Anda di halaman 1dari 38

A TERSIER Ha

P 8.5 4250 Nto 1 kn 1 P 3 1500


L 5.5 2750 L 2 150 1000
Nto 1 kn 2 P 3 1500
A total 1168.75 Ha L 2 150 1000
Nto 2 kn P 3 1500
kontrol A 1168.75 Ha L 1.5 112.5 750
Nto 3 ki P 3 1500
L 1.5 112.5 750
Nto 4 ki P 2.5 1250
L 1.5 93.75 750
sarsang 1 kiP 3 1500
L 2 150 1000
sarsang 1 P 3 1500
L 2 150 1000
sarsang 2 kP 2.5 1250
L 2 125 1000
sarsang 2 P 2.5 1250
L 2 125 1000
Kontur Tanah Masing Masing MENGHITUNG DEBIT AIR
Bangunan Utama = Elevasi + RUMUS; Q = A x a x e
BP JBG 1 = Elevasi + Ket;
BG JGB 2 = Elevasi + Q= debit air
BP JGB 3 = Elevasi + e= saluran Primer= 0.9
BS JGB 1.1 = Elevasi + saluran Skunder= 0.81
BS JGB 2.1 = Elevasi + saluran Tersier= 0.65
BS JGB 3.1 = Elevasi + A= Luas Area
BS JGB 1.2 = Elevasi + a= 1.23 l/dt/ha
BS JGB 2.2 = Elevasi + klo ubah nama saluran di tabel ini ya…
BS JGB 3.2 = Elevasi + SALURAN A(Ha)
BS JGB 1.3 = Elevasi + Primer sal.p.Neto 1 1168.75
Primer sal.p.Neto 2 318.75
LUAS PETAK TERSIER A (Ha) Sekunder sal.s.Neto 1 206.25
1 Nto 1 kn 1 150 Sekunder sal.s.Neto 2 93.75
2 Nto 1 kn 2 150 Sekunder sal.s.sarsang 1 550
3 Nto 2 kn 112.5 Sekunder sal.s.sarsang 2 250
4 Nto 3 ki 112.5
5 Nto 4 ki 93.75 PANJANG SALURAN L (m)
6 sarsang 1 kiri 150 Primer sal.p.Neto 1 1000
7 sarsang 1 kn 150 Primer sal.p.Neto 2 1000
8 sarsang 2 ki 125 Sekunder sal.s.Neto 1 1500
9 sarsang 2 kn 125 Sekunder sal.s.Neto 2 1500
Sekunder sal.s.sarsang 1 1500
Sekunder sal.s.sarsang 2 1500
DEBIT PETAK TERSIER Q.SAL.SEKUNDER Q.SAL.PRIMER
Nto 1 kn 1 sal.s.Neto 1 sal.p.Neto 1
Q= Axaxe 0.11993 Q=Axaxe 0.20549 Q=Axaxe 1.29381
Nto 1 kn 2 sal.s.Neto 2 sal.p.Neto 2
Q= Axaxe 0.11993 Q=Axaxe 0.09340 Q=Axaxe 0.35286
Nto 2 kn sal.s.sarsang 1
Q= Axaxe 0.08994 Q=Axaxe 0.54797
Nto 3 ki sal.s.sarsang 2
Q= Axaxe 0.08994 Q=Axaxe 0.24908
Nto 4 ki
Q= Axaxe 0.07495
sarsang 1 kiri
Q= Axaxe 0.11993
sarsang 1 kn
Q= Axaxe 0.11993
sarsang 2 ki
Q= Axaxe 0.10
sarsang 2 kn
Q= Axaxe 0.09994
DIMENSI (BILA Q=0,3 atau
Q
Dari tabel didapat
m=
k=
b=
V=

A=
=
=

P=
=
perhitungan…
A=Q/V
A=

h=
b=
Kontrol…
A=bh+mh^2
P=b+2h√(m^2+1)
V=
Q=
R=A/P
I=
Intinya perhatikan tabel y bos!!!
DIMENSI (BILA Q=0,3 atau kurang) DIMENSI (BILA Q lebih dari 0,3 kurang dari 0,4)
0.25 m3/dt Q 1.3 m3/dt
Dari tabel didapat Dari tabel didapat
1.0 m= 1.0
35 k= 40
1.0 h b= 2.0 h
0.30 m/det V= 0.55 m/det

bh+mh2 A= bh+mh2
1.0 + 1.0 = 2.0 + 1.0
2.0 h2 = 3.0 h2

b+2h√(m^2+1) P= b+2h√(m^2+1)
3.828427 h2 = 4.828427 h2
perhitungan… perhitungan…
A=Q/V
0.83 A= 2.352375

0.645497 h= 0.89
0.645497 b= 1.8
Kontrol…
A=bh+mh^2 0.83 m2 A=bh+mh^2 2.35 m2
P=b+2h√(m^2+1) 2.47 m P=b+2h√(m^2+1) 4.28 m
0.3 m/det V= 0.55 m/det
0.25 m3/dt Q= 1.293806 m3/dt
0.337 R=A/P 0.550
(V^2)/(K^2*R^(4/3)) I= (V^2)/(K^2*R^(4/3))
0.0003 ok 0.0004 ok

