1 TAHAP I
1.1 PEKERJAAN PERSIAPAN
1.2 PEK. GALIAN UNTUK PONDASI.
1.3 PEK. ANTI RAYAP UNTUK PONDASI
SISTEM SUSPENDED SLAB
1.4 PEK. COR PONDASI TAPAK + PEDESTAL KOLOM
1.5 PEK. PIPA HORISONTAL MEP LT.1 + SPARING PIPA MEP LT.1
1.6 PEK. COR TIE BEAM + SLAB ON GROUND
1.7 BUANG TANAH GALIAN PONDASI
1.8 KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
2 TAHAP II
2.1 PEK. KOLOM LT.1 (SISTEM FREE STANDING)
2.2 PEK. COR KANOPI LT.1
2.3 PEK. COR BALOK & PLAT LT.2, PEK. TANGGA LT.2 KE LT.1, SPARING ME LT
2.4 KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
3 TAHAP III
3.1 PEK. KOLOM LT.2 (SISTEM FREE STANDING)
3.2 PEK. COR KANOPI LT.2
3.3 PEK. BATA PAGAR BELAKANG
3.4 PEK. PLESTERAN PAGAR BELAKANG (LUAR + DALAM)
3.5 PEK. PASANG SEPTIC TANK DAN GROUND TANK
3.6 KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
4 TAHAP IV
4.1 PEK. COR BALOK DAN DAK TALANG, SPARING MEP + TEST GENANG BETO
4.2 PEK. COR RING BALOK
4.3 PEK. INST.AIR BERSIH LT.2 + CONNECT PIPA TEGAK & HORISONTAL LT.1
4.4 PEK. PASANGAN BATA + PEK. RING BALOK SOPI-SOPI + PLESTER ACI LT.
4.5 PEK. RANGKA ATAP SYSTEM TRUSS / ZINKALUME & ALUMINIUM FOIL.
4.6 PEK. PASANG GENTENG, NOK & AKSESORIS + KARPUS 100% + INCLUDE
4.7 KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
5 TAHAP V
5.1 PEK. LISPLANK, RANGKA + PLAFOND OVERSTEK + TERMASUK CAT FINISH
5.2 PEK. BATA LT.1 & LT.2 (100%) + KOLOM PRAKTIS + PIPA TEGAK AH, VEN
5.3 PEK. CONNECT PIPA TEGAK & HORISONTAL LT.2 (100%) + INST.AIR BERS
5.4 PEK. CONDUIT LISTRIK, TELEPON LT.2 + LT.1 (100%)
5.5 PEK. INBOW DUS LT.2 & LT.1 (100%)
5.6 PEK. CORING DAN GROUTHING
5.7 PEK. WATERPROOFING KM/WC & BALKON + TEST GENANG (TERMASUK SC
5.8 PEK. KERAMIK DINDING KM/WC LT.2 + LT.1 (100%)
5.9 PEK. PEMASANGAN PIPA AK & AB
5.10 PEK. CONNECT PIPA HORISONTAL KE PIPA TEGAK (AB & AK)
5.11 PEK. PENGETESAN MEP LT.2 + LT.1 (100%)
5.12 PEK. WATERPROOFING DAK TALANG + TES RENDAM TERMASUK SCREED
5.13 KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
6 TAHAP VI
6.1 PEK. PLESTER LT.2 + LT.1 (100%) + CEK SIKUAN
6.2 PEK. TATA UDARA (AC)
6.3 PEK. TAMPAK: OPENING KUSEN + SKONENGAN
6.4 PEK. COR BETON MEJA DAPUR + METERAN POMPA + PONDASI POMPA
6.5 PEK. OPENING KUSEN (100%)
6.6 PEK. ACIAN LT.2 + LT.1 (100%) + PAGAR LUAR DALAM
6.7 PEK. CAT DASAR DINDING INTERIOR (100%)
6.8 PEK. WIRING LISTRIK LT. 2 + 1 (100%)
6.9 PEK. RANGKA PLAFOND LT. 2 + LT.1 (100%)
6.10 PEK. TUTUP PLAFOND LT.2 & LT.1 + SHADOW LINE + EXPOSE CANOPY (PL
6.11 PEK. CAT DASAR DINDING EKSTERIOR (100%)
6.12 PEK. TEXTURE DINDING
6.13 KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
7 TAHAP VII
7.1 PEK. KERAMIK LANTAI UMUM, KM/WC LT.2 + BALKON
7.2 PEK. CAT DINDING EKSTERIOR ( LAPIS 1 & 2 )
7.3 PEK. KUSEN +PINTU ALUMINIUM (TERMASUK AKSESORIS) LT.2 + LT.1 (1
7.4 PEK. KRAWANGAN, BAK KONTROL + TEMPAT SAMPAH
7.5 PEK. KONSUIL PLN
7.6 PEK. CAT DINDING INTERIOR ( LAPIS 1 & 2 )
7.7 PEK. ATAP KECIL ALDERON (PVC + RANGKA HOLLOW)
7.8 PEK. KUSEN +PINTU KAYU (TERMASUK AKSESORIS) LT.2 + LT.1 (100%)
7.9 KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
8 TAHAP VIII
8.1 PEK. KERAMIK LANTAI UMUM, KM/WC LT.1 + TANGGA + DAPUR
8.2 PEK. FLEXITILE + WATER PROOFING
8.3 PEK. KERAMIK TERAS DAN CARPORT (100%)
8.4 PEK. RAILING TANGGA + RAILING BALKON
8.5 PEK. CAT FINISH DINDING INTERIOR, EKSTERIOR (100%) LAPIS 3
8.6 PEK. ARMATURE LT.2 DAN LT.1
8.7 PEK. AS BUILT DRAWING MEP (DENAH, TAMPAK & POTONGAN) + TERMAS
8.8 PEK. GREASE TRAP, POMPA DAN EXHAUST FAN (MATERIAL UTAMA)
8.9 PEK. PAVING AREA TAMAN + STEPING STONE & RABAT BETON
8.10 KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
9 TAHAP IX
9.1 PEKERJAAN PASANG SANITAIR
9.2 PEK. TESTING COMISSIONING MEP 100%
9.3 CHECKLIST
9.4 PEK. ANTI RAYAP TAMAN (25%)
9.5 KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
10 TAHAP X
10.1 CLOSING UNIT
10.2 TARIK KUNCI (TERMASUK MATERIAL YG DIKEMBALIKAN + VO TAMBAH KU
10.3 SERAH TERIMA (KELENGKAPAN BAST)
URAIAN PEKERJAAN
TAHAP I
PEKERJAAN PERSIAPAN
PEK. GALIAN UNTUK PONDASI.
