2.3)
Rk = 1,2 (dari Gambar 2.4)
Rh = 0,375 (dari Gambar 2.5)
Rμ = 0,97 (dari Gambar 2.6)
Es beton 27805,575
Nilai K = = = 1612
Es pasir 17 , 25
I = I 0 R k R h R μ = 0,046 x 1,2 x 0,375 x 0,97 = 0,0198

RESTI AYU PURWANTI(G1B019014) 101


TUGAS BESAR PONDASI DALAM

QI 1390,637 x 0,0198
S = = = 0,00532 m = 0,2096 inch
Es D 17250 0 , 3
2 2
S (4 B+3) 0,00532(4 x 1 ,5+ 3)
Sg = 2 = = 0,0143 m = 0,5612 inch
(B+ 4) (1 , 5+4)2
Karena penurunan tiang tunggal < 1 inch, maka pondasi Aman terhadap
penurunan.

3.13Perhitungan Momen Maksimum


Langkah pertama dalam menghitung Momen Maksimum yaitu menghitung
nilai tiang ujung bebas. Pada perhitungan tiang ujung bebas menggunakan
persamaan (16). Perhitungan tiang ujung bebas seperti pada tabel 2.11.
3.13.1 Momen Maksimum Sondir 4
No ф Mmaks
d L Mmaks Mmak
Pondas (kN/m3 Kp e Hu f pakai
(m) (m) (kNm) s (t.m)
i ) (kNm)
P1 19,60 0,4 12 5,590 0,116 3124,570 6,924 14787,831 4929,277 492,928
P2 19,60 0,4 12 5,590 0,079 3134,362 6,935 14738,183 4912,728 491,273
P3 19,60 0,4 12 5,590 0,112 3125,829 6,926 14781,441 4927,147 492,715
P4 19,60 0,4 12 5,590 0,083 3133,283 6,934 14743,645 4914,548 491,455
P5 19,60 0,4 12 5,590 0,003 3154,003 6,957 14638,919 4879,640 487,964
P6 19,60 0,4 12 5,590 0,005 3153,588 6,956 14641,010 4880,337 488,034

RESTI AYU PURWANTI(G1B019014) 102


TUGAS BESAR PONDASI DALAM

P7 19,60 0,4 12 5,590 0,009 3152,619 6,955 14645,899 4881,966 488,197


P8 19,60 0,4 12 5,590 0,100 3128,884 6,929 14765,942 4921,981 492,198

 Pondasi Tipe 1
ɣ = 19,60 kN
D = 0,4 m
L = 12 m
1+sin ɣ 1+sin ⁡( 19 ,60)
Kp = = = 5,590
1−sin ɣ 1−sin ⁡(19 ,60)
e = 0,116

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 ,60 x 0 , 4 x 123 x 5,590
= 3124,570
0,116+12

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 3124,570
0 , 4 x 5,590 x 19 , 60
= 6,924

Mmax = H u (e +2 f /3) = 3124,570 (0,116 + 2 x 6,924/3)


= 14787,831kN.m
M max 14787,831
Mmax pakai = = =4929,277kN.m =492,927 t.m
3 3
 Pondasi Tipe 2
ɣ = 19,60 kN
D = 0,4 m
L = 12 m
1+sin ɣ 1+sin ⁡( 19 ,60)
Kp = = = 5,590
1−sin ɣ 1−sin ⁡(19 ,60)
e = 0,079

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 ,60 x 0 , 4 x 123 x 5,590
= 3134,362
0,079+12

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 3134,362
0 , 4 x 5,590 x 19 , 60
= 6,935

Mmax = H u (e +2 f /3) = 3134,362 (0,079 + 2 x 6,935/3)


= 14738,183kN.m
M max 14738,183
Mmax pakai = = =4912,728kN.m =491,273 t.m
3 3

RESTI AYU PURWANTI(G1B019014) 103


TUGAS BESAR PONDASI DALAM

 Pondasi Tipe 3
ɣ = 19,60 kN
D = 0,4 m
L = 12 m
1+sin ɣ 1+sin ⁡( 19 ,60)
Kp = = = 5,590
1−sin ɣ 1−sin ⁡(19 ,60)
e = 0,112

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 ,60 x 0 , 4 x 123 x 5,590
= 3125,829
0,112+12

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 3125,829
0 , 4 x 5,590 x 19 , 60
= 6,926

Mmax = H u (e +2 f /3) = 3125,829 (0,112 + 2 x 6,926/3)


= 14781,441kN.m
M max 14781,441
Mmax pakai = = =4927,147kN.m =492,715 t.m
3 3
 Pondasi Tipe 4
ɣ = 19,60 kN
D = 0,4 m
L = 12 m
1+sin ɣ 1+sin ⁡( 19 ,60)
Kp = = = 5,590
1−sin ɣ 1−sin ⁡(19 ,60)
e = 0,083

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 ,60 x 0 , 4 x 123 x 5,590
= 3133,283
0,083+12

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 3133,283
0 , 4 x 5,590 x 19 , 60
= 6,934

Mmax = H u (e +2 f /3) = 3133,283 (0,083 + 2 x 6,934/3)


= 14743,645kN.m
M max 14743,645
Mmax pakai = = =4914,548kN.m =491,455 t.m
3 3
 Pondasi Tipe 5
ɣ = 19,60 kN

RESTI AYU PURWANTI(G1B019014) 104


TUGAS BESAR PONDASI DALAM

D = 0,4 m
L = 12 m
1+sin ɣ 1+sin ⁡( 19 ,60)
Kp = = = 5,590
1−sin ɣ 1−sin ⁡(19 ,60)
e = 0,003

Hu =
e+ L
3
(1/2)ɣD L K p
=
1
2 ()
19 ,60 x 0 , 4 x 123 x 5,590
= 3154,003
0,003+12

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 3154,003
0 , 4 x 5,590 x 19 , 60
= 6,957

Mmax = H u (e +2 f /3) = 3154,003 (0,003 + 2 x 6,957/3)


= 14638,919kN.m
M max 14638,919
Mmax pakai = = =4879,640kN.m =487,964 t.m
3 3
 Pondasi Tipe 6
ɣ = 19,60 kN
D = 0,4 m
L = 12 m
1+sin ɣ 1+sin ⁡( 19 ,60)
Kp = = = 5,590
1−sin ɣ 1−sin ⁡(19 ,60)
e = 0,005

Hu = (1/2)ɣD L
3
K p
1
2 ()
19 ,60 x 0 , 4 x 123 x 5,590
= 3153,588
e+ L 0,005+12

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 3153,588
0 , 4 x 5,590 x 19 , 60
= 6,956

Mmax = H u (e +2 f /3) = 3153,588 (0,005 + 2 x 6,956/3)


= 14641,010kN.m
M max 14641,010
Mmax pakai = = =4880,337kN.m =488,034 t.m
3 3
 Pondasi Tipe 7
ɣ = 19,60 kN
D = 0,4 m
L = 12 m

RESTI AYU PURWANTI(G1B019014) 105


TUGAS BESAR PONDASI DALAM

1+sin ɣ 1+sin ⁡( 19 ,60)


Kp = = = 5,590
1−sin ɣ 1−sin ⁡(19 ,60)
e = 0,009

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 ,60 x 0 , 4 x 123 x 5,590
= 3152,619
0,009+12

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 3152,619
0 , 4 x 5,590 x 19 , 60
= 6,955

Mmax = H u (e +2 f /3) = 3152,619 (0,009 + 2 x 6,955/3)


= 14645,899kN.m
M max 14645,899
Mmax pakai = = =4881,966kN.m =488,197t.m
3 3
 Pondasi Tipe 8
ɣ = 19,60 kN
D = 0,4 m
L = 12 m
1+sin ɣ 1+sin ⁡( 19 ,60)
Kp = = = 5,590
1−sin ɣ 1−sin ⁡(19 ,60)
e = 0,100

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 ,60 x 0 , 4 x 123 x 5,590
= 3128,884
0,100+12

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 3128,884
0 , 4 x 5,590 x 19 , 60
= 6,929

Mmax = H u (e +2 f /3) = 3128,884(0,100 + 2 x 6,929/3)


= 14765,942kN.m
M max 14765,942
Mmax pakai = = =4921,981kN.m =492,198 t.m
3 3

3.14.2 Momen Maksimum Sondir 3


No ɣ Mmaks
d L Mmaks Mmak
Pondas (kN/m3 Kp e Hu f pakai
(m) (m) (kNm) s (t.m)
i ) (kNm)
11,04 23063,47 2306,34
P9 22,04 0,4 11 5,845 0,032 9354,364 69190,422
7 4 7
11,04 23300,20 2330,02
P10 22,04 0,4 11 5,845 0,108 9354,364 69900,611
7 4 0
P11 22,04 0,4 11 5,845 0,076 9354,364 11,04 69602,478 23200,82 2320,08

RESTI AYU PURWANTI(G1B019014) 106


TUGAS BESAR PONDASI DALAM

7 6 3
11,04 23214,25 2321,42
P12 22,04 0,4 11 5,845 0,080 9354,364 69642,761
7 4 5
11,04 23246,37 2324,63
P13 22,04 0,4 11 5,845 0,090 9354,364 69739,125
7 5 8
11,04 23284,69 2328,47
P14 22,04 0,4 11 5,845 0,103 9354,364 69854,090
7 7 0
11,04 23286,50 2328,65
P15 22,04 0,4 11 5,845 0,103 9354,364 69859,500
7 0 0
11,04 23229,19 2322,91
P16 22,04 0,4 11 5,845 0,085 9354,364 69687,572
7 1 9

 Pondasi Tipe 9
ɣ = 22,40 kN
D = 0,4 m
L = 11 m
1+sin ɣ 1+sin ⁡( 22, 40)
Kp = = = 5,845
1−sin ɣ 1−sin ⁡(22 , 40)
e = 0,032

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
22 ,04 x 0 , 4 x 113 x 5,845
= 9354,364
0,032+11

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 9354,364
0 , 4 x 5,845 x 22 , 04
= 11,047

Mmax = H u (e +2 f /3) = 9354,364 (0,032 + 2 x 11,047/3)


= 69190,422kN.m
M max 69190,422
Mmax pakai = = =23063,474kN.m =2306,347 t.m
3 3
 Pondasi Tipe 10
ɣ = 22,40 kN
D = 0,4 m
L = 11 m
1+sin ɣ 1+sin ⁡( 22, 40)
Kp = = = 5,845
1−sin ɣ 1−sin ⁡(22 , 40)
e = 0,108

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
22 ,04 x 0 , 4 x 113 x 5,845
= 9354,364
0,108+11

RESTI AYU PURWANTI(G1B019014) 107


TUGAS BESAR PONDASI DALAM

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 9354,364
0 , 4 x 5,845 x 22 , 04
= 11,047

Mmax = H u (e +2 f /3) = 9354,364(0,108 + 2 x 11,047/3)


= 69900,611kN.m
M max 69900,611
Mmax pakai = = =23300,204kN.m =2330,020 t.m
3 3
 Pondasi Tipe 11
ɣ = 22,40 kN
D = 0,4 m
L = 11 m
1+sin ɣ 1+sin ⁡( 22, 40)
Kp = = = 5,845
1−sin ɣ 1−sin ⁡(22 , 40)
e = 0,076

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
22 ,04 x 0 , 4 x 113 x 5,845
= 9354,364
0,076+ 11

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 9354,364
0 , 4 x 5,845 x 22 , 04
= 11,047

Mmax = H u (e +2 f /3) =9354,364(0,076+ 2 x 11,047/3)