0.833333
Tabel Hasil Perhitungan Dimensi Saluran (perhatikan de pu I dgn f(m) e…ingat tabel bos!!! Khusus I hitumg d

Nama Saluran Data Saluran Karakteristik Saluran h(m) b (m)


A (Ha) 1168.75 m 1.5 0.885508 1.771017
sal.p.Neto 1
Q (m3/det) 1.3 v 0.6
f (m) 0.5 b/h 2.5
I 0.00042 k 40

A (Ha) 318.75 m 1 0.63 0.94


sal.p.Neto 2
Q (m3/det) 0.35 v 0.45
f (m) 0.4 b/h 1.5
I 0.0004 k 35

A (Ha) 206.25 m 1 0.63 0.95


sal.s.Neto 1
Q (m3/det) 0.21 v 0.45
f (m) 0.3 b/h 1.5
I 0.0005 k 35

A (Ha) 206.25 m 1 0.65 0.97


sal.s.Neto 2
Q (m3/det) 0.1 v 0.45
f (m) 0.3 b/h 1.5
I 0.0006 k 35

A (Ha) 550 m 1 0.62 0.62


sal.s.sarsang 1
Q (m3/det) 0.55 v 0.35
f (m) 0.5 b/h 1
I 0.0004 k 35

A (Ha) 250 m 1 0.42 0.42


sal.s.sarsang 2
Q (m3/det) 0.25 v 0.3
f (m) 0.3 b/h 1
I 0.0005 k 35

A (Ha) 150 m 1 0.55 0.83


Nto 1 kn 1
Q (m3/det) 0.120 v 0.4
f (m) 0.3 b/h 1.5
I 0.0005 k 35

A (Ha) 150 m 1 0.55 0.55


Nto 1 kn 2
Q (m3/det) 0.12 v 0.35
f (m) 0.3 b/h 1
I 0.0005 k 35
A (Ha) 112.5 m 1 0.42 0.42
Nto 2 kn
Q (m3/det) 0.09 v 0.3
f (m) 0.3 b/h 1
I 0.0006 k 35

A (Ha) 112.5 m 1 0.56 0.84


Nto 3 ki
Q (m3/det) 0.09 v 0.4
f (m) 0.3 b/h 1.5
I 0.0006 k 35

A (Ha) 93.75 m 1 0.53 0.53


Nto 4 ki
Q (m3/det) 0.07 v 0.35
f (m) 0.3 b/h 1
I 0.0004 k 35

A (Ha) 150 m 1 0.4 0.4


sarsang 1 kiri
Q (m3/det) 0.12 v 0.3
f (m) 0.3 b/h 1
I 0.0006 k 35

A (Ha) 150 m 1 0.37 0.37


sarsang 1 kn
Q (m3/det) 0.12 v 0.3
f (m) 0.3 b/h 1
I 0.0006 k 35

A (Ha) 125 m 1 0.37 0.37


sarsang 2 ki
Q (m3/det) 0.10 v 0.3
f (m) 0.3 b/h 1
I 0.0006 k 35

A (Ha) 125 m 1 0.37 0.37


sarsang 2 kn
Q (m3/det) 0.10 v 0.3
f (m) 0.3 b/h 1
I 0.0006 k 35
tabel bos!!! Khusus I hitumg d tabel dlu dimensi

A(m²) P(m) R (m) H (m)


2.352375 4.275612 0.550184 1.426

0.99 2.73 0.36 1.03

1 2.73 0.36 1.03

1.04 2.8 0.37 1.05

0.77 2.37 0.32 0.92

0.36 1.62 0.22 0.72

0.76 2.39 0.32 0.95

0.6 2.09 0.29 0.85


0.36 1.62 0.22 0.72

0.79 2.44 0.33 0.96

0.56 2.03 0.28 0.83

0.32 1.53 0.21 0.7

0.27 1.4 0.19 0.67

0.27 1.4 0.19 0.67

0.27 1.4 0.19 0.67


No Nama Saluran Elevasi A Q f(m) v (m/dt) m
1 Bangunan Utama 29.3
2 sal.p.Neto 1 25.9 1168.75 1.29 0.5 0.55 1
3 sal.p.Neto 2 25.4 318.75 0.35 0.4 0.4 1
4 sal.s.Neto 1 19.67 206.25 0.21 0.3 0.35 1
5 sal.s.Neto 2 15.77 93.75 0.09 0.3 0.3 1
6 sal.s.sarsang 1 20.2 550 0.55 0.5 0.3 1
7 sal.s.sarsang 2 15.83 250 0.25 0.3 0.3 1
8 Nto 1 kn 1 150 0.12 0.3 0.3 1
9 Nto 1 kn 2 150 0.12 0.3 0.3 1
10 Nto 2 kn 112.5 0.09 0.3 0.3 1
11 Nto 3 ki 112.5 0.09 0.3 0.3 1
12 Nto 4 ki 93.75 0.07 0.3 0.3 1
13 sarsang 1 kiri 150 0.12 0.3 0.3 1
14 sarsang 1 kn 150 0.12 0.3 0.3 1
15 sarsang 2 ki 125 0.10 0.3 0.3 1
16 sarsang 2 kn 125 0.10 0.3 0.3 1
k b/h mh I h(m) b(m) A(m2) P(m) R(m) H(m)