PEK. ANTI RAYAP UNTUK PONDASI
SISTEM SUSPENDED SLAB
PEK. COR PONDASI TAPAK + PEDESTAL KOLOM
PEK. PIPA HORISONTAL MEP LT.1 + SPARING PIPA MEP LT.1
PEK. COR TIE BEAM + SLAB ON GROUND
BUANG TANAH GALIAN PONDASI
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
SUB TOTAL
TAHAP II
PEK. KOLOM LT.1 (SISTEM FREE STANDING)
PEK. COR KANOPI LT.1
PEK. COR BALOK & PLAT LT.2, PEK. TANGGA LT.2 KE LT.1, SPARING ME LT.2 & PIPA TEGAK AH
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
SUB TOTAL
TAHAP III
PEK. KOLOM LT.2 (SISTEM FREE STANDING)
PEK. COR KANOPI LT.2
PEK. BATA PAGAR BELAKANG
PEK. PLESTERAN PAGAR BELAKANG (LUAR + DALAM)
PEK. PASANG SEPTIC TANK DAN GROUND TANK
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
SUB TOTAL
TAHAP IV
PEK. COR BALOK DAN DAK TALANG, SPARING MEP + TEST GENANG BETON
PEK. COR RING BALOK
PEK. INST.AIR BERSIH LT.2 + CONNECT PIPA TEGAK & HORISONTAL LT.1
PEK. PASANGAN BATA + PEK. RING BALOK SOPI-SOPI + PLESTER ACI LT. ATAP
PEK. RANGKA ATAP SYSTEM TRUSS / ZINKALUME & ALUMINIUM FOIL.
PEK. PASANG GENTENG, NOK & AKSESORIS + KARPUS 100% + INCLUDE BAN-BANAN
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
SUB TOTAL
TAHAP V
PEK. LISPLANK, RANGKA + PLAFOND OVERSTEK + TERMASUK CAT FINISH
PEK. BATA LT.1 & LT.2 (100%) + KOLOM PRAKTIS + PIPA TEGAK AH, VENT AK, AK, AB
PEK. CONNECT PIPA TEGAK & HORISONTAL LT.2 (100%) + INST.AIR BERSIH LT.1
PEK. CONDUIT LISTRIK, TELEPON LT.2 + LT.1 (100%)
PEK. INBOW DUS LT.2 & LT.1 (100%)
PEK. CORING DAN GROUTHING
PEK. WATERPROOFING KM/WC & BALKON + TEST GENANG (TERMASUK SCREED + KANOPI)
PEK. KERAMIK DINDING KM/WC LT.2 + LT.1 (100%)
PEK. PEMASANGAN PIPA AK & AB
PEK. CONNECT PIPA HORISONTAL KE PIPA TEGAK (AB & AK)
PEK. PENGETESAN MEP LT.2 + LT.1 (100%)
PEK. WATERPROOFING DAK TALANG + TES RENDAM TERMASUK SCREED
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
SUB TOTAL
TAHAP VI
PEK. PLESTER LT.2 + LT.1 (100%) + CEK SIKUAN
PEK. TATA UDARA (AC)
PEK. TAMPAK: OPENING KUSEN + SKONENGAN
PEK. COR BETON MEJA DAPUR + METERAN POMPA + PONDASI POMPA
PEK. OPENING KUSEN (100%)
PEK. ACIAN LT.2 + LT.1 (100%) + PAGAR LUAR DALAM
PEK. CAT DASAR DINDING INTERIOR (100%)
PEK. WIRING LISTRIK LT. 2 + 1 (100%)
PEK. RANGKA PLAFOND LT. 2 + LT.1 (100%)
PEK. TUTUP PLAFOND LT.2 & LT.1 + SHADOW LINE + EXPOSE CANOPY (PLAFOND KM/WC SETELAH
PEK. CAT DASAR DINDING EKSTERIOR (100%)
PEK. TEXTURE DINDING
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
SUB TOTAL
TAHAP VII
PEK. KERAMIK LANTAI UMUM, KM/WC LT.2 + BALKON
PEK. CAT DINDING EKSTERIOR ( LAPIS 1 & 2 )
PEK. KUSEN +PINTU ALUMINIUM (TERMASUK AKSESORIS) LT.2 + LT.1 (100%)
PEK. KRAWANGAN, BAK KONTROL + TEMPAT SAMPAH
PEK. KONSUIL PLN
PEK. CAT DINDING INTERIOR ( LAPIS 1 & 2 )
PEK. ATAP KECIL ALDERON (PVC + RANGKA HOLLOW)
PEK. KUSEN +PINTU KAYU (TERMASUK AKSESORIS) LT.2 + LT.1 (100%)
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
SUB TOTAL
TAHAP VIII
PEK. KERAMIK LANTAI UMUM, KM/WC LT.1 + TANGGA + DAPUR
PEK. FLEXITILE + WATER PROOFING
PEK. KERAMIK TERAS DAN CARPORT (100%)
PEK. RAILING TANGGA + RAILING BALKON
