RAB

PEKERJAAN GG BARU NO.63

NO KETERANGAN LT.I KE LT.II VOLUME SAT HARGA SAT JUMLAH


I Pintu Stainlis 3,10x347,5 10.77 m² 1,700,000 18,309,000
Bahan Hollow 4x4x1 plat 1mm
II Reling Tangga LT.I LT.II 8.15 m¹ 1,000,000 8,150,000

III Baklon LT. II 4.7 m¹ 1,000,000 4,700,000

IV Balkon LT.II Dalam 1.685 m¹ 1,000,000 1,685,000

V Balkon LT.II Depan 1.73 m¹ 1,000,000 1,730,000

VI Reling Tangga LT.II LT.III 7.58 m¹ 1,000,000 7,580,000

VII Balkon LT.III 5.6 m¹ 1,000,000 5,600,000

VIII Balkon LT.III Dalam 1.675 m¹ 1,000,000 1,675,000

IX Balkon LT.III Depan 1.725 m¹ 1,000,000 1,725,000

X Kanopi Hollow 4x4x1mm 21.72 m² 1,000,000 21,720,000


Atap Galvalum pasir 0,3
362m x 600
Jumlah 72,874,000
RAB
PEKERJAAN GG BARU NO.63

NO KETERANGAN LT.I KE LT.II VOLUME SAT HARGA SAT JUMLAH


I Pintu Stainlis 3,10x347,5 10.77 m² 1,700,000 18,309,000

II Reling Tangga LT.I LT.II 8.15 m¹ 800,000 6,520,000

III Baklon LT. II 4.7 m¹ 800,000 3,760,000

IV Balkon LT.II Dalam 1.685 m¹ 800,000 1,348,000

V Balkon LT.II Depan 1.73 m¹ 800,000 1,384,000

VI Reling Tangga LT.II LT.III 7.58 m¹ 800,000 6,064,000

VII Balkon LT.III 5.6 m¹ 800,000 4,480,000

VIII Balkon LT.III Dalam 1.675 m¹ 800,000 1,340,000

IX Balkon LT.III Depan 1.725 m¹ 800,000 1,380,000

X Kanopi Rangka Hollow 21.72 m² 800,000 17,376,000


Stainlis 4x4x1mm
362m x 600
Jumlah 61,961,000