40 2 1 0.0004 0.89 1.8 2.35 4.28 0.550 1.4


35 1.5 1 0.0005 0.59 0.9 0.88 2.57 0.343 1.0
35 1 1 0.0005 0.54 0.5 0.59 2.07 0.283 0.8
35 1 1 0.0006 0.39 0.4 0.31 1.51 0.206 0.7
35 2 1 0.0002 0.78 1.6 1.83 3.77 0.485 1.3
35 1 1 0.0003 0.64 0.6 0.83 2.47 0.337 0.9
35 1 1 0.0005 0.45 0.4 0.40 1.71 0.234 0.7
35 1 1 0.0005 0.45 0.4 0.40 1.71 0.234 0.7
35 1 1 0.0006 0.39 0.4 0.30 1.48 0.202 0.7
35 1 1 0.0006 0.39 0.4 0.30 1.48 0.202 0.7
35 1 1 0.0007 0.35 0.4 0.25 1.35 0.185 0.7
35 1 1 0.0005 0.45 0.4 0.40 1.71 0.234 0.7
35 1 1 0.0005 0.45 0.4 0.40 1.71 0.234 0.7
35 1 1 0.0006 0.41 0.4 0.33 1.56 0.213 0.7
35 1 1 0.0006 0.41 0.4 0.33 1.56 0.213 0.7
No Nama Saluran A Q f(m) I v (m/dm k b/h h(m) b(m) A(m2P(m) R(m) H(m)
1 Bangunan Utama
2 sal.p.Neto 1 1168.8 1.3 0.5 0.0004 0.55 1 40 2 0.89 1.8 2.35 4.28 0.55 1.39
3 sal.p.Neto 2 318.75 0.4 0.4 0.0005 0.4 1 35 1.5 0.59 0.9 0.88 2.57 0.34 0.99
4 sal.s.Neto 1 206.25 0.2 0.3 0.0005 0.35 1 35 1 0.54 0.5 0.59 2.07 0.28 0.84
5 sal.s.Neto 2 93.75 0.1 0.3 0.0006 0.3 1 35 1 0.39 0.4 0.31 1.51 0.21 0.69
6 sal.s.sarsang 1 550 0.5 0.5 0.0002 0.3 1 35 2 0.78 1.6 1.83 3.77 0.48 1.28
7 sal.s.sarsang 2 250 0.2 0.3 0.0003 0.3 1 35 1 0.64 0.6 0.83 2.47 0.34 0.94
8 Nto 1 kn 1 150 0.1 0.3 0.0005 0.3 1 35 1 0.45 0.4 0.40 1.71 0.23 0.75
9 Nto 1 kn 2 150 0.1 0.3 0.0005 0.3 1 35 1 0.45 0.4 0.40 1.71 0.23 0.75
10 Nto 2 kn 112.5 0.1 0.3 0.0006 0.3 1 35 1 0.39 0.4 0.30 1.48 0.20 0.69
11 Nto 3 ki 112.5 0.1 0.3 0.0006 0.3 1 35 1 0.39 0.4 0.30 1.48 0.20 0.69
12 Nto 4 ki 93.75 0.1 0.3 0.0007 0.3 1 35 1 0.35 0.4 0.25 1.35 0.18 0.65
13 sarsang 1 kiri 150 0.1 0.3 0.0005 0.3 1 35 1 0.45 0.4 0.40 1.71 0.23 0.75
14 sarsang 1 kn 150 0.1 0.3 0.0005 0.3 1 35 1 0.45 0.4 0.40 1.71 0.23 0.75
15 sarsang 2 ki 125 0.1 0.3 0.0006 0.3 1 35 1 0.41 0.4 0.33 1.56 0.21 0.71
16 sarsang 2 kn 125 0.1 0.3 0.0006 0.3 1 35 1 0.41 0.4 0.33 1.56 0.21 0.71
PERENCANAA PINTU PENGATUR DANBANGUNAN UKUR
bangunan 3 Kiri

1 Perencanaan pintu pengatur dan bangunan ukur debit pada saluran


Skunder yaitu saluran skunder Sp.4 Ruas 1. b= 0.4

a. Pintu Pengatur
Diketahui: Q = 0.10 m3/dt
Diambil b = 0.4 m, maka digunakan rumus: Tabel 4.1
ᵶ= 0.05 maka, digunsksn rumus; m= 1.0
Q = ϕ x b x h √(2 x g x ᵶ) b= 1.0

Q= Sp.4 1 Kiri = 0.10 m3/dt


ϕ= 0.85
b= 0.4
g= 9.81
ᵶ= 0.05

Q= ϕ x b x h √(2 x g x ᵶ)
0.10 = 0.85 x 0.6 x h x √(2 x 9.81 x 0.05) √(2 x g x ᵶ)=
0.10 = 0.34 x h√(2 x 9.81 x0.05) ϕxb=
h = 0.34 x 0.98 g=
h = (0.04/(0.51 x √0.98))
= 0.30