PEK. CAT FINISH DINDING INTERIOR, EKSTERIOR (100%) LAPIS 3
PEK. ARMATURE LT.2 DAN LT.1
PEK. AS BUILT DRAWING MEP (DENAH, TAMPAK & POTONGAN) + TERMASUK JILID & SOFTCOPY
PEK. GREASE TRAP, POMPA DAN EXHAUST FAN (MATERIAL UTAMA)
PEK. PAVING AREA TAMAN + STEPING STONE & RABAT BETON
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
SUB TOTAL
TAHAP IX
PEKERJAAN PASANG SANITAIR
PEK. TESTING COMISSIONING MEP 100%
CHECKLIST
PEK. ANTI RAYAP TAMAN (25%)
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI (VO TAMBAH KURANG)
SUB TOTAL
TAHAP X
CLOSING UNIT
TARIK KUNCI (TERMASUK MATERIAL YG DIKEMBALIKAN + VO TAMBAH KURANG + TES FINAL)
SERAH TERIMA (KELENGKAPAN BAST)
SUB TOTAL
DURAS
BOBOT % START FINISH
I
17.082
6.212 1 27/12/2021 02/01/22
0.158 3 27/12/2021 16/01/22
0.201 2 03/01/2022 16/01/22
-
4.144 3 03/01/2022 23/01/22
0.916 3 03/01/2022 23/01/22
5.470 3 30/01/22
0.275 3 31/01/2022 20/02/22
0.065 5 17/01/2021 20/02/21
17.082
12.095
3.329 2 17/01/2021 30/01/21
1.487 2 17/01/2022 30/01/22
7.214 3 24/01/2022 13/02/22
0.065 5 17/01/2021 20/02/21
12.095
7.068
1.681 3 07/02/2021 27/02/21
0.230 3 07/02/2021 27/02/21
1.332 3 31/01/2021 20/02/21
0.547 3 14/02/2021 06/03/21
3.212 4 07/02/2021 06/03/21
0.065 5 31/01/2021 06/03/21
7.068
9.249
2.233 3 14/02/2022 06/03/22
2.691 3 21/02/2021 13/03/21
0.292 3 28/02/2021 20/03/21
1.315 3 07/03/2022 27/03/22
1.221 3 14/03/2022 03/04/22
1.249 3 21/03/2022 10/04/22
0.248 5 07/03/2021 10/04/21
9.249
14.922
1.195 3 28/03/2022 17/04/22
9.859 5 28/02/2021 03/04/21
0.292 3 07/03/2022 27/03/22
0.323 3 14/03/2021 03/04/21
0.100 2 21/03/2021 03/04/21
0.046 2 07/03/2021 20/03/21
0.184 2 14/03/2021 27/03/21
1.117 4 21/03/2021 17/04/21
0.916 3 28/03/2022 17/04/22
0.458 2 04/04/2022 17/04/22
0.100 2 11/04/2022 24/04/22
0.266 3 28/03/2022 17/04/22
0.065 5 21/03/2021 24/04/21
14.922
15.159
3.511 5 14/03/2022 17/04/22
1.081 4 14/03/2022 10/04/22
0.497 4 21/03/2022 17/04/22
0.567 3 21/03/2022 10/04/22
2.123 3 28/03/2021 17/04/21
2.135 3 04/04/2022 24/04/22
0.299 4 04/04/2022 01/05/22
2.319 5 04/04/2022 08/05/22
0.779 2 11/04/2022 24/04/22
1.124 4 18/04/2022 15/05/22
0.099 3 09/05/2022 29/05/22
0.559 4 30/05/2022 26/06/22
0.065 5 23/05/2021 26/06/21
15.159
13.568
1.831 4 09/05/2022 05/06/22
0.312 3 09/05/2022 29/05/22
4.477 5 09/05/2022 12/06/22
1.859 3 09/05/2022 29/05/22
0.103 2 09/05/2022 22/05/22
1.081 3 23/05/2022 12/06/22
0.886 3 23/05/2022 12/06/22
2.952 4 30/05/2022 26/06/22
0.065 5 23/05/2021 26/06/21
13.568
11.204
3.164 4 16/05/2022 12/06/22
2.229 3 16/05/2022 05/06/22
1.361 4 06/06/2022 03/07/22
1.211 3 06/06/2022 26/06/22
0.759 4 20/06/2022 17/07/22
0.662 3 20/06/2022 10/07/22
0.579 2 27/06/2022 10/07/22
1.133 3 20/06/2022 10/07/22
0.043 3 20/06/2022 10/07/22
0.065 5 13/06/2021 17/07/21
11.204
3.880
3.398 4 27/06/2022 24/07/22
0.316 4 27/06/2022 24/07/22
0.076 5 04/07/2022 07/08/22
0.025 2 11/07/2021 24/07/21
0.066 6 27/06/2022 07/08/22
3.880
1.372
1.102 3 18/07/2022 07/08/22
0.076 4 18/07/2022 14/08/22
0.194 5 18/07/2022 21/08/22
1.372
NO.
I.