= 69602,478kN.m
M max 69602,4789
Mmax pakai = = =23200,826kN.m =2320,826t.m
3 3

 Pondasi Tipe 12
ɣ = 22,40 kN
D = 0,4 m
L = 11 m
1+sin ɣ 1+sin ⁡( 22, 40)
Kp = = = 5,845
1−sin ɣ 1−sin ⁡(22 , 40)
e = 0,080

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
22 ,04 x 0 , 4 x 113 x 5,845
= 9354,364
0,080+11

RESTI AYU PURWANTI(G1B019014) 108


TUGAS BESAR PONDASI DALAM

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 9354,364
0 , 4 x 5,845 x 22 , 04
= 11,047

Mmax = H u (e +2 f /3) = 9354,364 (0,080 + 2 x 11,047/3)


= 69642,761kN.m
M max 69642,761
Mmax pakai = = =23214,254kN.m =2321,425 t.m
3 3
 Pondasi Tipe 13
ɣ = 22,40 kN
D = 0,4 m
L = 11 m
1+sin ɣ 1+sin ⁡( 22, 40)
Kp = = = 5,845
1−s∈ɣ 1−sin ⁡(22 , 40)
e = 0,090

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
22 ,04 x 0 , 4 x 113 x 5,845
= 9354,364
0,090+11

= 0,82
√ Hu
D Kpɣ
= 0,82
√ 9354,364
0 , 4 x 5,845 x 22 , 04
= 11,047

Mmax = H u (e +2 f /3) = 9354,364(0,090 + 2 x 11,047/3)


= 69739,125kN.m
M max 69739,125
Mmax pakai = = =23246,375kN.m =2324,638 t.m
3 3
 Pondasi Tipe 14
ɣ = 22,40 kN
D = 0,4 m
L = 11 m
1+sin ɣ 1+sin ⁡( 22, 40)
Kp = = = 5,845
1−sin ɣ 1−sin ⁡(22 , 40)
e = 0,103

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 ,60 x 0 , 4 x 123 x 5,590
= 9354,364
0,103+12

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 9354,364
0 , 4 x 5,845 x 22 , 04
= 11,047

RESTI AYU PURWANTI(G1B019014) 109


TUGAS BESAR PONDASI DALAM

Mmax = H u (e +2 f /3) = 9354,364(0,103 + 2 x 11,047/3)


= 69854,090kN.m
M max 69854,090
Mmax pakai = = =23284,697kN.m =2328,470 t.m
3 3
 Pondasi Tipe 15
ɣ = 22,40 kN
D = 0,4 m
L = 11 m
1+sin ɣ 1+sin ⁡( 22, 40)
Kp = = = 5,845
1−sin ɣ 1−sin ⁡(22 , 40)
e = 0,103

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
22 ,04 x 0 , 4 x 113 x 5,845
= 9354,364
0,103+11

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 9354,364
0 , 4 x 5,845 x 22 , 04
= 11,047

Mmax = H u (e +2 f /3) = 9354,364(0,103 + 2 x 11,047/3)


= 69859,500kN.m
M max 69859,500
Mmax pakai = = =23286,500kN.m =2328,650 t.m
3 3
 Pondasi Tipe 16
ɣ = 22,40 kN
D = 0,4 m
L = 11 m
1+sin ɣ 1+sin ⁡( 22, 40)
Kp = = = 5,845
1−sin ɣ 1−sin ⁡(22 , 40)
e = 0,085

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
22 ,04 x 0 , 4 x 113 x 5,845
= 9354,364
0,085+11

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 9354,364
0 , 4 x 5,845 x 22 , 04
= 11,047

Mmax = H u (e +2 f /3) = 9354,364 (0,085 + 2 x 11,047/3)


= 69687,572kN.m

RESTI AYU PURWANTI(G1B019014) 110


TUGAS BESAR PONDASI DALAM

M max 69687,572
Mmax pakai = = =23229,191kN.m =2322,919 t.m
3 3

3.14.3 Momen Maksimum Sondir 1


No ɣ Mmaks
d L Mmaks Mmak
Pondas (kN/m3 Kp e Hu f pakai
(m) (m) (kNm) s (t.m)
i ) (kNm)
4,36 0,13 2467,84 13623,09 4541,03 454,10
P17 19,43 0,3 14 8,079
1 4 7 2 1 3
4,36 0,08 2476,88 13569,65 4523,21 452,32
P18 19,43 0,3 14 8,094
1 3 4 2 7 2
4,36 0,10 2473,53 13589,46 4529,82 452,98
P19 19,43 0,3 14 8,088
1 2 1 1 0 2
4,36 0,09 2475,12 13580,06 4526,68 452,66
P20 19,43 0,3 14 8,091
1 3 2 3 8 9
4,36 0,12 2469,78 13611,63 4537,21 453,72
P21 19,43 0,3 14 8,082
1 3 3 2 1 1
4,36 0,05 2481,00 13545,34 4515,11 451,51
P22 19,43 0,3 14 8,100
1 9 1 9 6 2
4,36 0,10 2473,40 13590,20 4530,06 453,00
P23 19,43 0,3 14 8,088
1 3 6 1 7 7
4,36 0,10 2473,76 13588,06 4529,35 452,93
P24 19,43 0,3 14 8,089
1 0 8 5 5 5

 Pondasi Tipe 17
ɣ = 19,43 kN
D = 0,3 m
L = 14 m
1+sin ɣ 1+sin ⁡( 19 , 43)
Kp = = = 4,361
1−sin ɣ 1−sin ⁡(19 , 43)
e = 0,134

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 , 43 x 0 , 3 x 14 3 x 4,361
= 2467,847
0,134+14

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 2467,847
0 ,3 x 4,361 x 19 , 43
= 8,079

Mmax = H u (e +2 f /3) = 2467,847 (0,134 + 2 x 8,079/3)


= 13623,092kN.m
M max 13623,092
Mmax pakai = = =4541,031kN.m =454,103 t.m
3 3
 Pondasi Tipe 18
ɣ = 19,43 kN
RESTI AYU PURWANTI(G1B019014) 111
TUGAS BESAR PONDASI DALAM

D = 0,3 m
L = 14 m
1+ si n ɣ 1+sin ⁡( 19 , 43)
Kp = = = 4,361
1−sin ɣ 1−sin ⁡(19 , 43)
e = 0,083

Hu =
e+ L
3
(1/2)ɣD L K p
=
1
2 ()
19 , 43 x 0 , 3 x 14 3 x 4,361
=2476,884
0,083+14

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 27476,884
0 , 4 x 4,361 x 19 , 43
= 8,094

Mmax = H u (e +2 f /3) = 2476,884(0,083 + 2 x 8,094/3)


= 13569,652kN.m
M max 13569,652
Mmax pakai = = =4523,217kN.m = 452,321 t.m
3 3
 Pondasi Tipe 19
ɣ = 19,43 kN
D = 0,3 m
L = 14 m
1+sin ɣ 1+sin ⁡( 19 , 43)
Kp = = = 4,361
1−sin ɣ 1−sin ⁡(19 , 43)
e = 0,102

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 , 43 x 0 , 3 x 14 3 x 4,361
= 2473,531
0,102+14

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 2473,531
0 ,3 x 4,361 x 19 , 43
= 8,088

Mmax = H u (e +2 f /3) = 2473,531 (0,102 + 2 x 8,088/3)


= 13589,461kN.m
M max 13589,461
Mmax pakai = = =4529,820kN.m = 452,982t.m
3 3
 Pondasi Tipe 20
ɣ = 19,43 kN
D = 0,3 m
L = 14 m

RESTI AYU PURWANTI(G1B019014) 112


TUGAS BESAR PONDASI DALAM

1+sin ɣ 1+sin ⁡( 19 , 43)


Kp = = = 4,361
1−sin ɣ 1−sin ⁡(19 , 43)
e = 0,093

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 , 43 x 0 , 3 x 14 3 x 4,361
= 2475,122
0,093+14

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 2475,122
0 ,3 x 4,361 x 19 , 43
= 8,091

Mmax = H u (e +2 f /3) = 2475,122 (0,093 + 2 x 8,091/3)


= 13580,063kN.m
M max 13580,063
Mmax pakai = = =4526,688kN.m =452,669t.m
3 3
 Pondasi Tipe 21
ɣ = 19,43 kN
D = 0,3 m
L = 14 m
1+sin ɣ 1+sin ⁡( 19 , 43)
Kp = = = 4,361
1−sin ɣ 1−sin ⁡(19 , 43)
e = 0,123

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2()
19 , 43 x 0 , 3 x 14 3 x 4,361
= 2469,783
0,123+14

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 2469,783
0 ,3 x 4,361 x 19 , 43
= 8,082

Mmax = H u (e +2 f /3) = 2469,783(0,123 + 2 x 8,082/3)


= 13611,632kN.m
M max 13611,632
Mmax pakai = = =4537,211kN.m =453,721 t.m
3 3
 Pondasi Tipe 22
ɣ = 19,43 kN
D = 0,3 m
L = 14 m
1+sin ɣ 1+sin ⁡( 19 , 43)
Kp = = = 4,361
1−sin ɣ 1−sin ⁡(19 , 43)

RESTI AYU PURWANTI(G1B019014) 113


TUGAS BESAR PONDASI DALAM

e = 0,059

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 , 43 x 0 , 3 x 14 3 x 4,361
= 2481,001
0,059+14

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 2481,001
0 , 4 x 4,361 x 19 , 43
= 8,086

Mmax = H u (e +2 f /3) = 2481,001 (0,059 + 2 x 8,086/3)


= 13545,349kN.m
M max 13545,349
Mmax pakai = = =4515,116kN.m =451,511 t.m
3 3
 Pondasi Tipe 23
ɣ = 19,43 kN
D = 0,3 m
L = 14 m
1+sin ɣ 1+sin ⁡( 19 , 43)
Kp = = = 4,361
1−sin ɣ 1−sin ⁡(19 , 43)
e = 0,103

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 , 43 x 0 , 3 x 14 3 x 4,361
= 2473,406
0,103+14

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 2473,406
0 ,3 x 4,361 x 19 , 43
= 8,082

Mmax = H u (e +2 f /3) = 2473,406 (0,103 + 2 x 8,082/3)


= 13590,201kN.m
M max 13590,201
Mmax pakai = = =4530,067kN.m =453,006 t.m
3 3
 Pondasi Tipe 24
ɣ = 19,43 kN
D = 0,3 m
L = 14 m
1+sin ɣ 1+sin ⁡( 19 , 43)
Kp = = = 4,361
1−sin ɣ 1−sin ⁡(19 , 43)
e = 0,100

RESTI AYU PURWANTI(G1B019014) 114


TUGAS BESAR PONDASI DALAM

Hu =
e+ L
3
(1/2)ɣD L K p
1
= 2 ()
19 , 43 x 0 , 3 x 14 3 x 4,361
= 2473,768
0,100+14

f = 0,82
√ Hu
D Kpɣ
= 0,82
√ 2473,768
0 ,3 x 4,361 x 19 , 43
= 8,083

Mmax = H u (e +2 f /3) = 2473,768 (0,100 + 2 x 8,083/3)


= 13588,065kN.m
M max 13588,065
Mmax pakai = = =4529,355kN.m =452,935 t.m
3 3

3.15 Perhitungan Tulangan Pondasi BoredPile


Perhitungan penulangan pile cap dilakukan berdasarkan persamaan pada sub
bab sebelumnya. Perhitungan berdasarkan data dari ukuran pondasi dengan fc’ 35
Mpa dan diameter tulangan yang dipakai D22 disamakan agar mempermudah
pelaksanaan dilapangan.
3.15.1 Tulangan Pondasi Bore Pile Sondir 1