A = b x h + m x h^2
= 1.0 h^2 + 1.0 h^2
= 2.0 h^2

P = b + 2 h √(m^2+1)
= 1.0 h + 2h√(1.0^2 + 1)
= 3.83

b. Bangunan Ukur
Q = Sp.4 1 kiri = 0.10 m3/dt
Rumus Q = 1.71 x b x h^(3/2) b=
Q = 1.71 x 0.4 x h^(3/2)
0.10 = 1.71 x 0.4 x h^(3/2)
h = (0.04 /(1.71 x 0.4))^(2/3)
= 0.28

c. Penentuan h tersier
Q = Sp.4.1 kiri = 0.10 m3/dt
m = 1,0
n = 1.0
k = 35
Anggap I= 0.0006 , maka digunakan rumus;
Q = VxA
Q = K x R^(2/3) x I^(1/2) x A
0.10 = 35 x ( A / P)^(2/3) x 0.001^(1/2)x 2.0 h^2
0.10 = 35 x (2.0 / 3.83) ^(2/3) x 0.0316 x 2.0
0.10 = 35 x 0.5224 ^(2/3) x 0.0316 x 2.0
0.10 = 35 x 0.6486 x 0.0245 x
0.10 = 1.11 h^(8/3)

h = ( 0.04 ./ 1.44) ^(3/8)


h = 0.41 m
UNAN UKUR PERENCANAA PINTU PENGATU
bangunan 3 Kiri

1 Perencanaan pintu pengatur dan bangunan ukur debit pada s


Skunder yaitu saluran skunder Sp.4 Ruas 1. b=

a. Pintu Pengatur
Diketahui: Q = 0.10 m3/dt
Diambil b = 0.4 m, maka digunakan rumus:
ᵶ= 0.05 maka, digunsksn rumus;
Q = ϕ x b x h √(2 x g x ᵶ)

Q= Sp.4 1 Kiri = 0.10


3.333333 ϕ= 0.85
2.147673 b= 0.4
g= 9.81
ᵶ= 0.05

Q= ϕ x b x h √(2 x g x ᵶ)
0.98 0.10 = 0.85 x 0.6 x h x √(2 x 9.81 x 0.05)
0.34 0.10 = 0.34 x
9.81 h = 0.34 x
h = (0.04/(0.51 x √0.98))
= 0.29677

A = b x h + m x h^2
= 1.0 h^2 + 1.0 h^2
= 2.0 h^2

P = b + 2 h √(m^2+1)
= 1.0 h + 2h√(1.0^2 + 1)
= 3.83

b. Bangunan Ukur
Q = Sp.4 1 kiri =
0.4 m Rumus Q = 1.71 x b x h^(3/2)
Q = 1.71 x 0.4 x h^(3/2)
0.10 = 1.71 x 0.4 x h^(3/2)
h = (0.04 /(1.71 x 0.4))^(2/3)
= 0.28

c. Penentuan h tersier
Q = Sp.4.1 kiri =
m = 1,0
n = 1.0
A= 2.0 k = 35
P= 3.83 I= 0.001 , maka digunakan rumus;
R= 0.5224 Q = VxA
0.6486 ^(2/3) Q = K x R^(2/3) x I^(1/2) x A
I= 0.0245 ^(1/2) 0.10 = 35 x ( A / P)^(2/3) x 0.001^(1/2)x 2.0 h^
0.10 = 35 x (2.0 / 3.83) ^(2/3) x 0.0316 x 2.0
0.10 = 35 x 0.5224 ^(2/3) x 0.0316 x 2.0
2.0 0.10 = 35 x
0.10 = 1.11 h^(8/3)

h = ( 0.04 ./ 1.44) ^(3/8)


h = 0.41 m
PERENCANAA PINTU PENGATUR DANBANGUNAN UKUR

an bangunan ukur debit pada saluran


Sp.4 Ruas 1. b= 0.4

m, maka digunakan rumus: Tabel 4.1


maka, digunsksn rumus; m= 1.0
√(2 x g x ᵶ) b= 1.0

m3/dt

6 x h x √(2 x 9.81 x 0.05) √(2 x g x ᵶ)= 0.98


h√(2 x 9.81 x0.05) ϕ x b = 0.34
0.98 g= 9.81

3
3
√(1.0^2 + 1)

0.10 m3/dt
b= 0.4 m

71 x 0.4))^(2/3)

0.10 m3/dt
A= 2.0
gunakan rumus; P= 3.83
R= 0.5224
3) x I^(1/2) x A 0.6486 ^(2/3)
P)^(2/3) x 0.001^(1/2)x 2.0 h^2 I= 0.0245 ^(1/2)
/ 3.83) ^(2/3) x 0.0316 x 2.0
24 ^(2/3) x 0.0316 x 2.0
0.6486 x 0.0245 x 2.0
SKEMA MUKA AIR
29.3 25.9 25.4

am an
Ut gun

0
a

.1

.2
00

BN

BN
n

0
0
0+
Ba

80
80

1+
A

0+
ST
+ 21.03442

A
A

ST
ST
20.93442 20.52
20.42 19.58
19.48

500 500
ihit = 0.0004 ihit = 0.0004 ihit =
ilap = 0.0008 ilap = 0.0008 ilap =
L= 1000 m L= 1000 m L=