1
2
3
4
5
6
7
8
9
10
11
SUB TOTAL I
II.
1
2
3
4
5
6
SUB TOTAL II
III.
1
-
-
-
2
-
3
-
-
-
-
-
-
4
-
-
-
-
-
-
-
5
-
IV.
1
3
4
SUB TOTAL IV
V.
1
-
-
2
-
-
SUB TOTAL V
VI.
1
3
8
SUB TOTAL VI
VII.
1
-
2
-
-
-
-
-
-
-
-
-
-
-
-
3
-
VIII.
2
-
4
-
-
SUB TOTAL VIII
IX.
A.
1
-
-
-
-
-
2
-
-
-
-
-
3
-
-
-
B.
-
-
C.
-
-
SUB TOTAL IX
X.
1
2
3
4
5
6
7
8
9
10
11
12
13
15
16
17
18
21
26
SUB TOTAL X
XI.
1
-
-
-
-
-
-
-
2
-
-
3
-
-
-
-
4
-
-
5
-
-
SUB TOTAL XI
XII.
1
2
3
4
5
XIII.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
XIV.
1
PEK. PERSIAPAN
Pembersihan lokasi m²
Pekerjaan Bouwplank & Pengukuran m¹
Gudang & los kerja m²
Air kerja ls
Listrik kerja ls
Alat kerja ls
As built drawing ls
Paket MCK, Container office dan sampah ls
Mobilisasi & Demobilisasi ls
Keamanan ls
Buang puing + Pembersihan Akhir Pekerjaan ls
SUB TOTAL I
SUB TOTAL II
PEK. STRUKTUR
Beton K - 250
Pondasi Tapak m³
Balok m³
Pelat Lantai
S.1A, Lx=Ly, atau Ø8-200, t=120mm, 2 lapis m³
Tangga m³
Meja beton dapur m³
Beton K - 300
Kolom, Screening m³
Besi Beton
Pondasi
Pondasi Tapak kg
Kolom kg
Balok, Ring Balok & Sopi-sopi kg
Pelat Lantai
S.1A, Lx=Ly, atau Ø8-200, t=120mm, 2 lapis kg
Tangga kg
Meja beton dapur kg
Bekisting
Pondasi
Pondasi Tapak m²
Sloof m²
Kolom, Screening m²
Balok, Ring Balok & Sopi-sopi m²
Pelat Lantai
S.1A, Lx=Ly, atau Ø8-200, t=120mm, 2 lapis m²
Tangga m²
Meja beton dapur m²
PEK. DINDING
Pekerjaan pasangan bata merah, tebal 10cm, khusus area dinding façade depan, belakang
Lantai 1 m²
Lantai 2 m²
Lantai 3 m²
Pekerjaan plesteran dalam (Mortar Multi acian plester-301)
Lantai 1 m²
Lantai 2 m²
Lantai 3 m²
Pekerjaan plesteran luar (Mortar Multi acian plester-301)
Lantai 1 m²
Lantai 2 m²
Lantai 3 m²
Pekerjaan plester trasram (PS-199)
Lantai 1 m²
Lantai 2 m²
Pekerjaan acian dalam (Mortar Multi acian putih-303)
Lantai 1 m²
Lantai 2 m²
Lantai 3 m²
Pekerjaan acian luar (Mortar Multi acian putih-303)
Lantai 1 m²
Lantai 2 m²
Lantai 3 pasangan bata ringan, tebal 10 cm, khusus area pagar samping
Pekerjaan m²
dan belakang m²
plesteran m²
acian m²
SUB TOTAL IV
PEK. ATAP
Rangka Atap baja ringan
atap termasuk ex. Bluescope
flashing by Manunggal
dan accesories pendukung incl. alm foil
single side
Lisplank include
0.8x30, pemasangan
0.8x10 wood plankgenteng beton Flat
ex. Elephant Excellence
/ setara, compound m²
sambungan sika construction ex. Sika m¹
Penutup Atap
Nok genteng Genteng
+papan ruiter + cat genteng Beton Flat Excellence Ex.
