Anda di halaman 1dari 1

SURAT PERINTAH KERJA ARTHUR TEKNIK

No Surat BL029/SPK/ART/VI/2023

Tanggal
04 Juni 2023
PIC Kantor
Houwdy - +62 811-995-565
PIC Lapangan
Revi Rahman - +62 812-9791-1114
Tanggal Loading 04 Juni 2023
Tanggal Sewa
6 - 11 Juni 2023
Lokasi Acara
Peninsula Island - Nusa Dua & Manarai Beach House
Program Acara
Dream Machine Festival 2023

Mesin Yang Mesin Yang Tanggal Max Pemakaian


No Deskripsi Tanggal Dipakai Operator Paraf
Disewa Dibawa Loading Mesin

80 KVA 100 KVA LED - Stage 1 (6-8 Jun : 8 Jam) (9-11 Jun : 12 Jam) 04-Jun 6 - 11 Jun 60 Jam Leader : Goris

100 KVA 150 KVA LIGHTING - Stage 1 (6-8 Jun : 8 Jam) (9-11 Jun : 12 Jam) 04-Jun 6 - 11 Jun 60 Jam Gameng/Putra

200 KVA 250 KVA SOUND SYSTEM - Stage 1 (6-8 Jun : 8 Jam) (9-11 Jun : 12 Jam) 04-Jun 6 - 11 Jun 60 Jam Eko

250 KVA Back Up Standby OFF Zainal Ansori

40 KVA 100 KVA LIGHTING - Stage 2 (6-8 Jun : 8 Jam) (9-11 Jun : 12 Jam) 04-Jun 6 - 11 Jun 60 Jam Huda

100 KVA 100 KVA SOUND SYSTEM - Stage 2 (6-8 Jun : 8 Jam) (9-11 Jun : 12 Jam) 04-Jun 6 - 11 Jun 60 Jam Kevin

150 KVA Back Up Standby OFF Agung

40 KVA 40 KVA LIGHTING - Stage 3 (6-8 Jun : 8 Jam) (9-11 Jun : 12 Jam) 04-Jun 6 - 11 Jun 60 Jam Sakroni

40 KVA 100 KVA LIGHTING - Manarai Beach House (9-10 Jun : 12 Jam) 08-Jun 9 - 10 Jun 24 Jam

60 KVA 100 KVA SOUND SYSTEM - Manarai Beach House (9-10 Jun : 12 Jam) 08-Jun 9 - 10 Jun 24 Jam

150 KVA Back Up Standby OFF

NOTE :

Bawa spare kabel Tembaga untuk Grounding Rigging & Ramp Cable

1 Lembar : Admin Sales


1 Lembar : Head Operation
1 Lembar : Operator
1 Lembar : Driver
1 Lembar : Gudang
1 Lembar : Teknisi
1 Lembar : Admin Finance
(ACCOUNT EXECUTIVE) (BRANCH MNGR) (TEKNISI & MAINTENANCE) (COORDINATOR OPERATION)
*) Kolom harus diisi penuh & diparaf

Anda mungkin juga menyukai