29.3 20.2

.1
.1
BN

BS
00

0
80
8

3+
2+

A
A

ST
ST

17.72 PINTU PENGATUR


17.62 16.98
16.88

500 500
ihit = 0.000424 ihit = 0.0005
ilap = 0.0013 ilap = 0.002
L= 1500 m L= 1500

25.4 19.67
.3
.2

BN
BN

0
80

80
3+
2+

A
A

ST
ST
.3
.2

BN
BN

0
80

80
3+
2+

A
A

ST
ST
19.58
19.48 17.07
16.97

500 500
ihit = 0.0005 ihit = 0.0006
ilap = 0.0016 ilap = 0.0018
L= 1500 m L= 1500
SKEMA MUKA AIR
19.67 15.77

.3 0.00021

.4
BN

BN

0
0

80

60
80

3+
1+

2+

A
A

ST
ST

ST

17.07
16.97 16.07
+ 15.97
500 500 15.97
0.0005 ihit = 0.0006 15.87
0.0016 ilap = 0.0018 15.77
1500 m L= 1500 m

15.83
.2
BS

0
60
4+
A
ST

NTU PENGATUR

16.13
+ 16.03
16.03
15.93
15.83
m

15.77
.4
BN

0
60
4+
A
ST
.4
BN

0
60
4+
A
ST

16.07
+ 15.97
15.97
15.87
15.77
m
#REF!

f I h TABEL NILAI - NILAI LAND CLEARING STA 0 + 000 - STA 1 + 000

0.30 0.0005 CARA BACASTA


0.65 JARAK
E . MUKA AIR
E. DASAR
(+) SAL.
E. T. (+)
TANGGUL
E. TANAH
(+) VOL.
ASLITIMBUNAN
(+) VOL. (m³)
GALIAN (m³)

0.3 0.0005 0.65 1500 0 + 000 0 16.88 16.23 17.18 16.03 0.0 147.75
0.3 0.0005 0.65 1450 0 + 050 50 16.86 16.21 17.16 16.03 533.4 -4.35
0.3 0.0005 0.65 1400 0 + 100 50 16.83 16.18 17.13 16.03 519.9 -3.99
0.3 0.0005 0.65 1350 0 + 150 50 16.81 16.16 17.11 16.03 506.5 -3.57
0.3 0.0005 0.65 1300 0 + 200 50 16.78 16.13 17.08 16.03 493.2 -3.08
0.3 0.0005 0.65 1250 0 + 250 50 16.76 16.11 17.06 16.03 479.9 -2.54
0.3 0.0005 0.65 1200 0 + 300 50 16.73 16.08 17.03 16.03 466.6 -1.93
0.3 0.0005 0.65 1150 0 + 350 50 16.71 16.06 17.01 16.03 453.4 -1.26
0.3 0.0005 0.65 1100 0 + 400 50 16.68 16.03 16.98 16.03 440.3 -0.53
0.3 0.0005 0.65 1050 0 + 450 50 16.66 16.01 16.96 16.03 427.3 0.27
0.3 0.0005 0.65 1000 0 + 500 50 16.63 15.98 16.93 16.03 414.3 1.13
0.3 0.0005 0.65 950 0 + 550 50 16.61 15.96 16.91 16.03 401.4 2.05
0.3 0.0005 0.65 900 0 + 600 50 16.58 15.93 16.88 16.03 388.5 3.03
0.3 0.0005 0.65 850 0 + 650 50 16.56 15.91 16.86 16.03 375.7 4.08
0.3 0.0005 0.65 800 0 + 700 50 16.53 15.88 16.83 16.03 363.0 5.18
0.3 0.0005 0.65 750 0 + 750 50 16.51 15.86 16.81 16.03 350.3 6.36
0.3 0.0005 0.65 700 0 + 800 50 16.48 15.83 16.78 16.03 337.7 7.59
0.3 0.0005 0.65 650 0 + 850 50 16.46 15.81 16.76 16.03 325.1 8.88
0.3 0.0005 0.65 600 0 + 900 50 16.43 15.78 16.73 16.03 312.7 10.24
0.3 0.0005 0.65 550 0 + 950 50 16.41 15.76 16.71 16.03 300.2 11.66
0.3 0.0005 0.65 500 1+ 000 50 16.38 15.73 16.68 16.03 287.9 13.15
0.3 0.0005 0.65 450 1+ 050 50 16.36 15.71 16.66 16.03 275.6 14.69
0.3 0.0005 0.65 400 1+ 100 50 16.33 15.68 16.63 16.03 263.3 16.30
0.3 0.0005 0.65 350 1+ 150 50 16.31 15.66 16.61 16.03 251.2 17.97
0.3 0.0005 0.65 300 1+ 200 50 16.28 15.63 16.58 16.03 239.1 19.70
0.3 0.0005 0.65 250 1+ 250 50 16.26 15.61 16.56 16.03 227.0 279.16
0.3 0.0005 0.65 200 1+ 300 50 16.23 15.58 16.53 16.03 215.0 23.36
0.3 0.0005 0.65 150 1+ 350 50 16.21 15.56 16.51 16.03 203.1 25.28
0.3 0.0005 0.65 100 1+ 400 50 16.18 15.53 16.48 16.03 191.2 27.26
0.3 0.0005 0.65 50 1+ 450 50 16.16 15.51 16.46 16.03 179.4 29.31
0.3 0.0005 0.65 0 1+500 50 16.13 15.48 16.43 16.03 167.7 31.41
Σ JUMLAH Vol. 10,389.98 684.56
Timbunan
9,705.43
- Vol.
Galian
Mencari E. Muka Air:
Elev. Tnh asli = + 16.03 ganti nilainya sesuaikan tanah asli
Nilai I = 0.00050 ganti nilainya, ambil dr skema mukair panjang saluran yg dipakai
Nialai L = 1450 m ganti nilainya, ambil dr skema muka air
Elevasi Muka Air = (Elev. Asli +0.1) +(L x I)
= 16.03 + 0.1 + 1200 x
= 16.73