Cisangkan/Cengkareng Permai m¹
Nok ujung Flat Excellence Ex. Cisangkan/Cengkareng Permai bh
SUB TOTAL V
PEK. PLAFOND
Plaf. Gypsum 9 mm + rgk. Hollow profil galvanis 2x4; 4x4; t=0.35mm, rangka 120x60cm penguat per 3m e
Lantai 1 m²
Lantai 2 m²
Lantai 3 m²
Plaf. Gypsum 9mm water resistant + rgk. Hollow profil galvanis 2x4; 4x4; t=0.35mm full, rangka 120x60cm
Lantai 1 m²
Lantai 2 m²
Lantai 3 m²
List profil gypsum 6x6 cm Fin. Cat m¹
Manhole Plafond Uk. 600x600 bh
SUB TOTAL VI
PEK. SANITARI
KAMAR MANDI
Toilet R. Tidur Utama
Monoblock CW635PJ/SW635JP1 (P-Trap) ex. TOTO set
Washtafel LW242J/LW239FJ ex.TOTO set
Shower TX492SUN ex. TOTO set
Floor drain
Cermin 6mmTX-1AN ex. TOTO
beuvel 20mm, rangka holow 60.80 finish cat type sisi luar, bh
multiplek 6mm fin duco cat putih bh
Toilet / WC Anak
Monoblock CW631PJ/SW631JP ex. TOTO set
Washtafel LW951CJ ex. TOTO set
Shower TX492SUN ex. TOTO set
Floor
Cermindrain
6mmTX-1AN ex. TOTO
beuvel 20mm, rangka holow 60.80 finish cat type sisi luar, bh
multiplek 6mm fin duco cat putih bh
Toilet Servis
Monoblock CW 630J + Eco Washer ex. TOTO set
Kran air T26-13 ex. TOTO (area service + taman +carport) set
Floor drain TX-1AN ex. TOTO bh
MEJA DAPUR
Kitchen Zink Type 80PK Ex. Benston bh
Kran TX 603 KCS ex. TOTO bh
EXTERIOR
Floor drain TX-1AN ex. TOTO bh
Kran air T26-13 ex. TOTO (area service + taman +carport) bh
SUB TOTAL IX
SUB TOTAL X
SUB TOTAL XI
PEK. PENGECATAN
Cat Exterior Jotashield Antifade Colours Ex. Jotun m²
Cat InteriorEssence Easy Wipe Ex. Jotun m²
Cat Plafond Jotaplast Morning Fog Ex. Jotun m²
Dulux Pentalite Cat Plafon White Supermatt 108 m²
Cat listplank l=30 cm Weathercoat ex. MOWILEX m²
PEK. LAIN-LAIN
Tangga Baja + Pijakan, include finish cat ls
Railing tangga Plat strip 4×4mm (kupingan kaca), Tempered 8mm m¹
Railing
Bak balkon
meter belakang
air pam beton h= 90cm,
precast ex.Tempered 8mm + tutup metal +
Karya Dinamika m¹
finishing cat unit
Anti rayap Fiberglass
Septictank ex. Maskitani
Type BM 8 HD ex. Mitra + struktur & material m²
penunjang termasuk CO
Sumur Resapan beton berpori smart well type WELL-1000 2 hole XLD unit
(Full set) ex. Dusaspun unit
Bak kontrol 50x50 cm dgn besi siku + tutup beton keliling besi siku unit
Pintu Kwh plat besi unit
box No
Roof Rumah
Tank 0.75m3 fiber glass ex. Mitra termasuk dudukan rangka baja dan unit
katup pelampung air V41, Ex. San Ei unit
Dudukan pompa bh
Carport finish ls
Tangga Bata finish keramik m3
PEK. TAMPAK
Kisi - Kisi Conwood include rangka m²
Rp58,971,208.28
Rp6,156,772.81
Rp354,736,205.54
e depan, belakang
124.84 Rp115,321.65 Rp14,396,755.10
97.84 Rp115,321.65 Rp11,283,012.82
68.58 Rp115,321.65 Rp7,908,926.15
Rp91,445.84 Rp0.00
Rp91,445.84 Rp0.00
Rp167,459,535.44
Rp24,168,105.41
ncl. kunci, kaca, handle, engsel, casement, rambuncis + cat + pasang) ex. Dekkson/setara Fin. Duco PU
1 Rp3,851,000 Rp3,851,000
gkap (incl. Kunci, kaca, engsel + pasang) ex. Dekkson / setara
1 Rp2,417,900 Rp2,417,900
7 Rp3,851,000 Rp26,957,000
1 Rp4,542,900 Rp4,542,900
1 Rp3,910,500 Rp3,910,500
1 Rp3,910,500 Rp3,910,500
1 Rp983,100 Rp983,100
3 Rp3,910,500 Rp11,731,500
1 Rp525,000 Rp525,000
1 Rp1,612,500 Rp1,612,500
1 Rp4,542,900 Rp4,542,900
1 Rp3,042,600 Rp3,042,600
1 Rp1,612,500 Rp1,612,500
3 Rp750,000 Rp2,250,000.00
Rp71,889,900
Rp46,911,098.71
1 Rp10,192,908.00 Rp10,192,908.00
1 Rp3,792,426.00 Rp3,792,426.00
1 Rp6,307,686.00 Rp6,307,686.00
1 Rp642,246.00 Rp642,246.00
1 Rp893,772.00 Rp893,772.00
1 Rp7,106,220.00 Rp7,106,220.00
1 Rp2,730,156.00 Rp2,730,156.00
1 Rp6,307,686.00 Rp6,307,686.00
1 Rp642,246.00 Rp642,246.00
1 Rp893,772.00 Rp893,772.00
1 Rp9,606,828.00 Rp9,606,828.00
1 Rp1,217,337.00 Rp1,217,337.00
1 Rp642,246.00 Rp642,246.00
1 Rp5,347,063.03 Rp5,347,063.03
1 Rp3,306,468.00 Rp3,306,468.00
