Anda di halaman 1dari 1

RENCANA ANGGARAN BIAYA

PROYEK : BELLAVISTA
PEKERJAAN : RENOVASI

JUMLAH
NO URAIAN PEKERJAAN KETERANGAN
HARGA TOTAL
1 PEKERJAAN
I PEKERJAAN PERSIAPAN 4,680,000.00
II PEKERJAAN PONDASI Besi 8,10,12 8,322,874.92
III PEKERJAAN STRUKTUR Besi 8,10,13 17,389,422.93
IV PEKERJAAN DINDING Bata ringan / hebel 10,020,000.00
V PEKERJAAN ATAP Rangka Baja Ringan 31,594,312.50
VI PEKERJAAN PELAPIS DINDING 9,861,495.00
VII PEKERJAAN LANTAI Granit homogenus 54,214,240.00
VIII PEKERJAAN PLAFOND Gypsum 22,123,000.00
X PEKERJAAN RAILLING Hollow 5,200,000.00
XI PEKERJAAN KUSEN, PINTU, JENDELA & KACA Pintu Kayu jendala alumunium 47,410,000.00
XII PEKERJAAN INSTALASI SANITASI Wavin 1/2", 2" , 3" dan 4" 10,663,571.50
XIII PEKERJAAN ACCESORIES SANITASI ex TOTO American standart -
XIV PEKERJAAN INSTALASI LISTRIK & PENANGKAL PETIR
XV PEKERJAAN PENGECATAN Ex Jotun / Nippon 14,000,000.00
XVI PEKERJAAN LAIN LAIN Canopy dan pembongkaran 29,550,000.00
TOTAL 265,028,916.85