Mencari E. Dasar Saluran:


Rumus : Elevasi Muka Air - h Dari Tabel.
F= 0.30 tabel 4.3
Elevasi Muka Air = 16.73 h= 0.65 ganti nilainya dari tabel hasil perhit
Ketinggian ( h) = 0.65 ganti 1x saja
E. Dasar Saluran = 16.73 - 0.65
= 16.08

Mencari Elevasi Tanggul:


= Tinggi Elev. muka air + w
= 16.73 + 0.3
= 17.03
3 1.13 3 0.95 0.65 0.95

a
a'
+ 17.16

16.86

Tnh. Asli+ 16.03


16.21
B' -0.18
b

Mencari E. Muka Air:


Elev. Tnh asli = + 16.03 ganti nilainya sesuaikan tanah asli
Nilai I = 0.00050 ganti nilainya, ambil dr skema mukair panjang saluran yg dipaka
Nialai L = 1450 m ganti nilainya, ambil dr skema mukair atau tiap saluran beda?
Elevasi Muka Air = (Elev. Asli +0.1) +(L x I)
= 16.03 - 0.1 - 1450
= 16.86

Mencari E. Dasar Saluran:


Rumus : Elevasi Muka Air - h Dari Tabel.
F= 0.30
Elevasi Muka Air = 16.86 h= 0.65
Ketinggian ( h) = 0.65
Elevasi Dsr Sal = 16.86 - 0.65
= 16.21

Mencari Elevasi Tanggul:


= Tinggi Elev. muka air + w
= 16.86 + 0.3
= 17.16

VOLUME TIMBUNAN
1450
1.69 x 50 = 84.38 H
h'
VOLUME GALIAN
-0.29 x 50 = -14.28 a
a'
825.00 L 10.79 x 0.29 b
L+6 16.79 B' 5.25
5.07 0.95

L = 2.a + 2.d + a' = 10.78649


TABEL LAND CLEARING
PANJAN
LUAS
PANJA G
NO STA LEBAR LUAS KOMULATI NO VOLUME
STA TIMBUNAN
NG KOMUL
F
ATIF

PANJA
NG

1 + 000 (M) (M) (M) (M2) (M2) (M)

LAND CLEARING (m²)