1 Rp642,246.00 Rp642,246.00
3 Rp763,125.00 Rp2,289,375.00
Rp62,560,681.03
1 Rp480,198.54 Rp480,198.54
1 Rp391,941.00 Rp391,941.00
1 Rp391,941.00 Rp391,941.00
33 Rp37,806.24 Rp1,247,605.86
33 Rp210,628.61 Rp6,950,743.97
3 Rp263,980.20 Rp791,940.60
13 Rp31,379.70 Rp407,936.10
13 Rp40,804.60 Rp530,459.79
10 Rp41,940.13 Rp419,401.29
1 Rp59,090.30 Rp59,090.30
4 Rp41,940.13 Rp167,760.52
4 Rp155,305.10 Rp621,220.38
1 Rp69,835.10 Rp69,835.10
4 Rp600,000 Rp2,400,000
33 Rp44,315.39 Rp1,462,407.84
10 Rp303,828.76 Rp3,038,287.56
6 Rp44,315.39 Rp265,892.33
5 Rp1,000,000 Rp5,000,000
1 Rp500,000 Rp500,000
Rp25,196,662.17
Rp29,190,044.90
676.48 Rp28,890.90 Rp19,544,244.63
329.97 Rp29,342.48 Rp9,682,076.84
123.64 Rp31,526.69 Rp3,897,846.41
22.44 Rp56,851.18 Rp1,275,716.21
9.36 Rp33,135.91 Rp310,019.53
Rp34,709,903.62
1 Rp13,500,000 Rp13,500,000
5.33 Rp1,300,000 Rp6,922,500
2.08 Rp1,300,000 Rp2,697,500
1 Rp500,000 Rp500,000
54.43 Rp35,000 Rp1,905,104
1 Rp4,273,500 Rp4,273,500
1 Rp1,995,114 Rp1,995,114
2 Rp650,000 Rp1,300,000
1 Rp450,000 Rp450,000
1 Rp250,000 Rp250,000
1 Rp1,550,000 Rp1,550,000
1 Rp150,000 Rp150,000
1 Rp1,500,000 Rp1,500,000
0.306 Rp3,750,000 Rp1,147,500
Rp24,641,218
Rp1,301,984
Bobot (%)
0.06
0.204
1.365
0.129
0.129
0.145
0.096
0.482
0.72
2.572
0.309
6.212
0.158
0.008
0.429
0.026
0.016
0.011
0.649
1.655
2.327
1.974
0.157
0.061
1.639
2.364
3.848
4.365
0
1.207
0.074
0.025
0.125
2.999
2.67
7.705
3.651
0.095
0.032
0.367
0.025
37.365
1.516
1.188
0.833
2.176
0.777
0.779
2.472
0.975
0.849
0
0
0
0.734
0.262
0.263
0.636
0.251
0.219
1.254
1.952
0.502
17.639
2.132
0.208
0
0.107
0.098
2.546
1.173
0.572
0.993
0.086
0.254
0.199
0.956
0.137
4.37
0.255
2.839
0.479
0.412
0.412
0.104
1.236
0.055
0.17
0.479
0.32
0.17
0.237
7.572
1.214
0.155
1.112
0.382
0.086
0.77
0.067
0.667
0.056
0.432
4.941
1.074
0.399
0.664
0.068
0.094
0.749
0.288
0.664
0.068
0.094
1.012
0.128
0.068
0.563
0.348
0.068
0.241
6.59
0.051
0.041
0.041
0.131
0.732
0.083
0.043
0.056
0.044
0.006
0.018
0.065
0.007
0.253
0.154
0.32
0.028
0.527
0.053
2.654
0.366
0.464
0.066
0.018
0.067
0.037
0.186
0.094
0.225
0.038
0.068
0.201
0.616
0.075
0.274
0.173
0.107
3.075
2.059
1.02
0.411
0.134
0.033
3.656
1.422
0.729
0.284
0.053
0.201
0.45
0.21
0.137
0.047
0.026
0.163
0.016
0.158
0.121
2.596
0.137
0.137
100
TIMES SCHEDULLE
Proyek : Rumah Tinggal Tipe 222
Lokasi : Bekasi
Waktu Pelaksanaan : 15 Januari 2024 - 21 Oktober 2024
Kontraktor : AA JUNET MANDIRI
Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24
NO. URAIAN PEKERJAAN % DUR 15-Jan 22-Jan 29-Jan 5-Feb 12-Feb 19-Feb 26-Feb 4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr 22-Apr 29-Apr 6-May 13-May 20-May 27-May 3-Jun 10-Jun 17-Jun 24-Jun 1-Jul 8-Jul 15-Jul 22-Jul 29-Jul 5-Aug 12-Aug 19-Aug 26-Aug 2-Sep 9-Sep 15-Sep 22-Sep 29-Sep 6-Oct 13-Oct 20-Oct KET
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
I Pekerjaan persiapan 6.21 0.00 38 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16
III Pekerjaan struktur 37.37 0.00 16 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34 2.34
IV Pekerjaan Dinding 17.64 0.00 15 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18 1.18
12
LEBARA 0.55 0.55 0.55 0.55 0.55 0.55 0.55 0.55
0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63 0.63
VIII Pekerjaan keramik lantai & dinding 4.94 0.00 8 N 0.62 0.62 0.62 0.62 0.62 0.62 0.62 0.62
X Pekerjaan Instalasi Listrik 2.65 0.00 12 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
XI Pekerjaan Instalasi Pipa & Mekanikal 3.08 0.00 20 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15 0.15
Pekerjaan Pengecatan 3.66
XII 0.00 12 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
Pekerjaan Lain-lain 2.60
XIII 0.00 12 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
