Anda di halaman 1dari 4

No.

UraIan Kode Drilling Rig Air


Truck Welding
Satuan Mud Pump Compresso Pick up Pumping Test Water Jetting
Cargo set
r
Prosentase
pemanfaatan
*) Biaya
operasi alat % 100%
S = (G + P) Rp./jam 419.564,02 100% 0% 15% 20% 5%
0% 0% 304.704,30
1. 2. 3. Bahan pakai M S K Rp./jam 91.390,00 289.025,66 656.824,20 80.308,87 66.774,46 108.074,23
139.165,46 - - - - -
4. habis S+K Rp./jam 68.890,00 --- --- --- --- ---
- 139.165,46 304.704,30
- Drilling Rp./jam 22.500,00 289.025,66 656.824,20 80.308,87 66.774,46 108.074,23
Fluid/mud Rp./jam 510.954,02
- Bit
Biaya operasi
alat+material
Biaya M x Rp/jam
5. 830.784,62
operasi total (S+K)
Koefisien Tenaga Kerja (OH)
Koefisien Alat
Pengeboran (Pilot Produktivitas **) (Q)
6. (1/Q)
hole dan Reaming) (Pekerja) (Mandor)
(Tukang Bor)

Borehole ø 8 3/4"
Reaming ø Reaming
1,85 m/jam 2,00 m/jam 0,5405 0,5000 0,3089 0,2857 0,0309 0,0286
ø Reaming ø 0,5051 0,5263 0,2886 0,3008 0,0772 0,0714 0,0289 0,0301
a. b. c. d. 1,98 m/jam 1,90 m/jam
8 3/4" - 12" 0,0722 0,0752
8 3/4" - 14 3/4" 8
3/4" - 17"
2. BongkarPasangTemporaryCasing
*) Disesuaikan dengan proporsi pemanfaatan
**) Produktifitas alat tergantung ukuran pipa dan konsistensi tanah, kapasitas ini untuk konsistensi stiff (sedang),
sedangkan untuk tanah lembek kapasitas dikali 2 - 3 dan untuk tanah keras kapasitas dikali 30 - 50%
Air Wate
Pum
Drilli Comp Truc r
Mud Weld ping
No. UraIan Kode Sat ng resso k Pick Jettin
Pum ing Test
uan Rig r Carg up g
p set
o
1. 2. 3. Prosen M S K % 75% 30% 0% 10% 0% 50% 0% 0%
4. tase S+K Rp. 419.5 289.0 656.8 80.3 66.7 108.0 139.1 304.7
peman /ja 64,02 25,66 24,20 08,8 74,4 74,23 65,46 04,30
faatan m 10.00 - - - - - - 7 - - 6 - - - - - - - - - - -
Biaya Rp. 0,00 289.0 656.8 - - 108.0 139.1 304.7
operas /ja 6.500 25,66 24,20 80.3 66.7 74,23 65,46 04,30
i Alat S m ,00 08,8 74,4
= (G + Rp. 3.500 7 6
P) /ja ,00
Bahan m 429.5
pakai Rp. 64,02
habis /ja
- Wire m
RB &
Ciron
-
Acetel
yn &
Rp.
CO2
/ja
Biaya
m
operas
i
Alat+
Materi
al
5. Biaya M x (S+K)
Rp/ 470.9
operas
jam 48,72
i total
Tempor Koefisien Tenaga
Produktivitas Koefisi
ary Kerja (OH)
en
Cassing (Q) (Tuka
6. Alat (Peker (Mand
Diamet ng
(1/Q) ja) or)
er Bor)
0,326 0,081
a. b. (ID) 17" 0,5714 5 6 0,0327
1,75 m/jam 1,75 m/jam
(ID) 12" 0,5714 0,326 0,081 0,0327
5 6
458
JDIH Kementerian PUPR

"HAK CIPTA SESUAI KETENTUAN DAN ATURAN YANG BERLAKU,


COPY DOKUMEN INI DIBUAT UNTUK SISTEM INFORMASI STANDAR BIDANG PEKERJAAN UMUM DAN TIDAK UNTUK
3. PemasanganKonstruksiSumur(PipaBlackSteeldanScreenLowCarbon)
Air
No Kod Drilling
Uraian Mud Compress Truck Welding Pumping Water
. e Satuan Rig Pick up
Pump or Cargo set Test Jetting
Persentase
pemanfaata
n Biaya %
operasi Alat Rp./ja
0%
S = (G + P) m
656.824,2
Bahan pakai Rp./ja 100% 0% 10% 10% 100% 0% 100%
1. 0
habis MS m 419.564,0 289.025,6 80.308,8 66.774,4 108.074,2 139.165,4 304.704,3
2. 12.500,00
- Wire RB & K Rp./ja 2 - - - 6--- 7--- 6--- 3--- 6--- 0---
3. -
Ciron S+K m 419.564,0 289.025,6 80.308,8 66.774,4 108.074,2 139.165,4 304.704,3
4. 12.500,00
- Acetelyn & Rp./ja 2 6 7 6 3 6 0
669.324,2
CO2 m
0
Biaya Rp./ja
operasi m
Alat+Materi
al
5. Biaya M x Rp/ 847.050,8
operasi (S+K jam 8
total )