l et-etasletasl-ema 1 2 4 5 3 6 7 1 2 3

-0.20 0.20 1.15 -0.85 1 0+000 0.00 0.00 16.84 0.00 0 1 0+000 0.00
-0.18 0.18 1.13 -0.83 2 0+050 50.00 50.00 16.79 840.57 840.57 2 0+050 50.00
-0.15 0.15 1.10 -0.80 3 0+100 50.00 100.00 16.74 838.07 1678.65 3 0+100 50.00
-0.13 0.13 1.08 -0.78 4 0+150 50.00 150.00 16.69 835.57 2514.22 4 0+150 50.00
-0.10 0.10 1.05 -0.75 5 0+200 50.00 200.00 16.64 833.07 3347.30 5 0+200 50.00
-0.08 0.08 1.03 -0.73 6 0+250 50.00 250.00 16.59 830.57 4177.87 6 0+250 50.00
-0.05 0.05 1.00 -0.70 7 0+300 50.00 300.00 16.54 828.07 5005.95 7 0+300 50.00
-0.03 0.03 0.98 -0.68 8 0+350 50.00 350.00 16.49 825.57 5831.52 8 0+350 50.00
0.00 0.00 0.95 -0.65 9 0+400 50.00 400.00 16.44 823.07 6654.60 9 0+400 50.00
0.02 -0.02 0.93 -0.63 10 0+450 50.00 450.00 16.39 820.57 7475.17 10 0+450 50.00
0.05 -0.05 0.90 -0.60 11 0+500 50.00 500.00 16.34 818.07 8293.25 11 0+500 50.00
0.07 -0.07 0.88 -0.58 12 0+550 50.00 550.00 16.29 815.57 9108.82 12 0+550 50.00
0.10 -0.10 0.85 -0.55 13 0+600 50.00 600.00 16.24 813.07 9921.90 13 0+600 50.00
0.12 -0.12 0.83 -0.53 14 0+650 50.00 650.00 16.19 810.57 10732.47 14 0+650 50.00
0.15 -0.15 0.80 -0.50 15 0+700 50.00 700.00 16.14 808.07 11540.54 15 0+700 50.00
0.17 -0.17 0.78 -0.48 16 0+750 50.00 750.00 16.09 805.57 12346.12 16 0+750 50.00
0.20 -0.20 0.75 -0.45 17 0+800 50.00 800.00 16.04 803.07 13149.19 17 0+800 50.00
0.22 -0.22 0.73 -0.43 18 0+850 50.00 850.00 15.99 800.57 13949.77 18 0+850 50.00
0.25 -0.25 0.70 -0.40 19 0+900 50.00 900.00 15.94 798.07 14747.84 19 0+900 50.00
0.27 -0.27 0.68 -0.38 20 0+950 50.00 950.00 15.89 795.57 15543.42 20 0+950 50.00
0.30 -0.30 0.65 -0.35 21 1+000 50.00 1000.00 15.84 793.07 16336.49 21 1+000 50.00
0.32 -0.32 0.63 -0.33 22 1+ 050 50.00 1050.00 15.79 790.57 17127.07 22 1+ 050 50.00
0.35 -0.35 0.60 -0.30 23 1+ 100 50.00 1100.00 15.74 788.07 17915.14 23 1+ 100 50.00
0.37 -0.37 0.58 -0.28 24 1+ 150 50.00 1150.00 15.69 785.57 18700.72 24 1+ 150 50.00
0.40 -0.40 0.55 -0.25 25 1+ 200 50.00 1200.00 15.64 783.07 19483.79 25 1+ 200 50.00
0.42 -0.42 0.53 -0.23 26 1+ 250 50.00 1250.00 15.59 780.57 20264.36 26 1+ 250 50.00
0.45 -0.45 0.50 -0.20 27 1+ 300 50.00 1300.00 15.54 778.07 21042.44 27 1+ 300 50.00
0.47 -0.47 0.48 -0.18 28 1+ 350 50.00 1350.00 15.49 775.57 21818.01 28 1+ 350 50.00
0.50 -0.50 0.45 -0.15 29 1+ 400 50.00 1400.00 15.44 773.07 22591.09 29 1+ 400 50.00
0.52 -0.52 0.43 -0.13 30 1+ 450 50.00 1450.00 15.39 770.57 23361.66 30 1+ 450 50.00
0.55 -0.55 0.40 -0.10 31 1+500 50.00 1500.00 15.34 768.07 24129.74 31 1+500 50.00
684.56 24129.74
m3 TOTAL 24129.74
ew
g saluran yg dipakai ew

0.0005

nti nilainya dari tabel hasil perhitungan sesuai panjang saluran


PERENCANAAN LAND CLEARING

3 1.13 3 MERAH= Nilainya sama (ketentuan dari asdos)


= Ganti Nilainya

Mencari H
Elev. Tanggul - Elev. Tnh Asli
= 17.16 - 16.03
0.3 w '= 1.13

1100

2
h
0.83 -0.18

mukair panjang saluran yg dipakai atau tiap saluran berbeda?


mukair atau tiap saluran beda?

x 0.0005
ketentuan dr asdos
ganti nilainya dari tabel sesuai panjang saluran natau tiap saluran beda nilainya

1.13 H=d
-0.18

3
2.54 Land Clearin 825
0.65
TIMBUN 9.281
GALIAN ###
9.365
468.2
VOLUME GALIAN
PANJA
PANJA NG
UME TIMBUNAN NO STA x b
NG KOMU
LATIF
PANJA
VOLUME
NG
T Lebar HLuas
= d Dimensi Saluran
LUAS VOLUME KOMULA
KOMU
TIF
LATIF
(M) (M) (M) (M) (A) m2 (M2) (M3) (M3) (M) (M) (M) (M) (M)