Pekerjaan Tampak 0.14
XIV 0.00 1 0.14
JUMLAH 100.00
RENCANA PER MINGGU 0.49 2.98 2.65 2.65 2.65 2.65 2.65 2.87 2.87 2.65 2.65 0.00 0.00 0.00 3.83 3.83 3.83 3.83 3.83 3.83 2.77 2.77 2.04 2.04 1.89 2.32 2.32 2.32 2.32 2.62 1.94 2.15 2.15 2.15 2.15 1.94 1.94 1.32 1.32 4.39 4.39
KUMULATIF RENCANA MINGGUAN 0 0.49 3.47 6.12 8.77 11.42 14.08 16.73 19.60 22.47 25.12 27.77 27.77 27.77 27.77 31.60 35.43 39.26 43.08 46.91 50.74 53.51 56.27 58.31 60.35 62.24 64.56 66.88 69.21 71.53 74.15 76.09 78.24 80.40 82.55 84.71 86.64 88.58 89.90 91.21 95.61 100.00
SELISIH +/-
LOGO PERUSAHAAN
KONTRAKTOR
PROYEK
: AA JUNET MANDIRI
: KOLABORASI
TIME SCHEDULE PROJECT COLLABORATION
PEKERJAAN : SIPIL, ARSITEKTUR, MEP
SCHEDULE : 02 DESEMBER 2023 S/D 05 OKTOBER 2024 3.741
Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24
URAIANPEKERJAAN BOBOT % DURASI 2-Dec 9-Dec 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan 20-Jan 27-Jan 3-Feb 10-Feb 17-Feb 24-Feb 2-Mar 9-Mar 16-Mar 23-Mar 30-Mar 6-Apr 13-Apr 20-Apr 27-Apr 4-May 11-May 18-May 25-May 1-Jun 8-Jun 15-Jun 22-Jun 29-Jun 6-Jul 13-Jul 20-Jul 27-Jul 3-Aug 10-Aug 17-Aug 24-Aug 31-Aug 7-Sep 14-Sep 21-Sep 28-Sep 5-Oct
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
TAHAP I
PEKERJAAN PERSIAPAN 5.541 4 0.800 1.000 1.871 1.871
PEK. GALIAN UNTUK PONDASI. 0.67 3 0.223 0.223 0.223
PEK. ANTI RAYAP UNTUK PONDASI 0.205 1 0.205
PEK. COR PONDASI TAPAK + PEDESTAL KOLOM 4.164 2 2.082 2.082
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI 0.035 5 0.007 0.007 0.007 0.007 0.007
SUB TOTAL 10.615
TAHAP II
PEK. COR TIE BEAM + SUSPENDED SLAB 5.567 2 2.784 2.784
PEK. PIPA HORISONTAL MEP LT.1 + SPARING PIPA MEP LT.1 0.484 2 0.242 0.242
PEK. KOLOM LT.1 (SISTEM FREE STANDING) 1.452 2 0.726 0.726
PEK. COR BALOK & PLAT LT.MEZZANINE 1 1.818 2 0.909 0.909
PEK. KOLOM LT.MEZZANINE 1 (SISTEM FREE STANDING) 1.613 2 0.807 0.807
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI 0.035 6 0.006 0.006 0.006 0.006 0.006 0.006
SUB TOTAL 10.969
TAHAP III
PEK. COR BALOK & PLAT LT.2, PEK. TANGGA LT.2 KE LT.mezzanine 1, SPARING ME LT.2 & PIPA TEGAK AH 4.334 3 1.445 1.445 1.445
PEK. KOLOM LT.2 (SISTEM FREE STANDING) 1.263 2 0.632 0.632
PEK. COR BALOK & PLAT LT.MEZZANINE 2 2.931 3 0.977 0.977 0.977
PEK. TANGGA BAJA LT.2 KE LT.MEZZANINE 2 1.45 2 0.725 0.725
PEK. KOLOM LT.MEZZANINE 2 (SISTEM FREE STANDING) 0.95 2 0.475 0.475
PEK. PASANG SEPTIC TANK DAN GROUND TANK 0.673 4 0.168 0.168 0.168 0.168
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI 0.035 7 0.005 0.005 0.005 0.005 0.005 0.005 0.005
SUB TOTAL 11.636
TAHAP IV
PEK. COR BALOK & PLAT LT.3, PEK. TANGGA LT.3 KE LT.mezzanine 2, SPARING ME LT.3 & PIPA TEGAK AH 5.189 4 1.297 1.297 1.297 1.297
PEK. COR BALOK & PLAT LT.ATTIC, PEK. TANGGA LT.ATTIC KE LT.3 2.585 3 0.862 0.862 0.862
PEK. KOLOM LT.3 (SISTEM FREE STANDING) 0.636 2 0.318 0.318
PEK. KOLOM LT.ATTIC (SISTEM FREE STANDING) 0.494 2 0.247 0.247
PEK. COR BALOK DAN DAK ATAP + TEST GENANG BETON + RING BALOK 0.512 2 0.256 0.256
PEK. KOLOM LT.ATAP (SISTEM FREE STANDING) 0.274 1 0.274
PEK. INST.AIR BERSIH LT.3, LT.2 + CONNECT PIPA TEGAK & HORISONTAL LT.1 0.374 3 0.125 0.125 0.125
PEK. RANGKA ATAP SYSTEM TRUSS & ALUMINIUM FOIL + PASANG GENTENG, NOK & AKSESORIS + INCLUDE BAN BANAN 2.384 3 0.795 0.795 0.795
LIB
PEK. LISPLANK, RANGKA + PLAFOND OVERSTEK + TERMASUK CAT FINISH 0.246 1 0.246
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI 0.035 10 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
SUB TOTAL 12.729
TAHAP V
PEK. BATA PAGAR BELAKANG + SAMPING 1.279 3 0.426 0.426 0.426
UR
PEK. PLESTERAN PAGAR BELAKANG + SAMPING (LUAR + DALAM) 1.991 3 0.664 0.664 0.664
PEK. BATA LT.1, LT.2 & LT.3 (100%) + KOLOM PRAKTIS + PIPA TEGAK AH, VENT AK, AK, AB 3.608 3 1.203 1.203 1.203