Produktivitas
Pemasangan Cassing dan Koefisien Tenaga Kerja (OH)
6. (Q) Koefisien Alat
Screen Low Carbon
(1/Q) (Tukang Bor)
(Pekerja) (Mandor)
8,00 m/jam
a. 0,1250 0,1429 0,0714 0,0816 0,0179 0,0071 0,0082
BS Casing or LC Screen 6" BS 7,00 m/jam
b. 0,0400 1,8182 0,0229 1,0390 0,0204 0,0023 0,1039
Casing or LC Screen 8" Pipa 25,00 m/jam
c. 0,0057
sounding PVC 1" Gravel Pack 0,55 m3/jam
d. 0,2598
4. PencucianSumur(WellDevelopment)
Air
Drilling Mud Truck Welding Pumping Water
No Uraian Kod Satuan Rig Pump
Compress
Cargo
Pick up
set Test Jetting
. e or
Persentase
pemanfaatan %
Biaya operasi Rp./ja 100%
alat S = (G + P) m 20% 0% 656.824,2 10% 15% 5% 0% 0%
1.
Bahan pakai M S Rp./ja 419.564,0 289.025,6 0 80.308,8 66.774,4 108.074,2 139.165,4 304.704,3
2.
habis K m 2-- 6-- 12.500,00 7-- 6-- 3-- 6-- 0--
3.
- S+K Rp./ja 419.564,0 289.025,6 12.500,00 80.308,8 66.774,4 108.074,2 139.165,4 304.704,3
4.
Foam/Deterg m 2 6 669.324,2 7 6 3 6 0
en Rp./ja 0
Biaya operasi m
alat+material
Mx
5. Biaya operasi (S+K Rp/ 776.687,7
total ) jam 7

Koefisien Tenaga
Koefisi
Develop Kerja (OH)
en
ment Produktivitas (Q) (Tuka
6. Alat (Peker (Mand
Methods ng
(1/Q) ja) or)
Bor)
1,000 0,571 0,142
Air
0 4 9
a. b. c. Lifting 1,00 jam 1,00 jam 1,00 jam 0,0571
1,000 0,571 0,142
Air 0,0571
0 4 9
Jetting 0,0571
1,000 0,571 0,142
Blow Up
0 4 9
459
JDIH Kementerian PUPR

5. UjiPemompaan(PumpingTest)
"HAK CIPTA SESUAI KETENTUAN DAN ATURAN YANG BERLAKU,
COPY DOKUMEN INI DIBUAT UNTUK SISTEM INFORMASI STANDAR BIDANG PEKERJAAN UMUM DAN TIDAK UNTUK
Air
No Kod Drilling
Uraian Mud Compress Truck Welding Pumping Water
. e Satuan Rig Pick up
Pump or Cargo set Test Jetting
Persentase
pemanfaata
n
Biaya
%
operasi alat
Rp./ja
S = (G + P) 20% 0% 0% 5% 10% 5% 100% 0%
m
1. Bahan pakai 419.564,0 289.025,6 656.824,2 80.308,8 66.774,4 108.074,2 139.165,4 304.704,3
MS Rp./ja
2. habis 2- 6- 0- 7- 6- 3- 6 9.000,00 0 -
K m
3. - Battery, - - - - - - 9.000,00 -
S+K Rp./ja
4. cable lamp, 419.564,0 289.025,6 656.824,2 80.308,8 66.774,4 108.074,2 148.165,4 304.704,3
m
dan lain- 2 6 0 7 6 3 6 0
Rp./
lain.
jam
Biaya
operasi
alat+materi
al
Biaya M x Rp/
248.174,8
5. operasi (S+K jam
7
total )

Koefisien Tenaga Kerja (OH)


6. Pumping Test Air Lift Methods: Produktivitas (Q) Koefisien Alat
(1/Q) (Tukang Bor)
(Pekerja) (Mandor)

0,5714
a. Method "V" Notch Method 1,00 jam 1,00 1,0000 1,0000 0,1429 0,0571
0,5714
b. Orifice jam 0,1429 0,0571