4 5 6 7 8 9 10 1 2 7 8 3 4

0.00 8.54 10.84 1.15 0.36 10.78 1 0+000 0.00 0.00 0.24 0.65
50.00 8.54 10.79 1.13 0.36 10.56 533.4 533.4 2 0+050 50.00 50.00 0.29 0.65
100.00 8.54 10.74 1.10 0.36 10.24 519.9 1053.4 3 0+100 50.00 100.00 0.34 0.65
150.00 8.54 10.69 1.08 0.36 10.02 506.5 1559.9 4 0+150 50.00 150.00 0.39 0.65
200.00 8.54 10.64 1.05 0.36 9.71 493.2 2053.0 5 0+200 50.00 200.00 0.44 0.65
250.00 8.54 10.59 1.03 0.36 9.49 479.9 2532.9 6 0+250 50.00 250.00 0.49 0.65
300.00 8.54 10.54 1.00 0.36 9.18 466.6 2999.5 7 0+300 50.00 300.00 0.54 0.65
350.00 8.54 10.49 0.98 0.36 8.96 453.4 3452.9 8 0+350 50.00 350.00 0.59 0.65
400.00 8.54 10.44 0.95 0.36 8.65 440.3 3893.3 9 0+400 50.00 400.00 0.64 0.65
450.00 8.54 10.39 0.93 0.36 8.44 427.3 4320.6 10 0+450 50.00 450.00 0.69 0.65
500.00 8.54 10.34 0.90 0.36 8.13 414.3 4734.9 11 0+500 50.00 500.00 0.74 0.65
550.00 8.54 10.29 0.88 0.36 7.92 401.4 5136.2 12 0+550 50.00 550.00 0.79 0.65
600.00 8.54 10.24 0.85 0.36 7.62 388.5 5524.8 13 0+600 50.00 600.00 0.84 0.65
650.00 8.54 10.19 0.83 0.36 7.41 375.7 5900.5 14 0+650 50.00 650.00 0.89 0.65
700.00 8.54 10.14 0.80 0.36 7.11 363.0 6263.4 15 0+700 50.00 700.00 0.94 0.65
750.00 8.54 10.09 0.78 0.36 6.90 350.3 6613.7 16 0+750 50.00 750.00 0.99 0.65
800.00 8.54 10.04 0.75 0.36 6.60 337.7 6951.4 17 0+800 50.00 800.00 1.04 0.65
850.00 8.54 9.99 0.73 0.36 6.40 325.1 7276.6 18 0+850 50.00 850.00 1.09 0.65
900.00 8.54 9.94 0.70 0.36 6.11 312.7 7589.2 19 0+900 50.00 900.00 1.14 0.65
950.00 8.54 9.89 0.68 0.36 5.90 300.2 7889.5 20 0+950 50.00 950.00 1.19 0.65
1000.00 8.54 9.84 0.65 0.36 5.61 287.9 8177.4 21 1+000 50.00 1000.00 1.24 0.65
1050.00 8.54 9.79 0.63 0.36 5.41 275.6 8452.9 22 1+ 050 50.00 1050.00 1.29 0.65
1100.00 8.54 9.74 0.60 0.36 5.12 263.3 8716.3 23 1+ 100 50.00 1100.00 1.34 0.65
1150.00 8.54 9.69 0.58 0.36 4.92 251.2 8967.4 24 1+ 150 50.00 1150.00 1.39 0.65
1200.00 8.54 9.64 0.55 0.36 4.64 239.1 9206.5 25 1+ 200 50.00 1200.00 1.44 0.65
1250.00 8.54 9.59 0.53 0.36 4.44 227.0 9433.5 26 1+ 250 50.00 1250.00 1.49 0.65
1300.00 8.54 9.54 0.50 0.36 4.16 215.0 9648.5 27 1+ 300 50.00 1300.00 1.54 0.65
1350.00 8.54 9.49 0.48 0.36 3.97 203.1 9851.6 28 1+ 350 50.00 1350.00 1.59 0.65
1400.00 8.54 9.44 0.45 0.36 3.68 191.2 10042.8 29 1+ 400 50.00 1400.00 1.64 0.65
1450.00 8.54 9.39 0.43 0.36 3.49 179.4 10222.3 30 1+ 450 50.00 1450.00 1.69 0.65
1500.00 8.54 9.34 0.40 0.36 3.21 167.7 10390.0 31 1+500 50.00 1500.00 1.74 0.65
10390.0
TOTAL 10389.98 TOTAL
20780.0
h' LUAS VOLUME H

(M) (M2) (M3)

5 6 7 GANTI!!!

-0.20 -0.090 147.75 1.15 c = 0.94


-0.18 -0.084 -4.35 1.12 b = 0.65
-0.15 -0.076 -3.99 1.10
-0.13 -0.067 -3.57 1.07
-0.10 -0.057 -3.08 1.05
-0.08 -0.045 -2.54 1.02
-0.05 -0.032 -1.93 1.00
-0.03 -0.018 -1.26 0.97
0.00 -0.003 -0.53 0.95
0.02 0.014 0.27 0.92
0.05 0.031 1.13 0.90
0.07 0.050 2.05 0.87
0.10 0.071 3.03 0.85
0.12 0.092 4.08 0.82
0.15 0.115 5.18 0.80
0.17 0.139 6.36 0.77
0.20 0.164 7.59 0.75
0.22 0.191 8.88 0.72
0.25 0.219 10.24 0.70
0.27 0.248 11.66 0.67
0.30 0.278 13.15 0.65
0.32 0.310 14.69 0.62
0.35 0.342 16.30 0.60
0.37 0.376 17.97 0.57
0.40 0.412 19.70 0.55
0.42 0.448 21.50 0.52
0.45 0.486 23.36 0.50
0.47 0.525 25.28 0.47
0.50 0.565 27.26 0.45
0.52 0.607 29.31 0.42
0.55 0.650 31.41 0.40

279.16

Anda mungkin juga menyukai