PEK. CONNECT PIPA TEGAK & HORISONTAL LT.3, LT.2 (100%) + INST.AIR BERSIH LT.1 0.665 3 0.222 0.222 0.222
PEK. CONDUIT LISTRIK, TELEPON LT.2 + LT.1 (100%) 0.586 2 0.293 0.293
PEK. WATERPROOFING KM/WC & DAK TALANG + TEST GENANG (TERMASUK SCREED) 0.400 4 0.100 0.100 0.100 0.100
LE
PEK. KERAMIK DINDING KM/WC LT.2 + LT.1 (100%) 1.907 3 0.636 0.636 0.636
PEK.INSTALASI ROOF TANK 0.199 1 0.199
PEK. TATA UDARA (AC) 0.313 4 0.078 0.078 0.078 0.078
PEK. FINISH TANGGA BATA 0.123 1 0.123
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI 0.035 8 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
BA
SUB TOTAL 11.106
TAHAP VI
PEK. PLESTER LT.3, LT.2 + LT.1 (100%) + CEK SIKUAN 8.188 3 2.729 2.729 2.729
PEK. TAMPAK: KISI KISI FASAD FINISH 0.299 1 0.299
PEK. COR BETON MEJA DAPUR + PONDASI POMPA 0.133 1 0.133
RA
PEK. ACIAN LT.3, LT.2 + LT.1 (100%) + PAGAR LUAR DALAM 2.923 3 0.974 0.974 0.974
PEK. OPENING KUSEN (100%) 0.93 3 0.310 0.310 0.310
PEK. CAT DASAR DINDING INTERIOR (100%) 0.26 1 0.260
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI 0.035 7 0.005 0.005 0.005 0.005 0.005 0.005 0.005
SUB TOTAL 12.768
N
TAHAP VII
PEK. WIRING LISTRIK LT. 3 + 2 + 1 (100%) 1.423 5 0.285 0.285 0.285 0.285 0.285
PEK. RANGKA PLAFOND LT. 3, LT.2 & LT.1 (100%) 2.159 3 0.720 0.720 0.720
PEK. TUTUP PLAFOND LT.3, LT.2 & LT.1 + SHADOW LINE (PLAFOND KM/WC SETELAH TEST RENDAM) 2.715 3 0.905 0.905 0.905
PEK. CAT DASAR DINDING EKSTERIOR (100%) 0.525 1 0.525
PEK. VYNIL LT.3 & LT.2 + BALKON + KERAMIK LANTAI KM 1.679 2 0.840 0.840
PEK. CAT DINDING EKSTERIOR ( LAPIS 1 & 2 ) 0.525 2 0.263 0.263
PEK. BAK KONTROL 0.14 1 0.140
PEK. KONSUIL PLN 0.038 1 0.038
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI 0.035 6 0.006 0.006 0.006 0.006 0.006 0.006
SUB TOTAL 9.239
TAHAP VIII
PEK. KUSEN +PINTU ALUMINIUM (TERMASUK AKSESORIS) LT.3, LT.2 + LT.1 (100%) 7.309 5 1.462 1.462 1.462 1.462 1.462
PEK. CAT DINDING INTERIOR ( LAPIS 1 & 2 ) 0.26 1 0.260
PEK. KUSEN +PINTU KAYU (TERMASUK AKSESORIS) LT.2 + LT.1 (100%) 0.414 1 0.414
PEK. KERAMIK LANTAI UMUM, TERAS + TANGGA + DAPUR 1.397 4 0.349 0.349 0.349 0.349
PEK. RAILING TANGGA + RAILING BALKON 1.033 1 1.033
PEK. CAT FINISH DINDING INTERIOR, EKSTERIOR (100%) LAPIS 3 0.52 2 0.260 0.260
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI 0.035 6 0.006 0.006 0.006 0.006 0.006 0.006
SUB TOTAL 10.968
TAHAP IX
PEK. AS BUILT DRAWING MEP (DENAH, TAMPAK & POTONGAN) + TERMASUK JILID & SOFTCOPY 0.098 2 0.049 0.049
PEK. INSTALASI POMPA DAN EXHAUST FAN 0.448 2 0.224 0.224
PEK. FINISH CARPORT 0.161 1 0.161
PEK. BAK METERAN AIR PAM, TUTUP KWH, BOX RUMAH 0.128 1 0.128
PEK. MANHOLE PLAFOND 0.140 1 0.140
PEK. INSTALASI REFRIGENT AC 0.628 3 0.209 0.209 0.209
PEKERJAAN PASANG SANITAIR 6.721 4 1.680 1.680 1.680 1.680
PEK. TESTING COMISSIONING MEP 100% 0.054 1 0.054
CHECKLIST 0.161 3 0.054 0.054 0.054
KEBERSIHAN, DOKUMENTASI DAN ADMINISTRASI 0.035 9 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004 0.004
SUB TOTAL 8.574
TAHAP X
CHECKLIST DAN SERAH TERIMA 1.074 3 0.358 0.358 0.358
SUB TOTAL 1.074
99.678 TOTAL 0.807 1.230 2.101 7.419 5.851 1.646 3.171 3.407 5.258 4.283 1.949 2.605 1.308 1.967 1.237 2.722 1.644 2.011 0.000 0.000 0.000 2.066 2.374 4.870 2.734 2.734 1.289 1.580 2.858 1.535 3.645 3.765 3.745 2.305 2.305 2.436 2.161 1.893 1.684 1.792 0.107 0.465 0.358 0.358 0.000
0.807
KUMULATIF RENCANA 2.037 4.138 11.557 17.409 19.054 22.225 25.633 30.891 35.173 37.122 39.727 41.035 43.003 44.240 46.962 48.607 50.618 50.618 50.618 50.618 52.684 55.057 59.927 62.662 65.396 66.685 68.265 71.124 72.659 76.304 80.069 83.814 86.119 88.424 90.860 93.021 94.915 96.599 98.391 98.497 98.962 99.320 99.678 99.678
REALISASI
REALISASI KUMULATIF
DEVIASI