No fc' D
n
Pondas (MPa tulangan
pakai
i ) (mm)
P1 35 22 20
P2 35 22 9
P3 35 22 5
P4 35 22 14
 Pondasi Tipe 1
D = 0,6 m = 600 mm
fc' = 35 MPa

RESTI AYU PURWANTI(G1B019014) 115


TUGAS BESAR PONDASI DALAM

fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 6 00 = 282743,339 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035.
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 282743,339. 0,02678 = 7570,453 mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 7570,453
n tulangan = = = 19,915≈ 20 buah
A tul 380,133

 Pondasi Tipe 2
D = 0,4 m = 400 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 400 = 125663,706 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 125663,706. 0,02678 = 3364,646 mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 3364,646
n tulangan = = = 8,851 ≈ 9 buah
A tul 380,133

 Pondasi Tipe 3
D = 0,3 m = 300 mm

RESTI AYU PURWANTI(G1B019014) 116


TUGAS BESAR PONDASI DALAM

fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 3 00 = 70685,835mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 70685,835. 0,02678 = 1892,613mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 1892,613
n tulangan = = = 4,979 ≈ 5 buah
A tul 380,133

 Pondasi Tipe 4
D = 0,5 m =500 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 5 00 = 196349,541mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 125663,706. 0,02678 = 5257,259 mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 5257,259
n tulangan = = = 13,830 ≈ 14 buah
A tul 380,133

RESTI AYU PURWANTI(G1B019014) 117


TUGAS BESAR PONDASI DALAM

3.15.2 Tulangan Pondasi Bore Pile Sondir 3

No fc' D
n
Pondas (MPa tulangan
pakai
i ) (mm)
P5 35 22 20
P6 35 22 5
P7 35 22 5
P8 35 22 14
P9 35 22 20
P10 35 22 9
P11 35 22 9
P12 35 22 14

 Pondasi Tipe 5
D = 0,6 m = 600 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 400 = 282743,339 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
0 , 85 β (f c ' /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 282743,339. 0,02678 = 7570,453mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 7570,453
n tulangan = = = 19,915 ≈ 20 buah
A tul 380,133

 Pondasi Tipe 6
D = 0,3 m = 300 mm
fc' = 35 MPa
fy = 400 MPa

RESTI AYU PURWANTI(G1B019014) 118


TUGAS BESAR PONDASI DALAM

β = 0,8
1 2 1 2
Ag = π D = π 3 00 = 70685,835 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 70685,835. 0,02678 = 1892,613mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 1892,613
n tulangan = = = 4,979≈ 5 buah
A tul 380,133

 Pondasi Tipe 7
D = 0,3 m = 300 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 3 00 = 70685,835mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 70685,835. 0,02678 = 1892,613mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 1892,613
n tulangan = = = 4,979≈ 5 buah
A tul 380,133

 Pondasi Tipe 8
D = 0,5 m = 500 mm
fc' = 35 MPa

RESTI AYU PURWANTI(G1B019014) 119


TUGAS BESAR PONDASI DALAM

fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 5 00 = 196349,541 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 196349,541. 0,02678 = 5257,259mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 5257,259
n tulangan = = =13,830≈ 14 buah
A tul 380,133

 Pondasi Tipe 9
D = 0,6 m = 600 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 600 = 282743,339 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 282743,339. 0,02678 = 7570,453 mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 7570,453
n tulangan = = =19,915≈ 20 buah
A tul 380,133

 Pondasi Tipe 10
D = 0,4m = 400 mm

RESTI AYU PURWANTI(G1B019014) 120


TUGAS BESAR PONDASI DALAM

fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 400 = 125663,706 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 125663,706. 0,02678 = 3364,646mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 3364,646
n tulangan = = =8,851≈ 9 buah
A tul 380,133

 Pondasi Tipe 11
D = 0,4m = 400 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 400 = 125663,706 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 125663,706. 0,02678 = 3364,646mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 3364,646
n tulangan = = =8,851≈ 9 buah
A tul 380,133

 Pondasi Tipe 12

RESTI AYU PURWANTI(G1B019014) 121


TUGAS BESAR PONDASI DALAM

D = 0,5 m = 500 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 500 = 196349,541 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 196349,541. 0,02678 = 5257,259mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 5257,259
n tulangan = = =13,830≈ 14 buah
A tul 380,133

3.15.3 Tulangan Pondasi Bore Pile Sondir 2

fc' D
No n
(MPa tulangan
Pondasi pakai
) (mm)
P13 35 22 20
P14 35 22 9
P15 35 22 9
P16 35 22 14
P17 35 22 20
P18 35 22 9
P19 35 22 9

RESTI AYU PURWANTI(G1B019014) 122


TUGAS BESAR PONDASI DALAM

P20 35 22 14
 Pondasi Tipe 13
D = 0,6 m = 600 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 600 = 282743,339 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 282743,339. 0,02678 = 7570,453 mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 7570,453
n tulangan = = =19,915≈ 20 buah
A tul 380,133

 Pondasi Tipe 14
D = 0,4m = 400 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 400 = 125663,706 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 125663,706. 0,02678 = 3364,646mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4

RESTI AYU PURWANTI(G1B019014) 123


TUGAS BESAR PONDASI DALAM

As 3364,646
n tulangan = = =8,851≈ 9 buah
A tul 380,133

 Pondasi Tipe 15
D = 0,4m = 400 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 400 = 125663,706 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
0 , 85 β (f c ' /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 125663,706. 0,02678 = 3364,646mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 3364,646
n tulangan = = =8,851≈ 9 buah
A tul 380,133

 Pondasi Tipe 16
D = 0,5 m = 500 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 500 = 196349,541 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
0 , 85 β (f c ' /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 196349,541. 0,02678 = 5257,259mm2

Digunakan tulangan D22

RESTI AYU PURWANTI(G1B019014) 124


TUGAS BESAR PONDASI DALAM

1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 5257,259
n tulangan = = =13,830≈ 14 buah
A tul 380,133

 Pondasi Tipe 17
D = 0,6 m = 600 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 600 = 282743,339 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 282743,339. 0,02678 = 7570,453 mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 7570,453
n tulangan = = =19,915≈ 20 buah
A tul 380,133

 Pondasi Tipe 18
D = 0,4m = 400 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 400 = 125663,706 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 125663,706. 0,02678 = 3364,646mm2

RESTI AYU PURWANTI(G1B019014) 125


TUGAS BESAR PONDASI DALAM

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 3364,646
n tulangan = = =8,851≈ 9 buah
A tul 380,133

 Pondasi Tipe 19
D = 0,4m = 400 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 400 = 125663,706 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 125663,706. 0,02678 = 3364,646mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 3364,646
n tulangan = = =8,851≈ 9 buah
A tul 380,133

 Pondasi Tipe 20
D = 0,5 m = 500 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 500 = 196349,541 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)

RESTI AYU PURWANTI(G1B019014) 126


TUGAS BESAR PONDASI DALAM

As = Ag ρ = 196349,541. 0,02678 = 5257,259mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 5257,259
n tulangan = = =13,830≈ 14 buah
A tul 380,133

3.15.4 Tulangan Pondasi Bore Pile Sondir 4

fc' D
No n
(MPa tulangan
Pondasi pakai
) (mm)
P21 35 22 20
P22 35 22 9
P23 35 22 9
P24 35 22 14

 Pondasi Tipe 21
D = 0,6 m = 600 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 600 = 282743,339 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 282743,339. 0,02678 = 7570,453 mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 7570,453
n tulangan = = =19,915≈ 20 buah
A tul 380,133

 Pondasi Tipe 22

RESTI AYU PURWANTI(G1B019014) 127


TUGAS BESAR PONDASI DALAM

D = 0,4m = 400 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 400 = 125663,706 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 125663,706. 0,02678 = 3364,646mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 3364,646
n tulangan = = =8,851≈ 9 buah
A tul 380,133

 Pondasi Tipe 23
D = 0,3 m = 300 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 300 = 70685,835mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
'
0 , 85 β (f c /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 70685,835. 0,02678 = 1892,613mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 1892,613
n tulangan = = = 4,979≈ 5 buah
A tul 380,133

RESTI AYU PURWANTI(G1B019014) 128


TUGAS BESAR PONDASI DALAM

 Pondasi Tipe 24
D = 0,5 m = 500 mm
fc' = 35 MPa
fy = 400 MPa
β = 0,8
1 2 1 2
Ag = π D = π 500 = 196349,541 mm2
4 4
ρmin = 1,4/fy = 1,4/400 = 0,0035
0 , 85 β (f c ' /fy) 0 , 85 .0 , 8(35/400)
ρ = = = 0,0357
400/(600 +fy) 400/(600+400)
ρmax = 0,75 . ρ = 0,75 . 0,0357 = 0,02678 (digunakan)
As = Ag ρ = 196349,541. 0,02678 = 5257,259mm2

Digunakan tulangan D22


1 2 1 2
A tulangan = π D = π 22 = 380,133 mm2
4 4
As 5257,259
n tulangan = = =13,830≈ 14 buah
A tul 380,133

3.16 Perhitungan Tulangan Geser

RESTI AYU PURWANTI(G1B019014) 129


TUGAS BESAR PONDASI DALAM

Tulanagan geser yang digunakan adalah D10 dengan jarak antar sengkang 75
mm berdasarkan SNI 2847:2013 pasal 7.10.4. maka, dalam hal ini diameter diambil
D10 dan jarak 75 mm untuk tulangan gesernya.

Gambar 2.11 Ketentuan sengkang spiral (SNI 2847 2013)

3.17 Perhitungan Tulangan penyaluran


Tulanagan geser yang digunakan adalah D10 dengan jarak antar sengkang 75
mm berdasarkan SNI 2847:2019 pasal 7.10.4. maka, dalam hal ini diameter diambil
D10 dan jarak 75 mm untuk tulangan gesernya.
0 ,24 fy
ldh = db
λ√ f 'c
0 ,24 x 400
ldh = x19 = 308 mm
1 √ 35
atau
ldh = 0,043 fy db
ldh =0,043 x 400 x 19
ldh = 326, 8 mm ( dipilih yang terbesar)
maka Panjang tulangan penyaluran dari kolom sebesar 350 mm
0 ,24 fy
ldh = db
λ√ f 'c
0 ,24 x 400
ldh = x22 = 356,99 mm
1 √ 35
atau
ldh = 0,043 fy db
ldh =0,043 x 400 x 22
ldh = 378,4 mm ( dipilih yang terbesar)
maka Panjang tulangan penyaluran sebesar 400 mm

3.18 Perhitungan Tulangan Pondasi Pile Cap


Perhitungan penulangan pile cap dilakukan berdasarkan persamaan pada sub
bab sebelumnya. Perhitungan berdasarkan data dari ukuran pondasi.

RESTI AYU PURWANTI(G1B019014) 130


TUGAS BESAR PONDASI DALAM

1. Tipe 1 (3 tiang)
 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:
Pumax =4114,05 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 2 , 4 -0, 7
Cx=
2 = 2 = 0,850 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,850– 0,45 = 0,400 m

RESTI AYU PURWANTI(G1B019014) 131


TUGAS BESAR PONDASI DALAM

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c = 0,850 x 2,21 x 0,5 x 24 = 22,491 kN

W 2=Cx×Ly×z×γ s = 0,850 x 2,21 x 1,5 x 19,43 = 54,635 kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

22,491 x 0,850 54,635 x 0,850


= 4114,05x 0,400 - 2 - 2

= 1612,843 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400
= 0,0357 )
7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

RESTI AYU PURWANTI(G1B019014) 132


TUGAS BESAR PONDASI DALAM

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 1612,843
M n=
φ = 0 , 8 = 2016,054 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn 2016,054 x 1000000
R n=
bd 2^ = 2205 x 404
2
= 5,60184

Periksa

Rn < Rmaks

5,60184< 8,782 OK !

8. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 5,60184
0 , 85 x 35 ]
= 0,0157

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 2205 x 404 = 13942,62 mm2

RESTI AYU PURWANTI(G1B019014) 133


TUGAS BESAR PONDASI DALAM

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 2205
s=
4 As ¿ 4
x
13942 , 62 = 60,12 mm

s maks = 200 mm
Digunakan tulangan D22 – 60
11. Luas tulangan terpakai
πD2 b
As= π 22 x 22 2205
4 s¿ x
4 60 = 13969,88 mm2

RESTI AYU PURWANTI(G1B019014) 134


TUGAS BESAR PONDASI DALAM

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =4114,05 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)

RESTI AYU PURWANTI(G1B019014) 135


TUGAS BESAR PONDASI DALAM

( Lx−by ) 2,205−0 , 7
Cy=
2 = 2 = 0,753 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,753 – 0,45 = 0,303 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,753x2,4x 0,5x24 = 21,672 kN

W 2=Cy×Lx×z×γ s = 0,753 x2,4x1,5x 19,43 = 31,587 kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

21,672 x 0,753 31,587 x 0,753


= 4114,05 x 0,303 -
2
- 2

= 1224,463 kN.m

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )

RESTI AYU PURWANTI(G1B019014) 136


TUGAS BESAR PONDASI DALAM

=
0 , 85 x 0 , 8
400 ( 600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 1224,463
M n=
φ = 0 , 8 = 1530,578 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 1530,578 x 1000000
bd 2^ = 2400 x 404
2 = 3,90734

Periksa

Rn < Rmaks

3,90734< 8,782 OK !

7. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 3,90734
0 , 85 x 35 ]
= 0,0105

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

RESTI AYU PURWANTI(G1B019014) 137


TUGAS BESAR PONDASI DALAM

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 2400x 404= 10191,56 mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 2400
s=
4 As ¿ 4 10191 ,56 = 90 mm

s maks = 200 mm
Digunakan tulangan D22 – 80
10. Luas tulangan terpakai
πD2 b
As= π 22 x 22 24 00
4 s¿
4 90 = 11403,98 mm2

RESTI AYU PURWANTI(G1B019014) 138


TUGAS BESAR PONDASI DALAM

2. Tipe 2 (4 tiang)
 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:
Pumax =3623,14 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm

RESTI AYU PURWANTI(G1B019014) 139


TUGAS BESAR PONDASI DALAM

Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 1, 8 -0, 7
Cx=
2 = 2 = 0,550 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,550– 0,35 = 0,200 m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c = 0,550 x 1,80x 0,5 x 24 = 11,880 kN

W 2=Cx×Ly×z×γ s = 0,550 x 1,80 x 1,5 x 19,43 = 28,859 kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

11,880 x 0,550 28,859 x 0,550


= 3623,14x 0,200 - 2 - 2

= 713,426 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
RESTI AYU PURWANTI(G1B019014) 140
TUGAS BESAR PONDASI DALAM

=
0 , 85 x 0 , 8
400 ( 600
600+400 )
= 0,0357

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 713,426
M n=
φ = 0 , 8 = 891,782 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn 891,782 x 1000000
R n=
bd 2^ = 1800 x 404
2
= 3,03545

Periksa

Rn < Rmaks

3,03545< 8,782 OK !

8. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 3,03545
0 ,85 x 35 ]
= 0,0080

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

RESTI AYU PURWANTI(G1B019014) 141


TUGAS BESAR PONDASI DALAM

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1800 x 404 = 5832,99 mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1800
s=
4 As ¿ 4
x
5832 , 99 = 117,30 mm

s maks = 200 mm
Digunakan tulangan D22 – 110
11. Luas tulangan terpakai
πD2 b
As= π 22 x 22 1800
4 s¿ x
4 110 = 6220,35 mm2

RESTI AYU PURWANTI(G1B019014) 142


TUGAS BESAR PONDASI DALAM

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =3623,14 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm

RESTI AYU PURWANTI(G1B019014) 143


TUGAS BESAR PONDASI DALAM

Lebar pile cap x (Lx)= 1800 mm


Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 1, 8−0 , 7
Cy=
2 = 2 = 0,550 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,550 – 0,35 = 0,200 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,550 x1,8 x 0,5x24 = 11,880 kN

W 2=Cy×Lx×z×γ s =0,550 x1,8x1,5x 19,43 = 17,315 kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

11,880 x 0,550 17,315 x 0,550


= 3623,14 x 0,200 -
2
- 2

= 716,600 kN.m

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)

RESTI AYU PURWANTI(G1B019014) 144


TUGAS BESAR PONDASI DALAM

( f ' c −28 ) ( 35−28 )


β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

(
ρ b = 0 , 85×β 1×f ' c
fy
600
600+f y )
=
400 (
0 , 85 x 0 , 8 600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 716,600
M n=
φ = 0 , 8 = 895,750 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 895,750 x 1000000
bd 2^ = 1800 x 404
2
= 3,04896

Periksa

Rn < Rmaks

3,04896< 8,782 OK !

7. Menentukan ρ perlu

RESTI AYU PURWANTI(G1B019014) 145


TUGAS BESAR PONDASI DALAM

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 3,04896
0 , 85 x 35 ]
= 0,0081

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1800x 404= 5860,52 mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1800
s=
4 As ¿ 4 5860 , 52 = 117 mm

s maks = 200 mm
Digunakan tulangan D22 – 110

10. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1800
4 s¿
4 110 = 6220,35 mm2

RESTI AYU PURWANTI(G1B019014) 146


TUGAS BESAR PONDASI DALAM

3. Tipe 3 (4 tiang)
 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:
Pumax =2366,83 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019

RESTI AYU PURWANTI(G1B019014) 147


TUGAS BESAR PONDASI DALAM

Tebal pile cap (h) = 500 mm


Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 1, 5 -0, 7
Cx=
2 = 2 = 0,400 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,400 – 0,35= 0,100 m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c =0,400 x 1,50x 0,5 x 24 = 7,200 kN

W 2=Cx×Ly×z×γ s = 0,400 x 1,50 x 1,5 x 19,43 = 17,490 kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

7,200 x 0,400 17,490 x 0,400


= 2366,83x 0,100 - 2 - 2

= 231,745 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

RESTI AYU PURWANTI(G1B019014) 148


TUGAS BESAR PONDASI DALAM

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

(
ρ b = 0 , 85×β 1×f ' c
fy
600
600+f y )
=
400 (
0 , 85 x 0 , 8 600
600+400 )
= 0,0357

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 231,745
M n=
φ = 0 , 8 = 289,681 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn 289,681 x 1000000
R n=
^
bd 2 = 2
= 1,18322
1500 x 404

Periksa

Rn < Rmaks

1,18322< 8,782 OK !

8. Menentukan ρ perlu

RESTI AYU PURWANTI(G1B019014) 149


TUGAS BESAR PONDASI DALAM

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 1,18322
0 ,85 x 35 ]
= 0,0030

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1500 x 404 = 2121,00 mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1500
s=
4 As ¿ 4
x
2121 , 00 = 268,84 mm

s maks = 200 mm
Digunakan tulangan D22 – 200

11. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1500
4 s¿ x
4 200 = 2851,00 mm2

RESTI AYU PURWANTI(G1B019014) 150


TUGAS BESAR PONDASI DALAM

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =2366,83 kN.m
fy = 400 MPa

RESTI AYU PURWANTI(G1B019014) 151


TUGAS BESAR PONDASI DALAM

f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 1, 5−0 ,7
Cy=
2 = 2 = 0,400 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,400– 0,3 = 0,100 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,400x1,5 x 0,5x24 = 7,200kN

W 2=Cy×Lx×z×γ s =0,400 x1,5x1,5x 19,43 = 10,494 kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

7,200 x 0,400 10,494 x 0,400


= 2366,83 x 0,100 -
2
- 2

= 233,144 kN.m

RESTI AYU PURWANTI(G1B019014) 152


TUGAS BESAR PONDASI DALAM

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 233,144
M n=
φ = 0 , 8 = 291,430 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 291,430 x 1000000
bd 2^ = 1500 x 404
2
= 1,19037

RESTI AYU PURWANTI(G1B019014) 153


TUGAS BESAR PONDASI DALAM

Periksa

Rn < Rmaks

1,19037< 8,782 OK !

7. Menentukan ρ perlu

[ √
ρ perlu= 0 ,85 f ' c 1− 1−
fy
2R n
0 , 85 f ' c ]
¿
400 [ √
0 , 85 x 35
1− 1−
2 x 1,19037
0 , 85 x 35 ]
= 0,0030

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x1500x 404= 2121,00 mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1500
s=
4 As ¿ 4 2121 , 00 = 269 mm

s maks = 200 mm
Digunakan tulangan D22 – 200

10. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1500
4 s¿
4 200 = 2851,00 mm2

RESTI AYU PURWANTI(G1B019014) 154


TUGAS BESAR PONDASI DALAM

4. Tipe 4 (3 tiang)
 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:
Pumax =3379,89 kN.m
fy = 400 MPa

RESTI AYU PURWANTI(G1B019014) 155


TUGAS BESAR PONDASI DALAM

f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 2 ,1 -0, 7
Cx=
2 = 2 = 0,700m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,700– 0,4= 0,300 m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c =0,700x 1,93x 0,5 x 24 = 16,220 kN

W 2=Cx×Ly×z×γ s = 0,700x 1,93 x 1,5 x 19,43 = 39,402 kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

16,220 x 0,700 x 39,402 x 0,700 x


= 3379,89x 0,300 - 2 - 2

= 994,500 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


RESTI AYU PURWANTI(G1B019014) 156
TUGAS BESAR PONDASI DALAM

1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 994,500
M n=
φ = 0 , 8 = 1243,125 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn 1243,125 x 1000000
R n=
bd 2^ = 1931 x 404
2
= 3,94430

Periksa

RESTI AYU PURWANTI(G1B019014) 157


TUGAS BESAR PONDASI DALAM

Rn < Rmaks

3,94430< 8,782 OK !

8. Menentukan ρ perlu

[ √
ρ perlu= 0 ,85 f ' c 1− 1−
fy
2R n
0 , 85 f ' c ]
¿
400 [ √
0 , 85 x 35
1− 1−
2 x 3,94430
0 ,85 x 35 ]
= 0,00106

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1931 x 404 =8283,97mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1931
s=
4 As ¿ 4
x
8283 ,97 = 88,61 mm

s maks = 200 mm
Digunakan tulangan D22 –80

11. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1931
4 s¿ x
4 80 = 9175,45 mm2

RESTI AYU PURWANTI(G1B019014) 158


TUGAS BESAR PONDASI DALAM

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

RESTI AYU PURWANTI(G1B019014) 159


TUGAS BESAR PONDASI DALAM

Diketahui :
Pumax =3379,89 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 1,931−0 , 7
Cy=
2 = 2 = 0,616 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,616– 0,4 = 0,216 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,616 x2,1x 0,5x24 = 15,511 kN

W 2=Cy×Lx×z×γ s =0,616x2,1x1,5x 19,43 = 22,607 kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

RESTI AYU PURWANTI(G1B019014) 160


TUGAS BESAR PONDASI DALAM

15,511 x 0,616 22,607 x 0,616


= 3379,89 x 0,216 -
2
- 2

= 716,636 kN.m

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400
= 0,0357)
6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 716,636
M n=
φ = 0 , 8 = 895,795 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

RESTI AYU PURWANTI(G1B019014) 161


TUGAS BESAR PONDASI DALAM

Mn
R n= 895,795 x 1000000
bd 2^ = 2100 x 404
2
= 2,61353

Periksa

Rn < Rmaks

2,61353< 8,782 OK !

7. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 2,61353
0 ,85 x 35 ]
= 0,0068

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 2100x 404= 5810,85mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 2100
s=
4 As ¿ 4 5810 , 85 = 137 mm

s maks = 200 mm
Digunakan tulangan D22 – 130

10. Luas tulangan terpakai

RESTI AYU PURWANTI(G1B019014) 162


TUGAS BESAR PONDASI DALAM

πD2 b
As= π 22 x 22 2100
4 s¿
4 130 = 6140,61 mm2

5. Tipe 5 (3 tiang)
 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

RESTI AYU PURWANTI(G1B019014) 163


TUGAS BESAR PONDASI DALAM

Diketahui:
Pumax =2947,25 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 2 , 4 -0, 7
Cx=
2 = 2 = 0,850 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,850– 0,45= 0,400 m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c =0,850x 2,21 x 0,5 x 24 = 22,491 kN

W 2=Cx×Ly×z×γ s = 0,850x 2,21x 1,5 x 22,04 = 61,971kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

22,491 x 0,850 61,971 x 0,850


= 2947,25 x 0,400 - 2 - 2

RESTI AYU PURWANTI(G1B019014) 164


TUGAS BESAR PONDASI DALAM

= 1143,002 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 1143,002
M n=
φ = 0 , 8 = 1428,752 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

RESTI AYU PURWANTI(G1B019014) 165


TUGAS BESAR PONDASI DALAM

Mn 1428,752 x 1000000
R n=
bd 2^ = 2205 x 404
2
= 3,96996

Periksa

Rn < Rmaks

3,96996< 8,782 OK !

8. Menentukan ρ perlu

[ √
ρ perlu= 0 ,85 f ' c 1− 1−
fy
2R n
0 , 85 f ' c ]
¿
400 [ √
0 , 85 x 35
1− 1−
2 x 3,96996
0 , 85 x 35 ]
= 0,0107

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 2205 x 404 =9526,12 mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 2205
s=
4 As ¿ 4
x
9526 ,12 =87,99 mm

s maks = 200 mm
Digunakan tulangan D22 –80

11. Luas tulangan terpakai

RESTI AYU PURWANTI(G1B019014) 166


TUGAS BESAR PONDASI DALAM

πD2 b
As= π 22 x 22 2205
4 s¿ x
4 80 = 10477,41 mm2

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =2947,25 kN.m
fy = 400 MPa
f’c = 35 MPa

RESTI AYU PURWANTI(G1B019014) 167


TUGAS BESAR PONDASI DALAM

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 2,205−0 , 7
Cy=
2 = 2 = 0,753 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,753 – 0,45 =0,303 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,753 x2,4x 0,5x24 = 21,672 kN

W 2=Cy×Lx×z×γ s = 0,753 x2,4x1,5x 22,04= 35,829 kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

21,672 x 0,753 35,829 x 0,753


= 2947,25 x 0,303 -
2
- 2

= 869,907 kN.m

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)

RESTI AYU PURWANTI(G1B019014) 168


TUGAS BESAR PONDASI DALAM

1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 869,907
M n=
φ = 0 , 8 = 1087,384 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 1087,384 x 1000000
bd 2^ = 2400 x 404
2 = 2,77593

Periksa

RESTI AYU PURWANTI(G1B019014) 169


TUGAS BESAR PONDASI DALAM

Rn < Rmaks

2,77593< 8,782 OK !

7. Menentukan ρ perlu

[ √
ρ perlu= 0 ,85 f ' c 1− 1−
fy
2R n
0 , 85 f ' c ]
¿
400 [ √
0 , 85 x 35
1− 1−
2 x 2,77593
0 ,85 x 35 ]
= 0,0073

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 2400x 404= 7076,02 mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 2400
s=
4 As ¿ 4 7076 , 02 = 129 mm

s maks = 200 mm
Digunakan tulangan D22 – 120

10. Luas tulangan terpakai


πD2 b
As= π 22 x 22 2400
4 s¿
4 120 =7602,65 mm2

RESTI AYU PURWANTI(G1B019014) 170


TUGAS BESAR PONDASI DALAM

6. Tipe 6 (6 tiang)
 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:
Pumax =2205,16 kN.m
fy = 400 MPa
f’c = 35 MPa

RESTI AYU PURWANTI(G1B019014) 171


TUGAS BESAR PONDASI DALAM

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 2 , 4 -0, 7
Cx=
2 = 2 = 0,850 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,850– 0,3= 0,550 m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c =0,850 x 1,50 x 0,5 x 24 = 15,300 kN

W 2=Cx×Ly×z×γ s = 0,850x 1,50x 1,5 x 22,04 = 42,157 kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

15,300 x 0,850 42,157 x 0,850


= 2205,16x 0,550 - 2 - 2

= 1188,420 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)

RESTI AYU PURWANTI(G1B019014) 172


TUGAS BESAR PONDASI DALAM

1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 1188,420
M n=
φ = 0 ,8 = 1485,525 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn 1485,525 x 1000000
R n=
bd 2^ = 1500 x 404
2
= 6,06772

Periksa

RESTI AYU PURWANTI(G1B019014) 173


TUGAS BESAR PONDASI DALAM

Rn < Rmaks

6,06772< 8,782 OK !

8. Menentukan ρ perlu

[ √
ρ perlu= 0 ,85 f ' c 1− 1−
fy
2R n
0 , 85 f ' c ]
¿
400 [ √
0 , 85 x 35
1− 1−
2 x 6,06772
0 ,85 x 35 ]
= 0,0171

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1500x 404 =10390,23 mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1500
s=
4 As ¿ 4
x
10390 , 23 =54,88 mm

s maks = 200 mm
Digunakan tulangan D22 –50

11. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1500
4 s¿ x
4 50 = 11403,98 mm2

RESTI AYU PURWANTI(G1B019014) 174


TUGAS BESAR PONDASI DALAM

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

RESTI AYU PURWANTI(G1B019014) 175


TUGAS BESAR PONDASI DALAM

Diketahui :
Pumax =2205,16 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 1, 5−0 ,7
Cy=
2 = 2 = 0,400 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,400– 0,3=0,100 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,400x2,4x 0,5x24 = 11,520 kN

W 2=Cy×Lx×z×γ s =0,400 x2,4x1,5x 22,04= 19,045 kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

RESTI AYU PURWANTI(G1B019014) 176


TUGAS BESAR PONDASI DALAM

11,520 x 0,400 19,045 x 0,400


= 2205,16 x 0,100 -
2
- 2

= 214,403 kN.m

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400
= 0,0357)
6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 214,403
M n=
φ = 0 , 8 = 268,004 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

RESTI AYU PURWANTI(G1B019014) 177


TUGAS BESAR PONDASI DALAM

Mn
R n= 268,004 x 1000000
bd 2^ = 2400 x 404
2
= 0,68418

Periksa

Rn < Rmaks

0,68418< 8,782 OK !

7. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 0,68418
0 , 85 x 35 ]
= 0,0017

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 2400x 404= 3393,60 mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 2400
s=
4 As ¿ 4 3393 , 60 = 269 mm

s maks = 200 mm
Digunakan tulangan D22 – 200

RESTI AYU PURWANTI(G1B019014) 178


TUGAS BESAR PONDASI DALAM

10. Luas tulangan terpakai


πD2 b
As= π 22 x 22 2400
4 s¿
4 200 =4561,59 mm2

7. Tipe7 (3 tiang)
 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

RESTI AYU PURWANTI(G1B019014) 179


TUGAS BESAR PONDASI DALAM

Diketahui:
Pumax =2086,29 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 1, 8 -0, 7
Cx=
2 = 2 = 0,550 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,550– 0,35= 0,200 m

3. Menentukan berat beton (W1) dan berat tanah (W2)

RESTI AYU PURWANTI(G1B019014) 180


TUGAS BESAR PONDASI DALAM

W 1=Cx×Ly×h×γ c =0,550x 1,80 x 0,5 x 24 = 11,880 kN

W 2=Cx×Ly×z×γ s = 0,550 x 1,80x 1,5 x 22,04 = 32,734 kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

11,880 x 0,550 32,734 x 0,550


= 2086,29 x 0,200 - 2 - 2

= 404,990 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400
= 0,0357)
7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

RESTI AYU PURWANTI(G1B019014) 181


TUGAS BESAR PONDASI DALAM

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 404,990
M n=
φ = 0 , 8 = 506,237 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn 506,237 x 1000000
R n=
bd 2^ = 1800 x 404
2
= 1,72313

Periksa

Rn < Rmaks

1,72313< 8,782 OK !

8. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 1,72313
0 ,85 x 35 ]
= 0,0044

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1800x 404 =3229,05 mm2

RESTI AYU PURWANTI(G1B019014) 182


TUGAS BESAR PONDASI DALAM

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1800
s=
4 As ¿ 4
x
3229 , 05 =211,90 mm

s maks = 200 mm
Digunakan tulangan D22 –200

11. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1800
4 s¿ x
4 200 = 3421,19 mm2

RESTI AYU PURWANTI(G1B019014) 183


TUGAS BESAR PONDASI DALAM

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =2086,29 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)

RESTI AYU PURWANTI(G1B019014) 184


TUGAS BESAR PONDASI DALAM

( Lx−by ) 1, 8−0 , 7
Cy=
2 = 2 = 0,550 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,550– 0,35=0,200 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,550x1,8x 0,5x24 = 11,880 kN

W 2=Cy×Lx×z×γ s =0,550x1,8x1,5x 22,04 = 19,640kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

11,880 x 0,550 19,640 x 0,550


= 2086,29 x 0,200 -
2
- 2

= 408,591 kN.m

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )

RESTI AYU PURWANTI(G1B019014) 185


TUGAS BESAR PONDASI DALAM

=
0 , 85 x 0 , 8
400 ( 600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 408,591
M n=
φ = 0 , 8 = 510,738 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 510,738 x 1000000
bd 2^ = 1800 x 404
2
= 1,73845

Periksa

Rn < Rmaks

1,73845< 8,782 OK !

7. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 1,73845
0 ,85 x 35 ]
= 0,0045

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

RESTI AYU PURWANTI(G1B019014) 186


TUGAS BESAR PONDASI DALAM

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1800x 404= 3258,68 mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1800
s=
4 As ¿ 4 3393 , 60 = 210 mm

s maks = 200 mm
Digunakan tulangan D22 – 200

10. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1800
4 s¿
4 200 =3421,19 mm2

RESTI AYU PURWANTI(G1B019014) 187


TUGAS BESAR PONDASI DALAM

8. Tipe 8 (3 tiang)
 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:
Pumax =2510,73 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

RESTI AYU PURWANTI(G1B019014) 188


TUGAS BESAR PONDASI DALAM

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 2 ,1 -0, 7
Cx=
2 = 2 = 0,700m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,700– 0,4= 0,300 m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c =0,700x 1,93 x 0,5 x 24 = 16,220 kN

W 2=Cx×Ly×z×γ s = 0,700x 1,93x 1,5 x 22,04 = 44,693kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

16,220 x 0,700 44,693 x 0,700


= 2510,73 x 0,300 - 2 - 2

= 731,898 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
RESTI AYU PURWANTI(G1B019014) 189
TUGAS BESAR PONDASI DALAM

=
0 , 85 x 0 , 8
400 ( 600
600+400 )
= 0,0357

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 731,898
M n=
φ = 0 , 8 = 914,873 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn 914,873 x 1000000
R n=
bd 2^ = 1931 x 404
2
= 2,90279

Periksa

Rn < Rmaks

2,90279< 8,782 OK !

8. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 2,90279
0 ,85 x 35 ]
= 0,0077

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

RESTI AYU PURWANTI(G1B019014) 190


TUGAS BESAR PONDASI DALAM

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1931x 404 =5968,30 mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1931
s=
4 As ¿ 4
x
5968 , 30 =122,99 mm

s maks = 200 mm
Digunakan tulangan D22 –120

11. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1931
4 s¿ x
4 120 = 6116,97 mm2

RESTI AYU PURWANTI(G1B019014) 191


TUGAS BESAR PONDASI DALAM

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =2510,73 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm

RESTI AYU PURWANTI(G1B019014) 192


TUGAS BESAR PONDASI DALAM

Lebar pile cap x (Lx)= 1800 mm


Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:

1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 1,931−0 , 7
Cy=
2 = 2 =0,616 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,616– 0,4=0,216 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,616x2,1x 0,5x24 = 15,511kN

W 2=Cy×Lx×z×γ s =0,616 x2,1x1,5x 22,04 = 25,643kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

15,511 x 0,616 25,643 x 0,616


= 2510,73 x 0,216 -
2
- 2

= 528,397kN.m

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)

RESTI AYU PURWANTI(G1B019014) 193


TUGAS BESAR PONDASI DALAM

( f ' c −28 ) ( 35−28 )


β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

(
ρ b = 0 , 85×β 1×f ' c
fy
600
600+f y )
=
400 (
0 , 85 x 0 , 8 600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 528,397
M n=
φ = 0 , 8 =660,496 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 660,496 x 1000000
bd 2^ = 2100 x 404
2
= 1,92703

Periksa

Rn < Rmaks

1,92703< 8,782 OK !

7. Menentukan ρ perlu

RESTI AYU PURWANTI(G1B019014) 194


TUGAS BESAR PONDASI DALAM

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 1,92703
0 ,85 x 35 ]
= 0,0050

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 2100x 404= 4228,94mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 2100
s=
4 As ¿ 4 4228 , 94 = 189mm

s maks = 200 mm
Digunakan tulangan D22 – 180

10. Luas tulangan terpakai


πD2 b
As= π 22 x 22 2100
4 s¿
4 180 =4434,88mm2

RESTI AYU PURWANTI(G1B019014) 195


TUGAS BESAR PONDASI DALAM

9. Tipe 9 (3 tiang)
 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:
Pumax =1601,83 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019

RESTI AYU PURWANTI(G1B019014) 196


TUGAS BESAR PONDASI DALAM

Tebal pile cap (h) = 500 mm


Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 2 ,1 -0, 7
Cx=
2 = 2 = 0,700 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,700– 0,45= 0,250 m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c =0,700x 1,94 x 2,1 x 24 = 68,584 kN

W 2=Cx×Ly×z×γ s = 0,700x 1,94x 1,5 x 19,39 = 39,590 kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

68,584 x 0,700 39,590 x 0,700


= 1601,83x0,250 - 2 - 2

= 362,597kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

RESTI AYU PURWANTI(G1B019014) 197


TUGAS BESAR PONDASI DALAM

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

(
ρ b = 0 , 85×β 1×f ' c
fy
600
600+f y )
=
400 (
0 , 85 x 0 , 8 600
600+400 )
= 0,0357

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 362,597
M n=
φ = 0 , 8 = 453,246 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn 453,246 x 1000000
R n=
^
bd 2 = 2
= 0,05806
1944 x 404

Periksa

Rn < Rmaks

0,05806< 8,782 OK !

8. Menentukan ρ perlu

RESTI AYU PURWANTI(G1B019014) 198


TUGAS BESAR PONDASI DALAM

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 0,05806
0 , 85 x 35 ]
= 0,0001

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1944x 404 =13635,22 mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1944
s=
4 As ¿ 4
x
13635 , 22 =54,20 mm

s maks = 200 mm
Digunakan tulangan D22 –50

11. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1944
4 s¿ x
4 50 = 14779,56 mm2

RESTI AYU PURWANTI(G1B019014) 199


TUGAS BESAR PONDASI DALAM

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =1601,83 kN.m
fy = 400 MPa

RESTI AYU PURWANTI(G1B019014) 200


TUGAS BESAR PONDASI DALAM

f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 1,944−0 ,7
Cy=
2 = 2 =0,622 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,622– 0,45=0,172m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,622x2,1x 2,1x24 =65,832 kN

W 2=Cy×Lx×z×γ s =0,622x2,1x1,5x 19,39 = 247,950 kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

65,832 x 0,622 247,950 x 0,622


=1601,83 x 0,172-
2
- 2

= 309,938 kN.m

RESTI AYU PURWANTI(G1B019014) 201


TUGAS BESAR PONDASI DALAM

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 309,938
M n=
φ = 0 , 8 =309,938 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 309,938 x 1000000
bd 2^ = 2100 x 404
2
= 0,03675

RESTI AYU PURWANTI(G1B019014) 202


TUGAS BESAR PONDASI DALAM

Periksa

Rn < Rmaks

0,03675< 8,782 OK !

7. Menentukan ρ perlu

[ √
ρ perlu= 0 ,85 f ' c 1− 1−
fy
2R n
0 , 85 f ' c ]
¿
400 [ √
0 , 85 x 35
1− 1−
2 x 0,03675
0 , 85 x 35 ]
= 0,0001

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 2100x 404= 14729,40 mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 2100
s=
4 As ¿ 4 14729 , 40 =54 mm

s maks = 200 mm
Digunakan tulangan D22 – 50

10. Luas tulangan terpakai

RESTI AYU PURWANTI(G1B019014) 203


TUGAS BESAR PONDASI DALAM

πD2 b
As= π 22 x 22 2100
4 s¿
4 50 =15965,57 mm2

10. Tipe 10 (4 tiang)


 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:

RESTI AYU PURWANTI(G1B019014) 204


TUGAS BESAR PONDASI DALAM

Pumax =1282,22 kN.m


fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 1, 5 -0, 7
Cx=
2 = 2 = 0,400 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,400– 0,35= 0,050 m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c =0,400x 1,5x 0,5x 24 = 7,200 kN

W 2=Cx×Ly×z×γ s = 0,400x 1,5x 1,5 x 19,39 = 17,456 kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

7,200 x 0,400 17,456 x 0,400


= 1282,22 x0,050 - 2 - 2

RESTI AYU PURWANTI(G1B019014) 205


TUGAS BESAR PONDASI DALAM

= 59,180 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 59,180
M n=
φ = 0 , 8 = 73,975 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

RESTI AYU PURWANTI(G1B019014) 206


TUGAS BESAR PONDASI DALAM

Mn 73,975 x 1000000
R n=
bd 2^ = 1500 x 404
2
= 0,30215

Periksa

Rn < Rmaks

0,30215< 8,782 OK !

8. Menentukan ρ perlu

[ √
ρ perlu= 0 ,85 f ' c 1− 1−
fy
2R n
0 , 85 f ' c ]
¿
400 [ √
0 , 85 x 35
1− 1−
2 x 0,30215
0 , 85 x 35 ]
= 0,0008

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1500x 404 =2121,00 mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1500
s=
4 As ¿ 4
x
2121 , 00 =268,84 mm

s maks = 200 mm
Digunakan tulangan D22 –200

11. Luas tulangan terpakai

RESTI AYU PURWANTI(G1B019014) 207


TUGAS BESAR PONDASI DALAM

πD2 b
As= π 22 x 22 1500
4 s¿ x
4 200 = 2851,00 mm2

 Tulangan Utama arah y

RESTI AYU PURWANTI(G1B019014) 208


TUGAS BESAR PONDASI DALAM

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =1282,22 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 1, 5−0 ,7
Cy=
2 = 2 =0,400 m

2. Menentukan jarak tiang terhadap sisi kolom (e)

RESTI AYU PURWANTI(G1B019014) 209


TUGAS BESAR PONDASI DALAM

ey=Cy−a = 0,400– 0,35=0,050m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,400x1,5x 0,5x24 =7,200 kN

W 2=Cy×Lx×z×γ s =0,400x1,5x1,5x 19,39 = 10,473 kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

7,200 x 0,400 10,473 x 0,400


=1282,22 x 0,050-
2
- 2

= 60,576 kN.m

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

RESTI AYU PURWANTI(G1B019014) 210


TUGAS BESAR PONDASI DALAM

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 60,576
M n=
φ = 0 , 8 =75,720 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 75,720 x 1000000
bd 2^ = 1500 x 404 2 = 0,30928

Periksa

Rn < Rmaks

0,30928< 8,782 OK !

7. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 0,30928
0 , 85 x 35 ]
= 0,0008

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

RESTI AYU PURWANTI(G1B019014) 211


TUGAS BESAR PONDASI DALAM

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1500x 404= 2121,00 mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1500
s=
4 As ¿ 4 2121 , 00 =269 mm

s maks = 200 mm
Digunakan tulangan D22 – 200

10. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1500
4 s¿
4 200 =2851,00 mm2

RESTI AYU PURWANTI(G1B019014) 212


TUGAS BESAR PONDASI DALAM

11. Tipe 11 (3 tiang)


 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:
Pumax =1388,85 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)

RESTI AYU PURWANTI(G1B019014) 213


TUGAS BESAR PONDASI DALAM

( Ly−bx ) 1, 8 -0, 7
Cx=
2 = 2 = 0,550m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,550– 0,4= 0,150 m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c =0,550x 1,67x 0,5x 24 = 11,022 kN

W 2=Cx×Ly×z×γ s = 0,550x 1,67x 1,5 x 19,39 = 26,722 kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

11,022 x 0,550 26,722 x 0,550


= 1388,85 x0,150- 2 - 2

= 197,948 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

RESTI AYU PURWANTI(G1B019014) 214


TUGAS BESAR PONDASI DALAM

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 197,948
M n=
φ = 0 , 8 = 247,436 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn 247,436 x 1000000
R n=
bd 2^ = 1670 x 404
2
= 0,90778

Periksa

Rn < Rmaks

0,90778< 8,782 OK !

8. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 0,90778
0 , 85 x 35 ]
= 0,0023

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

RESTI AYU PURWANTI(G1B019014) 215


TUGAS BESAR PONDASI DALAM

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1670x 404 =2361,38 mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1670
s=
4 As ¿ 4
x
2361 , 38 =268,84mm

s maks = 200 mm
Digunakan tulangan D22 –200

11. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1670
4 s¿ x
4 200 = 3174,11 mm2

RESTI AYU PURWANTI(G1B019014) 216


TUGAS BESAR PONDASI DALAM

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =1388,85 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8

RESTI AYU PURWANTI(G1B019014) 217


TUGAS BESAR PONDASI DALAM

Kolom (bx)/(by) = 700 mm


Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 1, 67−0 , 7
Cy=
2 = 2 =0,485 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,485– 0,4=0,085 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,485x1,8x 0,5x24 =10,476 kN

W 2=Cy×Lx×z×γ s =0,485x1,8x1,5x 19,39 = 15,239 kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

10,476 x 0,485 15,239 x 0,485


=1388,85 x0,085-
2
- 2

= 111,817 kN.m

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

RESTI AYU PURWANTI(G1B019014) 218


TUGAS BESAR PONDASI DALAM

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 ( 600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 111,817
M n=
φ = 0 , 8 =139,771 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 139,771 x 1000000
bd 2^ = 1800 x 404
2 = 0,47575

Periksa

Rn < Rmaks

0,47575< 8,782 OK !

7. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 0,47575
0 , 85 x 35 ]
= 0,0012
RESTI AYU PURWANTI(G1B019014) 219
TUGAS BESAR PONDASI DALAM

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1800x 404= 2545,20 mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1800
s=
4 As ¿ 4 2545 , 20 =269 mm

s maks = 200 mm
Digunakan tulangan D22 – 200

10. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1800
4 s¿
4 200 =3421,19 mm2

RESTI AYU PURWANTI(G1B019014) 220


TUGAS BESAR PONDASI DALAM

12. Tipe 12(3 tiang)


 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:
Pumax =2668,78 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8

RESTI AYU PURWANTI(G1B019014) 221


TUGAS BESAR PONDASI DALAM

Kolom (bx)/(by) = 700 mm


Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 2 ,21 -0, 7
Cx=
2 = 2 = 0,753 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,753– 0,45= 0,303 m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c =0,753x 2,21 x 0,5x 24 = 11,022 Kn

W 2=Cx×Ly×z×γ s = 0,753x 2,21x 1,5 x 19,60= 48,770kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

19,911 x 0,753 48,770 x 0,753


= 2668,78x0,303- 2 - 2

= 781,463 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

RESTI AYU PURWANTI(G1B019014) 222


TUGAS BESAR PONDASI DALAM

ρ b = 0 , 85×β 1×f ' c


fy (
600
600+f y )
=
400 (
0 , 85 x 0 , 8 600
600+400 )
= 0,0357

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 781,463
M n=
φ = 0 , 8 = 976,829 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn 976,829 x 1000000
R n=
bd 2^ = 2205 x 404
2
=1,097

Periksa

Rn < Rmaks

1,097< 8,782 OK !

8. Menentukan ρ perlu

[ √
ρ perlu= 0 ,85 f ' c 1− 1−
fy
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 1,097
0 , 85 x 35 ]
= 0,0028

RESTI AYU PURWANTI(G1B019014) 223


TUGAS BESAR PONDASI DALAM

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x2205 x 404 =3117,87 mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 2205
s=
4 As ¿ 4
x
3117 , 87 =269 mm

s maks = 200 mm
Digunakan tulangan D22 –200

11. Luas tulangan terpakai


πD2 b
As= π 22 x 22 2205
4 s¿ x
4 200 = 4190,96 mm2

RESTI AYU PURWANTI(G1B019014) 224


TUGAS BESAR PONDASI DALAM

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =2668,78 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm

RESTI AYU PURWANTI(G1B019014) 225


TUGAS BESAR PONDASI DALAM

Selimut beton (p) = 75 mm


Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 2 , 4−0 ,7
Cy=
2 = 2 =0,850 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,850– 0,45=0,400 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,850x2,4 x 0,5x24 = 24,480 kN

W 2=Cy×Lx×z×γ s =0,850x2,4x1,5x 19,60 = 59,961kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

24,480 x 0,850 59,961 x 0,850


=2668,78 x0,400-
2
- 2

= 1031,623 kN.m

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)

RESTI AYU PURWANTI(G1B019014) 226


TUGAS BESAR PONDASI DALAM

( f ' c −28 ) ( 35−28 )


β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

(
ρ b = 0 , 85×β 1×f ' c
fy
600
600+f y )
=
400 (
0 , 85 x 0 , 8 600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 1031,623
M n=
φ = 0 , 8 =1289,528 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 1289,528 x 1000000
bd 2^ = 2400 x 404
2
= 1,66245

Periksa

Rn < Rmaks

1,66245< 8,782 OK !

7. Menentukan ρ perlu

RESTI AYU PURWANTI(G1B019014) 227


TUGAS BESAR PONDASI DALAM

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 1,66245
0 ,85 x 35 ]
= 0,0028

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 2400x 404= 3393,60 mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 2400
s=
4 As ¿ 4 3393 , 60 =269 mm

s maks = 200 mm
Digunakan tulangan D22 – 200

10. Luas tulangan terpakai


πD2 b
As= π 22 x 22 2400
4 s¿
4 200 =4561,59 mm2

RESTI AYU PURWANTI(G1B019014) 228


TUGAS BESAR PONDASI DALAM

13. Tipe 13 (4 tiang)


 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:
Pumax =2613,54 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019

RESTI AYU PURWANTI(G1B019014) 229


TUGAS BESAR PONDASI DALAM

Tebal pile cap (h) = 500 mm


Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 1, 8 -0, 7
Cx=
2 = 2 = 0,550 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,550 – 0,35= 0,200 m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c =0,550 x1,8x 0,5x 24 = 11,880 Kn

W 2=Cx×Ly×z×γ s = 0,550 x 1,8x 1,5 x 19,60= 29,099 kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

11,880 x 0,550 29,099 x 0,550


= 2613,54 x0,200- 2 - 2

= 511,438 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

RESTI AYU PURWANTI(G1B019014) 230


TUGAS BESAR PONDASI DALAM

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

(
ρ b = 0 , 85×β 1×f ' c
fy
600
600+f y )
=
400 (
0 , 85 x 0 , 8 600
600+400 )
= 0,0357

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 511,438
M n=
φ = 0 ,8 = 639,298 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn 639,298 x 1000000
R n=
^
bd 2 = 2
=0,879
1800 x 404

Periksa

Rn < Rmaks

0,879< 8,782 OK !

8. Menentukan ρ perlu

RESTI AYU PURWANTI(G1B019014) 231


TUGAS BESAR PONDASI DALAM

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 0,879
0 , 85 x 35 ]
= 0,0022

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x1800 x 404 =2545,20 mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1800
s=
4 As ¿ 4
x
2545 , 20 =269 mm

s maks = 200 mm
Digunakan tulangan D22 –200

11. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1800
4 s¿ x
4 200 = 3421,19 mm2

RESTI AYU PURWANTI(G1B019014) 232


TUGAS BESAR PONDASI DALAM

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =2613,54 kN.m
fy = 400 MPa

RESTI AYU PURWANTI(G1B019014) 233


TUGAS BESAR PONDASI DALAM

f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 1, 8−0 , 7
Cy=
2 = 2 =0,550 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,550 – 0,35=0,200 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,550 x1,8 x 0,5x24 = 11,880 kN

W 2=Cy×Lx×z×γ s =0,550 x1,8x1,5x 19,60 = 29,099 kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

11,880 x 0,550 29,099 x 0,550


=2613,54 x0,200-
2
- 2

= 511,438 kN.m

RESTI AYU PURWANTI(G1B019014) 234


TUGAS BESAR PONDASI DALAM

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 511,438
M n=
φ = 0 ,8 =639,298 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 639,298 x 1000000
bd 2^ = 1800 x 404
2
= 1,09890

RESTI AYU PURWANTI(G1B019014) 235


TUGAS BESAR PONDASI DALAM

Periksa

Rn < Rmaks

1,09890< 8,782 OK !

7. Menentukan ρ perlu

[ √
ρ perlu= 0 ,85 f ' c 1− 1−
fy
2R n
0 , 85 f ' c ]
¿
400 [ √
0 , 85 x 35
1− 1−
2 x 1,09890
0 ,85 x 35 ]
= 0,0022

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1800x 404= 2545,20 mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1800
s=
4 As ¿ 4 2545 , 20 =269 mm

s maks = 200 mm
Digunakan tulangan D22 – 200

10. Luas tulangan terpakai

RESTI AYU PURWANTI(G1B019014) 236


TUGAS BESAR PONDASI DALAM

πD2 b
As= π 22 x 22 1800
4 s¿
4 200 =3421,19 mm2

14. Tipe 14 (4 tiang)


 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:

RESTI AYU PURWANTI(G1B019014) 237


TUGAS BESAR PONDASI DALAM

Pumax =21564,98 kN.m


fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Ly−bx ) 1, 5 -0, 7
Cx=
2 = 2 = 0,400 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,400 – 0,3= 0,100 m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c =0,400 x1,5x 0,5x 24 = 7,200 Kn

W 2=Cx×Ly×z×γ s = 0,400 x 1,5x 1,5 x 19,60= 17,636 kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

7,200 x 0,400 17,636 x 0,400


= 1564,98x0,100- 2 - 2

RESTI AYU PURWANTI(G1B019014) 238


TUGAS BESAR PONDASI DALAM

= 151,531 kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 151,531
M n=
φ = 0 ,8 = 189,414 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

RESTI AYU PURWANTI(G1B019014) 239


TUGAS BESAR PONDASI DALAM

Mn 189,414 x 1000000
R n=
bd 2^ = 1500 x 404
2
=0,313

Periksa

Rn < Rmaks

0,313< 8,782 OK !

8. Menentukan ρ perlu

[ √
ρ perlu= 0 ,85 f ' c 1− 1−
fy
2R n
0 , 85 f ' c ]
¿
400 [ √
0 , 85 x 35
1− 1−
2 x 0,313
0 , 85 x 35 ]
= 0,0008

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x1500 x 404 =2121,00 mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1500
s=
4 As ¿ 4
x
2121 , 00 =269 mm

s maks = 200 mm
Digunakan tulangan D22 –200

11. Luas tulangan terpakai

RESTI AYU PURWANTI(G1B019014) 240


TUGAS BESAR PONDASI DALAM

πD2 b
As= π 22 x 22 1500
4 s¿ x
4 200 = 2851,00 mm2

 Tulangan Utama arah y

RESTI AYU PURWANTI(G1B019014) 241


TUGAS BESAR PONDASI DALAM

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =21564,98 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 1, 5−0 ,7
Cy=
2 = 2 =0,400 m

2. Menentukan jarak tiang terhadap sisi kolom (e)

RESTI AYU PURWANTI(G1B019014) 242


TUGAS BESAR PONDASI DALAM

ey=Cy−a = 0,400 – 0,3=0,100 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,400 x1,5x 0,5x24 = 7,200 kN

W 2=Cy×Lx×z×γ s =0,400 x1,5x1,5x 19,60 = 17,636 kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

7,200 x 0,400 17,636 x 0,400


=21564,98 x0,100-
2
- 2

= 151,531kN.m

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

RESTI AYU PURWANTI(G1B019014) 243


TUGAS BESAR PONDASI DALAM

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 151,531
M n=
φ = 0 ,8 =189,414 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 189,414 x 1000000
bd 2^ = 1500 x 404
2 = 0,39071

Periksa

Rn < Rmaks

0,39071< 8,782 OK !

7. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 0,39071
0 ,85 x 35 ]
= 0,0008

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

RESTI AYU PURWANTI(G1B019014) 244


TUGAS BESAR PONDASI DALAM

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 1500x 404= 2121,00 mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1500
s=
4 As ¿ 4 2121 , 00 =269 mm

s maks = 200 mm
Digunakan tulangan D22 – 200

10. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1500
4 s¿
4 200 =2851,00 mm2

RESTI AYU PURWANTI(G1B019014) 245


TUGAS BESAR PONDASI DALAM

15. Tipe 15 (3 tiang)


 Tulangan Utama arah x
Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui:
Pumax =2637,42 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8
Kolom (bx)/(by) = 700 mm
Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)

RESTI AYU PURWANTI(G1B019014) 246


TUGAS BESAR PONDASI DALAM

( Ly−bx ) 1, 93 -0, 7
Cx=
2 = 2 =0,616m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ex =Cx−a = 0,616– 0,4= 0,216m

3. Menentukan berat beton (W1) dan berat tanah (W2)


W 1=Cx×Ly×h×γ c =0,616 x1,93x 0,5x 24 = 14,262 kN

W 2=Cx×Ly×z×γ s =0,616x 1,93x 1,5 x 19,60= 34,934kN

4. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cx W 2×Cx
M ux =Pu maks×ex− −
2 2

14,262 x 0,616 34,934 x 0,616


= 2637,42x0,216- 2 - 2

= 553,223kN.m

5. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,001 + 0,022/2 = 0,096 m

Maka,

d = 0,5 – 0,096 = 0,404 m

6. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 (600
600+400 )
= 0,0357

RESTI AYU PURWANTI(G1B019014) 247


TUGAS BESAR PONDASI DALAM

7. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 553,223
M n=
φ = 0 , 8 = 691,529 kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn 691,529 x 1000000
R n=
bd 2^ = 1931 x 404
2
=0,886

Periksa

Rn < Rmaks

0,886< 8,782 OK !

8. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 0,886
0 , 85 x 35 ]
= 0,0023

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

RESTI AYU PURWANTI(G1B019014) 248


TUGAS BESAR PONDASI DALAM

Diambil 0,0035

9. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x1931x 404 =2730,43 mm2

Digunakan D22

10. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 1931
s=
4 As ¿ 4
x
2730 , 43 =269 mm

s maks = 200 mm
Digunakan tulangan D22 –200

11. Luas tulangan terpakai


πD2 b
As= π 22 x 22 1931
4 s¿ x
4 200 = 3670,18 mm2

RESTI AYU PURWANTI(G1B019014) 249


TUGAS BESAR PONDASI DALAM

 Tulangan Utama arah y

Keterangan :
Bx = Lebar Kolom
W1 = Berat Beton
W2 = Berat Tanah
Cx = Jarak tepi kolom terhadap sisi luar pilecap
d = Tebal efektif plat
ex = Jarak tiang terhadap sisi kolom
x1 = Jarak antar tiang pancang
a = Jarak tiang pancang tepi terhadap sisi luar beton
z = Jarak pilecap kepermukaan tanah
h = Tebal pilecap

Diketahui :
Pumax =2637,42 kN.m
fy = 400 MPa
f’c = 35 MPa

Sumber : SNI 2847-2019


Tebal pile cap (h) = 500 mm
Selimut beton (p) = 75 mm
Lebar pile cap x (Lx)= 1800 mm
Lebar pile cap y (Ly)= 1660 mm
ϕ tulangan = 22 mm
Faktor reduksi = 0,8

RESTI AYU PURWANTI(G1B019014) 250


TUGAS BESAR PONDASI DALAM

Kolom (bx)/(by) = 700 mm


Penyelesaian:
1. Menentukan jarak tepi kolom terhadap sisi luar pile cap (C)
( Lx−by ) 2 ,1−0 ,7
Cy=
2 = 2 =0,700 m

2. Menentukan jarak tiang terhadap sisi kolom (e)


ey=Cy−a = 0,700 – 0,4=0,300 m

Menentukan berat beton (W1) dan berat tanah (W2)

W 1=Cy×Lx×h×γ c = 0,700 x2,1x 0,5x24 = 17,640 kN

W 2=Cy×Lx×z×γ s =0,700 x2,1x1,5x 19,60 = 43,207 kN

3. Menentukan momen yang terjadi pada pile cap (Mu)


W 1×Cy W 2×Cy
M ux =Pu maks×ey− −
2 2

17,640 x 0,700 43,207 x 0,700


=2637,42 x0,300 -
2
- 2

= 769,929kN.m

4. Menentukan jarak pusat tulangan terhadap sisi luar beton (d’)


1
d ' =S + P + D
2 = 0,075 + 0,01 + 0,022/2 = 0,096 m

Maka

d = 0,5 – 0,096 = 0,404 m

5. Menentukan rasio tulangan (ρ)


( f ' c −28 ) ( 35−28 )
β 1=0 , 85−0 ,05×
7 = 0,85 – 0,05 x 7 = 0,8

Sehingga ,

RESTI AYU PURWANTI(G1B019014) 251


TUGAS BESAR PONDASI DALAM

ρ b = 0 , 85×β 1×f ' c


fy
600
(
600+f y )
=
0 , 85 x 0 , 8
400 ( 600
600+400 )
= 0,0357

6. Menentukan (Rmaks)

[ ]
1
( 0 , 75× ρ b ×f y )
2
R maks=0 ,75×ρ b ×f y× 1 −
0 , 85×f ' c

[ ]
1
(0 , 75 x 0,0357 x 400)
= 0,75 x 0,0357 x 400 x 2
1−
0 , 85 x 400

= 8,782

Mu 769,929
M n=
φ = 0 , 8 =962,411kN.m

Dengan ф = 0,8 sebagai faktor reduksi kekuatan lentur

Mn
R n= 962,411 x 1000000
bd 2^ = 2100 x 404
2 = 1,41798

Periksa

Rn < Rmaks

1,41798< 8,782 OK !

7. Menentukan ρ perlu

ρ perlu=
fy [ √
0 ,85 f ' c
1− 1−
2R n
0 , 85 f ' c ]
¿
0 , 85 x 35
400 [ √
1− 1−
2 x 1,41798
0 ,85 x 35 ]
= 0,0023
RESTI AYU PURWANTI(G1B019014) 252
TUGAS BESAR PONDASI DALAM

ρ maks=0,75×ρ b = 0,75 x 0,0357 = 0,0268

1,4
ρ min = 1,4
fy = 400 = 0,0035

Diambil 0,0035

8. Menentukan As perlu (mm2)


As perlu=ρ×b×d = 0,0035 x 2100x 404= 2969,40mm2

Digunakan D22

9. Jaraktulangan yang diperlukan


πD2 b π 22 x 22 2100
s=
4 As ¿ 4 2969 , 40 =269 mm

s maks = 200 mm
Digunakan tulangan D22 – 200

10. Luas tulangan terpakai


πD2 b
As= π 22 x 22 2100
4 s¿
4 200 =3991,39 mm2

RESTI AYU PURWANTI(G1B019014) 253


TUGAS BESAR PONDASI DALAM

3.19Rekapitulasi Rencana Pondasi


Tabel 3.16.1 Rekapitulasi Rencana Pondasi
Jarak
Min
No Bentuk Jumlah Beban 1 Diamete Kapasitas 1
Beban Anta
Pondasi Tiang Tiang Tiang r Tiang
r
Tiang
4114,05
P1 Grup 3 1371,351 0,6 1977,503 1,5
4
3623,14
P2 Grup 4 905,786 0,4 1067,217 1,1
4
2366,83
P3 Grup 4 591,708 0,3 664,074 0,9
1
3379,89
P4 Grup 3 1126,631 0,5 1506,402 1,3
3
2947,24
P5 Grup 3 982,415 0,6 1154,930 1,5
6
2205,16
P6 Grup 6 367,527 0,3 390,803 0,9
2
2086,29
P7 Grup 6 347,716 0,3 390,803 0,9
4
2225,01
P8 Grup 3 741,673 0,5 873,831 1,3
9
3171,81
P9 Grup 3 1057,273 0,6 1154,930 1,5
8
1986,94
P10 Grup 4 496,737 0,4 618,588 1,1
7
2356,32
P11 Grup 4 589,082 0,4 618,588 1,1
8
2510,72
P12 Grup 3 836,909 0,5 873,831 1,3
6
1601,83
P13 Grup 3 533,944 0,6 736,559 1,2
1
1470,51
P14 Grup 4 367,628 0,4 397,043 0,8
2
1388,48
P15 Grup 4 347,121 0,4 397,043 0,8
2
1459,24
P16 Grup 3 486,416 0,5 555,879 1
7
1630,41
P17 Grup 3 543,472 0,6 736,559 1,2
5
1282,21
P18 Grup 4 320,554 0,4 397,043 0,8
6
P19 1295,56 Grup 4 323,892 0,4 397,043 0,8

RESTI AYU PURWANTI(G1B019014) 254


TUGAS BESAR PONDASI DALAM

7
1388,85
P20 Grup 3 462,951 0,5 555,879 1
4
2668,77
P21 Grup 3 889,592 0,6 1258,792 1,5
5
2613,53
P22 Grup 4 653,385 0,4 684,106 1,1
8
1564,98
P23 Grup 4 391,246 0,3 437,845 0,9
4
2637,41
P24 Grup 3 879,139 0,5 958,312 1,3
7

Tabel 3.16.2 Rekapitulasi Rencana Penulangan Pada Pondasi


Tulangan pile cap
Tipe Tulangan Tiang
Arah x Arah y
Tipe 1 9D22 D22-60 D22-80
Tipe 2 9D22 D22-110 D22-110
Tipe 3 9D22 D22-200 D22-200
Tipe 4 9D22 D22-80 D22-130
Tipe 5 9D22 D22-80 D22-80
Tipe 6 9D22 D22-50 D22-200
Tipe 7 9D22 D22-200 D22-200
Tipe 8 9D22 D22-120 D22-180
Tipe 9 9D22 D22-50 D22-50
Tipe 10 9D22 D22-200 D22-200
Tipe 11 9D22 D22-200 D22-200
Tipe 12 9D22 D22-200 D22-200
Tipe 13 9D22 D22-200 D22-200
Tipe 14 9D22 D22-200 D22-200
Tipe 15 9D22 D22-200 D22-200

RESTI AYU PURWANTI(G1B019014) 255


TUGAS BESAR PONDASI DALAM

3.20 Kesimpulan
Kesimpulan pada laporan ini adalah sebagai berikut :
1. Diameter direncanakan yaitu 0,3 m dan 0,4 mdengan tujuan agar tidak terlalu
banyak variasi dalam pembuatan pondasi dan mempermudah perencana
dengan kedalaman 12 m , 11 m, dan 14 m.
2. Pada pondasi grub memiliki distribusi beban tiang dengan beban maksimum
telah didukung oleh kapasitas daya dukung pada perencanaan pondasi.
Dengan kata lain pondasi yang direncanakan aman untuk beban maksimum
pada disitribusi beban.
3. Penurunan tiang grub terbesar terjadi pada nomor pondasi 7 dengan
penurunan senilai 0,5612 inch dan beban sebesar 1601,831kN.
4. Hasil desain pondasi yang telah direncanakan menghasilkan tipe pondasi
berdiameter 0,4 m dengan tulangan pokok 9D22 serta dengan tulangan
sengkang P10-75 berdasarkan SNI 2847 2013.
5. Penulangan pile cap mendapatkan hasil baik arah x maupun arah y dengan:
Tipe 1 : tulangan x D22-200, tulangan y D22-200
Tipe 2 : tulangan x D22-200, tulangan y D22-200
Tipe 3 : tulangan x D22-200, tulangan y D22-200
Tipe 4 : tulangan x D22-200, tulangan y D22-200
Tipe 5 : tulangan x D22-200, tulangan y D22-200

RESTI AYU PURWANTI(G1B019014) 256


TUGAS BESAR PONDASI DALAM

DAFTAR PUSTAKA

[BSN] Badan Standarisasi Nasional. 2013. SNI 2847 2013. Persyaratan Beton
Struktural Untuk Bangunan Gedung. Indonesia : Penerbit Badan Standart
Nasional. Jakarta
[BSN] Badan Standarisasi Nasional. 2012.SNI 1726, 2012. Tata Cara
Perencanaan Gempa Untuk Bangunan Gedung. Indonesia : Penerbit
Badan Standart Nasional. Jakarta
Hadiyatmo, Hary C. 2011. Analisis & Perancangan Pondasi II. Bandung : Gadjah
Mada University Press. Yogyakarta.
Perencanaan pile cap. Irwan Setyo. 26 November 2018.
https://id.scribd.com/document/394149872/perencanaan-Pile-Cap. Diakses
19 Mei 2020.
Poulus, H.G., dan Davis E.H., 1980. Pile Foundations Analysis and Design : John
Wiley and Sons Publishers, Inc., America
Robertson, P.K., 1990. Soil Clasification using the cone penetration test.
Canadian Geothechnical Journal, 27(1) : 151-158
Schmertmann, John H. 1970. Cone Penetration Test. Perfomance Design, U.S
Departement of Transfortation.

RESTI AYU PURWANTI(G1B019014) 257


TUGAS BESAR PONDASI DALAM

L
A
M
P
I
R
A
N
RESTI AYU PURWANTI(G1B019014) 258